EDISON INTERNATIONAL - Annual Report: 2022 (Form 10-K)
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
☑ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended | December 31, 2022 |
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from to
1-9936 | EDISON INTERNATIONAL | California | 95-4137452 | |||
1-2313 | SOUTHERN CALIFORNIA EDISON COMPANY | California | 95-1240335 |
EDISON INTERNATIONAL |
| SOUTHERN CALIFORNIA EDISON COMPANY |
2244 Walnut Grove Avenue | 2244 Walnut Grove Avenue | |
(P.O. Box 976) | (P.O. Box 800) | |
Rosemead, California 91770 | Rosemead, California 91770 | |
(Address of principal executive offices) | (Address of principal executive offices) | |
(626) 302-2222 | (626) 302-1212 | |
(Registrant's telephone number, including area code) | (Registrant's telephone number, including area code) |
Securities registered pursuant to Section 12(b) of the Act:
Edison International:
Title of each class | Trading Symbol(s) | Name of each exchange on which registered | |
Common Stock, no par value | EIX | NYSE | LLC |
Southern California Edison Company: None
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
Edison International |
| Yes þ No ☐ |
| Southern California Edison Company |
| Yes þ No ☐ |
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.
Edison International |
| Yes ☐ No þ |
| Southern California Edison Company |
| Yes ☐ No þ |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Edison International |
| Yes þ No ☐ |
| Southern California Edison Company |
| Yes þ No ☐ |
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Edison International |
| Yes þ No ☐ |
| Southern California Edison Company |
| Yes þ No ☐ |
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of "large accelerated filer," accelerated filer," "smaller reporting company," and "emerging growth company" in Rule 12b-12 of the Exchange Act. (Check One):
Edison International | Large Accelerated Filer | Accelerated Filer | Non-accelerated Filer | Smaller Reporting Company | Emerging growth company |
☑ | ☐ | ☐ | ☐ | ☐ | |
Southern California Edison Company | Large Accelerated Filer | Accelerated Filer | Non-accelerated Filer | Smaller Reporting Company | Emerging growth company |
☐ | ☐ | ☑ | ☐ | ☐ |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Edison International |
| ☐ |
| Southern California Edison Company |
| ☐ |
Indicate by check mark whether the registrant has filed a report on and attestation to its management's assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C 7262(b)) by the registered public accounting firm that prepared or issued its audit report.
Edison International |
| ☑ |
| Southern California Edison Company |
| ☐ |
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.
Edison International |
| ☐ |
| Southern California Edison Company |
| ☐ |
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b).
Edison International |
| ☐ |
| Southern California Edison Company |
| ☐ |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Edison International |
| Yes ☐ No þ |
| Southern California Edison Company |
| Yes ☐ No þ |
Aggregate market value of voting and non-voting common equity held by non-affiliates of the registrants as of June 30, 2022, the last business day of the most recently completed second fiscal quarter:
Edison International |
| Approximately $24 billion |
| Southern California Edison Company |
| owned by Edison International |
Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:
Common Stock outstanding as of February 16, 2023:
Edison International | 382,566,466 | shares | ||
Southern California Edison Company | 434,888,104 | shares (wholly owned by Edison International) |
OMISSION OF CERTAIN INFORMATION
Southern California Edison Company meets the conditions set forth in General Instruction I(1)(a) and (b) of Form 10-K and is therefore filing this Form with the reduced disclosure format allowed under the General Instruction.
DOCUMENTS INCORPORATED BY REFERENCE
Designated portions of the Edison International Proxy Statement relating to Edison International's 2023 Annual Meeting of Shareholders are incorporated by reference into Part III of this report.
TABLE OF CONTENTS
SEC Form 10-K | ||
Reference Number | ||
vi | ||
1 | ||
MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS | 4 | Part II, Item 7 |
4 | ||
4 | ||
6 | ||
7 | ||
8 | ||
8 | ||
10 | ||
12 | ||
13 | ||
13 | ||
14 | ||
14 | ||
16 | ||
16 | ||
16 | ||
17 | ||
17 | ||
17 | ||
17 | ||
18 | ||
18 | ||
22 | ||
23 | ||
25 | ||
26 | ||
27 | ||
28 | ||
29 | ||
29 |
i
32 | ||
33 | ||
33 | ||
34 | ||
34 | ||
34 | ||
34 | ||
34 | ||
35 | ||
36 | ||
36 | ||
36 | ||
38 | ||
39 | ||
40 | ||
41 | ||
43 | ||
44 | ||
44 | Part I, Item 1A | |
44 | ||
44 | ||
44 | ||
46 | ||
51 | ||
52 | ||
52 | ||
RISKS RELATING TO EDISON INTERNATIONAL AND SOUTHERN CALIFORNIA EDISON COMPANY | 53 | |
54 | Part II, Item 7A | |
54 | Part II, Item 8 | |
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM (PCAOB ID 238) | 55 | |
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM (PCAOB ID 238) | 59 | |
62 |
ii
iii
142 | Part I, Item 1 | |
142 | ||
143 | ||
143 | ||
143 | ||
146 | ||
146 | ||
146 | ||
148 | ||
151 | ||
152 | ||
154 | ||
155 | ||
155 | ||
156 | ||
157 | ||
158 | ||
158 | ||
158 | ||
160 | ||
160 | Part I, Item 1B | |
160 | Part I, Item 2 | |
160 | Part I, Item 3 | |
160 | ||
161 | ||
162 | Part I, Item 4 | |
162 | ||
162 | Part I | |
163 | Part III, Item 10 | |
163 | Part III, Item 11 | |
SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS | 163 | Part III, Item 12 |
CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE | 164 | Part III, Item 13 |
164 | Part III, Item 14 |
iv
165 | Part II, Item 5; | |
165 | ||
165 | ||
166 | ||
166 | Part IV, Item 16 | |
166 | Part II, Item 9B Part II, Item 6 | |
DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS | 166 | Part II, Item 9C |
166 | Part IV, Item 15 | |
168 | ||
174 | ||
181 |
This is a combined Form 10-K separately filed by Edison International and Southern California Edison Company. Information contained herein relating to an individual company is filed by such company on its own behalf. Each company makes representations only as to itself and makes no other representation whatsoever as to any other company.
v
GLOSSARY
The following terms and abbreviations appearing in the text of this report have the meanings indicated below.
2017/2018 Wildfire/Mudslide Events | the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire, collectively |
AB 1054 | California Assembly Bill 1054, executed by the governor of California on July 12, 2019 |
AB 1054 Excluded Capital Expenditures | approximately $1.6 billion in wildfire risk mitigation capital expenditures that SCE has excluded from the equity portion of SCE's rate base as required under AB 1054 |
AB 1054 Liability Cap | a cap on the aggregate requirement to reimburse the Wildfire Insurance Fund over a trailing three calendar year period which applies if certain conditions are met and is equal to 20% of the equity portion of the utility's transmission and distribution rate base, excluding general plant and intangibles, in the year of the applicable prudency determination |
ARO(s) | asset retirement obligation(s) |
BRRBA | Base Revenue Requirement Balancing Account |
CAISO | California Independent System Operator |
Capistrano Wind | a group of wind projects referred to as Capistrano Wind |
Capital Structure Compliance Period | January 1, 2023 to December 31, 2025, the current compliance period for SCE's CPUC authorized capital structure |
CAPP | California Arrearage Payment Program |
CCAs | community choice aggregators which are cities, counties, and certain other public agencies with the authority to generate and/or purchase electricity for their local residents and businesses |
CDP | Coastal Development Permit |
CEMA | Catastrophic Event Memorandum Account |
COVID-19 | Coronavirus disease 2019 |
CPUC | California Public Utilities Commission |
CSRP | Customer Service Re-platform, a SCE project to implement a new customer service system |
DART | a Days Away Restricted or Transferred incident, which is a work-related Occupational Safety and Health Administration recordable injury or illness that results in days away from work, restricted duty or transfer of duties |
DGC | the decommissioning general contractor engaged by SCE to undertake a significant scope of decommissioning activities at San Onofre |
Edison Energy | Edison Energy, LLC, an indirect wholly-owned subsidiary of Edison International, is engaged in the competitive business of providing integrated decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe |
Edison International Proxy Statement | Proxy Statement to be filed with the SEC in connection with Edison International's Annual Meeting of Shareholders' to be held on April 27, 2023 |
vi
EEI Serious Injury | a work-related injury that is categorized as a "serious injury" by Edison Electric Institute, which includes injuries that meet any of the following "serious" criteria: amputations (involving bone); concussions and/or cerebral hemorrhages; injury to internal organs; bone fractures excluding fingers and toes, compound bone fractures for fingers and toes; tendon and ligament tears; herniated disks (neck or back); lacerations resulting in severed tendons and/or a deep wound requiring internal stitches; second or third degree burns; eye injuries resulting in eye damage or loss of vision; injections of foreign materials; severe heat exhaustion and all heat stroke; and dislocation of a major joint |
EEI SIF | a work-related fatality or a EEI Serious Injury |
EIS | Edison Insurance Services, Inc., a wholly-owned subsidiary of Edison International is licensed to provide insurance to Edison International and its subsidiaries |
Electric Service Provider | an entity that offers electric power and ancillary services to retail customers, other than electrical corporations (like SCE) and CCAs |
ERRA | Energy Resource Recovery Account |
FERC | Federal Energy Regulatory Commission |
Fitch | Fitch Ratings, Inc. |
GAAP | generally accepted accounting principles in the United States |
GHG | greenhouse gas |
GRC | general rate case |
IRA | Inflation Reduction Act of 2022 |
Koenigstein Fire | a wind-driven fire that originated near Koenigstein Road in the City of Santa Paula in Ventura County, California, on December 4, 2017 |
MD&A | Management's Discussion and Analysis of Financial Condition and Results |
Montecito Mudslides | the debris flows and flooding in Montecito, Santa Barbara County, California, that occurred in January 2018 |
Moody's | Moody's Investors Service, Inc. |
MW | megawatts |
NEM | net energy metering |
NERC | North American Electric Reliability Corporation |
NRC | United States Nuclear Regulatory Commission |
NSGBA | New System Generation Balancing Account |
OEIS | Office of Energy Infrastructure Safety of the California Natural Resources Agency |
PABA | Portfolio Allocation Balancing Account |
Palo Verde | nuclear electric generating facility located near Phoenix, Arizona in which SCE holds a 15.8% ownership interest |
PBOP(s) | postretirement benefits other than pension(s) |
PCIA | Power Charge Indifference Adjustment |
PG&E | Pacific Gas & Electric Company |
Post–2018 Wildfires | Collectively, all the wildfires that originated in Southern California after 2018 where SCE’s equipment may be alleged to be associated with the fire’s ignition |
vii
PSPS | Public Safety Power Shutoff(s) |
ROE | return on common equity |
RPS | California's Renewables Portfolio Standard |
S&P | Standard & Poor's Financial Services LLC |
Safety Tier 1 Contractors | individuals assigned to contracted work activities that may be high risk and, without implementation of appropriate safety measures, may be potentially hazardous or life threatening |
San Onofre | retired nuclear generating facility located in south San Clemente, California in which SCE holds a 78.21% ownership interest |
SCE | Southern California Edison Company, a wholly-owned subsidiary of Edison International |
SCE Recovery Funding LLC | a bankruptcy remote, wholly owned special purpose subsidiary, consolidated by SCE |
SDG&E | San Diego Gas & Electric |
SEC | U.S. Securities and Exchange Commission |
SED | Safety and Enforcement Division of the CPUC |
SED Agreement | An agreement dated October 21, 2021 between SCE and the SED |
SoCalGas | Southern California Gas Company |
Thomas Fire | a wind-driven fire that originated in the Anlauf Canyon area of Ventura County, California, on December 4, 2017 |
TKM | collectively, the Thomas Fire, the Koenigstein Fire and the Montecito Mudslides |
TKM Subrogation Plaintiffs | the plaintiffs party to the TKM Subrogation Settlement, representing all the insurance subrogation plaintiffs in the TKM litigation at the time of the settlement |
TKM Subrogation Settlement | a settlement entered into by Edison International and SCE in September 2020 in the TKM litigation to which the TKM Subrogation Plaintiffs are party |
Turnover Rate | the number of employees (other than interns) who leave the companies for voluntary or involuntary reasons, excluding death, divided by the average number of employees during the relevant period |
WCCP | Wildfire Covered Conductor Program |
WEMA | Wildfire Expense Memorandum Account |
WMP | a wildfire mitigation plan required to be filed under AB 1054 to describe a utility's plans to construct, operate, and maintain electrical lines and equipment that will help minimize the risk of catastrophic wildfires caused by such electrical lines and equipment |
Wildfire Insurance Fund | the insurance fund established under AB 1054 |
Woolsey Fire | a wind-driven fire that originated in Ventura County in November 2018 |
Woolsey Subrogation Plaintiffs | the plaintiffs party to the Woolsey Subrogation Settlement, representing all the insurance subrogation plaintiffs in the Woolsey Fire litigation at the time of the settlement |
Woolsey Subrogation Settlement | a settlement entered into by Edison International and SCE in January 2021 in the Woolsey litigation to which the Woolsey Subrogation Plaintiffs are party |
viii
FORWARD-LOOKING STATEMENTS
This Annual Report on Form 10-K contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect Edison International's and SCE's current expectations and projections about future events based on Edison International's and SCE's knowledge of present facts and circumstances and assumptions about future events and include any statements that do not directly relate to a historical or current fact. Other information distributed by Edison International and SCE that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "projects," "intends," "plans," "probable," "may," "will," "could," "would," "should," “targets,” and variations of such words and similar expressions, or discussions of strategy or plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ from those currently expected, or that otherwise could impact Edison International and SCE, include, but are not limited to the:
● | ability of SCE to recover its costs through regulated rates, including uninsured wildfire-related and debris flow-related costs, costs incurred to mitigate the risk of utility equipment causing future wildfires, costs incurred as a result of the COVID-19 pandemic, and increased costs due to supply chain constraints, inflation and rising interest rates; |
● | ability of SCE to implement its WMP and capital program; |
● | risks of regulatory or legislative restrictions that would limit SCE's ability to implement operational measures to mitigate wildfire risk, including PSPS and fast curve settings, when conditions warrant or would otherwise limit SCE's operational practices relative to wildfire risk mitigation; |
● | risks associated with SCE implementing PSPS, including regulatory fines and penalties, claims for damages and reputational harm; |
● | ability of SCE to maintain a valid safety certification; |
● | ability of Edison International and SCE to obtain sufficient insurance at a reasonable cost, including insurance relating to wildfire-related claims, and to recover the costs of such insurance or, in the event liabilities exceed insured amounts, the ability to recover uninsured losses (including amounts paid for self-insured retention and co-insurance) from customers or other parties; |
● | extreme weather-related incidents (including events caused, or exacerbated, by climate change, such as wildfires, debris flows, flooding, droughts, high wind events and extreme heat events) and other natural disasters (such as earthquakes), which could cause, among other things, public safety issues, property damage, rotating outages and other operational issues (such as issues due to damaged infrastructure), PSPS activations and unanticipated costs; |
● | risk that AB 1054 does not effectively mitigate the significant exposure faced by California investor-owned utilities related to liability for damages arising from catastrophic wildfires where utility facilities are alleged to be a substantial cause, including the longevity of the Wildfire Insurance Fund and the CPUC's interpretation of and actions under AB 1054, including its interpretation of the prudency standard clarified by AB 1054; |
● | ability of Edison International and SCE to effectively attract, manage, develop and retain a skilled workforce, including its contract workers; |
● | decisions and other actions by the CPUC, the FERC, the NRC and other governmental authorities, including decisions and actions related to nationwide or statewide crisis, determinations of authorized rates of return or return |
