CADIZ INC - Quarter Report: 2011 September (Form 10-Q)

form10-q_sept2011.htm


United States
Securities and Exchange Commission

Washington, D. C. 20549
 
FORM 10-Q
 
(Mark One)
 
[√]   Quarterly Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
for the quarterly period ended September 30, 2011
OR
[  ]  Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
for the transition period from .....  to .....
Commission File Number 0-12114

Cadiz Inc.

(Exact name of registrant specified in its charter)

DELAWARE
77-0313235
(State or other jurisdiction of
(I.R.S. Employer
incorporation or organization)
Identification No.)

550 South Hope Street, Suite 2850
 
Los Angeles, California
90071
(Address of principal executive offices)
(Zip Code)
 
Registrant’s telephone number, including area code:  (213) 271-1600

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes   √   No        
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes   √   No        

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of "large accelerated filer," "accelerated filer" and "smaller reporting company" in Rule 12b-2 of the Exchange Act.
Large accelerated filer ___   Accelerated filer   √     Non-accelerated filer ___   Smaller Reporting Company ___

Indicate by check mark whether the Registrant is a shell company (as defined in Exchange Act Rule 12b-2).
Yes___ No   √  

As of November 4, 2011, the Registrant had 14,192,874 shares of common stock, par value $0.01 per share, outstanding.


 
 
 
 
Cadiz Inc.
Index
 
For the Nine Months ended September 30, 2011
Page
   
PART I – FINANCIAL INFORMATION
 
   
ITEM 1.  Financial Statements
 
   
Cadiz Inc. Consolidated Financial Statements
 
   
1
   
2
   
3
   
4
   
5
   
6
   
17 
   
29
   
29
   
30

i
 
 
 
 
 
 
   
For the Three Months
 
   
Ended September 30,
 
($ in thousands except per share data)
 
2011
   
2010
 
       
Revenues
  $ 121     $ 274  
                 
Costs and expenses:
               
Cost of sales
    266       256  
General and administrative
    2,467       2,023  
Depreciation
    92       81  
                 
Total costs and expenses
    2,825       2,360  
                 
Operating loss
    (2,704 )     (2,086 )
                 
Interest expense, net
    (1,451 )     (1,092 )
Other income, net
    52       -  
                 
Loss before income taxes
    (4,103 )     (3,178 )
Income tax provision
    2       1  
                 
Net loss applicable to common stock
  $ (4,105 )   $ (3,179 )
                 
Basic and diluted net loss per common share
  $ (0.29 )   $ (0.23 )
                 
Basic and diluted weighted average shares outstanding
    14,161       13,678  
   

See accompanying notes to the consolidated financial statements.
 
1
 
 

Cadiz Inc.
 
   
For the Nine Months
 
   
Ended September 30,
 
($ in thousands except per share data)
 
2011
   
2010
 
       
Revenues
  $ 618     $ 281  
                 
Costs and expenses:
               
Cost of sales
    716       256  
General and administrative
    7,650       8,115  
Depreciation
    273       263  
                 
Total costs and expenses
    8,639       8,634  
                 
Operating loss
    (8,021 )     (8,353 )
                 
Interest expense, net
    (4,169 )     (3,174 )
Other income, net
    108       -  
                 
Loss before income taxes
    (12,082 )     (11,527 )
Income tax provision
    5       3  
                 
Net loss applicable to common stock
  $ (12,087 )   $ (11,530 )
                 
Basic and diluted net loss per common share
  $ (0.87 )   $ (0.84 )
                 
Basic and diluted weighted average shares outstanding
    13,934       13,670  
   
See accompanying notes to the consolidated financial statements.


   
September 30,
   
December 31,
($ in thousands)
 
2011
   
2010
           
ASSETS
         
           
Current assets:
         
Cash and cash equivalents
  $ 3,452     $ 5,911  
Accounts receivable
    144       277  
Prepaid expenses and other
    738       299  
                 
Total current assets
    4,334       6,487  
                 
Property, plant, equipment and water programs, net
    40,822       38,315  
Goodwill
    3,813       3,813  
Other assets
    352       321  
                 
Total Assets
  $ 49,321     $ 48,936  
                 
LIABILITIES AND STOCKHOLDERS’ EQUITY
               
                 
Current liabilities:
               
Accounts payable
  $ 863     $ 358  
Accrued liabilities
    918       1,518  
Current portion of long term debt
    8       16  
                 
Total current liabilities
    1,789       1,892  
                 
Long-term debt, net
    50,517       44,403  
Derivative liabilities
    -       451  
Tax liability
    321       321  
Other long-term liabilities
    1,423       923  
                 
Total Liabilities
    54,050       47,990  
                 
Stockholders’ equity:
               
Common stock - $.01 par value; 70,000,000 shares
               
  authorized; shares issued and outstanding – 14,192,874 at
               
  September 30, 2011 and 13,677,772 at December 31, 2010
    142       137  
Additional paid-in capital
    288,766       282,359  
Accumulated deficit
    (293,637 )     (281,550
Total stockholders’ (deficit) equity
    (4,729 )     946  
                 
Total Liabilities and Stockholders’ equity
  $ 49,321     $ 48,936  

See accompanying notes to the consolidated financial statements.
 
   
For the Nine Months
 
   
Ended September 30,
 
($ in thousands except per share data)
 
2011
   
2010
 
             
Cash flows from operating activities:
           
Net loss
Adjustments to reconcile net loss to
  $ (12,087 )     (11,530 )
net cash used for operating activities:
               
Depreciation
    273       263  
Amortization of debt discount & issuance costs
    1,765       1,163  
Interest expense added to loan principal
    2,405       2,016  
Unrealized gain on derivative liability
    (108 )     -  
Compensation charge for stock and share options
    2,069       3,151  
        Changes in operating assets and liabilities:
               
Decrease (increase) in accounts receivable
    133       (108 )
Increase in prepaid expenses and other
    (439 )     (142 )
(Increase) decrease in other assets
    (83 )     32  
Increase (decrease) in accounts payable
    200       (119 )
Increase in accrued liabilities
    28       148  
Increase in other long-term liabilities
    500       -  
 
Net cash used for operating activities
    (5,344 )     (5,126 )
                 
Cash flows from investing activities:
               
Additions to property, plant and equipment
    (3,103 )     (743 )
                 
Net cash used in investing activities
    (3,103 )     (743 )
                 
Cash flows from financing activities:
               
Net proceeds from issuance of common stock
    4,000       -  
Proceeds from issuance of long-term debt
    2,000       -  
Principal payments on long-term debt
    (12 )     (17 )
                 
Net cash provided by (used in) financing activities
    5,988       (17 )
                 
Net decrease in cash and cash equivalents
    (2,459 )     (5,886 )
                 
Cash and cash equivalents, beginning of period
    5,911       8,878  
                 
Cash and cash equivalents, end of period
  $ 3,452     $ 2,992  

See accompanying notes to the consolidated financial statements.
($ in thousands except per share data)
         
Additional
         
Total
 
   
Common Stock
   
Paid-in
   
Accumulated
   
Stockholders’
 
   
Shares
   
Amount
   
Capital
   
Deficit
   
Equity
 
 
                             
Balance as of  December 31, 2010
    13,677,772     $ 137     $ 282,359     $ (281,550 )   $ 946  
                                         
Stock awards
    151,466       1       -       -       1  
                                         
Issuance of common stock for cash
    363,636       4       3,995       -       3,999  
                                         
Convertible term loan conversion option
    -       -       343       -       343  
                                         
Stock based compensation expense
    -       -       2,069       -       2,069  
                                         
Net loss
    -       -       -       (12,087 )     (12,087 )
 
                                       
Balance as of September 30, 2011
    14,192,874     $ 142     $ 288,766     $ (293,637 )   $ (4,729 )

See accompanying notes to the consolidated financial statements.

