BWX Technologies, Inc. - Annual Report: 2013 (Form 10-K)
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
x | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the fiscal year ended December 31, 2013
OR
¨ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission File Number 001-34658
THE BABCOCK & WILCOX COMPANY
(Exact name of registrant as specified in its charter)
DELAWARE | 80-0558025 | |
(State or Other Jurisdiction of Incorporation or Organization) |
(I.R.S. Employer Identification No.) | |
THE HARRIS BUILDING 13024 BALLANTYNE CORPORATE PLACE SUITE 700 CHARLOTTE, NORTH CAROLINA |
28277 | |
(Address of Principal Executive Offices) | (Zip Code) |
Registrants Telephone Number, Including Area Code: (704) 625-4900
Securities Registered Pursuant to Section 12(b) of the Act:
Title of each class |
Name of each Exchange on which registered | |
Common Stock, $0.01 par value | New York Stock Exchange |
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes þ No ¨
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act. Yes ¨ No þ
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes þ No ¨
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes þ No ¨
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein and will not be contained, to the best of registrants knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See definition of large accelerated filer, accelerated filer and smaller reporting company in Rule 12b-2 of the Exchange Act. (Check one):
Large accelerated filer | þ | Accelerated filer | ¨ | |||
Non-accelerated filer | ¨ | Smaller reporting company | ¨ |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No þ
The aggregate market value of the registrants common stock held by nonaffiliates of the registrant on the last business day of the registrants most recently completed second fiscal quarter (based on the closing sales price on the New York Stock Exchange on June 28, 2013) was approximately $3.4 billion.
The number of shares of the registrants common stock outstanding at January 31, 2014 was 110,413,084.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the registrants proxy statement for the 2014 Annual Meeting of Stockholders are incorporated by reference into Part III of this Form 10-K.
THE BABCOCK & WILCOX COMPANY
PAGE | ||||||
PART I | ||||||
Item 1. |
||||||
1 | ||||||
1 | ||||||
4 | ||||||
5 | ||||||
6 | ||||||
7 | ||||||
8 | ||||||
10 | ||||||
11 | ||||||
11 | ||||||
11 | ||||||
11 | ||||||
12 | ||||||
12 | ||||||
14 | ||||||
16 | ||||||
18 | ||||||
Item 1A. |
18 | |||||
Item 1B. |
35 | |||||
Item 2. |
36 | |||||
Item 3. |
37 | |||||
Item 4. |
37 | |||||
P A R T I I | ||||||
Item 5. |
38 | |||||
Item 6. |
41 | |||||
Item 7. |
Managements Discussion and Analysis of Financial Condition and Results of Operations |
42 | ||||
42 | ||||||
44 | ||||||
Year Ended December 31, 2013 Compared to Year Ended December 31, 2012 |
48 | |||||
Year Ended December 31, 2012 Compared to Year Ended December 31, 2011 |
51 | |||||
54 | ||||||
54 | ||||||
55 | ||||||
Item 7A. |
58 | |||||
Item 8. |
59 | |||||
60 | ||||||
Consolidated Balance Sheets December 31, 2013 and December 31, 2012 |
61 | |||||
Consolidated Statements of Income for the Years Ended December 31, 2013, 2012 and 2011 |
63 |
i
Consolidated Statements of Comprehensive Income for the Years Ended December 31, 2013, 2012 and 2011 |
64 | |||||
Consolidated Statement of Stockholders Equity for the Years Ended December 31, 2013, 2012 and 2011 |
65 | |||||
Consolidated Statements of Cash Flows for the Years Ended December 31, 2013, 2012 and 2011 |
66 | |||||
67 | ||||||
Item 9. |
Changes In and Disagreements With Accountants on Accounting and Financial Disclosure |
115 | ||||
Item 9A. |
115 | |||||
115 | ||||||
Managements Report on Internal Control Over Financial Reporting |
115 | |||||
116 | ||||||
116 | ||||||
Item 9B. |
117 | |||||
PART III | ||||||
Item 10. |
118 | |||||
Item 11. |
118 | |||||
Item 12. |
Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters |
118 | ||||
Item 13. |
Certain Relationships and Related Transactions, and Director Independence |
118 | ||||
Item 14. |
118 | |||||
PART IV | ||||||
Item 15. |
119 | |||||
124 |
ii
Statements we make in this Annual Report on Form 10-K, which express a belief, expectation or intention, as well as those that are not historical fact, are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are subject to various risks, uncertainties and assumptions, including those to which we refer under the headings Cautionary Statement Concerning Forward-Looking Statements and Risk Factors in Items 1 and 1A of Part I of this report. In this annual report on Form 10-K, unless the context otherwise indicates, we, us and our mean The Babcock & Wilcox Company (B&W) and its consolidated subsidiaries.
PART I
Item 1. | BUSINESS |
B&W is a leading technology innovator in power generation systems, a specialty constructor of nuclear components and a premier service provider, with an operating history of more than 145 years. We provide a variety of products and services to customers in the power and other steam-using industries, including electric utilities and other power generators, industrial customers in various other industries, and the United States Government. While we provide a wide range of products and services, our business segments are heavily focused on major projects. At any given time, a relatively small number of projects can represent a significant part of our operations.
We are a successor to a business founded in 1867, which was acquired by McDermott International, Inc. (MII) in 1978. In July 2010, MII spun-off the businesses that comprised its then power generation systems and government operations segments into B&W, a separate independent public company that was incorporated in Delaware, through the distribution of shares of B&W common stock to holders of MII common stock. B&Ws common stock is listed on the New York Stock Exchange under the trading symbol BWC.
We operate in five business segments: Power Generation, Nuclear Operations, Technical Services, Nuclear Energy and mPower. Prior to 2013, we reported four segments: Power Generation, Nuclear Operations, Technical Services and Nuclear Energy. Our small modular nuclear reactor business previously included in our Nuclear Energy segment is now being reported as a separate segment, mPower. We revised historical amounts to conform to our current presentation. The change in our reportable segments had no impact on our previously reported consolidated results of operations, financial condition or cash flows. For financial information regarding each of our segments, financial information regarding geographic areas and additional information regarding the change to our segments, see Note 17 to our consolidated financial statements included in this report. In general, we operate in capital-intensive industries and rely on large contracts for a substantial amount of our revenues.
Power Generation
Through this segment, we supply boilers fired with fossil fuels, such as coal, oil and natural gas, or renewable fuels such as biomass, municipal solid waste and concentrated solar energy. In addition, we supply environmental equipment and components and related services to customers in different regions around the world. We design, engineer, manufacture, supply, construct and service large utility and industrial power generation systems, including boilers used to generate steam in electric power plants, pulp and paper making, chemical and process applications and other industrial uses.
This segment specializes in engineering, manufacturing, procurement, and erection of equipment used in the power generation industry and various other industries, and the provision of related services, including:
| engineered-to-order services, products and systems for energy conversion worldwide and related auxiliary equipment, such as burners, pulverizers, soot blowers and ash handling systems; |
| heavy-pressure equipment for energy conversion, such as boilers fueled by coal, oil, bitumen, natural gas, municipal solid waste, biomass and other fuels; |
1
| environmental control systems, including both wet and dry scrubbers for flue gas desulfurization, modules for selective catalytic reduction of the oxides of nitrogen, equipment to capture particulate matter, such as fabric filter baghouses and wet and dry electrostatic precipitators, and similar devices; and |
| heavy mechanical erection services related to power plant equipment. |
We support primarily fossil fuel operating plants with a wide variety of additional services, including the installation of new systems and replacement parts, engineering services, construction, inspection, maintenance and field technical services, such as condition assessments and inventory services. We offer a wide range of construction services, including erection of utility and industrial boiler plants and installations of cogeneration facilities and pollution control equipment, such as selective catalytic reduction systems and flue gas desulfurization scrubbers.
We also provide power through cogeneration, refuse-fueled power plants and other independent power-producing facilities. In this market, we own and operate proprietary facilities, supply equipment and serve as contractors for engineer-procure-construct services and operations and maintenance.
Our Power Generation segments overall activity depends mainly on the capital expenditures of electric power generating companies and other steam-using industries. Several factors influence these expenditures, including:
| prices for electricity, along with the cost of production and distribution; |
| prices for coal and natural gas and other sources used to produce electricity; |
| demand for electricity, paper and other end products of steam-generating facilities; |
| availability of other sources of electricity, paper or other end products; |
| requirements for environmental improvements; |
| impact of potential regional, state, national and/or global requirements to significantly limit or reduce greenhouse gas emissions in the future; |
| level of capacity utilization at operating power plants, paper mills and other steam-using facilities; |
| requirements for maintenance and upkeep at operating power plants and paper mills to comply with environmental regulations and combat the accumulated effects of wear and tear; |
| ability of electric power generating companies and other steam users to raise capital; and |
| relative prices of fuels used in boilers, compared to prices for fuels used in gas turbines and other alternative forms of generation. |
Customer demand in the Power Generation segment is heavily affected by the variations in our customers business cycles and by the overall economies of the countries in which they operate.
For further details regarding our Power Generation segments facilities, see Item 2, Properties.
Nuclear Operations
Through this segment, we engineer, design and manufacture precision naval nuclear components and reactors for the U.S. Department of Energy (DOE)/National Nuclear Security Administrations (NNSA) Naval Nuclear Propulsion Program.
Our Nuclear Operations segment specializes in the design and manufacture of close-tolerance and high-quality equipment for nuclear applications. In addition, we are a leading manufacturer of critical nuclear components, fuels and assemblies for government and limited other uses. We have supplied nuclear components for DOE programs since the 1950s, and we are the largest domestic supplier of research reactor fuel elements for colleges, universities and national laboratories. We also convert or downblend high-enriched uranium into low-enriched fuel for use in commercial reactors to generate electricity. In addition, we have over 100 years of experience in supplying components for defense applications.
We work closely with the DOE-supported nuclear non-proliferation program. Currently, this program is assisting in the development of a high-density, low-enriched uranium fuel required for high-enriched uranium test reactor conversions. We have also been a leader in the receipt, storage, characterization, dissolution, recovery and purification of a variety of uranium-bearing materials. All phases of uranium downblending and uranium recovery are performed at our Lynchburg, Virginia and Erwin, Tennessee sites.
2
The demand for nuclear components by the U.S. Government determines a substantial portion of this segments backlog. We expect that orders for nuclear components will continue to be a significant part of backlog for the foreseeable future; however, such orders may be subject to Department of Defense budget constraints.
For further details regarding our Nuclear Operations segments facilities, see Item 2, Properties.
Technical Services
Through this segment, we provide various services to the U.S. Government, including uranium processing, environmental site restoration services and management and operating services for various U.S. Government-owned facilities. These services are provided to the DOE, including the NNSA, the Office of Nuclear Energy and the Office of Science; the Department of Defense and the Office of Environmental Management.
This segments principal operations include:
| managing and operating nuclear weapons production facilities; |
| managing and operating environmental management sites; |
| managing spent nuclear fuel and transuranic waste for the DOE; and |
| providing critical skills and resources for DOE sites. |
Our Technical Services segments overall activity primarily depends on authorized spending levels of the DOE, the NNSA, the Office of Nuclear Energy, the Office of Science, the Department of Defense and the Office of Environmental Management.
We manage and operate complex, high-consequence nuclear and national security operations for the DOE and the NNSA, primarily through our joint ventures, as further discussed under the caption Joint Ventures below.
Nuclear Energy
Through this segment, we supply commercial nuclear steam generators and components to nuclear utility customers. In addition, this segment offers a full spectrum of services for steam generators and balance of plant equipment, as well as nondestructive examination and tooling/repair solutions for other plant systems and components. Our Nuclear Energy segment fabricates pressure vessels, reactors, steam generators, heat exchangers and other auxiliary equipment. This segment also provides specialized engineering and maintenance services and power plant construction.
This segment specializes in performing full scope, prototype design work coupled with manufacturing integration. The design, engineering and other capabilities of this segment include:
| steam separation equipment design and development; |
| thermal-hydraulic design of reactor plant components; |
| structural component design for precision manufacturing; |
| materials expertise in high-strength, low-alloy steels and nickel-based materials; |
| material procurement of tubing, forgings and weld wire; and |
| metallographic and chemical analysis. |
Our Nuclear Energy segments overall activity primarily depends on the demand and competitiveness of nuclear energy. A significant portion of our Nuclear Energy segments operations is generated from the Canadian nuclear energy market. The activity of this segment depends on capital expenditures and maintenance spending of nuclear utilities; specifically Canadian utilities, which could vary annually based on planned outages and capital projects.
3
mPower
This segment is actively developing the B&W mPowerTM reactor and the associated mPower Plant through its majority-owned joint venture, Generation mPower LLC (GmP). Its activity is a function of research and development efforts for the B&W mPower reactor and the potential orders to be generated from various mPower deployment initiatives. As part of this initiative, we have been selected to receive funding and have signed a Cooperative Agreement with the DOE under its Small Modular Reactor Licensing Technical Support Program (the Funding Program), which is expected to provide financial assistance initially totaling at least $150 million for small modular reactor (SMR) design engineering and licensing activities supporting a planned commercial operating date for the first mPower Plant by 2022.
Our mPower segments overall activity primarily depends on the overall success of the research and development activities related to the B&W mPower reactor and the associated mPower Plant. It also depends on the continued demand for and competitiveness of nuclear energy.
We are currently exploring growth strategies across our segments through acquisitions to expand and complement our existing businesses. As we pursue these opportunities, we expect they would be funded by cash on hand, external financing (including debt), equity or some combination thereof.
Acquisitions
Anlagenbau und Fördertechnik Arthur Loibl GmbH. In November 2011, a subsidiary within our Power Generation segment acquired Anlagenbau und Fördertechnik Arthur Loibl GmbH (Loibl), a German-based manufacturer of material handling equipment for $24.2 million. Loibl expands the products, services and global reach of this segments Allen-Sherman-Hoff business, which is one of the worlds leading suppliers of ash handling solutions for the power generation and other industries.
Investments
USEC Investment. In May 2010, our subsidiary Babcock & Wilcox Investment Company (BWICO) entered into an agreement with Toshiba Corporation (Toshiba), which was subsequently assigned to one of its subsidiaries, and USEC Inc. (USEC) to make a combined strategic investment in USEC totaling $200 million payable over three phases. In September 2010, following the satisfaction of certain conditions, including the availability to USECs American Centrifuge program of at least $2 billion in uncommitted funds under the DOEs loan guarantee program for front-end nuclear fuel facilities and the establishment of a joint venture between us and USEC for supply by the joint venture of centrifuges and related equipment for the American Centrifuge program, we made a $37.5 million investment in USEC as part of a definitive agreement for us to make a total $100 million strategic investment in USEC.
In connection with our investment, we received 37,500 shares of USEC Series B-1 12.75% Convertible Preferred Stock; Warrants to purchase 3,125,000 shares of USEC Class B Common Stock at an exercise price of $7.50 per share, which are exercisable between January 1, 2015 and December 31, 2016; and a seat on USECs board of directors. On July 1, 2013, USEC completed a 1-for-25 reverse stock split of its common stock, resulting in a decrease of the shares to be purchased under the Warrants to 125,000 at an adjusted exercise price of $187.50 per share.
On December 16, 2013, USEC announced that it had reached agreement with a majority of the holders of USECs outstanding convertible notes due October 2014 on the terms of a financial restructuring. We have fully impaired our investment in USEC, resulting in a remaining book value of $0. See Note 2 to our consolidated financial statements included in this report for additional information concerning our investment in USEC, USECs pending restructuring and the impairment of our investment in USEC.
4
We execute our contracts through a variety of methods, including fixed-price, cost-plus, target price cost incentive, cost-reimbursable or some combination of these methods. Contracts are usually awarded through a competitive bid process. Factors that customers may consider include price, plant or equipment availability, technical capabilities of equipment and personnel, efficiency, safety record and reputation.
Fixed-price contracts are for a fixed amount to cover all costs and any profit element for a defined scope of work. Fixed-price contracts entail more risk to us because they require us to predetermine both the quantities of work to be performed and the costs associated with executing the work. For further specification see Risk Factors We are subject to risks associated with contractual pricing in our industries, including the risk that, if our actual costs exceed the costs we estimate on our fixed-price contracts, our profitability will decline, and we may suffer losses as outlined in Item 1A of this report.
We have contracts that extend beyond one year. Most of our long-term contracts have provisions for progress payments. We attempt to cover anticipated increases in labor, material and service costs of our long-term contracts either through an estimate of such changes, which is reflected in the original price, or through risk-sharing mechanisms, such as escalation or price adjustments for items such as labor and commodity prices.
We generally recognize our contract revenues and related costs on a percentage-of-completion basis. Accordingly, we review contract price and cost estimates periodically as the work progresses and reflect adjustments in profit proportionate to the percentage of completion in the period when we revise those estimates. To the extent that these adjustments result in a reduction or an elimination of previously reported profits with respect to a project, we would recognize a charge against current earnings, which could be material. For parts orders and certain aftermarket services activities, we recognize revenues as goods are delivered and work is performed.
Our contracts with the U.S. Government are subject to annual funding determinations. In addition, contracts between the U.S. Government and its prime contractors usually contain standard provisions for termination at the convenience of the U.S. Government or the prime contractor. As a U.S. Government contractor, we are subject to federal regulations under which our right to receive future awards of new federal contracts would be unilaterally suspended or barred if we were convicted of a crime or indicted based on allegations of a violation of specific federal statutes. In addition, some of our contracts with the U.S. Government require us to provide advance notice in connection with any contemplated sale or shut down of the relevant facility. In each of those situations, the U.S. Government has an exclusive right to negotiate a mutually acceptable purchase of the facility. The contracts for the management and operation of U.S. Government facilities are awarded through a complex and protracted procurement process. These contracts are generally structured as five-year contracts with five-year renewal options, which are exercisable by the customer, or include provisions whereby the contract durations can be extended as a result of the achievement of certain performance metrics. These are cost-reimbursement contracts with a U.S. Government credit line with some corporate-funded working capital required. However, many new contracts currently in the bidding process and recently awarded have a different structure. While such contracts remain cost-reimbursement contracts, the contractor is required to supply working capital and be reimbursed by the U.S. Government through regular invoicing. These contracts include a fee primarily based on performance, which is evaluated annually.
Our arrangements with customers frequently require us to provide letters of credit, bid and performance bonds or guarantees to secure bids or performance under contracts. While these letters of credit, bonds and guarantees may involve significant dollar amounts, historically, there have been no material payments to our customers under these arrangements.
In the event of a contract deferral or cancellation, we generally would be entitled to recover costs incurred, settlement expenses and profit on work completed prior to deferral or termination. Significant or numerous cancellations could adversely affect our business, financial condition, results of operations and cash flows.
5
Backlog represents the dollar amount of revenue we expect to recognize in the future from contracts awarded and in progress. Not all of our expected revenue from a contract award is recorded in backlog for a variety of reasons, including that some projects are awarded and completed within the same fiscal year.
Backlog is not a measure defined by generally accepted accounting principles. It is possible that our methodology for determining backlog may not be comparable to methods used by other companies. We are subject to the budgetary and appropriations cycle of the U.S. Government as it relates to our Nuclear Operations and Technical Services segments. Backlog may not be indicative of future operating results, and projects in our backlog may be cancelled, modified or otherwise altered by customers.
We generally include expected revenue from contracts in our backlog when we receive written confirmation from our customers authorizing the performance of work and committing the customer to payment for work performed. Accordingly, we exclude from backlog orders or arrangements that have been awarded but that we have not been authorized to begin performance.
Our backlog at December 31, 2013 and 2012 was as follows:
December 31, 2013 |
December 31, 2012 |
|||||||||||||||
(Dollars in millions) | ||||||||||||||||
Power Generation |
$ | 2,072 | 45 | % | $ | 2,483 | 43 | % | ||||||||
Nuclear Operations |
2,369 | 52 | % | 2,984 | 52 | % | ||||||||||
Technical Services |
5 | 0 | % | 4 | 0 | % | ||||||||||
Nuclear Energy |
142 | 3 | % | 276 | 5 | % | ||||||||||
mPower |
2 | 0 | % | 2 | 0 | % | ||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Backlog |
$ | 4,590 | 100 | % | $ | 5,749 | 100 | % | ||||||||
|
|
|
|
|
|
|
|
We do not include the value of our unconsolidated joint venture contracts in backlog. These unconsolidated joint ventures are primarily included in our Power Generation and Technical Services segments. See Note 3 to our consolidated financial statements included in this report for financial information on our equity method investments.
Of the December 31, 2013 backlog, we expect to recognize revenues as follows:
2014 | 2015 | Thereafter | Total | |||||||||||||
(In approximate millions) | ||||||||||||||||
Power Generation |
$ | 750 | $ | 418 | $ | 904 | $ | 2,072 | ||||||||
Nuclear Operations |
890 | 617 | 862 | 2,369 | ||||||||||||
Technical Services |
5 | | | 5 | ||||||||||||
Nuclear Energy |
92 | 44 | 6 | 142 | ||||||||||||
mPower |
2 | | | 2 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Backlog |
$ | 1,739 | $ | 1,079 | $ | 1,772 | $ | 4,590 | ||||||||
|
|
|
|
|
|
|
|
As of December 31, 2013, Power Generation backlog with the U.S. Government was $31.0 million, all of which was fully funded.
As of December 31, 2013, Nuclear Operations backlog with the U.S. Government was $2,367.5 million, of which $194.5 million had not yet been funded.
As of December 31, 2013, Technical Services backlog with the U.S. Government was $5.0 million, all of which was fully funded.
6
As of December 31, 2013, Nuclear Energy and mPower had no backlog with the U.S. Government.
During the year ended December 31, 2013, the U.S. Government awarded us new orders of approximately $679.4 million, $543.7 million of which pertains to our Nuclear Operations segment. Major new awards from the U.S. Government are typically received during the fourth quarter of each year, following congressional approval of the budget for the governments next fiscal year, which starts October 1. Due to events associated with the government shutdown and delayed budget approvals, approximately $700 million of awards anticipated in the fourth quarter of 2013 were delayed until the first quarter of 2014.
The competitive environments in which each segment operates are described below.
Power Generation. With more than 145 years of experience, we provide advanced steam generating equipment, emissions control equipment and services. Having supplied worldwide capacity of more than 300,000 MW and some of the worlds largest and most efficient steam generating systems, we have a competitive advantage in our experience and technical capability to reliably convert a wide range of fuels to steam. Our strong, installed base in North America also yields competitive advantages in after-market services, although this segment of the market is highly competitive and price sensitive. Through this segment, we compete with a number of domestic and foreign-based companies specializing in steam generating systems technology, equipment and services, including Alstom S.A., Doosan Babcock, Babcock Power, Inc., Foster Wheeler AG., and Hitachi, Ltd.; a variety of engineering and construction companies with respect to the installation of steam-generating systems; a number of additional companies in the markets for environmental control equipment and related specialized industrial equipment and in the independent power-producing business; and other suppliers of replacement parts, repair and alteration services and other services required to retrofit and maintain existing steam systems. The primary bases of competition for this segment are price, technical capabilities, quality, timeliness of performance, breadth of products and services and willingness to accept project risks.
Nuclear Operations. We have specialized technical capabilities that have allowed us to be a valued supplier of nuclear components and fuel for the U.S. Governments naval nuclear fleet since the 1950s. Because of the technical standards required to meet U.S. Government contracting requirements for nuclear components and the barriers to entry present in this type of environment, competition in this segment is limited. The primary bases of limited competition for this segment are price, high capital investment, technical capabilities and quality of products and services.
Technical Services. Through this segment, we are engaged in the management and operation of U.S. Government facilities. Many of our government contracts are bid as a joint venture with one or more companies, in which we may have a majority or a minority position. The performance of the prime or lead contractor can impact our reputation and our future competitive position with respect to that particular project and customer. Our primary competitors in the delivery of goods and services to the U.S. Government and the operation of U.S. Government facilities include Bechtel National, Inc., URS Corporation, CH2M Hill, Inc., Fluor Corporation, Lockheed Martin Corporation, Jacobs Engineering Group, Inc. and Northrop Grumman Corporation. The primary bases of competition for this segment are experience, past performance, availability of key personnel and technical capabilities.
Nuclear Energy. Our Nuclear Energy segment supplies commercial nuclear steam generators and components. B&W has supplied the nuclear industry with more than 1,300 large, heavy components worldwide. This segment is the only heavy nuclear component manufacturer in North America. Our Nuclear Energy segment fabricates pressure vessels, reactors, steam generators, heat exchangers and other auxiliary equipment. This segment also provides specialized engineering and maintenance services, including services for plant outages and power plant construction. Through this segment, we compete with a number of companies specializing in nuclear capabilities including AREVA Inc., Chicago, Bridge & Iron Company N.V. and Westinghouse Electric Corporation. The primary bases of competition for this segment are price, technical capabilities, quality, timeliness of performance, breadth of products and services and willingness to accept project risks.
7
mPower. Our mPower segment is actively designing the modular and scalable B&W mPower reactor. The B&W mPower reactor has the capacity to provide output of 180 MW for a four-year operating cycle without refueling and is designed to produce clean, near-zero emission operations. While the activity in this segment is currently a function of research and development activity, we competed with a number of companies for matching DOE funding. We were the only company awarded funding under the initial DOE award and NuScale Power was the recipient under the DOEs second award. We may continue to compete with NuScale Power as the DOE obligates funding to the two recipients. Ultimately, mPower will compete against other nuclear equipment manufacturers, as well as manufacturers of other power generation fuel source technologies.
We participate in the ownership of a variety of entities with third parties, primarily through corporations, limited liability companies and partnerships, which we refer to as joint ventures. Our Power Generation segment enters into joint ventures primarily to enhance its manufacturing, design and global production operations. Through several joint venture arrangements, our Technical Services segment manages and operates nuclear facilities and associated plant infrastructure, manufactures components and assembles/dismantles nuclear devices, constructs large capital facilities, provides safeguards and security for inventory and assets, supports and conducts research and development for advanced energy technology and manages environmental programs for the DOE and the NNSA. We generally account for our investments in joint ventures under the equity method of accounting. Certain of our unconsolidated joint ventures are described below.
Power Generation
| Ebensburg Power Company & Ebensburg Investors Limited Partnership. Through these entities, which were formed by subsidiaries within our Power Generation segment and ESI Energy, Inc. in 1992, we own an interest in and operate a combined solid waste and cogeneration facility located in Cambria County near Ebensburg, Pennsylvania. This facility uses bituminous waste coal for its primary fuel and sells generated electricity to the wholesale energy market. |
| Halley & Mellowes Pty. Ltd. Diamond Power International, Inc. (DPII), one of our wholly owned subsidiaries, owns an interest in this Australian company, which was formed in 1984. Halley & Mellowes Pty. Ltd. sells soot blowers, boiler cleaning equipment, valves and material handling equipment, primarily in Australian markets, all of which are complementary to DPIIs product lines. |
| Babcock & Wilcox Beijing Company, Ltd. We own equal interests in this entity with Beijing Jingcheng Machinery Electric Holding Company, Ltd. Babcock & Wilcox Beijing Company, Ltd. was formed in 1986 and is located in Beijing, China. Its main activities are the design, manufacture, production and sale of various power plant and industrial boilers. It operates the largest heavy drum shop in northern China. This entity expands our markets internationally and provides additional capacity to our Power Generation segments boiler business. |
| Thermax Babcock & Wilcox Energy Solutions Private Limited. In June 2010, one of our subsidiaries and Thermax Ltd., a boiler manufacturer based in India, formed a joint venture to build subcritical and highly efficient supercritical boilers and pulverizers for the Indian utility boiler market. We have licensed to the joint venture our technology for subcritical boilers 300 MW and larger, highly efficient supercritical boilers and coal pulverizers. In 2013, the joint venture finalized construction of a facility in India designed to produce parts for up to 3,000 MW of utility boiler capacity per year. |
| BWM Ottumwa Environmental Partners. Through our subsidiary Babcock & Wilcox Construction Co., Inc., we formed BWM Ottumwa Environmental Partners, a joint venture with Burns & McDonnell Engineering Company, Inc., to engineer, procure, and construct environmental control systems for the Ottumwa Generating Station. |
8
Technical Services
| Pantex Plant. Through Babcock & Wilcox Technical Services Pantex, LLC, a limited liability company we formed with Honeywell International Inc. and Bechtel National, Inc., we manage and operate the Pantex Plant for the DOE. The Pantex Plant is located on a 16,000-acre NNSA site near Amarillo, Texas. Key operations at this facility include evaluating, retrofitting and repairing nuclear devices; dismantling and sanitizing nuclear devices; developing, testing and fabricating high-explosive components; and handling and storing plutonium pits. See Technical Services within the Outlook section of Item 7 for additional information on the contract to manage and operate the Pantex Plant. |
| Y-12 National Security Complex. Through Babcock & Wilcox Technical Services Y-12, LLC, a limited liability company we formed with Bechtel National, Inc. and in which we own a majority interest, we manage and operate the Y-12 National Security Complex for the DOE. Y-12 is located on an 811-acre NNSA site in Oak Ridge, Tennessee. Operations at the site focus on the production, refurbishment and dismantlement of nuclear devices, storage of nuclear material and the prevention of the proliferation of weapons of mass destruction. See Technical Services within the Outlook section of Item 7 for additional information on the contract to manage and operate the Y-12 National Security Complex. |
| Los Alamos National Laboratory. Since 2006, Los Alamos National Security, LLC, a limited liability company formed in 2005 with the University of California, Bechtel National, Inc., URS Corporation and BWX Technologies, Inc. (BWXT), has managed and operated the Los Alamos National Laboratory, a premier national security research institution, delivering scientific and engineering solutions for the nations most crucial and complex problems. Located in Los Alamos, New Mexico, the Los Alamos National Laboratory conducts ongoing research and development on the measures necessary for certifying the safety and reliability of nuclear devices without the use of nuclear testing for the U.S. Government. |
| Lawrence Livermore National Laboratory. Lawrence Livermore National Security, LLC, a limited liability company formed in 2006 with the University of California, Bechtel National, Inc., URS Corporation and BWXT, manages and operates Lawrence Livermore National Laboratory located in Livermore, California. The laboratory serves as a national resource in science and engineering, focused on national security, energy, the environment and bioscience, with special responsibility for nuclear devices. |
| Savannah River Liquid Waste Disposition Program. In July 2009, Savannah River Remediation LLC, a limited liability company formed by URS Corporation, Bechtel National, Inc., CH2M Hill Constructors, Inc. and Babcock & Wilcox Technical Services Group, Inc. (B&W TSG) became the liquid waste contractor for the DOEs Savannah River Site located in Aiken, South Carolina. The objective of this program is to achieve closure of the Savannah River Site liquid waste tanks in compliance with the Federal Facilities Agreement, utilizing the Defense Waste Processing Facility and Saltstone Facility. |
| Nevada National Security Site. National Security Technologies, LLC (NSTec), a limited liability company formed by Northrop Grumman Corporation, AECOM Technology Corporation, CH2M Hill and B&W TSG, manages and operates the Nevada National Security Site and its related facilities and laboratories for the DOE. Located in Las Vegas, Nevada, NSTec works on projects for other federal agencies such as the Defense Threat Reduction Agency, the National Aeronautics and Space Administration, the U.S. Nuclear Regulatory Commission (the NRC) and the U.S. Air Force, Army, and Navy. Missions include defense experimentation and stockpile stewardship, homeland security and defense applications and environmental management. |
| Portsmouth Gaseous Diffusion Plant D&D. Fluor-B&W Portsmouth, LLC is a limited liability company formed by Fluor Federal Services, Inc. and B&W TSG, to provide nuclear operations, decontamination and decommissioning services at the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio. |
9
| Paducah and Portsmouth Gaseous Diffusion Plant Uranium Conversion Operations. Babcock & Wilcox Conversion Services, LLC is a limited liability company formed by B&W TSG and URS Corporation to perform uranium conversion operations at the Paducah Gaseous Diffusion Plant in Paducah, Kentucky and the Portsmouth Gaseous Diffusion Plant in Ohio. |
| Advanced Mixed Waste Treatment Project (AMWTP). Idaho Treatment Group, LLC (ITG) is a limited liability company formed by B&W TSG, URS Energy & Constructions, Inc. and EnergySolutions Federal Services, Inc. ITG is responsible for management and operations at the DOEs AMWTP located in Idaho Falls, Idaho. The purpose of the AMWTP is to safely process and dispose of transuranic waste and mixed low-level waste at the DOEs Idaho Site Transuranic Storage Area while maintaining a fully operational facility. |
| West Valley Demonstration Project Phase I Decommissioning and Facility Disposition. CH2M Hill-B&W West Valley, LLC is a limited liability company formed by CH2M Hill Constructors, Inc., B&W TSG and Environmental Chemical Corporation. Services provided include project management and support services, site operations, maintenance, utilities, high-level waste canister relocation, facility disposition, waste tank farm management, NRC-licensed disposal area management, waste management and nuclear materials disposition and safeguards and security. |
| Waste Isolation Pilot Plant. Nuclear Waste Partnership, LLC is a limited liability company formed by B&W TSG, URS Corporation and Areva Federal Services, LLC as the major subcontractor. The purpose of the partnership is to manage and operate DOEs Waste Isolation Pilot Plant in Carlsbad, New Mexico. |
We have foreign operations in our Power Generation and Nuclear Energy segments. Our Canadian operations serve the North American electric utility, industrial power, oil production and global nuclear utility markets. Our operations in Denmark provide comprehensive services to companies in the waste-to-energy sector of the power generation market, primarily in eastern and western Europe. Our joint venture in China primarily serves the power generation needs of the Chinese domestic and other utility markets. The functional currency of these entities is not the U.S. dollar, and as a result, we are subject to exchange rate fluctuations that impact our financial position, results of operations and cash flows. Our combined Power Generation and Nuclear Energy segment revenues, net of intersegment revenues, and income derived from operations located outside of the United States, as well as the approximate percentages of our total consolidated revenues and total consolidated operating income, respectively, for each of the last three years were as follows (dollars in thousands):
Revenues | Operating Income | |||||||||||||||
Amount | Percent of Consolidated |
Amount | Percent of Consolidated |
|||||||||||||
Year ended December 31, 2013 |
$ | 634,347 | 19 | % | $ | 117,839 | 22 | % | ||||||||
Year ended December 31, 2012 |
$ | 684,886 | 21 | % | $ | 98,699 | 28 | % | ||||||||
Year ended December 31, 2011 |
$ | 641,612 | 22 | % | $ | 57,032 | 60 | % |
Our revenues exclude revenues attributable to our joint ventures accounted for under the equity method of accounting, while our operating income includes results from joint ventures accounted for under the equity method.
For additional information on the geographic distribution of our revenues, see Note 17 to our consolidated financial statements included in this report.
10
We provide our products and services to a diverse customer base, including utilities and other power producers, businesses in various process industries, such as pulp and paper mills, petrochemical plants, oil refineries and steel mills and the U.S. Government. Our largest customers, as a percentage of our total consolidated revenues, during the years ended December 31, 2013, 2012 and 2011 were as follows:
Year Ended December 31, 2013: |
||||
U.S. Government |
38 | % | ||
Solid Waste Authority of Palm Beach County |
4 | % | ||
Year Ended December 31, 2012: |
||||
U.S. Government |
34 | % | ||
Solid Waste Authority of Palm Beach County |
3 | % | ||
Year Ended December 31, 2011: |
||||
U.S. Government |
38 | % | ||
American Electric Power Company, Inc. |
6 | % |
The U.S. Government is the primary customer of our Nuclear Operations and Technical Services segments. Revenues from U.S. Government contracts comprised 99%, 99% and 98% of segment revenues for the years ended December 31, 2013, 2012 and 2011, respectively, in our Nuclear Operations segment. Revenues from the U.S. Government contracts comprised 77%, 72% and 74% of segment revenues for the years ended December 31, 2013, 2012 and 2011, respectively, in our Technical Services segment.
Our non-U.S. Government customers that account for a significant portion of revenues or accounts receivable in one year may represent an immaterial portion of revenues or accounts receivable in subsequent years due to the timing of major projects, primarily for our utility customers.
Our operations use raw materials, such as carbon and alloy steels in various forms and components and accessories for assembly, which are available from numerous sources. We generally purchase these raw materials and components as needed for individual contracts. Our Power Generation and Nuclear Energy segments do not depend on a single source of supply for any significant raw materials. Our Nuclear Operations segment relies on several single-source suppliers for materials used in its products. We believe these suppliers are viable, and we and the U.S. Government expend significant effort to monitor and maintain the supplier base for our Nuclear Operations segment.
Although shortages of some raw materials have existed from time to time, no serious shortage exists at the present time.
At December 31, 2013, we employed approximately 11,000 persons worldwide. Approximately 2,700 of our employees were members of labor unions at December 31, 2013. Many of our operations are subject to union contracts, which we customarily renew periodically. We consider our relationships with our employees to be satisfactory.
We currently hold a large number of U.S. and foreign patents and have patent applications pending. We have acquired patents and technology licenses and granted technology licenses to others when we have considered it advantageous for us to do so. Although in the aggregate our patents and licenses are important to us, we do not regard any single patent or license or group of related patents or licenses as critical or essential to our business as a whole. In general, we depend on our technological capabilities and the application of know-how, rather than patents and licenses, in the conduct of our various businesses.
11
Research and Development Activities
Our research and development activities are related to the development and improvement of new and existing products and equipment, as well as conceptual and engineering evaluation for translation into practical applications. We charge to research and development cost the costs of research and development unrelated to specific contracts as incurred. Substantially all of these costs are in our Power Generation and mPower segments, the majority of which are related to the development of our B&W mPower technology. Contractual arrangements for customer-sponsored research and development can vary on a case-by-case basis and include contracts, cooperative agreements and grants.
Research and development activities (including in-kind research and development services described below) totaled $200.8 million, $173.9 million and $163.0 million in the years ended December 31, 2013, 2012 and 2011, respectively. These activities include amounts paid for by our customers of $43.2 million, $53.4 million and $56.6 million, in the years ended December 2013, 2012 and 2011, respectively and DOE funding described below of $78.4 million in the year ended December 31, 2013.
During the years ended December 31, 2013, 2012 and 2011, we recognized $15.8 million, $17.9 million and $16.6 million, respectively, of non-cash in-kind research and development costs (included above) related to services contributed by our minority partner to GmP, our majority-owned subsidiary formed in 2011 to oversee the program to develop the small modular nuclear power plant based on B&W mPower technology.
On April 12, 2013, Babcock & Wilcox mPower, Inc. (B&W mPower), a wholly owned subsidiary of B&W, entered into a Cooperative Agreement establishing the terms and conditions of a funding award initially totaling at least $150 million under the DOEs Funding Program. This cost-sharing award requires us to use the DOE funds to cover first-of-a-kind engineering costs associated with SMR design certification and licensing efforts. The DOE will provide cost reimbursement for up to 50% of qualified expenditures incurred from April 1, 2013 to March 31, 2018. The DOE has authorized $99.3 million of funding for this award program as of December 31, 2013. Congress has allocated and designated an additional $85 million from the 2014 budget to the Cooperative Agreement; however, the DOE has not yet obligated those funds to us. The Cooperative Agreement also provides for reimbursement of pre-award costs incurred from October 1, 2012 to March 31, 2013. During the year ended December 31, 2013, we recognized $78.4 million associated with the funding award, including $21.5 million of pre-award cost reimbursement, as a reduction of research and development costs on our consolidated statements of income. Of the total pre-award cost reimbursement, $9.7 million relates to research and development costs incurred in the year ended December 31, 2012.
Our operations present risks of injury to or death of people, loss of or damage to property and damage to the environment. We have created loss control systems to assist us in the identification and treatment of the hazard risks presented by our operations, and we endeavor to make sure these systems are effective.
As loss control measures will not always be successful, we seek to establish various means of funding losses and liability related to incidents or occurrences. We primarily seek to do this through contractual protections, including waivers of consequential damages, indemnities, caps on liability, liquidated damage provisions, and access to the insurance of other parties. We also procure insurance, operate our own captive insurance company and/or establish funded or unfunded reserves. However, none of these methods will eliminate all risks.
Depending on competitive conditions, the nature of the work, industry custom and other factors, we may not be successful in obtaining adequate contractual protection from our customers and other parties against losses and liabilities arising out of or related to the performance of our work. The scope of the protection may be limited, may be subject to conditions and may not be supported by adequate insurance or other means of financing. In addition, we sometimes have difficulty enforcing our contractual rights with others following a material loss.
12
Similarly, insurance for certain potential losses or liabilities may not be available or may only be available at a cost or on terms we consider not to be economical. Insurers frequently react to market losses by ceasing to write or severely limiting coverage for certain exposures. Risks that we have frequently found difficult to cost-effectively insure against include, but are not limited to, business interruption, property losses from wind, flood and earthquake events, nuclear hazards, war and confiscation or seizure of property in some areas of the world, pollution liability, liabilities related to occupational health exposures (including asbestos), liability related to our executives participating in the management of certain outside entities, professional liability/errors and omissions coverage, the failure, misuse or unavailability of our information systems, the failure of security measures designed to protect our information systems from security breaches and liability related to risk of loss of our work in progress and customer-owned materials in our care, custody and control. In cases where we place insurance, we are subject to the credit worthiness of the relevant insurer(s), the available limits of the coverage, our retention under the relevant policy, exclusions in the policy and gaps in coverage.
Our operations in designing, engineering, manufacturing, constructing and servicing nuclear power equipment and components for our commercial nuclear utility customers, subject us to various risks, including, without limitation, damage to our customers property and third party claims for personal injury, environmental liability, death and property damage. To protect against liability for damage to a customers property, we endeavor to obtain waivers of liability and subrogation from the customer and its insurer and are usually named as an additional insured under the utility customers nuclear property policy. We also attempt to cap our overall liability in our contracts. To protect against liability from claims brought by third parties, we seek to be insured under the utility customers nuclear liability policies and have the benefit of the indemnity and limitation of any applicable liability provision of the Price-Anderson Act. The Price-Anderson Act limits the public liability of U.S. manufacturers and operators of licensed nuclear facilities and other parties who may be liable in respect of, and indemnifies them against, all claims in excess of a certain amount. This amount is determined by the sum of commercially available liability insurance plus certain retrospective premium assessments payable by operators of commercial nuclear reactors. For those sites where we provide environmental remediation services, we seek the same protection from our customers as we do for our other nuclear activities. The Price-Anderson Act, as amended, includes a sunset provision and requires renewal each time that it expires. Contracts that were entered into during a period of time that Price-Anderson was in full force and effect continue to receive the benefit of the Price-Anderson Acts nuclear indemnity. The Price-Anderson Act is set to expire on December 31, 2025. We also provide nuclear fabrication and other services to the nuclear power industry in Canada. Canadas Nuclear Liability Act generally conforms to international conventions and is conceptually similar to the Price-Anderson Act in the United States. Accordingly, indemnification protections and the possibility of exclusions under Canadas Nuclear Liability Act are similar to those under the Price-Anderson Act in the United States.
Although we do not own or operate any nuclear reactors, we have some coverage under commercially available nuclear liability and property insurance for our facilities that are currently licensed to possess special nuclear materials. Substantially all of our Nuclear Operations segment contracts involving nuclear materials are covered by and subject to the nuclear indemnity provisions of either the Price-Anderson Act or Public Law 85-804 which, among other things, authorizes the DOE to indemnify certain contractors when such acts would facilitate national defense. However, to the extent the value of the nuclear materials in our care, custody or control exceeds the commercially available limits of our insurance, we potentially have underinsured risk of loss for such nuclear material.
Our Technical Services segment participates in the management and operation of various U.S. Government facilities. This participation is customarily accomplished through the participation in joint ventures with other contractors for any given facility. These activities involve, among other things, handling nuclear devices and their components from the aging stockpile of the U.S. Government. Insurable liabilities arising from these sites are rarely protected by our or our partners corporate insurance programs. Instead, we rely on government contractual agreements, insurance purchased specifically for a site and certain specialized self-insurance programs funded by the U.S. Government. The U.S. Government has historically fulfilled its contractual agreement to reimburse its contractors for covered claims, and we expect it to continue this process during our participation in the administration of these facilities. However, in most of these situations in which the U.S. Government is contractually obligated to pay, the payment obligation is subject to the availability of authorized government funds. The reimbursement obligation of the U.S. Government is also conditional, and provisions of the relevant contract or applicable law may preclude reimbursement.
13
Our wholly owned captive insurance subsidiary provides workers compensation, employers liability, commercial general liability and automotive liability insurance to support our operations. We may also have business reasons in the future to have our insurance subsidiary accept other risks that we cannot or do not wish to transfer to outside insurance companies. These risks may be considerable in any given year or cumulatively. Our insurance subsidiary has not provided significant amounts of insurance to unrelated parties. Claims, as a result of our operations, could adversely impact the ability of our insurance subsidiary to respond to all claims presented.
Additionally, upon the February 22, 2006 effectiveness of the settlement relating to the Chapter 11 proceedings involving several of our subsidiaries, most of our subsidiaries contributed substantial insurance rights to the asbestos personal injury trust, including rights to (1) certain pre-1979 primary and excess insurance coverages and (2) certain of our 1979-1986 excess insurance coverage. These insurance rights provided coverage for, among other things, asbestos and other personal injury claims, subject to the terms and conditions of the policies. The contribution of these insurance rights was made in exchange for the agreement on the part of the representatives of the asbestos claimants, including the representative of future claimants, to the entry of a permanent injunction, pursuant to Section 524(g) of the U.S. Bankruptcy Code, to channel to the asbestos trust all asbestos-related claims against our subsidiaries and former subsidiaries arising out of, resulting from or attributable to their operations, and the implementation of related releases and indemnification provisions protecting those subsidiaries and their affiliates from future liability for such claims. Although we are not aware of any significant, unresolved claims against our subsidiaries and former subsidiaries that are not subject to the channeling injunction and that relate to the periods during which such excess insurance coverage related, with the contribution of these insurance rights to the asbestos personal injury trust, it is possible that we could have underinsured or uninsured exposure for non-derivative asbestos claims or other personal injury or other claims that would have been insured under these coverages had the insurance rights not been contributed to the asbestos personal injury trust.
Governmental Regulations and Environmental Matters
General
Many aspects of our operations and properties are affected by political developments and are subject to both domestic and foreign governmental regulations, including those relating to:
| constructing and equipping electric power and other industrial facilities; |
| possessing and processing special nuclear materials; |
| workplace health and safety; |
| currency conversions and repatriation; |
| taxation of foreign earnings and earnings of expatriate personnel; and |
| protecting the environment. |
We are required by various governmental and quasi-governmental agencies to obtain certain permits, licenses and certificates with respect to our operations. The kinds of permits, licenses and certificates required in our operations depend upon a number of factors.