1
on equity, the recoverability of wildfire-related and debris flow-related costs, issuance of SCE's wildfire safety certification, wildfire mitigation efforts, approval and implementation of electrification programs, and delays in executive, regulatory and legislative actions; |
● | cost and availability of labor, equipment and materials, including as a result of supply chain constraints and inflation; |
● | ability of Edison International or SCE to borrow funds and access bank and capital markets on reasonable terms; |
● | risks associated with the decommissioning of San Onofre, including those related to worker and public safety, public opposition, permitting, governmental approvals, on-site storage of spent nuclear fuel and other radioactive material, delays, contractual disputes, and cost overruns; |
● | pandemics, such as COVID-19, and other events that cause regional, statewide, national or global disruption, which could impact, among other things, Edison International's and SCE's business, operations, cash flows, liquidity and/or financial results and cause Edison International and SCE to incur unanticipated costs; |
● | physical security of Edison International's and SCE's critical assets and personnel and the cybersecurity of Edison International's and SCE's critical information technology systems for grid control, and business, employee and customer data; |
● | risks associated with cost allocation resulting in higher rates for utility bundled service customers because of possible customer bypass or departure for other electricity providers such as CCAs and Electric Service Providers; |
● | risks inherent in SCE's capital investment program, including those related to project site identification, public opposition, environmental mitigation, construction, permitting, contractor performance, changes in the CAISO's transmission plans, and governmental approvals; |
● | risks associated with the operation of electrical facilities, including worker and public safety issues, the risk of utility assets causing or contributing to wildfires, failure, availability, efficiency, and output of equipment and facilities, and availability and cost of spare parts; |
● | actions by credit rating agencies to downgrade Edison International or SCE's credit ratings or to place those ratings on negative watch or negative outlook; |
● | changes in tax laws and regulations, at both the state and federal levels, or changes in the application of those laws, that could affect recorded deferred tax assets and liabilities, effective tax rates and cash flows; |
● | changes in future taxable income, or changes in tax law, that would limit Edison International's and SCE's realization of expected net operating loss and tax credit carryover benefits prior to expiration; |
● | changes in the fair value of investments and other assets; |
● | changes in interest rates and potential adjustments to SCE's ROE based on changes in Moody's utility bond rate index; |
● | changes in rates of inflation (including whether inflation-related adjustments to SCE's authorized revenues allowed by the public utility regulators are commensurate with inflation rates); |
● | governmental, statutory, regulatory, or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market adopted by the NERC, CAISO, Western Electricity Coordinating Council, and similar regulatory bodies in adjoining regions, and changes in the United States' and |
2
California's environmental priorities that lessen the importance placed on GHG reduction and other climate related priorities; |
● | availability and creditworthiness of counterparties and the resulting effects on liquidity in the power and fuel markets and/or the ability of counterparties to pay amounts owed in excess of collateral provided in support of their obligations; |
● | potential for penalties or disallowance for non-compliance with applicable laws and regulations, including fines, penalties and disallowances related to wildfires where SCE's equipment is alleged to be associated with ignition; and |
● | cost of fuel for generating facilities and related transportation, which could be impacted by, among other things, disruption of natural gas storage facilities, to the extent not recovered through regulated rate cost escalation provisions or balancing accounts. |
Additional information about risks and uncertainties, including more detail about the factors described in this report, is contained throughout this report. Readers are urged to read this entire report, including information incorporated by reference, and carefully consider the risks, uncertainties, and other factors that affect Edison International's and SCE's businesses. Forward-looking statements speak only as of the date they are made and neither Edison International nor SCE are obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Edison International and SCE with the SEC. Edison International and SCE post or provide direct links to (i) certain SCE and other parties' regulatory filings and documents with the CPUC and the FERC and certain agency rulings and notices in open proceedings in a section titled "SCE Regulatory Highlights," (ii) certain documents and information related to Southern California wildfires which may be of interest to investors in a section titled "Southern California Wildfires," and (iii) presentations, documents and information that may be of interest to investors in a section titled "Presentations and Updates" at www.edisoninvestor.com in order to publicly disseminate such information. The reports, presentations, documents and information contained on, or connected to, the Edison investor website are not deemed part of, and are not incorporated by reference into, this report.
Except when otherwise stated, references to each of Edison International or SCE mean each such company with its subsidiaries on a consolidated basis. References to "Edison International Parent and Other" mean Edison International Parent and its subsidiaries other than SCE and its subsidiaries and "Edison International Parent" mean Edison International on a stand-alone basis, not consolidated with its subsidiaries. Unless otherwise described, all the information contained in this report relates to both filers.
3
MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The discussion related to the results of operations and changes in financial condition for 2021 compared to 2020 is incorporated by reference to Part II, Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in Edison International's and SCE's combined Annual Report on Form 10-K for the year ended December 31, 2021, which was filed with the SEC in February 2022.
MANAGEMENT OVERVIEW
Highlights of Operating Results
Edison International is the ultimate parent holding company of SCE and Edison Energy. SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of southern California. Edison Energy is engaged in the competitive business of providing integrated decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe. Edison Energy's business activities are currently not material to report as a separate business segment.
2022 vs. 2021 | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| Change |
| 2020 | ||||
Net income (loss) attributable to Edison International |
|
|
|
|
|
|
|
| ||||
SCE | $ | 847 | $ | 829 | $ | 18 | $ | 810 | ||||
Edison International Parent and Other |
| (235) |
| (70) |
| (165) |
| (71) | ||||
Edison International |
| 612 |
| 759 |
| (147) |
| 739 | ||||
Less: Non-core items |
|
|
|
|
|
|
|
| ||||
SCE |
|
|
|
|
| |||||||
2017/2018 Wildfire/Mudslide Events claims and expenses, net of recoveries |
| (1,248) |
| (1,234) |
| (14) |
| (1,248) | ||||
Wildfire Insurance Fund expense |
| (214) |
| (215) |
| 1 |
| (336) | ||||
Upstream lighting program decision | (81) | — | (81) | — | ||||||||
Impairments | (64) | (79) | 15 | — | ||||||||
Employment litigation matter, net of recoveries | (23) | — | (23) | — | ||||||||
Organizational realignment charge | (14) | — | (14) | — | ||||||||
Sale of San Onofre nuclear fuel |
| 10 |
| 10 |
| — |
| 150 | ||||
Income tax benefits from re-measurement of tax assets and liabilities |
| — |
| — |
| — |
| 18 | ||||
Income tax benefits1 |
| 452 |
| 404 |
| 48 |
| 401 | ||||
Edison International Parent and Other |
|
|
|
|
|
|
|
| ||||
Customer revenues for EIS insurance contract, net of claims |
| 36 |
| 24 |
| 12 |
| — | ||||
Sale of Vidalia lease |
| — |
| — |
| — |
| 132 | ||||
Goodwill impairment |
| — |
| — |
| — |
| (34) | ||||
Income tax benefit from Settlement of 2007 – 2012 California tax audits |
| — |
| 115 |
| (115) |
| — | ||||
Income tax expense from re-measurement of tax liabilities |
| — |
| — |
| — |
| (3) | ||||
Income tax expense2 | (7) | (7) | — | (27) | ||||||||
Total non-core items |
| (1,153) |
| (982) |
| (171) |
| (947) | ||||
Core earnings (losses) |
|
|
|
|
|
|
|
| ||||
SCE |
| 2,029 |
| 1,943 |
| 86 |
| 1,825 | ||||
Edison International Parent and Other |
| (264) |
| (202) |
| (62) |
| (139) | ||||
Edison International | $ | 1,765 | $ | 1,741 | $ | 24 | $ | 1,686 |
1 | SCE non-core items are tax‐effected at an estimated statutory rate of approximately 28% |
2 | Edison International Parent and Other non-core items are tax-effected at an estimated statutory rate of approximately 28%; customer revenues for EIS insurance contract, net of claims are tax-effected at an estimated statutory rate of approximately 20% |
4
Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (losses) internally for financial planning and for analysis of performance. Core earnings (losses) are also used when communicating with investors and analysts regarding Edison International's earnings results to facilitate comparisons of the company's performance from period to period. Core earnings (losses) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (losses) are defined as earnings attributable to Edison International shareholders less non-core items. Non-core items include income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs, asset impairments and other income and expense related to changes in law, outcomes in tax, regulatory or legal proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing.
Edison International's 2022 earnings decreased $147 million, driven by an increase in Edison International Parent and Other losses of $165 million, offset by an increase in SCE's earnings of $18 million. Edison International Parent and Other higher losses consisted of $103 million of lower non-core earnings and $62 million of higher core losses. SCE's higher net income consisted of $86 million of higher core earnings, offset by $68 million of higher non-core losses.
The increase in SCE's core earnings was primarily due to higher revenue due to the escalation mechanism as set forth in the 2021 GRC final decision and higher return on rate base from capital balancing accounts, partially offset by higher operating and maintenance expenses, higher depreciation from increased plant balance and higher interest expense.
The increase in Edison International Parent and Other's core losses was primarily due to higher preferred dividends.
Consolidated non-core items for 2022 and 2021 for Edison International included:
● | Charges of $1.2 billion ($899 million after-tax) recorded in 2022 and $1.2 billion ($919 million after-tax) recorded in 2021 for 2017/2018 Wildfire/Mudslide Events claims and expenses, net of expected recoveries from FERC customers. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information. |
● | Charges of $214 million ($154 million after-tax) recorded in 2022 and $215 million ($155 million after-tax) recorded in 2021 from the amortization of SCE's contributions to the Wildfire Insurance Fund. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information. |
● | A charge of $81 million ($64 million after-tax) recorded in 2022 related to the Presiding Officer's Decision ("POD") in September 2022 on SCE's Upstream Lighting Program. See "—Upstream Lighting Program" for further information. |
● | Impairment charges of $64 million ($46 million after-tax) recorded in 2022 including an impairment charge of $47 million ($34 million after-tax) related to SCE's CSRP settlement agreement filed with the CPUC in June 2022 and an impairment charge of $17 million ($12 million after-tax) related to historical capital expenditures disallowed in SCE's GRC track 3 final decision. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information. An impairment charge of $79 million ($47 million after-tax) recorded in 2021 related to disallowed historical capital expenditures in SCE's 2021 GRC final decision. |
● | A charge of $23 million ($16 million after-tax) recorded in 2022 related to settlement of an employment litigation matter, net of estimated insurance recoveries. SCE and Edison International settled the matter following an atypical jury award. |
● | A charge of $14 million ($10 million after-tax) recorded in 2022 related to organizational realignment services. |
5
● | Gains of $10 million ($7 million after-tax) recorded in both 2022 and 2021 for SCE's sale of San Onofre nuclear fuel. |
● | Net earnings of $36 million ($29 million after-tax) for Edison International Parent and Other recorded in 2022, which includes earnings of $45 million ($36 million after-tax) related to customer revenues for an EIS insurance contract offset by a charge of $9 million ($7 million after-tax) related to estimated wildfire-related claims insured by EIS. Earnings of $24 million ($17 million after-tax) recorded in 2021 related to customer revenues for an EIS insurance contract. See "Notes to Consolidated Financial Statements—Note 18. Related-Party Transactions" for further information. |
● | An income tax benefit of $115 million for Edison International Parent and Other recorded in 2021 related to the settlement of the 2007 – 2012 California tax audits with the California Franchise Tax Board ("FTB"). |
See "Results of Operations" for discussion of SCE and Edison International Parent and Other results of operations.
Electricity Industry Trends
The electric power industry is undergoing transformative change driven by federal and state government actions to reduce GHG emissions, as well as technological advances, such as customer-owned generation, electric vehicles and energy storage. These factors are altering the way in which electricity is generated and delivered as well as the regulatory and business environment for the industry.
California is committed to reducing its GHG emissions, improving local air quality and supporting continued economic growth. The state codified into law goals to reduce GHG emissions by 40% from 1990 levels by 2030 and 85% from the same baseline by 2045, as well as to be carbon neutral by 2045. State and local air quality plans also call for substantial improvements. In the most polluted areas of the state this includes reducing smog-causing nitrogen oxides 90% below 2010 levels by 2032.
While these policy goals cannot be achieved by the electric sector alone, the electric grid is a critical enabler of the adoption of energy technologies that support California's climate change and GHG reduction objectives. California has set RPS targets which require California retail sellers of electricity to provide 60% of power from renewable resources by 2030. California also requires sellers of electricity to deliver 100% of retail sales from carbon-free sources by 2045, including interim targets of 90% by 2035 and 95% by 2040. In 2022, approximately 48% of SCE's customer deliveries came from carbon-free resources. SCE remains well-positioned to meet its long-term RPS and carbon-free power goals and interim targets. In addition, Edison International is committed to achieving net-zero GHG emissions by 2045, in alignment with economy-wide climate actions planned by California. This commitment covers the power SCE delivers to customers and Edison International's enterprise-wide operations.
The current federal administration has also responded to climate change through numerous regulatory and Executive Order actions including for the development of more robust fuel efficiency and vehicle emission standards. Many of these actions align with internal company goals and efforts to address and mitigate climate change. Additionally, building upon the historic infrastructure legislation of 2021, Congress passed the IRA in 2022 that provides significant new funding to electrify the economy. Edison International believes these actions complement its industry-leading efforts to equitably transition to a decarbonized economy.
Edison International believes that California's 2045 goals can be achieved most economically through emissions reductions from using clean electricity to serve 100% of retail sales, electrifying approximately 76% of light-duty vehicles, 67% of medium-duty vehicles, 38% of heavy-duty vehicles, 85% of buses and 70% of buildings and using low-carbon fuels for technologies that are not yet viable for electrification. California has demonstrated strong long-term support of transportation electrification as shown by the approval of SCE's Charge Ready programs and 2022 legislation
6
banning sales of new gas vehicles by 2035. However, SCE believes that more state policy support, along with public and private investment, is needed to enable California to reach its 2030 GHG reduction targets.