NOTE 1 – DESCRIPTION OF BUSINESS AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

The Consolidated Financial Statements have been prepared by Cadiz Inc., sometimes referred to as “Cadiz” or “the Company”, without audit and should be read in conjunction with the Consolidated Financial Statements and notes thereto included in the Company’s Form 10-K for the year ended December 31, 2010.

Basis of Presentation

The foregoing Consolidated Financial Statements include the accounts of the Company and contain all adjustments, consisting only of normal recurring adjustments, which the Company considers necessary for a fair statement of the Company’s financial position, the results of its operations and its cash flows for the periods presented and have been prepared in accordance with generally accepted accounting principles.

The preparation of financial statements in conformity with generally accepted accounting principles requires Management to make estimates and assumptions that affect the amounts reported in the financial statements and the accompanying notes.  Actual results could differ from those estimates and such differences may be material to the financial statements. This quarterly report on Form 10-Q should be read in conjunction with the Company’s Form 10-K for the year ended December 31, 2010.  The results of operations for the nine months ended September 30, 2011, are not necessarily indicative of results for the entire fiscal year ending December 31, 2011.

Liquidity

The financial statements of the Company have been prepared using accounting principles applicable to a going concern, which assumes realization of assets and settlement of liabilities in the normal course of business.  The Company incurred losses of $12.1 million for the nine months ended September 30, 2011, and $11.5 million for the nine months ended September 30, 2010.  The Company had working capital of $2.5 million at September 30, 2011, and used cash in operations of $5.3 million for the nine months ended September 30, 2011 and $5.1 million for the nine months ended September 30, 2010.  Working capital requirements are seasonally less in the second half of the year as proceeds from the Company’s agricultural operations are realized.  Currently, the Company's sole focus is the development of its land and water assets.

In June 2006, the Company raised $36.4 million through the private placement of a five year zero coupon convertible term loan with Peloton Partners LLP (“Peloton”), as administrative agent, and an affiliate of Peloton and another investor, as lenders (the “Term Loan”).  The proceeds of the new term loan were partially used to repay the Company’s prior term loan facility with ING Capital LLC (“ING”).  On April 16, 2008, the Company was advised that Peloton’s interest in the Term Loan had been assigned to an affiliate of Lampe, Conway & Company LLC (“Lampe Conway”), and Lampe Conway subsequently replaced Peloton as administrative agent of the loan.  On June 4, 2009, the Company completed arrangements to amend the Term Loan and extend its maturity to June of 2013.
 
6
 
 
On October 19, 2010, the Company closed a new $10 million working capital facility with the same existing lenders.  A total of $7 million was drawn during the term of this facility.

In November and December 2008, the Company raised $5.2 million with a private placement of 165,000 Units at $31.50 per unit.  Each unit consisted of three (3) shares of the Company’s common stock and two (2) stock purchase warrants.  The first warrant entitled the holder to purchase one (1) share of common stock at an exercise price of $12.50 per share.  On November 17, 2009, the exercise price of this Callable Warrant was temporarily reduced to $10.50 per share.  In response, holders of 162,849 warrants exercised their warrants, resulting in the Company's issuance of 162,849 shares of common stock with net proceeds of $1,709,915.  The remaining 2,151 warrants were cancelled.  The second warrant entitles the holder to purchase one (1) share of common stock at an exercise price of $12.50 per share.  This warrant has a term of three years and is not callable by the Company.

In October and November 2009, the Company raised $7.1 million with a private placement of 226,200 Units at $31.50 per Unit.  This included 20,880 Units purchased by the Lenders of the Term Loan pursuant to the Lenders’ Participation Rights under the Term Loan.  Each Unit consists of three (3) shares of the Company’s common stock and one (1) stock purchase warrant.  The warrant entitles the holder to purchase one (1) share of common stock at an exercise price of $15.00 per share.  The warrant has a term of three (3) years, but is callable by the Company at any time following November 1, 2010, if the closing market price of the Company’s common stock exceeds $22.50 for 10 consecutive trading days.

In June 2011, the Company filed a shelf registration statement on Form S-3 registering the sale of up to $50 million of the Company’s common stock in one or more public offerings.  The registration statement was declared effective on June 10, 2011.  On July 8, 2011, the Company raised $4.0 million with the sale of 363,636 shares at $11.00 per share by way of a takedown from this shelf registration.

The Company’s current resources do not provide the capital necessary to fund its implementation of the Cadiz Valley Water Conservation, Recovery and Storage Project (“Water Project”) should the Company be required to do so.  There is no assurance that additional financing (public or private) will be available on acceptable terms or at all.

If the Company issues additional equity or equity linked securities to raise funds, the ownership percentage of the Company’s existing stockholders would be reduced.  New investors may demand rights, preferences or privileges senior to those of existing holders of common stock.  If the Company cannot raise needed funds, it might be forced to make substantial reductions in its operating expenses, which could adversely affect its ability to implement its current business plan and ultimately its viability as a company.

Based upon the Company’s current and anticipated usage of cash resources, it will require additional working capital commencing during the second quarter of fiscal 2012 to meet its cash resource needs from that point forward and to continue to finance its operations until such time as its asset development programs produce revenues.  If the Company is unable to generate cash from its current development activities, then it will need to seek additional debt or equity financing in the capital markets.
 
7
 
 
Principles of Consolidation

In December 2003, the Company transferred substantially all of its assets (with the exception of certain office furniture and equipment and any Sun World related assets) to Cadiz Real Estate LLC, a Delaware limited liability company (“Cadiz Real Estate”).  The Company holds 100% of the equity interests of Cadiz Real Estate, and therefore, continues to hold 100% beneficial ownership of the properties that it transferred to Cadiz Real Estate.  Because the transfer of the Company’s properties to Cadiz Real Estate has no effect on its ultimate beneficial ownership of these properties, the properties owned of record either by Cadiz Real Estate or by the Company are treated as belonging to the Company.  Cadiz Real Estate is consolidated in these financial statements.

Cash and Cash Equivalents

The Company considers all short-term deposits with an original maturity of three months or less to be cash equivalents.  The Company invests its excess cash in deposits with major international banks, government agency notes and short-term commercial paper, and therefore, bears minimal risk.  Such investments are stated at cost, which approximates fair value, and are considered cash equivalents for purposes of reporting cash flows.

Short-Term Investments

The Company considers all short-term deposits with an original maturity greater than three months, but no greater than one year, to be short-term investments.  The Company had no short-term investments at September 30, 2011, or December 31, 2010.

Supplemental Cash Flow Information

No cash payments, including interest, are due on the loan with Lampe Conway prior to the June 29, 2013, final maturity date.

The Company recorded non-cash additions to fixed assets of $676,000 at September 30, 2011, and $1,276,000 at December 31, 2010, which were accrued at the respective period ends, for the costs directly attributable to the development of the Water Project.

Recent Accounting Pronouncements

In December 2010, the Financial Accounting Standards Board issued Accounting Standards Update 2010-28, an accounting pronouncement related to Accounting Standards Codification Topic 350, Intangibles – Goodwill and Other, which requires a company to consider whether there are any adverse qualitative factors indicating that an impairment may exist in performing step 2 of the impairment test for reporting units with zero or negative carrying amounts.  The provisions of this pronouncement are effective for fiscal years, and interim periods within those fiscal years, beginning December 15, 2010.  The Company adopted this pronouncement on January 1, 2011.  The adoption of this pronouncement has no impact on the Company’s financial position and results of operations.
 
8
 
         In September 2011, the Financial Accounting Standards Board, or FASB, issued Accounting Standards Update, or ASU, No. 2011-08, Testing Goodwill for Impairment. This ASU permits an entity to make a qualitative assessment of whether it is more likely than not that a reporting unit’s fair value is less than its carrying amount before applying the two-step goodwill impairment test. If an entity concludes it is not more likely than not that the fair value of a reporting unit is less than its carrying amount, then there is no need to perform the two-step impairment test. This ASU is effective for annual and interim goodwill impairment tests performed for fiscal years beginning after December 15, 2011. Early adoption is permitted.  The Company expects to adopt this pronouncement in the fourth quarter of 2011.  The Company believes that the adoption of the ASU will not have a material impact on the Company’s consolidated financial statements, as it is intended to simplify the assessment for goodwill impairment.