We cannot determine the extent to which new legislation, new regulations or changes in existing laws or regulations may affect our future operations.
Environmental
Our operations and properties are subject to a wide variety of increasingly complex and stringent foreign, federal, state and local environmental laws and regulations, including those governing discharges into the air and water, the handling and disposal of solid and hazardous wastes, the remediation of soil and groundwater contaminated by hazardous substances and the health and safety of employees. Sanctions for noncompliance may include revocation of permits, corrective action orders, administrative or civil penalties and criminal prosecution. Some environmental laws provide for strict, joint and several liability for remediation of spills and other releases of hazardous substances, as well as damage to natural resources. In addition, companies may be subject to claims alleging personal injury or property damage as a result of alleged exposure to hazardous substances. Such laws and regulations may also expose us to liability for the conduct of or conditions caused by others or for our acts that were in compliance with all applicable laws at the time such acts were performed.
14
These laws and regulations include the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), the Clean Air Act, the Clean Water Act, the Resource Conservation and Recovery Act and similar laws that provide for responses to, and liability for, releases of hazardous substances into the environment. These laws and regulations also include similar foreign, state or local counterparts to these federal laws, which regulate air emissions, water discharges, hazardous substances and waste and require public disclosure related to the use of various hazardous substances. Our operations are also governed by laws and regulations relating to workplace safety and worker health, including the U.S. Occupational Safety and Health Act and regulations promulgated thereunder.
We are currently in the process of investigating and remediating some of our current and former operating sites. Although we have recorded reserves in connection with certain of these matters, due to the uncertainties associated with environmental remediation, we cannot assure you that the actual costs resulting from these remediation matters will not exceed the recorded reserves.
Our compliance with U.S. federal, state and local environmental control and protection regulations resulted in pretax charges of approximately $13.1 million, $15.3 million and $13.2 million in the years ended December 31, 2013, 2012 and 2011 respectively. In addition, compliance with existing environmental regulations necessitated capital expenditures of $1.1 million, $3.2 million and $1.8 million in the years ended December 31, 2013, 2012 and 2011, respectively. We expect to spend another $2.2 million on such capital expenditures over the next five years. We cannot predict all of the environmental requirements or circumstances that will exist in the future but anticipate that environmental control and protection standards will become increasingly stringent and costly. Based on our experience to date, we do not currently anticipate any material adverse effect on our business or consolidated financial condition as a result of future compliance with existing environmental laws and regulations. However, future events, such as changes in existing laws and regulations or their interpretation, more vigorous enforcement policies of regulatory agencies or stricter or different interpretations of existing laws and regulations, may require additional expenditures by us, which may be material. Accordingly, we can provide no assurance that we will not incur significant environmental compliance costs in the future.
We have been identified as a potentially responsible party at various cleanup sites under CERCLA. CERCLA and other environmental laws can impose liability for the entire cost of cleanup on any of the potentially responsible parties, regardless of fault or the lawfulness of the original conduct. Generally, however, where there are multiple responsible parties, a final allocation of costs is made based on the amount and type of wastes disposed of by each party and the number of financially viable parties, although this may not be the case with respect to any particular site. We have not been determined to be a major contributor of wastes to any of these sites. On the basis of our relative contribution of waste to each site, we expect our share of the ultimate liability for the various sites will not have a material adverse effect on our consolidated financial condition, results of operations or cash flows in any given year.
We perform significant amounts of work for the U.S. Government under both prime contracts and subcontracts and operate certain facilities that are licensed to possess and process special nuclear materials. As a result of these activities, we are subject to continuing reviews by governmental agencies, including the U.S. Environmental Protection Agency (the EPA) and the NRC.
The NRCs decommissioning regulations require our Nuclear Operations segment to provide financial assurance that it will be able to pay the expected cost of decommissioning each of its licensed facilities at the end of its service life. We provided financial assurance aggregating $47.2 million during the year ended December 31, 2013 with existing letters of credit for the ultimate decommissioning of these licensed facilities. These two facilities have provisions in their government contracts pursuant to which substantially all of our decommissioning costs and financial assurance obligations are covered by the DOE, including the costs to complete the decommissioning projects underway at the Erwin, Tennessee facility. These letters of credit are to cover decommissioning required pursuant to work not subject to this DOE obligation.
15
The demand for power generation services and products can be influenced by state and federal governmental legislation setting requirements for utilities related to operations, emissions and environmental impacts. The legislative process is unpredictable and includes a platform that continuously seeks to increase the restrictions on power producers. Potential legislation limiting emissions from power plants, including carbon dioxide, could affect our markets and the demand for our products and services in our Power Generation segment.
At December 31, 2013 and 2012, we had total environmental accruals, including provisions for the facilities discussed above, of $58.1 million and $49.6 million, respectively. Of our total environmental accruals at December 31, 2013 and 2012, $4.7 million and $3.1 million, respectively, were included in current liabilities. Inherent in the estimates of those accruals and recoveries are our expectations regarding the levels of contamination, decommissioning costs and recoverability from other parties, which may vary significantly as decommissioning activities progress. Accordingly, changes in estimates could result in material adjustments to our operating results, and the ultimate loss may differ materially from the amounts we have provided for in our consolidated financial statements.
Cautionary Statement Concerning Forward-Looking Statements
We are including the following discussion to inform our existing and potential security holders generally of some of the risks and uncertainties that can affect our company and to take advantage of the safe harbor protection for forward-looking statements that applicable federal securities law affords.
From time to time, our management or persons acting on our behalf make forward-looking statements to inform existing and potential security holders about our company. These statements may include projections and estimates concerning the timing and success of specific projects and our future backlog, revenues, income and capital spending. Forward-looking statements are generally accompanied by words such as estimate, project, predict, believe, expect, anticipate, plan, seek, goal, could, intend, may, should or other words that convey the uncertainty of future events or outcomes. In addition, sometimes we will specifically describe a statement as being a forward-looking statement and refer to this cautionary statement.
In addition, various statements in this annual report on Form 10-K, including those that express a belief, expectation or intention, as well as those that are not statements of historical fact, are forward-looking statements. Those forward-looking statements appear in Item 1 Business and Item 3 Legal Proceedings in Part I of this report and in Item 7 Managements Discussion and Analysis of Financial Condition and Results of Operations and in the notes to our consolidated financial statements in Item 8 of Part II of this report and elsewhere in this report.
These forward-looking statements include, but are not limited to, statements that relate to, or statements that are subject to risks, contingencies or uncertainties that relate to:
| our business strategy; |
| future levels of revenues (including our backlog and projected claims to the extent either may be viewed as an indicator of future revenues), operating margins, income from operations, net income or earnings per share; |
| anticipated levels of demand for our products and services; |
| future levels of research and development, capital, environmental or maintenance expenditures; |
| our beliefs regarding the timing and effects on our businesses of certain environmental and tax legislation, rules or regulations; |
| the success or timing of completion of ongoing or anticipated capital or maintenance projects; |
| expectations regarding the acquisition or divestiture of assets and businesses; |
| our share repurchase or other return of capital activities; |
| our ability to maintain appropriate insurance and indemnities; |
| the potential effects of judicial or other proceedings, including tax audits, on our business or businesses, financial condition, results of operations and cash flows; |
| the anticipated effects of actions of third parties such as competitors, or federal, foreign, state or local regulatory authorities, or plaintiffs in litigation; |
| the effective date and expected impact of accounting pronouncements; |
| our plans regarding the design, research and development, financing and deployment of the B&W mPower reactor; and |
| anticipated benefits, timing, and changes associated with cost reduction and efficiency improvement activities. |
16
We have based our forward-looking statements on our current expectations, estimates and projections about our industries and our company. We caution that these statements are not guarantees of future performance and you should not rely unduly on them, as they involve risks, uncertainties and assumptions that we cannot predict. In addition, we have based many of these forward-looking statements on assumptions about future events that may prove to be inaccurate. While our management considers these assumptions to be reasonable, they are inherently subject to significant business, economic, competitive, regulatory and other risks, contingencies and uncertainties, most of which are difficult to predict and many of which are beyond our control. Accordingly, our actual results may differ materially from the future performance that we have expressed or forecast in our forward-looking statements. Differences between actual results and any future performance suggested in our forward-looking statements could result from a variety of factors, including the following:
| decisions on spending and trends by power-generating companies and by the U.S. Government, including continuing appropriations by Congress and the automatic budget cuts (or sequestration) established by the Budget Control Act of 2011 (the Budget Control Act); |
| the highly competitive nature of our businesses; |
| general economic and business conditions, including changes in interest rates and currency exchange rates; |
| general developments in the industries in which we are involved; |
| cancellations of and adjustments to backlog and the resulting impact from using backlog as an indicator of future earnings; |
| our ability to perform projects on time and on budget, in accordance with the schedules and terms established by the applicable contracts with customers; |
| changes in our effective tax rate and tax positions; |
| our ability to maintain operational support for our information systems against service outages and data corruption, as well as protection against cyber-based network security breaches and theft of data; |
| our ability to protect our intellectual property and renew licenses to use intellectual property of third parties; |
| our use of the percentage-of-completion method of accounting; |
| our ability to obtain and maintain surety bonds, letters of credit and similar financing; |
| the operating risks normally incident to our lines of business, including the potential impact of project losses, liquidated damages and professional liability, product liability, warranty and other claims against us; |
| our ability to manage our capital structure, including our access to capital, credit ratings, debt and ability to raise additional financing; |
| our ability to comply with covenants in our credit agreements and other debt instruments and the availability, terms and deployment of capital; |
| volatility and uncertainty of the credit markets; |
| our ability to successfully manage research and development projects and costs, including our efforts to successfully develop and commercialize new technologies and products; |
| the risks associated with integrating businesses we acquire; |
| our ability to obtain and maintain builders risk, liability, property and other insurance in amounts and on terms we consider adequate and at rates that we consider economical; |
| the aggregated risks retained in our captive insurance subsidiary; |
| the effects of asserted and unasserted claims; |
| results of tax audits, including a determination by the Internal Revenue Service (IRS) that the spin-off or certain other transactions should be treated as a taxable transaction, and the realization of deferred tax assets; |
| changes in, and liabilities relating to, existing or future environmental regulatory matters; |
| changes in, or our failure or inability to comply with, laws and government regulations; |
| difficulties we may encounter in obtaining regulatory or other necessary permits or approvals; |
| adverse outcomes from legal and regulatory proceedings; |
| our limited ability to influence and direct the operations of our joint ventures; |
| potential violations of the Foreign Corrupt Practices Act; |
| our ability to successfully compete with current and future competitors; |
| the loss of key personnel and the continued availability of qualified personnel; |
| our inability to realize expected gains from the Global Competitiveness Initiative; |
| our ability to negotiate and maintain good relationships with labor unions; |
| changes in pension and medical expenses associated with our retirement benefit programs; |
17
| our potentially ineffective systems of internal controls over financial reporting; |
| the ability of our suppliers to deliver raw materials in sufficient quantities and in a timely manner; |
| social, political and economic situations in foreign countries where we do business; and |
| the possibilities of natural disasters, war, other armed conflicts or terrorist attacks. |
We believe the items we have outlined above are important factors that could cause estimates in our financial statements to differ materially from actual results and those expressed in a forward-looking statement made in this report or elsewhere by us or on our behalf. We have discussed many of these factors in more detail elsewhere in this report. These factors are not necessarily all the factors that could affect us. Unpredictable or unanticipated factors we have not discussed in this report could also have material adverse effects on actual results of matters that are the subject of our forward-looking statements. We do not intend to update our description of important factors each time a potential important factor arises, except as required by applicable securities laws and regulations. We advise our security holders that they should (1) be aware that factors not referred to above could affect the accuracy of our forward-looking statements and (2) use caution and common sense when considering our forward-looking statements.
Our website address is www.babcock.com. We make available through the Investor Relations section of this website under SEC Filings, free of charge, our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, our proxy statement, statements of beneficial ownership of securities on Forms 3, 4 and 5 and amendments to those reports as soon as reasonably practicable after we electronically file those materials with, or furnish those materials to, the Securities and Exchange Commission (the SEC). You may read and copy any materials we file with the SEC at the SECs Public Reference Room at 100 F Street, NE, Washington, DC 20549. You may obtain information regarding the Public Reference Room by calling the SEC at 1-800-SEC-0330. In addition, the SEC maintains a website at www.sec.gov that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC. We have also posted on our website our: Corporate Governance Principles; Code of Business Conduct; Code of Ethics for our Chief Executive Officer and Senior Financial Officers; Board of Directors Conflicts of Interest Policies and Procedures; Management, Board Members and Independent Director Contact Information; By-laws; and charters for the Audit & Finance, Governance, Compensation and Safety & Security Committees of our Board.
Item 1A. | RISK FACTORS |
Risk Factors Related to Our Business
We derive substantial revenues from electric power generating companies and other steam-using industries, with demand for our products and services depending on capital expenditures in these historically cyclical industries. Additionally, recent legislative and regulatory developments relating to clean air legislation are impacting plans for new coal-fired power plants within the United States.
The demand for power generation products and services depends primarily on the capital expenditures of electric power generating companies, paper companies and other steam-using industries and expenditures by original equipment manufacturers. These capital expenditures are influenced by such factors as:
| prices for electricity, along with the cost of production and distribution; |
| prices for natural resources such as coal and natural gas; |
| demand for electricity, paper and other end products of steam-generating facilities; |
| availability of other sources of electricity, paper or other end products; |
| requirements of environmental legislation and regulation, including potential requirements applicable to carbon dioxide emissions; |
| impact of potential regional, state, national and/or global requirements to significantly limit or reduce greenhouse gas emissions in the future; |
| level of capacity utilization at operating power plants, paper mills and other steam-using facilities; |
| requirements for maintenance and upkeep at operating power plants and paper mills to combat the accumulated effects of wear and tear; |
| ability of electric generating companies and other steam users to raise capital; and |
18
| relative prices of fuels used in boilers, compared to prices for fuels used in gas turbines and other alternative forms of generation. |
A material decline in capital expenditures by electric power generating companies, paper companies and other steam-using industries over a sustained period of time could materially and adversely affect the demand for our power generation products and services and, therefore, our financial condition, results of operations and cash flows. U.S. coal-fired power plants have been scrutinized by environmental groups and government regulators over the emissions of potentially harmful pollutants. The recent economic environment and uncertainty concerning new environmental legislation or replacement rules or regulations has caused many of our major customers, principally electric utilities, to delay making substantial capital expenditures for new plants, as well as upgrades to existing power plants.
We rely on U.S. Government contracts for a large percentage of our revenue, and some of those contracts are subject to continued appropriations by Congress and may be terminated or delayed if future funding is not made available. In addition, the U.S. Government may not renew or may seek to modify or terminate our existing contracts.
For the year ended December 31, 2013, we relied on U.S. Government contracts for approximately 38% of our revenue. Government contracts are subject to various uncertainties, restrictions and regulations, including oversight audits, which could result in withholding or delaying of payments to us, and termination or modification at the U.S. Governments convenience. In addition, some of our large, multi-year contracts with the U.S. Government are subject to annual funding determinations and the continuing availability of Congressional appropriations. Although multi-year operations may be planned in connection with major procurements, Congress generally appropriates funds on a fiscal-year basis even though a program may continue for several years. Consequently, programs often are only partially funded initially, and additional funds are committed only as Congress makes further appropriations. In years when the U.S. Government does not complete its budget process before the end of its fiscal year on September 30, government operations typically are funded through a continuing resolution that authorizes agencies of the U.S. Government to continue to operate, but does not authorize new spending initiatives. When the U.S. Government operates under a continuing resolution, delays can occur in the procurement of products and services. As a result, we are subject to ongoing uncertainties associated with U.S. Government budget restraints and other factors affecting government funding.
The U.S. Government typically can terminate or modify any of its contracts with us either for its convenience or if we default by failing to perform under the terms of the applicable contract. A termination arising out of our default could expose us to liability and have an adverse effect on our ability to compete for future contracts and orders. If any of our contracts reflected in backlog are terminated by the U.S. Government, our backlog would be reduced by the expected value of the remaining work under such contracts. In addition, on those contracts for which we are teamed with others and are not the prime contractor, the U.S. Government could terminate a prime contract under which we are a subcontractor, irrespective of the quality of our products and services as a subcontractor. The reduction or termination of funding, or changes in the timing of funding, for a U.S. Government program in which we provide products or services would result in a reduction or loss of anticipated future revenues attributable to that program and could have a negative impact on our results of operations.
We also have several significant contracts with the U.S. Government that are subject to periodic renewal and rebidding through a competitive process. If the U.S. Government fails to renew these contracts, our results of operations and cash flows would be adversely affected. In January 2013, we were notified that our joint venture was not selected for the combined Management and Operating contract for the Y-12 National Security Complex and Pantex Plant. In November 2013, following protests instituted by our joint venture, this decision was re-affirmed and our joint venture subsequently filed an additional protest with the Government Accountability Office (GAO), which is currently pending.
As a result of these and other factors, the termination of one or more of our significant government contracts, our suspension from government contract work, the failure of the U.S. Government to renew our existing contracts or the disallowance of the payment of our contract costs could have a material adverse effect on our financial condition, results of operations and cash flows.
19
Federal sequestration and other delays or reductions in government spending could adversely impact government spending for the products and services we provide.
In August 2011, Congress enacted the Budget Control Act, which committed the U.S. Government to significantly reducing the federal deficit over ten years. The Budget Control Act established caps on discretionary spending through 2021. It also called for substantial automatic spending cuts split between defense and non-defense programs scheduled to start in March 2013 and continue over a nine-year period.
Federal government spending reductions, including through sequestration, could adversely impact U.S. Government programs for which we provide products or services. Additionally, while we believe many of our programs are well aligned with national defense and other strategic priorities, and we supply high-end equipment for submarines and aircraft carriers for the U.S. Navy, the outcome of efforts underway regarding sequestration is uncertain and it is possible that spending cuts may be applied to U.S. Government programs across the board, regardless of how programs align with those priorities. There are many variables in how budget reductions could be implemented that will determine its specific impact; however, reductions in federal government spending and sequestration, as currently provided for under the Budget Control Act, could adversely impact programs in which we provide products or services. In addition, these cuts could adversely affect the viability of the suppliers and subcontractors under our programs. We may also be required to maintain operations of our joint ventures if the government can no longer meet its funding obligations.
The Bipartisan Budget Act of 2013 was approved in December 2013. This budget agreement replaces $63 billion in sequester cuts over two years split evenly between defense and non-defense programs. Both defense and non-defense programs will receive approximately $22.4 billion more in government fiscal year 2014 than would have been allocated under sequestration. The discretionary spending levels for government fiscal years 2014 and 2015 have been set. While this budget agreement provides some near-term relief, sequestration, reduction in government spending in lieu of sequestration or fiscal issues raised by negotiations over the federal debt ceiling remain a long-term concern.
Demand for our products and services is vulnerable to economic downturns and reductions in private sector and government spending.
Demand for our products and services has been, and we expect that demand will continue to be, subject to significant fluctuations due to a variety of factors beyond our control, including economic and industry conditions. We continued to experience uncertainty in 2013 from the global economic downturn in 2008-2009. Since 2008, concerns over inflation, energy costs, geopolitical issues, the availability and cost of credit and other market factors have contributed to increased volatility and diminished expectations for the global economy and expectations of slower global economic growth for the foreseeable future. Volatile oil and natural gas prices, low business and consumer confidence and high unemployment have remained despite economic improvements since 2009.
As a result, some of our customers have delayed, curtailed or cancelled proposed and existing projects and may continue to do so, which may decrease the overall demand for our products and services and adversely affect our results of operations.
In addition, our Nuclear Operations and Technical Services segments depend on U.S. Government funding, particularly funding levels at the DOE. Significant changes in the level of funding (for example, the annual budget of the DOE) or specifically mandated levels for individual programs that are important to our business could have an unfavorable impact on us. In addition, if Congress does not pass annual appropriations bills in a timely fashion, spending delays under our U.S. Government contracts may result. Any reduction in the level of U.S. Government funding, particularly at the DOE, may result in, among other things, a reduction in the number and scope of projects put out for bid by the U.S. Government or the curtailment of existing U.S. Government programs, either of which may result in a reduction in the number of contract award opportunities available to us, a reduction of activities at DOE sites and an increase in costs, including the costs of obtaining contract awards.
20
In addition, our customers may find it more difficult to raise capital in the future due to limitations on the availability of credit, increases in interest rates and other factors affecting the federal, municipal and corporate credit markets. Also, our customers may demand more favorable pricing terms and find it increasingly difficult to timely pay invoices for our products and services, which would impact our future cash flows and liquidity. Inflation or significant changes in interest rates could reduce the demand for our products and services. Any inability to timely collect our invoices may lead to an increase in our accounts receivables and potentially to increased write-offs of uncollectible invoices. If the economy weakens, or customer spending declines, then our backlog, revenues, net income and overall financial condition could deteriorate.
Our backlog is subject to unexpected adjustments and cancellations and may not be a reliable indicator of future revenues or earnings.
There can be no assurance that the revenues projected in our backlog will be realized or, if realized, will result in profits. Because of project cancellations or changes in project scope and schedule, we cannot predict with certainty when or if backlog will be performed. In addition, even where a project proceeds as scheduled, it is possible that contracted parties may default and fail to pay amounts owed to us or poor project performance could increase the cost associated with a project. Delays, suspensions, cancellations, payment defaults, scope changes and poor project execution could materially reduce or eliminate the revenues and profits that we actually realize from projects in backlog.
Reductions in our backlog due to cancellation or modification by a customer or for other reasons may adversely affect, potentially to a material extent, the revenues and earnings we actually receive from contracts included in our backlog. Many of the contracts in our backlog provide for cancellation fees in the event customers cancel projects. These cancellation fees usually provide for reimbursement of our out-of-pocket costs, revenues for work performed prior to cancellation and a varying percentage of the profits we would have realized had the contract been completed. However, we typically have no contractual right upon cancellation to the total revenues reflected in our backlog. Projects may remain in our backlog for extended periods of time. If we experience significant project terminations, suspensions or scope adjustments to contracts reflected in our backlog, our financial condition, results of operations and cash flows may be adversely impacted.
We are subject to risks associated with contractual pricing in our industries, including the risk that, if our actual costs exceed the costs we estimate on our fixed-price contracts, our profitability will decline, and we may suffer losses.
We are engaged in highly competitive industries, and we have priced a number of our projects on a fixed-price basis. Our actual costs could exceed our projections. We attempt to cover the increased costs of anticipated changes in labor, material and service costs of long-term contracts, either through estimates of cost increases, which are reflected in the original contract price, or through price escalation clauses. Despite these attempts, however, the cost and gross profit we realize on a fixed-price contract could vary materially from the estimated amounts because of supplier, contractor and subcontractor performance, changes in job conditions, variations in labor and equipment productivity and increases in the cost of labor and raw materials, particularly steel, over the term of the contract. These variations and the risks generally inherent in our industries may result in actual revenues or costs being different from those we originally estimated and may result in reduced profitability or losses on projects. Some of these risks include:
| difficulties encountered on our large-scale projects related to the procurement of materials or due to schedule disruptions, equipment performance failures, unforeseen site conditions or other factors that may result in additional costs to us, reductions in revenue, claims or disputes; |
| our inability to obtain compensation for additional work we perform or expenses we incur as a result of our customers providing deficient design or engineering information or equipment or materials; |
| requirements to pay liquidated damages upon our failure to meet schedule or performance requirements of our contracts; and |
| difficulties in engaging third party subcontractors, equipment manufacturers or materials suppliers or failures by third party subcontractors, equipment manufacturers or materials suppliers to perform could result in project delays and cause us to incur additional costs. |
21
Changes in our effective tax rate and tax positions may vary.
We are subject to income taxes in the United States and numerous foreign jurisdictions. A change in tax laws, treaties or regulations, or their interpretation, in any country in which we operate could result in a higher tax rate on our earnings, which could have a material impact on our earnings and cash flows from operations. In addition, significant judgment is required in determining our worldwide provision for income taxes. In the ordinary course of our business, there are many transactions and calculations where the ultimate tax determination is uncertain. We are regularly under audit by tax authorities. Although we believe that our tax estimates and tax positions are reasonable, they could be materially affected by many factors including the final outcome of tax audits and related litigation, the introduction of new tax accounting standards, legislation, regulations and related interpretations, our global mix of earnings, the realizability of deferred tax assets and changes in uncertain tax positions. A significant increase in our tax rate could have a material adverse effect on our profitability and liquidity.
Our business could be negatively impacted by security threats, including physical and cybersecurity threats, and other disruptions.
We face various security threats, including cyber threats, threats to the physical security of our facilities and infrastructure (including those that we manage and operate for our customers), and threats from terrorist acts, as well as the potential for business disruptions associated with these threats. Although we utilize a combination of tailored and industry standard security measures and technology to monitor and mitigate these threats, we cannot guarantee that these measures and technology will be sufficient to prevent security threats from materializing.
We have been, and will likely continue to be, subject to cyber-based attacks and other attempts to threaten our information technology systems, including attempts to gain unauthorized access to our proprietary or classified information and attacks from computer hackers, viruses, malicious code and other security problems. As a U.S. Government contractor, we may be prone to a greater number of those threats than companies in other industries. From time to time, we experience system interruptions and delays; however, prior cyber-based attacks directed at us have not had a material adverse impact on our results of operations. Due to the evolving nature of these security threats, however, the impact of any future incident cannot be predicted.
The costs related to cyber or other security threats or disruptions may not be fully insured or indemnified by other means. Occurrence of any of these events could adversely affect our internal operations, the services we provide to customers, the value of our investment in research and development efforts and other intellectual property, our future financial results, our reputation or our stock price.
In addition, from time to time we may replace and/or upgrade current financial, human resources and other information technology systems. These activities subject us to inherent costs and risks associated with replacing and updating these systems, including potential disruption of our internal control structure, substantial capital expenditures, demands on management time and other risks of delays or difficulties in transitioning to new systems or of integrating new systems into our current systems. Our systems implementations and upgrades may not result in productivity improvements at the levels anticipated, or at all. In addition, the implementation of new technology systems may cause disruptions in our business operations. Such disruption and any other information technology system disruptions, and our ability to mitigate those disruptions, if not anticipated and appropriately mitigated, could have a material adverse effect on us.
22
We rely on intellectual property law and confidentiality agreements to protect our intellectual property. We also rely on intellectual property we license from third parties. Our failure to protect our intellectual property rights, or our inability to obtain or renew licenses to use intellectual property of third parties, could adversely affect our business.
Our success depends, in part, on our ability to protect our proprietary information and other intellectual property. Our intellectual property could be stolen, challenged, invalidated, circumvented or rendered unenforceable. In addition, effective intellectual property protection may be limited or unavailable in some foreign countries where we operate.
Our failure to protect our intellectual property rights may result in the loss of valuable technologies or adversely affect our competitive business position. We rely significantly on proprietary technology, information, processes and know-how that are not subject to patent or copyright protection. We seek to protect this information through trade secret or confidentiality agreements with our employees, consultants, subcontractors or other parties, as well as through other security measures. These agreements and security measures may be inadequate to deter or prevent misappropriation of our confidential information. In the event of an infringement of our intellectual property rights, a breach of a confidentiality agreement or divulgence of proprietary information, we may not have adequate legal remedies to protect our intellectual property. Litigation to determine the scope of intellectual property rights, even if ultimately successful, could be costly and could divert managements attention away from other aspects of our business. In addition, our trade secrets may otherwise become known or be independently developed by competitors.
In some instances, we have augmented our technology base by licensing the proprietary intellectual property of third parties. In the future, we may not be able to obtain necessary licenses on commercially reasonable terms.
Our use of the percentage-of-completion method of accounting could result in volatility in our results of operations.
We generally recognize revenues and profits under our long-term contracts on a percentage-of-completion basis. Accordingly, we review contract price and cost estimates periodically as the work progresses and reflect adjustments proportionate to the percentage of completion in income in the period when we revise those estimates. To the extent these adjustments result in a reduction or an elimination of previously reported profits with respect to a project, we would recognize a charge against current earnings, which could be material. Our current estimates of our contract costs and the profitability of our long-term projects, although reasonably reliable when made, could change as a result of the uncertainties associated with these types of contracts, and if adjustments to overall contract costs are significant, the reductions or reversals of previously recorded revenue and profits could be material in future periods.
Maintaining adequate bonding and letter of credit capacity is necessary for us to successfully bid on and win various contracts.
In line with industry practice, we are often required to post standby letters of credit and surety bonds to support contractual obligations to customers as well as other obligations. These letters of credit and bonds generally indemnify customers should we fail to perform our obligations under the applicable contracts. If a letter of credit or bond is required for a particular project and we are unable to obtain it due to insufficient liquidity or other reasons, we will not be able to pursue that project. We utilize bonding facilities, but, as is typically the case, the issuance of bonds under each of those facilities is at the suretys sole discretion. In addition, we have capacity limits under our credit facility for letters of credit. Moreover, due to events that affect the insurance and bonding and credit markets generally, bonding and letters of credit may be more difficult to obtain in the future or may only be available at significant additional cost. There can be no assurance that letters of credit or bonds will continue to be available to us on reasonable terms. Our inability to obtain adequate letters of credit and bonding and, as a result, to bid on new work could have a material adverse effect on our business, financial condition and results of operations. As of December 31, 2013, we had $259.4 million in letters of credit and bank guarantees and $405.8 million in surety bonds outstanding.
23
Our debt obligations and credit facility could restrict our operations.
The terms of our credit agreement impose various restrictions and covenants on us that could have adverse consequences, including:
| limiting our ability to react to changing economic, regulatory and industry conditions; |
| limiting our ability to compete and our flexibility in planning for, or reacting to, changes in our business and the industry; |
| limiting our ability to invest in joint ventures or acquire other companies; |
| limiting our ability to pay dividends to our stockholders; and |
| limiting our ability to borrow additional funds. |
Our business strategy includes acquisitions to support our growth. Acquisitions of other businesses can create certain risks and uncertainties.
We intend to pursue growth through the acquisition of businesses or assets that we believe will enable us to strengthen our existing businesses and expand into new industries and regions. We may be unable to continue this growth strategy if we cannot identify suitable businesses or assets, reach agreement on potential strategic acquisitions on acceptable terms or for other reasons. Moreover, business acquisitions involve certain risks, including:
| difficulties relating to the assimilation of personnel, services and systems of an acquired business and the assimilation of marketing and other operational capabilities; |
| challenges resulting from unanticipated changes in customer relationships subsequent to acquisition; |
| additional financial and accounting challenges and complexities in areas such as tax planning, treasury management, financial reporting and internal controls; |
| assumption of liabilities of an acquired business, including liabilities that were unknown at the time the acquisition transaction was negotiated; |
| diversion of managements attention from day-to-day operations; |
| failure to realize anticipated benefits, such as cost savings and revenue enhancements; |
| potentially substantial transaction costs associated with business combinations; and |
| potential impairment of goodwill or other intangible assets resulting from the overpayment for an acquisition. |
Acquisitions may be funded by the issuance of additional equity or debt financing, which may not be available on attractive terms. Our ability to secure such financing will depend in part on prevailing capital market conditions, as well as conditions in our business and operating results. Moreover, to the extent an acquisition transaction financed by non-equity consideration results in goodwill, it will reduce our tangible net worth, which might have an adverse effect on potential credit and bonding capacity.
Additionally, an acquisition may bring us into businesses we have not previously conducted and expose us to additional business risks that are different than those we have historically experienced.
Our business strategy also includes development and commercialization of new technologies to support our growth, which requires significant investment and involves various risks and uncertainties. These new technologies may not achieve desired commercial or financial results.
Our future growth will depend on our ability to continue to innovate by developing and commercializing new product and service offerings. Investments in new technologies involve varying degrees of uncertainties and risk. Commercial success depends on many factors, including the levels of innovation, the development costs and the availability of capital resources to fund those costs, the levels of competition from others developing similar or other competing technologies, our ability to obtain or maintain government permits or certifications, the effectiveness of production, distribution and marketing efforts, and the costs to customers to deploy and provide support for the new technologies. We may not achieve significant revenue from new product and service investments for a number of years, if at all. Moreover, new products and services may not be profitable, and, even if they are profitable, our operating margins from new products and services may not be as high as the margins we have experienced historically. In addition, new technologies may not be patentable and, as a result, we may face increased competition.
24
Among our opportunities involving new technologies, we are developing the B&W mPower reactor. The costs to develop and commercialize this technology will require a substantial amount of investment over a period of years, and the funding requirements may vary significantly from period to period. Commercialization of this technology will require certification from the NRC. There can be no assurance that we will be successful in addressing all the technological challenges to developing and commercializing this technology or in obtaining the required NRC certification. Furthermore, while there currently are various small reactor competitors with limited capability, the potential exists for other competitors to emerge with competing technologies, in some cases with funding readily available, and we can provide no assurance that those competitors will not develop and commercialize similar or superior technologies sooner than we can or at a significant cost or price advantage.
On April 12, 2013, B&W mPower entered into a Cooperative Agreement with the DOE establishing the terms and conditions of a funding award expected to initially total at least $150 million under the DOE SMR Licensing Technical Support Program. Under the Cooperative Agreement, the DOE will provide incremental cost reimbursements for up to 50%, subject to the overall size of the award, of qualified expenditures incurred in connection with the development and commercialization of the SMR technology. Only a portion of the funding award has been authorized by the DOE, with the remaining amount subject to future Congressional appropriations. Our ability to obtain continued funding under the Cooperative Agreement is also dependent, in part, on our ability to perform our obligations under the Cooperative Agreement, including achieving specified milestones. In addition, the DOE may elect to not extend funding beyond the end of the then-current budget period, which is expected to occur on or about each anniversary of the date of the Cooperative Agreement. Further, either the DOE or B&W mPower may terminate the Cooperative Agreement at any time upon defined notice periods. Such a termination would eliminate the DOEs obligation to continue funding under the award program. If we do not receive or if we experience delays in obtaining continued program funding due to lack of Congressional appropriations or the other reasons described above, funding of our related research and development activities could be impaired or delayed.
On November 13, 2013 we announced an accelerated search for additional investors who would collectively own the majority interest in GmP. Identifying and completing a transaction (or transactions) with additional investors is subject to many risks and uncertainties. There is no guarantee that any such additional investment would occur in the timeframe we desire, or at all, and it may not achieve the desired financial or commercial benefits. If we are unable to complete transactions with additional investors, development of and funding for our B&W mPower reactor program may be adversely impacted or delayed. This may cause us to not realize any return on our investment, impact the timing and likelihood of achieving program development milestones and possibly expose us to claims of contractual and other liability from our current partner, customer or others.
Our operations are subject to operating risks, which could expose us to potentially significant professional liability, product liability, warranty and other claims. Our insurance coverage may be inadequate to cover all of our significant risks or our insurers may deny coverage of material losses we incur, which could adversely affect our profitability and overall financial condition.
We engineer, construct and perform services in large industrial facilities where accidents or system failures can have significant consequences. Risks inherent in our operations include:
| accidents resulting in injury or the loss of life or property; |
| environmental or toxic tort claims, including delayed manifestation claims for personal injury or loss of life; |
| pollution or other environmental mishaps; |
| adverse weather conditions; |
| mechanical failures; |
| property losses; |
| business interruption due to political action in foreign countries or other reasons; and |
| labor stoppages. |
25
Any accident or failure at a site where we have provided products or services could result in significant professional liability, product liability, warranty and other claims against us, regardless of whether our products or services caused the incident. We have been, and in the future we may be, named as defendants in lawsuits asserting large claims as a result of litigation arising from events such as those listed above.
We endeavor to identify and obtain in established markets insurance agreements to cover significant risks and liabilities. Insurance against some of the risks inherent in our operations is either unavailable or available only at rates or on terms that we consider uneconomical. Also, catastrophic events customarily result in decreased coverage limits, more limited coverage, additional exclusions in coverage, increased premium costs and increased deductibles and self-insured retentions. Risks that we have frequently found difficult to cost-effectively insure against include, but are not limited to, business interruption, property losses from wind, flood and earthquake events, nuclear hazards, war and confiscation or seizure of property in some areas of the world, pollution liability, liabilities related to occupational health exposures (including asbestos), professional liability/errors and omissions coverage, the failure, misuse or unavailability of our information systems, the failure of security measures designed to protect our information systems from security breaches, and liability related to risk of loss of our work in progress and customer-owned materials in our care, custody and control. Depending on competitive conditions and other factors, we endeavor to obtain contractual protection against certain uninsured risks from our customers. When obtained, such contractual indemnification protection may not be as broad as we desire or may not be supported by adequate insurance maintained by the customer. Such insurance or contractual indemnity protection may not be sufficient or effective under all circumstances or against all hazards to which we may be subject. A successful claim for which we are not insured or for which we are underinsured could have a material adverse effect on us. Additionally, disputes with insurance carriers over coverage may affect the timing of cash flows and, if litigation with the carrier becomes necessary, an outcome unfavorable to us may have a material adverse effect on our results of operations.
We are also involved in management and operating activities for the U.S. Government where we are the prime contractor, including the Y-12 National Security Complex and Pantex Plant facilities. These activities involve, among other things, handling nuclear devices and their components from the aging stockpile of the U.S. Government. Most insurable liabilities arising from these sites are not protected in our corporate insurance program. Instead, we rely on government contractual agreements, some insurance purchased specifically for the sites and certain specialized self-insurance programs funded by the U.S. Government. The U.S. Government has historically fulfilled its contractual agreement to reimburse for insurable claims, and we expect it to continue this process during our administration of these two facilities. However, it should be noted that, in most situations, the U.S. Government is contractually obligated to pay subject to the availability of authorized government funds. The reimbursement obligation of the U.S. Government is also conditional, and provisions of the relevant contract or applicable law may preclude reimbursement.
We have a captive insurance company subsidiary that provides us with various insurance coverages. Claims, as a result of our operations, could adversely impact the ability of our captive insurance company subsidiary to respond to all claims presented.
Additionally, upon the February 22, 2006 effectiveness of the settlement relating to the Chapter 11 proceedings involving several of our subsidiaries, most of our subsidiaries contributed substantial insurance rights providing coverage for, among other things, asbestos and other personal injury claims, to an asbestos personal injury trust. With the contribution of these insurance rights to the asbestos personal injury trust, we may have underinsured or uninsured exposure for non-derivative asbestos claims or other personal injury or other claims that would have been insured under these coverages had the insurance rights not been contributed to the asbestos personal injury trust.
Our nuclear operations subject us to various environmental, regulatory, financial and other risks.
Our operations in designing, engineering, manufacturing, supplying, constructing and maintaining nuclear fuel and nuclear power equipment and components subject us to various risks, including:
| potential liabilities relating to harmful effects on the environment and human health resulting from nuclear operations and the storage, handling and disposal of radioactive materials; |
| unplanned expenditures relating to maintenance, operation, security, upgrades and repairs required by the NRC and other government agencies; |
| limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with nuclear operations; and |
26
| potential liabilities arising out of a nuclear incident, whether or not it is within our control. |
Our nuclear operations are subject to various safety-related requirements imposed by the U.S. Government, the DOE and the NRC. In the event of non-compliance, these agencies might increase regulatory oversight, impose fines or shut down our operations, depending upon the assessment of the severity of the situation. Revised security and safety requirements promulgated by these agencies could necessitate substantial capital and other expenditures.
Limitations or modifications to indemnification regulations of the United States or foreign countries could adversely affect our business.
The Price-Anderson Act partially indemnifies the nuclear industry against liability arising from nuclear incidents in the United States, while ensuring compensation for the general public. The Price-Anderson Act comprehensively regulates the manufacture, use and storage of radioactive materials, while promoting the nuclear industry by offering broad indemnification to commercial nuclear power plant operators and DOE contractors. Because we provide nuclear fabrication and other services to the DOE relating to its nuclear devices, facilities and other programs and the nuclear power industry in the ongoing maintenance and modifications of its nuclear power plants, including the manufacture of equipment and other components for use in such nuclear power plants, we may be entitled to some of the indemnification protections under the Price-Anderson Act against liability arising from nuclear incidents in the United States. The indemnification authority under the Price-Anderson Act was extended through December 2025 by the Energy Policy Act of 2005. We also provide nuclear fabrication and other services to the nuclear power industry in Canada. Canadas Nuclear Liability Act generally conforms to international conventions and is conceptually similar to the Price-Anderson Act in the United States. Accordingly, indemnification protections and the possibility of exclusions under Canadas Nuclear Liability Act are similar to those under the Price-Anderson Act in the United States.
The Price-Anderson Acts indemnification provisions may not apply to all liabilities that we might incur while performing services as a contractor for the DOE and the nuclear power industry. If an incident or evacuation is not covered under the Price-Anderson Acts indemnification provisions, we could be held liable for damages, regardless of fault, which could have an adverse effect on our results of operations and financial condition. In connection with the international transportation of toxic, hazardous and radioactive materials, it is possible for a claim to be asserted which may not fall within the indemnification provided by the Price-Anderson Act. If such indemnification authority is not applicable in the future, our business could be adversely affected if the owners and operators of nuclear power plants fail to retain our services in the absence of commercially adequate insurance and indemnification.
Moreover, because we manufacture nuclear components for the U.S. Governments defense program, we may be entitled to some of the indemnification protections afforded by Public Law 85-804 for certain of our nuclear operations risks. Public Law 85-804 authorizes certain agencies of the U.S. Government, such as the DOE and the U.S. Department of Defense, to indemnify their contractors against unusually hazardous or nuclear risks when such action would facilitate the national defense. However, because the indemnification protections afforded by Public Law 85-804 are granted on a discretionary basis, situations could arise where the U.S. Government elects not to offer such protections. In such situations, our business could be adversely affected by either our inability to obtain commercially adequate insurance or indemnification or our refusal to pursue such operations in the absence of such protections.
We are subject to government regulations that may adversely affect our future operations.
Many aspects of our operations and properties are affected by political developments and are subject to both domestic and foreign governmental regulations, including those relating to:
| constructing and manufacturing power generation products and nuclear components; |
| currency conversions and repatriation; |
| clean air and other environmental protection legislation; |
| taxation of foreign earnings and earnings of expatriate personnel; and |
| use of local employees and suppliers. |
27
In addition, a substantial portion of the demand for our products and services is from electric power generating companies and other steam-using customers. The demand for power generation products and services can be influenced by state and federal governmental legislation setting requirements for utilities related to operations, emissions and environmental impacts. The legislative process is unpredictable and includes a platform that continuously seeks to increase the restrictions on power producers. Potential legislation limiting emissions from power plants, including carbon dioxide, could affect our markets and the demand for our products and services related to power generation.
We cannot determine the extent to which our future operations and earnings may be affected by new legislation, new regulations or changes in existing regulations.
Regulations related to conflict minerals may force us to incur additional expenses, may make our supply chain more complex and may result in damage to our reputation with customers.
On August 22, 2012, under the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the Dodd-Frank Act), the SEC adopted new requirements for companies that use certain minerals and metals, known as conflict minerals, in their products, whether or not these products are manufactured by third parties. These requirements will require companies that are subject to the rules to conduct due diligence, and disclose and report whether or not such minerals originate from the Democratic Republic of Congo and adjoining countries. The implementation of these new requirements could adversely affect the sourcing, availability and pricing of minerals used in the manufacture of certain components incorporated in our products. In addition, we will incur additional costs to comply with the disclosure requirements, including costs related to determining the source of any of the relevant minerals and metals used in our products. Since our supply chain is complex, we may not be able to sufficiently verify the origins for these minerals and metals used in our products through the diligence procedures that we implement, which may harm our reputation. In such event, we may also face difficulties in satisfying customers who require that all of the components of our products are certified as conflict mineral free.
Our businesses require us to obtain, and to comply with, national, state and local government permits and approvals.
Our businesses are required to obtain, and to comply with, national, state and local government permits and approvals. Any of these permits or approvals may be subject to denial, revocation or modification under various circumstances. Failure to obtain or comply with the conditions of permits or approvals may adversely affect our operations by temporarily suspending our activities or curtailing our work and may subject us to penalties and other sanctions. Although existing licenses are routinely renewed by various regulators, renewal could be denied or jeopardized by various factors, including:
| failure to provide adequate financial assurance for decommissioning or closure; |
| failure to comply with environmental and safety laws and regulations or permit conditions; |
| local community, political or other opposition; |
| executive action; and |
| legislative action. |
In addition, if new environmental legislation or regulations are enacted or implemented, or existing laws or regulations are amended or are interpreted or enforced differently, we may be required to obtain additional operating permits or approvals. Our inability to obtain, and to comply with, the permits and approvals required for our businesses could have a material adverse effect on us.
Our operations involve the handling, transportation and disposal of radioactive and hazardous materials, and environmental laws and regulations and civil liability for contamination of the environment or related personal injuries may result in increases in our operating costs and capital expenditures and decreases in our earnings and cash flows.
Our operations involve the handling, transportation and disposal of radioactive and hazardous materials, including nuclear devices and their components. Failure to properly handle these materials could pose a health risk to humans or wildlife and could cause personal injury and property damage (including environmental contamination). If an accident were to occur, its severity could be significantly affected by the volume of the
28
materials and the speed of corrective action taken by emergency response personnel, as well as other factors beyond our control, such as weather and wind conditions. Actions taken in response to an accident could result in significant costs.
Governmental requirements relating to the protection of the environment, including solid waste management, air quality, water quality, the decontamination and decommissioning of nuclear manufacturing and processing facilities and cleanup of contaminated sites, have had a substantial impact on our operations. These requirements are complex and subject to frequent change. In some cases, they can impose liability for the entire cost of cleanup on any responsible party without regard to negligence or fault and impose liability on us for the conduct of others or conditions others have caused, or for our acts that complied with all applicable requirements when we performed them. Our compliance with amended, new or more stringent requirements, stricter interpretations of existing requirements or the future discovery of contamination may require us to make material expenditures or subject us to liabilities that we currently do not anticipate. Such expenditures and liabilities may adversely affect our business, financial condition, results of operations and cash flows. In addition, some of our operations and the operations of predecessor owners of some of our properties have exposed us to civil claims by third parties for liability resulting from alleged contamination of the environment or personal injuries caused by releases of hazardous substances into the environment. See BusinessGovernmental Regulations and Environmental Matters.
In our contracts, we seek to protect ourselves from liability associated with accidents, but there can be no assurance that such contractual limitations on liability will be effective in all cases or that our or our customers insurance will cover all the liabilities we have assumed under those contracts. The costs of defending against a claim arising out of a nuclear incident or precautionary evacuation, and any damages awarded as a result of such a claim, could adversely affect our results of operations and financial condition.
We maintain insurance coverage as part of our overall risk management strategy and due to requirements to maintain specific coverage in our financing agreements and in many of our contracts. These policies do not protect us against all liabilities associated with accidents or for unrelated claims. In addition, comparable insurance may not continue to be available to us in the future at acceptable prices, or at all.