To support these goals, Edison International's vision is to lead the transformation of the electric power industry and the company is focused on opportunities in delivering clean energy, advancing electrification, building a modernized and more reliable grid, and enabling customers' technology choices. SCE is focused on accelerating clean power and electrification, strengthening and modernizing the grid, achieving operational and service excellence and proactively mitigating climate change-related risks, including wildfires. SCE's ongoing focus to drive operational and service excellence is intended to allow it to achieve these objectives safely while controlling costs and customer rates. SCE projects that, even as electricity bills increase over time, due to higher efficiency of electrified end-use technologies, decarbonization and electrification will reduce energy consumption costs for the average family by one-third by 2045. SCE's focus on the transmission and distribution of electricity aligns with California's policy supporting competitive power procurement markets.
SCE is undertaking projects and programs to accelerate economy-wide electrification. To support system reliability, SCE is investing $1.0 billion in utility owned storage capacity as well as contracting for substantial new clean energy resources. See "—Capital Program" and "Business—SCE—Purchased Power and Fuel Supply—CAISO Wholesale Energy Market" for further details. SCE also continues to implement its transportation electrification programs. As of December 31, 2022, SCE had completed construction at 179 sites to support 3,048 charge ports under its suite of light duty Charge Ready Programs, and 42 sites to support the electrification of 895 medium and heavy-duty vehicles through its Charge Ready Transport program.
Changes in the electric power industry are impacting customers and jurisdictions outside California as well. Many other states and countries are also pursuing climate change and GHG reduction objectives and large commercial and industrial customers are continuing to pursue cost reduction and sustainability goals. Edison Energy provides decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe who may be impacted by these changes.
To better engage in this broader transformation and provide a view of developments outside of SCE, Edison International has made several investments in emerging companies in areas related to the technology and business model changes that are driving industry transformation and may make additional investments in the future. These investments are not financially material to Edison International.
2025 General Rate Case
SCE expects to file its 2025 GRC application with the CPUC in May 2023, for the four-year period of 2025 – 2028. In its 2025 GRC, SCE will seek necessary funding for various grid planning and development activities to support California's clean energy transformation and economy-wide decarbonization objectives, while continuing to prioritize wildfire mitigation programs in high fire risk areas, focus on increased system reliability, technology enabled grid investments and provide safe, reliable, and affordable service to customers.
7
Cost of Capital Applications
In 2021, SCE filed an application with the CPUC for authority to establish its authorized cost of capital for utility operations for 2022 and to reset the related annual cost of capital mechanism that can adjust the authorized cost of capital between SCE's cost of capital proceedings based on changes in Moody's utility bond rate index. In November 2022, the CPUC issued a decision maintaining SCE's cost of capital at pre-2022 levels for 2022 and closing the proceedings. In December 2022, intervenors filed an application for rehearing of the decision; if the CPUC takes further action it may impact revenues collected in rates during 2022.
In April 2022, SCE filed an application with the CPUC for authority to establish its authorized cost of capital for utility operations for a three-year term beginning in 2023 and to reset the related annual cost of capital adjustment mechanism (see "Business—SCE—Overview of Ratemaking Process" for further information on the adjustment mechanism). In December 2022, the CPUC issued a final decision that set SCE's ROE at 10.05%, and maintained SCE's current authorized capital structure, after CPUC-allowed exclusions, of 52% common equity, 43% long-term debt, and 5% preferred equity. Under the final decision, SCE's 2023 authorized cost of long-term debt and preferred equity are 4.39% and 6.50%, respectively. Based on the approved capital structure and costs, SCE's weighted average return on rate base for 2023 will be 7.44%. Based on the revenue requirement approved in SCE's 2021 GRC, the final decision will decrease SCE's revenue requirement for 2023 by approximately $90 million compared to the cost of capital currently in rates. In January an intervenor filed an application for rehearing, if the CPUC takes further action it may impact revenues being collected in rates during 2023.
The cost of capital adjustment mechanism's benchmark beginning January 1, 2023, is the 12-month, October 1, 2021 through September 30, 2022, average Moody's Baa utility bond yield of 4.37%. If the difference between the benchmark and the average of the same index for the 12-month period from October 1, 2022 to September 30, 2023 exceeds 100-basis points, SCE's CPUC-authorized ROE will be adjusted for 2024 by half the amount of the difference (up or down). The average Moody's Baa utility bond yield between October 1, 2022 and February 16, 2023 was 5.78%. The spot rate for Moody's Baa utility bond was 5.65% on February 16, 2023. An average Moody's Baa utility bond yield of 5.13% or higher from February 17, 2023 through September 30, 2023 would trigger the mechanism to adjust upward.
Capital Program
Total capital expenditures (including accruals) were $5.7 billion in 2022 and $5.4 billion in 2021. SCE's year-end rate base was $40.6 billion at December 31, 2022, compared to $37.9 billion at December 31, 2021, after excluding rate base associated with AB 1054 Excluded Capital Expenditures.
SCE's 2022 recorded and 2023 – 2024 forecast capital expenditures are set forth in the table below:
8
Total | ||||||||||||
(in billions) |
| 2022 |
| 2023 |
| 2024 |
| 2023 – 2024 | ||||
Traditional capital expenditures |
|
|
|
|
|
|
|
| ||||
Distribution1 | $ | 4.1 | $ | 4.2 | $ | 3.9 | $ | 8.1 | ||||
Transmission |
| 0.3 | 0.5 | 0.6 |
| 1.1 | ||||||
Generation |
| 0.1 | 0.2 | 0.2 |
| 0.4 | ||||||
Subtotal |
| 4.5 |
| 4.9 |
| 4.7 |
| 9.6 | ||||
Wildfire mitigation-related capital expenditures |
| 1.2 |
| 1.1 |
| 1.1 |
| 2.2 | ||||
Total capital expenditures | $ | 5.7 | $ | 6.0 | $ | 5.8 | $ | 11.8 | ||||
Total capital expenditures using range case discussed below | * | $ | 5.7 | $ | 5.2 | $ | 10.9 |
1 | Includes forecast expenditures for the utility owned storage projects described below and reflects delays to the original project timelines. |
* Not applicable
SCE's capital expenditure forecast reflects planned CPUC-jurisdictional spending including amounts requested in SCE's GRC track 4 filing for the 2024 attrition year of the 2021 GRC, the WCCP and other programs outlined in SCE's WMP that are above amounts authorized in the 2021 GRC, CPUC-approved utility owned storage expenditures and planned FERC capital expenditures. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information on the GRC track 4 filing.
Potential capital spending variability associated with future regulatory requests based on management judgment, potential for permitting delays and other operational considerations is reflected in the range case above, including deferral of all activity on the Riverside Transmission Reliability Project during 2023. For more information, see "Liquidity—SCE—Capital Investment Plan." The completion of projects, the timing of expenditures, and the associated cost recovery may be affected by permitting requirements and delays, construction schedules, availability of labor, equipment and materials, financing, legal and regulatory approvals and developments, community requests or protests, weather and other unforeseen conditions.
In addition to the amounts presented in the table above SCE expects to make additional CPUC capital expenditures, the recovery of which will be subject to future regulatory approval. This includes expenditures to be requested in the 2025 GRC application which will reflect SCE's 2023 – 2025 WMP and non-GRC programs including the Building Electrification Program and an enterprise resource planning software implementation. These capital expenditures and expected FERC capital expenditures are expected to be in a range of approximately $5.3 billion to $6.8 billion in aggregate between 2024 and 2025.
Reflected below is SCE's weighted average annual rate base for 2023 – 2024 incorporating authorized CPUC-jurisdictional expenditures including utility owned storage, planned FERC capital expenditures, and planned non-GRC projects or programs.
(in billions) |
| 2022 |
| 2023 |
| 2024 | |||
Rate base for expected capital expenditures | $ | 38.6 | $ | 41.9 | $ | 44.8 | |||
Rate base for expected capital expenditures using range case discussed above | $ | * | $ | 41.6 | $ | 43.9 |
* Not applicable
Including programs outlined in SCE's WMP subject to future cost recovery proceedings, rate base associated with wildfire restoration capital expenditures subject to future CEMA applications and planned expenditures from the 2025 GRC and non-GRC programs, SCE's weighted average annual rate base could be up to $45.0 billion in 2024 and is expected to be between $47.2 billion and $49.5 billion in 2025.
9
Utility Owned Storage Projects
In October 2021, SCE contracted with Ameresco, Inc. ("Ameresco") for the construction of utility owned energy storage projects at three sites in SCE's service territory with an aggregate capacity of 537.5 MW and an in-service date of August 1, 2022.
In April 2022, SCE received a force majeure event notice from Ameresco in which Ameresco asserted that both manufacturing delays related to COVID-19 shut-downs in China and new shipping restrictions imposed by Chinese governmental authorities were then impacting the supply of batteries from China necessary for timely completion of the projects. Ameresco subsequently supplemented its force majeure notice noting additional supply chain issues related to COVID-19. Permitting delays and engineering issues and certain changes requested by SCE also impacted the projects in 2022. SCE expects to receive in aggregate approximately $270 million of tax credits available under the IRA for all three projects, which will accrue to the benefit of its customers. In January 2023, SCE received a force majeure event notice from Ameresco in which Ameresco asserted that severe winter storms in Southern California had impacted the timely completion of the projects.
While Ameresco has advised SCE that it currently expects all three projects to be in-service prior to June 2023, SCE believes that there is risk of delay beyond Ameresco's projected in-service dates.
SCE is continuing to evaluate the force majeure event notices and is awaiting additional information from Ameresco on the underlying events. If there is a valid force majeure event under the contracts with Ameresco, subject to certain conditions, the project schedules and any related triggers of liquidated damages may be extended, and the contract prices may be increased to account for the impact of the force majeure event. Because Ameresco did not achieve an in-service date of August 1, 2022, SCE is entitled to liquidated damages under the terms of the contracts subject to any relief Ameresco may be entitled to under the contracts, including any relief for any valid force majeure events. Once triggered, liquidated damages accrue daily for up to 60 days up to a maximum of $89 million in aggregate for all three projects.
Subject to reductions for any liquidated damages SCE is paid, SCE currently expects these storage projects to result in $1.0 billion of capital expenditures. In December 2021, the CPUC approved recovery of these expenditures and establishment of a balancing account for the associated revenue requirement, which have been reflected in rates beginning in the first quarter of 2022. Authorized revenue requirements will be included in the annual ERRA review proceeding and can only be disallowed upon a finding that SCE failed to prudently administer the contracts.
Southern California Wildfires and Mudslides
California has experienced unprecedented weather conditions in recent years due to climate change. The worsening weather and fuel conditions across California increase the likelihood of wildfires, including those where SCE's equipment may be alleged to be associated with the fire's ignition, and SCE's service territory remains susceptible to additional wildfire activity in 2023 and beyond. In response to worsening conditions and increased wildfire activity over the past several years, SCE has developed and is implementing its WMP to reduce the risk of SCE equipment contributing to the ignition of wildfires. In addition, California has increased its investment in wildfire prevention and fire suppression capabilities. In addition to the investments SCE is making as part of its WMP, SCE also uses its PSPS program to proactively de-energize power lines as a last resort to mitigate the risk of significant wildfires during extreme weather events.
Wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. SCE has incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events.
10
SCE's equipment has been, and may further be, alleged to be associated with several wildfires that have originated in Southern California subsequent to 2018. Edison International and SCE expect that any losses incurred in connection with those fires will be covered by insurance, subject to self-insured retentions and co-insurance, recoveries through electric rates or third-party receivables, and expect that any such losses after recoveries will not be material.
2017/2018 Wildfire/Mudslide Events
Multiple lawsuits and investigations related to the 2017/2018 Wildfire/Mudslide Events have been initiated against SCE and Edison International. As of December 31, 2022, in addition to the Local Public Entity Settlement, the TKM Subrogation Settlement and the Woolsey Subrogation Settlement, SCE had entered into settlements with approximately 9,500 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In addition, SCE and the SED executed the SED Agreement in October 2021, and SCE's obligations under the SED Agreement commenced on August 15, 2022, when CPUC approval of the SED Agreement became final and non-appealable.
In 2022, SCE accrued estimated losses of $1.3 billion for the 2017/2018 Wildfire/Mudslide Events. As a result, SCE also recorded expected recoveries through FERC electric rates of $76 million against the charge, and the resulting net charge to earnings was $1.2 billion ($879 million after-tax).
Through December 31, 2022, SCE has accrued estimated losses of $8.8 billion, expected recoveries from insurance of $2.0 billion and expected recoveries through FERC electric rates of $376 million related to the 2017/2018 Wildfire/Mudslide Events. The after-tax net charges to earnings recorded through December 31, 2022 have been $4.6 billion.
As of December 31, 2022, SCE had paid $7.6 billion under executed settlements and had $185 million to be paid under executed settlements, including $120 million to be paid under the SED Agreement, related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, SCE had recovered $2.0 billion through insurance and approximately $234 million through FERC-jurisdictional electric rates.
After giving effect to all payment obligations under settlements entered into through December 31, 2022, including under the SED Agreement, Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events was $934 million. As of the same date, SCE had assets for expected recoveries through FERC electric rates of $142 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events. Edison International and SCE may incur a material loss in excess of amounts accrued in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events.
SCE will seek CPUC-jurisdictional rate recovery of prudently-incurred losses and related costs realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance and FERC-jurisdictional recoveries, other than for any obligations under the SED Agreement. Based on Edison International's and SCE's current best estimate of expected losses for the 2017/2018 Wildfire/Mudslide Events, SCE currently expects to seek CPUC-jurisdictional rate recovery of approximately $6 billion by filing multiple future applications with the CPUC. SCE targets the third quarter of 2023 for the first of such cost recovery applications, and expects to request recovery of approximately $2 billion in that filing. SCE's plans with respect to these filings may be delayed or modified. For example, the filings may be delayed if proceedings related to the 2017/2018 Wildfire/Mudslide Events do not progress as anticipated. SCE believes that, in light of the CPUC's decision in a cost recovery proceeding involving SDG&E arising from several 2007 wildfires in SDG&E's service area, there is substantial uncertainty regarding how the CPUC will interpret and apply its prudency standard to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to the adoption of AB 1054 on July 12, 2019. Accordingly, while the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured
11
CPUC-jurisdictional wildfire-related costs related to the 2017/2018 Wildfire/Mudslide Events are probable of recovery through electric rates.
Post-2018 Wildfires
Several wildfires have significantly impacted portions of SCE's service territory after 2018, including the 2019 Saddle Ridge Fire, the 2020 Bobcat Fire, the 2022 Coastal Fire and the 2022 Fairview Fire.