NOTE 2 - PROPERTY, PLANT, EQUIPMENT AND WATER PROGRAMS

Property, plant, equipment and water programs consist of the following (in thousands):

   
September 30,
   
December 31,
 
   
2011
   
2010
 
             
Land and land improvements
  $ 24,188     $ 23,680  
Water programs
    17,780       15,496  
Buildings
    1,187       1,180  
Leasehold improvements
    570       570  
Furniture and fixtures
    442       442  
Machinery and equipment
    978       950  
Construction in progress
    116       163  
      45,261       42,481  
                 
Less accumulated depreciation
    (4,439 )     (4,166 )
                 
    $ 40,822     $ 38,315  

Depreciation expense totaled $92,000 for the three months ended September 30, 2011, and $81,000 for the three months ended September 30, 2010.  Depreciation expense totaled $273,000 and $263,000 for the nine months ended September 30, 2011 and 2010, respectively.


NOTE 3 – LONG-TERM DEBT

The carrying value of the Company's debt, before discount, approximates fair value, based on interest rates available to the Company for debt with similar terms.

 At September 30, 2011, and December 31, 2010, the carrying amount of the Company’s outstanding debt is summarized as follows (in thousands):
 
9
 
 
   
September 30,
   
December 31,
   
2011
   
2010
           
Zero coupon secured convertible term loan due June 29, 2013.
Interest accruing at 5% per annum until June 29, 2009 and at 6%
thereafter
  $ 55,817     $ 51,412  
Other loans
    8       20  
Debt discount, net of accumulated accretion
    (5,300 )     (7,013
      50,525       44,419  
                 
Less current portion
    8       16  
                 
    $ 50,517     $ 44,403  

Pursuant to the Company’s loan agreements, annual maturities of long-term debt outstanding on September 30, 2011, are as follows:

12 Months
Ending September 30
 
(in thousands)
 
       
2012
    8  
2013
    55,817  
2014
    -  
    $ 55,825  

In June 2006, the Company entered into a $36.4 million five year zero coupon convertible term loan with Peloton Partners LLP, as administrative agent for the loan, and with an affiliate of Peloton and another investor, as lenders.  Certain terms of the loan were subsequently amended pursuant to Amendment #1 to the Credit Agreement, which was effective September 2006.  On April 16, 2008, the Company was advised that Peloton had assigned its interest in the loan to an affiliate of Lampe Conway & Company LLC (“Lampe Conway”), and Lampe Conway subsequently replace Peloton as administrative agent of the loan (the “Term Loan”).  On June 4, 2009, the Company completed arrangements to amend the Term Loan with Lampe Conway which modified certain of the conversion features and extended the maturity date to June 29, 2013.

On October 19, 2010 (“Closing Date”), the Company entered into a new $10 million working capital facility with Lampe Conway and other participating lenders (“the Lenders”).  The Company drew the first $5 million on the Closing Date (“First Tranche”).  The Company was also granted the option to draw up to an additional $5 million over the 12 months following the Closing Date (“Second Tranche”), of which $2 million was drawn on June 30, 2011. No further draws were made on this new facility prior to its expiration.  All interest on outstanding balances accrue at 6%, with no principal or interest payments required before the new facility’s June 29, 2013 maturity date, consistent with the Company’s existing term debt facility.  

The First Tranche (including accrued interest) is convertible at any time into the Company’s common stock at a price of $13.50 per share and the Second Tranche (including accrued interest) is convertible into the Company’s common stock at $12.50 per share.
 
10
 
 
Also on the Closing Date, the Company’s existing Term Loan with the Lenders was modified as to certain of its conversion features:

·  
$20.62 million of the existing convertible debt has been changed to allow for up to $2.5 million of this amount to be converted at any time into the Company’s common stock at the price of $13.50 per share, with the remaining amount becoming non-convertible.

·  
If the Second Tranche were to be drawn in full, approximately $20 million of additional existing debt would be changed to allow for up to $5 million of this amount to be converted at any time into the Company’s common stock at $12.50 per share, with the remaining amount becoming non-convertible.

·  
The final $4.55 million of the existing debt continues to be convertible at $7 per share.

On June 30, 2011, $2 million of the $5 million available Second Tranche was drawn.  As a result of the Second Tranche draw, $4 million of the outstanding loan became convertible into 320,000 shares of Cadiz common stock.  Further, approximately $10 million of the loan that was previously convertible into approximately 290,000 shares of Cadiz common stock is no longer convertible.
 
        The Term Loan is collateralized by substantially all of the assets of the Company, and contains representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit the Company’s ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person.  However, while there are affirmative covenants, there are no financial maintenance covenants and no restrictions on the Company’s ability to issue additional common stock to fund future working capital needs.

As a result of the modifications of the convertible debt arrangements in June 2009 and October 2010, the change in conversion value between the original and modified instrument totaling approximately $3.2 million was recorded as additional debt discount with an offsetting amount recorded as additional paid-in capital.  Such debt discount is accreted to the redemption value of the instrument over the remaining term of the loan as additional interest expense.  In connection with the modification transaction in October 2010, the Company recorded a derivative liability related to the conversion option.  The fair value of the derivative liability was marked-to-market at the end of each reporting period and recorded as other income (expense).  On July 25, 2011, the Company entered into an amendment to the facility eliminating the availability to the Company of the unused $3 million portion of the facility.  As a result, the conversion option related to the unused portion of the facility no longer exists and a derivative liability is no longer being recorded.


NOTE 4 – COMMON STOCK

In October 2007, the Company agreed to the conditional issuance of up to 300,000 shares to the former sole shareholder and successor in interest to Exploration Research Associates, Inc. (“ERA”), who is now an employee of the Company.  The agreement settled certain claims by ERA against the Company and provided that the 300,000 shares will be issued if and when certain significant milestones in the development of the Company’s properties are achieved.
 
11
 
 
In November 2008, the Company entered into an agreement with the law firm of Brownstein Hyatt Farber Schreck LLP to provide legal and advisory services.  The primary services being provided are advising the Company as to the Water Project design and implementation, permit approvals, environmental compliance, negotiation and drafting of agreements related to the Water Project.  The agreement provides for interim payments due upon completion of specified milestones with respect to the Water Project, with the fee payable in cash and/or stock.  The first such milestone was satisfied on June 4, 2009, resulting in an obligation by the Company to pay a fee of $500,000, for which the parties agreed to payment in the form of 59,312 shares of the Company’s common stock valued at $8.43 per share, reflecting the fair market value of the stock on June 4, 2009.

In June 2011, the Company filed a shelf registration statement on Form S-3 registering the sale of up to $50 million of the Company’s common stock in one or more public offerings.  The registration statement was declared effective on June 10, 2011.  On July 8, 2011, the Company raised $4.0 million with the sale of 363,636 shares at $11.00 per share by way of a takedown from this shelf registration.


NOTE 5 – STOCK-BASED COMPENSATION PLANS AND WARRANTS

The Company has issued options and has granted stock awards pursuant to its 2003 Management Equity Incentive Plan, 2007 Management Equity Incentive Plan, and 2009 Equity Incentive Plan.  The Company has also granted stock awards pursuant to its Outside Director Compensation Plan.
 
2003 Management Equity Incentive Plan
 
In December 2003, concurrently with the completion of the Company’s then current financing arrangements with ING, the Company’s board of directors authorized the adoption of a Management Equity Incentive Plan.  Under the Incentive Plan, a total of 1,472,051 shares of common stock and common stock options were granted to key personnel.  As of September 30, 2011, a total of 315,000 common stock options remain outstanding under this plan.
 