We conduct a portion of our operations through joint venture entities, over which we may have limited ability to influence.
We currently have equity interests in several significant joint ventures and may enter into additional joint venture arrangements in the future. We do not manage all of these entities. Even in those joint ventures that we manage, we are often required to consider the interests of our joint venture partners in connection with major decisions concerning the operations of the joint ventures. In any case, differences in views among the joint venture participants may result in delayed decisions or disputes. We also cannot control the actions of our joint venture participants. We sometimes have joint and several liabilities with our joint venture partners under the applicable contracts for joint venture projects and we cannot be certain that our partners will be able to satisfy any potential liability that could arise. These factors could potentially harm the business and operations of a joint venture and, in turn, our business and operations.
Operating through joint ventures in which we are minority holders results in us having limited control over many decisions made with respect to projects and internal controls relating to projects. These joint ventures may not be subject to the same requirements regarding internal controls and internal control over financial reporting that we follow. As a result, internal control problems may arise with respect to the joint ventures that could adversely affect our ability to respond to requests or contractual obligations to customers or to meet the internal control requirements to which we are otherwise subject.
In addition, our arrangements involving joint ventures may restrict us from gaining access to the cash flows or assets of these entities. In some cases, our joint ventures have governmentally imposed restrictions on their abilities to transfer funds to us.
29
If our co-venturers fail to perform their contractual obligations on a project or if we fail to coordinate effectively with our co-venturers, we could be exposed to legal liability, loss of reputation and reduced profit on the project.
We often perform projects jointly with third parties. For example, we enter into contracting consortia and other contractual arrangements to bid for and perform jointly on large projects. Success on these joint projects depends in part on whether our co-venturers fulfill their contractual obligations satisfactorily. If any one or more of these third parties fail to perform their contractual obligations satisfactorily, we may be required to make additional investments and provide added services in order to compensate for that failure. If we are unable to adequately address any such performance issues, then our customer may exercise its right to terminate a joint project, exposing us to legal liability, loss of reputation and reduced profit.
Our collaborative arrangements also involve risks that participating parties may disagree on business decisions and strategies. These disagreements could result in delays, additional costs and risks of litigation. Our inability to successfully maintain existing collaborative relationships or enter into new collaborative arrangements could have a material adverse effect on our results of operations.
Employee, agent or partner misconduct or our overall failure to comply with laws, regulations or government contracts could weaken our ability to win contracts, lead to the suspension of our operations and result in reduced revenues and profits.
Misconduct, fraud, or other improper activities by one or more of our employees, agents or partners as well as our failure to comply with applicable laws and regulations, could have a significant negative impact on our business and reputation. Such misconduct could include the failure to comply with government procurement regulations, regulations regarding the protection of classified information, regulations regarding the pricing of labor and other costs in government contracts, regulations on lobbying or similar activities, regulations pertaining to the internal controls over financial reporting and various other applicable laws or regulations. For example, we regularly provide services that may be highly sensitive or that are related to critical national security matters; if a security breach were to occur, our ability to procure future government contracts could be severely limited. The precautions we take to prevent and detect these activities may not be effective, and we could face unknown risks or losses.
We are routinely audited and reviewed by the U.S. Government and its agencies. These agencies review our performance under our contracts, our cost structure and our compliance with applicable laws, regulations and standards, as well as the adequacy of, and our compliance with, our internal control systems and policies. Systems that are subject to review include our purchasing systems, billing systems, property management and control systems, cost estimating systems, compensation systems and management information systems. Any costs found to be improperly allocated to a specific contract will not be reimbursed or must be refunded if already reimbursed. If an audit or review uncovers improper or illegal activities, we could be subject to civil and criminal penalties and administrative sanctions, including termination of contracts, forfeiture of profits, suspension of payments, fines, loss of security clearance and suspension or debarment from contracting with the U.S. Government. In addition, we could suffer serious reputational harm if allegations of impropriety were made against us.
We could be adversely affected by violations of the U.S. Foreign Corrupt Practices Act.
The U.S. Foreign Corrupt Practices Act (the FCPA) generally prohibits companies and their intermediaries from making improper payments to non-U.S. officials. Our training program and policies mandate compliance with the FCPA. We operate in some parts of the world that have experienced governmental corruption to some degree, and, in certain circumstances, strict compliance with anti-bribery laws may conflict with local customs and practices. If we are found to be liable for violations of the FCPA (either due to our own acts or our inadvertence, or due to the acts or inadvertence of others, including employees of our joint ventures), we could suffer from civil and criminal penalties or other sanctions.
30
We may not be able to compete successfully against current and future competitors.
Some of our competitors or potential competitors have greater financial or other resources than we have. Our operations may be adversely affected if our current competitors or new market entrants introduce new products or services with better features, performance, prices or other characteristics than those of our products and services. Furthermore, we operate in industries where capital investment is critical. We may not be able to obtain as much purchasing and borrowing leverage and access to capital for investment as other public companies, which may impair our ability to compete against competitors or potential competitors.
The loss of the services of one or more of our key personnel, or our failure to attract, assimilate and retain trained personnel in the future, could disrupt our operations and result in loss of revenues.
Our success depends on the continued active participation of our executive officers and key operating personnel. The unexpected loss of the services of any one of these persons could adversely affect our operations.
Our operations require the services of employees having the technical training and experience necessary to obtain the proper operational results. As such, our operations depend, to a considerable extent, on the continuing availability of such personnel. If we should suffer any material loss of personnel to competitors or be unable to employ additional or replacement personnel with the requisite level of training and experience to adequately operate our business, our operations could be adversely affected. While we believe our wage rates are competitive and our relationships with our employees are satisfactory, a significant increase in the wages paid by other employers could result in a reduction in our workforce, increases in wage rates, or both. If either of these events occurred for a significant period of time, our financial condition, results of operations and cash flows could be adversely impacted.
We may be unable to realize expected benefits from our Global Competitiveness Initiative and our profitability may be hurt or our business otherwise might be adversely affected.
In order to operate more efficiently and control costs, in 2012 we launched B&Ws Global Competitiveness Initiative, which includes operational and functional efficiency improvements, organizational design changes and manufacturing optimization. These plans are intended to generate operating expense savings through direct and indirect overhead expense reductions as well as other savings. These types of cost reduction and restructuring activities are complex. If we do not successfully manage our current restructuring activities, or any other restructuring activities that we may undertake in the future, expected efficiencies and benefits might be delayed or not realized, and our operations and business could be disrupted. Risks associated with these actions and other workforce management issues include delays, additional unexpected costs, implementation cost overruns, changes in restructuring plans that increase or decrease the number of employees affected, adverse effects on employee morale and the failure to meet operational targets due to the loss of employees, any of which may impair our ability to achieve anticipated cost reductions or may otherwise harm our business, which could have a material adverse effect on our competitive position, results of operations, cash flows or financial condition.
Negotiations with labor unions and possible work stoppages and other labor problems could divert management attention and disrupt operations. In addition, new collective bargaining agreements or amendments to agreements could increase our labor costs and operating expenses.
A significant number of our employees are members of labor unions. If we are unable to negotiate acceptable new contracts with our unions from time to time, we could experience strikes or other work stoppages by the affected employees. If any such strikes or other work stoppages were to occur, we could experience a significant disruption of operations. In addition, negotiations with unions could divert management attention. New union contracts could result in increased operating costs, as a result of higher wages or benefit expenses, for both union and nonunion employees. If nonunion employees were to unionize, we would experience higher ongoing labor costs.
31
Pension and medical expenses associated with our retirement benefit plans may fluctuate significantly depending on changes in actuarial assumptions, future market performance of plan assets, future trends in health care costs and legislative or other regulatory actions.
A substantial portion of our current and retired employee population is covered by pension and postretirement benefit plans, the costs and funding requirements of which depend on our various assumptions, including estimates of rates of return on benefit-related assets, discount rates for future payment obligations, rates of future cost growth and trends for future costs. Variances from these estimates could have a material adverse effect on us. In addition, funding requirements for benefit obligations of our pension and postretirement benefit plans are subject to legislative and other government regulatory actions. As of December 31, 2013, our defined benefit pension and postretirement benefit plans were underfunded by approximately $441.4 million. For additional information regarding our pension and postretirement benefit plans, see Note 7 to the consolidated financial statements included in this report.
Our internal controls over financial reporting may not be sufficient to achieve all stated goals and objectives.
Our internal controls and procedures were developed through a process in which our management applied its judgment in assessing the costs and benefits of such controls and procedures, which, by their nature, can provide only reasonable assurance regarding the control objectives. You should note that the design of any system of internal controls and procedures is based in part upon various assumptions about the likelihood of future events, and we cannot assure you that any design will succeed in achieving its stated goals under all potential future conditions, regardless of how remote.
Our Nuclear Operations segment relies on several single-source suppliers, which could, under certain circumstances, adversely affect our revenues and operating results.
Our Nuclear Operations segment relies on several single-source suppliers for materials used in its products. If the supply of a single-sourced material is delayed or ceases, we may not be able to produce the related product in a timely manner or in sufficient quantities, if at all, which could adversely affect our revenues and operating results. In addition, a single-source supplier of a key component could potentially exert significant bargaining power over price, quality, warranty claims, or other terms relating to the single-sourced materials.
Our international operations are subject to political, economic and other uncertainties not generally encountered in our domestic operations.
We derive a substantial portion of our revenues and equity in income of investees from international operations. Our international operations are subject to political, economic and other uncertainties not generally encountered in our U.S. operations. These include:
| risks of war, terrorism and civil unrest; |
| expropriation, confiscation or nationalization of our assets; |
| renegotiation or nullification of our existing contracts; |
| changing political conditions and changing laws and policies affecting trade and investment; |
| overlap of different tax structures; and |
| risk of changes in foreign currency exchange rates. |
Various foreign jurisdictions have laws limiting the right and ability of foreign subsidiaries and joint ventures to pay dividends and remit earnings to affiliated companies. Our international operations sometimes face the additional risks of fluctuating currency values, hard currency shortages and controls of foreign currency exchange.
32
Natural disasters or other events beyond our control could adversely impact our business.
Natural disasters, such as earthquakes, tsunamis, hurricanes, floods, tornados, or other events could adversely impact demand for or supply of our products. In addition, natural disasters could also cause disruption to our facilities, systems or projects, which could interrupt operational processes and performance on our contracts and adversely impact our ability to manufacture our products and provide services and support to our customers. We operate facilities in areas of the world that are exposed to natural disasters, such as, but not limited to, hurricanes, floods and tornados.
War, other armed conflicts or terrorist attacks could have a material adverse effect on our business.
The wars in Iraq and Afghanistan and terrorist attacks and unrest have caused and may continue to cause instability in the worlds financial and commercial markets and have significantly increased political and economic instability in some of the geographic areas in which we operate. Threats of war or other armed conflict may cause further disruption to financial and commercial markets. In addition, continued unrest could lead to acts of terrorism in the United States or elsewhere, and acts of terrorism could be directed against companies such as ours. Also, acts of terrorism and threats of armed conflicts in or around various areas in which we operate could limit or disrupt our markets and operations, including disruptions from evacuation of personnel, cancellation of contracts or the loss of personnel or assets. Armed conflicts, terrorism and their effects on us or our markets may significantly affect our business and results of operations in the future.
We are subject to continuing contingent liabilities of MII as a result of the spin-off.
With completion of the spin-off, there are several significant areas where the liabilities of MII may become our obligations. For example, under the Internal Revenue Code of 1986, as amended (the Code) and the related rules and regulations, each corporation that was a member of our consolidated tax reporting group during any taxable period or portion of any taxable period ending on or before the effective time of the spin-off is jointly and severally liable for the federal income tax liability of our entire consolidated tax reporting group for that taxable period. We have entered into a tax sharing agreement with a subsidiary of MII that allocates the responsibility for prior period taxes of our consolidated tax reporting group between us and MII and its subsidiaries. However, if the subsidiary of MII were unable to pay, we could be required to pay the entire amount of such taxes. Other provisions of federal law establish similar liability for other matters, including laws governing tax-qualified pension plans as well as other contingent liabilities.
The spin-off from MII could result in substantial tax liability.
MII has obtained a private letter ruling from the IRS substantially to the effect that, for U.S. federal income tax purposes, the spin-off qualified under Section 355 of the Code and certain transactions related to the spin-off qualified under Sections 355 and/or 368 of the Code. If the factual assumptions or representations made in the private letter ruling request are inaccurate or incomplete in any material respect, then we will not be able to rely on the ruling. Furthermore, the IRS will not rule on whether a distribution such as the spin-off satisfies certain requirements necessary to obtain tax-free treatment under Section 355 of the Code. Rather, the private letter ruling is based on representations by MII that those requirements have been satisfied, and any inaccuracy in those representations could invalidate the ruling.
Under the terms of the tax sharing agreement we entered into in connection with the spin-off, we are generally responsible for any taxes imposed on us or MII and its subsidiaries in the event that the spin-off and/or certain related preparatory transactions were to fail to qualify for tax-free treatment. However, if the spin-off and/or certain related preparatory transactions were to fail to qualify for tax-free treatment because of actions or failures to act by MII or its subsidiaries, a subsidiary of MII would be responsible for all such taxes. If we are liable for taxes under the tax sharing agreement, that liability could have a material adverse effect on us.
33
Potential indemnification liabilities to MII pursuant to the master separation agreement could materially adversely affect our company.
The master separation agreement with MII provides for, among other things, the principal corporate transactions required to effect the spin-off, certain conditions to the spin-off and provisions governing the relationship between our company and MII with respect to and resulting from the spin-off. Among other things, the master separation agreement provides for indemnification obligations designed to make our company financially responsible for substantially all liabilities that may exist relating to our business activities, whether incurred prior to or after the spin-off, as well as those obligations of MII assumed by us pursuant to the master separation agreement. If we are required to indemnify MII under the circumstances set forth in the master separation agreement, we may be subject to substantial liabilities.
In connection with our separation from MII, MII will indemnify us for certain liabilities. However, there can be no assurance that the indemnity will be sufficient to insure us against the full amount of such liabilities, or that MIIs ability to satisfy its indemnification obligation will not be impaired in the future.
Pursuant to the master separation agreement, MII has agreed to indemnify us for certain liabilities. However, third parties could seek to hold us responsible for any of the liabilities that MII has agreed to retain, and there can be no assurance that the indemnity from MII will be sufficient to protect us against the full amount of such liabilities, or that MII will be able to fully satisfy its indemnification obligations. Moreover, even if we ultimately succeed in recovering from MII any amounts for which we are held liable, we may be temporarily required to bear these losses, which could have a material adverse effect on our liquidity.
Risks Relating to Ownership of Our Common Stock
Provisions in our corporate documents and Delaware law could delay or prevent a change in control of our company, even if that change may be considered beneficial by some stockholders.
The existence of some provisions of our certificate of incorporation and bylaws and Delaware law could discourage, delay or prevent a change in control of our company that a stockholder may consider favorable. These include provisions:
| providing that our Board of Directors fixes the number of members of the board; |
| providing for the division of our board of directors into three classes with staggered terms; |
| limiting who may call special meetings of stockholders; |
| prohibiting stockholder action by written consent, thereby requiring stockholder action to be taken at a meeting of the stockholders; |
| establishing advance notice requirements for nominations of candidates for election to our Board of Directors or for proposing matters that can be acted on by stockholders at stockholder meetings; |
| establishing supermajority vote requirements for certain amendments to our certificate of incorporation and bylaws; |
| limiting the right of stockholders to remove directors; |
| authorizing a large number of shares of common stock that are not yet issued, which would allow our Board of Directors to issue shares to persons friendly to current management, thereby protecting the continuity of our management, or which could be used to dilute the stock ownership of persons seeking to obtain control of us; and |
| authorizing the issuance of blank check preferred stock, which could be issued by our Board of directors to increase the number of outstanding shares and thwart a takeover attempt. |
In addition, we are subject to Section 203 of the Delaware General Corporation Law, which may have an anti-takeover effect with respect to transactions not approved in advance by our Board of Directors, including discouraging takeover attempts that might result in a premium over the market price for shares of our common stock.
34
We believe these provisions protect our stockholders from coercive or otherwise unfair takeover tactics by requiring potential acquirers to negotiate with our Board of Directors and by providing our Board of Directors with more time to assess any acquisition proposal, and are not intended to make our company immune from takeovers. However, these provisions apply even if the offer may be considered beneficial by some stockholders and could delay or prevent an acquisition that our Board of Directors determines is not in the best interests of our company and our stockholders.
We may issue preferred stock that could dilute the voting power or reduce the value of our common stock.
Our certificate of incorporation authorizes us to issue, without the approval of our stockholders, one or more classes or series of preferred stock having such designation, powers, preferences and relative, participating, optional and other special rights, including preferences over our common stock respecting dividends and distributions, as our Board of Directors generally may determine. The terms of one or more classes or series of preferred stock could dilute the voting power or reduce the value of our common stock. For example, we could grant holders of preferred stock the right to elect some number of our directors in all events or on the happening of specified events or the right to veto specified transactions. Similarly, the repurchase or redemption rights or liquidation preferences we could assign to holders of preferred stock could affect the residual value of the common stock.
Item 1B. | UNRESOLVED STAFF COMMENTS |
None
35
Item 2. | PROPERTIES |
The following table provides the segment name, location and general use of each of our principal properties at December 31, 2013 that we own or lease.
Business Segment and Location |
Principal Use |
Owned/Leased (Lease Expiration) | ||
Power Generation |
||||
Barberton, Ohio |
Manufacturing facility / administrative office | Owned(1) | ||
West Point, Mississippi |
Manufacturing facility | Owned(1) | ||
Lancaster, Ohio |
Manufacturing facility | Owned(1) | ||
Copley, Ohio |
Warehouse / service center | Owned(1) | ||
Cambridge, Ontario, Canada |
Manufacturing facility | Owned | ||
Esbjerg, Denmark |
Manufacturing facility | Owned(1) | ||
Dumbarton, Scotland |
Manufacturing facility | Owned | ||
Straubing, Germany |
Manufacturing facility | Leased (2021) | ||
Guadalupe, NL, Mexico |
Manufacturing facility | Leased (2024) | ||
Melville, Saskatchewan, Canada |
Manufacturing facility | Owned | ||
Jingshan, Hubei, China |
Manufacturing facility | Owned | ||
Nuclear Operations |
||||
Lynchburg, Virginia |
Manufacturing facility(3) | Owned | ||
Barberton, Ohio |
Manufacturing facility | Owned | ||
Euclid, Ohio |
Manufacturing facility | Owned /Leased(2) | ||
Mount Vernon, Indiana |
Manufacturing facility | Owned | ||
Erwin, Tennessee |
Manufacturing facility | Owned | ||
Technical Services |
||||
Charlotte, North Carolina |
Administrative office | Leased (2018) | ||
Nuclear Energy |
||||
Charlotte, North Carolina |
Administrative office | Leased (2019) | ||
Lynchburg, Virginia |
Engineering office | Leased (2018) | ||
Cambridge, Ontario, Canada |
Manufacturing facility | Owned | ||
mPower |
||||
Charlotte, North Carolina |
Administrative office | Leased (2019) | ||
Lynchburg, Virginia |
Engineering and design facility | Leased (2015) | ||
Corporate |
||||
Charlotte, North Carolina |
Administrative office | Leased (2018) |
1) | These properties are encumbered by liens under existing credit facilities. |
2) | We acquired the Euclid facilities through a bond/lease transaction facilitated by the Cleveland Cuyahoga County Port Authority (the Port), whereby we acquired a ground parcel and the Port issued bonds, the proceeds of which were used to acquire, improve and equip the facilities, including the acquisition of the larger facility and a 40-year prepaid ground lease for the smaller facility. We are leasing the facilities from the Port with an expiration date of 2014 but subject to certain extension options. |
3) | The Lynchburg, Virginia facility is our Nuclear Operations segments primary manufacturing plant and is the nations largest commercial high-enriched uranium processing facility. The site is the recipient of the highest rating given by the NRC for license performance. The performance review determines the safe and secure conduct of operations of the facility. The site is also the largest commercial International Atomic Energy Agency-certified facility in the U.S. |
We also own or lease a number of sales, administrative and field construction offices, warehouses and equipment maintenance centers strategically located throughout the world. We consider each of our significant properties to be suitable and adequate for its intended use.
For further details regarding our properties, see Item 1, Business.
36
Item 3. | LEGAL PROCEEDINGS |
The information set forth under the heading Investigations and Litigation in Note 11 to our consolidated financial statements included in this report is incorporated by reference into this Item 3.
Item 4. | MINE SAFETY DISCLOSURES |
We own an interest in and manage and operate Ebensburg Power Company, an independent power company that produces alternative electrical energy. Through one of our subsidiaries, Revloc Reclamation Service, Inc., Ebensburg Power Company operates multiple coal refuse sites in Western Pennsylvania (collectively, the Revloc Sites). At the Revloc Sites, Ebensburg Power Company utilizes coal refuse from abandoned surface mine lands to produce energy. Beyond converting the coal refuse to energy, Ebensburg Power Company is also taking steps to reclaim the former surface mine lands to make the land and streams more attractive for wildlife and human uses.
The Revloc Sites are subject to regulation by the federal Mine Safety and Health Administration under the Federal Mine Safety and Health Act of 1977. Information concerning mine safety violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and this Item is included in exhibit 95 to this annual report on Form 10-K.
37
P A R T I I
Item 5. | MARKET FOR REGISTRANTS COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES |
Our common stock is traded on the New York Stock Exchange under the symbol BWC.
High and low common stock prices by quarter in the years ended December 31, 2013 and 2012 were as follows:
YEAR ENDED DECEMBER 31, 2013
SHARE PRICE | DIVIDENDS | |||||||||||
QUARTER ENDED |
HIGH | LOW | PER SHARE | |||||||||
March 31, 2013 |
$ | 29.97 | $ | 24.84 | $ | 0.08 | ||||||
June 30, 2013 |
$ | 30.84 | $ | 25.55 | $ | 0.08 | ||||||
September 30, 2013 |
$ | 34.45 | $ | 29.95 | $ | 0.08 | ||||||
December 31, 2013 |
$ | 34.67 | $ | 30.07 | $ | 0.10 |
YEAR ENDED DECEMBER 31, 2012
SHARE PRICE | DIVIDENDS | |||||||||||
QUARTER ENDED |
HIGH | LOW | PER SHARE | |||||||||
March 31, 2012 |
$ | 27.93 | $ | 23.30 | | |||||||
June 30, 2012 |
$ | 26.24 | $ | 22.86 | | |||||||
September 30, 2012 |
$ | 27.00 | $ | 23.86 | | |||||||
December 31, 2012 |
$ | 26.87 | $ | 22.72 | $ | 0.08 |
On November 5, 2012, our Board of Directors approved an annual cash dividend, payable quarterly, of $0.32 per share. On November 8, 2013, our Board of Directors approved an increase to the annual cash dividend, payable quarterly, to $0.40 per share. Our ability to pay dividends may be limited by certain restrictions in our credit agreement. Our Board of Directors will continue to evaluate our cash dividend policy from time to time.
As of January 31, 2014, there were approximately 2,343 record holders of our common stock.
38
The following table provides information on our equity compensation plans as of December 31, 2013:
Equity Compensation Plan Information
Plan Category |
Number of securities to be issued upon exercise of outstanding options and rights |
Weighted-average exercise price of outstanding options and rights |
Number of securities remaining available for future issuance |
|||||||||
Equity compensation plans approved by security holders |
1,973,467 | $ | 26.87 | 4,134,129 | ||||||||
|
|
|
|
|
|
In November 2012, we announced that a share repurchase program was authorized by our Board of Directors. The following table provides information on our purchases of equity securities during the quarter ended December 31, 2013. Any shares purchased that were not part of a publicly announced plan or program are related to repurchases of common stock pursuant to the provisions of employee benefit plans that permit the repurchase of shares to satisfy statutory tax withholding obligations.
Issuer Purchases of Equity Securities
Period |
Total number of shares purchased(1) |
Average price paid per share |
Total number of shares purchased as part of publicly announced plans or programs |
Approximate dollar value of shares that may yet be purchased under the plans or programs (in millions) (2) |
||||||||||||
October 1, 2013 October 31, 2013 |
57,500 | $ | 32.90 | 57,500 | $ | 261.4 | ||||||||||
November 1, 2013 November 30, 2013 |
266,036 | $ | 31.68 | 265,400 | $ | 253.0 | ||||||||||
December 1, 2013 December 31, 2013 |
203,108 | $ | 32.71 | 203,000 | $ | 496.3 | ||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total |
526,644 | $ | 32.21 | 525,900 | ||||||||||||
|
|
|
|
|
|
|
|
(1) | Includes 0, 636 and 108 shares repurchased during October, November, and December, respectively, pursuant to the provisions of employee benefit plans that permit the repurchase of shares to satisfy statutory tax withholding obligations. |
(2) | On November 7, 2012, we announced that our Board of Directors authorized us to repurchase an indeterminate number of shares of our common stock at an aggregate market value of up to $250 million in the open market during a two-year period ending on November 5, 2014. On May 7, 2013, we announced that our Board of Directors authorized us to repurchase an indeterminate number of shares of our common stock at an aggregate market value of up to $250 million. On February 26, 2014, we announced that our Board of Directors authorized us to repurchase an indeterminate number of shares of our common stock at an aggregate market value of up to $250 million. The May 2013 and February 2014 authorizations are in addition to the initial $250 million share repurchase amount authorized in November 2012. On December 9, 2013, we completed the repurchase of shares using our initial $250 million authorization. We may repurchase shares in the open market using the additional repurchase amounts authorized in May 2013 and February 2014 during a two-year period that expires February 25, 2016. |
39
The following graph provides a comparison of our three-year and five-month cumulative total shareholder return through December 31, 2013 to the return of the S&P 500 and our custom peer group. The following graph shall not be deemed to be soliciting material or filed with the SEC or be subject to Regulation 14A or 14C (other than as provided in Item 201 of Regulation S-K) or to the liabilities of Section 18 of the Securities Exchange Act of 1934, as amended (the Exchange Act), nor shall such information be incorporated by reference into any future filing under the Securities Act of 1933, as amended, or the Exchange Act, except to the extent that B&W specifically incorporates it by reference into such filing.
(1) | Assumes initial investment of $100 on July 31, 2010. |
The peer group used for the three-year and five-month comparison is comprised of the following companies:
| AECOM Technology Corporation |
| Chicago Bridge & Iron Company N.V. |
| Curtiss-Wright Corporation |
| Emcor Group, Inc. |
| Fluor Corporation |
| Foster Wheeler AG |
| Jacobs Engineering Group, Inc. |
| KBR, Inc. |
| MasTec, Inc. |
| Quanta Services, Inc. |
| Tetra Tech, Inc. |
| URS Corporation |
40
Item 6. | SELECTED FINANCIAL DATA |
For the Years Ended | ||||||||||||||||||||
2013 | 2012 | 2011 | 2010 | 2009 | ||||||||||||||||
(In thousands, except for per share amounts) | ||||||||||||||||||||
Revenues |
$ | 3,269,208 | $ | 3,291,359 | $ | 2,952,040 | $ | 2,688,811 | $ | 2,854,632 | ||||||||||
Income (Loss) before Provision for Income Taxes |
$ | 517,173 | $ | 319,418 | $ | 94,498 | $ | 220,208 | $ | 272,154 | ||||||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 346,078 | $ | 227,695 | $ | 78,319 | $ | 139,939 | $ | 171,522 | ||||||||||
Basic Earnings per Common Share(1): |
||||||||||||||||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 3.09 | $ | 1.92 | $ | 0.67 | $ | 1.20 | $ | 1.48 | ||||||||||
Diluted Earnings per Common Share(1): |
||||||||||||||||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 3.07 | $ | 1.91 | $ | 0.66 | $ | 1.19 | $ | 1.46 | ||||||||||
Cash Dividends Per Common Share |
$ | 0.34 | $ | 0.08 | | | | |||||||||||||
Total Assets |
$ | 2,609,153 | $ | 2,840,355 | $ | 2,789,111 | $ | 2,500,510 | $ | 2,603,859 | ||||||||||
Current Maturities of Long-Term Debt |
$ | 4,671 | $ | 4,062 | $ | 4,653 | $ | 4,790 | $ | 6,432 | ||||||||||
Long-Term Debt |
$ | 225 | $ | 430 | $ | 633 | $ | 855 | $ | 4,222 |
(1) | On July 30, 2010, 116,225,732 shares of our common stock were distributed to MII shareholders to complete our spin-off from MII. For comparative purposes, and to provide a more meaningful calculation of weighted average shares, we have assumed this amount to be outstanding as of the beginning of each period presented prior to our spin-off in our calculation of basic weighted average shares. In addition, for our dilutive weighted average share calculations, we have assumed the dilutive securities outstanding at July 30, 2010 were also outstanding at each of the periods presented prior to our spin-off. |
In the year ended December 31, 2013, we recorded contract losses totaling $35.6 million for additional estimated costs to complete a new build steam generation systems project experiencing unforeseen worksite conditions and fuel specification issues that have caused schedule delays, resulting in us filing suit against the customer in January 2014. We also incurred $39.6 million of charges related to restructuring activities. In addition, we recorded an impairment charge totaling $19.1 million associated with our investment in USEC.
In the year ended December 31, 2012, we recorded contract losses totaling $16.9 million, net of claims, for additional estimated costs to complete a new build steam generation systems project experiencing unforeseen worksite conditions. We also entered into an agreement with the customer of a Nuclear Energy project to settle contract claims resulting in recognition of revenues totaling approximately $18.4 million. In addition, we recorded an impairment charge totaling $27.0 million associated with our investment in USEC.
In the year ended December 31, 2011, we recorded additional costs totaling approximately $61.8 million ($50.7 million in our Nuclear Energy segment and $11.1 in our Nuclear Operations segment) to complete certain projects attributable to changes in estimate due to productivity and scheduling issues. In addition, we recognized a gain totaling approximately $10.9 million attributable to a settlement with the sellers of Nuclear Fuel Services, Inc. (NFS), a wholly owned subsidiary in our Nuclear Operations segment, related to conditions in existence at the acquisition date.
We immediately recognize actuarial gains and losses for our pension and post-retirement benefit plans into earnings in the fourth quarter each year as a component of net periodic benefit cost. The effect of this adjustment for 2013, 2012, 2011, 2010, and 2009 on pre-tax income was $222.9 million, $(32.0) million, $(215.8) million, $(91.8) million and $(43.6) million, respectively.
41
Our historical financial information prior to July 2010 reflects the performance of a combined reporting entity comprised primarily of the assets and liabilities involved in managing and operating what was previously the Power Generation Systems and Government Operations segments of MII and may not provide a useful indicator of future performance.
Item 7. | MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS |
Statements we make in the following discussion, which express a belief, expectation or intention, as well as those that are not historical fact, are forward-looking statements that are subject to risks, uncertainties and assumptions. Our actual results, performance or achievements, or industry results, could differ materially from those we express in the following discussion as a result of a variety of factors, including the risks and uncertainties we have referred to under the headings Cautionary Statement Concerning Forward-Looking Statements and Risk Factors in Items 1 and 1A of Part I of this report.
In general, we operate in capital-intensive industries and rely on large contracts for a substantial amount of our revenues. We are currently exploring growth strategies across our segments through acquisitions to expand and complement our existing businesses. As we pursue these opportunities, we expect they would be funded by cash on hand, external financing, including debt, equity or some combination thereof.
We operate in five business segments: Power Generation, Nuclear Operations, Technical Services, Nuclear Energy and mPower. Prior to 2013, we reported four segments: Power Generation, Nuclear Operations, Technical Services and Nuclear Energy. Our small modular nuclear reactor business previously included in our Nuclear Energy segment is now being reported as a separate segment, mPower. The change in our reportable segments had no impact on our previously reported consolidated results of operations, financial condition or cash flows.
Outlook
Power Generation
We expect the backlog of our Power Generation segment of approximately $2.1 billion at December 31, 2013 to produce revenues of approximately $0.8 billion in 2014, not including any change orders or new contracts that may be awarded during the year. Through this segment, we are actively bidding on and, in some cases, beginning preliminary work on projects that we expect will be awarded to us in 2014 subject to successful contract negotiations. These projects are not currently reflected in backlog.
Our Power Generation segments overall activity depends mainly on the capital expenditures of electric power generating companies and other steam-using industries. As such, customer demand is heavily affected by the variations in customers business cycles, costs of fuel and by the overall economies of the countries in which they operate.
The Environmental Protection Agency (EPA) issued proposed final environmental regulations concerning Mercury and Air Toxics Standards and rules concerning implementation of the Cross State Air Pollution Rule (CSAPR) in 2011. On December 30, 2011 the U.S. Court of Appeals for the District of Columbia Circuit (the Court) stayed the CSAPR rules and reinstated EPA regulations from 2005. Oral arguments were held in April 2012. In August 2012, the Court ruled CSAPR, which set stricter limits on sulfur dioxide and nitrogen oxide emissions from power plants in 28 states, violated the Clean Air Act. The ruling leaves CSAPRs predecessor, the Clean Air Interstate Rule, in place. In October 2012, the EPA appealed the Courts decision, and in June 2013, the U.S. Supreme Court determined that it would consider the appeal during its next term, and a decision is expected sometime in 2014. While MATS remains in effect, we believe it could take one to two years for any regulatory response to develop in response to the Courts ruling on CSAPR. Uncertainty concerning environmental final rules and regulations could impact our Power Generation segment. For example, instead of adding environmental equipment, some of our customers may decide to close down their least efficient coal-fired boilers.
42
Future decisions to retire boilers would impact our business in a variety of ways, including the servicing and retrofitting of operating power plants. The need to replace retired generating capacity with cleaner technologies would also create business opportunities for us. To generate energy while minimizing the emission of greenhouse gasses, we are actively researching and developing a range of products, including:
| non-carbon technologies, such as nuclear power plants and solar receivers for concentrating solar power plants; |
| low-carbon technologies that enable clean use of fossil fuels, such as oxy-fuel combustion and regenerable solvent absorption technologies to scrub carbon dioxide from exhaust gases; and |
| carbon-neutral technologies, such as biomass-fueled boilers and gasifiers, which can use a renewable resource where the growing biomass re-absorbs the carbon dioxide emitted during energy production. |
Changes and the uncertainties described above regarding the regulatory landscape, low natural gas prices and continued uncertainty in the economy have dampened the medium-term expected rate of growth of our environmental business within this segment and will likely result in a near-term decline in environmental revenues. Utilities continue to operate coal-fired plants that require the environmental equipment and services that our Power Generation segment provides. However, we now expect that the timeframe over which such projects will be spread will be longer than our original timeframe of three to four years. Subject to further clarification of environmental regulations in the U.S., we now expect the current environmental cycle to extend through the end of the decade, during which we anticipate a more competitive landscape in the near to medium term.
Nuclear Operations
We expect the backlog of our Nuclear Operations segment of approximately $2.4 billion at December 31, 2013 to produce revenues of approximately $0.9 billion in 2014, not including any change orders or new contracts that may be awarded during the year. Awards expected to be received in the first quarter of 2014 totaling approximately $700 million, which were delayed from the fourth quarter of 2013 due to events associated with the government shutdown and budget approval delays, will generate additional revenues in 2014.
The revenues of our Nuclear Operations segment are largely a function of defense spending by the U.S. Government. As a supplier of major nuclear components for certain U.S. Government programs, we are a significant participant in the defense industry and have not been negatively impacted by sequestration or federal budget reductions to date. We believe many of our programs are well aligned with national defense and other strategic priorities, and we supply high-end equipment for submarines and aircraft carriers for the U.S. Navy. However, it is possible that reductions in federal government spending and sequestration could have an adverse impact on the operating results and cash flows of our Nuclear Operations and Technical Services segments in the future.
Technical Services
A significant portion of this segments operations are conducted through joint ventures, which typically earn fees and we account for them following the equity method of accounting. See Note 3 to our consolidated financial statements included in this report for financial information on our equity method investments. As a result, this segment reports minimal backlog and revenues.
With our specialized capabilities of full life-cycle management of special nuclear materials, facilities and technologies, our Technical Services segment is well-positioned to continue to participate in the continuing cleanup, operation and management of the nuclear sites and weapons complexes maintained by the DOE and the U.K. Nuclear Decommissioning Authority.
Contracts for two projects under B&W led management teams, Y-12 and Pantex, ended in 2010 but were extended while the NNSA conducted a contract re-compete process. In addition, the NNSA determined it would be advantageous to combine the management of Y-12 and Pantex into a single management contract. On January 8, 2013, we were notified that our joint venture, Nuclear Production Partners, LLC (NP2), was not selected to lead the NNSAs combined Management and Operating contract for the Y-12 National Security Complex and Pantex Plant. Since then, we have filed multiple protests with the GAO in relation to the selection decision. On November 1, 2013 we received notification that NP2 was not selected by NNSA in the re-affirmed procurement decision. On November 20, 2013, we
43
filed our third and latest protest with the GAO encompassing concerns identified previously and through information received during the NNSA debriefing process. We will continue to manage these sites under existing contracts through our joint ventures and during any transition period, which has yet to be determined.
This segment produced $58.2 million of operating income in 2013. We expect operating income attributable to this segment to be lower in 2014 based on the new ownership fee structure for the combined Y-12/Pantex contract or the eventual loss of the contract resulting from an unsuccessful protest.
Nuclear Energy
We expect the backlog of our Nuclear Energy segment of approximately $142 million at December 31, 2013 to produce revenues of approximately $92 million in 2014, not including any change orders or new contracts that may be awarded during the year. The revenues in this segment primarily depend on the demand and competitiveness of nuclear energy. The activity of this segment depends on capital expenditures and maintenance spending of nuclear utilities.
A significant portion of this segments activities is generated from the Canadian nuclear market, which could cause variability in our financial results depending on the level of maintenance and capital spending of Canadian utilities in a given year.
mPower
The development, general and administrative and capital costs to develop and commercialize our B&W mPower technology will require a substantial amount of investment over a period of years, and the funding requirements may vary significantly from period to period. We intend to continue with our plan to seek third party funding and/or participation to pursue the development and commercialization of this technology. On November 13, 2013, we announced that we have accelerated our search for additional equity partner(s) with intentions of the additional equity partner(s) collectively owning a majority equity interest in GmP. If such transaction is consummated, GmP may no longer be a consolidated subsidiary of B&W.
We have been selected to receive funding and have signed a Cooperative Agreement with the DOE under its Funding Program, which is expected to provide financial assistance initially totaling at least $150 million for SMR design engineering and licensing activities supporting a planned commercial operating date for the first mPower Plant by 2022. The Funding Program is a cost-sharing award that requires us to use the DOE funds to cover first-of-a-kind engineering costs associated with SMR design certification and licensing efforts. The DOE will provide cost reimbursement for up to 50%, subject to the overall size of the award, of qualified expenditures incurred from April 1, 2013 to March 31, 2018. The DOE has authorized $99.3 million of funding for this award program as of December 31, 2013. Congress has allocated and designated an additional $85 million from the 2014 budget to the Cooperative Agreement; however, the DOE has not yet obligated those funds to us. The Cooperative Agreement also provides for reimbursement of pre-award costs incurred from October 1, 2012 to March 31, 2013. During the year ended December 31, 2013, we recognized $78.4 million of the cost-sharing award, including $21.5 million of pre-award cost reimbursement, as a reduction of research and development costs on our consolidated statements of income. Of the total pre-award cost reimbursement, $9.7 million relates to research and development costs incurred in the year ended December 31, 2012.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Our financial statements and accompanying notes are prepared in accordance with accounting principles generally accepted in the United States. Preparing financial statements requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses. These estimates and assumptions are affected by managements application of accounting policies. We believe the following are our most critical accounting policies that we apply in the preparation of our financial statements. These policies require our most difficult, subjective and complex judgments, often as a result of the need to make estimates of matters that are inherently uncertain.
44
Contracts and Revenue Recognition. We determine the appropriate accounting method for each of our long-term contracts before work on the project begins. We generally recognize contract revenues and related costs on a percentage-of-completion method for individual contracts or combinations of contracts based on work performed, man hours or a cost-to-cost method, as applicable to the product or activity involved. We recognize estimated contract revenue and resulting income based on costs incurred to date as a percentage of total estimated costs. Certain costs may be excluded from the cost-to-cost method of measuring progress, such as significant costs for materials and major third-party subcontractors, if it appears that such exclusion would result in a more meaningful measurement of actual contract progress and resulting periodic allocation of income. For all contracts, if a current estimate of total contract cost indicates a loss on a contract, the projected loss is recognized in full when determined. It is possible that current estimates could materially change for various reasons, including, but not limited to, fluctuations in forecasted labor productivity or steel and other raw material prices. We routinely review estimates related to our contracts, and revisions to profitability are reflected in the quarterly and annual earnings we report. In the years ended December 31, 2013, 2012 and 2011, we recognized net favorable changes in estimate related to long-term contracts accounted for on the percentage-of-completion basis that increased operating income by approximately $21.9 million, $93.1 million and $33.1 million, respectively. The 2013 amount includes contract losses totaling $35.6 million for additional estimated costs to complete a project in our Power Generation segment. This is in addition to approximately $16.9 million of contract losses, net of claims, recorded on this project in 2012. The 2011 amount includes approximately $61.8 million ($50.7 million in our Nuclear Energy segment and $11.1 in our Nuclear Operations segment) to complete certain projects attributable to unfavorable changes in estimate due to productivity and scheduling issues. The projects in 2011 are now complete.
For contracts as to which we are unable to estimate the final profitability except to assure that no loss will ultimately be incurred, we recognize equal amounts of revenue and cost until the final results can be estimated more precisely. For these deferred profit recognition contracts, we recognize revenue and cost equally and only recognize gross margin when probable and reasonably estimable, which we generally determine to be when the contract is approximately 70% complete. We treat long-term construction contracts that contain such a level of risk and uncertainty that estimation of the final outcome is impractical except to assure that no loss will be incurred as deferred profit recognition contracts. We did not enter into any contracts that we have accounted for as deferred profit recognition contracts during 2013, 2012 or 2011.
Our policy is to account for fixed-price contracts under the completed-contract method if we believe that we are unable to reasonably forecast cost to complete at start-up. For example, if we have no experience in performing the type of work on a particular project and are unable to develop reasonably dependable estimates of total costs to complete, we would follow the completed-contract method of accounting for such projects. Generally, our managements policy is not to enter into fixed-price contracts without an accurate estimate of cost to complete. However, it is possible that in the time between contract execution and the start of work on a project, we could lose confidence in our ability to forecast cost to complete based on intervening events, including, but not limited to, experience on similar projects, civil unrest, strikes and volatility in our expected costs. In such a situation, we would use the completed-contract method of accounting for that project. We did not enter into any contracts that we have accounted for under the completed-contract method during 2013, 2012 or 2011.
For parts orders and certain aftermarket services activities, we recognize revenues as goods are delivered and work is performed.
Although we continually strive to improve our ability to estimate our contract costs and profitability, adjustments to overall contract costs due to unforeseen events could be significant in future periods. We recognize claims for extra work or for changes in scope of work in contract revenues, to the extent of costs incurred, when we believe collection is probable and can be reasonably estimated. We recognize income from contract change orders or claims when formally agreed with the customer. We regularly assess the collectability of contract revenues and receivables from customers.
45
Property, Plant and Equipment. We carry our property, plant and equipment at depreciated cost, reduced by provisions to recognize economic impairment when we determine impairment has occurred. Property, plant and equipment amounts are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, or asset group, may not be recoverable. An impairment loss would be recognized when the carrying amount of an asset exceeds the estimated undiscounted future cash flows expected to result from the use of the asset and its eventual disposition. The amount of the impairment loss to be recorded is calculated by the excess of the asset carrying value over its fair value. Fair value is generally determined using a discounted cash flow analysis. Our estimates of cash flow may differ from actual cash flow due to, among other things, technological changes, economic conditions or changes in operating performance. Any changes in such factors may negatively affect our business segments and result in future asset impairments.
We depreciate our property, plant and equipment using the straight-line method, over estimated economic useful lives of eight to 33 years for buildings and three to 28 years for machinery and equipment. We expense the costs of maintenance, repairs and renewals, which do not materially prolong the useful life of an asset, as we incur them.
Investments in Unconsolidated Affiliates. We use the equity method of accounting for affiliates in which our investment ownership ranges from 20% to 50%, unless significant economic or governance considerations indicate that we are unable to exert significant influence, in which case the cost method is used. The equity method is also used for affiliates in which our investment ownership is greater than 50% but we do not have a controlling interest. Currently, all of our material investments in affiliates that are not included in our consolidated results are recorded using the equity method. Affiliates in which our investment ownership is less than 20% and where we are unable to exert significant influence are carried at cost.
Self-Insurance. We have a wholly owned insurance subsidiary that provides employers liability, general and automotive liability and workers compensation insurance and, from time to time, builders risk insurance within certain limits to our companies. We may also have business reasons in the future to have our insurance subsidiary accept other risks that we cannot or do not wish to transfer to outside insurance companies. When estimating our self-insurance liabilities, we consider a number of factors, including historical claims experience and trend lines, projected growth patterns, inflation and exposure forecasts. The assumptions we make with respect to each of these factors represent our judgment as to the most probable cumulative impact of each factor on our future obligations. Our calculation of self-insurance liabilities requires us to apply judgment to estimate the ultimate cost to settle reported claims and claims incurred but not yet reported as of the balance sheet date. We engage the services of an actuarial firm to assist us in the calculation of our liabilities for self-insurance. While the actual outcome of insured claims could differ significantly from estimated amounts, these loss estimates and accruals recorded in our financial statements for claims have historically been reasonable in light of the actual amount of claims paid. Provisions for exposure to self-insurance claims and the related payments of claims have historically not had a material adverse impact on our consolidated financial position, results of operations and cash flows, and we do not expect these provisions to have a material impact on our self-insurance programs in the future.
Pension Plans and Postretirement Benefits. We estimate income or expense related to our pension and postretirement benefit plans based on actuarial assumptions, including assumptions regarding discount rates and expected returns on plan assets. We determine our discount rate based on a review of published financial data and discussions with our actuary regarding rates of return on high-quality, fixed-income investments currently available and expected to be available during the period to maturity of our pension and postretirement plan obligations. Based on historical data, market projections and discussions with our actuary, we determine our expected return on plan assets based on the expected long-term rate of return on our plan assets and the market-related value of our plan assets. Our pension plan assets can include assets that are difficult to value. Changes in these assumptions can result in significant changes in our estimated pension income or expense and our consolidated financial condition. We revise our assumptions on an annual basis based upon changes in current interest rates, return on plan assets and the underlying demographics of our workforce. These assumptions are reasonably likely to change in future periods and may have a material impact on future earnings. We immediately recognize actuarial gains and losses into earnings in the fourth quarter of each year as a component of net periodic benefit cost.