In 2022, SCE recorded a $572 million increase in estimated losses for the Post-2018 Wildfires and recorded $399 million in expected insurance recoveries against the charge. In light of the prudency standard the CPUC is required to apply under AB 1054 to utilities holding a safety certificate at the time a wildfire ignited after July 12, 2019, SCE has concluded, at this time, that both uninsured CPUC-jurisdictional and uninsured FERC-jurisdictional wildfire-related costs related to the Post-2018 Wildfires, other than for those already authorized for inclusion in electric rates, are probable of recovery through electric rates. As a result, SCE also recorded expected recoveries through electric rates of $162 million against the charges accrued related to the Post-2018 Wildfires. The resulting net charge to earnings was $11 million ($8 million after-tax).
As of December 31, 2022, SCE had paid $13 million under executed settlements related to the Post-2018 Wildfires. After giving effect to all payment obligations under settlements entered into through December 31, 2022, Edison International's and SCE's estimated losses (established at the lower end of the estimated range of reasonably possible losses) for remaining alleged and potential claims related to the Post-2018 Wildfires was $682 million. As of the same date, SCE had assets for expected recoveries through insurance of $473 million and through electric rates of $166 million on their consolidated balance sheets related to the Post-2018 Wildfires.
Expected recoveries from insurance recorded for the Post-2018 Wildfires are supported by SCE's insurance coverage for multiple policy years. While Edison International and SCE may incur material losses in excess of the amounts accrued for each of the Post-2018 Wildfires, Edison International and SCE expect that any losses incurred in connection with any such fire will be covered by insurance, subject to self-insured retentions and co-insurance, and expect that any such losses after expected recoveries from insurance and through electric rates will not be material.
For further information on Southern California Wildfires and Mudslides, see "Business— Southern California Wildfires," "Risk Factors," "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054" and "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" in this report.
Upstream Lighting Program
From 2017 – 2019, SCE administered the Upstream Lighting Program, part of a statewide program administered by investor-owned utilities that offered discounted energy efficient light bulbs to customers through incentives to lighting manufacturers. The CPUC began investigating the programs administered by the investor-owned utilities based on reports that investor-owned utilities, including SCE, shipped a significant number of bulbs under the program that could not be tracked to customers.
In May 2022, the CPUC issued an order directing SCE to show cause as to why SCE should not be required to: (i) refund ratepayer funding for the portion of the program budget associated with light bulbs that were unaccounted for, (ii) refund energy efficiency incentive mechanism ("ESPI") awards associated with unaccounted-for light bulbs, and (iii) pay penalties for misrepresenting program progress and results to the CPUC. In September 2022, a Presiding Officer's Decision ("POD") was issued in the proceeding finding that SCE mismanaged its Upstream Lighting Program from 2017 through 2019 and failed to ensure that efficient light bulbs were tracked and sold as intended by the program design. The POD requires SCE to (i) refund to ratepayers $76.1 million, representing the portion of the program budget associated
12
with light bulbs that could not be accounted for, (ii) refund to ratepayers $6.8 million, representing ESPI awards associated with light bulbs that could not be accounted for, (iii) pay $19.06 million in fines; and (iv) bear the cost of SCE's investigation, approximately $900,000. The CPUC issued its final decision in November 2022 in line with the POD.
RESULTS OF OPERATIONS
SCE
SCE's results of operations are derived mainly through two sources:
● | Earning activities – representing revenue authorized by the CPUC and the FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission, and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue and regulatory charges or disallowances. |
● | Cost-recovery activities – representing CPUC- and FERC-authorized balancing accounts which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards, as well as non-bypassable rates collected for SCE Recovery Funding LLC. Cost-recovery activities include rates which provide recovery, subject to reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), certain operation and maintenance expenses, (including vegetation management and wildfire insurance), and repayment of bonds and financing costs of SCE Recovery Funding LLC. SCE earns no return on these activities. |
13
Years ended December 31, 2022, 2021, and 2020
The following table is a summary of SCE's results of operations for the periods indicated:
2022 |
| 2021 |
| 2020 |
| ||||||||||||||||||||||
Cost- | Cost- | Cost- | |||||||||||||||||||||||||
Earning | Recovery | Total | Earning | Recovery | Total | Earning | Recovery | Total | |||||||||||||||||||
(in millions) | Activities |
| Activities |
| Consolidated |
| Activities |
| Activities |
| Consolidated |
| Activities |
| Activities |
| Consolidated |
| |||||||||
Operating revenue | $ | 9,008 | $ | 8,164 | $ | 17,172 | $ | 7,872 | $ | 7,002 | $ | 14,874 | $ | 7,468 | $ | 6,078 | $ | 13,546 | |||||||||
Purchased power and fuel |
| — |
| 6,375 |
| 6,375 | — |
| 5,540 |
| 5,540 |
| 2 | 4,930 |
| 4,932 | |||||||||||
Operation and maintenance |
| 2,793 |
| 1,866 |
| 4,659 | 2,015 |
| 1,573 |
| 3,588 |
| 2,280 | 1,243 |
| 3,523 | |||||||||||
Wildfire-related claims, net of insurance recoveries |
| 1,305 |
| — |
| 1,305 | 1,276 |
| — |
| 1,276 |
| 1,328 | — |
| 1,328 | |||||||||||
Wildfire Insurance Fund expense |
| 214 |
| — |
| 214 | 215 |
| — |
| 215 |
| 336 | — |
| 336 | |||||||||||
Depreciation and amortization |
| 2,540 |
| 19 |
| 2,559 | 2,209 |
| 7 |
| 2,216 |
| 1,965 | — |
| 1,965 | |||||||||||
Property and other taxes |
| 482 |
| 15 |
| 497 | 462 |
| — |
| 462 |
| 435 | — |
| 435 | |||||||||||
Impairment, net of other (income) |
| 50 |
| — |
| 50 | 67 |
| — |
| 67 |
| (151) | — |
| (151) | |||||||||||
Total operating expenses |
| 7,384 |
| 8,275 |
| 15,659 |
| 6,244 |
| 7,120 | 13,364 | 6,195 |
| 6,173 | 12,368 | ||||||||||||
Operating income (loss) |
| 1,624 |
| (111) |
| 1,513 |
| 1,628 |
| (118) | 1,510 | 1,273 |
| (95) | 1,178 | ||||||||||||
Interest expense |
| (977) |
| (28) |
| (1,005) |
| (785) |
| (6) | (791) | (757) |
| (11) | (768) | ||||||||||||
Other income |
| 198 |
| 139 |
| 337 |
| 109 |
| 124 | 233 | 149 |
| 106 | 255 | ||||||||||||
Income before income taxes |
| 845 |
| — |
| 845 |
| 952 |
| — | 952 | 665 |
| — | 665 | ||||||||||||
Income tax (benefit) expense |
| (109) |
| — |
| (109) |
| 17 |
| — | 17 | (277) |
| — | (277) | ||||||||||||
Net income |
| 954 |
| — |
| 954 |
| 935 |
| — | 935 | 942 |
| — | 942 | ||||||||||||
Less: Preference stock dividend requirements |
| 107 |
| — |
| 107 |
| 106 |
| — | 106 | 132 |
| — | 132 | ||||||||||||
Net income available for common stock | $ | 847 | $ | — | $ | 847 | $ | 829 | $ | — | $ | 829 | $ | 810 | $ | — | $ | 810 |
Earning Activities
Earning activities in 2022 compared to 2021 were primarily affected by the following:
● | Higher operating revenue of $1,136 million is primarily due to: |
● | SCE recognized $701 million of revenue for wildfire-related expenses that had been deferred prior to 2021 and were authorized for recovery in the GRC track 2 in January 2022 and GRC track 3 in June 2022 ($416 million included in earnings activities, $285 million included in cost-recovery activities). |
● | An increase of CPUC-related revenue of $376 million primarily due to the escalation mechanism set forth in the 2021 GRC decision. |
● | SCE recognized $156 million of revenue on CPUC approval of recovery for CSRP-related costs in September 2022. The revenue comprised recovery of $174 million of previously deferred expenses and $48 million of previously unrecognized return on rate base and taxes, offset by $66 million of income tax benefits. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information. |
● | An increase of other CPUC-related revenue of $121 million primarily related to higher return, taxes and operating expenses recovered through capital balancing accounts, including for wildfire mitigation expenditures. |
● | An increase in FERC-related revenue of $23 million primarily due to rate base growth. |
14
● | An increase in other operating revenue of $44 million primarily due to deferred revenue and billing associated with the agreement with Morongo Transmission LLC (offset in depreciation, property and other taxes and operation and maintenance expenses). See "Notes to Consolidated Financial Statements—Note 7. Revenue" for further information. |
● | Higher operation and maintenance costs of $778 million primarily due to the following: |
● | Higher expenses of $404 million subject to balancing account treatment including the approval in the GRC track 2 and GRC track 3 to recover wildfire-related expenses that had been deferred as regulatory assets prior to 2021 (offset in revenue above). |
● | Higher expenses of $95 million related to the POD in September 2022 on SCE's Upstream Lighting Program. This consisted of $76 million of disallowed costs reclassified from cost recovery activities and $19 million of fines. See "Management Overview—Upstream Lighting Program" for further information. |
● | Higher expenses of $57 million related to inspections and maintenance. |
● | Higher expenses of $27 million previously deferred and expensed on approval for recovery in the CSRP decision (offset in revenue above). |
● | Higher uncollectibles expenses of $38 million, including prior period expenses not subject to cost recovery, following a CPUC decision, which required SCE to change its methodology for calculating the portion of uncollectibles expenses incremental to GRC authorized expenses. |
● | A charge of $23 million related to settlement of an employment litigation matter, net of estimated insurance recoveries. |
● | Higher expenses of $18 million of wildfire mitigation expenses that were disallowed in the GRC track 3 decision. |
● | A charge of $14 million related to organizational realignment services. |
● | Higher other expenses of $102 million including IT costs, franchise fees, capital related costs, safety programs related to COVID-19, and power plant maintenance costs. |
● | Higher wildfire-related claims and expenses of $29 million primarily due to higher estimated losses related to wildfire claims from the 2017/2018 Wildfire/Mudslide Events in 2022 compared to 2021. |
● | Higher depreciation and amortization expense of $331 million primarily due to $134 million of previously deferred CSRP depreciation expensed on approval for recovery in the CSRP decision (offset in revenue above) and increased plant balances in 2022. |
● | Higher property and other taxes of $20 million primarily due to higher property assessed value in 2022. |
● | Lower impairment and other operating income of $17 million primarily due to an impairment charge of $79 million recorded in 2021 related to disallowed historical capital expenditures in SCE's 2021 GRC final decision. Impairments were recorded in 2022 of $17 million related to the CPUC decision in the GRC track 3 proceeding and $47 million related to a settlement agreement between SCE and TURN in the CSRP proceeding. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information. |
● | Higher interest expense of $192 million primarily due to increased long-term borrowing and higher interest rates on short-term debt and balancing account overcollections. |
15
● | Higher other income of $89 million primarily due to a higher interest rates applied to balancing account undercollections and allowance for funds used during construction. |
● | See "Income Taxes" below for the explanation of $126 million increase in income tax benefits. |
Cost-Recovery Activities
Cost-recovery activities in 2022 compared to 2021 were primarily affected by the following:
● | Higher purchased power and fuel costs of $835 million primarily due to higher power and gas prices, partially offset by lower load. |
● | Higher operation and maintenance costs of $293 million primarily due to: |
● | Higher expenses of $285 million of GRC track 2 and GRC track 3 wildfire mitigation expenses that had been deferred prior to 2021 and were authorized for recovery in January 2022 and June 2022, respectively. See "—Earnings Activities" above. |
● | Higher uncollectible expenses of $83 million primarily due to authorization to recover 2020 and 2021 costs that had been previously deferred as regulatory assets through the residential uncollectibles balancing account. |
● | Lower cost recovery activity expenses due to $76 million of disallowed costs reclassified to earnings activities related to Upstream Lighting Program. See "—Earnings Activities" above. |
● | Higher depreciation and amortization expense of $12 million due to recovery of expenses associated with AB 1054 Excluded Capital Expenditures financed through securitization. |
● | Higher property and other taxes of $15 million due to recovery of property taxes associated with AB 1054 Excluded Capital Expenditures financed through securitization. |
● | Higher interest expense of $22 million primarily due to recovery of expenses associated with AB 1054 Excluded Capital Expenditures financed through securitization. |
● | Higher other income of $15 million primarily driven by higher income related to the non-service cost components for SCE's pension benefit plans. See "Notes to Consolidated Financial Statements—Note 9. Compensation and Benefit Plans" for further information. |
Supplemental Operating Revenue Information
As a result of the CPUC-authorized decoupling mechanism, SCE revenues are not affected by changes in retail electricity sales.
Income Taxes
Lower income tax expense of $126 million in 2022 compared to 2021 (a tax benefit was recorded in 2022) was primarily driven by a decrease in pre-tax income and the absence of a one-time charge recorded in 2021. In July 2021, SCE received the IRS's response to its private letter ruling request, regarding the scope of the deferred tax normalization requirements and the computations required to comply with the average rate assumption method. As a result of the IRS ruling, SCE's estimate changed, and a charge was recorded in 2021 to reduce the 2018 through 2021 cumulative tax benefits returned to customers. The effective tax rates were (12.9)% and 1.8% for 2022 and 2021, respectively. SCE's effective tax rate is below the federal statutory rate of 21% for 2022 and 2021 primarily due to the CPUC's ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences, which reverse
16
over time. The accounting treatment for these temporary differences results in recording regulatory assets and liabilities for amounts that would otherwise be recorded to deferred income tax expense.
See "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rates.
Edison International Parent and Other
Results of operations for Edison International Parent and Other include amounts from other subsidiaries that are not reportable as segments, as well as intercompany eliminations.
Loss from Operations
The following table summarizes the results of Edison International Parent and Other:
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Edison Energy Group and subsidiaries | $ | (17) | $ | (15) | $ | (35) | |||
Corporate expenses and other subsidiaries |
| (113) |
| 5 |
| (36) | |||
Edison International Parent and Other net loss | $ | (130) | $ | (10) | $ | (71) | |||
Less: Preferred stock dividend requirement | 105 | 60 | — | ||||||
Edison International Parent and Other net loss attributable to common shareholders | $ | (235) | $ | (70) | $ | (71) |
The net loss attributable to common shareholders from operations of Edison International Parent and Other increased $165 million in 2022 compared to 2021 primarily due to an income tax benefit of $110 million recorded in 2021 related to the settlement of the 2007 – 2012 California tax audits with the FTB and higher preferred dividends in 2022.