Outside Director Compensation Plan
 
The Cadiz Inc. Outside Director Compensation Plan was approved by Cadiz shareholders in November 2006.  Under the plan, each outside director receives $30,000 of cash compensation and receives a deferred stock award consisting of shares of the Company’s common stock with a value equal to $20,000 on June 30th of each year.  The award accrues on a quarterly basis, with $7,500 of cash compensation and $5,000 of stock earned for each fiscal quarter in which a director serves.  The deferred stock award vests automatically on the January 31st which first follows the award date.
 
12
 
 
2007 Management Equity Incentive Plan

The 2007 Management Equity Incentive Plan was approved by stockholders at the 2007 Annual Meeting.  The plan provides for the grant and issuance of up to 1,050,000 shares and options to the Company’s employees and consultants.  The plan became effective when the Company filed a registration statement on Form S-8 on July 25, 2007.  As of September 30, 2011, a total of 10,000 common stock options remain outstanding under this plan.

2009 Equity Incentive Plan

The 2009 Equity Incentive Plan was approved by stockholders at the 2009 Annual Meeting.  The plan provides for the grant and issuance of up to 850,000 shares and options to the Company’s employees and consultants.  The plan became effective when the Company filed a registration statement on Form S-8 on December 18, 2009.
 
In January and February 2010, the Company granted a total of 402,500 options for the purchase of one share of common stock under the 2009 Equity Incentive Plan.  These options have strike prices that are at or slightly above the fair market value of the Company’s common stock on the date that the grants became effective.  In February 2011, the Company granted 20,000 options for purchase of one share of common stock at a price of $12.60 under the 2009 Equity Incentive Plan.  In April 2011, the Company granted 100,000 options for purchase of one share of common stock at a price of $12.51 under the 2009 Equity Incentive Plan.  All options under the 2009 Equity Incentive Plan have a ten year term with vesting periods ranging from issuance date to 24 months, and all remained outstanding as of September 30, 2011.

All options that have been issued under the above plans have been issued to officers and employees of the Company.  In total, options to purchase 847,500 shares were unexercised and outstanding on September 30, 2011, under the three equity incentive plans.

The Company recognized stock option related compensation costs of $964,000 and $1,853,000 in the nine months ended September 30, 2011 and 2010, respectively.  On September 30, 2011, there was $534,000 of unamortized compensation expense relating to option awards.  This unamortized compensation expense is expected to be recognized through April 2013.  No options were exercised during the nine months ended September 30, 2011.

Stock Awards to Directors, Officers, and Consultants

The Company has granted stock awards pursuant to its 2007 Management Equity Incentive Plan, 2009 Equity Incentive Plan and Outside Director Compensation Plan.

Of the total 1,050,000 shares reserved under the 2007 Management Equity Incentive Plan, a grant of 950,000 shares became effective on July 25, 2007.  The grant consisted of two separate awards.

-  
 A 150,000 share award, that vested in three equal installments on January 1, 2008, January 1, 2009, and January 1, 2010.  150,000 shares have been issued pursuant to this award as of January 2010; and
 
13
 
 
-  
800,000 of the shares were designated as Milestone – Based Deferred Stock, none of which were ultimately issued.  The shares were allocated for issuance subject to the satisfaction of certain milestone conditions relating to the trading price of the Company's common stock during the period commencing March 13, 2007, and ending March 12, 2009.  The milestone conditions were not satisfied by March 12, 2009, resulting in the expiration of all 800,000 shares.

Of the remaining 100,000 shares reserved under the 2007 Management Equity Incentive Plan, 10,000 were issued as options as described above and 90,000 were issued as shares that vested in May 2009 consistent with the terms of the agreements pursuant to which those executives provide services to the Company.

Of the total 850,000 shares reserved under the 2009 Equity Incentive Plan, a grant of 115,000 restricted shares of common stock became effective on January 14, 2010, and a grant of 140,000 restricted shares of common stock became effective on January 10, 2011, consistent with the terms of the agreements pursuant to which those executives provide services to the Company and which contemplate that such executives will participate in the Company’s long-term incentive plans.
 
        The recipients of these restricted shares have a contractual agreement not to sell any of these shares for a period of three years following the effective date.  Of the remaining 595,000 shares reserved under the 2009 Equity Incentive Plan, 522,500 were issued as options as described above and 72,500 are available for future distribution as of September 30, 2011.
 
Under the Outside Director Compensation Plan, 48,571 shares have been awarded for the plan years ended June 30, 2006, through June 30, 2011.  Of the 48,571 shares awarded, 39,151 shares have vested and been issued.  The remaining shares will vest on January 31, 2012.

The Company recognized stock based compensation costs related to stock based awards of $1,105,000 and $1,298,000 in the nine months ended September 30, 2011 and 2010, respectively.

Stock Purchase Warrants Issued to Non-Employees

A private placement was completed by the Company in November and December of 2008 of 165,000 Units at the price of $31.50 per unit for proceeds of $5,197,500.  Each Unit consists of three (3) shares of the Company’s common stock and two (2) common stock purchase warrants.  The first warrant entitled the holder to purchase one (1) share of common stock at an exercise price of $12.50 per share.  On November 17, 2009, the exercise price of this Callable Warrant was temporarily reduced to $10.50 per share.  In response, holders of 162,849 warrants exercised their warrants, resulting in the Company's issuance of 162,849 shares of common stock with net proceeds of $1,709,915.  The remaining 2,151 warrants were cancelled.  The second warrant entitles the holder to purchase one (1) share of common stock at an exercise price of $12.50 per share.  This warrant has a term of three years and is not callable by the Company.
 
14
 
 
In October and November 2009, the Company raised $7.1 million with a private placement of 226,200 Units at $31.50 per Unit.  This includes 20,880 Units purchased by the Lenders of the Term Loan pursuant to the Lenders’ Participation Rights under the Term Loan.  Each Unit consists of three (3) shares of the Company’s common stock and one (1) stock purchase warrant.  The warrant entitles the holder to purchase one (1) share of common stock at an exercise price of $15.00 per share.  The warrant has a term of three (3) years, but is callable by the Company at any time following November 1, 2010, if the closing market price of the Company’s common stock exceeds $22.50 for 10 consecutive trading days.

391,200 warrants remain outstanding as of September 30, 2011.


NOTE 6 – INCOME TAXES

As of September 30, 2011, the Company had net operating loss (“NOL”) carryforwards of approximately $114 million for federal income tax purposes and $71 million for California state income tax purposes.  Such carryforwards expire in varying amounts through the year 2031.  Use of the carryforward amounts is subject to an annual limitation as a result of ownership changes.

In addition, on August 26, 2005, a Settlement Agreement between Cadiz, on one hand, and Sun World and three of Sun World’s subsidiaries, on the other hand, was approved by the U.S. Bankruptcy Court, concurrently with the Court’s confirmation of the amended Plan.  The Settlement Agreement provides that following the September 6, 2005, effective date of Sun World’s plan of reorganization, Cadiz will retain the right to utilize the Sun World net operating loss carryovers (“NOLs”).  Sun World Federal NOLs are estimated to be approximately $58 million.  If, in any year from calendar year 2005 through calendar year 2011, the utilization of such NOLs results in a reduction of Cadiz’ tax liability for such year, then Cadiz will pay to the Sun World bankruptcy estate 25% of the amount of such reduction, and shall retain the remaining 75% for its own benefit.  There is no requirement that Cadiz utilize these NOLs during this reimbursement period, or provide any reimbursement to the Sun World bankruptcy estate for any NOLs used by Cadiz after this reimbursement period expires.

As of September 30, 2011, the Company possessed unrecognized tax benefits totaling approximately $3.3 million.  None of these, if recognized, would affect the Company's effective tax rate because the Company has recorded a full valuation allowance against these assets.  Additionally, as of that date the Company had approximately $321,000 that was previously accrued for state taxes, interest and penalties related to income tax positions in prior returns.  Income tax penalties and interest are classified as general and administrative expenses.  The Company was not subject to any income tax penalties or interest during the nine months ended September 30, 2011.