46
Loss Contingencies. We estimate liabilities for loss contingencies when it is probable that a liability has been incurred and the amount of loss is reasonably estimable. We provide disclosure when there is a reasonable possibility that the ultimate loss will exceed the recorded provision or if such probable loss is not reasonably estimable. We are currently involved in some significant litigation, as discussed in Note 11 to our consolidated financial statements included in this report. We have accrued our estimates of the probable losses associated with these matters. However, our losses are typically resolved over long periods of time and are often difficult to estimate due to the possibility of multiple actions by third parties. Therefore, it is possible that future earnings could be affected by changes in our estimates related to these matters.
Goodwill. In accordance with FASB Topic Intangibles Goodwill and Other, we perform periodic testing of goodwill for impairment. We may elect to perform a qualitative test when we believe that there is sufficient excess fair value over carrying value based on our most recent quantitative assessment, adjusted for relevant events and circumstances that could affect fair value during the current year. If we conclude based on this assessment that it is more likely than not that the reporting unit is not impaired, we do not perform the two-step quantitative impairment test. In all other circumstances, we utilize the two-step quantitative impairment test to identify potential goodwill impairment and measure the amount of a goodwill impairment loss. The first step of the test compares the fair value of a reporting unit with its carrying amount, including goodwill. If the carrying amount of a reporting unit exceeds its fair value, the second step of the goodwill impairment test is performed to measure the amount of the impairment loss, if any. The second step compares the implied fair value of the reporting units goodwill with the carrying amount of that goodwill.
Each year, we evaluate goodwill at each reporting unit to assess recoverability and impairments, if any, are recognized in earnings. An impairment loss would be recognized in an amount equal to the excess of the carrying amount of the goodwill over the implied fair value of the goodwill. We determined that both the income and market valuation approaches provide inputs into the estimate of the fair value of our reporting units, which would be considered by market participants. Under the income valuation approach, we employ a discounted cash flow model to estimate the fair value of each reporting unit. This model requires the use of significant estimates and assumptions regarding future revenues, costs, margins, capital expenditures, changes in working capital, terminal year growth rate and cost of capital. Our cash flow models are based on our forecasted results for the applicable reporting units. Actual results could differ from our projections. Under the market valuation approach, we employ the guideline publicly traded company method, which indicates the fair value of the equity of each reporting unit by comparing it to publicly traded companies in similar lines of business. After identifying and selecting guideline companies, we analyze their business and financial profiles for relative similarity. Factors such as size, growth, risk and profitability are analyzed and compared to each of our reporting units. We have completed our annual review of goodwill for each of our reporting units for the year ended December 31, 2013, which indicated that we had no impairment of goodwill. The fair value of our reporting units was substantially in excess of carrying value, with the exception of our Nuclear Energy reporting unit. The fair value of the Nuclear Energy reporting unit exceeded its carrying value by approximately 22% based on our step one quantitative test. The Nuclear Energy reporting unit had goodwill totaling $14.0 million at December 31, 2013.
Asset Retirement Obligations and Environmental Clean-up Costs. We accrue for future decommissioning of our nuclear facilities that will permit the release of these facilities to unrestricted use at the end of each facilitys life, which is a requirement of our licenses from the NRC. In accordance with the FASB Topic Asset Retirement and Environmental Obligations, we record the fair value of a liability for an asset retirement obligation in the period in which it is incurred. In estimating fair value, we use present value of cash flows expected to be incurred in settling our obligations. To the extent possible, we perform a marketplace assessment of the cost and timing of performing the retirement activities. We apply a credit-adjusted risk-free interest rate to our expected cash flows in our determination of fair value. When we initially record such a liability, we capitalize a cost by increasing the carrying amount of the related long-lived asset. Over time, the liability is accreted to its present value each period, and the capitalized cost is depreciated over the useful life of the related asset. Upon settlement of a liability, we will settle the obligation for its recorded amount or incur a gain or loss. This topic applies to environmental liabilities associated with assets that we currently operate and are obligated to remove from service. For environmental liabilities associated with assets that we no longer operate, we have accrued amounts based on the estimated costs of clean-up activities, net of the anticipated effect of any applicable cost-sharing arrangements. We adjust the estimated costs as further information develops or circumstances change. An exception to this accounting treatment relates to the work we perform for two facilities for which the U.S. Government is obligated to pay substantially all the decommissioning costs.
47
Income Taxes. Income tax expense for federal, foreign, state and local income taxes are calculated on pre-tax income based on current tax law and includes the cumulative effect of any changes in tax rates from those used previously in determining deferred tax assets and liabilities. We record a valuation allowance to reduce our deferred tax assets to the amount that is more likely than not to be realized. We assess deferred taxes and the adequacy of the valuation allowance on a quarterly basis. In the ordinary course of business there is inherent uncertainty in quantifying our income tax positions. We assess our income tax positions and record tax benefits for all years subject to examination based upon managements evaluation of the facts, circumstances, and information available at the reporting date. For those tax positions where it is more likely than not that a tax benefit will be sustained, we have recorded the largest amount of tax benefit with a greater than 50% likelihood of being realized upon ultimate settlement with a taxing authority that has full knowledge of all relevant information. For those income tax positions where it is not more likely than not that a tax benefit will be sustained, no tax benefit has been recognized in the financial statements. We record interest and penalties (net of any applicable tax benefit) related to income taxes as a component of provision for income taxes on our consolidated statements of income.
Warranty. We accrue estimated expense included in cost of operations on our consolidated statements of income to satisfy contractual warranty requirements when we recognize the associated revenue on the related contracts. In addition, we record specific provisions or reductions when we expect the actual warranty costs to significantly differ from the accrued estimates. Factors that impact our estimate of warranty costs include prior history of warranty claims and our estimates of future costs of materials and labor. Such changes could have a material effect on our consolidated financial condition, results of operations and cash flows.
Stock-Based Compensation. We account for stock-based compensation in accordance with FASB Topic Compensation Stock Compensation. Under the fair value recognition provisions of this statement, the cost of employee services received in exchange for an award of equity instruments is measured at the grant date based on the fair value of the award. Stock-based compensation expense is recognized on a straight-line basis over the requisite service periods of the awards, which is generally equivalent to the vesting term. We use a Black-Scholes model to determine the fair value of certain share-based awards, such as stock options and stock appreciation rights. The determination of the fair value of a share-based payment award using an option-pricing model requires the input of highly subjective assumptions, such as the expected life of the award and stock price volatility. For liability-classified awards, such as cash-settled restricted stock units and performance units, fair values are determined at grant date using the closing price of our common stock and are remeasured at the end of each reporting period through the date of settlement.
Business Combinations. We account for acquisitions in accordance with FASB Topic Business Combinations. This topic broadens the fair value measurements and recognition of assets acquired, liabilities assumed and interests transferred as a result of business combinations. It also provides disclosure requirements to assist users of the financial statements in evaluating the nature and financial effects of business combinations.
For further discussion of recently adopted accounting standards, see Note 1 to our consolidated financial statements included in this report.
YEAR ENDED DECEMBER 31, 2013 COMPARED TO YEAR ENDED DECEMBER 31, 2012
The Babcock & Wilcox Company
Consolidated revenues decreased 0.7%, or $22.2 million, to $3.27 billion in the year ended December 31, 2013 compared to $3.29 billion in 2012. Our Power Generation segment revenues decreased $18.3 million, or 1.0%, primarily attributable to decreased revenue in our new build steam generation systems and new build environmental equipment businesses, partially offset by increases in our aftermarket services business. Our Nuclear Operations segment experienced a $69.7 million, or 6.3%, increase in revenues, primarily attributable to increased activity in the manufacturing of nuclear components for U.S. Government programs and naval nuclear fuel and downblending activities. Our Technical Services segment revenues decreased $3.6 million, or 3.3%. In addition, our Nuclear Energy segment revenues decreased $41.8 million, or 12.8%, primarily attributable to decreased activity in our nuclear services and nuclear equipment businesses associated with the completion of several large contracts that were ongoing in 2012.
48
Consolidated operating income increased $189.8 million to $536.4 million in the year ended December 31, 2013 from $346.6 million in 2012. Operating income includes actuarial gains and losses (MTM charges) related to our pension and postretirement plans, which reflected a fourth quarter non-cash gain (loss) of $222.7 million and $(31.9) million in 2013 and 2012, respectively. In addition, operating income for the year ended December 31, 2013 includes special charges for restructuring activities totaling $39.6 million related to the Global Competitiveness Initiative (GCI) we launched to enhance competitiveness, better position B&W for growth, and improve profitability. Excluding MTM charges and GCI charges, operating income of our reportable segments and unallocated corporate expenses decreased $25.3 million for the year ended December 31, 2013 compared to 2012. We experienced decreased operating income in our Power Generation segment of $27.6 million primarily due to additional estimated costs to complete a new build steam generation systems project experiencing unforeseen worksite conditions and fuel specification issues. Operating income in our Nuclear Operations segment increased by $11.6 million associated with the revenue growth discussed above. The Technical Services segment operating income decreased by $1.5 million, primarily due to lower award fees earned on its NNSA projects. The Nuclear Energy segment experienced a decrease in operating income totaling $42.0 million associated with the decline in revenues noted above, lower margins from project mix, and an $18.1 million project settlement realized in the prior period. We experienced increased operating income in our mPower segment totaling $32.2 million as the $78.4 million recognized under the DOE Cooperative Agreement more than offset increased research and development activities related to the continued development of the B&W mPower reactor.
Power Generation
Revenues decreased 1.0%, or $18.3 million, to $1,767.7 million in the year ended December 31, 2013, compared to $1,786.0 million in 2012. The net decrease is primarily attributable to a $56.9 million decrease in our new build steam generation systems business due to a lower level of activity on waste-to-energy and industrial boiler projects. We also experienced a $12.3 million decrease in our new build environmental equipment business principally driven by lower levels of engineering, procurement and construction activities as projects related to the previously enacted environmental rules and regulations near completion and uncertainties continue regarding the ultimate outcome of environmental regulations. These decreases were partially offset by an increase in revenues of $43.6 million in our aftermarket services business as increases in boiler-related construction and maintenance services more than offset a decrease in environmental retrofit activity.
Operating income decreased $27.6 million to $155.8 million in the year ended December 31, 2013 compared to $183.4 million in 2012, due to contract losses totaling $35.6 million recorded for additional estimated costs to complete a new build steam generation systems project experiencing unforeseen worksite conditions and fuel specification issues. These losses are in addition to $16.9 million of contract losses, net of claims, recorded for this project during the fourth quarter of 2012. In addition to the lower revenues discussed above, we also experienced more competitive profit margins and a lower level of net favorable project close-outs compared to the prior period. These decreases in income were partially offset by decreased overhead costs and a $12.5 million reduction in selling, general and administrative expenses due to ongoing cost reduction initiatives.
Nuclear Operations
Revenues increased 6.3%, or $69.7 million, to $1,167.7 million in the year ended December 31, 2013 compared to $1,098.0 million in the corresponding period of 2012, primarily attributable to increased activity related to the manufacturing of nuclear components for U.S. Government programs totaling $55.9 million and increased activity in our naval nuclear fuel and downblending activities totaling $13.8 million as compared to the corresponding period of 2012.
Operating income increased $11.6 million to $237.9 million in the year ended December 31, 2013 compared to $226.3 million in the corresponding period in 2012 primarily attributable to increased activity related to the manufacturing of nuclear components for U.S. Government programs totaling $9.6 million and increased activity in our naval nuclear fuel and downblending activities totaling $2.0 million.
49
Technical Services
Revenues decreased 3.3%, or $3.6 million, to $104.3 million in the year ended December 31, 2013 compared to $107.9 million for the corresponding period of 2012, primarily attributable to lower reimbursable costs at our Naval Reactor decommissioning and decontamination project.
Operating income decreased $1.5 million, to $58.2 million in the year ended December 31, 2013 compared to $59.7 million for the corresponding period of 2012. This decrease is principally due to net lower fees for NNSA projects totaling $2.7 million and lower income associated with a restructured contract totaling $3.7 million. These amounts were offset by lower selling, general and administrative expenses of $4.8 million compared to 2012 primarily due to timing of new proposals resulting in lower business development expenses.
Nuclear Energy
Revenues decreased 12.8%, or $41.8 million, to $283.9 million in the year ended December 31, 2013 compared to $325.7 million in the corresponding period of 2012. The decrease in revenues is primarily attributable to decreased activity in our nuclear services and nuclear equipment businesses of $95.8 million associated with the completion of several large contracts that were ongoing in the prior period and $18.4 million of revenue recorded in the prior year related to the settlement agreement reached with Energy Northwest related to a condenser replacement project at Columbia Generating Station in 2011. This decline in revenue was partially offset by increased project activities associated with an ongoing long-term project in our nuclear projects business.
Operating income decreased $42.0 million to $8.6 million in the year ended December 31, 2013 compared to $50.6 million in the corresponding period of 2012. This decrease is primarily attributable to the decline in revenues noted above, lower margins due to unfavorable project mix compared to the prior period, and $18.1 million (net of related expenses) recognized in 2012 associated with the Energy Northwest settlement agreement discussed above. These decreases were partially offset by $7.1 million of favorable warranty experience.
mPower
Operating income increased $32.2 million to a loss of $81.3 million in the year ended December 31, 2013 compared to a loss of $113.5 million in the corresponding period of 2012. Research and development activities related to the continued development of the B&W mPower reactor increased by $40.8 million, offset by the recognition of $78.4 million of the cost-sharing award from the DOE under the Cooperative Agreement as a reduction of research and development costs. The cost-sharing amount recognized includes $21.5 million of pre-award cost reimbursement for the period from October 2012 through March 2013. Selling, general, and administrative expenses increased by $5.0 million compared to the corresponding period of 2012 primarily due to increased business development activity.
Corporate
Unallocated corporate expenses decreased $2.0 million to $26.0 million in the year ended December 31, 2013, as compared to $28.0 million in 2012, due to GCI cost savings, partially offset by increased corporate development costs.
Other Income Statement Items
Othernet decreased $7.4 million to a loss of $17.5 million in the year ended December 31, 2013, as compared to a loss of $24.9 million for the corresponding period in 2012, primarily due to the impairment of the remainder of our USEC investment in 2013 totaling $19.1 million compared to a $27.0 million impairment of our USEC investment in 2012.
50
Net Loss Attributable to Noncontrolling Interest
Net Loss Attributable to Noncontrolling Interest increased $3.4 million in the year ended December 31, 2013 compared to 2012, primarily attributable to noncontrolling interest recognition of losses incurred in connection with B&W mPowerTM reactor development efforts.
Provision for Income Taxes
For the year ended December 31, 2013, our provision for income taxes increased $82.7 million to $184.6 million, while income before provision for income taxes increased $197.8 million to $517.2 million. Our effective tax rate was approximately 35.7% for 2013, as compared to 31.9% for 2012. The increase in our effective tax rate is primarily related to the significant increase in income before provision for income taxes attributable to our mark to market pension adjustments and the effect that had on the overall jurisdictional mix of our pre-tax earnings in 2013 as compared to 2012, as well as the recognition of previously unrecognized tax benefits associated with the lapse in 2012 of applicable statutes of limitation. In addition, our provision for income taxes in 2013 was benefited by the American Taxpayer Relief Act of 2012, enacted on January 2, 2013 which retroactively extended the U.S. research & development tax credit for two years, offset by a change in our assertion with respect to some of our undistributed foreign earnings.
Income before provision for income taxes, provision for income taxes and effective tax rates for our U.S. and non-U.S. jurisdictions were as shown below:
Income before Provision for Income Taxes |
Provision for Income Taxes |
Effective Tax Rate | ||||||||||||||||||||||
2013 | 2012 | 2013 | 2012 | 2013 | 2012 | |||||||||||||||||||
(In thousands) | (In thousands) | |||||||||||||||||||||||
United States |
$ | 399,263 | $ | 222,840 | $ | 153,404 | $ | 78,868 | 38.4 | % | 35.4 | % | ||||||||||||
Non-United States |
117,910 | 96,578 | 31,179 | 22,993 | 26.4 | % | 23.8 | % | ||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
Total |
$ | 517,173 | $ | 319,418 | $ | 184,583 | $ | 101,861 | 35.7 | % | 31.9 | % | ||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
We are subject to U.S. federal income tax at a statutory rate of 35% on our U.S. operations plus the applicable state income taxes on our profitable U.S. subsidiaries. Our non-U.S. earnings are subject to tax at various tax rates and under various tax regimes, including deemed profits tax regimes.
See Note 5 to our consolidated financial statements included in this report for further information on income taxes.
YEAR ENDED DECEMBER 31, 2012 COMPARED TO YEAR ENDED DECEMBER 31, 2011
The Babcock & Wilcox Company
Consolidated revenues increased 11.5%, or $339.3 million, to $3.29 billion in the year ended December 31, 2012 compared to $2.95 billion in 2011. Our Power Generation segment revenues increased $244.5 million, or 15.9%, primarily attributable to increased revenue in our new build environmental equipment and new build steam generation systems businesses, partially offset by decreases in our aftermarket services business. Our Nuclear Operations segment experienced a $54.8 million, or 5.3%, increase in revenues, primarily attributable to increased activity in the manufacturing of nuclear components for U.S. Government programs and increased volume in our naval nuclear fuel and downblending activities. Our Technical Services segment revenues decreased $11.8 million, or 9.9%. In addition, our Nuclear Energy segment revenues increased $4.2 million, or 1.3%.
51
Consolidated operating income increased $250.9 million to $346.6 million in the year ended December 31, 2012 from $95.7 million in 2011. Operating income includes actuarial gains and losses related to our pension and postretirement plans, which were fourth quarter non-cash losses totaling $31.9 million and $215.4 million in 2012 and 2011, respectively. Excluding these MTM charges, operating income of our reportable segments and unallocated corporate expenses increased $67.4 million for the year ended December 31, 2012 compared to 2011. We experienced increased operating income in our Nuclear Operations segment associated with the revenue growth discussed above totaling $31.9 million. Operating income for our Nuclear Energy segment increased $71.4 million, primarily attributable to project costs to complete the condenser replacement project at Columbia Generating Station recognized during 2011 that did not reoccur in 2012. These increases were partially offset by decreased operating income in our Technical Services segment totaling $10.2 million, primarily due to reduced award fees earned in 2012 and increased corporate expenses which totaled $7.6 million. We also experienced decreased operating income in our mPower segment totaling $17.4 million due to increased research and development activities related to the continued development of the B&W mPower reactor. Operating income in our Power Generation segment was relatively unchanged in 2012.
Power Generation
Revenues increased 15.9%, or $244.5 million, to $1,786.0 million in the year ended December 31, 2012, compared to $1,541.5 million in 2011, primarily attributable to a $210.7 million increase in our new build environmental equipment business and a $94.4 million increase in our new build steam generation systems business. In our new build environmental equipment business, the increase in revenues was principally driven by ongoing engineering, procurement and construction activities on projects as a result of new environmental rules and regulations. In our new build steam generation systems business, the main driver for this increase in revenues was a significant increase in activity on waste-to-energy and biomass boiler projects. These increases were partially offset by lower revenues of $53.1 million in our aftermarket services business primarily due to lower construction activities on boiler retrofit service projects and boiler replacement parts sales to existing power plants largely as a result of reduced demand from coal-fired power plants due to lower natural gas prices. The aftermarket services business did however experience an increase in aftermarket environmental parts, services and construction activities as customers invested to keep their existing environmental equipment in compliance with new environmental rules and regulations.
Operating income was relatively unchanged at $183.4 million in the year ended December 31, 2012 compared to $184.0 million in 2011. The increases in revenues discussed above were partially offset by more competitive profit margins from the early market cycle of environmental projects along with a lower level of project improvements on project closeouts than experienced in the prior year period. We also experienced a decrease in equity in income of investees totaling $8.4 million, primarily attributable to lower production and project activities at our joint venture in China. In addition, we incurred increased research and development expenses totaling $1.6 million for the period in 2012 as compared to the same period in the prior year. Further, we experienced impairment charges totaling $3.2 million in 2012 and gains on asset disposals totaling $3.5 million in 2011.
Nuclear Operations
Revenues increased 5.3%, or $54.8 million, to $1,098.0 million in the year ended December 31, 2012 compared to $1,043.2 million in the corresponding period of 2011, primarily attributable to increased activity in the manufacturing of nuclear components for U.S. Government programs totaling $36.2 million and increased volume in our naval nuclear fuel and downblending activities totaling $18.6 million as compared to the corresponding period of 2011.
Operating income increased $31.9 million to $226.3 million in the year ended December 31, 2012 compared to $194.4 million in the corresponding period in 2011, primarily due to improved contract performance for the manufacturing of nuclear components for U.S. Government programs totaling $23.4 million. Our naval nuclear fuel and downblending operating income also increased $8.5 million compared to 2011. Included in operating income for 2011 is a $10.9 million gain resulting from a favorable settlement with the previous owner of NFS. Contract performance associated with naval nuclear fuel and downblending activities improved $19.4 million compared to 2011.
52
Technical Services
Revenues decreased 9.9%, or $11.8 million, to $107.9 million in the year ended December 31, 2012 compared to $119.7 million for the corresponding period of 2011. These decreases are primarily attributable to a decrease in our specialty manufacturing work scope associated with the American Centrifuge program totaling $8.9 million and a decrease in our international contract support services associated with the Fukushima event totaling $3.5 million, partially offset by an increase in environmental remediation services.
Operating income decreased $10.2 million to $59.7 million in the year ended December 31, 2012 compared to $69.9 million in the corresponding period of 2011. This decrease is principally due to decreased award fees earned on our NNSA management contracts totaling $7.9 million, primarily attributable to our Oak Ridge, Tennessee and Los Alamos, New Mexico sites. We also experienced a decrease in operating income totaling $3.8 million associated with the decreased revenues from the American Centrifuge program discussed above and increased selling, general and administrative expenses totaling $3.3 million associated with higher bid and proposal activity. These amounts were offset by increased environmental remediation services income totaling $1.4 million and lower research and development expenses totaling $1.2 million.
Nuclear Energy
Revenues increased 1.3%, or $4.2 million, to $325.7 million in the year ended December 31, 2012 compared to $321.5 million in the corresponding period of 2011, primarily attributable to increased activity in our nuclear services and nuclear equipment businesses of $18.5 million principally due to timing of customer outage projects and execution of our long-term equipment manufacturing contracts. This revenue increase was partially offset by lower revenue in our nuclear projects business due to the completion of a major project in the prior year. For the year ended December 31, 2012, revenues in our nuclear projects business also included $18.4 million from the May 2012 claims settlement agreement reached with Energy Northwest related to a condenser replacement project at the Columbia Generating Station in 2011.
Operating income increased $71.4 million to income of $50.6 million in the year ended December 31, 2012 compared to a loss of $20.8 million in the corresponding period of 2011, primarily due to $50.7 million of project costs to complete the condenser replacement project at Columbia Generating Station recognized during the year ended December 31, 2011 and $18.1 million income (net of related expenses) recognized in the year ended December 31, 2012 associated with the May 2012 settlement discussed above. In addition, operating income in our nuclear services and nuclear equipment businesses increased by $3.6 million associated with the increased revenue discussed above.
mPower
Operating income decreased $17.4 million to a loss of $113.5 million in the year ended December 31, 2012 compared to a loss of $96.1 million in the corresponding period of 2011. Research and development activities related to the continued development of the B&W mPower reactor increased by $12.1 million, including a $1.4 million increase in non-cash in-kind research and development services contributed by GmPs minority partner. Selling, general, and administrative expenses increased by $5.0 million compared to the corresponding period of 2011.
Corporate
Unallocated corporate expenses increased $7.6 million to $28.0 million in the year ended December 31, 2012, as compared to $20.4 million in 2011, mainly due to higher information technology costs, outside consultant costs and a decrease in operating results in our captive insurance company in 2012 compared to 2011.
Other Income Statement Items
Other - net decreased $26.9 million to a loss of $24.9 million in the year ended December 31, 2012, as compared to income of $2.0 million for the corresponding period in 2011, primarily due to the impairment of our USEC investment totaling $27.0 million, which we recognized in the three months ended September 30, 2012.
53
Net Loss Attributable to Noncontrolling Interest
Net Loss Attributable to Noncontrolling Interest increased $2.4 million in the year ended December 31, 2012 compared to 2011, primarily attributable to noncontrolling interest recognition of losses incurred in connection with the B&W mPower reactor development efforts.
Provision for Income Taxes
For the year ended December 31, 2012, our provision for income taxes increased $78.0 million to $101.9 million, while income before provision for income taxes increased $224.9 million to $319.4 million. Our effective tax rate was approximately 31.9% for 2012, as compared to 25.3% for 2011. The increase in our effective tax rate was primarily attributable to a significant shift in jurisdictional mix of pre-tax earnings in 2012 as compared to 2011, and the temporary expiration in 2012 of the U.S. research & development tax credit, offset in part by a reduction of reserves for uncertain tax positions.
Income before provision for income taxes, provision for income taxes and effective tax rates for our U.S. and non-U.S. jurisdictions were as shown below:
Income before Provision for Income Taxes |
Provision for Income Taxes |
Effective Tax Rate | ||||||||||||||||||||||
2012 | 2011 | 2012 | 2011 | 2012 | 2011 | |||||||||||||||||||
(In thousands) | (In thousands) | |||||||||||||||||||||||
United States |
$ | 222,840 | $ | 39,417 | $ | 78,868 | $ | 17,172 | 35.4 | % | 43.6 | % | ||||||||||||
Non-United States |
96,578 | 55,081 | 22,993 | 6,708 | 23.8 | % | 12.2 | % | ||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
Total |
$ | 319,418 | $ | 94,498 | $ | 101,861 | $ | 23,880 | 31.9 | % | 25.3 | % | ||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
We are subject to U.S. federal income tax at a statutory rate of 35% on our U.S. operations plus the applicable state income taxes on our profitable U.S. subsidiaries. Our non-U.S. earnings are subject to tax at various tax rates and under various tax regimes, including deemed profits tax regimes.
The American Taxpayer Relief Act of 2012 was signed into law on January 2, 2013. Some provisions of this law provide for retroactive changes to the 2012 tax year, which we did not consider in determining our effective tax rate for 2012. The impact of these retroactive changes was recorded in the first quarter of 2013.
See Note 5 to our consolidated financial statements included in this report for further information on income taxes.
ADJUSTED RESULTS OF OPERATIONS
In the results of operations discussion above, we have disclosed operating income changes excluding MTM charges and GCI charges which have been recorded in accordance with generally accepted accounting principles. We disclose this non-GAAP financial measure because we believe it provides an enhanced understanding of the relationship between our reported results of operations and our segment operating performance.
EFFECTS OF INFLATION AND CHANGING PRICES
Our financial statements are prepared in accordance with generally accepted accounting principles in the United States, using historical U.S. dollar accounting (historical cost). Statements based on historical cost, however, do not adequately reflect the cumulative effect of increasing costs and changes in the purchasing power of the U.S. dollar, especially during times of significant and continued inflation.
54
In order to minimize the negative impact of inflation on our operations, we attempt to cover the increased cost of anticipated changes in labor, material and service costs, either through an estimate of those changes, which we reflect in the original price, or through price escalation clauses in our contracts. However, there can be no assurance we will be able to cover all changes in cost using this strategy.
LIQUIDITY AND CAPITAL RESOURCES
Our overall liquidity position, which we generally define as our unrestricted cash and investments plus amounts available for borrowings under our credit facility, remained strong in 2013. Our liquidity position at December 31, 2013 decreased by approximately $120.3 million to $898.2 million from $1,018.5 million at December 31, 2012, mainly due to factors discussed below and due to the changes in our cash flows from operating, investing and financing activities. We experienced net cash generated from operations in each of the years ended December 31, 2013, 2012 and 2011. Typically, the fourth quarter has been the period of highest cash flows from operating activities, primarily attributable to payments received from the U.S. Government on accounts receivable retainages, cash dividends received from our joint ventures and strong working capital performance.
Credit Facility
On June 8, 2012, B&W entered into an Amended and Restated Credit Agreement (the Credit Agreement) with a syndicate of lenders and letter of credit issuers, and Bank of America, N.A., as administrative agent, which amended and restated our previous Credit Agreement dated May 3, 2010. The Credit Agreement provides for revolving credit borrowings and issuances of letters of credit in an aggregate outstanding amount of up to $700 million, and is scheduled to mature June 8, 2017. The proceeds of the Credit Agreement are available for working capital needs and other general corporate purposes. The Credit Agreement includes procedures for additional financial institutions to become lenders, or for any existing lender to increase its commitment thereunder, subject to an aggregate maximum of $1.0 billion for all revolving loan and letter of credit commitments.
The Credit Agreement is guaranteed by substantially all of B&Ws wholly owned domestic subsidiaries. Obligations under the Credit Agreement are secured by first-priority liens on certain assets owned by B&W and the guarantors (other than subsidiaries comprising our Nuclear Operations and Technical Services segments). If the corporate family rating of B&W and its subsidiaries from Moodys is Baa3 or better (with a stable outlook or better), the corporate rating of B&W and its subsidiaries from Standard & Poors is BBB- or better (with a stable outlook or better), and other conditions are met, the liens securing obligations under the Credit Agreement will be released, subject to reinstatement upon the terms set forth in the Credit Agreement.
The Credit Agreement requires only interest payments on a periodic basis until maturity. We may prepay all loans under the Credit Agreement at any time without premium or penalty (other than customary LIBOR breakage costs), subject to certain notice requirements.
The Credit Agreement contains financial covenants relating to leverage and interest coverage and includes covenants that restrict, among other things, the level of debt incurrence, liens, investments, acquisitions, asset dispositions, dividends, prepayments of subordinated debt and mergers. At December 31, 2013, we were in compliance with all of the covenants set forth in the Credit Agreement. A comparison of the key financial covenants and current compliance at December 31, 2013 is as follows:
Required | Actual | |||
Less than | ||||
Maximum leverage ratio |
2.75 to 1.0 | 0.08 to 1.0 | ||
Greater than | ||||
Minimum interest coverage ratio |
4.0 to1.0 | 87.84 to 1.0 |
55
Loans outstanding under the Credit Agreement bear interest at our option at either the Eurocurrency rate plus a margin ranging from 1.25% to 2.25% per year or the base rate (the highest of the Federal Funds rate plus 0.50%, the one month Eurocurrency rate plus 1.0%, or the administrative agents prime rate) plus a margin ranging from 0.25% to 1.25% per year. The applicable margin for revolving loans varies depending on the credit ratings of the Credit Agreement. Under the Credit Agreement, we are charged a commitment fee on the unused portions of the Credit Agreement and that fee varies between 0.225% and 0.350% per year depending on the credit ratings of the Credit Agreement. Additionally, we are charged a letter of credit fee of between 1.25% and 2.25% per year with respect to the amount of each financial letter of credit issued under the Credit Agreement and a letter of credit fee of between 0.80% and 1.25% per year with respect to the amount of each performance letter of credit issued under the Credit Agreement, in each case depending on the credit ratings of the Credit Agreement. We also pay customary fronting fees and other fees and expenses in connection with the issuance of letters of credit under the Credit Agreement. In connection with entering into the Credit Agreement, we paid upfront fees to the lenders thereunder, and arrangement and other fees to the arrangers and agents of the Credit Agreement. At December 31, 2013, there were no borrowings outstanding and letters of credit issued under the Credit Agreement totaled $163.0 million, resulting in $537.0 million available for borrowings or to meet letter of credit requirements. The applicable interest rate at December 31, 2013 under this facility was 3.75% per year for revolving loans.
Based on the current credit ratings of the Credit Agreement, the applicable margin for Eurocurrency loans is 1.50%, the applicable margin for base rate loans is 0.50%, the letter of credit fee for financial letters of credit is 1.50%, the letter of credit fee for performance letters of credit is 0.875%, and the commitment fee for unused portions of the Credit Agreement is 0.25%. The Credit Agreement does not have a floor for the base rate or the Eurocurrency rate.
The Credit Agreement generally includes customary events of default for a secured credit facility. If any default occurs under the Credit Agreement, or if we are unable to make any of the representations and warranties in the Credit Agreement, we will be unable to borrow funds or have letters of credit issued under the Credit Agreement.
Other Arrangements
Certain subsidiaries within our Power Generation segment have credit arrangements with various commercial banks and other financial institutions for the issuance of letters of credit and bank guarantees in association with contracting activity. The aggregate value of all such letters of credit and bank guarantees as of December 31, 2013 was $96.4 million.
We have posted surety bonds to support contractual obligations to customers relating to certain projects. We utilize bonding facilities to support such obligations, but the issuance of bonds under those facilities is typically at the suretys discretion. Although there can be no assurance that we will maintain our surety bonding capacity, we believe our current capacity is more than adequate to support our existing project requirements for the next twelve months. In addition, these bonds generally indemnify customers should we fail to perform our obligations under the applicable contracts. We, and certain of our subsidiaries, have jointly executed general agreements of indemnity in favor of surety underwriters relating to surety bonds those underwriters issue in support of some of our contracting activity. As of December 31, 2013, bonds issued and outstanding under these arrangements in support of contracts totaled approximately $405.8 million.
OTHER
Foreign Operations
Included in our total unrestricted cash and cash equivalents is approximately $198.0 million or 57.2% related to foreign operations and subsidiaries. In general, these resources are not available to fund our U.S. operations unless the funds are repatriated to the U.S., which would expose us to taxes we presently have not accrued in our results of operations. We presently have no plans to repatriate these funds to the U.S. as the liquidity generated by our U.S. operations is sufficient to meet the cash requirements of our U.S. operations.
56
Cash, Cash Equivalents, Restricted Cash and Investments
In the aggregate, our cash and cash equivalents, restricted cash and cash equivalents and investments decreased by approximately $130.3 million to $410.0 million at December 31, 2013 from $540.3 million at December 31, 2012, primarily due to the items discussed below.
Our working capital increased by approximately $68.4 million to $510.2 million at December 31, 2013 from $441.8 million at December 31, 2012, attributable primarily to a reduction in advance billings on contracts offset by a decline in investments.
Our net cash provided by operating activities was approximately $137.9 million in the year ended December 31, 2013 compared to $184.9 million in the year ended December 31, 2012. This decrease was primarily attributable to changes in net contracts in progress and advance billings due to timing of project billings, offset by lower pension contributions.
Our net cash used in investing activities decreased by approximately $131.5 million to cash provided by investing activities of approximately $20.1 million in the year ended December 31, 2013 from cash used in investing activities of approximately $111.4 million in the year ended December 31, 2012. This decrease in net cash used in investing activities was primarily attributable to sales and maturities of investments whose proceeds were utilized for corporate purposes rather than reinvested in available-for-sale securities.
Our net cash used in financing activities increased by approximately $82.9 million to $190.9 million in the year ended December 31, 2013 as compared to $108.0 million in the year ended December 31, 2012. This increase in net cash used in financing activities was primarily attributable to the repurchase of common shares and the full year payment of dividends in 2013.
At December 31, 2013, we had restricted cash and cash equivalents totaling $48.7 million, $3.9 million of which was held in restricted foreign cash accounts, $2.8 million of which was held for future decommissioning of facilities (which we include in other assets on our consolidated balance sheets), and $42.0 million of which was held to meet reinsurance reserve requirements of our captive insurer (in lieu of long-term investments).
At December 31, 2013, we had short-term and long-term investments with a fair value of $15.2 million. Our investment portfolio consists primarily of investments in government obligations and other highly liquid money market instruments.
Our investments are classified as available-for-sale and are carried at fair value with unrealized gains and losses, net of tax, reported as a component of other comprehensive income. Our net unrealized gain/loss on investments is currently in an unrealized gain position totaling approximately $0.2 million at December 31, 2013. At December 31, 2012, we had unrealized gains on our investments totaling approximately $0.6 million. Based on our analysis of these investments, we believe that none of our available-for-sale securities were permanently impaired as of December 31, 2013.
Based on our liquidity position, we believe we have sufficient cash and letter of credit and borrowing capacity to fund our operating requirements for at least the next twelve months.
57
CONTRACTUAL OBLIGATIONS
Our cash requirements as of December 31, 2013 under current contractual obligations were as follows:
Total | Less than 1 Year |
1-3 Years |
3-5 Years |
After 5 Years |
||||||||||||||||
(In thousands) | ||||||||||||||||||||
Long-term debt principal (a) |
$ | 4,896 | $ | 4,671 | $ | 225 | $ | | $ | | ||||||||||
Lease payments |
$ | 39,449 | $ | 10,814 | $ | 13,787 | $ | 9,243 | $ | 5,605 |
We expect cash requirements totaling approximately $66.6 million for contributions to our pension plans in 2014. In addition, we anticipate cash requirements totaling approximately $9.4 million for contributions to our other postretirement benefit plans in 2014.
(a) Interest payments on these borrowings as of December 31, 2013 are not significant.
Our contingent commitments under letters of credit, bank guarantees and surety bonds currently outstanding expire as follows:
Total |
Less than 1 Year |
1-3 Years |
3-5 Years |
Thereafter | ||||||||||||
(In thousands) | ||||||||||||||||
$665,188 |
$ | 210,821 | $ | 391,155 | $ | 62,556 | $ | 656 |
Item 7A. | QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK |
Our exposure to market risk from changes in interest rates relates primarily to our cash equivalents and our investment portfolio, which primarily consists of investments in U.S. Government obligations and highly liquid money market instruments denominated in U.S. dollars. We are averse to principal loss and seek to ensure the safety and preservation of our invested funds by limiting default risk, market risk and reinvestment risk. All our investments in debt securities are classified as available-for-sale.
We have exposure to changes in interest rates on the Credit Agreement (see Item 7 Managements Discussion and Analysis of Financial Condition and Results of Operations Liquidity and Capital Resources). At December 31, 2013, we had no outstanding borrowings under this facility. We have no material future earnings or cash flow exposures from changes in interest rates on our other long-term debt obligations.
We have operations in many foreign locations, and, as a result, our financial results could be significantly affected by factors such as changes in foreign currency exchange (FX) rates or weak economic conditions in those foreign markets. In order to manage the risks associated with FX rate fluctuations, we attempt to hedge those risks with FX derivative instruments. Historically, we have hedged those risks with FX forward contracts. We do not enter into speculative derivative positions.
58
Interest Rate Sensitivity
The following tables provide information about our financial instruments that are sensitive to changes in interest rates. The tables present principal cash flows and related weighted-average interest rates by expected maturity dates.
Principal Amount by Expected Maturity | ||||||||||||||||||||||||||||||||
(In thousands) | ||||||||||||||||||||||||||||||||
At December 31, 2013: | Fair Value
at December 31, 2013 |
|||||||||||||||||||||||||||||||
Years Ending December 31, | ||||||||||||||||||||||||||||||||
2014 | 2015 | 2016 | 2017 | 2018 | Thereafter | Total | ||||||||||||||||||||||||||
Investments |
$ | 10,747 | | | | | $ | 4,224 | $ | 14,971 | $ | 15,174 | ||||||||||||||||||||
Average Interest Rate |
0.18 | % | | | | | 0.25 | % | ||||||||||||||||||||||||
Long-term Debt |
$ | 4,671 | $ | 225 | | | | | $ | 4,896 | $ | 4,917 | ||||||||||||||||||||
Average Interest Rate |
6.31 | % | 0.46 | % | | | | | ||||||||||||||||||||||||
At December 31, 2012: | Fair Value
at December 31, 2012 |
|||||||||||||||||||||||||||||||
Years Ending December 31, | ||||||||||||||||||||||||||||||||
2013 | 2014 | 2015 | 2016 | 2017 | Thereafter | Total | ||||||||||||||||||||||||||
Investments |
$ | 88,750 | | | | | $ | 3,511 | $ | 92,261 | $ | 92,859 | ||||||||||||||||||||
Average Interest Rate |
0.29 | % | | | | | 0.36 | % | ||||||||||||||||||||||||
Long-term Debt |
$ | 4,062 | $ | 215 | $ | 215 | | | | $ | 4,492 | $ | 4,529 | |||||||||||||||||||
Average Interest Rate |
6.28 | % | 0.46 | % | 0.46 | % | | | |
Exchange Rate Sensitivity
The following table provides information about our FX forward contracts outstanding at December 31, 2013 and presents such information in U.S. dollar equivalents. The table presents notional amounts and related weighted-average FX rates by expected (contractual) maturity dates and constitutes a forward-looking statement. These notional amounts generally are used to calculate the contractual payments to be exchanged under the contract. The average contractual FX rates are expressed using market convention, which is dependent on the currencies being bought and sold under the forward contract.
Forward Contracts to Purchase Foreign Currencies in U.S. Dollars (in thousands) | ||||||||||||
Year Ending | Fair Value at | Average Contractual | ||||||||||
Foreign Currency | December 31, 2014 | December 31, 2013 | Exchange Rate | |||||||||
British Pound Sterling |
$ | 8,726 | $ | 412 | 1.5669 | |||||||
British Pound Sterling (selling Euros) |
$ | 353 | $ | 13 | 0.8679 | |||||||
Canadian Dollars |
$ | 24,958 | $ | (385 | ) | 1.0539 | ||||||
Euros |
$ | 2,182 | $ | 29 | 1.3555 | |||||||
Euros (selling Canadian Dollars) |
$ | 169 | $ | 8 | 1.4123 | |||||||
Swedish Krona (selling Danish Krona) |
$ | 96 | $ | (4 | ) | 1.1598 | ||||||
Swedish Krona (selling Norwegian Krona) |
$ | 373 | $ | 22 | 1.1267 | |||||||
U.S. Dollars (selling Canadian Dollars) |
$ | 1,987 | $ | 917 | 1.0505 | |||||||
Year Ending | Fair Value at | Average Contractual | ||||||||||
Foreign Currency | December 31, 2015 | December 31, 2013 | Exchange Rate | |||||||||
British Pound Sterling |
$ | 1,665 | $ | 50 | 1.5896 | |||||||
Canadian Dollars |
$ | 29,884 | $ | (553 | ) | 1.0662 | ||||||
U.S. Dollars (selling Canadian Dollars) |
$ | 5,195 | $ | 94 | 1.0693 | |||||||
Year Ending | Fair Value at | Average Contractual | ||||||||||
Foreign Currency | December 31, 2016 | December 31, 2013 | Exchange Rate | |||||||||
Canadian Dollars |
$ | 3,227 | $ | (51 | ) | 1.0793 |
ITEM 8. | FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA |
59
Report of Independent Registered Public Accounting Firm
To the Board of Directors and Stockholders of The Babcock & Wilcox Company:
We have audited the accompanying consolidated balance sheets of The Babcock & Wilcox Company and subsidiaries (the Company) as of December 31, 2013 and 2012, and the related consolidated statements of income, comprehensive income, stockholders equity, and cash flows for each of the three years in the period ended December 31, 2013. These consolidated financial statements are the responsibility of the Companys management. Our responsibility is to express an opinion on these financial statements based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of The Babcock & Wilcox Company and subsidiaries as of December 31, 2013 and 2012, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2013, in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the Companys internal control over financial reporting as of December 31, 2013, based on the criteria established in Internal Control Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 2014 expressed an unqualified opinion on the Companys internal control over financial reporting.
/S/ DELOITTE & TOUCHE LLP
Charlotte, North Carolina
February 26, 2014
60
CONSOLIDATED BALANCE SHEETS
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
ASSETS | ||||||||
Current Assets: |
||||||||
Cash and cash equivalents |
$ | 346,116 | $ | 383,547 | ||||
Restricted cash and cash equivalents |
45,945 | 60,961 | ||||||
Investments |
10,748 | 88,769 | ||||||
Accounts receivable trade, net |
360,323 | 364,960 | ||||||
Accounts receivable other |
45,480 | 61,682 | ||||||
Contracts in progress |
370,820 | 316,518 | ||||||
Inventories |
113,058 | 124,218 | ||||||
Deferred income taxes |
97,170 | 78,573 | ||||||
Other current assets |
47,764 | 41,858 | ||||||
|
|
|
|
|||||
Total Current Assets |
1,437,424 | 1,521,086 | ||||||
|
|
|
|
|||||
Property, Plant and Equipment |
1,126,683 | 1,099,040 | ||||||
Less accumulated depreciation |
679,604 | 652,019 | ||||||
|
|
|
|
|||||
Net Property, Plant and Equipment |
447,079 | 447,021 | ||||||
|
|
|
|
|||||
Investments |
4,426 | 4,090 | ||||||
|
|
|
|
|||||
Goodwill |
281,708 | 280,780 | ||||||
|
|
|
|
|||||
Deferred Income Taxes |
127,076 | 227,215 | ||||||
|
|
|
|
|||||
Investments in Unconsolidated Affiliates |
184,831 | 186,354 | ||||||
|
|
|
|
|||||
Intangible Assets |
81,521 | 87,686 | ||||||
|
|
|
|
|||||
Other Assets |
45,088 | 86,123 | ||||||
|
|
|
|
|||||
TOTAL |
$ | 2,609,153 | $ | 2,840,355 | ||||
|
|
|
|
See accompanying notes to consolidated financial statements.
61
THE BABCOCK & WILCOX COMPANY
CONSOLIDATED BALANCE SHEETS
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
LIABILITIES AND STOCKHOLDERS EQUITY | ||||||||
Current Liabilities: |
||||||||
Notes payable and current maturities of long-term debt |
$ | 4,671 | $ | 4,062 | ||||
Accounts payable |
319,774 | 264,798 | ||||||
Accrued employee benefits |
163,833 | 186,495 | ||||||
Accrued liabilities other |
58,192 | 57,991 | ||||||
Advance billings on contracts |
317,771 | 472,287 | ||||||
Accrued warranty expense |
56,436 | 83,682 | ||||||
Income taxes payable |
6,551 | 9,973 | ||||||
|
|
|
|
|||||
Total Current Liabilities |
927,228 | 1,079,288 | ||||||
|
|
|
|
|||||
Long-Term Debt |
225 | 430 | ||||||
|
|
|
|
|||||
Accumulated Postretirement Benefit Obligation |
43,194 | 71,208 | ||||||
|
|
|
|
|||||
Environmental Liabilities |
53,391 | 46,497 | ||||||
|
|
|
|
|||||
Pension Liability |
336,878 | 579,165 | ||||||
|
|
|
|
|||||
Other Liabilities |
65,296 | 60,851 | ||||||
|
|
|
|
|||||
Commitments and Contingencies (Note 11) |
||||||||
Stockholders Equity: |
||||||||
Common stock, par value $0.01 per share, authorized 325,000,000 shares; issued 120,536,910 and 119,608,026 shares at December 31, 2013 and December 31, 2012, respectively |
1,205 | 1,196 | ||||||
Preferred stock, par value $0.01 per share, authorized 75,000,000 shares; no shares issued |
| | ||||||
Capital in excess of par value |
747,189 | 713,257 | ||||||
Retained earnings |
656,916 | 349,063 | ||||||
Treasury stock at cost, 10,068,731 and 4,372,143 shares at December 31, 2013 and December 31, 2012, respectively |
(268,971 | ) | (109,809 | ) | ||||
Accumulated other comprehensive income |
28,348 | 32,728 | ||||||
|
|
|
|
|||||
Stockholders Equity The Babcock & Wilcox Company |
1,164,687 | 986,435 | ||||||
Noncontrolling interest |
18,254 | 16,481 | ||||||
|
|
|
|
|||||
Total Stockholders Equity |
1,182,941 | 1,002,916 | ||||||
|
|
|
|
|||||
TOTAL |
$ | 2,609,153 | $ | 2,840,355 | ||||
|
|
|
|
See accompanying notes to consolidated financial statements.