LIQUIDITY AND CAPITAL RESOURCES
SCE
SCE's ability to operate its business, fund capital expenditures, and implement its business strategy is dependent upon its cash flow and access to the bank and capital markets. SCE's overall cash flows fluctuate based on, among other things, its ability to recover its costs in a timely manner from its customers through regulated rates, changes in commodity prices and volumes, collateral requirements, interest obligations, dividend payments to and equity contributions from Edison International, obligations to preference shareholders, and the outcome of tax, regulatory and legal matters.
In the next 12 months, SCE expects to fund its cash requirements through operating cash flows, capital market and bank financings and equity contributions from Edison International Parent, as needed. SCE also has availability under its credit facility to fund cash requirements. SCE expects to issue bonds to finance or refinance eligible sustainable projects. Eligible sustainable projects include categories such as renewable energy, clean transportation, energy efficiency and carbon reduction, climate change adaptation, and socioeconomic advancement and empowerment. SCE maintains processes to ensure that proceeds from the sale of the bonds are only used for projects that are aligned with the Edison International sustainable financing framework issued in June 2021. SCE also expects to issue additional debt for general corporate purposes and to finance payments for future resolutions of claims related to the 2017/2018 Wildfire/Mudslide Events.
SCE has invested all $1.6 billion of the required AB 1054 Excluded Capital Expenditures. SCE issued securitized bonds in the amounts of $338 million and $533 million in February 2021 and 2022, respectively, to finance a portion of these expenditures. SCE expects to use the proceeds of future securitized bonds to repay a term loan of $730 million prior to its maturity in May 2023, which financed the remaining AB 1054 Excluded Capital Expenditures. SCE has filed a regulatory application for authorization to issue additional securitized bonds. For further information, see "—Regulatory Proceedings—Financing Order."
17
The IRA was signed into law in August 2022. See "—Edison International Parent and Other— Edison International Income Taxes" for a description of the impacts of the legislation on the Edison International consolidated tax group including SCE.
The following table summarizes SCE's current, long-term issuer credit ratings and outlook from the major credit rating agencies:
| Moody's |
| Fitch |
| S&P | |
Credit Rating | Baa2 | BBB- | BBB | |||
Outlook | Positive | Positive | Stable |
SCE's credit ratings may be affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by claims from catastrophic wildfires. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financings or other borrowings. In addition, some of SCE's power procurement contracts and environmental remediation obligations would require SCE to pay related liabilities or post additional collateral if SCE's credit rating were to fall below investment grade. For further details, see "—Margin and Collateral Deposits."
Available Liquidity
At December 31, 2022, SCE had cash on hand of $766 million and approximately $2.7 billion available to borrow on its $3.4 billion revolving credit facility. The credit facility is available for borrowing needs until May 2026.
At December 31, 2022, SCE had $195 million outstanding commercial paper, net of discount, at a weighted average interest rate of 5.20%. The aggregate maximum principal amount under the SCE revolving credit facility may be increased up to $4.0 billion, provided that additional lender commitments are obtained. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
SCE may finance balancing account undercollections and working capital requirements to support operations and capital expenditures with commercial paper, its credit facilities or other borrowings, subject to availability in the bank and capital markets. As necessary, SCE will utilize its available liquidity, capital market financings, other borrowings or parent company contributions to SCE equity in order to meet its obligations as they become due, including costs related to the 2017/2018 Wildfire/Mudslide Events. For further information, see "Management Overview—Southern California Wildfires and Mudslides."
Debt Covenant
SCE's credit facilities and term loan require a debt to total capitalization ratio as defined in the applicable agreements of less than or equal to 0.65 to 1. At December 31, 2022, SCE's debt to total capitalization ratio was 0.56 to 1.
At December 31, 2022, SCE was in compliance with all financial covenants that affect access to capital.
Regulatory Proceedings
Wildfire Related Regulatory Proceedings
In response to the increase in wildfire activity, and faster progression of and increased damage from wildfires across SCE's service territory and throughout California, SCE has incurred wildfire mitigation, wildfire insurance and wildfire and drought restoration related spending at levels significantly exceeding amounts authorized in SCE's GRCs.
18
2021 General Rate Case Wildfire Mitigation Memorandum Account Balances
The 2021 GRC decision authorized the establishment of balancing accounts for expenses for vegetation management, wildfire insurance, and the WCCP program, with expenditures up to certain thresholds approved for cost recovery. SCE may submit subsequent reasonableness review applications for any spending in excess of these thresholds. SCE has incurred, and in 2023 expects to incur, vegetation management expenses and capital expenditures for WCCP in excess of thresholds established in the 2021 GRC. SCE has also incurred, and in 2023 expects to incur, costs in excess of amounts authorized in the 2021 GRC related to other wildfire mitigation activities, including inspections and maintenance and to support execution of PSPS events. SCE tracks these incremental amounts in memorandum accounts which will be subject to approval in future regulatory proceedings. For more information see "Business—SCE—Overview of Ratemaking Process."
In June 2022, SCE filed an application with the CPUC requesting reasonableness review of these incremental costs incurred in 2021 related to non-covered conductor wildfire mitigation and vegetation management activities, requesting a total revenue requirement of approximately $327 million. In October 2022, the CPUC temporarily suspended the procedural schedule for the proceeding to consider whether there is a sufficient record in the proceeding to address the issue of whether recorded costs are incremental, reasonable, and properly recoverable. In December 2022, the CPUC began to conduct an audit of SCE's 2021 incurred costs, with an expectation of issuing an audit report in July 2023.
2021 General Rate Case Track 3
In June 2022, the CPUC issued a decision on SCE's 2021 GRC track 3 filing that authorized SCE to recover
$385 million of incremental wildfire mitigation operation and maintenance expense and approved $465 million of incremental wildfire mitigation capital expenditures as reasonable. SCE did not obtain a determination of reasonableness for an additional $197 million of capital expenditures, associated with construction in progress, plant assets and installation of current limiting fuses, portions of which were defective. SCE expects to provide additional information supporting its application for recovery of approximately $25 million of current limiting fuses expenditure in its 2025 GRC application. The construction in progress not approved as reasonable in the 2021 GRC track 3 was not eligible for inclusion in SCE's final financing order application, but is being recovered as part of SCE's authorized rate base included in the 2021 GRC decision on a forecast basis.
The decision did not find reasonable certain capital expenditures related to vegetation management software purchased by SCE. As a result of the decision, SCE recorded a $17 million impairment of utility property, plant and equipment.
In October 2022, SCE filed a request to seek recovery of $35 million, after accounting for a $10 million deductible, for vegetation management-related operations and maintenance expenses not approved in this proceeding. These increased costs are tracked in a "Z-Factor" memorandum account for vegetation management line clearance costs related to Senate Bill 247, which went into effect January 1, 2020, and requires SCE to pay line clearance tree trimmers the prevailing wage of qualified electrical workers.
The decision resulted in a revenue requirement of approximately $400 million including a $15 million 2020 revenue requirement for capital expenditures previously found reasonable by the CPUC. The approved revenue requirements are required to be amortized over a 36-month period. SCE is seeking recovery of the approved capital expenditures in a separate financing order application. See "— Financing Order" below.
Wildfire Expense Memorandum Account
SCE tracks insurance premium costs related to wildfire liability insurance policies as well as other wildfire-related costs in its WEMA. In December 2020, SCE filed a WEMA application with the CPUC to seek recovery of $215 million of costs recorded in WEMA at December 31, 2020. The costs primarily related to incremental wildfire insurance premium
19
expenses and associated costs for wildfire liability insurance policies that provide coverage for the last six months of 2020. In October 2022, the CPUC extended the statutory deadline for completion of the proceeding to April 2023.
SCE believes that uninsured CPUC-jurisdictional wildfire-related costs related to the Post-2018 Wildfires, other than for those already authorized for inclusion in electric rates, are probable of recovery through electric rates. As of
December 31, 2022, SCE has recorded total expected recoveries related to the Post-2018 Wildfires of $152 million within the WEMA and risk management balancing accounts.
2020 Emergency Wildfire Restoration
Multiple wildfires occurred during 2020 which caused damage within SCE's service territory and to SCE's Big Creek hydroelectric facility.
In March 2022, SCE filed a CEMA application requesting recovery of $207 million of operation and maintenance expenses incremental to authorized revenue requirements and $312 million of capital expenditures incremental to amounts authorized in the 2021 GRC primarily related to these restoration efforts. SCE has not yet filed for recovery of generation restoration costs, as repairs to hydroelectric generation facilities are not complete.
2021 General Rate Case Track 4
SCE made its 2021 GRC track 4 filing with the CPUC in May 2022. SCE is requesting a revenue requirement of
$8.6 billion for 2024. This represents an increase of $938 million compared to SCE's revenue requirement of $7.7 billion for the 2023 attrition year. A significant component of the track 4 revenue requirement request relates to projects previously authorized by the CPUC, including those which were completed and put into service since the 2021 GRC final decision. The other primary drivers of the increase are inflation and SCE's 2024 vegetation management and wildfire mitigation spending forecasts, partially due to a legislatively required wage rate increase. The schedule adopted by the CPUC for the 2021 GRC track 4 filing calls for a proposed decision in the fourth quarter of 2023.
Financing Order
In September 2022, SCE filed its third application for an irrevocable order from the CPUC to finance $772 million, comprised of AB1054 Excluded Capital Expenditures, allowed overhead costs and associated financing expenses, through the issuance of securitized bonds. The expenditures consist of $204 million approved in the 2021 GRC track 1 and $465 million approved in the 2021 GRC track 3. SCE received a proposed decision on this application in January 2023, which would authorize the issuance of securitized bonds, if approved. SCE expects a final decision in the first quarter of 2023.
CSRP
In September 2022, the CPUC approved SCE's CSRP proceeding for expenditures incurred through April 2021. The approval resulted in a revenue requirement of $388 million through December 2024. See "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Polices— Impairments of Long-lived Assets" for further information.
In May 2022, SCE filed a second CSRP application with the CPUC requesting recovery of $59 million of capital expenditures and $28 million of operation and maintenance expenses incurred from May 2021 to December 2021. SCE also expects to propose review and cost recovery for additional post-implementation CSRP costs incurred from January 2022 through December 2024 in its 2025 GRC filing.
20
ERRA Proceeding
SCE's cost-recovery mechanism for its fuel and purchased power-related costs is facilitated in three main balancing accounts, the ERRA, the PABA, and the NSGBA. SCE sets rates based on an annual forecast of the costs that it expects to incur during the subsequent year. The undercollection in ERRA and PABA during 2022 resulted in SCE triggering an established mechanism requiring SCE to file an application to advise the CPUC that SCE's undercollections had exceeded the trigger amount. In December 2022, the CPUC approved inclusion of the undercollection in a January 1, 2023 rate change.
At December 31, 2022, the ERRA and PABA were undercollected by approximately $1.5 billion due to higher gas and power prices and in January 2023, SCE notified the CPUC of a further trigger of the mechanism. Due to the new rate effective in January 2023, undercollections are expected to decrease, however, if undercollections remain above the trigger level, it could result in a further adjustment to customer rates during 2023. See "Business—SCE—Overview of Ratemaking Process" for further information.
In October 2022, as part of the 2020 ERRA review proceeding, the CPUC rejected the methodology SCE used to calculate the portion of uncollectibles expense incremental to amounts authorized in SCE's GRC. This led to a disallowance of $16 million of uncollectibles expense recorded to the residential uncollectible balancing account ("RUBA") in 2020. Beginning in the fourth quarter of 2022, SCE modified its methodology for calculating incremental uncollectibles expense to be included in RUBA to align with the decision.
2023 FERC Formula Rate Annual Update
In November 2022, SCE filed its 2023 annual transmission revenue requirement update with the FERC, with the proposed rate effective January 1, 2023. The update reflects a $2 million increase from SCE's 2022 transmission revenue requirement included in customer rates. The 2023 filing was in line with the 2022 transmission revenue requirement due to significant wildfire-related claims expenses recorded in both years.
2022 California Arrearage Payment Program ("CAPP 2022")
In June 2022, California's State Assembly passed legislation to authorize, fund and implement the CAPP 2022, which is expected to reduce customer arrearages for certain residential customers of California's investor-owned utilities by up to $1.0 billion. In November 2022, SCE received $202 million of CAPP funds on behalf of customers, which has been applied to accounts receivable outstanding from individual customers. To the extent SCE's uncollectibles expenses have been offset by the CAPP 2022, recovery will not be sought through other mechanisms.
Building Electrification Programs Application
In December 2021, SCE filed a $677 million Building Electrification Program Application for a four-year program (2024 – 2027) to incentivize replacing 250,000 gas-fueled water and space heaters with efficient electric heat pumps and to upgrade or enhance the electrical infrastructure for 65,000 homes to support electrification. The proposed program would include $200 million for customer-side electrical infrastructure upgrades for which SCE has requested inclusion as a regulatory asset in rate base, $69 million in capital expenditures and $408 million of operations and maintenance expense including heat pump incentives, program administration, and implementation costs. The CPUC is expected to issue a final decision on the application in mid-2023.
21
Capital Investment Plan
Major Transmission Projects
A summary of SCE's most significant transmission and substation construction projects during the next two years is presented below. The timing of the projects below is subject to timely receipt of permitting, licensing and regulatory approvals.
| Direct |
|
| ||||||||
Project | Expenditures | Inception to Date | Scheduled In- | ||||||||
Project Name |
| Lifecycle Phase |
| (in millions)1 |
| (in millions)1 |
| Service Date |
| ||
Riverside Transmission Reliability2 |
| Licensing |
| 584 |
| 33 |
| 2026 | |||
Alberhill System3 |
| Licensing |
| 486 |
| 48 |
| — | 3 | ||
Eldorado-Lugo-Mohave Upgrade |
| Construction |
| 247 |
| 226 |
| 2023 |
1 | Direct expenditures include direct labor, land and contract costs incurred for the respective projects and exclude overhead costs that are included in the capital expenditures forecast discussed in "Management Overview—Capital Program." |
2 | Expenditures and in-service date are based on CPUC approved plans and may be impacted by any changes to those plans required by Riverside City Council. |
3 | Includes the original estimated project cost for Alberhill. In January 2020, SCE submitted a supplemental analysis to the CPUC which included alternative projects as well as an update to the original project cost. SCE is unable to predict the timing of a final CPUC decision, the corresponding in-service date, and what the final project costs will be for the Alberhill System Project. |
Riverside Transmission Reliability Project
The Riverside Transmission Reliability Project is a joint project between SCE and Riverside Public Utilities ("RPU"), the municipal utility department of the City of Riverside. While RPU will be responsible for constructing some of the project's facilities within Riverside, SCE's portion of the project consists of constructing upgrades to its system, including a new 230 kV substation; certain interconnection and telecommunication facilities and transmission lines in the cities of Riverside, Jurupa Valley and Norco and in portions of unincorporated Riverside County. In May 2022, the Riverside City Council voted to review and advise on alternatives to the CPUC approved project. Consequently, SCE suspended all major activities on the project. In January 2023, the City Council voted to establish a working group to pursue funding for additional undergrounding. SCE's capital forecast currently includes $128 million and $190 million of Riverside Transmission Reliability Project expenditures in 2023 and 2024, respectively, which may be affected by further delays to the project.