The Company does not expect that the unrecognized tax benefits will significantly increase or decrease in the next 12 months.

The Company's tax years 2008 through 2010 remain subject to examination by the Internal Revenue Service, and tax years 2007 through 2010 remain subject to examination by California tax jurisdictions.  In addition, the Company's loss carryforward amounts are generally subject to examination and adjustment for a period of three years for federal tax purposes and four years for California purposes, beginning when such carryovers are utilized to reduce taxes in a future tax year.
 
15
 
 
Because it is more likely than not that the Company will not realize its net deferred tax assets, it has recorded a full valuation allowance against these assets.  Accordingly, no deferred tax asset has been reflected in the accompanying balance sheet.


NOTE 7 – NET LOSS PER COMMON SHARE

Basic earnings per share (EPS) is computed by dividing the net loss, after deduction for preferred dividends either accrued or imputed, if any, by the weighted-average common shares outstanding.  Options, deferred stock units, warrants and convertible debt were not considered in the computation of diluted EPS because their inclusion would have been antidilutive.  Had these instruments been included, the fully diluted weighted average shares outstanding would have increased by approximately 2,852,000 and 2,714,000 for the three months ended September 30, 2011 and 2010, respectively, and 2,778,000 and 2,507,000 for the nine months ended September 30, 2011 and 2010, respectively.
 
16
 
 
Management’s Discussion and Analysis of Financial Condition and Results of Operations

In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements.  Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes".  Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements.  These include, among others, our ability to maximize value from our Cadiz, California land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs.  See additional discussion under the heading “Risk Factors” in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2010.

Overview

Our primary asset consists of 45,000 acres of land located in three areas of eastern San Bernardino County, California.  Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct, a major source of imported water for Southern California.  Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.

For more than 20 years, we have maintained an agricultural development at our property in the Cadiz Valley, relying upon groundwater from the underlying aquifer system for irrigation. In 1993, we secured permits for agricultural production on up to 9,600 acres of our 35,000 acre Cadiz Valley property and the withdrawal of more than one million acre-feet of groundwater from the aquifer system. Since that time, we have maintained various levels of agricultural development at the property and this development has provided our principal source of revenue.  Although sustainable agricultural development is an important and enduring component of our business, we believe that the long-term value of our assets can best be derived through the development of water supply and storage projects at our properties.

The primary factors that drive the value of water supply and storage projects are continued population growth and sustained pressure on water supplies throughout California, including environmental restrictions and regulatory shortages on each of the State’s three primary water sources: the State Water Project, the Colorado River and the Los Angeles Aqueduct.  Availability of supplies in California also differs greatly from year to year due to natural hydrological variability.  For example, a historic drought from 2007 – 2009 was followed by above-average rainfall in 2010 and average rainfall thus far in 2011. Southern California’s water providers rely on imported sources for a majority of their water supplies. With the region’s population expected to continue to expand, Southern California water providers are presently seeking new, reliable supply solutions to account for anticipated fluctuations in traditional supplies and to plan for long-term water needs.
 
17
 
 
At present, our development efforts are primarily focused on the Cadiz Valley Water Conservation, Recovery and Storage Project (“Water Project”), which proposes to capture and conserve millions of acre-feet of native groundwater currently being lost to evaporation from the aquifer system beneath our Cadiz Valley property and deliver it to water providers throughout Southern California (see “Water Resource Development”).  We believe that the ultimate implementation of this Water Project will create the primary source of our future cash flow and, accordingly, our working capital requirements relate largely to the development activities associated with this Water Project.

Additionally, in September 2011, we entered into two separate option agreements giving us the right, but not the obligation, to purchase over 300 miles of existing underground natural gas pipelines (see “Other Development Opportunities”). We are currently exploring the feasibility of converting the pipelines for water transmission and utilizing these lines to transport water between various markets in the region. If feasible, these pipelines would create opportunities to move water in addition to that provided by the Water Project.

Further, we continue to pursue other additional uses of our land and water resource assets, including solar energy development.  Opportunities in the solar energy production market are being driven by a series of policy initiatives issued by the State of California and the United States government.  This includes California’s mandate to acquire 33% of the state’s electricity from renewable sources by 2020 and federal efforts to accelerate the development of renewable energy and energy transmission projects in the Mojave Desert.  Energy companies, government agencies and environmental organizations are engaged in efforts to identify suitable locations for solar energy development to meet future energy needs and are encouraging development on private lands.

We plan to continue our current development efforts and also pursue strategic investments in complementary business or infrastructure to meet our objectives. We cannot predict with certainty when or if these objectives will be realized.

Water Resource Development

The Water Project proposes to capture, conserve and store groundwater beneath our Cadiz Valley property that would otherwise be lost to evaporation from nearby dry lakes and deliver it via a buried conveyance pipeline to the Colorado River Aqueduct for further delivery throughout Southern California.  Through the active management of the aquifer system, the Project will create a reliable and sustainable water supply for Project participants. The Water Project is being designed, constructed and operated in accordance with established groundwater management principles to maximize the reasonable and beneficial use of groundwater and avoid harm to the aquifer system, surrounding desert environment or other consumptive users.

In general, several elements are needed to complete such a project: (1) a pipeline from the Water Project area to the existing water distribution system; (2) storage and supply agreements with one or more public water agencies or private water utilities; (3) environmental permits; and (4) construction and working capital financing.  As described below, the first three elements have progressed on a concurrent basis.  The fourth is dependent on actions arising from the completion of the first three.
 
18
 
 
(1)  
A Pipeline from the Water Project Area to Access the Water Distribution System

In September 2008, we secured a right-of-way for the Water Project’s water conveyance pipeline by entering into a lease agreement with the Arizona & California Railroad Company.  The agreement allows for the use of a portion of the railroad’s right-of-way to construct and operate a water conveyance pipeline for a period up to 99 years. The pipeline would be used to convey water between our Cadiz Valley property and the Colorado River Aqueduct (CRA).

The Company is also exploring the potential to utilize one or more of the unused natural gas pipelines (as described in “Overview” above) that exist in the Project area as a means to access additional distribution systems.
 
(2)  
Storage and Supply Agreements with One or More Public Water Agencies or Private Water Utilities
 
In June 2010, we entered into option and environmental cost sharing agreements with three water providers: Santa Margarita Water District (“Santa Margarita”), Golden State Water Company (a wholly-owned subsidiary of American States Water [NYSE: AWR]), and Three Valleys Municipal Water District.  The three water providers serve more than one million customers in cities throughout California’s San Bernardino, Riverside, Los Angeles, Orange and Ventura Counties.

In September 2010, we entered into option and environmental cost sharing agreements with Suburban Water Systems, a wholly-owned subsidiary of SouthWest Water Company.  Suburban Water Systems provides water to a population of approximately 300,000 people in a 42-square-mile service area across California's Los Angeles and Orange counties.

In May 2011, we entered into an option agreement with Jurupa Community Services District (“JCSD”).  JCSD provides water and sewer services in a 48-square mile service area located in an unincorporated portion of western Riverside County, California.
 
Under the terms of the option agreements with the five water providers, upon completion of the Water Project’s California Environmental Quality Act (“CEQA”) review, each agency will have the right to acquire an annual supply of 5,000 acre-feet of water at a pre-determined formula competitive with their incremental cost of new water.  SMWD also has the option to purchase an additional 10,000 acre-feet of water per year.  The agencies also have options to acquire carry-over storage rights in the Water Project to allow them to manage their supplies in complement with their other water resources.
 
        We continue to work with additional water providers interested in acquiring rights to the remaining annual supply expected to be conserved by the Water Project and are in discussions with third parties regarding the imported storage aspect of this Project.
 