62
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands, except per share amounts) | ||||||||||||
Revenues |
$ | 3,269,208 | $ | 3,291,359 | $ | 2,952,040 | ||||||
|
|
|
|
|
|
|||||||
Costs and Expenses: |
||||||||||||
Cost of operations |
2,301,648 | 2,461,205 | 2,384,154 | |||||||||
Research and development costs |
79,226 | 120,562 | 106,396 | |||||||||
Losses (gains) on asset disposals and impairments, net |
1,049 | 1,419 | (3,087 | ) | ||||||||
Selling, general and administrative expenses |
379,382 | 428,293 | 447,561 | |||||||||
Special charges for restructuring activities |
39,599 | | | |||||||||
|
|
|
|
|
|
|||||||
Total Costs and Expenses |
2,800,904 | 3,011,479 | 2,935,024 | |||||||||
|
|
|
|
|
|
|||||||
Equity in Income of Investees |
68,058 | 66,709 | 78,655 | |||||||||
|
|
|
|
|
|
|||||||
Operating Income |
536,362 | 346,589 | 95,671 | |||||||||
|
|
|
|
|
|
|||||||
Other Income (Expense): |
||||||||||||
Interest income |
1,443 | 1,491 | 1,342 | |||||||||
Interest expense |
(3,115 | ) | (3,735 | ) | (4,543 | ) | ||||||
Other net |
(17,517 | ) | (24,927 | ) | 2,028 | |||||||
|
|
|
|
|
|
|||||||
Total Other Expense |
(19,189 | ) | (27,171 | ) | (1,173 | ) | ||||||
|
|
|
|
|
|
|||||||
Income before Provision for Income Taxes |
517,173 | 319,418 | 94,498 | |||||||||
Provision for Income Taxes |
184,583 | 101,861 | 23,880 | |||||||||
|
|
|
|
|
|
|||||||
Net Income |
$ | 332,590 | $ | 217,557 | $ | 70,618 | ||||||
|
|
|
|
|
|
|||||||
Net Loss Attributable to Noncontrolling Interest |
13,488 | 10,138 | 7,701 | |||||||||
|
|
|
|
|
|
|||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 346,078 | $ | 227,695 | $ | 78,319 | ||||||
|
|
|
|
|
|
|||||||
Earnings per Common Share: |
||||||||||||
Basic: |
||||||||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 3.09 | $ | 1.92 | $ | 0.67 | ||||||
Diluted: |
||||||||||||
Net Income Attributable to The Babcock & Wilcox Company |
$ | 3.07 | $ | 1.91 | $ | 0.66 | ||||||
|
|
|
|
|
|
|||||||
Shares used in the computation of earnings per share (Note 19): |
||||||||||||
Basic |
111,901,750 | 118,418,930 | 117,560,594 | |||||||||
Diluted |
112,685,417 | 119,021,324 | 118,404,597 | |||||||||
|
|
|
|
|
|
See accompanying notes to consolidated financial statements.
63
CONSOLIDATED STATEMENTS OF
COMPREHENSIVE INCOME
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Net Income |
$ | 332,590 | $ | 217,557 | $ | 70,618 | ||||||
|
|
|
|
|
|
|||||||
Other Comprehensive Income: |
||||||||||||
Currency translation adjustments |
(2,518 | ) | 4,284 | 747 | ||||||||
Derivative financial instruments: |
||||||||||||
Unrealized gains (losses) arising during the period, net of tax (benefit) provision of $1,518, $(622) and $347, respectively |
(4,418 | ) | 1,409 | (877 | ) | |||||||
Reclassification adjustment for (gains) losses included in net income, net of tax benefit (provision) of $(973), $704 and $(496), respectively |
2,942 | (2,023 | ) | 1,655 | ||||||||
Benefit obligations: |
||||||||||||
Unrecognized losses arising during the period, net of tax benefit of $1,177, $221 and $437, respectively |
(1,928 | ) | (434 | ) | (1,205 | ) | ||||||
Amortization of benefit plan costs, net of tax benefit of $(1,035), $(1,159) and $(1,267), respectively |
1,975 | 2,281 | 2,487 | |||||||||
Investments: |
||||||||||||
Unrealized gains (losses) arising during the period, net of tax provision of $(103), $0 and $0, respectively |
302 | 431 | (74 | ) | ||||||||
Reclassification adjustment for (gains) losses included in net income, net of tax provision of $30, $0 and $0, respectively |
(769 | ) | (35 | ) | 5 | |||||||
|
|
|
|
|
|
|||||||
Other Comprehensive Income (Loss) |
(4,414 | ) | 5,913 | 2,738 | ||||||||
|
|
|
|
|
|
|||||||
Total Comprehensive Income |
328,176 | 223,470 | 73,356 | |||||||||
|
|
|
|
|
|
|||||||
Comprehensive Loss Attributable to Noncontrolling Interest |
13,522 | 10,127 | 7,670 | |||||||||
|
|
|
|
|
|
|||||||
Comprehensive Income Attributable to The Babcock & Wilcox Company |
$ | 341,698 | $ | 233,597 | $ | 81,026 | ||||||
|
|
|
|
|
|
See accompanying notes to consolidated financial statements.
64
CONSOLIDATED STATEMENT OF STOCKHOLDERS EQUITY
Capital In Excess of Par Value |
Retained Earnings |
Accumulated Other Comprehensive Income (Loss) |
Treasury Stock |
Stockholders Equity |
Noncontrolling Interest |
Total Stockholders Equity |
||||||||||||||||||||||||||||||
Common Stock | ||||||||||||||||||||||||||||||||||||
Shares | Par Value | |||||||||||||||||||||||||||||||||||
(In thousands, except share and per share amounts) | ||||||||||||||||||||||||||||||||||||
Balance December 31, 2010 |
116,963,664 | $ | 1,170 | $ | 637,396 | $ | 52,571 | $ | 24,119 | $ | (2,397 | ) | $ | 712,859 | $ | 666 | $ | 713,525 | ||||||||||||||||||
Net income |
| | | 78,319 | | | 78,319 | (7,701 | ) | 70,618 | ||||||||||||||||||||||||||
Defined benefit obligations |
| | | | 1,282 | | 1,282 | | 1,282 | |||||||||||||||||||||||||||
Available-for-sale investments |
| | | | (69 | ) | | (69 | ) | | (69 | ) | ||||||||||||||||||||||||
Currency translation adjustments |
| | | | 716 | | 716 | 31 | 747 | |||||||||||||||||||||||||||
Derivative financial instruments |
| | | | 778 | | 778 | | 778 | |||||||||||||||||||||||||||
Exercise of stock options |
379,706 | 4 | 8,542 | | | | 8,546 | | 8,546 | |||||||||||||||||||||||||||
Contributions to thrift plan |
510,510 | 5 | 13,093 | | | | 13,098 | | 13,098 | |||||||||||||||||||||||||||
Shares placed in treasury |
| | | | | (7,662 | ) | (7,662 | ) | | (7,662 | ) | ||||||||||||||||||||||||
Stock-based compensation charges |
605,031 | 6 | 17,921 | | | | 17,927 | | 17,927 | |||||||||||||||||||||||||||
Contribution of in-kind services |
| | | | | | | 16,584 | 16,584 | |||||||||||||||||||||||||||
Distributions to noncontrolling interests |
| | | | | | | (401 | ) | (401 | ) | |||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
Balance December 31, 2011 |
118,458,911 | $ | 1,185 | $ | 676,952 | $ | 130,890 | $ | 26,826 | $ | (10,059 | ) | $ | 825,794 | $ | 9,179 | $ | 834,973 | ||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
Net income |
| | | 227,695 | | | 227,695 | (10,138 | ) | 217,557 | ||||||||||||||||||||||||||
Dividends declared ($.08 per share) |
| | | (9,522 | ) | | | (9,522 | ) | | (9,522 | ) | ||||||||||||||||||||||||
Defined benefit obligations |
| | | | 1,847 | | 1,847 | | 1,847 | |||||||||||||||||||||||||||
Available-for-sale investments |
| | | | 396 | | 396 | | 396 | |||||||||||||||||||||||||||
Currency translation adjustments |
| | | | 4,273 | | 4,273 | 11 | 4,284 | |||||||||||||||||||||||||||
Derivative financial instruments |
| | | | (614 | ) | | (614 | ) | | (614 | ) | ||||||||||||||||||||||||
Exercise of stock options |
261,784 | 3 | 4,511 | | | | 4,514 | | 4,514 | |||||||||||||||||||||||||||
Contributions to thrift plan |
549,121 | 5 | 13,788 | | | | 13,793 | | 13,793 | |||||||||||||||||||||||||||
Shares placed in treasury |
| | | | | (99,750 | ) | (99,750 | ) | | (99,750 | ) | ||||||||||||||||||||||||
Stock-based compensation charges |
338,210 | 3 | 18,006 | | | | 18,009 | | 18,009 | |||||||||||||||||||||||||||
Contribution of in-kind services |
| | | | | | | 17,942 | 17,942 | |||||||||||||||||||||||||||
Distributions to noncontrolling interests |
| | | | | | | (513 | ) | (513 | ) | |||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
Balance December 31, 2012 |
119,608,026 | $ | 1,196 | $ | 713,257 | $ | 349,063 | $ | 32,728 | $ | (109,809 | ) | $ | 986,435 | $ | 16,481 | $ | 1,002,916 | ||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
Net income |
| | | 346,078 | | | 346,078 | (13,488 | ) | 332,590 | ||||||||||||||||||||||||||
Dividends declared ($.34 per share) |
| | | (38,225 | ) | | | (38,225 | ) | | (38,225 | ) | ||||||||||||||||||||||||
Defined benefit obligations |
| | | | 47 | | 47 | | 47 | |||||||||||||||||||||||||||
Available-for-sale investments |
| | | | (467 | ) | | (467 | ) | | (467 | ) | ||||||||||||||||||||||||
Currency translation adjustments |
| | | | (2,484 | ) | | (2,484 | ) | (34 | ) | (2,518 | ) | |||||||||||||||||||||||
Derivative financial instruments |
| | | | (1,476 | ) | | (1,476 | ) | | (1,476 | ) | ||||||||||||||||||||||||
Exercise of stock options |
241,561 | 2 | 4,928 | | | | 4,930 | | 4,930 | |||||||||||||||||||||||||||
Contributions to thrift plan |
464,451 | 5 | 13,934 | | | | 13,939 | | 13,939 | |||||||||||||||||||||||||||
Shares placed in treasury |
| | | | | (159,162 | ) | (159,162 | ) | | (159,162 | ) | ||||||||||||||||||||||||
Stock-based compensation charges |
222,872 | 2 | 15,070 | | | | 15,072 | | 15,072 | |||||||||||||||||||||||||||
Contribution of in-kind services |
| | | | | | | 15,794 | 15,794 | |||||||||||||||||||||||||||
Distributions to noncontrolling interests |
| | | | | | | (499 | ) | (499 | ) | |||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||||
Balance December 31, 2013 |
120,536,910 | $ | 1,205 | $ | 747,189 | $ | 656,916 | $ | 28,348 | $ | (268,971 | ) | $ | 1,164,687 | $ | 18,254 | $ | 1,182,941 | ||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See accompanying notes to consolidated financial statements.
65
THE BABCOCK & WILCOX COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
CASH FLOWS FROM OPERATING ACTIVITIES: |
||||||||||||
Net Income |
$ | 332,590 | $ | 217,557 | $ | 70,618 | ||||||
Non-cash items included in net income: |
||||||||||||
Depreciation and amortization |
70,525 | 69,697 | 73,003 | |||||||||
Income of investees, net of dividends |
11,537 | (15,115 | ) | (20,854 | ) | |||||||
Losses (gains) on asset disposals and impairments |
1,049 | 1,419 | (3,087 | ) | ||||||||
Impairment of USEC investment |
19,139 | 27,000 | | |||||||||
In-kind research and development costs |
15,794 | 17,942 | 16,584 | |||||||||
Provision for (benefit from) deferred taxes |
94,068 | 43,038 | (19,200 | ) | ||||||||
Recognition of (gains) losses for pension and postretirement plans |
(219,915 | ) | 35,480 | 219,508 | ||||||||
Stock-based compensation expense |
15,072 | 18,009 | 17,927 | |||||||||
Excess tax benefits from stock-based compensation |
(177 | ) | (1,571 | ) | (4,083 | ) | ||||||
Changes in assets and liabilities, net of effects from acquisitions: |
||||||||||||
Accounts receivable |
19,726 | (52,034 | ) | (26,887 | ) | |||||||
Accounts payable |
54,895 | 30,391 | 48,246 | |||||||||
Contracts in progress and advance billings on contracts |
(210,582 | ) | 32,527 | (28,746 | ) | |||||||
Inventories |
11,971 | (16,448 | ) | (6,052 | ) | |||||||
Income taxes |
(6,364 | ) | 5,522 | 31,961 | ||||||||
Accrued and other current liabilities |
(28,499 | ) | (30,553 | ) | (23,106 | ) | ||||||
Pension liability, accrued postretirement benefit obligation and employee benefits |
(68,961 | ) | (168,004 | ) | (144,802 | ) | ||||||
Other, net |
26,018 | (29,930 | ) | (27,439 | ) | |||||||
|
|
|
|
|
|
|||||||
NET CASH PROVIDED BY OPERATING ACTIVITIES |
137,886 | 184,927 | 173,591 | |||||||||
|
|
|
|
|
|
|||||||
CASH FLOWS FROM INVESTING ACTIVITIES: |
||||||||||||
Decrease (increase) in restricted cash and cash equivalents |
15,016 | 229 | (48,923 | ) | ||||||||
Purchases of property, plant and equipment |
(64,950 | ) | (86,635 | ) | (63,874 | ) | ||||||
Acquisition of businesses, net of cash acquired |
| (318 | ) | (11,907 | ) | |||||||
Purchase of intangible assets |
(2,200 | ) | | | ||||||||
Purchases of available-for-sale securities |
(90,836 | ) | (268,929 | ) | (145,198 | ) | ||||||
Sales and maturities of available-for-sale securities |
168,879 | 247,649 | 147,288 | |||||||||
Proceeds from asset disposals |
1,028 | 580 | 6,468 | |||||||||
Proceeds from sale of an unconsolidated affiliate |
| 2,091 | | |||||||||
Investment in equity and cost method investees |
(6,884 | ) | (6,064 | ) | (38,176 | ) | ||||||
|
|
|
|
|
|
|||||||
NET CASH PROVIDED BY (USED IN) INVESTING ACTIVITIES |
20,053 | (111,397 | ) | (154,322 | ) | |||||||
|
|
|
|
|
|
|||||||
CASH FLOWS FROM FINANCING ACTIVITIES: |
||||||||||||
Payment of short-term borrowing and long-term debt |
(211 | ) | (4,643 | ) | (1,782 | ) | ||||||
Payment of debt issuance costs |
| (4,902 | ) | (82 | ) | |||||||
Increase in short-term borrowing |
484 | 3,815 | 1,254 | |||||||||
Repurchase of common shares |
(157,093 | ) | (96,774 | ) | | |||||||
Dividends paid to common shareholders |
(38,011 | ) | (9,485 | ) | | |||||||
Exercise of stock options |
4,275 | 2,926 | 4,463 | |||||||||
Excess tax benefits from stock-based compensation |
177 | 1,571 | 4,083 | |||||||||
Other |
(499 | ) | (514 | ) | (401 | ) | ||||||
NET CASH (USED IN) PROVIDED BY FINANCING ACTIVITIES |
(190,878 | ) | (108,006 | ) | 7,535 | |||||||
|
|
|
|
|
|
|||||||
EFFECTS OF EXCHANGE RATE CHANGES ON CASH |
(4,492 | ) | 2,814 | (2,737 | ) | |||||||
|
|
|
|
|
|
|||||||
NET (DECREASE) INCREASE IN CASH AND CASH EQUIVALENTS |
(37,431 | ) | (31,662 | ) | 24,067 | |||||||
|
|
|
|
|
|
|||||||
CASH AND CASH EQUIVALENTS AT BEGINNING OF PERIOD |
383,547 | 415,209 | 391,142 | |||||||||
|
|
|
|
|
|
|||||||
CASH AND CASH EQUIVALENTS AT END OF PERIOD |
$ | 346,116 | $ | 383,547 | $ | 415,209 | ||||||
|
|
|
|
|
|
|||||||
SUPPLEMENTAL DISCLOSURES OF CASH FLOW INFORMATION: |
||||||||||||
Cash paid during the period for: |
||||||||||||
Income taxes (net of refunds) |
$ | 86,924 | $ | 83,062 | $ | 33,505 | ||||||
SCHEDULE OF NONCASH INVESTING ACTIVITY: |
||||||||||||
Accrued capital expenditures included in accounts payable |
$ | 8,141 | $ | 7,902 | $ | 11,950 | ||||||
|
|
|
|
|
|
See accompanying notes to consolidated financial statements.
66
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
DECEMBER 31, 2013
NOTE 1 BASIS OF PRESENTATION AND SIGNIFICANT ACCOUNTING POLICIES
We have presented the consolidated financial statements of The Babcock & Wilcox Company (B&W) in U.S. dollars in accordance with accounting principles generally accepted in the United States (GAAP).
We use the equity method to account for investments in entities that we do not control, but over which we have the ability to exercise significant influence. We generally refer to these entities as joint ventures. We have eliminated all intercompany transactions and accounts. We have reclassified certain amounts previously reported to conform to the presentation at December 31, 2013 and for the year ended December 31, 2013. We present the notes to our consolidated financial statements on the basis of continuing operations, unless otherwise stated.
Unless the context otherwise indicates, we, us and our mean B&W and its consolidated subsidiaries.
Business Segments
We operate in five reportable segments: Power Generation, Nuclear Operations, Technical Services, Nuclear Energy and mPower. Our reportable segments at December 31, 2013 reflect changes we made during the first quarter of 2013 in the manner in which our segment operating information is reported for purposes of assessing operating performance and allocating resources. Prior to 2013, we reported four segments: Power Generation, Nuclear Operations, Technical Services and Nuclear Energy. Our small modular nuclear reactor business, previously included in our Nuclear Energy segment, is now being reported as a separate segment, mPower. The change in our reportable segments had no impact on our previously reported consolidated results of operations, financial condition or cash flows. We have applied the change in reportable segments to previously reported historical financial information and disclosures included in this report. For financial information about our segments, see Note 17 to our consolidated financial statements included in this report.
Our reportable segments are further described as follows:
| Our Power Generation segment supplies boilers fired with fossil fuels, such as coal, oil and natural gas, or renewable fuels such as biomass and municipal solid waste. In addition, we supply environmental equipment and components and related services to customers in different regions around the world. This segment owns or leases manufacturing facilities in the U.S., Canada, Denmark, Germany, Mexico, China and Scotland. We design, engineer, manufacture, supply, construct and service large utility and industrial power generation systems, including boilers used to generate steam in electric power plants, pulp and paper making, chemical and process applications and other industrial uses. We also provide the same complement of services for our renewable portfolio of boiler technology, which includes biomass fired, waste-to-energy and concentrated solar energy for steam generating solutions. In addition, this segment is a technological leader in providing cost-effective and efficient air pollution control solutions and material handling systems. We have successfully developed advanced technologies to control nitrogen oxides, sulfur dioxide, fine particulate, mercury, acid gases and other hazardous air emissions. In addition, our Power Generation segment offers a variety of construction services for the entire balance of plant, from large steam generation or environmental equipment projects, to cogeneration and combined cycle installations. This segment also offers a full suite of aftermarket services. Our Power Generation segments full-scope boiler, environmental and auxiliary equipment retrofits, upgrades and services improve plant performance and efficiency and increase the reliability of vital steam generating assets. |
| Our Nuclear Operations segment manufactures naval nuclear reactors for the U.S. Department of Energy (DOE)/National Nuclear Security Administrations (NNSA) Naval Nuclear Propulsion Program, which in turn supplies them to the U.S. Navy for use in submarines and aircraft carriers. Through this segment, we own and operate manufacturing facilities located in Lynchburg, Virginia; Mount Vernon, Indiana; Euclid, Ohio; Barberton, Ohio; and Erwin, Tennessee. The Barberton and Mount Vernon locations specialize in the design and manufacture of heavy components. These two locations are N-Stamp certified by the American |
67
Society of Mechanical Engineers (ASME), making them two of only a few North American suppliers of large, heavy-walled nuclear components and vessels. The Euclid facility, which is also ASME N-Stamp certified, fabricates electro-mechanical equipment for the U.S. Government, and performs design, manufacturing, inspection, assembly and testing activities. The Lynchburg operations fabricate fuel-bearing precision components that range in weight from a few grams to hundreds of tons. In-house capabilities also include wet chemistry uranium processing, advanced heat treatment to optimize component material properties and a controlled, clean-room environment with the capacity to assemble railcar-size components. Fuel for the naval nuclear reactors is provided by Nuclear Fuel Services, Inc. (NFS), one of our wholly owned subsidiaries. Located in Erwin, NFS also converts Cold War-era government stockpiles of highly enriched uranium into material suitable for further processing into commercial nuclear reactor fuel. |
| Our Technical Services segment provides various services to the U.S. Government, including uranium processing, environmental site restoration services and management and operating services for various U.S. Government-owned facilities. These services are provided to the DOE, including the NNSA, the Office of Nuclear Energy and the Office of Science; the Department of Defense and the Office of Environmental Management. Through this segment we deliver products and management solutions to nuclear operations and high-consequence manufacturing facilities. We also perform specialty manufacturing through production of centrifuge machines for USEC Inc.s (USEC) American Centrifuge Plant. A significant portion of this segments operations are conducted through joint ventures. |
| Our Nuclear Energy segment supplies commercial nuclear steam generators and components to nuclear utility customers. B&W has supplied the nuclear industry with more than 1,300 large, heavy components worldwide. This segment is the only heavy nuclear component, N-Stamp certified manufacturer in North America. Our Nuclear Energy segment fabricates pressure vessels, reactors, steam generators, heat exchangers and other auxiliary equipment. This segment also provides specialized engineering services that include structural component design, 3-D thermal-hydraulic engineering analysis, weld and robotic process development and metallurgy and materials engineering. Our Nuclear Energy segment also provides power plant construction and management and maintenance services. In addition, this segment offers services for nuclear steam generators and balance of plant equipment, as well as nondestructive examination and tooling/repair solutions for other plant systems and components. |
| Our mPower segment is actively designing the B&W mPowerTM reactor, a small modular reactor (SMR) design generally based on proven light-water nuclear technology and able to operate for four years without refueling. Through our majority-owned joint venture, Generation mPower LLC (GmP), we are developing the associated mPower Plant power generating facility, which will use two B&W mPowerTM reactors to generate 360 MW within an advanced passively safe and secure plant architecture. As part of this initiative, we have been selected as the only recipient to receive funding pursuant to a Cooperative Agreement with the DOE under its Small Modular Reactor Licensing Technical Support Program (the Funding Program) for SMR deployment by 2022. This Funding Program provides financial assistance for our mPower Plant design engineering and licensing activities supporting the planned first mPower Plant commercial operation date by 2022. |
The consolidated results of operations, financial position and cash flows for the year ended December 31, 2013 are not necessarily indicative of the results that may be expected for the year ending December 31, 2014.
Use of Estimates
We use estimates and assumptions to prepare our financial statements in conformity with GAAP. Some of our more significant estimates include our estimate of costs to complete long-term construction contracts and estimates we make in selecting assumptions related to the valuations of our pension and postretirement plans, including the selection of our discount rates and expected rates of return on our pension plan assets. These estimates and assumptions affect the amounts we report in our financial statements and accompanying notes. Our actual results could differ from these estimates. Variances could result in a material effect on our financial condition and results of operations in future periods.
68
Earnings Per Share
We have computed earnings per common share on the basis of the weighted average number of common shares, and, where dilutive, common share equivalents, outstanding during the indicated periods. We have a number of forms of stock-based compensation, including incentive and non-qualified stock options, restricted stock, restricted stock units and performance shares and performance units, subject to satisfaction of specific performance goals. We include the shares applicable to these plans in dilutive earnings per share when related performance criteria have been met.
Investments
Our investments, primarily U.S. Government obligations, mutual funds, and commercial paper, are classified as available-for-sale and are carried at fair value, with the unrealized gains and losses, net of tax, reported as a component of accumulated other comprehensive income. We classify investments available for current operations in the consolidated balance sheets as current assets, while we classify investments held for long-term purposes as noncurrent assets. We adjust the amortized cost of debt securities for amortization of premiums and accretion of discounts to maturity. That amortization is included in interest income. We include realized gains and losses on our investments in other net. The cost of securities sold is based on the specific identification method. We include interest on securities in interest income.
Foreign Currency Translation
We translate assets and liabilities of our foreign operations into U.S. dollars at current exchange rates, and we translate income statement items at average exchange rates for the periods presented. We record adjustments resulting from the translation of foreign currency financial statements as a component of accumulated other comprehensive income. We report foreign currency transaction gains and losses in income. We have included in other - net transaction gains (losses) of $0.5 million, $(0.6) million and $(1.9) million for the years ended December 31, 2013, 2012 and 2011, respectively.
Contracts and Revenue Recognition
We generally recognize contract revenues and related costs on a percentage-of-completion method for individual contracts or combinations of contracts based on work performed, man hours, or a cost-to-cost method, as applicable to the product or activity involved. We recognize estimated contract revenue and resulting income based on the measurement of the extent of progress completion as a percentage of the total project. Certain costs may be excluded from the cost-to-cost method of measuring progress, such as significant costs for materials and major third party subcontractors, if it appears that such exclusion would result in a more meaningful measurement of actual contract progress and resulting periodic allocation of income. We include revenues and related costs so recorded, plus accumulated contract costs that exceed amounts invoiced to customers under the terms of the contracts, in contracts in progress. We include in advance billings on contracts billings that exceed accumulated contract costs and revenues and costs recognized under the percentage-of-completion method. Most long-term contracts contain provisions for progress payments. Our unbilled receivables do not contain an allowance for credit losses as we expect to invoice customers and collect all amounts for unbilled revenues. We review contract price and cost estimates periodically as the work progresses and reflect adjustments proportionate to the percentage-of-completion in income in the period when those estimates are revised. For all contracts, if a current estimate of total contract cost indicates a loss on a contract, the projected loss is recognized in full when determined.
For contracts as to which we are unable to estimate the final profitability except to assure that no loss will ultimately be incurred, we recognize equal amounts of revenue and cost until the final results can be estimated more precisely. For these deferred profit recognition contracts, we recognize revenue and cost equally and only recognize gross margin when probable and reasonably estimable, which we generally determine to be when the contract is approximately 70% complete. We treat long-term construction contracts that contain such a level of risk and uncertainty that estimation of the final outcome is impractical, except to assure that no loss will be incurred, as deferred profit recognition contracts.
69
Our policy is to account for fixed-price contracts under the completed-contract method if we believe that we are unable to reasonably forecast cost to complete at start-up. Under the completed-contract method, income is recognized only when a contract is completed or substantially complete.
For parts orders and certain aftermarket services activities, we recognize revenues as goods are delivered and work is performed.
Variations from estimated contract performance could result in material adjustments to operating results for any fiscal quarter or year. We include claims for extra work or changes in scope of work to the extent of costs incurred in contract revenues when we believe collection is probable.
In the year ended December 31, 2013, we recorded a contract loss totaling approximately $35.6 million based on our estimate of costs to complete a project. This is in addition to approximately $16.9 million of contract losses, net of claims, recorded on this project in 2012. In the year ended December 31, 2011, we recorded additional costs totaling approximately $61.8 million ($50.7 million in our Nuclear Energy segment and $11.1 in our Nuclear Operations segment) to complete certain projects attributable to changes in estimate due to productivity and scheduling issues. In May 2012, we entered into an agreement with the customer of the Nuclear Energy project to settle contract claims resulting in recognition of revenues totaling approximately $18.4 million in 2012.
The following represent the components of our contracts in progress and advance billings on contracts included in our consolidated balance sheets:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Included in Contracts in Progress: |
||||||||
Costs incurred less costs of revenue recognized |
$ | 150,724 | $ | 135,972 | ||||
Revenues recognized less billings to customers |
220,096 | 180,546 | ||||||
|
|
|
|
|||||
Contracts In Progress |
$ | 370,820 | $ | 316,518 | ||||
|
|
|
|
|||||
Included In Advance Billings on Contracts: |
||||||||
Billings to customers less revenues recognized |
$ | 411,156 | $ | 541,983 | ||||
Costs incurred less costs of revenue recognized |
(93,385 | ) | (69,696 | ) | ||||
|
|
|
|
|||||
Advance Billings on Contracts |
$ | 317,771 | $ | 472,287 | ||||
|
|
|
|
The following amounts represent retainages on contracts:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Retainages expected to be collected within one year |
$ | 84,389 | $ | 85,776 | ||||
Retainages expected to be collected after one year |
12,820 | 28,661 | ||||||
|
|
|
|
|||||
Total retainages |
$ | 97,209 | $ | 114,437 | ||||
|
|
|
|
We have included in accounts receivable trade retainages expected to be collected in 2014. Retainages expected to be collected after one year are included in other assets. Of the long-term retainages at December 31, 2013, we anticipate collecting $3.1 million in 2015, $4.8 million in 2016, $4.6 million in 2017 and $0.3 million in 2018.
70
Comprehensive Income
The components of accumulated other comprehensive income included in stockholders equity are as follows:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Currency translation adjustments |
$ | 38,415 | $ | 40,899 | ||||
Net unrealized gain on investments |
130 | 597 | ||||||
Net unrealized gain on derivative financial instruments |
627 | 2,103 | ||||||
Unrecognized prior service cost on benefit obligations |
(10,824 | ) | (10,871 | ) | ||||
|
|
|
|
|||||
Accumulated other comprehensive income |
$ | 28,348 | $ | 32,728 | ||||
|
|
|
|
The amounts reclassified out of accumulated other comprehensive income by component and the affected consolidated statements of income line items are as follows:
Year ended December 31, | ||||||||||||||
2013 | 2012 | 2011 | ||||||||||||
Accumulated Other Comprehensive Income Component Recognized |
(In thousands) | Line Item Presented | ||||||||||||
Realized (losses) gains on derivative financial instruments | $ | (1,885 | ) | $ | (1,082 | ) | $ | (4,128 | ) | Revenues | ||||
(2,174 | ) | 3,833 | 2,350 | Cost of operations | ||||||||||
144 | (24 | ) | (373 | ) | Other-net | |||||||||
|
|
|
|
|
|
|||||||||
(3,915 | ) | 2,727 | (2,151 | ) | Total before tax | |||||||||
973 | (704 | ) | 496 | Provision for Income Taxes | ||||||||||
|
|
|
|
|
|
|||||||||
$ | (2,942 | ) | $ | 2,023 | $ | (1,655 | ) | Net Income | ||||||
Amortization of prior service cost on benefit obligations | $ | (2,813 | ) | $ | (3,271 | ) | $ | (3,650 | ) | Cost of operations | ||||
(197 | ) | (169 | ) | (104 | ) | Selling, general and administrative expenses | ||||||||
|
|
|
|
|
|
|||||||||
(3,010 | ) | (3,440 | ) | (3,754 | ) | Total before tax | ||||||||
1,035 | 1,159 | 1,267 | Provision for Income Taxes | |||||||||||
|
|
|
|
|
|
|||||||||
$ | (1,975 | ) | $ | (2,281 | ) | $ | (2,487 | ) | Net Income | |||||
Realized gains (losses) on investments | $ | 799 | $ | 35 | $ | (5 | ) | Other-net | ||||||
(30 | ) | 0 | 0 | Provision for Income Taxes | ||||||||||
|
|
|
|
|
|
|||||||||
$ | 769 | $ | 35 | $ | (5 | ) | Net Income | |||||||
|
|
|
|
|
|
|||||||||
Total reclassification for the period | $ | (4,148 | ) | $ | (223 | ) | $ | (4,147 | ) | |||||
|
|
|
|
|
|
Warranty Expense
We accrue estimated expense included in cost of operations on our consolidated statements of income to satisfy contractual warranty requirements when we recognize the associated revenue on the related contracts. In addition, we record specific provisions or reductions where we expect the actual warranty costs to significantly differ from the accrued estimates. Such changes could have a material effect on our consolidated financial condition, results of operations and cash flows.
71
The following summarizes the changes in the carrying amount of accrued warranty expense:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Balance at beginning of period |
$ | 83,682 | $ | 97,209 | $ | 109,588 | ||||||
Additions |
18,486 | 20,972 | 21,267 | |||||||||
Expirations and other changes |
(24,801 | ) | (24,766 | ) | (14,288 | ) | ||||||
Charges |
(20,250 | ) | (10,217 | ) | (19,035 | ) | ||||||
Translation and other |
(681 | ) | 484 | (323 | ) | |||||||
|
|
|
|
|
|
|||||||
Balance at end of period |
$ | 56,436 | $ | 83,682 | $ | 97,209 | ||||||
|
|
|
|
|
|
Asset Retirement Obligations and Environmental Clean-up Costs
We accrue for future decommissioning of our nuclear facilities that will permit the release of these facilities to unrestricted use at the end of each facilitys life, which is a requirement of our licenses from the U.S. Nuclear Regulatory Commission (the NRC). In accordance with the FASB Topic Asset Retirement and Environmental Obligations, we record the fair value of a liability for an asset retirement obligation in the period in which it is incurred. When we initially record such a liability, we capitalize a cost by increasing the carrying amount of the related long-lived asset. Over time, the liability is accreted to its present value each period and the capitalized cost is depreciated over the useful life of the related asset. Upon settlement of a liability, we will settle the obligation for its recorded amount or incur a gain or loss. This topic applies to environmental liabilities associated with assets that we currently operate and are obligated to remove from service. For environmental liabilities associated with assets that we no longer operate, we have accrued amounts based on the estimated costs of clean-up activities for which we are responsible, net of any cost-sharing arrangements. We adjust the estimated costs as further information develops or circumstances change. An exception to this accounting treatment relates to the work we perform for two facilities for which the U.S. Government is obligated to pay substantially all of the decommissioning costs.
Substantially all of our asset retirement obligations relate to the remediation of our nuclear analytical laboratory and the NFS facility in our Nuclear Operations segment. The following table reflects our asset retirement obligations:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Balance at beginning of period |
$ | 42,366 | $ | 35,885 | $ | 32,657 | ||||||
Costs incurred |
| | (2,265 | ) | ||||||||
Additions/Adjustments |
(109 | ) | 3,422 | 2,935 | ||||||||
Accretion |
2,514 | 3,059 | 2,558 | |||||||||
|
|
|
|
|
|
|||||||
Balance at end of period |
$ | 44,771 | $ | 42,366 | $ | 35,885 | ||||||
|
|
|
|
|
|
Research and Development
Our research and development activities are related to the development and improvement of new and existing products and equipment, as well as conceptual and engineering evaluation for translation into practical applications. We charge the costs of research and development unrelated to specific contracts as incurred. Substantially all of these costs are in our Power Generation and mPower segments, the majority of which are related to the development of our B&W mPower reactor and the associated mPower Plant. Contractual arrangements for customer-sponsored research and development can vary on a case-by-case basis and include contracts, cooperative agreements and grants. Research and development activities (including in-kind research and development services described below) totaled $200.8 million, $173.9 million and $163.0 million in the years ended December 31, 2013, 2012 and 2011, respectively. This includes amounts paid for by our customers of $43.2 million, $53.4 million and $56.6 million, in the years ended December 31, 2013, 2012 and 2011, respectively, and DOE funding described below of $78.4 million in the year ended December 31, 2013.
72
During the years ended December 31, 2013, 2012 and 2011, we recognized $15.8 million, $17.9 million and $16.6 million, respectively, of non-cash in-kind research and development costs (included above) related to services contributed by our minority partner to GmP, our majority-owned subsidiary formed in 2011 to oversee the program to develop the small modular nuclear power plant based on B&W mPower technology.
On April 12, 2013, Babcock & Wilcox mPower, Inc., a wholly owned subsidiary of B&W, entered into a Cooperative Agreement establishing the terms and conditions of a funding award totaling $150 million under the DOEs Funding Program. This cost-sharing award requires us to use the DOE funds to cover first-of-a-kind engineering costs associated with SMR design certification and licensing efforts. The DOE will provide cost reimbursement for up to 50% of qualified expenditures incurred from April 1, 2013 to March 31, 2018. The DOE has authorized $99.3 million of funding for this award program as of December 31, 2013. Congress has allocated and designated an additional $85 million from the 2014 budget to the Cooperative Agreement; however, the DOE has not yet obligated those funds to us. The Cooperative Agreement also provides for reimbursement of pre-award costs incurred from October 1, 2012 to March 31, 2013. During the year ended December 31, 2013, we recognized $78.4 million associated with the funding award, including $21.5 million of pre-award cost reimbursement, as a reduction of research and development costs on our consolidated statements of income. Of the total pre-award cost reimbursement, $9.7 million relates to research and development costs incurred in the year ended December 31, 2012.
Income Taxes
Income tax expense for federal, foreign, state and local income taxes are calculated on pre-tax income based on current tax law and includes the cumulative effect of any changes in tax rates from those used previously in determining deferred tax assets and liabilities. We record a valuation allowance to reduce our deferred tax assets to the amount that is more likely than not to be realized. We assess deferred taxes and the adequacy of the valuation allowance on a quarterly basis. In the ordinary course of business there is inherent uncertainty in quantifying our income tax positions. We assess our income tax positions and record tax benefits for all years subject to examination based upon managements evaluation of the facts, circumstances, and information available at the reporting date. For those tax positions where it is more likely than not that a tax benefit will be sustained, we have recorded the largest amount of tax benefit with a greater than 50% likelihood of being realized upon ultimate settlement with a taxing authority that has full knowledge of all relevant information. For those income tax positions where it is not more likely than not that a tax benefit will be sustained, no tax benefit has been recognized in the financial statements. We record interest and penalties (net of any applicable tax benefit) related to income taxes as a component of provision for income taxes on our consolidated statements of income.
Inventories
We carry our inventories at the lower of cost or market. We determine cost principally on the first-in, first-out basis, except for certain materials inventories of our Power Generation segment, for which we use the last-in, first-out (LIFO) method. We determined the cost of approximately 18% and 17% of our total inventories using the LIFO method at December 31, 2013 and 2012, respectively, and our total LIFO reserve at December 31, 2013 and 2012 was approximately $7.7 million and $7.5 million, respectively. Inventories are summarized below:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Raw Materials and Supplies |
$ | 85,455 | $ | 98,428 | ||||
Work in Progress |
10,872 | 7,956 | ||||||
Finished Goods |
16,731 | 17,834 | ||||||
|
|
|
|
|||||
Total Inventories |
$ | 113,058 | $ | 124,218 | ||||
|
|
|
|
73
Property, Plant and Equipment
We carry our property, plant and equipment at depreciated cost, less any impairment provisions.
We depreciate our property, plant and equipment using the straight-line method over estimated economic useful lives of eight to 33 years for buildings and three to 28 years for machinery and equipment. Our depreciation expense was $62.2 million, $59.4 million and $61.8 million for the years ended December 31, 2013, 2012 and 2011, respectively.
We expense the costs of maintenance, repairs and renewals that do not materially prolong the useful life of an asset as we incur them.
Property, plant and equipment is stated at cost and is set forth below:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Land |
$ | 11,718 | $ | 11,875 | ||||
Buildings |
249,614 | 241,281 | ||||||
Machinery and equipment |
782,633 | 776,678 | ||||||
Property under construction |
82,718 | 69,206 | ||||||
|
|
|
|
|||||
1,126,683 | 1,099,040 | |||||||
Less accumulated depreciation |
679,604 | 652,019 | ||||||
|
|
|
|
|||||
Net Property, Plant and Equipment |
$ | 447,079 | $ | 447,021 | ||||
|
|
|
|
Investments in Unconsolidated Affiliates
We use the equity method of accounting for affiliates in which we are able to exert significant influence. Currently, substantially all of our material investments in affiliates that are not consolidated are recorded using the equity method. Affiliates in which our investment ownership is less than 20% and where we are unable to exert significant influence are carried at cost.
Goodwill
The following summarizes the changes in the carrying amount of goodwill:
Power Generation |
Nuclear Operations |
Technical Services |
Nuclear Energy |
Total | ||||||||||||||||
(In thousands) | ||||||||||||||||||||
Balance at December 31, 2011 |
$ | 99,102 | $ | 118,103 | $ | 45,000 | $ | 13,975 | $ | 276,180 | ||||||||||
Purchase price adjustment for acquisition of Loibl (Note 2) |
3,727 | | | | 3,727 | |||||||||||||||
Foreign currency translation adjustments and other |
873 | | | | 873 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Balance at December 31, 2012 |
$ | 103,702 | $ | 118,103 | $ | 45,000 | $ | 13,975 | $ | 280,780 | ||||||||||
Foreign currency translation adjustments and other |
928 | | | | 928 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||
Balance at December 31, 2013 |
$ | 104,630 | $ | 118,103 | $ | 45,000 | $ | 13,975 | $ | 281,708 | ||||||||||
|
|
|
|
|
|
|
|
|
|
74
Intangible Assets
We amortize intangible assets with definite lives to operating expense using the straight-line method. Our intangible assets are as follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Amortized intangible assets: |
||||||||||||
Gross cost: |
||||||||||||
Customer relationships |
$ | 35,383 | $ | 36,644 | $ | 40,051 | ||||||
Acquired backlog |
| 2,979 | 22,435 | |||||||||
Tradename |
11,945 | 11,945 | 15,169 | |||||||||
Unpatented technology |
6,422 | 6,422 | 6,402 | |||||||||
Patented technology |
2,521 | 6,961 | 6,961 | |||||||||
All other |
9,755 | 7,912 | 7,901 | |||||||||
|
|
|
|
|
|
|||||||
Total |
$ | 66,026 | $ | 72,863 | $ | 98,919 | ||||||
|
|
|
|
|
|
|||||||
Accumulated amortization: |
||||||||||||
Customer relationships |
$ | (13,490 | ) | $ | (11,173 | ) | $ | (8,618 | ) | |||
Acquired backlog |
| (1,457 | ) | (17,040 | ) | |||||||
Tradename |
(8,015 | ) | (6,422 | ) | (6,509 | ) | ||||||
Unpatented technology |
(3,335 | ) | (2,682 | ) | (2,033 | ) | ||||||
Patented technology |
(806 | ) | (4,235 | ) | (3,219 | ) | ||||||
All other |
(3,994 | ) | (4,343 | ) | (3,594 | ) | ||||||
|
|
|
|
|
|
|||||||
Total |
$ | (29,640 | ) | $ | (30,312 | ) | $ | (41,013 | ) | |||
|
|
|
|
|
|
|||||||
Net amortized intangible assets |
$ | 36,386 | $ | 42,551 | $ | 57,906 | ||||||
|
|
|
|
|
|
|||||||
Unamortized intangible assets: |
||||||||||||
NRC category 1 license |
$ | 43,830 | $ | 43,830 | $ | 43,830 | ||||||
Trademarks and trade names |
1,305 | 1,305 | 1,305 | |||||||||
|
|
|
|
|
|
|||||||
Total unamortized intangible assets |
$ | 45,135 | $ | 45,135 | $ | 45,135 | ||||||
|
|
|
|
|
|
The following summarizes the changes in the carrying amount of intangible assets:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Balance at beginning of period |
$ | 87,686 | $ | 103,041 | $ | 105,604 | ||||||
Business acquisitions & adjustments |
2,200 | (1,746 | ) | 9,100 | ||||||||
Amortization expense |
(8,324 | ) | (11,010 | ) | (11,545 | ) | ||||||
Impairment charge |
(1,260 | ) | (3,216 | ) | | |||||||
Foreign currency translation adjustments and other |
1,219 | 617 | (118 | ) | ||||||||
|
|
|
|
|
|
|||||||
Balance at end of period |
$ | 81,521 | $ | 87,686 | $ | 103,041 | ||||||
|
|
|
|
|
|
75
We recognized impairment charges totaling $1.3 million and $3.2 million in the years ended December 31, 2013 and 2012, respectively, related to the cancellation of operations and maintenance services contracts in our Power Generation segment.
The estimated amortization expense for the next five fiscal years is as follows (in thousands):
Year Ending December 31, |
Amount | |||
2014 |
$ | 5,578 | ||
2015 |
$ | 4,421 | ||
2016 |
$ | 4,349 | ||
2017 |
$ | 4,108 | ||
2018 |
$ | 3,351 |
Other Non-Current Assets
We have included deferred debt issuance costs in other assets. We amortize deferred debt issuance costs as interest expense over the life of the related debt. The following summarizes the changes in the carrying amount of these assets:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Balance at beginning of period |
$ | 8,468 | $ | 5,723 | $ | 8,102 | ||||||
Additions |
| 4,902 | 82 | |||||||||
Interest expense debt issuance costs |
(1,950 | ) | (2,157 | ) | (2,461 | ) | ||||||
|
|
|
|
|
|
|||||||
Balance at end of period |
$ | 6,518 | $ | 8,468 | $ | 5,723 | ||||||
|
|
|
|
|
|
Capitalization of Interest Cost
We capitalize interest in accordance with FASB Topic Interest. We incurred total interest of $4.8 million, $4.9 million and $6.1 million in the years ended December 31, 2013, 2012 and 2011, respectively, of which we capitalized $1.7 million, $1.2 million and $1.6 million in the years ended December 31, 2013, 2012 and 2011, respectively.
Cash and Cash Equivalents and Restricted Cash
Our cash equivalents are highly liquid investments, with maturities of three months or less when we purchase them.
We record cash and cash equivalents as restricted when we are unable to freely use such cash and cash equivalents for our general operating purposes. At December 31, 2013, we had restricted cash and cash equivalents totaling $48.7 million, $3.9 million of which was held in restricted foreign cash accounts, $2.8 million of which was held for future decommissioning of facilities (which is included in other assets on our consolidated balance sheets), and $42.0 million of which was held to meet reinsurance reserve requirements of our captive insurer (in lieu of long-term investments).