Alberhill System Project
The Alberhill System Project consists of constructing a new 500 kV substation, two 500 kV transmission lines to connect the proposed substation to the existing Serrano-Valley 500 kV transmission line, telecommunication equipment and subtransmission lines in western Riverside County. The project was designed to meet long-term forecasted electrical demand in the proposed Alberhill System Project area and to increase electrical system reliability and resiliency. In April 2018 and July 2018, the CPUC issued a proposed decision and an alternate proposed decision, both denying SCE's ability to construct the Alberhill System Project based on a perceived lack of need. SCE filed comments on both proposed decisions requesting that the CPUC grant the certificate of public convenience and necessity ("CPCN") for the Alberhill System Project. In August 2018, the CPUC issued a decision that did not deny or approve the Alberhill System Project but directed SCE to submit supplemental information on the Alberhill System Project including but not limited to a load forecast and cost benefit analysis of several alternatives to the proposed project. Ongoing capital spending has been deferred as a result of the CPUC request for additional information. In January 2020, SCE submitted a supplemental analysis to the CPUC for the Alberhill System Project including several alternatives to the proposed project as well as an update to the original project cost. A final decision on the Alberhill System Project remains
22
pending. Given the uncertainty associated with the resolution of the permitting process, potential revisions to the project have not been reflected in total direct expenditures. SCE continues to believe a system solution is needed for the project area but is unable to predict the timing of a final CPUC decision in connection with the Alberhill System Project proceeding.
Approximately 48% of the Alberhill System Project costs spent to date would be subject to recovery through CPUC revenue and 52% through FERC revenue. In October 2017, SCE obtained approval from the FERC for abandoned plant treatment for the Alberhill System Project, which allows SCE to seek recovery of 100% of all prudently incurred costs after the approval date and 50% of prudently incurred costs prior to the approval date. Excluding land costs, which may be recovered through sale to a third party, SCE has incurred approximately $59 million and $55 million of capital expenditures, including overhead costs, of which approximately $42 million and $39 million may not be recoverable if the project is cancelled, as of December 31, 2022 and 2021, respectively.
Eldorado-Lugo-Mohave Upgrade Project
The Eldorado-Lugo-Mohave Upgrade Project will increase capacity on existing transmission lines to allow additional renewable energy to flow from Nevada to southern California. The project would modify SCE's existing Eldorado, Lugo, and Mohave electrical substations to accommodate the increased flows from Nevada to southern California; increase the power flow through the existing 500 kV transmission lines by constructing two new capacitors along the lines; raise transmission tower heights to meet ground clearance requirements; and install fiber optics on the transmission lines to provide communications between existing SCE substations. In August 2020, the CPUC approved the CPCN for the project.
Construction for the project began in November 2020 and the project is expected to be operational in the second quarter of 2023.
Other Capital Investment Projects and Programs
For a discussion of utility owned storage and forecast wildfire mitigation capital expenditures, including the WCCP, see "Management Overview—Capital Program." For discussion of Electrification and Clean Energy Transition Programs, see "— Regulatory Proceedings—Building Electrification Programs Application."
Decommissioning of San Onofre
The decommissioning of a nuclear plant requires the management of three related activities: radiological decommissioning, non-radiological decommissioning and the management of spent nuclear fuel. SCE has engaged the DGC to undertake a significant scope of decommissioning activities for Units 1, 2 and 3 at San Onofre. The decommissioning of San Onofre is expected to take many years.
Under federal law, the U.S. Department of Energy ("DOE") is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE has not met its contractual obligation to accept spent nuclear fuel. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues.
Two Independent Spent Fuel Storage Installations ("ISFSI") store nuclear fuel onsite at San Onofre. The first primarily stores nuclear fuel from Unit 1 ("ISFSI 1") and the second stores nuclear fuel from Units 2 and 3 ("ISFSI 2"). SCE's CDPs for ISFSI 1 and ISFSI 2 extend through 2035.
Decommissioning of San Onofre Unit 1 began in 1999 and the transfer of spent nuclear fuel from Unit 1 to dry cask storage in ISFSI 1 was completed in 2005. Major decommissioning work for Unit 1 has been completed except for certain underground work.
23
Decommissioning of San Onofre Units 2 and 3 began in June 2013 and the transfer of spent nuclear fuel from San Onofre Units 2 and 3 to dry cask storage in the two ISFSIs was completed in August 2020. In October 2019, the California Coastal Commission approved SCE's application for a CDP, the principal discretionary permit required to start major decommissioning activities at San Onofre Units 2 and 3. In August 2020, SCE commenced, and is currently conducting, major decommissioning activities in accordance with the terms of the permit.
In the third quarter of 2021, SCE updated its decommissioning cost estimate for decommissioning activities to be completed at San Onofre Units 2 and 3 to $3.4 billion (SCE share is $2.6 billion) in 2021 dollars. The decommissioning cost estimate included costs through the expected decommissioning completion date, currently estimated to be in 2053 for San Onofre Units 2 and 3. SCE filed its updated decommissioning cost estimate with the CPUC in February 2022. Decommissioning cost estimates are subject to a number of uncertainties including the cost and timing of nuclear waste disposal, the time it will take to obtain required permits, cost of removal of property, site remediation costs, as well as a number of other assumptions and estimates, including when the federal government will provide for either interim or permanent off-site storage of spent nuclear fuel enabling the removal and transport of spent fuel canisters from the San Onofre site, as to which there can be no assurance. Cost estimates are subject to change as decommissioning proceeds and such changes may be material.
SCE's share of the San Onofre Units 2 and 3 decommissioning costs recorded during 2022 and 2021 were $187 million (in 2022 dollars) and $236 million (in 2021 dollars), respectively. The CPUC conducts a reasonableness review of recorded decommissioning costs.
In February 2022, SCE filed its application for reasonableness review of approximately $570 million (SCE share in 2022 dollars) of recorded San Onofre Units 2 and 3 decommissioning costs incurred during the period 2018 to 2020. Intervenors in the proceeding have recommended approximately $115 million (SCE share in 2022 dollars) in disallowances for San Onofre Units 2 and 3 decommissioning costs. This amount includes a recommended disallowance of approximately $45 million in costs associated with an August 2018 incident that occurred when an SCE contractor was loading a spent nuclear fuel canister into an ISFSI resulting in fuel transfer operations being suspended for approximately one year. The remainder of the recommended disallowance amount is primarily for contractor staffing costs incurred during a delay in issuance of the CDP to allow for decommissioning.
SCE had nuclear decommissioning trust funds for San Onofre Units 2 and 3 of $2.2 billion and $2.8 billion as of December 31, 2022 and December 31, 2021, respectively. Based upon the resolution of a number of uncertainties, including the uncertainties of decommissioning discussed above, the financial performance of the nuclear decommissioning trust fund investments, as well as the resolution of a number of other assumptions and estimates, additional contributions to the nuclear decommissioning trust's funds may be required. If additional contributions to the nuclear decommissioning trust funds become necessary, SCE will seek recovery of such additional funds through electric rates and any such recovery will be subject to a reasonableness review by the CPUC. Cost increases resulting from contractual disputes, delays in performance by the contractor, elevated levels of inflation, or permitting delays, among other things, could cause SCE to materially overrun the decommissioning cost estimate and could materially impact the sufficiency of trust funds.
In December 2022, the CPUC approved disbursements from SCE's nuclear decommissioning trusts to cover forecasted 2023 decommissioning costs for San Onofre Units 2 and 3, of which SCE's share is approximately $300 million in 2023 dollars.
24
SCE Dividends
CPUC holding company rules require that SCE's dividend policy be established by SCE's Board of Directors on the same basis as if SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's electricity service obligations, shall receive first priority from the Boards of Directors of both Edison International and SCE. In addition, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders.
The common equity component of SCE's CPUC authorized capital structure is 52% on a weighted average basis over the Capital Structure Compliance Period, unchanged from the January 1, 2020 to December 31, 2022 compliance period. The CPUC authorized capital structure differs from the capital structure calculated based on GAAP due to certain exclusions allowed by CPUC, including the impact of SCE's contributions to the Wildfire Insurance Fund under AB 1054. For further information, see "Business—SCE—Overview of Ratemaking Process" and "Business—Southern California Wildfires."
In May 2020, the CPUC issued a decision on SCE's application to the CPUC for waiver of compliance with its equity ratio requirement, that allows SCE to exclude from its equity ratio calculations (i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. With these exclusions, SCE was in compliance with its authorized capital structure for the compliance period from January 1, 2020 to December 31, 2022. The temporary exclusion lapsed on May 7, 2022. In April 2022, SCE filed another application requesting continued waiver of compliance with its equity ratio requirement. Under the CPUC's rules, SCE will not be deemed to be in violation of the equity ratio requirement while the waiver application is pending resolution. While the exclusion is in place, SCE is required to notify the CPUC if an adverse financial event reduces SCE's spot equity ratio by more than one percent from the level most recently filed with the CPUC in the proceeding. The last spot equity ratio SCE filed with the CPUC in the proceeding did not exclude the then $1.8 billion net charge and was 45.2% as of December 31, 2018 (at the time the common equity component of SCE's CPUC authorized capital structure was required to remain at or above 48% on a weighted average basis over the applicable 37-month period). SCE's spot equity ratio on December 31, 2018 would have been 48.7% had the $1.8 billion net charge at December 31, 2018 been excluded, therefore SCE will notify the CPUC if its spot ratio drops below 47.7% in any quarter. For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
SCE monitors its compliance with the CPUC's equity ratio requirement based on the weighted average of the common equity component of SCE's CPUC authorized capital structure over the Capital Structure Compliance Period using its actual capital structure from the beginning of the Capital Structure Compliance Period through the reporting date together with forecasted performance and expected financing activities for the remainder of the Capital Structure Compliance Period. SCE expects to be compliant with its CPUC authorized capital structure at the end of the Capital Structure Compliance Period.
SCE's ability to declare and pay common dividends may be restricted under the terms of its outstanding series of preference stock. For further information see "Notes to Consolidated Financial Statements—Note 14. Equity."
As a California corporation, SCE's ability to pay dividends is also governed by the California General Corporation Law. California law requires that for a dividend to be declared: (a) retained earnings must equal or exceed the proposed dividend, or (b) immediately after the dividend is made, the value of the corporation's assets must exceed the value of its liabilities plus amounts required to be paid, if any, in order to liquidate stock senior to the shares receiving the dividend. Additionally, a California corporation may not declare a dividend if it is, or as a result of the dividend would be, likely to be unable to meet its liabilities as they mature. Prior to declaring dividends, SCE's Board of Directors evaluates available information, including when applicable, information pertaining to the 2017/2018 Wildfire/Mudslide Events, to ensure
25
that the California law requirements for the declarations are met. On February 23, 2023, SCE declared a dividend to Edison International of $350 million.
The timing and amount of future dividends are also dependent on a number of other factors including SCE's requirements to fund other obligations and capital expenditures, and its ability to access the capital markets and generate operating cash flows and earnings. If SCE incurs significant costs related to catastrophic wildfires and is unable to recover such costs through insurance, the Wildfire Insurance Fund (for fires after July 12, 2019), or from customers or is unable to access capital markets on reasonable terms, SCE may be limited in its ability to pay future dividends to Edison International and its preference shareholders.
Margin and Collateral Deposits
Certain derivative instruments, power and energy procurement contracts and other contractual arrangements contain collateral requirements. In addition, certain environmental remediation obligations require financial assurance that may be in the form of collateral postings. Future collateral requirements may differ from the requirements at December 31, 2022 due to the addition of incremental power and energy procurement contracts with collateral requirements, if any, the impact of changes in wholesale power and natural gas prices on SCE's contractual obligations, and the impact of SCE's credit ratings falling below investment grade.
The table below provides the amount of collateral posted by SCE to its counterparties as well as the potential collateral that would have been required as of December 31, 2022, if SCE's credit rating had been downgraded to below investment grade as of that date. The table below also provides the potential collateral that could be required due to adverse changes in wholesale power and natural gas prices over the remaining lives of existing power and fuel derivative contracts. Natural gas prices have increased significantly in 2022 due to global demand and extreme weather conditions in the USA, which resulted in substantially higher collateral postings and potential collateral requirements during the year.
In addition to amounts shown in the table, power and fuel contract counterparties may also institute new collateral requirements, applicable to future transactions to allow SCE to continue trading in power and fuel contracts at the time of a downgrade or upon significant increases in market prices. In particular, SCE has an agreement with a counterparty for gas transport and balancing services through their pipeline. In December 2022, extreme winter conditions combined with pipeline constraints led to extremely high natural gas prices and usage, which affected collateral terms within the arrangement. Through December 31, 2022, the counterparty could have contractually requested $118 million in collateral from SCE but waived the amount, given the extraordinary conditions. Furthermore, SCE may also be required to post up to $50 million in collateral in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which the downgrade occurs.
26
(in millions) |
| ||
Collateral posted as of December 31, 20221 | $ | 461 | |
Incremental collateral requirements for purchased power and fuel contracts resulting from a potential downgrade of SCE's credit rating to below investment grade2 |
| 252 | |
Incremental collateral requirements for SCE's financial hedging activities resulting from adverse market price movement3 |
| 73 | |
Posted and potential collateral requirements | $ | 786 |
1 Net collateral provided to counterparties and other brokers consisted of $437 million in letters of credit and surety bonds and $24 million of cash collateral.
2 Represents potential collateral requirements for accounts payable and mark-to-market valuation at December 31, 2022. Requirement varies throughout the period and is generally lower at the end of the month.
3 Incremental collateral requirements were based on potential changes in SCE's forward positions as of December 31, 2022 due to adverse market price movements over the remaining lives of the existing power and fuel derivative contracts using a 95% confidence level.
Edison International Parent and Other
In the next 12 months, Edison International expects to fund its net cash requirements through cash on hand, dividends from SCE, and capital market and bank financings. Edison International may finance its ongoing cash requirements, including dividends, working capital requirements, payment of obligations, and capital investments, including capital contributions to subsidiaries, with short-term or other financings, subject to availability in the bank and capital markets.
At December 31, 2022, Edison International Parent had cash on hand of $148 million and $1.4 billion available to borrow on its $1.5 billion revolving credit facility. The credit facility is available for borrowing needs until May 2026.