19
 
 
(3)  
Environmental Permits
 
In order to properly develop and quantify the sustainability of the Water Project, and prior to initiating the formal permitting process for the Water Project, we commissioned internationally recognized environmental consulting firm CH2M HILL to complete a comprehensive study of the water resources at the Project area.  Following a year of analysis, CH2M HILL released its study of the aquifer system in February 2010. Utilizing new models produced by the U.S. Geological Survey in 2006 and 2008, the study estimated the total groundwater in storage in the aquifer system to be between 17 and 34 million acre-feet, a quantity on par with Lake Mead, the nation’s largest surface reservoir.  The study also identified a renewable annual supply of native groundwater in the aquifer system currently being lost to evaporation. CH2M HILL’s findings, which were peer reviewed by leading groundwater experts, confirmed that the aquifer system could sustainably support the Water Project.

Further, and also prior to beginning the formal environmental permitting process, we entered into a Memorandum of Understanding with the Natural Heritage Institute (“NHI”), a leading global environmental organization committed to protecting aquatic ecosystems. As part of this “Green Compact”, NHI will assist with our efforts to sustainably manage the development of our Cadiz Valley property and we will follow stringent plans for groundwater management and habitat conservation and create a groundwater monitoring plan for the Water Project.
 
        As discussed in (2), above, we entered into environmental cost sharing agreements with all participating water providers. The environmental cost sharing agreements created a framework for funds to be committed by each participant to share in the costs associated with the CEQA review work. SMWD is serving as the lead agency for the review process. In July 2010, ESA Associates, a leading environmental consulting firm, was retained to prepare the Water Project’s formal CEQA documentation. 

A Notice of Preparation (NOP) of a Draft Environmental Impact Report (DEIR) formally commencing the public portion of the CEQA process was issued in February 2011 by SMWD, and a 30-day scoping comment period was initiated at that time. Two public scoping meetings were held in March 2011.

In April 2011, a 12-member Groundwater Stewardship Committee (GSC) comprised of leading national groundwater experts was formed by SMWD and other project participants, including the Company, to review historical and recently collected field data and modeling work and provide advice and recommendations for the Water Project’s proposed operating plan and monitoring program. Members of the GSC were drawn from various sectors and include individuals from regulatory institutions, non-governmental organizations, academia, and the professional groundwater industry, all with extensive experience on similar projects. In October 2011, the GSC issued its findings and recommendations to SMWD as part of the ongoing CEQA process. After an extensive review of all available technical studies, the GSC concluded that the Project could be implemented without harming the environment. The panel recommended the inclusion of a state-of-the-art groundwater protection program as added assurance to the community of its findings. The work of the GSC will be incorporated into the DEIR document, which is expected to be released for public review and comment in the coming weeks.
 
(4)  
Construction and Working Capital
 
Once the environmental review is concluded, we expect that we will complete economic agreements with the Water Project participants and make arrangements for the construction phase of the Water Project.  Construction would consist of wellfield facilities at our Cadiz Valley property and a conveyance pipeline extending approximately 43 miles along the right-of-way described in (1), above, from the wellfield to the Colorado River Aqueduct.
 
20
 
 
Should the Water Project ultimately include any of the existing natural gas pipelines which are subject to our option rights, then we will also incur costs associated with the exercise of these options and the conversion of the pipelines (see “Other Development Opportunities”).
 
Agricultural Development
 
Within the Cadiz Valley property, 9,600 acres have been zoned for agriculture.  The infrastructure includes seven wells that are interconnected within this acreage, with total annual production capacity of approximately 13,000 acre-feet of water.  Additionally, there are housing and kitchen facilities that support up to 300 employees associated with the agricultural operations.  The underlying groundwater, fertile soil, and desert temperatures are well suited for a wide variety of fruits and vegetables.

Permanent crops currently in commercial production include 160 acres of vineyards of certified-organic, dried-on-the-vine raisins and 260 acres of lemons.  Both of these crops are farmed using sustainable agricultural practices.  Seasonal vegetable crops in production include squash and beans.  All seasonal vegetable crops are grown organically.

We currently derive our agricultural revenues through the sale of our products in bulk or through independent packing facilities.  We incur all of the costs necessary to produce and harvest our organic raisin crop.  These raisins are then sold in bulk to a raisin processing facility.  We also incur all of the costs necessary to produce our lemon crop.  Once harvested, the lemons are shipped in bulk to a packing and sales facility.  In 2009, we entered into a lease agreement with a third party to develop up to an additional 500 acres of lemon orchards, 110 acres of which have been planted to date.  We expect to receive lease income once the new lemon orchards reach commercial production through a profit sharing agreement within the lease.

Although we plan to maintain our agricultural development, revenues will continue to vary from year to year based on acres in development, crop yields, and prices.  Further, we do not believe that our agricultural revenues are likely to be material to our overall results of operations once we begin to receive revenues from the Water Project.

Other Development Opportunities

Water Transportation

As described above (see “Overview”), we are currently evaluating the feasibility of converting existing idle natural gas pipelines for the transportation of water, either exclusively for the distribution of third party water or, in certain segments, in conjunction with the Water Project. In September 2011, we entered into two separate option agreements to purchase over 300 miles of existing underground natural gas pipelines. These two agreements, with unrelated parties, provide us with option terms that expire in April and December of 2012 to perform due diligence and determine the feasibility of water transportation uses.  If both purchase options are exercised they would require payments totaling $50 million.  Should conversion prove feasible, then upon conversion the pipelines are expected to have a combined average capacity to distribute up to 40,000 acre-feet of water per year in markets that currently lack multiple pick-up and delivery water distribution segments. Specific segments that may be used in conjunction with the Water Project will be further evaluated in its environmental documents.
 
21
 
 
Currently, the vast majority of potential water transfers in Southern California are difficult to implement because of location or the lack of space available in the existing distribution system, thereby creating a demand for additional water transfer capacity.  If we are ultimately able to utilize the natural gas pipelines to provide new water transmission lines in key markets, we intend to access existing demand for water transfers and allow agencies to do so outside of the few existing systems.  Further, we believe a conversion of the pipelines for water transfer use, if feasible, will allow remote water supplies to reach the urban market and could also help link Southern California groundwater systems that have been historically inaccessible.

Solar Energy Production

In addition to the development projects described above, we believe that our landholdings are suitable for other types of development, including solar energy production.  Located in an area with strong solar irradiation, proximity to existing utility corridors, appropriate topography, and access to water supplies, our properties could provide an ideal setting for solar energy generation. Moreover, state, federal and local government entities, along with environmental organizations, have issued compelling calls to increase the production of renewable energy to reduce greenhouse gas emissions and the consumption of imported fossil fuels.  Solar energy development on private land, particularly in the Mojave Desert region where our properties are located, is being encouraged as an alternative to the use of federal desert lands.

We believe that our significant, contiguous private landholdings in the Mojave Desert could provide an alternative to the use of federal lands for new solar facilities in the region.  Up to 20,000 acres at our Cadiz Valley property could potentially be made available for solar energy projects.  We are presently in discussions with energy companies interested in utilizing our landholdings for various types of solar energy development.

We believe that over the longer-term, the population of Southern California, Nevada, and Arizona will continue to grow, and that, in time, the economics of commercial and residential development of our properties will become attractive. Moreover, other opportunities in business or infrastructure complementary to our current objectives could become attractive and provide new opportunities for our business.

We remain committed to the sustainable use of our land and water assets, and will continue to explore all opportunities for environmentally-responsible development of these assets.  We cannot predict with certainty which of these various opportunities will ultimately be utilized.

Results of Operations

Three Months Ended September 30, 2011, Compared to Three Months Ended September 30, 2010

We have not received significant revenues from our water resource and real estate development activity to date.  As a result, we have historically incurred a net loss from operations.  We had revenues of $121 thousand for the three months ended September 30, 2011, and $274 thousand for the three months ended September 30, 2010.  We incurred a net loss of $4.1 million in the three months ended September 30, 2011, compared with a $3.2 million net loss during the three months ended September 30, 2010.
 