Derivative Financial Instruments
Our global operations give rise to exposure to market risks from changes in foreign currency exchange (FX) rates. We use derivative financial instruments, primarily FX forward contracts, to reduce the impact of changes in FX rates on our operating results. We use these instruments primarily to hedge our exposure associated with revenues or costs on our long-term contracts that are denominated in currencies other than our operating entities functional currencies. We do not hold or issue derivative financial instruments for trading or other speculative purposes.
76
We enter into derivative financial instruments primarily as hedges of certain firm purchase and sale commitments denominated in foreign currencies. We record these contracts at fair value on our consolidated balance sheets. Depending on the hedge designation at the inception of the contract, the related gains and losses on these contracts are either deferred in stockholders equity as a component of accumulated other comprehensive income until the hedged item is recognized in earnings or offset against the change in fair value of the hedged firm commitment through earnings. Any ineffective portion of a derivatives change in fair value and any portion excluded from the assessment of effectiveness is immediately recognized in other net on our consolidated statements of income. The gain or loss on a derivative instrument not designated as a hedging instrument is also immediately recognized in earnings. Gains and losses on derivative financial instruments that require immediate recognition are included as a component of other net in our consolidated statements of income.
Self-Insurance
We have a wholly owned insurance subsidiary that provides employers liability, general and automotive liability and workers compensation insurance and, from time to time, builders risk insurance (within certain limits) to our companies. We may also, in the future, have this insurance subsidiary accept other risks that we cannot or do not wish to transfer to outside insurance companies. Included in other liabilities on our consolidated balance sheets are reserves for self-insurance totaling $37.8 million and $42.8 million at December 31, 2013 and 2012, respectively. The reduction in 2013 was primarily attributable to a change in estimate recognized in cost of operations in our consolidated statements of income.
Loss Contingencies
We estimate liabilities for loss contingencies when it is probable that a liability has been incurred and the amount of loss is reasonably estimable. We provide disclosure when there is a reasonable possibility that the ultimate loss will exceed the recorded provision or if such probable loss is not reasonably estimable. We are currently involved in some significant litigation, as discussed in Note 11. Our losses are typically resolved over long periods of time and are often difficult to assess and estimate due to, among other reasons, the possibility of multiple actions by third parties; the attribution of damages, if any, among multiple defendants; plaintiffs, in most cases involving personal injury claims, do not specify the amount of damages claimed; the discovery process may take multiple years to complete; during the litigation process, it is common to have multiple complex unresolved procedural and substantive issues; the potential availability of insurance and indemnity coverages; the wide-ranging outcomes reached in similar cases, including the variety of damages awarded; the likelihood of settlements for de minimus amounts prior to trial; the likelihood of success at trial; and the likelihood of success on appeal. Consequently, it is possible future earnings could be affected by changes in our assessments of the probability that a loss has been incurred in a material pending litigation against us and/or changes in our estimates related to such matters.
Stock-Based Compensation
We expense stock-based compensation in accordance with FASB Topic Compensation Stock Compensation. Under this topic, the fair value of equity-classified awards, such as restricted stock, performance shares and stock options, is determined on the date of grant and is not remeasured. The fair value of liability-classified awards, such as cash-settled stock appreciation rights, restricted stock units and performance units, is determined on the date of grant and is remeasured at the end of each reporting period through the date of settlement. Grant date fair values for restricted stock, restricted stock units, performance shares and performance units are determined using the closing price of our common stock on the date of grant. Grant date fair values for stock options and stock appreciation rights are determined using a Black-Scholes option-pricing model (Black-Scholes). The determination of the fair value of a share-based payment award using an option-pricing model requires the input of significant assumptions, such as the expected life of the award and stock price volatility.
Under the provisions of this FASB topic, we recognize expense, net of an estimated forfeiture rate, for all share-based awards granted on a straight-line basis over the requisite service periods of the awards, which is generally equivalent to the vesting term. This topic requires compensation expense to be recognized, net of an estimate for forfeitures, such that compensation expense is recorded only for those awards expected to vest. We review the estimate for forfeitures periodically and record any adjustments deemed necessary for each reporting period. If our actual forfeiture rate is materially different from our estimate, the stock-based compensation expense could be significantly different from what we have recorded in the current period.
77
Additionally, this FASB topic amended FASB Topic Statement of Cash Flows, to require excess tax benefits to be reported as a financing cash flow, rather than as a reduction of taxes paid. These excess tax benefits result from tax deductions in excess of the cumulative compensation expense recognized for options exercised and other equity-classified awards.
See Note 10 for a further discussion of stock-based compensation.
Recently Adopted Accounting Standards
In July 2012, the Financial Accounting Standards Board (the FASB) issued an update to Topic IntangiblesGoodwill and Other. This update permits an entity to first assess qualitative factors to determine whether it is more likely than not that an indefinite-lived intangible asset is impaired as a basis for determining whether it is necessary to perform the quantitative impairment test currently required under this topic. On January 1, 2013, we adopted this update. The adoption of these provisions did not have an impact on our financial statements.
In February 2013, the FASB issued an update to Topic Comprehensive Income. This update requires an entity to provide information about the amounts reclassified out of accumulated other comprehensive income by component. In addition, an entity is required to present, either on the face of the statement of income or in the notes, significant amounts reclassified out of accumulated other comprehensive income by the respective line items of net income but only if the amount reclassified is required under GAAP to be reclassified to net income in its entirety in the same reporting period. For other amounts that are not required under GAAP to be reclassified in their entirety to net income, an entity is required to cross-reference to other disclosures required under GAAP that provide additional detail about those amounts. On January 1, 2013, we adopted this update. The adoption of these provisions did not have an impact on our financial statements.
New Accounting Standards
In February 2013, the FASB issued an update to the Topic Liabilities. This update requires an entity to recognize obligations resulting from joint and several liability arrangements for which the total amount of the obligation is fixed at the reporting date. This update will be effective for us in 2014. We do not expect the adoption of this update to have a material impact on our financial statements.
In July 2013, the FASB issued an update to the Topic Income Taxes. This update relates to the financial statement presentation of an unrecognized tax benefit when a net operating loss carryforward, similar tax loss, or tax credit carryforward exists. This update will be effective for us in 2014. We do not expect the adoption of this update to have a material impact on our financial statements.
NOTE 2 BUSINESS ACQUISITIONS AND INVESTMENTS
Anlagenbau und Fördertechnik Arthur Loibl GmbH
In November 2011, our Power Generation segment, acquired Anlagenbau und Fördertechnik Arthur Loibl GmbH (Loibl) for approximately $24.2 million. The acquisition of Loibl, a German-based manufacturer of material handling equipment, expands the products, services and global reach of our Power Generation segments ash handling business, which is one of the worlds leading suppliers of ash handling solutions for the power generation and other industries.
78
In connection with the Loibl acquisition, we recorded goodwill of approximately $14.7 million, intangible assets of $7.6 million, property, plant and equipment of $2.5 million and other net liabilities totaling $0.9 million. During 2012, we finalized our purchase price allocation for the Loibl acquisition, resulting in an increase to goodwill of approximately $3.7 million. The intangible assets consist of the following (dollar amounts in thousands):
Amount | Amortization Period |
|||||||
Customer relationships |
$ | 3,200 | 8 years | |||||
Backlog |
$ | 3,100 | 2 years | |||||
Tradename |
$ | 800 | 5 years | |||||
Unpatented technology |
$ | 500 | 12 years |
USEC Inc. Investment
In May 2010, our subsidiary Babcock & Wilcox Investment Company (BWICO) entered into an agreement with Toshiba Corporation (Toshiba), which was subsequently assigned to one of its subsidiaries, and USEC to make a strategic investment in USEC totaling $200 million payable over three phases. In September 2010, following the satisfaction of certain conditions, including the availability to USECs American Centrifuge program of at least $2 billion in uncommitted funds under the DOEs Loan Guarantee Program for front-end nuclear fuel facilities and the establishment of a joint venture between us and USEC for supply by the joint venture of centrifuges and related equipment for the American Centrifuge program, we made a $37.5 million investment in USEC as part of a definitive agreement for us to make a total $100 million strategic investment in USEC.
In connection with our investment, we received 37,500 shares of USEC Series B-1 12.75% Convertible Preferred Stock; Warrants to purchase 3,125,000 shares of USEC Class B Common Stock at an exercise price of $7.50 per share, which are exercisable between January 1, 2015 and December 31, 2016; and a seat on USECs board of directors. On July 1, 2013, USEC completed a 1-for-25 reverse stock split of its common stock, resulting in a decrease of the shares to be purchased under the Warrants to 125,000 at an adjusted exercise price of $187.50 per share.
In 2011, we entered into a standstill agreement with USEC and Toshiba when it became apparent that USEC would not be able to satisfy the closing conditions applicable to the second phase of the strategic investment. Pursuant to the standstill agreement, each party agreed not to exercise its right to terminate the strategic investment agreement for a limited standstill period, as subsequently extended. USEC has been unable to satisfy the closing conditions to the second and third phases of the strategic investment and the limited standstill period, as extended, has expired. Currently, BWICO, Toshiba and USEC each have the right to terminate their obligations under the original strategic investment agreement.
On June 12, 2012, USEC entered into a Cooperative Agreement with the DOE to provide funding for a cost-share research, development and demonstration (RD&D) program to enhance the technical and financial readiness of centrifuge technology for commercialization. The Cooperative Agreement provides for 80% DOE and 20% USEC cost sharing for work performed during the period from June 1, 2012 through December 31, 2013.
On August 1, 2012 USEC filed its quarterly report for the period ended June 30, 2012 on Form 10-Q with the Securities and Exchange Commission. This report contained several updated risk factors (along with other disclosures) concerning operational and structural issues facing USEC including, but not limited to, the future operations of USECs Paducah Gaseous Diffusion Plant, achievement of milestones under the RD&D program discussed above, approved funding for the RD&D program, achievement of milestones under a 2002 DOE-USEC Agreement to develop, demonstrate and deploy the American Centrifuge technology and possible failure to maintain compliance with listing requirements of the New York Stock Exchange, which could result in a delisting of USECs common stock (which could require USEC to repurchase its convertible notes for cash and trigger a default under its credit facility). In addition, on August 15, 2012 Standard & Poors lowered its ratings on USEC, including the corporate credit rating to CCC from CCC+ along with a negative outlook. Standard & Poors also lowered its issue-level rating on USECs senior convertible notes due October 2014 to CC from CCC-. In the third quarter of 2012, based on the facts and circumstances disclosed above, we decided that a fair value determination of our cost-method
79
investment in USEC Preferred Stock was warranted. We determined the fair value of our investment in USEC Preferred Stock, with the assistance of a third party valuation firm, resulting in a $27.0 million impairment charge recognized in the third quarter of 2012. This impairment resulted in a remaining book value of our preferred stock investment totaling $19.1 million.
On March 18, 2013, USEC filed its annual report for the period ended December 31, 2012 on Form 10-K with the Securities and Exchange Commission. This report disclosed the recognition of a $1.1 billion impairment charge resulting in a stockholders deficit position at December 31, 2012, and USEC further disclosed that it had engaged with advisors and certain stakeholders on alternatives for a possible restructuring of its balance sheet. These events resulted in USECs independent registered public accounting firm including an explanatory paragraph in its report stating that these factors raise substantial doubt about USECs ability to continue as a going concern.
On December 16, 2013, USEC announced that it had reached an agreement (Plan Support Agreement) with a majority of the holders of USECs outstanding convertible notes due October 2014 on the terms of a financial restructuring. The Plan Support Agreement was entered into with noteholders representing more than 60% of USECs convertible notes regarding a proposed voluntary Chapter 11 pre-packaged or pre-arranged plan of reorganization of USEC (the Plan).
The Plan includes, among other things, for B&W to receive 7.98% of the new USEC common stock and approximately $20.2 million in principal amount of USECs new notes in exchange for B&Ws current investment in USEC Series B-1 12.75% Convertible Preferred Stock and Warrants. Pursuant to the terms of the Plan Support Agreement, the Plan is subject to certain material conditions precedent, which must be satisfied or waived as a condition to moving forward with the commencement of a Chapter 11 case or solicitation on the Plan. The material closing conditions include, among other things, reaching mutual agreement on the treatment of B&W and Toshibas Convertible Preferred Stock and Warrants. In addition, the plan support agreement is subject to certain termination events, including satisfying the material conditions by February 28, 2014 and DOEs failure to extend the current RD&D program through September 30, 2014 at a rate equal to not less than $10 million per month with DOEs continued funding of 80% of the program. Due to the uncertainty surrounding the Plan, we have re-assessed the carrying value of our remaining book value of our preferred stock investment. We have recorded a $19.1 million impairment charge recognized in the fourth quarter of 2013, resulting in a remaining book value of $0.
We continue to manufacture components for and provide technical support services to the American Centrifuge program.
NOTE 3 EQUITY METHOD INVESTMENTS
We have investments in entities that we account for using the equity method. The undistributed earnings of our equity method investees were $113.0 million and $115.6 million at December 31, 2013 and 2012, respectively.
Summarized below is combined balance sheet and income statement information for investments accounted for under the equity method:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Current assets |
$ | 800,704 | $ | 835,997 | ||||
Noncurrent assets |
252,430 | 271,233 | ||||||
|
|
|
|
|||||
Total Assets |
$ | 1,053,134 | $ | 1,107,230 | ||||
|
|
|
|
|||||
Current liabilities |
$ | 610,329 | $ | 616,786 | ||||
Noncurrent liabilities |
72,742 | 89,285 | ||||||
Owners equity |
370,063 | 401,159 | ||||||
|
|
|
|
|||||
Total Liabilities and Owners Equity |
$ | 1,053,134 | $ | 1,107,230 | ||||
|
|
|
|
80
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Revenues |
$ | 2,832,202 | $ | 2,758,159 | $ | 2,669,923 | ||||||
Gross profit |
$ | 208,714 | $ | 210,425 | $ | 271,920 | ||||||
Income before provision for income taxes |
$ | 150,511 | $ | 146,911 | $ | 185,859 | ||||||
Provision for income taxes |
8,603 | 9,000 | 14,258 | |||||||||
|
|
|
|
|
|
|||||||
Net Income |
$ | 141,908 | $ | 137,911 | $ | 171,601 | ||||||
|
|
|
|
|
|
Revenues of equity method investees include $2,121.0 million, $2,222.4 million and $1,956.7 million of reimbursable costs recorded by limited liability companies in our Technical Services segment at December 31, 2013, 2012 and 2011, respectively. Our investment in equity method investees was $4.5 million more than our underlying equity in net assets of those investees based on stated ownership percentages at December 31, 2013. These differences were primarily related to the timing of distribution of dividends and various adjustments under GAAP.
The provision for income taxes is based on the tax laws and rates in the countries in which our investees operate. There is no expected relationship between the provision for income taxes and income before provision for income taxes. The taxation regimes vary not only by their nominal rates, but also by the allowability of deductions, credits and other benefits. For some of our U.S. investees, U.S. income taxes are the responsibility of the respective owners.
Reconciliation of net income per combined income statement information of our investees to equity in income of investees per our consolidated statements of income is as follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Equity income based on stated ownership percentages |
$ | 68,305 | $ | 66,064 | $ | 81,971 | ||||||
All other adjustments due to amortization of basis differences, timing of GAAP adjustments and other adjustments |
(247 | ) | 645 | (3,316 | ) | |||||||
|
|
|
|
|
|
|||||||
Equity in income of investees |
$ | 68,058 | $ | 66,709 | $ | 78,655 | ||||||
|
|
|
|
|
|
Our transactions with unconsolidated affiliates were as follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Sales to |
$ | 99,443 | $ | 42,538 | $ | 49,400 | ||||||
Purchases from |
$ | 4,645 | $ | 1,814 | $ | 980 | ||||||
Dividends received |
$ | 79,595 | $ | 51,594 | $ | 57,801 | ||||||
Capital contributions, net of returns |
$ | 6,884 | $ | 6,289 | $ | 38,176 |
We recognized a $1.2 million gain in the year ended December 31, 2012 from the sale of our interest in a joint venture associated with the management and operations of the Strategic Petroleum Reserve.
81
NOTE 4 GLOBAL COMPETITIVENESS INITIATIVE
In the third quarter of 2012, we announced the Global Competitiveness Initiative (GCI) to enhance competitiveness, better position B&W for growth, and improve profitability. In conjunction with GCI, during the year ended December 31, 2013, we reduced our workforce and initiated other actions, resulting in $23.7 million of expenses related to employee termination benefits, $8.5 million of expenses related to consulting and administrative costs, and $7.4 million of expenses related to facility consolidation.
At December 31, 2013, unpaid GCI charges totaled $8.6 million for employee termination benefits and $1.5 million related to facility consolidation. The following summarizes the changes in our GCI restructuring liability for the years ended December 31, 2013 and December 31, 2012:
Year Ended December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Liability balance at the beginning of the period |
$ | | $ | | ||||
Special charges for restructuring activities(1) |
36,150 | | ||||||
Payments |
(26,096 | ) | | |||||
|
|
|
|
|||||
Liability balance at the end of the period |
$ | 10,054 | $ | | ||||
|
|
|
|
(1) | The charges in the year ended December 31, 2013 exclude $2.0 million of accelerated depreciation and $1.4 million of asset impairments that did not impact the restructuring liability. |
Approximately $18.2 million and $8.6 million of the GCI charges were related to activities conducted in our Power Generation and Nuclear Energy segments, respectively. The remaining charges primarily relate to corporate activities.
NOTE 5 INCOME TAXES
B&W and its subsidiaries are subject to U.S. federal income tax and income tax of multiple state and international jurisdictions. We provide for income taxes based on the tax laws and rates in the jurisdictions in which we conduct our operations. These jurisdictions may have regimes of taxation that vary with respect to nominal rates and with respect to the basis on which these rates are applied. This variation, along with the changes in our mix of income within these jurisdictions, can contribute to shifts in our effective tax rate from period to period.
The results of the U.S. operations of McDermott International, Inc. (MII) and/or certain of its subsidiaries were reflected in our consolidated return for U.S. federal income tax purposes and/or certain consolidated, combined and unitary returns for state, local and foreign tax purposes through June 7, 2010. The Statute of Limitations is closed for 2009 and prior U.S. federal income tax return years.
We are currently under audit by various state and international authorities. With few exceptions, we do not have any returns under examination for years prior to 2009.
We apply the provisions of FASB Topic Income Taxes regarding the treatment of uncertain tax positions. A reconciliation of unrecognized tax benefits follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Balance at beginning of period |
$ | 4,487 | $ | 32,357 | $ | 36,342 | ||||||
Increases based on tax positions taken in the current year |
732 | 980 | 1,171 | |||||||||
Increases based on tax positions taken in the prior years |
1,546 | 65 | 3,269 | |||||||||
Decreases based on tax positions taken in the prior years |
(167 | ) | (3,114 | ) | (4,329 | ) | ||||||
Decreases due to settlements with tax authorities |
| (1,101 | ) | (1,073 | ) | |||||||
Decreases due to lapse of applicable statute of limitation |
(868 | ) | (24,700 | ) | (3,023 | ) | ||||||
|
|
|
|
|
|
|||||||
Balance at end of period |
$ | 5,730 | $ | 4,487 | $ | 32,357 | ||||||
|
|
|
|
|
|
82
The $5.7 million balance of unrecognized tax benefits at December 31, 2013 would reduce our effective tax rate if recognized.
We recognize interest and penalties related to unrecognized tax benefits in our provision for income taxes. During the year ended December 31, 2013, we recorded an increase in our accruals of $0.1 million, resulting in recorded liabilities of approximately $0.4 million for the payment of tax-related interest and penalties. At December 31, 2012 and 2011, our recorded liabilities for the payment of tax-related interest and penalties totaled approximately $0.3 million and $1.1 million, respectively.
We believe that, within the next 12 months, it is reasonably possible that our previously unrecognized tax benefits could increase by less than $1.0 million.
Deferred income taxes reflect the net tax effects of temporary differences between the financial and tax bases of assets and liabilities. Significant components of deferred tax assets and liabilities as of December 31, 2013 and 2012 were as follows:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Deferred tax assets: |
||||||||
Pension liability |
$ | 105,370 | $ | 201,229 | ||||
Accrued warranty expense |
18,003 | 26,695 | ||||||
Accrued vacation pay |
12,865 | 13,312 | ||||||
Accrued liabilities for self-insurance (including postretirement health care benefits) |
33,349 | 35,374 | ||||||
Accrued liabilities for executive and employee incentive compensation |
45,413 | 39,483 | ||||||
Environmental and products liabilities |
8,858 | 8,024 | ||||||
Investments in joint ventures and affiliated companies |
23,780 | 16,993 | ||||||
Long-term contracts |
37,684 | 29,807 | ||||||
Net operating loss carryforward |
12,539 | 15,787 | ||||||
State tax net operating loss carryforward |
21,252 | 21,757 | ||||||
Foreign tax credit carryforward |
320 | 808 | ||||||
Other |
7,135 | 7,722 | ||||||
|
|
|
|
|||||
Total deferred tax assets |
326,568 | 416,991 | ||||||
Valuation allowance for deferred tax assets |
(24,872 | ) | (19,979 | ) | ||||
|
|
|
|
|||||
Deferred tax assets |
301,696 | 397,012 | ||||||
|
|
|
|
|||||
Deferred tax liabilities: |
||||||||
Property, plant and equipment |
35,797 | 39,016 | ||||||
Investments in joint ventures and affiliated companies |
| 1,064 | ||||||
Long-term contracts |
27,628 | 30,571 | ||||||
Intangibles |
29,388 | 24,756 | ||||||
Other |
8,631 | 9,580 | ||||||
|
|
|
|
|||||
Total deferred tax liabilities |
101,444 | 104,987 | ||||||
|
|
|
|
|||||
Net deferred tax assets |
$ | 200,252 | $ | 292,025 | ||||
|
|
|
|
83
Income before provision for income taxes was as follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
U.S. |
$ | 399,263 | $ | 222,840 | $ | 39,417 | ||||||
Other than U.S. |
117,910 | 96,578 | 55,081 | |||||||||
|
|
|
|
|
|
|||||||
Income before provision for income taxes |
$ | 517,173 | $ | 319,418 | $ | 94,498 | ||||||
|
|
|
|
|
|
The provision for income taxes consisted of:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Current: |
||||||||||||
U.S. federal |
$ | 70,660 | $ | 39,784 | $ | 24,591 | ||||||
U.S. state and local |
6,388 | 7,979 | 7,452 | |||||||||
Other than U.S. |
13,467 | 11,060 | 11,037 | |||||||||
|
|
|
|
|
|
|||||||
Total current |
90,515 | 58,823 | 43,080 | |||||||||
|
|
|
|
|
|
|||||||
Deferred: |
||||||||||||
U.S. Federal |
69,810 | 24,560 | (20,066 | ) | ||||||||
U.S. State and local |
6,546 | 6,545 | 5,195 | |||||||||
Other than U.S. |
17,712 | 11,933 | (4,329 | ) | ||||||||
|
|
|
|
|
|
|||||||
Total deferred (benefit) provision |
94,068 | 43,038 | (19,200 | ) | ||||||||
|
|
|
|
|
|
|||||||
Provision for income taxes |
$ | 184,583 | $ | 101,861 | $ | 23,880 | ||||||
|
|
|
|
|
|
The following is a reconciliation of the U.S. statutory federal tax rate (35%) to the consolidated effective tax rate:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
U.S. federal statutory (benefit) rate |
35.0 | % | 35.0 | % | 35.0 | % | ||||||
State and local income taxes |
2.5 | 4.3 | 6.4 | |||||||||
Foreign rate differential |
(2.5 | ) | (4.1 | ) | (11.8 | ) | ||||||
Foreign operations |
| 0.5 | 6.4 | |||||||||
Tax credits |
(2.0 | ) | (2.5 | ) | (46.8 | ) | ||||||
Dividends and deemed dividends from affiliates |
1.2 | 2.3 | 38.7 | |||||||||
Valuation allowances |
0.9 | 3.4 | 7.6 | |||||||||
Uncertain tax positions |
0.3 | (9.0 | ) | (2.8 | ) | |||||||
Non-deductible expenses |
0.4 | 1.3 | 5.5 | |||||||||
Additional spin related benefit |
| | (4.6 | ) | ||||||||
Manufacturing deduction |
(1.4 | ) | (1.3 | ) | (3.6 | ) | ||||||
Minority interest |
1.0 | 1.1 | 3.2 | |||||||||
Other |
0.3 | 0.9 | (7.9 | ) | ||||||||
|
|
|
|
|
|
|||||||
Effective tax rate |
35.7 | % | 31.9 | % | 25.3 | % | ||||||
|
|
|
|
|
|
At December 31, 2013, we had a valuation allowance of $24.9 million for deferred tax assets, which we expect cannot be realized through carrybacks, future reversals of existing taxable temporary differences and our estimate of future taxable income. We believe that our remaining deferred tax assets are more likely than not realizable through carrybacks, future reversals of existing taxable temporary differences and our estimate of future taxable income. Any changes to our estimated valuation allowance could be material to our consolidated financial statements.
84
The following is an analysis of our valuation allowance for deferred tax assets:
Beginning Balance |
Charges To Costs and Expenses |
Charged To Other Accounts |
Ending Balance |
|||||||||||||
(In thousands) | ||||||||||||||||
Year Ended December 31, 2013 |
$ | (19,979 | ) | (4,893 | ) | | $ | (24,872 | ) | |||||||
Year Ended December 31, 2012 |
$ | (9,354 | ) | (10,625 | ) | | $ | (19,979 | ) | |||||||
Year Ended December 31, 2011 |
$ | (2,205 | ) | (7,149 | ) | | $ | (9,354 | ) |
We have foreign net operating loss carryforwards of $50.5 million available to offset future taxable income in foreign jurisdictions. Of the foreign net operating loss carryforwards, $3.8 million is scheduled to expire in 2017 to 2033. We have foreign tax credit carryovers of $0.3 million which will expire in 2014. We have state net operating losses of $404.0 million available to offset future taxable income in various states. Our state net operating loss carryforwards begin to expire in the year 2014. We are carrying a valuation allowance of $9.8 million against the deferred tax asset related to the state loss carryforwards.
We would be subject to withholding taxes if we were to distribute earnings from certain foreign subsidiaries. For the year ended December 31, 2013, the undistributed earnings of these subsidiaries were $275.6 million. Unrecognized deferred income tax liabilities, including withholding taxes, of approximately $42.6 million would be payable upon distribution of these earnings. We have provided tax of $6.5 million on earnings we intend to remit. All other earnings are considered permanently reinvested.
NOTE 6 LONG-TERM DEBT AND NOTES PAYABLE
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Long-term debt consists of: |
||||||||
Secured Debt: |
||||||||
Power Generation various notes payable |
$ | 444 | $ | 639 | ||||
Other |
3 | 5 | ||||||
|
|
|
|
|||||
447 | 644 | |||||||
Less: Amounts due within one year |
222 | 214 | ||||||
|
|
|
|
|||||
Long-term debt |
$ | 225 | $ | 430 | ||||
|
|
|
|
|||||
Notes payable and current maturities of long-term debt consist of: |
||||||||
Short-term lines of credit |
$ | 4,449 | $ | 3,848 | ||||
Current maturities of long-term debt |
222 | 214 | ||||||
|
|
|
|
|||||
Total |
$ | 4,671 | $ | 4,062 | ||||
|
|
|
|
|||||
Interest rate on short-term borrowing |
6.6 | % | 6.6 | % | ||||
|
|
|
|
Our short-term lines of credit represent borrowings by one of our subsidiaries. We have included this amount in notes payable and current maturities of long-term debt on our consolidated balance sheets. This facility is renewable annually and the interest rate associated with this line of credit was 6.6% per annum at December 31, 2013.
Maturities of long-term debt during the five years subsequent to December 31, 2013 are as follows: 2014 $0.2 million; 2015 $0.2 million; 2016 $0.0 million; 2017 $0.0 million; and 2018 $0.0 million.
Credit Facility
On June 8, 2012, B&W entered into an Amended and Restated Credit Agreement (the Credit Agreement) with a syndicate of lenders and letter of credit issuers, and Bank of America, N.A., as administrative agent, which amended and restated our previous Credit Agreement dated May 3, 2010. The Credit Agreement provides for revolving credit borrowings and issuances of letters of credit in an aggregate outstanding amount of up to $700 million, and is scheduled to mature June 8, 2017. The proceeds of the Credit Agreement are available for working
85
capital needs and other general corporate purposes. The Credit Agreement includes procedures for additional financial institutions to become lenders, or for any existing lender to increase its commitment thereunder, subject to an aggregate maximum of $1.0 billion for all revolving loan and letter of credit commitments.
The Credit Agreement is guaranteed by substantially all of B&Ws wholly owned domestic subsidiaries. Obligations under the Credit Agreement are secured by first-priority liens on certain assets owned by B&W and the guarantors (other than subsidiaries comprising our Nuclear Operations and Technical Services segments). If the corporate family rating of B&W and its subsidiaries from Moodys is Baa3 or better (with a stable outlook or better), the corporate rating of B&W and its subsidiaries from Standard & Poors is BBB- or better (with a stable outlook or better), and other conditions are met, the liens securing obligations under the Credit Agreement will be released, subject to reinstatement upon the terms set forth in the Credit Agreement.
The Credit Agreement requires only interest payments on a periodic basis until maturity. We may prepay all loans under the Credit Agreement at any time without premium or penalty (other than customary LIBOR breakage costs), subject to certain notice requirements.
The Credit Agreement contains customary financial covenants relating to leverage and interest coverage and includes covenants that restrict, among other things, debt incurrence, liens, investments, acquisitions, asset dispositions, dividends, prepayments of subordinated debt and mergers. At December 31, 2013, we were in compliance with all of the covenants set forth in the Credit Agreement. A comparison of the key financial covenants and current compliance at December 31, 2013 is as follows:
Required | Actual | |||
Less than | ||||
Maximum leverage ratio |
2.75 to 1.0 | 0.08 to 1.0 | ||
Greater than | ||||
Minimum interest coverage ratio |
4.0 to1.0 | 87.84 to 1.0 |
Loans outstanding under the Credit Agreement bear interest at our option at either the Eurocurrency rate plus a margin ranging from 1.25% to 2.25% per year or the base rate (the highest of the Federal Funds rate plus 0.50%, the one month Eurocurrency rate plus 1.0%, or the administrative agents prime rate) plus a margin ranging from 0.25% to 1.25% per year. The applicable margin for revolving loans varies depending on the credit ratings of the Credit Agreement. Under the Credit Agreement, we are charged a commitment fee on the unused portion of the Credit Agreement and that fee varies between 0.225% and 0.350% per year depending on the credit ratings of the Credit Agreement. Additionally, we are charged a letter of credit fee of between 1.25% and 2.25% per year with respect to the amount of each financial letter of credit issued under the Credit Agreement and a letter of credit fee of between 0.80% and 1.25% per year with respect to the amount of each performance letter of credit issued under the Credit Agreement, in each case depending on the credit ratings of the Credit Agreement. We also pay customary fronting fees and other fees and expenses in connection with the issuance of letters of credit under the Credit Agreement. In connection with entering into the Credit Agreement, we paid upfront fees to the lenders thereunder, and arrangement and other fees to the arrangers and agents of the Credit Agreement. At December 31, 2013, there were no borrowings outstanding and letters of credit issued under the Credit Agreement totaled $163.0 million, resulting in $537.0 million available for borrowings or to meet letter of credit requirements. The applicable interest rate at December 31, 2013 under this facility was 3.75% per year for revolving loans.
Based on the current credit ratings of the Credit Agreement, the applicable margin for Eurocurrency loans is 1.50%, the applicable margin for base rate loans is 0.50%, the letter of credit fee for financial letters of credit is 1.50%, the letter of credit fee for performance letters of credit is 0.875%, and the commitment fee for unused portions of the Credit Agreement is 0.25%. The Credit Agreement does not have a floor for the base rate or the Eurocurrency rate.
The Credit Agreement generally includes customary events of default for a secured credit facility. If any default occurs under the Credit Agreement, or if we are unable to make any of the representations and warranties in the Credit Agreement, we will be unable to borrow funds or have letters of credit issued under the Credit Agreement.
86
Other Arrangements
Certain subsidiaries in our Power Generation segment have credit arrangements with various commercial banks and other financial institutions for the issuance of letters of credit and bank guarantees in association with contracting activity. The aggregate value of all such letters of credit and bank guarantees as of December 31, 2013 was $96.4 million.
B&W and certain of its subsidiaries have jointly executed general agreements of indemnity in favor of surety underwriters relating to surety bonds those underwriters issue in support of some of our contracting activity. As of December 31, 2013, bonds issued and outstanding under these arrangements in support of contracts totaled approximately $405.8 million.
NOTE 7 PENSION PLANS AND POSTRETIREMENT BENEFITS
We have historically provided defined benefit retirement benefits, primarily through noncontributory pension plans, for most of our regular employees. As of 2006, our retirement plans for U.S.-based employees were closed to new entrants for our corporate employees and were closed to new salaried plan entrants for our existing plans within our Power Generation and Nuclear Operations segments. Effective October 31, 2008, the salaried and hourly retirement plans acquired with Marine Mechanical Corporation were merged into the retirement plan for our Nuclear Operations segment. Effective December 31, 2008, we acquired the retirement plans and postretirement benefit plans of NFS.
In October 2012, we notified employees that, effective December 31, 2015, benefit accruals for those salaried employees covered by, and continuing to accrue service and salary adjusted benefits under our major U.S. and Canadian defined benefit qualified pension plans will cease. This amendment is reflected as a curtailment at December 31, 2012. Furthermore, effective January 1, 2016, we will make service-based, cash contributions to The Babcock & Wilcox Company Thrift Plan (the Thrift Plan) for those employees impacted by the plan freeze.
Effective January 1, 2012, a defined contribution component was adopted applicable to Babcock & Wilcox Canada, Ltd. (the Canadian Plans). Any employee with less than two years of continuous service as of December 31, 2011 was required to enroll in the defined contribution component of the Canadian Plans as of January 1, 2012 or upon the completion of six months of continuous service, whichever is later. These and future employees will not be eligible to enroll in the defined benefit component of the Canadian Plans. This amendment to the Canadian Plans is reflected as a curtailment in 2012.
We do not provide retirement benefits to certain non-resident alien employees of foreign subsidiaries. Retirement benefits for salaried employees who accrue benefits in a defined benefit plan are based on final average compensation and years of service, while benefits for hourly paid employees are based on a flat benefit rate and years of service. Our funding policy is to fund the plans as recommended by the respective plan actuaries and in accordance with the Employee Retirement Income Security Act of 1974, as amended, or other applicable law. The Pension Protection Act of 2006 became effective in 2008. Funding provisions under the Pension Protection Act accelerate funding requirements to ensure full funding of benefits accrued. Assuming we continue as a government contractor, our contractual arrangements with the U.S. Government provide for the recovery of contributions to our pension and other postretirement benefit plans covering employees working primarily in our Nuclear Operations segment.
We make available other benefits which include postretirement health care and life insurance benefits to certain salaried and union retirees based on their union contracts. Certain subsidiaries provide these benefits to unionized and salaried future retirees.
87
Obligations and Funded Status
Pension Benefits Year Ended December 31, |
Other Benefits Year Ended December 31, |
|||||||||||||||
2013 | 2012 | 2013 | 2012 | |||||||||||||
(In thousands) | ||||||||||||||||
Change in benefit obligation: |
||||||||||||||||
Benefit obligation at beginning of period |
$ | 2,779,990 | $ | 2,687,007 | $ | 116,256 | $ | 122,460 | ||||||||
Service cost |
46,417 | 46,828 | 975 | 1,138 | ||||||||||||
Interest cost |
111,200 | 122,605 | 3,745 | 5,124 | ||||||||||||
Plan participants contributions |
266 | 300 | 1,055 | 115 | ||||||||||||
Curtailments |
| (94,642 | ) | | | |||||||||||
Amendments |
3,105 | 2,996 | | (1,302 | ) | |||||||||||
Settlements |
(21,862 | ) | (57,430 | ) | | | ||||||||||
Actuarial loss (gain) |
(195,290 | ) | 198,935 | (16,335 | ) | (2,153 | ) | |||||||||
Foreign currency exchange rate changes |
(17,465 | ) | 6,793 | (655 | ) | 220 | ||||||||||
Benefits paid |
(136,266 | ) | (133,402 | ) | (9,135 | ) | (9,346 | ) | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Benefit obligation at end of period |
$ | 2,570,095 | $ | 2,779,990 | $ | 95,906 | $ | 116,256 | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Change in plan assets: |
||||||||||||||||
Fair value of plan assets at beginning of period |
$ | 2,127,694 | $ | 1,917,850 | $ | 37,324 | $ | 33,558 | ||||||||
Actual return on plan assets |
155,071 | 207,728 | 6,056 | 2,233 | ||||||||||||
Plan participants contributions |
266 | 300 | 1,055 | 115 | ||||||||||||
Company contributions |
70,681 | 187,284 | 7,974 | 10,764 | ||||||||||||
Settlements |
(21,862 | ) | (57,430 | ) | | | ||||||||||
Foreign currency exchange rate changes |
(14,261 | ) | 5,364 | | | |||||||||||
Benefits paid |
(136,266 | ) | (133,402 | ) | (9,135 | ) | (9,346 | ) | ||||||||
|
|
|
|
|
|
|
|
|||||||||
Fair value of plan assets at the end of period |
2,181,323 | 2,127,694 | 43,274 | 37,324 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Funded status |
$ | (388,772 | ) | $ | (652,296 | ) | $ | (52,632 | ) | $ | (78,932 | ) | ||||
|
|
|
|
|
|
|
|
|||||||||
Amounts recognized in the balance sheet consist of: |
||||||||||||||||
Accrued employee benefits |
$ | (54,391 | ) | $ | (75,119 | ) | $ | (9,438 | ) | $ | (7,724 | ) | ||||
Accumulated postretirement benefit obligation |
| | (43,194 | ) | (71,208 | ) | ||||||||||
Pension liability |
(334,538 | ) | (577,177 | ) | | | ||||||||||
Prepaid pension |
157 | | | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Accrued benefit liability, net |
$ | (388,772 | ) | $ | (652,296 | ) | $ | (52,632 | ) | $ | (78,932 | ) | ||||
|
|
|
|
|
|
|
|
|||||||||
Amount recognized in accumulated comprehensive income (before taxes): |
||||||||||||||||
Prior service cost (credit) |
$ | 18,237 | $ | 18,327 | $ | (2,338 | ) | $ | (2,523 | ) | ||||||
|
|
|
|
|
|
|
|
|||||||||
Supplemental information: |
||||||||||||||||
Plans with accumulated benefit obligation in excess of plan assets |
||||||||||||||||
Projected benefit obligation |
$ | 2,433,369 | $ | 2,779,990 | N/A | N/A | ||||||||||
Accumulated benefit obligation |
$ | 2,406,269 | $ | 2,723.930 | $ | 95,906 | $ | 116,256 | ||||||||
Fair value of plan assets |
$ | 2,047,507 | $ | 2,127,694 | $ | 43,274 | $ | 37,324 | ||||||||
Plans with plan assets in excess of accumulated benefit obligation |
||||||||||||||||
Projected benefit obligation |
$ | 136,726 | $ | | N/A | N/A | ||||||||||
Accumulated benefit obligation |
$ | 132,221 | $ | | $ | | $ | | ||||||||
Fair value of plan assets |
$ | 133,816 | $ | | $ | | $ | | ||||||||
|
|
|
|
|
|
|
|
88
Pension Benefits Year Ended December 31, |
Other Benefits Year Ended December 31, |
|||||||||||||||||||||||
2013 | 2012 | 2011 | 2013 | 2012 | 2011 | |||||||||||||||||||
(In thousands) | ||||||||||||||||||||||||
Components of net periodic benefit cost: |
||||||||||||||||||||||||
Service cost |
$ | 46,417 | $ | 46,828 | $ | 43,495 | $ | 975 | $ | 1,138 | $ | 1,143 | ||||||||||||
Interest cost |
111,200 | 122,605 | 134,927 | 3,745 | 5,124 | 5,805 | ||||||||||||||||||
Expected return on plan assets |
(147,621 | ) | (136,913 | ) | (148,347 | ) | (2,116 | ) | (1,930 | ) | (1,919 | ) | ||||||||||||
Amortization of prior service cost |
3,158 | 3,579 | 3,721 | (148 | ) | (139 | ) | 33 | ||||||||||||||||
Recognized net actuarial loss (gain) |
(202,442 | ) | 34,496 | 212,802 | (20,483 | ) | (2,456 | ) | 2,952 | |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
Net periodic benefit cost (income) |
$ | (189,288 | ) | $ | 70,595 | $ | 246,598 | $ | (18,027 | ) | $ | 1,737 | $ | 8,014 | ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Recognized net actuarial loss (gain) consists primarily of our reported actuarial loss (gain), curtailments, and the difference between the actual return on plan assets and the expected return on plan assets. These amounts are disclosed in this Note 7. As discussed in Note 17, we have excluded the recognized net actuarial loss (gain) from our reportable segments and such amount has been reflected in Note 17 as the Mark to Market Adjustment in the reconciliation of reportable segment income to consolidated operating income. The recognized net actuarial loss (gain) and the affected consolidated statements of income line items are as follows:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
Cost of operations |
$ | (191,352 | ) | $ | 23,893 | $ | 176,449 | |||||
Selling, general and administrative expenses |
(31,384 | ) | 7,997 | 38,969 | ||||||||
Other-net |
(189 | ) | 150 | 336 | ||||||||
|
|
|
|
|
|
|||||||
Total |
$ | (222,925 | ) | $ | 32,040 | $ | 215,754 | |||||
|
|
|
|
|
|
Additional Information
Pension Benefits Year Ended December 31, |
Other Benefits Year Ended December 31, |
|||||||||||||||
2013 | 2012 | 2013 | 2012 | |||||||||||||
(In thousands) | ||||||||||||||||
Increase (decrease) in accumulated other comprehensive income due to actuarial losses - before taxes |
$ | (3,105 | ) | $ | (1,957 | ) | $ | | $ | 1,302 |
In the current fiscal year, we have recognized expense (income) in other comprehensive income as components of net periodic benefit cost approximately $3.2 million and $(0.1) million for our pension benefits and other benefits, respectively. In the next fiscal year, we expect to recognize expense (income) in other comprehensive income as components of net periodic benefit cost approximately $2.8 million and $(0.2) million for our pension benefits and other benefits, respectively.
89
Assumptions
Pension Benefits | Other Benefits | |||||||||||||||
2013 | 2012 | 2013 | 2012 | |||||||||||||
Weighted average assumptions used to determine net periodic benefit obligations at December 31: |
||||||||||||||||
Discount rate |
4.78 | % | 4.09 | % | 4.23 | % | 3.43 | % | ||||||||
Rate of compensation increase |
2.56 | % | 2.57 | % | | | ||||||||||
Weighted average assumptions used to determine net periodic benefit cost for the years ended December 31: |
||||||||||||||||
Discount rate |
4.09 | % | 4.76 | % | 3.43 | % | 4.34 | % | ||||||||
Expected return on plan assets |
7.06 | % | 7.08 | % | 5.74 | % | 5.76 | % | ||||||||
Rate of compensation increase |
2.57 | % | 3.69 | % | | |
The expected rate of return on plan assets assumption is based on the long-term expected returns for the investment mix of assets currently in the portfolio. In setting this rate, we use a building-block approach. Historic real return trends for the various asset classes in the plans portfolio are combined with anticipated future market conditions to estimate the real rate of return for each class. These rates are then adjusted for anticipated future inflation to determine estimated nominal rates of return for each class. The expected rate of return on plan assets is determined to be the weighted average of the nominal returns based on the weightings of the classes within the total asset portfolio. We are using an expected return on plan assets assumption of 7.2% for the majority of our existing pension plan assets (approximately 89% of our total pension assets at December 31, 2013).
Our existing other benefit plans are unfunded, with the exception of the NFS postretirement benefit plans. These plans provide health benefits to certain salaried and hourly employees, as well as retired employees, of NFS. Approximately 86% of total assets for these postretirement benefit plans are contributed into a Voluntary Employees Beneficiary Association trust.
2013 | 2012 | |||||||
Assumed health-care cost trend rates at December 31 |
||||||||
Health-care cost trend rate assumed for next year |
8.00 | % | 8.50 | % | ||||
Rates to which the cost trend rate is assumed to decline (ultimate trend rate) |
4.50 | % | 4.50 | % | ||||
Year that the rate reaches ultimate trend rate |
2021 | 2021 |
Assumed health-care cost trend rates have a significant effect on the amounts we report for our health-care plan. A one-percentage-point change in our assumed health-care cost trend rates would have the following effects:
One-Percentage- Point Increase |
One-Percentage- Point Decrease |
|||||||
(In thousands) | ||||||||
Effect on total of service and interest cost |
$ | 422 | $ | (351 | ) | |||
Effect on postretirement benefit obligation |
$ | 6,821 | $ | (5,774 | ) |
Investment Goals
General
The overall investment strategy of the pension trusts is to achieve long-term growth of principal, while avoiding excessive risk and to minimize the probability of loss of principal over the long term. The specific investment goals that have been set for the pension trusts in the aggregate are (1) to ensure that plan liabilities are met when due and (2) to achieve an investment return on trust assets consistent with a reasonable level of risk.
90
Allocations to each asset class for both domestic and foreign plans are reviewed periodically and rebalanced, if appropriate, to assure the continued relevance of the goals, objectives and strategies. The pension trusts for both our domestic and foreign plans employ a professional investment advisor and a number of professional investment managers whose individual benchmarks are, in the aggregate, consistent with the plans overall investment objectives. The goals of each investment manager are (1) to meet (in the case of passive accounts) or exceed (for actively managed accounts) the benchmark selected and agreed upon by the manager and the Trust and (2) to display an overall level of risk in its portfolio that is consistent with the risk associated with the agreed upon benchmark.
The investment performance of total portfolios, as well as asset class components, is periodically measured against commonly accepted benchmarks, including the individual investment manager benchmarks. In evaluating investment manager performance, consideration is also given to personnel, strategy, research capabilities, organizational and business matters, adherence to discipline and other qualitative factors that may impact the ability to achieve desired investment results.