At December 31, 2022 Edison International Parent had $90 million outstanding commercial paper, net of discount, at a weighted-average interest rate of 4.92% supported by the $1.5 billion revolving credit facility. The aggregate maximum principal amount under the Edison International Parent revolving credit facility may be increased up to $2.0 billion, provided that additional lender commitments are obtained. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Edison International Parent has $1.4 billion of debt maturities arising in the next 12 months. Edison International expects to finance these maturities with $300 million to $400 million of equity content, as viewed by ratings agencies, and expects to issue debt for the remainder. In August 2022, Edison International Parent established a program to sell shares of its common stock with aggregate sales price up to $500 million, including through designated broker-dealers at prevailing market prices (an at-the-market offering). For further information, see "Notes to Consolidated Financial Statements—Note 14. Equity."
On February 23, 2023, Edison International declared a dividend of $0.7375 per share to be paid on April 30, 2023. Edison International Parent and Other's liquidity and its ability to pay operating expenses and pay dividends to common shareholders are dependent on access to the bank and capital markets, dividends from SCE, realization of tax benefits and its ability to meet California law requirements for the declaration of dividends. Prior to declaring dividends, Edison International's Board of Directors evaluates available information, including when applicable, information pertaining to the 2017/2018 Wildfire/Mudslide Events, to ensure that the California law requirements for the declarations are met. For information on the California law requirements on the declaration of dividends, see "—SCE—SCE Dividends." Edison International intends to maintain its target payout ratio of 45% – 55% of SCE's core earnings, subject to the factors identified above.
Edison International's ability to declare and pay common dividends may be restricted under the terms of the Series A and Series B Preferred Stock. For further information see "Notes to Consolidated Financial Statements—Note 14. Equity."
27
Edison International Parent's credit facility requires a consolidated debt to total capitalization ratio as defined in the applicable agreements of less than or equal to 0.70 to 1. At December 31, 2022, Edison International's consolidated debt to total capitalization ratio was 0.64 to 1.
At December 31, 2022, Edison International Parent was in compliance with all financial covenants that affect access to capital.
The following table summarizes Edison International Parent's current long-term issuer credit ratings and outlook from the major credit rating agencies:
| Moody's |
| Fitch |
| S&P | |
Credit Rating | Baa3 | BBB- | BBB | |||
Outlook | Positive | Positive | Stable |
Edison International Parent's credit ratings may be affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by claims from catastrophic wildfires. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, note financings or other borrowings.
Edison International Income Taxes
Net Operating Loss and Tax Credit Carryforwards
Edison International has approximately $3.4 billion of tax effected net operating losses and tax credit carryforwards at December 31, 2022 (after excluding $121 million of Capistrano Wind attributes and offsetting $310 million of unrecognized tax benefits), which are available to offset future consolidated tax liabilities.
See "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for further information regarding taxes payable to Capistrano Wind. Edison International expects to utilize its net operating loss and tax credit carryforwards through 2029 based on currently enacted tax laws.
Inflation Reduction Act of 2022
On August 16, 2022, the IRA was signed into law. The law imposes a 15% corporate alternative minimum tax ("CAMT") on adjusted financial statement income ("AFSI") of corporations with average AFSI exceeding $1 billion over a specified 3-year period. The CAMT will be effective January 1, 2023. Based on the current interpretation of the law and historical financial data, Edison International estimates that it will exceed the $1 billion threshold and be subject to CAMT on its consolidated Federal tax returns beginning in 2025. SCE expects to be subject to CAMT on its stand-alone Federal return beginning in 2024.
The law also includes significant extensions, expansions, and enhancements of numerous energy-related investment tax credits, as well as creating new credits applicable to electricity production which may apply to SCE's capital expenditures. Under the IRA, SCE expects to generate investment tax credits related to its utility owned storage projects, which will accrue to the benefit of its customers.
28
Historical Cash Flows
SCE
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Net cash provided by operating activities | $ | 3,319 | $ | 158 | $ | 1,427 | |||
Net cash provided by financing activities |
| 2,724 |
| 5,218 |
| 3,699 | |||
Net cash used in investing activities |
| (5,557) |
| (5,152) |
| (5,094) | |||
Net increase in cash, cash equivalents and restricted cash | $ | 486 | $ | 224 | $ | 32 |
Net Cash Provided by Operating Activities
The following table summarizes major categories of net cash provided by operating activities as provided in more detail in SCE's consolidated statements of cash flows for 2022, 2021 and 2020:
Years ended December 31, | Change | |||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022/2021 | ||||
Net income | $ | 954 |
| $ | 935 |
| $ | 942 |
|
| ||
Non-cash items1 |
| 2,701 |
| 2,534 |
| 1,840 |
|
| ||||
Subtotal |
| 3,655 |
| 3,469 |
| 2,782 |
| 186 | ||||
Contributions to Wildfire Insurance Fund |
| (95) |
| (95) | (95) |
| — | |||||
Changes in cash flow resulting from working capital2 |
| 327 |
| (705) |
| (136) |
| 1,032 | ||||
Regulatory assets and liabilities |
| (51) |
| (720) |
| (1,799) |
| 669 | ||||
Wildfire related claims3 | (56) | (2,648) | (56) | 2,592 | ||||||||
Proceeds from Morongo Transmission LLC4 | — | 400 | — | (400) | ||||||||
Other noncurrent assets and liabilities5 |
| (461) |
| 457 |
| 731 |
| (918) | ||||
Net cash provided by operating activities | $ | 3,319 | $ | 158 | $ | 1,427 | $ | 3,161 |
1 | Non-cash items include depreciation and amortization, allowance for equity during construction, impairment and other, Wildfire Insurance Fund amortization expense, deferred income taxes and other. |
2 | Changes in working capital items include receivables, unbilled revenue, inventory, amortization of prepaid expenses, accounts payable, tax receivables and payables, and other current assets and liabilities. |
3 | The 2022 amounts include payments of $1.9 billion settlements on 2017/2018 Wildfire/Mudslide Events claims, partially offset by an increase of estimated losses of $1.3 billion on 2017/2018 Wildfire/Mudslide Events and $0.6 billion on Post-2018 Wildfires. The 2021 amounts were primarily related to settlement payments of $3.9 billion for 2017/2018 Wildfire/Mudslide Events, partially offset by an increase of $1.3 billion in liabilities for the 2017/2018 Wildfire/Mudslide Events. |
4 | Represents $400 million proceeds from Morongo Transmission LLC for use of a portion of the West of Devers transmission line in 2021. |
5 | Includes changes in wildfire-related insurance receivables. Also includes nuclear decommissioning trusts activities. See "Nuclear Decommissioning Activities" below for further information. |
Net cash provided by operating activities was impacted by the following:
Net income and non-cash items increased in 2022 by $186 million from 2021 primarily due to higher revenue due to the escalation mechanism as set forth in the 2021 GRC final decision and higher return on rate base from capital balancing accounts, partially offset by higher operation and maintenance expenses and higher interest expense.
Net cash provided by operating activities was also impacted by cash outflow of $95 million related to SCE's contributions to the Wildfire Insurance Fund in both 2022 and 2021. See "Business—Southern California Wildfires" for further information.
29
Net cash inflow (outflow) for working capital was $327 million and $(705) million in 2022 and 2021, respectively. The net cash inflow for working capital for 2022 was mainly due to an increase in payables of $343 million driven by higher payables on power purchase contracts and a net decrease of $24 million in customer receivables and unbilled revenue primarily from $387 million of CAPP funds received in 2022, partially offset by lower collections. The net cash outflow for working capital in 2021 was mainly due to net increases in unbilled revenue and customer receivables of
$700 million.
Net cash used in regulatory assets and liabilities, including the increase in net undercollections of balancing accounts, was $51 million and $720 million in 2022 and 2021, respectively. SCE has a number of balancing and memorandum accounts, which impact cash flows based on differences between timing of collection of amounts through rates and accrual expenditures. Cash flows were primarily impacted by the following:
2022
● | Net undercollections of BRRBA increased by $259 million primarily due to inclusion in BRRBA of $401 million of revenue requirement authorized under GRC track 2 for collection in customer rates starting March 2022 over a 36-month period, a revenue requirement of approximately $400 million authorized under GRC track 3 for collection in customer rates starting October 2022 over a 36-month period, and $174 million CSRP related expenses approved in September 2022. These higher undercollections were partially offset by current year overcollections due to higher sales volume and average rates due to extreme heat in California and recovery of prior year undercollections, including 2021 GRC authorized additional revenue requirement for the first nine months of 2021 to be collected over a 27-month period starting October 2021. |
● | Undercollections decreased by $180 million related to wildfire risk mitigation and restoration memorandum and balancing accounts as a result of approval to recover costs in GRC track 2 and track 3, which were transferred to BRRBA for recovery as mentioned above, partially offset by additional WEMA and wildfire risk mitigation and restoration costs incurred. |
● | Net undercollections for ERRA, PABA and NSGBA increased by $795 million primarily due to current year undercollections due to higher than forecast energy prices and load, partially offset by higher sales volume and higher average rates driven by extreme heat in California and recovery of prior PABA and NSGBA undercollections. |
● | Increased overcollections of $511 million for the public purpose and energy efficiency programs primarily due to lower program spending due to timing and increased sales volume. |
● | Net overcollection increased by $178 million for the FERC balancing accounts primarily due to current year overcollections due to higher sales volume, recovery of prior year undercollections and lower operating expenses than amounts included in revenue requirements. |
● | Increase in overcollections of $56 million for excess California Department of Water Resources ("DWR") bond and power charges to be refunded to customers over a 12-month period beginning in June 2022. |
● | Undercollections in the CSRP memorandum account decreased by $64 million primarily due to transfer $174 million approved expense to BRRBA as mentioned above, partially offset by related deferred CSRP post implementation costs. |
2021
● | Net undercollections of BRRBA increased by $227 million primarily driven by adoption of the 2021 GRC final decision, including 2021 authorized revenue requirements to be collected over a 27-month period starting October |
30
2021, and CEMA drought authorized revenue requirement to be collected over a 12-month period starting October 2021. The undercollections are partially offset by current year overcollection due to higher sales volume, and recovery of prior year undercollections, including WEMA and the Grid Safety and Resiliency Program being collected over a two-year and one-year period, respectively, starting October 2020. |
● | Undercollections of $364 million were related to wildfire-related expenses that are probable of future recovery from customers. |
● | Undercollections of CEMA accounts decreased by $62 million as a result of approval to recover drought restoration costs, which was transferred to BRRBA for recovery, partially offset by additional restoration costs due to wildfire events in 2020. |
● | Net undercollections for ERRA, PABA and the NSGBA increased by $251 million primarily due to current year undercollections as a result of higher gas and power prices, partially offset by higher sales volume, and recovery of prior PABA and NSGBA undercollections. |
● | Undercollections from COVID-19-related memorandum and balancing accounts decreased by $82 million due to transfer of $182 million to ERRA and public purpose programs, partially offset by additional customer uncollectible expenses. |
● | Undercollections of $98 million in the CSRP memorandum account were related to CSRP implementation costs. |
Cash flows (used in) or provided by other noncurrent assets and liabilities were primarily related to an increase in wildfire insurance receivables of $(398) million in 2022 and an insurance recovery of $708 million in 2021. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
Net Cash Provided by Financing Activities
The following table summarizes cash provided by financing activities for 2022, 2021 and 2020. Issuances of debt is discussed in "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Issuances of long-term debt, including premium/discount and net of issuance costs | $ | 5,032 | $ | 5,411 | $ | 2,676 | |||
Long-term debt repaid or repurchased | (385) | (1,037) | (699) | ||||||
Short-term debt borrowed | — |
| 2,654 |
| 2,194 | ||||
Short-term debt repaid | (1,543) | (2,255) | (326) | ||||||
Commercial paper (repaid), net of borrowing | (406) | (124) | 175 | ||||||
Capital contributions from Edison International Parent | 1,400 |
| 1,633 |
| 1,432 | ||||
Redemptions of preferred and preference stock | — |
| — |
| (308) | ||||
Payment of common stock dividends to Edison International | (1,300) |
| (975) |
| (1,332) | ||||
Payment of preferred and preference stock dividends | (110) |
| (106) |
| (118) | ||||
Other | 36 |
| 17 |
| 5 | ||||
Net cash provided by financing activities | $ | 2,724 | $ | 5,218 | $ | 3,699 |
Net Cash Used in Investing Activities
Cash flows used in investing activities are primarily due to capital expenditures and funding of nuclear decommissioning trusts. Cash used in capital expenditures were $5.8 billion, $5.5 billion and $5.5 billion for 2022, 2021 and 2020, respectively, primarily related to transmission, distribution and generation investments. SCE had a net redemption of nuclear decommissioning trust investments of $123 million, $256 million and $197 million in 2022, 2021 and 2020, respectively. See "Nuclear Decommissioning Activities" below for further discussion.
31
Nuclear Decommissioning Activities
SCE's statements of cash flows include nuclear decommissioning activities, which are reflected in the following line items:
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Net cash used in operating activities: | |||||||||
Net earnings (losses) from nuclear decommissioning trust investments | $ | 78 | $ | (31) | $ | 25 | |||
SCE's decommissioning costs |
| (189) |
| (238) |
| (223) | |||
Net cash provided by investing activities: |
|
|
| ||||||
Proceeds from sale of investments | 4,177 | 3,961 | 5,927 | ||||||
Purchases of investments |
| (4,054) |
| (3,705) |
| (5,730) | |||
Net cash impact | $ | 12 | $ | (13) | $ | (1) |
Net cash used in operating activities relates to interest and dividends less administrative expenses, taxes and SCE's decommissioning costs. Investing activities represent the purchase and sale of investments within the nuclear decommissioning trusts, including the reinvestment of earnings from nuclear decommissioning trust investments.
Funds for decommissioning costs are requested from the nuclear decommissioning trusts one month in advance. Decommissioning disbursements are funded from sales of investments of the nuclear decommissioning trusts. The net cash impact reflects timing of decommissioning payments ($189 million, $238 million and $223 million in 2022, 2021 and 2020, respectively) and reimbursements to SCE from the nuclear decommissioning trust ($201 million, $225 million and $222 million in 2022, 2021 and 2020, respectively).
Edison International Parent and Other
The table below sets forth condensed historical cash flow from operations for Edison International Parent and Other, including intercompany eliminations.