22
 
 
Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e. general and administrative expense) and our interest expense.  We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.

Revenues  We had revenues of $121 thousand for the three months ended September 30, 2011, and $274 thousand for the three months ended September 30, 2010.  The decrease in revenue in 2011 was primarily due to a smaller raisin crop in 2011 in comparison to the 2010 raisin crop.

Cost of Sales  Cost of sales totaled $266 thousand for the three months ended September 30, 2011, and $256 for the three months ended September 30, 2010.  The harvest for the 2011 raisin crop was smaller than the prior year, which required a higher allocation of fixed growing costs in 2011 to a smaller crop.  This resulted in an increase in cost of sales for the three months ended September 30, 2011, as compared to the same period the prior year.

General and Administrative Expenses General and administrative expenses were $2.5 million during the three months ended September 30, 2011, and $2.0 million during the three months ended September 30, 2010.  Non-cash compensation costs for stock and option awards are included in General and Administrative Expenses.  The higher 2011 expenses were primarily due to additional legal and consulting fees related to water development efforts, and are partially offset by the lower stock based non-cash compensation costs related to options issued in 2010 under the 2009 Equity Incentive plan.

Compensation costs from stock and option awards for the three months ended September 30, 2011, were $276 thousand, compared with $478 thousand for the three months ended September 30, 2010.  The expense reflects the vesting schedules of the stock and option awards under the 2009 equity incentive plan.

Other General and Administrative Expenses, exclusive of stock based compensation costs, totaled $2.2 million and $1.5 million for the three months ended September 30, 2011 and 2010, respectively.

Depreciation Depreciation expense totaled $92 thousand for the three months ended September 30, 2011, and $81 thousand for the three months ended September 30, 2010.

Interest Expense, net  Net interest expense totaled $1.5 million during the three months ended September 30, 2011, compared to $1.1 million during the same period in 2010.  The following table summarizes the components of net interest expense for the two periods (in thousands):
 
23
 
 
 
Three Months Ended
 
September 30,
 
2011
 
2010
         
Interest on outstanding debt
  $ 843     $ 689  
Amortization of financing costs
    13       11  
Amortization of debt discount
    595       393  
Interest income
    -       (1
                 
    $ 1,451     $ 1,092  

See Notes to the Consolidated Financial Statements: Note 3 – Long-term Debt.

Other Income, net  Net other income for the three months ended September 30, 2011, was $52 thousand, and $0 for the three months ended September 30, 2010.  The amount recorded in 2011 relates to the derivative liability associated with certain of the Term Loan’s conversion options.  See Notes to the Consolidated Financial Statements:  Note 3 – Long-term Debt.

Income Taxes  Income tax expense for the three months ended September 30, 2011, was $2 thousand, and $1 thousand for the three months ended September 30, 2010.   See Notes to the Consolidated Financial Statements: Note 6 – Income Taxes.

Nine Months Ended September 30, 2011, Compared to Nine Months Ended September 30, 2010

We had revenues of $618 thousand for the nine months ended September 30, 2011, and $281 thousand for the nine months ended September 30, 2010.  We incurred a net loss of $12.1 million in the nine months ended September 30, 2011, compared with an $11.5 million net loss during the nine months ended September 30, 2010.

Revenues  Cadiz had revenues of $618 thousand for the nine months ended September 30, 2011, and $281 thousand for the nine months ended September 30, 2010.  The increase in revenue in 2011 was primarily due to a larger and longer 2010-2011 lemon harvest season in comparison to the 2009-2010 lemon harvest season, and is partially offset by a decrease in revenue due to a smaller raisin crop in 2011 in comparison to the 2010 raisin crop.

Cost of Sales  Cost of sales totaled $716 thousand during the nine months ended September 30, 2011, and $256 during the nine months ended September 30, 2010.  The higher cost of sales for the nine months ended September 30, 2011, is primarily due to the higher lemon harvesting and marketing costs related to the larger size of the 2010-2011 lemon crop.

General and Administrative Expenses General and administrative expenses during the nine months ended September 30, 2011, totaled $7.7 million compared to $8.1 million for the nine months ended September 30, 2010.  Non-cash compensation costs for stock and option awards are included in General and Administrative Expenses.  The lower 2011 expense was primarily due to lower stock based non-cash compensation costs related to options issued in 2010 under the 2009 Equity Incentive Plan, and is partially offset by higher 2011 expenses primarily due to additional legal and consulting fees related to water development efforts.
 
24
 
 
Compensation costs from stock and option awards for the nine months ended September 30, 2011, were $2.1 million compared with $3.2 million for the nine months ended September 30, 2010.  The expense reflects the vesting schedules of the stock and option awards under the 2009 equity incentive plan.

Other General and Administrative Expenses, exclusive of stock based compensation costs, totaled $5.6 million in the nine months ended September 30, 2011, compared with $5.0 million for the nine months ended September 30, 2010.

Depreciation Depreciation expense totaled $273 thousand for the nine months ended September 30, 2011, and $263 thousand for the nine months ended September 30, 2010.

Interest Expense, net  Net interest expense totaled $4.2 million during the nine months ended September 30, 2011, compared to $3.2 million during the same period in 2010.  The following table summarizes the components of net interest expense for the two periods (in thousands):

 
Nine Months Ended
 
 
September 30,
 
 
2011
   
2010
 
           
Interest on outstanding debt
  $ 2,406     $ 2,016  
Amortization of financing costs
    52       30  
Amortization of debt discount
    1,713       1,133  
Interest income
    (2 )     (5 )
                 
    $ 4,169     $ 3,174  

See Notes to the Consolidated Financial Statements: Note 3 – Long-term Debt.

Other Income, net  Net other income for the nine months ended September 30, 2011, was $108 thousand, and $0 for the nine months ended September 30, 2010.  The amount recorded in 2011 is in connection to the derivative liability related to certain of the Term Loan’s conversion options.  See Notes to the Consolidated Financial Statements:  Note 3 – Long-term Debt.

Income Taxes  Income tax expense was $5 thousand for the nine months ended September 30, 2011, and $3 thousand for the nine months ended September 30, 2010.  See Notes to the Consolidated Financial Statements: Note 6 – Income Taxes.

Liquidity and Capital Resources

Current Financing Arrangements

As we have not received significant revenues from our water resource, agricultural and renewable energy development activity to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred, and the time that revenue will commence.  Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants.
 
25
 
 
We have worked with our secured lenders to structure our debt in a way which allows us to continue our development of the Water Project and minimize the dilution of the ownership interests of common stockholders.  In June 2006, we entered into a $36.4 million five year zero coupon senior secured convertible term loan with Peloton Partners LLP and another lender (the “Term Loan”).  On April 16, 2008, we were advised that Peloton had assigned its interest in the Term Loan to an affiliate of Lampe Conway & Company LLC (“Lampe Conway” or “Lenders”), and Lampe Conway subsequently replaced Peloton as administrative agent of the loan.  On June 4, 2009, we completed arrangements to extend the maturity date of the Term Loan from June 29, 2011 to June 29, 2013 with interest continuing to accrue at 6% per annum though maturity.  Further, the conversion feature was modified to allow up to $4.55 million of principal to be converted into 650,000 shares of Cadiz common stock at a conversion price of $7 per share, and the remaining principal and interest to be converted into shares of Cadiz common stock at a conversion price of $35 per share.

                On October 19, 2010 (“Closing Date”), we closed a new $10 million working capital facility with our existing Lenders.  Under the terms of the new $10 million facility, we drew the first $5 million on the Closing Date (“First Tranche”).  Also upon closing, we were granted the option to draw up to an additional $5 million over the 12 months following the Closing Date (“Second Tranche”).    We drew a total of $2 million on the second tranche prior to its expiration.  All interest on outstanding balances accrues at 6%, with no principal or interest payments required before the new facility’s June 29, 2013 maturity date, consistent with our existing term debt facility.  The First Tranche (including accrued interest) is convertible at any time into our common stock at a price of $13.50 per share, and the Second Tranche (including accrued interest) is convertible into our common stock at $12.50 per share.
 