Domestic Plans
We sponsor the following domestic defined benefit plans:
| Retirement Plan for Employees of Babcock & Wilcox Commercial Operations (covering Power Generation and Nuclear Energy segment employees); |
| Retirement Plan for Employees of Babcock & Wilcox Governmental Operations (covering Nuclear Operations and Technical Services segment employees and Corporate employees); |
| Nuclear Fuel Services, Inc. Retirement Plan for Salaried Employees; and |
| Nuclear Fuel Services, Inc. Retirement Plan for Hourly Employees. |
The assets of the domestic pension plans are commingled for investment purposes and held by the Trustee in The Babcock & Wilcox Company Master Trust (the Master Trust). For the years ended December 31, 2013 and 2012, the investment return on domestic plan assets of the Master Trust (net of deductions for management fees) was approximately 7% and 12%, respectively.
The following is a summary of the asset allocations for the Master Trust at December 31, 2013 and 2012 by asset category:
2013 | 2012 | |||||||
Asset Category: |
||||||||
Commingled and Mutual Funds |
36 | % | 34 | % | ||||
Fixed Income (excluding U. S. Government Securities) |
30 | % | 29 | % | ||||
U.S. Government Securities |
18 | % | 22 | % | ||||
Equity Securities |
7 | % | 6 | % | ||||
Partnerships with Security Holdings |
6 | % | 6 | % | ||||
Real Estate |
1 | % | 1 | % | ||||
Other |
2 | % | 2 | % | ||||
|
|
|
|
|||||
Total |
100 | % | 100 | % | ||||
|
|
|
|
The target allocation for 2014 for the domestic plans, by asset class, is as follows:
Asset Class: |
||||
Fixed Income |
55 | % | ||
Equities |
45 | % |
91
Foreign Plans
We sponsor various plans through certain of our foreign subsidiaries. These plans are the Canadian Plans and the Diamond Power Specialty Limited Retirement Benefits Plan (the Diamond UK Plan).
The combined weighted average asset allocations of these plans at December 31, 2013 and 2012 by asset category were as follows:
2013 | 2012 | |||||||
Asset Category: |
||||||||
Equity Securities and Commingled Mutual Funds |
58 | % | 58 | % | ||||
Fixed Income |
39 | % | 40 | % | ||||
Other |
3 | % | 2 | % | ||||
|
|
|
|
|||||
Total |
100 | % | 100 | % | ||||
|
|
|
|
The target allocation for 2014 for the foreign plans, by asset class, is as follows:
Canadian Plans |
Diamond UK Plan |
|||||||
Asset Class: |
||||||||
U. S. Equity |
17 | % | 7 | % | ||||
Global Equity |
38 | % | 16 | % | ||||
Fixed Income |
45 | % | 77 | % |
Fair Value
See Note 16 for a detailed description of fair value measurements and the hierarchy established for valuation inputs. The following is a summary of total investments for our plans measured at fair value at December 31, 2013:
12/31/13 | Level 1 | Level 2 | Level 3 | |||||||||||||
(In thousands) | ||||||||||||||||
Pension and Other Benefits: |
||||||||||||||||
Fixed Income |
$ | 682,028 | $ | | $ | 682,028 | $ | | ||||||||
Equities |
144,438 | 144,438 | | | ||||||||||||
Commingled and Mutual Funds |
861,354 | 31,083 | 830,271 | | ||||||||||||
U.S. Government Securities |
355,245 | 355,245 | | | ||||||||||||
Partnerships with Security Holdings |
116,154 | | | 116,154 | ||||||||||||
Real Estate |
6,214 | | | 6,214 | ||||||||||||
Cash and Accrued Items |
59,164 | 48,087 | 11,077 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Assets |
$ | 2,224,597 | $ | 578,853 | $ | 1,523,376 | $ | 122,368 | ||||||||
|
|
|
|
|
|
|
|
The following is a summary of total investments for our plans measured at fair value at December 31, 2012:
12/31/12 | Level 1 | Level 2 | Level 3 | |||||||||||||
(In thousands) | ||||||||||||||||
Pension and Other Benefits: |
||||||||||||||||
Fixed Income |
$ | 649,978 | $ | 1,031 | $ | 648,947 | $ | | ||||||||
Equities |
120,223 | 120,220 | | 3 | ||||||||||||
Commingled and Mutual Funds |
791,195 | 9,084 | 782,111 | | ||||||||||||
U.S. Government Securities |
425,709 | 425,709 | | | ||||||||||||
Partnerships with Security Holdings |
112,881 | | | 112,881 | ||||||||||||
Real Estate |
14,516 | | | 14,516 | ||||||||||||
Cash and Accrued Items |
50,516 | 46,785 | 3,731 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total Assets |
$ | 2,165,018 | $ | 602,829 | $ | 1,434,789 | $ | 127,400 | ||||||||
|
|
|
|
|
|
|
|
92
The following is a summary of the changes in the Plans Level 3 instruments measured on a recurring basis for the years ended December 31, 2013 and 2012:
Year ended December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Balance at beginning of period |
$ | 127,400 | $ | 187,861 | ||||
Issuances and acquisitions |
6,016 | 12,593 | ||||||
Dispositions |
(31,471 | ) | (74,329 | ) | ||||
Realized gain |
18,058 | 692 | ||||||
Unrealized gain |
2,365 | 583 | ||||||
|
|
|
|
|||||
Balance at end of period |
$ | 122,368 | $ | 127,400 | ||||
|
|
|
|
Our Level 3 instruments include assets with no market price but rather calculations of net asset values per share or its equivalent. When appropriate, we adjust these net asset values for contributions and distributions, if any, made during the period beginning on the latest net asset value valuation date and ending on our measurement date. We also consider available market data, relevant index returns, preliminary estimates from our investees and other data obtained through research and consultation with third party advisors in determining the fair value of our Level 3 instruments.
Cash Flows
Domestic Plans | Foreign Plans | |||||||||||||||
Pension Benefits |
Other Benefits |
Pension Benefits |
Other Benefits |
|||||||||||||
(In thousands) | ||||||||||||||||
Expected employer contributions to trusts of defined benefit plans: |
||||||||||||||||
2014 |
$ | 41,230 | $ | 1,936 | $ | 21,670 | N/A | |||||||||
Expected benefit payments: |
||||||||||||||||
2014 |
$ | 138,591 | 9,090 | $ | 10,913 | 565 | ||||||||||
2015 |
143,260 | 8,632 | 11,567 | 559 | ||||||||||||
2016 |
147,481 | 8,219 | 12,164 | 546 | ||||||||||||
2017 |
151,205 | 7,689 | 12,559 | 566 | ||||||||||||
2018 |
154,378 | 7,276 | 13,044 | 593 | ||||||||||||
2019-2023 |
798,800 | 27,059 | 72,787 | 3,098 |
Defined Contribution Plans
We provide benefits under The Babcock & Wilcox Company Supplemental Executive Retirement Plan (the SERP Plan), which is a defined contribution plan. We recorded expense related to the SERP Plan of approximately $0.7 million, $0.6 million and $0.3 million in the years ended December 31, 2013, 2012 and 2011, respectively.
We also provide benefits under the Thrift Plan. The Thrift Plan generally provides for matching employer contributions of 50% of participants contributions up to 6% of compensation. These matching employer contributions are typically made in shares of B&W common stock. We also provide service-based cash contributions under the Thrift Plan to employees not accruing benefits under our defined benefit plans. Amounts charged to expense for employer contributions under the Thrift Plan totaled approximately $24.3 million, $24.2 million and $22.1 million in the years ended December 31, 2013, 2012 and 2011, respectively.
Effective January 1, 2012, we adopted The Babcock & Wilcox Company Defined Contribution Restoration Plan (the Restoration Plan) to restore benefits that would be provided to participants in the Thrift Plan but are precluded by the application of certain sections of the Internal Revenue Code of 1986, as amended (the Code). Each participant who is precluded from receiving the full amount of service-based contributions otherwise provided under the Thrift Plan in a plan year by the application of Code Section 401(a)(17) or 415(c) shall be credited with an employer service-based contribution for such plan year equal to the excess of the amount of service-based contributions that would have been made to the participants Thrift Plan account without the application of Code Section 401(a)(17) and 415(c) for the plan year over the amount of service-based contribution actually made to such participants Thrift Plan account for the plan year. In addition, the Restoration Plan permits participants who are
93
precluded from making the full amount of employee contributions to the Thrift Plan and receiving associated employer matching contributions by the application of Code Sections 401(a)(17) and 415(c) to elect to make deferral contributions and receive associated employer matching contributions under the Restoration Plan. Amounts charged to expense under the Restoration Plan totaled approximately $0.2 million and $0.1 million in the years ended December 31, 2013 and 2012, respectively.
Effective January 1, 2012, a defined contribution component was added to those Canadian Plans previously offering defined benefits to salaried employees. As of January 1, 2012, we made cash, service-based contributions under this arrangement. The amount charged to expense for employer contributions was approximately $0.6 million and $0.5 million in the years ended December 31, 2013 and 2012, respectively.
Multiemployer Plans
One of our subsidiaries in the Power Generation segment contributes to various multiemployer plans. The plans generally provide defined benefits to substantially all unionized workers in this subsidiary.
The following table summarizes our contributions to multiemployer plans for the years covered by this report:
Pension Fund |
EIN/PIN | Pension Protection Act Zone Zone Status |
FIP/RP
Status Pending/ Implemented |
Contributions | Expiration Date Of Collective Bargaining Agreement | |||||||||||||||||||||
2013 | 2012 | 2011 | Surcharge Imposed |
|||||||||||||||||||||||
2013 | 2012 | (in millions) | ||||||||||||||||||||||||
Boilermaker-Blacksmith National Pension Trust |
48-6168020/ 001 |
Yellow | Yellow | Yes | $ | 19.0 | $ | 18.9 | $ | 25.9 | No | Described Below | ||||||||||||||
All Other |
11.9 | 5.3 | 5.5 | |||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||
$ | 30.9 | $ | 24.2 | $ | 31.4 | |||||||||||||||||||||
|
|
|
|
|
|
The Boilermaker-Blacksmith National Pension Trust (the Boilermaker Plan) is, by plan, the only significant contribution of our total contributions to these funds. Our collective bargaining agreements with the Boilermaker Plan are under a National Maintenance Agreement platform which is evergreen in terms of expiration. However, the agreement allows for termination by either party with a 90-day written notice. Our contributions to the Boilermaker Plan constitute less than 5% of total contributions to the plan. All other contributions expense for all periods included in this report represents multiple amounts to various plans that, individually, are deemed to be insignificant.
NOTE 8 ASSET SALES AND IMPAIRMENT OF LONG-LIVED ASSETS
We had net gains on asset sales of approximately $3.1 million during the year ended December 31, 2011, primarily attributable to the sale of a wholly owned manufacturing facility in a Chinese subsidiary in our Power Generation segment.
During the years ended December 31, 2013, 2012 and 2011, we did not record any impairments of property, plant and equipment.
NOTE 9 CAPITAL STOCK
In November 2012, our Board of Directors authorized us to repurchase an indeterminate number of shares of our common stock at an aggregate value of up to $250 million. In addition, in May 2013 our Board of Directors authorized us to repurchase an additional $250 million of aggregate value of common stock. On December 9, 2013, we completed the repurchase of the first $250 million, and we may continue to repurchase shares from time to time during a two-year period in the open market under the second $250 million repurchase authorization. As of December 31, 2013, we have repurchased 9,529,374 shares of common stock for approximately $253.7 million.
94
NOTE 10 STOCK-BASED COMPENSATION
2010 Long-Term Incentive Plan of The Babcock & Wilcox Company
We established the 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company (the Plan) allowing members of the Board of Directors, executive officers, key employees and consultants eligibility to participate in the Plan. The Compensation Committee of the Board of Directors selects the participants for the Plan. The Plan provides for a number of forms of stock-based compensation, including incentive and non-qualified stock options, restricted stock, restricted stock units, performance shares and performance units, subject to satisfaction of specific performance goals. Shares subject to awards under the Plan that are cancelled, forfeited, terminated or expire unexercised, shall immediately become available for the granting of awards under this Plan. In addition, 10,000,000 shares of common stock were authorized for issuance through the Plan. Options to purchase shares are granted at not less than 100% of the fair market value closing price on the date of grant, become exercisable at such time or times as determined when granted and expire not more than seven years after the date of grant.
At December 31, 2013, we had awarded 5,865,871 shares under the Plan and had a total of 4,134,129 shares of our common stock available for future awards. In the event of a change in control of our company, the terms of the awards under the Plan contain provisions that may cause restrictions to lapse and accelerate the vesting of plan awards.
2012 Long-Term Incentive Plan of Babcock & Wilcox Technical Services Group, Inc.
In June 2012, we established the 2012 Long-Term Incentive Plan of Babcock & Wilcox Technical Services Group, Inc., a cash-settled plan for employees of certain subsidiaries and unconsolidated affiliates as selected by the plan committee. The cash-settled plan provides for a number of forms of stock-based compensation, including stock appreciation rights, restricted stock units and performance units, subject to satisfaction of specific performance goals. Stock appreciation rights are granted at not less than 100% of the fair market value closing price of a share of B&W common stock on the date of grant, become exercisable at such time or times as determined when granted and expire not more than seven years after the date of grant. Stock appreciation rights are cash settled for the excess of the market price of B&W common stock on the exercise date minus the exercise price. Restricted stock units and performance units are cash settled upon vesting as determined when granted. We will not issue any shares of B&W common stock under this plan, as all awards are cash settled.
In the event of a change in control of our company, the terms of the awards under the cash-settled plan contain provisions that may cause restrictions to lapse and accelerate the vesting of plan awards.
Total stock-based compensation expense for all of our plans recognized for the years ended December 31, 2013, 2012 and 2011 totaled $16.5 million, $18.3 million and $17.9 million, respectively, with associated tax benefit recognized for the years ended December 31, 2013, 2012 and 2011 totaling $6.2 million, $6.9 million and $6.6 million, respectively.
As of December 31, 2013, total unrecognized estimated compensation expense related to nonvested awards was $13.5 million, net of estimated tax benefits of $8.2 million. The total gross unrecognized estimated compensation expense of $21.7 million is expected to be recognized over a weighted-average period of 1.9 years.
95
B&W Stock Options
The fair value of each option grant was estimated at the date of grant using Black-Scholes, with the following weighted-average assumptions:
Year Ended December 31, |
||||||||||||
2013 | 2012 | 2011 | ||||||||||
Risk-free interest rate |
0.56 | % | 0.65 | % | 1.52 | % | ||||||
Expected volatility |
.33 | .36 | .46 | |||||||||
Expected life of the option in years |
3.93 | 3.98 | 3.75 | |||||||||
Expected dividend yield |
1.19 | % | 0 | % | 0 | % |
The risk-free interest rate is based on the implied yield on a U.S. Treasury zero-coupon issue with a remaining term equal to the expected life of the option. The expected volatility is based on implied volatility from publicly traded options on our common stock, historical volatility of the price of our common stock and other factors. The expected life of the option is based on observed historical patterns. The expected dividend yield is based on the projected annual dividend payment per share divided by the stock price at the date of grant. This amount was zero prior to 2013 because we did not expect to pay dividends at the grant dates for those stock options awarded.
The following table summarizes activity for our stock options for the year ended December 31, 2013 (share data in thousands):
Number of Shares |
Weighted- Average Exercise Price |
Weighted- Average Remaining Contractual Term |
Aggregate Intrinsic Value (in millions) |
|||||||||||||
Outstanding at beginning of period |
1,432 | $ | 25.65 | |||||||||||||
Granted |
1,009 | 27.00 | ||||||||||||||
Exercised |
(241 | ) | 19.68 | |||||||||||||
Cancelled/expired/forfeited |
(226 | ) | 27.36 | |||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Outstanding at end of period |
1,974 | $ | 26.87 | 5.1 Years | $ | 14.6 | ||||||||||
|
|
|
|
|
|
|
|
|||||||||
Exercisable at end of period |
705 | $ | 26.75 | 3.9 Years | $ | 5.4 | ||||||||||
|
|
|
|
|
|
|
|
The aggregate intrinsic value included in the table above represents the total pretax intrinsic value that would have been received by the option holders had all option holders exercised their options on December 31, 2013. The intrinsic value is calculated as the total number of option shares multiplied by the difference between the closing price of our common stock on the last trading day of the period and the exercise price of the options. This amount changes based on the price of our common stock.
The weighted-average fair value of the stock options granted in the years ended December 31, 2013, 2012 and 2011 was $6.41, $7.30 and $12.33, respectively.
During the years ended December 31, 2013, 2012 and 2011, the total intrinsic value of stock options exercised was $2.3 million, $3.8 million and $7.5 million, respectively. The actual tax benefits realized related to the stock options exercised during the year ended December 31, 2013 were $0.2 million.
96
B&W Performance Shares
Nonvested performance shares as of December 31, 2013 and changes during the year ended December 31, 2013 were as follows (share data in thousands):
Number of Shares |
Weighted- Average Grant Date Fair Value |
|||||||
Nonvested at beginning of period |
799 | $ | 29.55 | |||||
Adjustment to assumed vesting percentage |
(223 | ) | 28.02 | |||||
Granted |
426 | 27.10 | ||||||
Vested |
| | ||||||
Cancelled/forfeited |
(168 | ) | 28.06 | |||||
|
|
|
|
|||||
Nonvested at end of period |
834 | $ | 29.07 | |||||
|
|
|
|
The actual number of shares in which each participant vests is dependent upon achievement of certain Return on Invested Capital and Diluted Earnings Per Share targets over three-year performance periods. The number of shares in which participants can vest ranges from zero to 200% of the initial performance shares granted, to be determined upon completion of the three-year performance period. The nonvested shares at the end of the period in the table above assumes weighted-average vesting of 95%.
B&W Restricted Stock Units
Nonvested restricted stock units as of December 31, 2013 and changes during the year ended December 31, 2013 were as follows (share data in thousands):
Number of Shares |
Weighted- Average Grant Date Fair Value |
|||||||
Nonvested at beginning of period |
421 | $ | 26.58 | |||||
Granted |
278 | 27.48 | ||||||
Vested |
(253 | ) | 27.02 | |||||
Cancelled/forfeited |
(61 | ) | 27.42 | |||||
|
|
|
|
|||||
Nonvested at end of period |
385 | $ | 26.78 | |||||
|
|
|
|
Cash-Settled Stock Appreciation Rights
The fair value of each stock appreciation right grant was calculated at the grant date using Black-Scholes and was remeasured at the end of the reporting period with the following weighted-average assumptions:
Year Ended December 31, |
||||||||
2013 | 2012 | |||||||
Risk-free interest rate |
0.77 | % | 0.50 | % | ||||
Expected volatility |
0.30 | 0.32 | ||||||
Expected life of the option in years |
3.21 | 3.55 | ||||||
Expected dividend yield |
1.19 | % | 1.23 | % |
97
The risk-free interest rate is based on the implied yield on a U.S. Treasury zero-coupon issue with a remaining term equal to the expected life of the stock appreciation right. The expected volatility is based on implied volatility from publicly traded options on our common stock, historical volatility of the price of our common stock and other factors. The expected life of the stock appreciation right is based on observed historical patterns and the length of time each award has been outstanding as of each measurement date. The expected dividend yield is based on the projected annual dividend payment per share divided by the stock price at the date of measurement.
The following table summarizes activity for our stock appreciation rights for the year ended December 31, 2013 (unit data in thousands):
Number of Units |
Weighted- Average Exercise Price |
Weighted- Average Remaining Contractual Term |
Aggregate Intrinsic Value (in millions) |
|||||||||||||
Outstanding at beginning of period |
37 | $ | 25.27 | |||||||||||||
Granted |
76 | 26.80 | ||||||||||||||
Exercised |
(7 | ) | 25.42 | |||||||||||||
Cancelled/expired/forfeited |
(10 | ) | 26.39 | |||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Outstanding at end of period |
96 | $ | 26.35 | 6.0 Years | $ | 0.8 | ||||||||||
|
|
|
|
|
|
|
|
|||||||||
Exercisable at end of period |
6 | $ | 25.11 | 5.5 Years | $ | 0.1 | ||||||||||
|
|
|
|
|
|
|
|
The aggregate intrinsic value included in the table above represents the total pretax intrinsic value that would have been received by the stock appreciation rights holders had all holders exercised their rights on December 31, 2013. The intrinsic value is calculated as the total number of stock appreciation rights multiplied by the difference between the closing price of our common stock on the last trading day of the period and the exercise price of the stock appreciation rights. This amount changes based on the price of our common stock.
The weighted-average fair value as of December 31, 2013 for stock appreciation rights granted for the years ended December 31, 2013 and 2012 was $9.92 and $10.26, respectively. The fair value is re-determined at the end of each reporting period for purposes of remeasuring compensation expense associated with these cash-settled awards.
Cash-Settled Performance Units
Nonvested cash-settled performance units as of December 31, 2013 and changes during the year ended December 31, 2013 were as follows (unit data in thousands):
Number of Units |
Weighted- Average Fair Value |
|||||||
Nonvested at beginning of period |
30 | |||||||
Adjustment to assumed vesting percentage |
(6 | ) | ||||||
Granted |
33 | |||||||
Vested |
| |||||||
Cancelled/forfeited |
(6 | ) | ||||||
|
|
|
|
|||||
Nonvested at end of period |
51 | $ | 34.19 | |||||
|
|
|
|
The actual number of units in which each participant vests is dependent upon achievement of certain Return on Invested Capital and Diluted Earnings Per Share targets over three-year performance periods. The number of units in which participants can vest ranges from zero to 200% of the initial performance units granted, to be determined upon completion of the three-year performance period. The nonvested shares at the end of the period in the table above assumes weighted-average vesting of 90%.
98
The weighted-average fair value for these cash-settled awards is based on our closing stock price as of December 31, 2013. The fair value is re-determined at the end of each reporting period for purposes of remeasuring compensation expense associated with these cash-settled awards.
Cash-Settled Restricted Stock Units
Nonvested restricted stock units as of December 31, 2013 and changes during the year ended December 31, 2013 were as follows (unit data in thousands):
Number of Units |
Weighted- Average Fair Value |
|||||||
Nonvested at beginning of period |
14 | |||||||
Granted |
16 | |||||||
Vested |
(5 | ) | ||||||
Cancelled/forfeited |
(2 | ) | ||||||
|
|
|
|
|||||
Nonvested at end of period |
23 | $ | 34.19 | |||||
|
|
|
|
The weighted-average fair value for these cash-settled awards is based on our closing stock price as of December 31, 2013. The fair value is re-determined at the end of each reporting period for purposes of remeasuring compensation expense associated with these cash-settled awards.
Thrift Plan
On August 13, 2010, 5,000,000 of the authorized and unissued shares of B&W common stock were reserved for issuance for the employer match to the Thrift Plan. Those matching employer contributions equal 50% of the first 6% of compensation, as defined in the Thrift Plan, contributed by participants, and fully vest and are nonforfeitable after three years of service or upon retirement, death, lay-off or approved disability. The Thrift Plan allows employees to sell their interest in B&Ws common stock fund at any time, except as limited by applicable securities laws and regulations. During the year ended December 31, 2013, we issued 464,451 shares of B&Ws common stock as employer contributions pursuant to the Thrift Plan. At December 31, 2013, 3,257,219 shares of B&Ws common stock remained available for issuance under the Thrift Plan.
NOTE 11 COMMITMENTS AND CONTINGENCIES
Investigations and Litigation
Apollo and Parks Township
In January 2010, Michelle McMunn, Cara D. Steele and Yvonne Sue Robinson filed suit against Babcock & Wilcox Power Generation Group, Inc. (B&W PGG), Babcock & Wilcox Technical Services Group, Inc., formerly known as B&W Nuclear Environmental Services, Inc. (the B&W Parties) and Atlantic Richfield Company (ARCO) in the United States District Court for the Western District of Pennsylvania. Since January 2010, additional suits have been filed by additional plaintiffs and there are currently fourteen lawsuits pending in the U.S. District Court for the Western District of Pennsylvania against the B&W Parties and ARCO. Following the June 2012 dismissal of a number of claims, ten additional primary claims were filed on February 4, 2013, followed by the filing of two additional primary claims on May 17, 2013 and eight additional primary claims on October 21, 2013. In total, the suits presently involve approximately 95 primary claimants alleging, among other things, personal injuries and property damage as a result of alleged releases of radioactive material relating to the operation, remediation, and/or decommissioning of two former nuclear fuel processing facilities located in Apollo Borough and Parks Township, Pennsylvania (collectively, the Apollo and Parks Litigation). Those facilities previously were owned by Nuclear Materials and Equipment Company, a former subsidiary of ARCO (NUMEC), which was acquired by B&W PGG. The plaintiffs in the Apollo and Parks Litigation seek compensatory and punitive damages. All of the suits, except for the most recent filings, have been consolidated for non-dispositive pre-trial matters. Fact discovery in the Apollo and Parks Litigation is closed except with regard to the most recent eight primary claims. No trial date has been set.
99
At the time of ARCOs sale of NUMEC stock to B&W PGG, B&W PGG received an indemnity and hold harmless agreement from ARCO with respect to claims and liabilities arising prior to or as a result of conduct or events predating the acquisition.
Insurance coverage and/or the ARCO indemnity currently provides coverage for the claims alleged in the Apollo and Parks Litigation, although no assurance can be given that insurance and/or the indemnity will be available or sufficient in the event of liability, if any.
The B&W Parties and ARCO were defendants in a prior litigation filed in 1994 relating to the operation of the Apollo Borough and Parks Township facilities in the matter of Donald F. Hall and Mary Ann Hall, et al., v. Babcock & Wilcox Company, et al. (the Hall Litigation). In 1998, the B&W Parties settled all then-pending and future punitive damage claims in the Hall Litigation for $8.0 million and sought reimbursement from third parties, including its insurers, American Nuclear Insurers and Mutual Atomic Energy Liability Underwriters (ANI). In 2008, ARCO settled the Hall Litigation with the plaintiffs for $27.5 million. The B&W Parties then settled the Hall Litigation in 2009 for $52.5 million, settling approximately 250 personal injury and wrongful death claims, as well as approximately 125 property damage claims, alleging damages as a result of alleged releases involving the facilities. ARCO and the B&W Parties retained their insurance rights against ANI in their respective settlements; however, under a related settlement regarding ARCOs indemnification of B&W PGG relating to the two facilities, ARCO assigned to the B&W Parties 58.33% of the total of all ARCOs proceeds/amounts recovered against ANI on account of the Hall Litigation.
The B&W Parties sought recovery from ANI for amounts paid by the B&W Parties to settle the Hall Litigation, along with unreimbursed attorneys fees, allocated amounts assigned by ARCO to the B&W Parties, and applicable interest based upon ANIs breach of contract and bad faith conduct in the matter of The Babcock & Wilcox Company et al. v. American Nuclear Insurers, et al. (the ANI Litigation). ARCO also sought recovery against ANI in the ANI Litigation, which has been pending before the Court of Common Pleas of Allegheny County, Pennsylvania.
In September 2011, a jury returned a verdict in the ANI Litigation, finding that the B&W Parties settlement of the Hall Litigation for $52.5 million and ARCOs settlement for $27.5 million were fair and reasonable. Following the verdict, in February 2012, the B&W Parties, ARCO and ANI entered into an agreement in which the parties agreed to the dismissal with prejudice of all remaining claims pending in the ANI Litigation, excluding the B&W Parties and ARCOs claims seeking reimbursement from ANI for the $52.5 million and $27.5 million settlements (plus interest) (the Settlement Claims). By agreement, ANI also waived: (1) any and all rights to appeal the September 2011 jury verdict on the basis of the trial courts evidentiary rulings; and (2) any defenses and arguments of any kind except ANIs position that it was not required to reimburse the B&W Parties and ARCO for their settlements under the provisions of the ANI policies. In February 2012, the Court granted the parties proposed order implementing their agreement and entered final judgment in favor of the B&W Parties and ARCO on the Settlement Claims. As part of the final order and judgment, the Court ruled that the B&W Parties and ARCO are entitled to pre-judgment interest on their $52.5 million and $27.5 million settlements, in the amounts of approximately $8.8 million and $6.2 million, respectively. In addition, post-verdict interest from the date of the jury verdict was awarded at 6%. In March 2012, ANI filed a notice of appeal as to the final judgment and a supersedeas appeal bond in the amount of 120% of the total final judgment amount. The parties filed their respective briefs with the Superior Court and oral arguments were held October 31, 2012.
In July 2013, the Superior Court reversed the judgment of the trial court with instructions to reconsider the issue of the Settlement Claims under a different standard. In August 2013, B&W and ARCO filed a request for appeal of the Superior Courts decision to the Pennsylvania Supreme Court. On January 24, 2014, the Supreme Court of Pennsylvania granted B&W and ARCOs request for appeal. The parties briefs on the appeal are due March 31, 2014, but the date for oral arguments has not been set. B&W has not recognized any amounts claimed in the ANI Litigation in its financial statements due to the uncertainty surrounding the ultimate amount to be realized.
100
Berlin Station
Our subsidiary, Babcock & Wilcox Construction Co., Inc. (BWCC), is currently in a dispute with a customer in connection with a 75MW biomass-energy power plant that BWCC designed and built in Berlin, New Hampshire. The dispute primarily concerns (1) material claims by BWCC against its customer for contract changes relating to schedule delays, delay costs and extra work and (2) whether liquidated damages for delay (Delay LDs) are due to the customer under the contract. The customer contends it is owed Delay LDs, capped under the terms of the contract at approximately $18.7 million, and has made two partial draws (approximately $3.3 million related to the period commencing October 16, 2013 through December 31, 2013 and $1.3 million for the period from January 1, 2014 through January 31, 2014, for a total of approximately $4.6 million) against $44 million of letters of credit from BWCC. BWCC has asserted that substantial completion has been achieved and that any further delays to completion of the project, beyond the delays already caused by the customer during construction or otherwise excusable under the contract are the result of the customers failure to supply wood fuel complying with the contract specifications. BWCCs aggregate liquidated damages cap under the contract is approximately $37.4 million, which includes an additional $18.7 million cap for performance LDs. There is a risk that the customer will attempt to call all or part of the letters of credit during the pendency of this matter. We believe any such call would be wrongful and entitle us to return of the funds and other damages. Nevertheless, we have made provisions in our financial statements totaling $7.8 million based on Delay LDs called to date and managements estimation of further calls against the letters of credit and have not recorded offsetting claims revenue in our financial statements.
Following the customers denial of BWCCs change order request relating to schedule delays, delay costs and extra work, on January 16, 2014, BWCC filed suit against the customer in the Court of Common Pleas, Summit County, Ohio, Case No. 2014 01 0208, seeking damages in excess of $37 million. In addition, BWCC has submitted claims based on the customers failure to supply wood fuel complying with the contract specifications that has resulted (and continues to result) in further delays, reduced plant performance abilities and damage to plant equipment. BWCCs suit asserts counts including the customers breach of contract, fraud, constructive fraud, negligent misrepresentation, fraudulent inducement and fraudulent concealment. On or about January 30, 2014, BWCCs customer filed suit against BWCC in the Superior Court of Coos County, New Hampshire, Case No. 214-2014-CV-14 alleging breach of contract and seeking unspecified amounts.
We believe BWCC has sound legal and factual bases for its claims. BWCC intends to aggressively pursue recovery on its claims, including recovery of the wrongful calls against BWCCs letters of credit. However, it is premature to predict the outcome of this matter. The litigation could be lengthy, and if BWCCs customer were to prevail completely or substantially in this matter, the outcome could have a material adverse effect on our financial statements.
Other Litigation and Settlements
Additionally, due to the nature of our business, we are, from time to time, involved in routine litigation or subject to disputes or claims related to our business activities, including, among other things:
| performance- or warranty-related matters under our customer and supplier contracts and other business arrangements; and |
| workers compensation claims, premises liability claims and other claims. |
Based upon our prior experience, we do not expect that any of these other litigation proceedings, disputes and claims will have a material adverse effect on our consolidated financial condition, results of operations or cash flows.
Environmental Matters
We have been identified as a potentially responsible party at various cleanup sites under the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). CERCLA and other environmental laws can impose liability for the entire cost of cleanup on any of the potentially responsible parties, regardless of fault or the lawfulness of the original conduct. Generally, however, where there are multiple responsible parties, a final allocation of costs is made based on the amount and type of wastes disposed of by each party and the number of financially viable parties, although this may not be the case with respect to any particular site. We have not been determined to be a major contributor of wastes to any of these sites. On the basis of our relative contribution of waste to each site, we expect our share of the ultimate liability for the various sites will not have a material adverse effect on our consolidated financial condition, results of operations or cash flows in any given year.
101
The Department of Environmental Protection of the Commonwealth of Pennsylvania (PADEP) advised us in March 1994 that it would seek monetary sanctions and remedial and monitoring relief related to the clean-up sites located in Parks Township, Pennsylvania (the Parks Facilities). The relief sought is related to potential groundwater contamination resulting from previous operations at the facilities. These facilities are currently owned by a subsidiary in our Nuclear Operations segment. PADEP has advised us that it does not intend to assess any monetary sanctions, provided our Nuclear Operations segment continues its remediation program for the Parks Facilities. Whether additional nonradiation contamination remediation will be required at the Parks Facilities remains unclear. Results from sampling completed by our Nuclear Operations segment have indicated that such remediation may not be necessary. Our Nuclear Operations segment continues to evaluate closure of the groundwater issues pursuant to applicable Pennsylvania law.
We perform significant amounts of work for the U.S. Government under both prime contracts and subcontracts and operate certain facilities that are licensed to possess and process special nuclear materials. As a result of these activities, we are subject to continuing reviews by governmental agencies, including the U.S. Environmental Protection Agency and the NRC.
The NRCs decommissioning regulations require our Nuclear Operations segment to provide financial assurance that it will be able to pay the expected cost of decommissioning each of its licensed facilities at the end of its service life. We provided financial assurance aggregating $47.2 million during the year ended December 31, 2013 with existing letters of credit for the ultimate decommissioning of these licensed facilities. These two facilities have provisions in their government contracts pursuant to which substantially all of our decommissioning costs and financial assurance obligations are covered by the DOE, including the costs to complete the decommissioning projects underway at the facility in Erwin, Tennessee. These letters of credit are to cover decommissioning required pursuant to work not subject to this DOE obligation.
Our compliance with U.S. federal, state and local environmental control and protection regulations resulted in pretax charges of approximately $13.1 million in the year ended December 31, 2013. In addition, compliance with existing environmental regulations necessitated capital expenditures of $1.1 million in the year ended December 31, 2013. At December 31, 2013 and 2012, we had total environmental accruals (including provisions for the facilities discussed above) of $58.1 million and $49.6 million, respectively. Of our total environmental accruals at December 31, 2013 and 2012, $4.7 million and $3.1 million, respectively, were included in current liabilities. Inherent in the estimates of those accruals and recoveries are our expectations regarding the levels of contamination, decommissioning costs and recoverability from other parties, which may vary significantly as decommissioning activities progress. Accordingly, changes in estimates could result in material adjustments to our operating results, and the ultimate loss may differ materially from the amounts that we have provided for in our consolidated financial statements.
Operating Leases
Future minimum payments required under operating leases that have initial or remaining noncancellable lease terms in excess of one year at December 31, 2013 are as follows (in thousands):
Fiscal Year Ending December 31, |
Amount | |||
2014 |
$ | 10,814 | ||
2015 |
$ | 8,291 | ||
2016 |
$ | 5,496 | ||
2017 |
$ | 4,962 | ||
2018 |
$ | 4,281 | ||
Thereafter |
$ | 5,605 |
Total rental expense for the years ended December 31, 2013, 2012 and 2011 was $11.6 million, $12.1 million and $11.1 million, respectively. These expense amounts include contingent rentals and are net of sublease income, neither of which is material.
102
NOTE 12 RISKS AND UNCERTAINTIES
Percentage-of-Completion Accounting
As of December 31, 2013, in accordance with the percentage-of-completion method of accounting, we have provided for our estimated costs to complete all of our ongoing contracts. However, it is possible that current estimates could change due to unforeseen events, which could result in adjustments to overall contract costs. The risk on fixed-priced contracts is that revenue from the customer does not cover increases in our costs. It is possible that current estimates could materially change for various reasons, including, but not limited to, fluctuations in forecasted labor productivity or steel and other raw material prices. Increases in costs on our fixed-price contracts could have a material adverse impact on our consolidated financial condition, results of operations and cash flows. Alternatively, reductions in overall contract costs at completion could materially improve our consolidated financial condition, results of operations and cash flows.
Insurance
Upon the February 22, 2006 effectiveness of the settlement relating to the Chapter 11 proceedings involving several of our subsidiaries, most of our subsidiaries contributed substantial insurance rights to the asbestos personal injury trust, including rights to (1) certain pre-1979 primary and excess insurance coverages and (2) certain of our 1979-1986 excess insurance coverage. These insurance rights provided coverage for, among other things, asbestos and other personal injury claims, subject to the terms and conditions of the policies. The contribution of these insurance rights was made in exchange for the agreement on the part of the representatives of the asbestos claimants, including the representative of future claimants, to the entry of a permanent injunction, pursuant to Section 524(g) of the U.S. Bankruptcy Code, to channel to the asbestos trust all asbestos-related claims against our subsidiaries and former subsidiaries arising out of, resulting from or attributable to their operations, and the implementation of related releases and indemnification provisions protecting those subsidiaries and their affiliates from future liability for such claims. Although we are not aware of any significant, unresolved claims against our subsidiaries and former subsidiaries that are not subject to the channeling injunction and that relate to the periods during which such excess insurance coverage related, with the contribution of these insurance rights to the asbestos personal injury trust, it is possible that we could have underinsured or uninsured exposure for non-derivative asbestos claims or other personal injury or other claims that would have been insured under these coverages had the insurance rights not been contributed to the asbestos personal injury trust.
NOTE 13 FINANCIAL INSTRUMENTS WITH CONCENTRATIONS OF CREDIT RISK
Our Power Generation and Nuclear Energy segments major customers are large utilities. The primary customer of our Nuclear Operations segment is the U.S. Government, including some of its contractors. These concentrations of customers may impact our overall exposure to credit risk, either positively or negatively, in that our customers may be similarly affected by changes in economic or other conditions. In the years ended December 31, 2013, 2012 and 2011, the U.S. Government accounted for approximately 38%, 34% and 38%, respectively, of our total revenues. Accounts receivable due directly or indirectly from the U.S. Government represented 20% and 26% of net receivables at December 31, 2013 and December 31, 2012, respectively. See Note 17 for additional information about our operations in different geographic areas.
We believe that our provision for possible losses on uncollectible accounts receivable is adequate for our credit loss exposure. At December 31, 2013 and 2012, the allowance for possible losses that we deducted from accounts receivable trade on the accompanying consolidated balance sheets was $3.6 million and $3.8 million, respectively.
103
NOTE 14 INVESTMENTS
The following is a summary of our available-for-sale securities at December 31, 2013:
Amortized Cost |
Gross Unrealized Gains |
Gross Unrealized Losses |
Estimated Fair Value |
|||||||||||||
(In thousands) | ||||||||||||||||
U.S. Government and agency securities |
$ | 2,999 | $ | 1 | $ | | $ | 3,000 | ||||||||
Mutual funds |
3,752 | 249 | | 4,001 | ||||||||||||
Asset-backed securities and collateralized mortgage obligations |
472 | 8 | (55 | ) | 425 | |||||||||||
Commercial paper |
7,748 | | | 7,748 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total |
$ | 14,971 | $ | 258 | $ | (55 | ) | $ | 15,174 | |||||||
|
|
|
|
|
|
|
|
The following is a summary of our available-for-sale securities at December 31, 2012:
Amortized Cost |
Gross Unrealized Gains |
Gross Unrealized Losses |
Estimated Fair Value |
|||||||||||||
(In thousands) | ||||||||||||||||
U.S. Government and agency securities |
$ | 21,436 | $ | 10 | $ | | $ | 21,446 | ||||||||
Mutual funds |
2,958 | 679 | | 3,637 | ||||||||||||
Asset-backed securities and collateralized mortgage obligations |
554 | 2 | (102 | ) | 454 | |||||||||||
Commercial paper |
67,313 | 9 | | 67,322 | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total |
$ | 92,261 | $ | 700 | $ | (102 | ) | $ | 92,859 | |||||||
|
|
|
|
|
|
|
|
Proceeds, gross realized gains and gross realized losses on sales of available-for-sale securities were as follows:
Proceeds | Gross Realized Gains |
Gross Realized Losses |
||||||||||
(In thousands) | ||||||||||||
Year Ended December 31, 2013 |
$ | 168,879 | $ | 1,127 | $ | | ||||||
Year Ended December 31, 2012 |
$ | 247,649 | $ | 35 | $ | | ||||||
Year Ended December 31, 2011 |
$ | 147,288 | $ | | $ | 5 |
NOTE 15 DERIVATIVE FINANCIAL INSTRUMENTS
Our global operations give rise to exposure to market risks from changes in foreign currency exchange (FX) rates. We use derivative financial instruments, primarily FX forward contracts, to reduce the impact of changes in FX rates on our operating results. We use these instruments primarily to hedge our exposure associated with revenues or costs on our long-term contracts that are denominated in currencies other than our operating entities functional currencies. We do not hold or issue derivative financial instruments for trading or other speculative purposes.
We enter into derivative financial instruments primarily as hedges of certain firm purchase and sale commitments denominated in foreign currencies. We record these contracts at fair value on our consolidated balance sheets. Depending on the hedge designation at the inception of the contract, the related gains and losses on these contracts are either deferred in stockholders equity as a component of accumulated other comprehensive income, until the hedged item is recognized in earnings, or offset against the change in fair value of the hedged firm commitment through earnings. Any ineffective portion of a derivatives change in fair value and any portion excluded from the assessment of effectiveness are immediately recognized in other net on our consolidated statements of income. The gain or loss on a derivative instrument not designated as a hedging instrument is also immediately recognized in earnings. Gains and losses on derivative financial instruments that require immediate recognition are included as a component of other net in our consolidated statements of income.
104
We have designated all of our FX forward contracts that qualify for hedge accounting as cash flow hedges. The hedged risk is the risk of changes in functional-currency-equivalent cash flows attributable to changes in FX spot rates of forecasted transactions related to long-term contracts. We exclude from our assessment of effectiveness the portion of the fair value of the forward contracts attributable to the difference between FX spot rates and FX forward rates. At December 31, 2013, we had deferred approximately $0.6 million of net gains on these derivative financial instruments in accumulated other comprehensive income. Assuming current market conditions continue, we expect to recognize substantially all of this amount in the next twelve months.
At December 31, 2013, substantially all of our derivative financial instruments consisted of FX forward contracts. The notional value of our FX forward contracts totaled $78.8 million at December 31, 2013, with maturities extending to December 2016. These instruments consist primarily of contracts to purchase or sell Canadian Dollars. We are exposed to credit-related losses in the event of nonperformance by counterparties to derivative financial instruments. We attempt to mitigate this risk by using major financial institutions with high credit ratings. The counterparties to all of our FX forward contracts are financial institutions included in our credit facility. Our hedge counterparties have the benefit of the same collateral arrangements and covenants as described under our credit facility.
The following tables summarize our derivative financial instruments at December 31, 2013 and 2012:
Asset and Liability Derivatives | ||||||||
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Derivatives Designated as Hedges: |
||||||||
Foreign Exchange Contracts: |
||||||||
Location |
||||||||
Accounts receivable-other |
$ | 1,139 | $ | 2,251 | ||||
Other assets |
$ | 94 | $ | 3,777 | ||||
Accounts payable |
$ | 581 | $ | 1,893 | ||||
Other liabilities |
$ | 603 | $ | 29 | ||||
Derivatives Not Designated as Hedges: |
||||||||
Foreign Exchange Contracts: |
||||||||
Location |
||||||||
Accounts receivable-other |
$ | 464 | $ | | ||||
Other assets |
$ | 50 | $ | 191 | ||||
Accounts payable |
$ | 10 | $ | 962 | ||||
Stock Warrants: |
||||||||
Location |
||||||||
Other assets |
$ | | $ | 317 |
105
The effects of derivatives on our financial statements are outlined below:
December 31, | ||||||||
2013 | 2012 | |||||||
(In thousands) | ||||||||
Derivatives Designated as Hedges: |
||||||||
Cash Flow Hedges: |
||||||||
Foreign Exchange Contracts: |
||||||||
Amount of gain (loss) recognized in other comprehensive income |
$ | (5,936 | ) | $ | 2,031 | |||
Gain (loss) reclassified from accumulated other comprehensive income into earnings: effective portion |
||||||||
Location | ||||||||
Revenues |
$ | (1,885 | ) | $ | (1,082 | ) | ||
Cost of operations |
$ | (2,174 | ) | $ | 3,833 | |||
Other-net |
$ | 144 | $ | (24 | ) | |||
Loss recognized in income: portion excluded from effectiveness testing |
||||||||
Location | ||||||||
Other-net |
$ | (349 | ) | $ | (185 | ) | ||
Derivatives Not Designated as Hedges: |
||||||||
Forward Contracts: |
||||||||
Gain (loss) recognized in income |
||||||||
Location | ||||||||
Other-net |
$ | 96 | $ | (169 | ) | |||
Stock Warrants: |
||||||||
Loss recognized in income |
||||||||
Location | ||||||||
Other-net |
$ | (317 | ) | $ | (560 | ) |
NOTE 16 FAIR VALUE MEASUREMENTS
FASB Topic Fair Value Measurements and Disclosures defines fair value as the price that would be received to sell an asset or paid to transfer a liability (an exit price) in an orderly transaction between market participants at the measurement date. This topic also sets forth the disclosure requirements regarding fair value and establishes a hierarchy for valuation inputs that emphasizes the use of observable inputs when measuring fair value. A financial instruments categorization within the fair value hierarchy is based upon the lowest level of input that is significant to the fair value measurement. The fair value hierarchy established by this topic is as follows:
| Level 1 inputs are based upon quoted prices for identical instruments traded in active markets. |
| Level 2 inputs are based upon quoted prices for similar instruments in active markets, quoted prices for similar or identical instruments in inactive markets and model-based valuation techniques for which all significant assumptions are observable in the market or can be corroborated by observable market data for substantially the full term of the assets and liabilities. |
| Level 3 inputs are generally unobservable and typically reflect managements estimates of assumptions that market participants would use in pricing the asset or liability. The fair values are therefore determined using model-based techniques that include option pricing models, discounted cash flow models and similar valuation techniques. |
The following sections describe the valuation methodologies we use to measure the fair values of our available-for-sale securities, derivatives and nonrecurring fair value measurements.
106
Available-for-Sale-Securities
Investments other than derivatives primarily include U.S. Government and agency securities, money-market funds, mortgage-backed securities and corporate notes and bonds.
In general, and where applicable, we principally use a composite of observable prices and quoted prices in active markets for identical assets or liabilities to determine fair value. This pricing methodology applies to our Level 1 and Level 2 investments.
Our investments are currently in an unrealized gain position totaling approximately $0.2 million at December 31, 2013. At December 31, 2012, we had an unrealized gain on our investments totaling approximately $0.6 million. Based on our analysis of these investments, we believe that none of our available-for-sale securities were other than temporarily impaired at December 31, 2013.
Fair Value Measurements
The following is a summary of our available-for-sale securities measured at fair value at December 31, 2013:
12/31/13 | Level 1 | Level 2 | Level 3 | |||||||||||||
(In thousands) | ||||||||||||||||
Mutual funds |
$ | 4,001 | $ | | $ | 4,001 | $ | | ||||||||
U.S. Government and agency securities |
3,000 | 3,000 | | | ||||||||||||
Asset-backed securities and collateralized mortgage obligations |
425 | | 425 | | ||||||||||||
Commercial paper |
7,748 | | 7,748 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total |
$ | 15,174 | $ | 3,000 | $ | 12,174 | $ | | ||||||||
|
|
|
|
|
|
|
|
The following is a summary of our available-for-sale securities measured at fair value at December 31, 2012:
12/31/12 | Level 1 | Level 2 | Level 3 | |||||||||||||
(In thousands) | ||||||||||||||||
Mutual funds |
$ | 3,637 | $ | | $ | 3,637 | $ | | ||||||||
U.S. Government and agency securities |
21,446 | 21,446 | | | ||||||||||||
Asset-backed securities and collateralized mortgage obligations |
454 | | 454 | | ||||||||||||
Commercial paper |
67,322 | | 67,322 | | ||||||||||||
|
|
|
|
|
|
|
|
|||||||||
Total |
$ | 92,859 | $ | 21,446 | $ | 71,413 | $ | | ||||||||
|
|
|
|
|
|
|
|
We estimate the fair value of investments based on quoted market prices. For investments for which there are no quoted market prices, we derive fair values from available yield curves for investments of similar quality and terms.
Derivatives
Level 2 derivative assets and liabilities currently consist of FX forward contracts. Where applicable, the value of these derivative assets and liabilities is computed by discounting the projected future cash flow amounts to present value using market-based observable inputs, including FX forward and spot rates, interest rates and counterparty performance risk adjustments. At December 31, 2013 and 2012, we had forward contracts outstanding to purchase or sell foreign currencies, primarily Canadian Dollars, with a total fair value of $0.6 million and $3.3 million, respectively.
107
Other Financial Instruments
We used the following methods and assumptions in estimating our fair value disclosures for our other financial instruments, as follows:
Cash and cash equivalents and restricted cash and cash equivalents. The carrying amounts that we have reported in the accompanying consolidated balance sheets for cash and cash equivalents and restricted cash and cash equivalents approximate their fair values due to their highly liquid nature.
Long- and short-term debt. We base the fair values of debt instruments on quoted market prices. Where quoted prices are not available, we base the fair values on the present value of future cash flows discounted at estimated borrowing rates for similar debt instruments or on estimated prices based on current yields for debt issues of similar quality and terms. The fair value of our debt instruments approximated their carrying value at December 31, 2013 and December 31, 2012.
NOTE 17 SEGMENT REPORTING
Our reportable segments are Power Generation, Nuclear Operations, Technical Services, Nuclear Energy and mPower, as described in Note 1. In connection with our segment reporting change we have revised historical amounts to conform to our current segment presentation.
The operations of our segments are managed separately and each has unique technology, services and customer class. We account for intersegment sales at prices that we generally establish by reference to similar transactions with unaffiliated customers. Reportable segments are measured based on operating income exclusive of general corporate expenses, contract and insurance claims provisions, legal expenses and gains (losses) on sales of corporate assets.
1. Information about Operations in our Different Industry Segments:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
REVENUES (1): |
||||||||||||
Power Generation |
$ | 1,767,651 | $ | 1,785,959 | $ | 1,541,509 | ||||||
Nuclear Operations |
1,167,683 | 1,098,031 | 1,043,185 | |||||||||
Technical Services |
104,254 | 107,851 | 119,711 | |||||||||
Nuclear Energy |
283,857 | 325,655 | 321,469 | |||||||||
mPower |
1,523 | 326 | 1,325 | |||||||||
Adjustments and Eliminations |
(55,760 | ) | (26,463 | ) | (75,159 | ) | ||||||
|
|
|
|
|
|
|||||||
$ | 3,269,208 | $ | 3,291,359 | $ | 2,952,040 | |||||||
|
|
|
|
|
|
(1) | Segment revenues are net of the following intersegment transfers and other adjustments: |
Power Generation Transfers |
$ | 37,552 | $ | 7,932 | $ | 53,852 | ||||||
Nuclear Operations Transfers |
6,773 | 6,015 | 5,860 | |||||||||
Technical Services Transfers |
3,817 | 3,496 | 2,155 | |||||||||
Nuclear Energy Transfers |
7,618 | 8,992 | 11,928 | |||||||||
mPower Transfers |
| 28 | 1,364 | |||||||||
|
|
|
|
|
|
|||||||
$ | 55,760 | $ | 26,463 | $ | 75,159 | |||||||
|
|
|
|
|
|
108
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
OPERATING INCOME: |
||||||||||||
Power Generation |
$ | 155,837 | $ | 183,387 | $ | 183,984 | ||||||
Nuclear Operations |
237,855 | 226,269 | 194,438 | |||||||||
Technical Services |
58,234 | 59,655 | 69,915 | |||||||||
Nuclear Energy |
8,641 | 50,649 | (20,777 | ) | ||||||||
mPower |
(81,304 | ) | (113,528 | ) | (96,110 | ) | ||||||
|
|
|
|
|
|
|||||||
$ | 379,263 | $ | 406,432 | $ | 331,450 | |||||||
|
|
|
|
|
|
|||||||
Unallocated Corporate(1) |
(26,039 | ) | (27,953 | ) | (20,361 | ) | ||||||
Special Charges for Restructuring Activities |
(39,599 | ) | | | ||||||||
Mark to Market Adjustment |
222,737 | (31,890 | ) | (215,418 | ) | |||||||
|
|
|
|
|
|
|||||||
Total Operating Income(2) |
$ | 536,362 | $ | 346,589 | $ | 95,671 | ||||||
|
|
|
|
|
|
|||||||
Other Income (Expense): |
||||||||||||
Interest income |
1,443 | 1,491 | 1,342 | |||||||||
Interest expense |
(3,115 | ) | (3,735 | ) | (4,543 | ) | ||||||
Other - net |
(17,517 | ) | (24,927 | ) | 2,028 | |||||||
|
|
|
|
|
|
|||||||
Total Other Expense |
(19,189 | ) | (27,171 | ) | (1,173 | ) | ||||||
|
|
|
|
|
|
|||||||
Income before Provision for Income Taxes |
$ | 517,173 | $ | 319,418 | $ | 94,498 | ||||||
|
|
|
|
|
|
|||||||
(1) Unallocated corporate includes general corporate overhead not allocated to segments |
||||||||||||
(2) Included in operating income is the following: |
||||||||||||
(Gains) Losses on Asset Disposals Net: |
||||||||||||
Power Generation |
$ | 1,181 | $ | 3,276 | $ | (3,456 | ) | |||||
Nuclear Operations |
163 | (339 | ) | | ||||||||
Technical Services |
| (1,517 | ) | | ||||||||
Nuclear Energy |
(28 | ) | (1 | ) | 96 | |||||||
mPower |
| | | |||||||||
Unallocated Corporate |
(267 | ) | | 273 | ||||||||
|
|
|
|
|
|
|||||||
$ | 1,049 | $ | 1,419 | $ | (3,087 | ) | ||||||
|
|
|
|
|
|
|||||||
Equity in Income of Investees: |
||||||||||||
Power Generation |
$ | 18,388 | $ | 17,402 | $ | 25,778 | ||||||
Nuclear Operations |
| | | |||||||||
Technical Services |
50,281 | 49,621 | 52,877 | |||||||||
Nuclear Energy |
(611 | ) | (314 | ) | | |||||||
mPower |
| | | |||||||||
|
|
|
|
|
|
|||||||
$ | 68,058 | $ | 66,709 | $ | 78,655 | |||||||
|
|
|
|
|
|
109
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
SEGMENT ASSETS: |
||||||||||||
Power Generation |
$ | 970,718 | $ | 1,059,824 | $ | 1,325,959 | ||||||
Nuclear Operations |
778,203 | 708,607 | 679,818 | |||||||||
Technical Services |
120,559 | 125,494 | 123,717 | |||||||||
Nuclear Energy |
439,325 | 391,096 | 346,759 | |||||||||
mPower |
21,790 | 10,137 | 399 | |||||||||
|
|
|
|
|
|
|||||||
Total Segment Assets |
2,330,595 | 2,295,158 | 2,476,652 | |||||||||
Corporate Assets |
278,558 | 545,197 | 312,459 | |||||||||
|
|
|
|
|
|
|||||||
Total Assets |
$ | 2,609,153 | $ | 2,840,355 | $ | 2,789,111 | ||||||
|
|
|
|
|
|
|||||||
CAPITAL EXPENDITURES: |
||||||||||||
Power Generation |
$ | 15,280 | $ | 24,592 | $ | 15,788 | ||||||
Nuclear Operations |
31,572 | 44,810 | 32,082 | |||||||||
Technical Services |
98 | | | |||||||||
Nuclear Energy |
5,506 | 5,881 | 7,257 | |||||||||
mPower |
2,854 | 2,554 | | |||||||||
|
|
|
|
|
|
|||||||
Segment Capital Expenditures |
55,310 | 77,837 | 55,127 | |||||||||
Corporate Capital Expenditures |
9,640 | 8,798 | 8,747 | |||||||||
|
|
|
|
|
|
|||||||
Total Capital Expenditures |
$ | 64,950 | $ | 86,635 | $ | 63,874 | ||||||
|
|
|
|
|
|
|||||||
DEPRECIATION AND AMORTIZATION: |
||||||||||||
Power Generation |
$ | 23,892 | $ | 19,126 | $ | 17,264 | ||||||
Nuclear Operations |
26,975 | 32,013 | 38,169 | |||||||||
Technical Services |
185 | 244 | 262 | |||||||||
Nuclear Energy |
6,520 | 5,923 | 5,346 | |||||||||
mPower |
554 | 279 | | |||||||||
|
|
|
|
|
|
|||||||
Segment Depreciation and Amortization |
58,126 | 57,585 | 61,041 | |||||||||
Corporate Depreciation and Amortization |
12,399 | 12,112 | 11,962 | |||||||||
|
|
|
|
|
|
|||||||
Total Depreciation and Amortization |
$ | 70,525 | $ | 69,697 | $ | 73,003 | ||||||
|
|
|
|
|
|
|||||||
INVESTMENT IN UNCONSOLIDATED AFFILIATES: |
||||||||||||
Power Generation |
$ | 144,475 | $ | 139,399 | $ | 124,686 | ||||||
Nuclear Operations |
| | | |||||||||
Technical Services |
40,329 | 46,928 | 38,882 | |||||||||
Nuclear Energy |
27 | 27 | | |||||||||
mPower |
| | | |||||||||
|
|
|
|
|
|
|||||||
Total Investment in Unconsolidated Affiliates |
$ | 184,831 | $ | 186,354 | $ | 163,568 | ||||||
|
|
|
|
|
|
110
2. Information about our Product and Service Lines:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
REVENUES: |
||||||||||||
Power Generation: |
||||||||||||
New Build Environmental Equipment |
$ | 434,228 | $ | 446,514 | $ | 235,750 | ||||||
New Build Steam Generation Systems |
454,277 | 511,201 | 416,779 | |||||||||
Aftermarket Services |
885,185 | 841,571 | 894,677 | |||||||||
Eliminations/Other |
(6,039 | ) | (13,327 | ) | (5,697 | ) | ||||||
|
|
|
|
|
|
|||||||
1,767,651 | 1,785,959 | 1,541,509 | ||||||||||
|
|
|
|
|
|
|||||||
Nuclear Operations: |
||||||||||||
Nuclear Component Program |
1,153,216 | 1,086,081 | 1,025,838 | |||||||||
Commercial Operations |
7,681 | 5,908 | 11,674 | |||||||||
Eliminations/Other |
6,786 | 6,042 | 5,673 | |||||||||
|
|
|
|
|
|
|||||||
1,167,683 | 1,098,031 | 1,043,185 | ||||||||||
|
|
|
|
|
|
|||||||
Technical Services: |
||||||||||||
Commercial Operations |
21,227 | 20,819 | 29,708 | |||||||||
Nuclear Environmental Services |
73,043 | 78,228 | 76,267 | |||||||||
Management & Operation Contracts of U.S. Government Facilities |
9,984 | 8,804 | 13,736 | |||||||||
Eliminations/Other |
| | | |||||||||
|
|
|
|
|
|
|||||||
104,254 | 107,851 | 119,711 | ||||||||||
|
|
|
|
|
|
|||||||
Nuclear Energy: |
||||||||||||
Nuclear Services |
113,180 | 158,365 | 151,118 | |||||||||
Nuclear Equipment |
83,449 | 134,011 | 122,789 | |||||||||
Nuclear Projects |
87,002 | 33,319 | 45,539 | |||||||||
Eliminations/Other |
226 | (40 | ) | 2,023 | ||||||||
|
|
|
|
|
|
|||||||
283,857 | 325,655 | 321,469 | ||||||||||
|
|
|
|
|
|
|||||||
mPower: |
1,523 | 326 | 1,325 | |||||||||
|
|
|
|
|
|
|||||||
Eliminations |
(55,760 | ) | (26,463 | ) | (75,159 | ) | ||||||
|
|
|
|
|
|
|||||||
$ | 3,269,208 | $ | 3,291,359 | $ | 2,952,040 | |||||||
|
|
|
|
|
|
111
3. Information about our Operations in Different Geographic Areas:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands) | ||||||||||||
REVENUES(1): |
||||||||||||
United States |
$ | 2,589,521 | $ | 2,615,387 | $ | 2,340,299 | ||||||
Canada |
313,881 | 288,246 | 238,663 | |||||||||
China |
58,775 | 45,830 | 48,153 | |||||||||
Denmark |
56,336 | 18,504 | 12,310 | |||||||||
Colombia |
44,622 | 1,163 | 1,647 | |||||||||
Sweden |
37,823 | 101,688 | 94,337 | |||||||||
Germany |
22,869 | 34,364 | 8,222 | |||||||||
United Kingdom |
20,927 | 6,653 | 6,150 | |||||||||
Chile |
9,240 | 11,582 | 6,811 | |||||||||
Korea |
9,033 | 14,461 | 6,272 | |||||||||
Saudi Arabia |
8,200 | 7,973 | 3,307 | |||||||||
Netherlands |
8,099 | 5,376 | 851 | |||||||||
Indonesia |
6,227 | 7,828 | 4,642 | |||||||||
Argentina |
5,737 | 23,529 | 21,016 | |||||||||
India |
4,670 | 13,306 | 8,891 | |||||||||
Italy |
4,156 | 8,477 | 6,516 | |||||||||
France |
3,930 | 2,384 | 3,433 | |||||||||
Mexico |
3,461 | 3,384 | 2,523 | |||||||||
Trinidad |
3,264 | 2,401 | 2,668 | |||||||||
Austria |
2,970 | 2,218 | 465 | |||||||||
Israel |
2,919 | 2,502 | 2,071 | |||||||||
Brazil |
2,751 | 2,585 | 4,671 | |||||||||
Thailand |
2,650 | 3,041 | 1,946 | |||||||||
Russia |
2,607 | 2,727 | 1,405 | |||||||||
Norway |
2,594 | 9,939 | 29,844 | |||||||||
Singapore |
2,507 | 171 | 468 | |||||||||
South Africa |
2,208 | 2,993 | 4,204 | |||||||||
Other Countries |
37,231 | 52,647 | 90,255 | |||||||||
|
|
|
|
|
|
|||||||
$ | 3,269,208 | $ | 3,291,359 | $ | 2,952,040 | |||||||
|
|
|
|
|
|
(1) | We allocate geographic revenues based on the location of the customers operations. |
NET PROPERTY, PLANT AND EQUIPMENT: | ||||||||||||
United States |
$ | 367,672 | $ | 363,447 | $ | 348,498 | ||||||
Canada |
38,738 | 45,402 | 41,868 | |||||||||
China |
10,980 | 7,926 | 2,145 | |||||||||
United Kingdom |
9,414 | 9,714 | 9,758 | |||||||||
Denmark |
8,715 | 8,565 | 8,813 | |||||||||
Mexico |
8,312 | 8,302 | 7,024 | |||||||||
Other Countries |
3,248 | 3,665 | 4,185 | |||||||||
|
|
|
|
|
|
|||||||
$ | 447,079 | $ | 447,021 | $ | 422,291 | |||||||
|
|
|
|
|
|
4. Information about our Major Customers:
In the years ended December 31, 2013, 2012 and 2011, the U.S. Government accounted for approximately 38%, 34% and 38% of our total revenues, respectively. Substantially, these revenues are included in our Nuclear Operations and Technical Services segments.
112
NOTE 18 QUARTERLY FINANCIAL DATA (UNAUDITED)
The following tables set forth selected unaudited quarterly financial information for the years ended December 31, 2013 and 2012:
Year Ended December 31,
2013 Quarter Ended |
||||||||||||||||
March 31, 2013 |
June 30, 2013 |
Sept. 30, 2013 |
Dec. 31, 2013 |
|||||||||||||
(In thousands, except per share amounts) | ||||||||||||||||
Revenues |
$ | 805,423 | $ | 886,136 | $ | 774,834 | $ | 802,815 | ||||||||
Operating income (1) |
$ | 60,213 | $ | 98,706 | $ | 82,121 | $ | 295,322 | ||||||||
Equity in income of investees |
$ | 14,787 | $ | 18,775 | $ | 18,151 | $ | 16,345 | ||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 47,174 | $ | 72,870 | $ | 60,446 | $ | 165,588 | ||||||||
Earnings per common share: |
||||||||||||||||
Basic: |
||||||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 0.41 | $ | 0.65 | $ | 0.54 | $ | 1.50 | ||||||||
Diluted: |
||||||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 0.41 | $ | 0.65 | $ | 0.54 | $ | 1.48 |
(1) | Includes equity in income of investees. |
Year Ended December 31,
2012 Quarter Ended |
||||||||||||||||
March 31, 2012 |
June 30, 2012 |
Sept. 30, 2012 |
Dec. 31, 2012 |
|||||||||||||
(In thousands, except per share amounts) | ||||||||||||||||
Revenues |
$ | 765,892 | $ | 852,585 | $ | 807,586 | $ | 865,296 | ||||||||
Operating income (1) |
$ | 86,420 | $ | 110,077 | $ | 84,399 | $ | 65,693 | ||||||||
Equity in income of investees |
$ | 17,357 | $ | 16,687 | $ | 14,546 | $ | 18,119 | ||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 59,950 | $ | 77,231 | $ | 51,443 | $ | 39,071 | ||||||||
Earnings per common share: |
||||||||||||||||
Basic: |
||||||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 0.51 | $ | 0.65 | $ | 0.43 | $ | 0.33 | ||||||||
Diluted: |
||||||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 0.50 | $ | 0.65 | $ | 0.43 | $ | 0.33 |
(1) | Includes equity in income of investees. |
Our June 30, 2012 quarter included an $18.1 million favorable settlement with Energy Northwest. Our September 30, 2012 quarter included a $27.0 million impairment of our investment in USEC Inc. with no related tax benefit and a $25.3 million reduction in our provision for income taxes related to the recognition of previously unrecognized tax benefits. Our December 31, 2012 quarter also included contract losses of $16.9 million for additional estimated costs to complete a project in our Power Generation segment. Our June 30, 2013 quarter included contract losses of $30.2 million for additional estimated costs to complete a project in our Power Generation segment. Our December 31, 2013 quarter included a $19.1 million impairment of our investment in USEC, Inc. with no related tax benefit.
113
We immediately recognize actuarial gains and losses for our pension and postretirement benefit plans into earnings in the fourth quarter of each year as a component of net periodic benefit cost. The effect of this adjustment, recorded in the quarters ended December 31, 2013 and 2012 on pre-tax income was $222.9 million and $(32.0) million, respectively. Included in the 2013 adjustment is approximately $23 million ($17 million net of tax) of pension gains that should have been recognized in the quarter ended September 30, 2013 because of the interim remeasurement requirements resulting from settlements of certain pension obligations. The recognition of this amount in the quarter ended December 31, 2013 is not material to any interim period presented.
NOTE 19 EARNINGS PER SHARE
The following table sets forth the computation of basic and diluted earnings per share:
Year Ended December 31, | ||||||||||||
2013 | 2012 | 2011 | ||||||||||
(In thousands, except shares and per share amounts) |
||||||||||||
Basic: |
||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 346,078 | $ | 227,695 | $ | 78,319 | ||||||
|
|
|
|
|
|
|||||||
Weighted average common shares |
111,901,750 | 118,418,930 | 117,560,594 | |||||||||
|
|
|
|
|
|
|||||||
Basic earnings per common share: |
||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 3.09 | $ | 1.92 | $ | 0.67 | ||||||
|
|
|
|
|
|
|||||||
Diluted: |
||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 346,078 | $ | 227,695 | $ | 78,319 | ||||||
|
|
|
|
|
|
|||||||
Weighted average common shares (basic) |
111,901,750 | 118,418,930 | 117,560,594 | |||||||||
Effect of dilutive securities: |
||||||||||||
Stock options, restricted stock and performance shares(1) |
783,667 | 602,394 | 844,003 | |||||||||
|
|
|
|
|
|
|||||||
Adjusted weighted average common shares |
112,685,417 | 119,021,324 | 118,404,597 | |||||||||
|
|
|
|
|
|
|||||||
Diluted earnings per common share: |
||||||||||||
Net income attributable to The Babcock & Wilcox Company |
$ | 3.07 | $ | 1.91 | $ | 0.66 | ||||||
|
|
|
|
|
|
(1) | At December 31, 2013, 2012 and 2011, we excluded from the diluted share calculation 442,226, 1,082,904 and 742,035 shares, respectively, related to stock options, as their effect would have been antidilutive. |
114
Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None
Item 9A. CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
As of the end of the period covered by this annual report, we carried out an evaluation, under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of our disclosure controls and procedures (as that term is defined in Rules 13a-15(e) and 15d-15(e) adopted by the SEC under the Securities Exchange Act of 1934, as amended (the Exchange Act)). Our disclosure controls and procedures were developed through a process in which our management applied its judgment in assessing the costs and benefits of such controls and procedures, which, by their nature, can provide only reasonable assurance regarding the control objectives. You should note that the design of any system of disclosure controls and procedures is based in part upon various assumptions about the likelihood of future events, and we cannot assure you that any design will succeed in achieving its stated goals under all potential future conditions, regardless of how remote. Based on the evaluation referred to above, our Chief Executive Officer and Chief Financial Officer concluded that the design and operation of our disclosure controls and procedures are effective as of December 31, 2013 to provide reasonable assurance that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC and such information is accumulated and communicated to management, including its principal executives and principal financial officers or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.
Managements Report on Internal Control Over Financial Reporting
Our management is responsible for establishing and maintaining adequate internal control over financial reporting (as that term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) and for our assessment of the effectiveness of internal control over financial reporting.
Our internal control over financial reporting includes policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of our assets; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of our consolidated financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures are being made only in accordance with authorizations of our management and Board of Directors; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of our assets that could have a material effect on the consolidated financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Our management, including our Chief Executive Officer and Chief Financial Officer, has conducted an assessment of the effectiveness of our internal control over financial reporting as of December 31, 2013, based on the framework established in Internal Control Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. This assessment included an evaluation of the design of our internal control over financial reporting and testing of the operational effectiveness of those controls. Based on our assessment under the criteria described above, management has concluded that our internal control over financial reporting was effective as of December 31, 2013. Deloitte & Touche LLP has audited our internal control over financial reporting as of December 31, 2013, and their report is included in Item 9A.
115
Changes in Internal Control Over Financial Reporting
There has been no change in our internal control over financial reporting during the quarter ended December 31, 2013 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.
Report of Independent Registered Public Accounting Firm
To the Board of Directors and Stockholders of The Babcock & Wilcox Company:
We have audited the internal control over financial reporting of The Babcock & Wilcox Company and subsidiaries (the Company) as of December 31, 2013, based on the criteria established in Internal Control Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Companys management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Managements Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Companys internal control over financial reporting based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
A companys internal control over financial reporting is a process designed by, or under the supervision of, the companys principal executive and principal financial officers, or persons performing similar functions, and effected by the companys board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A companys internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the companys assets that could have a material effect on the financial statements.
Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2013, based on the criteria established in Internal Control Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements as of and for the year ended December 31, 2013 of the Company and our report dated February 26, 2014 expressed an unqualified opinion on those financial statements.
/S/ DELOITTE & TOUCHE LLP
Charlotte, North Carolina
February 26, 2014
116
None
117
P A R T I I I
Item 10. | DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE |
The information required by this item with respect to directors and executive officers is incorporated by reference to the material appearing under the headings Election of Directors, Named Executive Profiles, and Executive Officers in the Proxy Statement for our 2014 Annual Meeting of Stockholders. The information required by this item with respect to compliance with section 16(a) of the Securities and Exchange Act of 1934, as amended, is incorporated by reference to the material appearing under the heading Section 16(a) Beneficial Ownership Compliance in the Proxy Statement for our 2014 Annual Meeting of Stockholders. The information required by this item with respect to the Audit Committee and Audit and Finance Committee financial experts is incorporated by reference to the material appearing in the Director Independence and Audit and Finance Committee sections under the heading Corporate Governance Board of Directors and Its Committees in the Proxy Statement for our 2014 Annual Meeting of Stockholders.
We have adopted a Code of Business Conduct for our employees and directors, including, specifically, our chief executive officer, our chief financial officer, our chief accounting officer, and our other executive officers. Our code satisfies the requirements for a code of ethics within the meaning of SEC rules. A copy of the code is posted on our web site, www.babcock.com under Investor Relations Corporate Governance Highlights.
Item 11. | EXECUTIVE COMPENSATION |
The information required by this item is incorporated by reference to the material appearing under the headings Compensation Discussion and Analysis, Compensation of Directors, Compensation of Executive Officers, Compensation Committee Interlocks and Insider Participation and Compensation Committee Report in the Proxy Statement for our 2014 Annual Meeting of Stockholders.
Item 12. | SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS |
The information required by this item is incorporated by reference to (1) the Equity Compensation Plan Information table appearing in Item 5 Market for the Registrants Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities in Part II of this report and (2) the material appearing under the headings Security Ownership of Directors and Executive Officers and Security Ownership of Certain Beneficial Owners in the Proxy Statement for our 2014 Annual Meeting of Stockholders.
Item 13. | CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE |
Information required by this item is incorporated by reference to the material appearing under the headings Corporate Governance Director Independence and Certain Relationships and Related Transactions in the Proxy Statement for our 2014 Annual Meeting of Stockholders.
Item 14. | PRINCIPAL ACCOUNTANT FEES AND SERVICES |
The information required by this item is incorporated by reference to the material appearing under the heading Ratification of Appointment of Independent Registered Public Accounting Firm for Year Ending December 31, 2014 in the Proxy Statement for our 2014 Annual Meeting of Stockholders.
118
P A R T IV
Item 15. | EXHIBITS, FINANCIAL STATEMENT SCHEDULES |
The following documents are filed as part of this Annual Report or incorporated by reference:
1. | CONSOLIDATED FINANCIAL STATEMENTS |
Report of Independent Registered Public Accounting Firm
Consolidated Balance Sheets as of December 31, 2013 and 2012
Consolidated Statements of Income for the Years Ended December 31, 2013, 2012 and 2011
Consolidated Statements of Comprehensive Income for the Years Ended December 31, 2013, 2012 and 2011
Consolidated Statements of Stockholders Equity for the Years Ended December 31, 2013, 2012 and 2011
Consolidated Statements of Cash Flows for the Years Ended December 31, 2013, 2012 and 2011
Notes to Consolidated Financial Statements for the Years Ended December 31, 2013, 2012 and 2011
2. | CONSOLIDATED FINANCIAL STATEMENT SCHEDULES |
All schedules for which provision is made of the applicable regulations of the SEC have been omitted because they are not required under the relevant instructions or because the required information is included in the financial statements or the related footnotes contained in this report.
3. | EXHIBITS |
Exhibit Number |
Description | |
2.1 | Master Separation Agreement dated as of July 2, 2010 between McDermott International, Inc. and The Babcock & Wilcox Company (incorporated by reference to Exhibit 2.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File no. 1-34658)). | |
3.1 | Restated Certificate of Incorporation of The Babcock & Wilcox Company (incorporated by reference to Exhibit 3.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |
3.2 | Amended and Restated Bylaws of The Babcock & Wilcox Company (incorporated by reference to Exhibit 3.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |
3.3 | Amended and Restated Bylaws of The Babcock & Wilcox Company effective September 9, 2013 (incorporated by reference to Exhibit 3.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated September 11, 2013 (File No. 1-34658)). | |
4.1 | Amended and Restated Credit Agreement, dated as of June 8, 2012, entered into by and among The Babcock & Wilcox Company, certain lenders and letter of credit issuers executing the signature pages thereto and Bank of America, N.A., as administrative agent (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 8, 2012 (File No. 1-34658)). | |
4.2 | Amended and Restated Pledge and Security Agreement, dated as of June 8, 2012, entered into by and among The Babcock & Wilcox Company and certain of its subsidiaries in favor of Bank of America, N.A., as administrative agent (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 8, 2012 (File No. 1-34658)). |
119
10.1 |
Tax Sharing Agreement dated as of June 7, 2010 between J. Ray Holdings, Inc. and Babcock & Wilcox Holdings, Inc. (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |
10.2 |
Securities Purchase Agreement dated as of May 25, 2010, by and among USEC Inc., Toshiba Corporation and Babcock & Wilcox Investment Company (incorporated by reference to Exhibit 10.18 to The Babcock & Wilcox Companys Registration Statement on Form 10 filed on June 4, 2010 (File No. 1-34658)). | |
10.3 |
Standstill Agreement, dated as of June 30, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.3 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q dated August 8, 2011 (File No. 1-34658)). | |
10.4 |
First Amendment to Standstill Agreement, dated as of August 15, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). | |
10.5 |
Second Amendment to Standstill Agreement, dated as of September 30, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.3 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). | |
10.6 |
Cooperative Agreement, dated as of April 12, 2013, between Babcock & Wilcox mPower, Inc. and the United States Department of Energy (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated April 15, 2013 (File No. 1-34658)). | |
10.7* |
2010 Long-Term Incentive Plan of The Babcock & Wilcox Company, effective July 2, 2010 (incorporated by reference to Exhibit 10.8 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |
10.8* |
Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company, dated as of February 22, 2011, (incorporated by reference to Appendix A to The Babcock & Wilcox Companys Proxy Statement dated April 1, 2011 (File No. 1-34658)). | |
10.9* |
The Babcock & Wilcox Executive Incentive Compensation Plan, as amended and restated as of February 22, 2011, (incorporated by reference to Appendix B to The Babcock & Wilcox Companys Proxy Statement dated April 1, 2011 (File No. 1-34658)). | |
10.10* |
Supplemental Executive Retirement Plan of The Babcock & Wilcox Company, as amended and restated December 8, 2010, (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated December 8, 2010 (File No. 1-34658)). |
120
10.11* |
The Babcock & Wilcox Company Defined Contribution Restoration Plan, effective January 1, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). | |
10.12* |
Change In Control Agreement between E. James Ferland and The Babcock & Wilcox Company effective November 8, 2013. | |
10.13* |
Form of Change in Control Agreement entered into among The Babcock & Wilcox Company and executive officers (other than Mr. Ferland) effective as of November 8, 2013. | |
10.14* |
Form of Change in Control Agreement entered into among The Babcock & Wilcox Company and selected officers (other than executive officers) effective as of November 8, 2013. | |
10.15* |
Form of Director and Officer Indemnification Agreement entered into between The Babcock & Wilcox Company and each of its directors and executive officers (incorporated by reference to Exhibit 10.4 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2013 (File No. 1-34658)). | |
10.16* |
Form of Non-Employee Director Grant Letter (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended March 31, 2013 (File No. 1-34658)). | |
10.17* |
2014 Notice of Grant under Amended and Restated 2010 Long-Term Inventive Plan of The Babcock & Wilcox Company. | |
10.18* |
Form of 2014 Stock Option Grant Agreement for Employees. | |
10.19* |
Form of 2014 Restricted Stock Unit Grant Agreement for Employees. | |
10.20* |
Form of 2014 Performance Restricted Stock Units Grant Agreement for Employees. | |
10.21* |
2013 Notice of Grant under Amended and Restated 2010 Long-Term Inventive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.16 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.22* |
Form of 2013 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.17 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.23* |
Form of 2013 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.18 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.24* |
Form of 2013 Performance Restricted Stock Units Grant Agreement for Employees (incorporated by reference to Exhibit 10.19 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.25* |
2012 Notice of Grant under Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.27 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). |
121
10.26* |
Form of 2012 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.28 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.27* |
Form of 2012 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.29 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.28* |
Form of 2012 Performance Share Grant Agreement for Employees (incorporated by reference to Exhibit 10.30 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.29* |
2011 Notice of Grant under Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.23 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.30* |
Form of 2011 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.24 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.31* |
Form of 2011 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.25 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.32* |
Form of 2011 Performance Share Grant Agreement for Employees (incorporated by reference to Exhibit 10.26 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.33* |
Form of 2010 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.28 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.34* |
Form of 2010 Restricted Stock Award Grant Agreement for Employees (incorporated by reference to Exhibit 10.29 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.35* |
Form of 2010 Stock Option Grant Agreement for Employees converted on the spin-off from awards of stock options to purchase shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.30 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.36* |
Form of 2010 Restricted Stock Award Grant Agreement for Employees converted on the spin-off from awards of restricted shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.31 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.37* |
Form of 2010 Restricted Stock Unit Grant Agreement for Employees converted on the spin-off from awards of restricted stock units denominated in shares of McDermott International, Inc. common stock. (incorporated by reference to Exhibit 10.32 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). |
122
10.38* |
Form of 2010 Restricted Stock Unit Grant Agreement for Employees converted on the spin-off from awards of performance shares denominated in shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.33 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.39* |
Consulting Agreement, dated as of June 29, 2011, between The Babcock & Wilcox Company and Michael S. Taff (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 29, 2011 (File No. 1-34658)). | |
10.40* |
Separation and Consulting Agreement between Brandon C. Bethards and The Babcock & Wilcox Company, dated April 5, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated March 31, 2012 (File No. 1-34658)). | |
10.41* |
Consulting Agreement by and between Babcock & Wilcox Power Generation Group, Inc. and Richard L. Killion dated as of July 9, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated July 9, 2012 (File No. 1-34658)). | |
10.42* |
The Babcock & Wilcox Company Executive Severance Plan dated November 5, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated November 5, 2012 (File No. 1-34658)). | |
10.43* |
Separation Agreement between Mary Pat Salomone and The Babcock & Wilcox Company, dated May 6, 2013 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated May 6, 2013 (File No. 1-34658)). | |
10.44* |
Retention Agreement by and between The Babcock & Wilcox Company and Christofer M. Mowry, dated as of December 17, 2013 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated December 19, 2013 (File No. 1-34658)). | |
21.1 |
Significant Subsidiaries of the Registrant. | |
23.1 |
Consent of Deloitte & Touche LLP. | |
31.1 |
Rule 13a-14(a)/15d-14(a) certification of Chief Executive Officer. | |
31.2 |
Rule 13a-14(a)/15d-14(a) certification of Chief Financial Officer. | |
32.1 |
Section 1350 certification of Chief Executive Officer. | |
32.2 |
Section 1350 certification of Chief Financial Officer. | |
95 |
Mine Safety | |
101.INS |
XBRL Instance Document | |
101.SCH |
XBRL Taxonomy Extension Schema Document | |
101.CAL |
XBRL Taxonomy Extension Calculation Linkbase Document | |
101.LAB |
XBRL Taxonomy Extension Label Linkbase Document | |
101.PRE |
XBRL Taxonomy Extension Presentation Linkbase Document | |
101.DEF |
XBRL Taxonomy Extension Definition Linkbase Document |
* | Management contract or compensatory plan or arrangement. |
123
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
THE BABCOCK & WILCOX COMPANY | ||||
/s/ E. James Ferland | ||||
February 26, 2014 | By: | E. James Ferland | ||
President and Chief Executive Officer |
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated and on the date indicated.
Signature |
Title | |
/s/ E. James Ferland |
President and Chief Executive Officer (Principal Executive Officer) | |
E. James Ferland | ||
/s/ Anthony S. Colatrella |
Senior Vice President and Chief Financial Officer (Principal Financial Officer and Duly Authorized Representative) | |
Anthony S. Colatrella | ||
/s/ David S. Black |
Vice President and Chief Accounting Officer (Principal Accounting Officer and Duly Authorized Representative) | |
David S. Black | ||
/s/ John A. Fees |
Chairman of the Board and Director | |
John A. Fees | ||
/s/ Jan A. Bertsch |
Director | |
Jan A. Bertsch | ||
/s/ Thomas A. Christopher |
Director | |
Thomas A. Christopher | ||
/s/ Brian K. Ferraioli |
Director | |
Brian K. Ferraioli | ||
/s/ Robert W. Goldman |
Director | |
Robert W. Goldman | ||
/s/ Stephen G. Hanks |
Director | |
Stephen G. Hanks | ||
/s/ D. Bradley McWilliams |
Director | |
D. Bradley McWilliams | ||
/s/ Richard W. Mies |
Director | |
Richard W. Mies | ||
/s/ Anne R. Pramaggiore |
Director | |
Anne R. Pramaggiore | ||
/s/ Larry L. Weyers |
Director | |
Larry L. Weyers |
February 26, 2014
124
INDEX TO EXHIBITS
Exhibit Number |
Description |
Sequentially Numbered Pages | ||
2.1 | Master Separation Agreement dated as of July 2, 2010 between McDermott International, Inc. and The Babcock & Wilcox Company (incorporated by reference to Exhibit 2.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File no. 1-34658)). | |||
3.1 | Restated Certificate of Incorporation of The Babcock & Wilcox Company (incorporated by reference to Exhibit 3.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |||
3.2 | Amended and Restated Bylaws of The Babcock & Wilcox Company (incorporated by reference to Exhibit 3.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |||
3.3 | Amended and Restated Bylaws of The Babcock & Wilcox Company effective September 9, 2013 (incorporated by reference to Exhibit 3.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated September 11, 2013 (File No. 1-34658)). | |||
4.1 | Amended and Restated Credit Agreement, dated as of June 8, 2012, entered into by and among The Babcock & Wilcox Company, certain lenders and letter of credit issuers executing the signature pages thereto and Bank of America, N.A., as administrative agent (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 8, 2012 (File No. 1-34658)). | |||
4.2 | Amended and Restated Pledge and Security Agreement, dated as of June 8, 2012, entered into by and among The Babcock & Wilcox Company and certain of its subsidiaries in favor of Bank of America, N.A., as administrative agent (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 8, 2012 (File No. 1-34658)). | |||
10.1 | Tax Sharing Agreement dated as of June 7, 2010 between J. Ray Holdings, Inc. and Babcock & Wilcox Holdings, Inc. (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |||
10.2 | Securities Purchase Agreement dated as of May 25, 2010, by and among USEC Inc., Toshiba Corporation and Babcock & Wilcox Investment Company (incorporated by reference to Exhibit 10.18 to The Babcock & Wilcox Companys Registration Statement on Form 10 filed on June 4, 2010 (File No. 1-34658)). | |||
10.3 | Standstill Agreement, dated as of June 30, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.3 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q dated August 8, 2011 (File No. 1-34658)). | |||
10.4 | First Amendment to Standstill Agreement, dated as of August 15, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). | |||
10.5 | Second Amendment to Standstill Agreement, dated as of September 30, 2011, among Toshiba America Nuclear Energy Corporation, Babcock & Wilcox Investment Company and USEC Inc. (incorporated by reference to Exhibit 10.3 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). |
125
10.6 | Cooperative Agreement, dated as of April 12, 2013, between Babcock & Wilcox mPower, Inc. and the United States Department of Energy (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated April 15, 2013 (File No. 1-34658)). | |
10.7* | 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company, effective July 2, 2010 (incorporated by reference to Exhibit 10.8 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2010 (File No. 1-34658)). | |
10.8* | Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company, dated as of February 22, 2011, (incorporated by reference to Appendix A to The Babcock & Wilcox Companys Proxy Statement dated April 1, 2011 (File No. 1-34658)). | |
10.9* | The Babcock & Wilcox Executive Incentive Compensation Plan, as amended and restated as of February 22, 2011, (incorporated by reference to Appendix B to The Babcock & Wilcox Companys Proxy Statement dated April 1, 2011 (File No. 1-34658)). | |
10.10* | Supplemental Executive Retirement Plan of The Babcock & Wilcox Company, as amended and restated December 8, 2010, (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated December 8, 2010 (File No. 1-34658)). | |
10.11* | The Babcock & Wilcox Company Defined Contribution Restoration Plan, effective January 1, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended September 30, 2011 (File No. 1-34658)). | |
10.12* | Change In Control Agreement between E. James Ferland and The Babcock & Wilcox Company effective November 8, 2013. | |
10.13* | Form of Change in Control Agreement entered into among The Babcock & Wilcox Company and executive officers (other than Mr. Ferland) effective as of November 8, 2013. | |
10.14* | Form of Change in Control Agreement entered into among The Babcock & Wilcox Company and selected officers (other than executive officers) effective as of November 8, 2013. | |
10.15* | Form of Director and Officer Indemnification Agreement entered into between The Babcock & Wilcox Company and each of its directors and executive officers (incorporated by reference to Exhibit 10.4 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended June 30, 2013 (File No. 1-34658)). | |
10.16* | Form of Non-Employee Director Grant Letter (incorporated by reference to Exhibit 10.2 to The Babcock & Wilcox Companys Quarterly Report on Form 10-Q for the quarter ended March 31, 2013 (File No. 1-34658)). | |
10.17* | 2014 Notice of Grant under Amended and Restated 2010 Long-Term Inventive Plan of The Babcock & Wilcox Company. | |
10.18* | Form of 2014 Stock Option Grant Agreement for Employees. | |
10.19* | Form of 2014 Restricted Stock Unit Grant Agreement for Employees. | |
10.20* | Form of 2014 Performance Restricted Stock Units Grant Agreement for Employees. |
126
10.21* | 2013 Notice of Grant under Amended and Restated 2010 Long-Term Inventive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.16 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.22* | Form of 2013 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.17 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.23* | Form of 2013 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.18 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.24* | Form of 2013 Performance Restricted Stock Units Grant Agreement for Employees (incorporated by reference to Exhibit 10.19 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2012 (File No. 1-34658)). | |
10.25* | 2012 Notice of Grant under Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.27 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.26* | Form of 2012 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.28 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.27* | Form of 2012 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.29 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.28* | Form of 2012 Performance Share Grant Agreement for Employees (incorporated by reference to Exhibit 10.30 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.29* | 2011 Notice of Grant under Amended and Restated 2010 Long-Term Incentive Plan of The Babcock & Wilcox Company (incorporated by reference to Exhibit 10.23 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2011 (File No. 1-34658)). | |
10.30* | Form of 2011 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.24 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.31* | Form of 2011 Restricted Stock Unit Grant Agreement for Employees (incorporated by reference to Exhibit 10.25 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.32* | Form of 2011 Performance Share Grant Agreement for Employees (incorporated by reference to Exhibit 10.26 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.33* | Form of 2010 Stock Option Grant Agreement for Employees (incorporated by reference to Exhibit 10.28 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.34* | Form of 2010 Restricted Stock Award Grant Agreement for Employees (incorporated by reference to Exhibit 10.29 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). |
127
10.35* | Form of 2010 Stock Option Grant Agreement for Employees converted on the spin-off from awards of stock options to purchase shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.30 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.36* | Form of 2010 Restricted Stock Award Grant Agreement for Employees converted on the spin-off from awards of restricted shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.31 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.37* | Form of 2010 Restricted Stock Unit Grant Agreement for Employees converted on the spin-off from awards of restricted stock units denominated in shares of McDermott International, Inc. common stock. (incorporated by reference to Exhibit 10.32 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.38* | Form of 2010 Restricted Stock Unit Grant Agreement for Employees converted on the spin-off from awards of performance shares denominated in shares of McDermott International, Inc. common stock (incorporated by reference to Exhibit 10.33 to The Babcock & Wilcox Companys Annual Report on Form 10-K for the year ended December 31, 2010 (File No. 1-34658)). | |
10.39* | Consulting Agreement, dated as of June 29, 2011, between The Babcock & Wilcox Company and Michael S. Taff (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated June 29, 2011 (File No. 1-34658)). | |
10.40* | Separation and Consulting Agreement between Brandon C. Bethards and The Babcock & Wilcox Company, dated April 5, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated March 31, 2012 (File No. 1-34658)). | |
10.41* | Consulting Agreement by and between Babcock & Wilcox Power Generation Group, Inc. and Richard L. Killion dated as of July 9, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated July 9, 2012 (File No. 1-34658)). | |
10.42* | The Babcock & Wilcox Company Executive Severance Plan dated November 5, 2012 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated November 5, 2012 (File No. 1-34658)). | |
10.43* | Separation Agreement between Mary Pat Salomone and The Babcock & Wilcox Company, dated May 6, 2013 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated May 6, 2013 (File No. 1-34658)). | |
10.44* | Retention Agreement by and between The Babcock & Wilcox Company and Christofer M. Mowry, dated as of December 17, 2013 (incorporated by reference to Exhibit 10.1 to The Babcock & Wilcox Companys Current Report on Form 8-K dated December 19, 2013 (File No. 1-34658)). | |
21.1 | Significant Subsidiaries of the Registrant. | |
23.1 | Consent of Deloitte & Touche LLP. | |
31.1 | Rule 13a-14(a)/15d-14(a) certification of Chief Executive Officer. |
128
31.2 | Rule 13a-14(a)/15d-14(a) certification of Chief Financial Officer. | |
32.1 | Section 1350 certification of Chief Executive Officer. | |
32.2 | Section 1350 certification of Chief Financial Officer. | |
95 | Mine Safety | |
101.INS | XBRL Instance Document | |
101.SCH | XBRL Taxonomy Extension Schema Document | |
101.CAL | XBRL Taxonomy Extension Calculation Linkbase Document | |
101.LAB | XBRL Taxonomy Extension Label Linkbase Document | |
101.PRE | XBRL Taxonomy Extension Presentation Linkbase Document | |
101.DEF | XBRL Taxonomy Extension Definition Linkbase Document |
* | Management contract or compensatory plan or arrangement. |
129