                Also on the Closing Date, our existing debt facility with the Lenders was modified as to certain of its conversion features.  $20.62 million of the existing convertible debt was changed to allow for up to $2.5 million of this amount to be converted at any time into our common stock at the price of $13.50 per share, with the remaining amount becoming non-convertible. On June 30, 2011, $2 million of the $5 million available Second Tranche was drawn.   As a result of the Second Tranche draw, $4 million of the outstanding loan became convertible into 320,000 shares of Cadiz common stock.  Further, approximately $10 million of the loan that was previously convertible into approximately 290,000 shares of Cadiz common stock is no longer convertible.
 
The debt covenants associated with the loan were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed.  At September 30, 2011, the Company was in compliance with its debt covenants.

On July 8, 2011, the Company sold 363,636 shares of Common Stock (the “Shares”) at a price of $11.00 per share for total proceeds of $4,000,000.  The proceeds were used to replace the unutilized portion of the Company’s working capital facility and for general corporate purposes.
 
26
 
 
Additionally, as a result of private placements conducted in 2008 and 2009, the Company has 165,000 common stock purchase warrants outstanding that are exercisable at $12.50 and expire in November and December of 2011, and 226,200 common stock purchase warrants outstanding that are exercisable at $15.00 and expire in October and November of 2012.  If these warrants were fully exercised, they would result in proceeds of approximately $5.4 million to the Company.
 
As we continue to actively pursue our business strategy, additional financing will be required.  See “Outlook”, below.  The covenants in the Term Loan do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing.  We do not expect the loan covenants to materially limit our ability to finance our water development activities.

At September 30, 2011, we had no outstanding credit facilities other than the Convertible Term Loan.

Cash Used for Operating Activities.  Cash used for operating activities totaled $5.3 million and $5.1 million for the nine months ended September 30, 2011 and 2010, respectively.  Working capital requirements are seasonally less in the second half of the year as proceeds from agricultural operations are realized.  The cash was primarily used to fund general and administrative expenses related to our resource development efforts.

Cash Used for Investing Activities.  Cash used for investing activities during the nine months ended September 30, 2011, was $3.1 million, compared with $743 thousand during the same period in 2010.   The 2011 period included additional investments in well-field and environmental work related to progressing the Water Project.
 
 
Cash Provided By (Used for) Financing Activities.  Cash provided by financing activities was $6.0 million during the nine months ended September 30, 2011, compared with $17 thousand of cash used for financing activities during the comparable prior year period.  The 2011 cash provided includes $2 million drawn by the Company on the Second Tranche of its existing Term Loan and $4.0 million of proceeds from the issuance of shares as described above.
 
Outlook

Short Term Outlook. Based on our current and anticipated usage of cash resources, we will require additional working capital commencing during the second quarter of fiscal 2012 to meet our cash resource needs from that point forward and to continue to finance our operations until such time as our asset development programs produce revenues.  If we are unable to generate cash from our current development activities, then we will need to seek additional debt or equity financing in the capital markets.  We expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities.  See "Long Term Outlook", below.  No assurances can be given, however, as to the availability or terms of any new financing.
 
27
 
 
Long Term Outlook. In the longer term, we will need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our senior secured convertible term loan at maturity.  See “Current Financing Arrangements” above.  Payments will be due under the term loan only to the extent that lenders elect not to exercise equity conversion rights prior to the loan’s final maturity date.  Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other development.  Future capital expenditures will depend primarily on the progress of the Water Project.  We will evaluate the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis.  We may meet any future cash requirements through a variety of means, including debt or equity placements, or through the sale or other disposition of assets.  Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders.  Limitations on our liquidity and ability to raise capital may adversely affect us.  Sufficient liquidity is critical to meet our resource development activities.  However, liquidity in the currently dislocated capital markets has been severely constrained since the beginning of the credit crisis.  Although we currently expect our sources of capital to be sufficient to meet our near term liquidity needs, there can be no assurance that our liquidity requirements will continue to be satisfied.  If we cannot raise needed funds, we might be forced to make substantial reductions in our operating expenses, which could adversely affect our ability to implement our current business plan and ultimately our viability as a company.

Recent Accounting Pronouncements

See Note 1 to the Consolidated Financial Statements – Description of Business and Summary of Significant Accounting Policies.

Certain Known Contractual Obligations

   
Payments Due by Period
 
Contractual Obligations
 
Total
   
1 year or less
   
2-3 years
   
4-5 years
   
After 5 years
 
(in thousands)
 
                             
Long-term debt obligations
  $ 55,825     $ 8     $ 56,817     $ -     $ -  
Interest Expense
    6,213       -       6,213       -       -  
Operating leases
    459       348       111       -       -  
    $ 62,497     $ 356     $ 62,141     $ -     $ -  
                                         
* The above table does not reflect unrecognized tax benefits of $3.3 million, the timing of which is uncertain. Refer to Note 7 to our Annual Report on Form 10-K for the year ended December 31, 2010.
 
 
         Not included in the table above is a potential obligation to pay an amount of up to 1% of the net present value of the Water Project in consideration of certain legal and advisory services to be provided to us by Brownstein Hyatt Farber Schreck LLP.  The primary services being provided are advising us as to Water Project design and implementation, permit approvals, environmental compliance, negotiation and drafting of agreements related to the Water Project.  This fee would be payable upon receipt of all environmental approvals and permits and the execution of binding agreements for at least 51% of the Water Project’s annual capacity.  A portion of this fee may be payable in stock.  Interim payments of up to $1.5 million, to be credited against the final total, would be made upon the achievement of certain specified milestones.  $500 thousand of these interim payments was earned in June 2009 in consideration for the legal and advisory services previously provided.  This arrangement may be terminated by either party upon 60 days notice, with any compensation earned but unpaid prior to termination payable following termination.
 
28
 
 
ITEM 3.  Quantitative and Qualitative Disclosures about Market Risk

As of September 30, 2011, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.


ITEM 4. Controls and Procedures

Disclosure Controls and Procedures
 
The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chairman and Chief Executive Officer (the “Principal Executive Officer”) and Chief Financial Officer (the “Principal Financial Officer”) and to its Board of Directors.  Based on their evaluation as of September 30, 2011, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.
 
Changes in Internal Controls Over Financial Reporting
 
In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.
 
29
 
 
PART II - OTHER INFORMATION


ITEM 1.
Legal Proceedings

         There are no material pending legal proceedings to which the Company is a party or of which any of the Company's property is the subject.

 
ITEM 1A.
Risk Factors

There have been no material changes to the factors disclosed in Item 1A. Risk Factors in the Company's Annual Report on Form 10-K for the year ended December 31, 2010.
 

ITEM 2.
Unregistered Sales of Equity Securities and Use of Proceeds

Not applicable.


ITEM 3.
Defaults Upon Senior Securities
 
Not applicable.


ITEM 4.
(Removed and Reserved)


ITEM 5.
Other Information
 
30
 
 
ITEM 6.
Exhibits

The following exhibits are filed or incorporated by reference as part of this Quarterly Report on Form 10-Q.
 
 
31.1
Certification of Keith Brackpool, Chairman and Chief Executive Officer of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

 
31.2
Certification of Timothy J. Shaheen, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

 
32.1
Certification of Keith Brackpool, Chairman and Chief Executive Officer of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

 
32.2
Certification of Timothy J. Shaheen, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
 
31
 
 
SIGNATURE


Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Cadiz Inc.
 
By:  /s/ Keith Brackpool November 8, 2011
 
Keith Brackpool
Date 
  Chairman of the Board and Chief Executive Officer  
  (Principal Executive Officer)   
     
     
By:  /s/ Timothy J. Shaheen November 8, 2011
  Timothy J. Shaheen  Date 
  Chief Financial Officer and Secretary  
  (Principal Financial Officer)   

32