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Net cash used in operating activities | $ | (103) | $ | (147) | $ | (164) | |||
Net cash provided by financing activities |
| 157 |
| 227 |
| 28 | |||
Net cash (used in) provided by investing activities |
| (17) |
| 1 |
| 123 | |||
Net increase (decrease) in cash, cash equivalents and restricted cash | $ | 37 | $ | 81 | $ | (13) |
Net Cash Used in Operating Activities
Net cash used in operating activities decreased in 2022 by $44 million from 2021 due to:
● | Outflows of $193 million and $147 million from operating activities in 2022 and 2021, respectively, due to payments and receipts relating to interest and operating costs. |
● | $90 million cash inflow from a wildfire insurance premium received by EIS in 2022. |
32
Net Cash Provided by Financing Activities
Net cash provided by financing activities was as follows:
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Dividends paid to Edison International common shareholders | $ | (1,050) | $ | (988) | $ | (928) | |||
Dividends paid to Edison International preferred shareholders | (99) | (35) | — | ||||||
Dividends received from SCE |
| 1,300 |
| 975 |
| 1,332 | |||
Capital contributions to SCE |
| (1,400) |
| (1,633) |
| (1,432) | |||
Issuance of common stock |
| 13 |
| 32 |
| 912 | |||
Issuance of preferred stock, net of issuance costs | — | 1,977 | — | ||||||
Long-term debt issuance, net of discount and issuance costs |
| 939 |
| — |
| 397 | |||
Long-term debt repayments |
| (700) |
| — |
| (400) | |||
Issuance of term loan |
| 1,000 |
| — |
| — | |||
Commercial paper financing, net |
| 89 |
| (130) |
| 129 | |||
Other |
| 65 |
| 29 |
| 18 | |||
Net cash provided by financing activities | $ | 157 | $ | 227 | $ | 28 |
Net Cash (Used in) Provided by Investing Activities
Net cash used in investing activities in 2022 included a net cash outflow of $17 million for a business acquisition at Edison Energy. For more details, see "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Business Acquisition."
Contractual Obligations and Contingencies
Contractual Obligations
SCE and Edison International Parent and Other have various contractual obligations, which are recorded as liabilities in the consolidated financial statements. Other items, such as certain purchase commitments and other executory contracts, are not recognized as liabilities in the consolidated financial statements but are required to be disclosed in the footnotes to the financial statements.
For details on long-term debt, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Certain power purchase agreements which SCE entered into with independent power producers are treated as operating or finance leases. In addition, SCE has other operating lease obligations primarily related to vehicles, office space and other equipment. For further discussion, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" and "—Note 13. Leases."
SCE also has other purchase obligations primarily related to maintaining reliability and expanding SCE's transmission and distribution system and nuclear fuel supply contracts. For further discussion, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies."
Edison International Parent and Other and SCE have estimated contributions to the pension and PBOP plans. These amounts represent estimates that are based on assumptions that are subject to change. See "Notes to Consolidated Financial Statements—Note 9. Compensation and Benefit Plans" for further information.
Edison International and SCE have a total net liability recorded for uncertain tax positions. Edison International and SCE cannot make reliable estimates of the cash flows by period due to uncertainty surrounding the timing of resolving these
33
open tax issues with the tax authorities. See "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for further information.
For details on derivative obligations and asset retirement obligations, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments" and "—Note 1. Summary of Significant Accounting Policies," respectively.
Contingencies
Edison International's and SCE's contingencies are discussed in "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies."
Off-Balance Sheet Arrangements
SCE has variable interests in power purchase contracts with variable interest entities and a variable interest in unconsolidated Trust II, Trust III, Trust IV, Trust V and Trust VI that issued $400 million (aggregate liquidation preference) of 5.10%, $275 million (aggregate liquidation preference) of 5.75%, $325 million (aggregate liquidation preference) of 5.375%, $300 million (aggregate liquidation preference) of 5.45% and $475 million (aggregate liquidation preference) of 5.00%, trust securities, respectively, to the public. In 2020, SCE Trust II redeemed $180 million of its trust securities from the public, from its issued trust securities of $400 million. See "Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities."
MARKET RISK EXPOSURES
Edison International's and SCE's primary market risks include fluctuations in interest rates, commodity prices and volumes, and counterparty credit. Derivative instruments are used to manage market risks including market risks to SCE's customers. For further discussion of market risk exposures, including commodity price risk, credit risk and interest rate risk, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments" and "—Note 4. Fair Value Measurements."
Interest Rate Risk
Edison International and SCE are exposed to changes in interest rates primarily as a result of financing, investing and borrowing activities used for liquidity purposes, and to fund business operations and capital investments. The nature and amount of Edison International's and SCE's long-term and short-term debt can be expected to vary as a result of future business requirements, market conditions and other factors. Fluctuations in interest rates can affect earnings and cash flows. Changes in interest rates may impact SCE's authorized rate of return for the period beyond 2023 through a CPUC cost of capital adjustment mechanism, see "Liquidity and Capital Resources—SCE" and "Business—SCE—Overview of Ratemaking Process" for further discussion. The following table summarizes the increase or decrease to the fair value of long-term debt including the current portion, if the market interest rates were changed while leaving all other assumptions the same:
(in millions) |
| Carrying Value |
| Fair Value |
| 10% Increase |
| 10% Decrease | ||||
Edison International: | ||||||||||||
December 31, 2022 |
| $ | 29,639 |
| $ | 26,824 | $ | 25,739 | $ | 28,006 | ||
December 31, 2021 |
|
| 25,247 |
|
| 27,718 |
| 26,920 |
| 28,565 | ||
SCE: |
|
|
|
|
|
|
|
|
|
| ||
December 31, 2022 |
| 26,258 |
| 23,469 | 22,444 | 24,590 | ||||||
December 31, 2021 |
|
| 22,110 |
|
| 24,375 |
| 23,603 |
| 25,196 |
Commodity Price Risk
SCE and its customers are exposed to the risk of a change in the market price of natural gas, electric power and transmission congestion. Due to regulatory mechanisms, exposure to commodity prices is not expected to impact
34
earnings but may impact timing of cash flows. SCE's hedging program is designed to reduce exposure to variability in market prices related to SCE's purchases and sales of electric power and natural gas. As part of this program, SCE enters into energy options, swaps, forward arrangements and congestion revenue rights ("CRRs"). The transactions are pre-approved by the CPUC or executed in compliance with CPUC-approved procurement plans. Therefore, SCE expects recovery of its related hedging costs, as well as procurement costs, through the ERRA balancing account or CPUC-approved procurement plans. For more details of the ERRA balancing account, see "Liquidity and Capital Resources—SCE—Regulatory Proceedings—ERRA Proceeding" and "Business—SCE—Overview of Ratemaking Process."
Fair Value of Derivative Instruments
The fair value of derivative instruments is included in the consolidated balance sheets unless subject to an exception under the applicable accounting guidance. Realized gains and losses from derivative instruments are expected to be recovered from or refunded to customers through regulatory mechanisms and, accordingly, changes in the fair value of derivative instruments have no impact on earnings. SCE does not use hedge accounting for these transactions due to this regulatory accounting treatment. For further discussion on fair value measurements and the fair value hierarchy, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements."
The fair value of outstanding derivative instruments used to mitigate exposure to commodity price risk was a net asset of $240 million and $44 million at December 31, 2022 and 2021, respectively.
The following table summarizes the increase or decrease to the fair values of the net asset of derivative instruments included in the consolidated balance sheets, if the electricity prices or gas prices were changed while leaving all other assumptions constant:
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Increase in electricity prices by 10% | $ | 22 | $ | 13 | ||
Decrease in electricity prices by 10% |
| (22) |
| (13) | ||
Increase in gas prices by 10% |
| 40 |
| 20 | ||
Decrease in gas prices by 10% |
| (40) |
| (20) |
Investment Price Risk
Edison International and SCE are subject to investment price risk due to securities held as investments in the nuclear decommissioning trust and various pension and other post-retirement benefit plan trusts.
Nuclear Decommissioning Trust
As of December 31, 2022, SCE's nuclear decommissioning trust investments consist of equity investments of $1.6 billion and fixed income investments of $2.2 billion. These investments are exposed to price fluctuations in equity markets and changes in interest rates. SCE's investment policies and CPUC requirements place limitations on the types and investment grade ratings of the securities that may be held by the nuclear decommissioning trust. These policies restrict the trust from holding alternative investments and limit the trust funds' exposures to investments in highly illiquid markets. Due to regulatory mechanisms, investment earnings and realized and unrealized gains and losses increase or decrease the trust assets and the related regulatory asset or liability, and do not materially affect earnings. For further discussion on the nuclear decommissioning trust investments, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "—Note 10. Investments."
PBOP and Pension Plan Assets
The PBOP Plan and the Southern California Edison Company Retirement Plan Trust assets include investments in equity securities, U.S. treasury securities, other fixed-income securities, common/collective funds, mutual funds, other investment entities, foreign exchange and interest rate contracts, and partnership/joint ventures. These investments are
35
exposed to price fluctuations in equity markets and changes in interest rates. The investment of plan assets is overseen by a fiduciary investment committee. Risk is managed through diversification among multiple asset classes, managers, styles and securities. See "Notes to Consolidated Financial Statements—Note 9. Compensation and Benefit Plans" for additional information regarding investment strategy of plan assets.
A significant decline in the value of plan assets could require SCE to increase funding of its pension and PBOP plans in future periods, which could adversely affect cash flows in those periods. Annual contributions related to SCE employees made to SCE plans are anticipated to be recovered through CPUC-approved regulatory mechanisms.
Credit Risk
Credit risk exposure from counterparties for power and gas trading activities is measured as the sum of net accounts receivable (accounts receivable less accounts payable) and the current fair value of net derivative assets (derivative assets less derivative liabilities) reflected on the consolidated balance sheets. SCE enters into master agreements which typically provide for a right of set-off. Accordingly, SCE's credit risk exposure from counterparties is based on a net exposure under these arrangements. SCE manages the credit risk on the portfolio of counterparties based on credit ratings and other publicly disclosed information, such as financial statements, regulatory filings and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements. Based on SCE's policies and risk exposures related to credit, SCE does not anticipate a material adverse effect on their financial statements as a result of counterparty nonperformance. At December 31, 2022, SCE's power and gas trading counterparty credit risk exposure was $239 million, all of which is associated with entities that have an investment grade rating of A or higher. SCE assigns a credit rating to counterparties based on the lowest of a counterparty's S&P's, Moody's and Fitch's rating.
For more information related to credit risks, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments."
CRITICAL ACCOUNTING ESTIMATES AND POLICIES
The accounting policies described below are considered critical to obtaining an understanding of Edison International's and SCE's consolidated financial statements because their application requires the use of significant estimates and judgments by management in preparing the consolidated financial statements. Management estimates and judgments are inherently uncertain and may differ significantly from actual results achieved. Management considers an accounting estimate to be critical if the estimate requires significant assumptions and changes in the estimate or, the use of alternative estimates, could have a material impact on Edison International's and SCE's results of operations or financial position. For more information on Edison International's and SCE's accounting policies, see "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies."
Accounting for Contingencies
Nature of Estimates Required. Edison International and SCE record loss contingencies when management determines that the outcome of future events is probable of occurring and when the amount of the loss can be reasonably estimated. Gain contingencies are recognized in the financial statements when they are realized.
Key Assumptions and Approach Used. The determination of an accrual for a loss contingency is based on management judgment and estimates with respect to the likely outcome of the matter, including the analysis of different scenarios. Liabilities are recorded or adjusted when events or circumstances cause these judgments or estimates to change. In assessing whether a loss is a reasonable possibility, Edison International and SCE may consider the following factors, among others: the nature of the litigation, claim or assessment, available information, opinions or views of legal counsel and other advisors, and the experience gained from similar cases. Edison International and SCE provide disclosures for material contingencies when there is a reasonable possibility that a loss or an additional loss may be incurred.
36
Effect if Different Assumptions Used. Actual amounts realized upon settlement of contingencies may be different than amounts recorded and disclosed and could have a significant impact on the liabilities, revenue and expenses recorded on the consolidated financial statements. For a discussion of contingencies, guarantees and indemnities, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies."
Application to 2017/2018 Wildfire/Mudslide Events
As discussed in "Management Overview," wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers.
The extent of legal liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether the utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be required to show negligence in addition to causation. Final determinations of legal liability for wildfire events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes and settlements may be reached before determinations of legal liability are ever made.
Edison International and SCE have incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events. Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged. For instance, SCE will receive additional information with respect to damages claimed as the claims mediation processes progress. Other factors that can cause actual losses incurred to be higher or lower than estimated include the ability to reach settlements and the outcomes of settlements reached through the ongoing claims mediation processes, uncertainties related to the sufficiency of insurance held by plaintiffs, uncertainties related to the litigation processes, including whether plaintiffs will ultimately pursue claims, uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements.
Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Management's 2022 reviews included a review of large damage claims presented by a small number of plaintiffs, new lawsuits filed in the Woolsey Fire litigation and information obtained after the statute of limitations for individual plaintiffs for the Woolsey Fire expired, including information regarding the nature of claims remaining in the Woolsey Fire litigation. Management also reviewed information obtained from settling a substantial portion of the claims in the 2017/2018 Wildfire/Mudslide Events litigations, including higher than expected costs to settle claims. As a result of management's reviews during 2022, SCE recorded a $1.3 billion increase in estimated losses for the 2017/2018 Wildfire/Mudslide Events during the year.
In total, through December 31, 2022, SCE has accrued estimated losses of $8.8 billion, has paid or is obligated to pay approximately $7.8 billion in settlements and has recovered $2.0 billion from its insurance carriers and approximately $234 million through FERC-jurisdictional electric rates in relation to the 2017/2018 Wildfire/Mudslide Events. At December 31, 2022 Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events is $934 million.
Edison International and SCE may incur a material loss in excess of amounts accrued in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Due to the number of uncertainties and possible outcomes related to the 2017/2018 Wildfire/Mudslide Events litigation, Edison International and SCE cannot estimate the upper end of the range of reasonably possible losses that may be incurred.
37
Rate Regulated Enterprises
Nature of Estimate Required. SCE follows the accounting principles for rate-regulated enterprises which are required for entities whose rates are set by regulators at levels intended to recover the estimated costs of providing service, plus a return on net investment, or rate base. Regulators may also impose penalties or grant incentives. Due to timing and other differences in the collection of revenue, these principles allow a cost that would otherwise be charged as an expense by an unregulated entity to be capitalized as a regulatory asset if it is probable that such cost is recoverable through future rates; conversely the principles allow creation of a regulatory liability for amounts collected in rates to recover costs expected to be incurred in the future or amounts collected in excess of costs incurred and refundable to customers. In addition, SCE recognizes revenue and regulatory assets from alternative revenue programs, which enables the utility to adjust future rates in response to past activities or completed events, if certain criteria are met, even for programs that do not qualify for recognition of "traditional" regulatory assets and liabilities.
Accounting principles for rate-regulated enterprises also require recognition of an impairment loss if it becomes probable that the regulated utility will abandon a plant investment, or if it becomes probable that the cost of a recently completed plant will be disallowed, either directly or indirectly, for ratemaking purposes and a reasonable estimate of the amount of the disallowance can be made.
Key Assumptions and Approach Used. SCE's management assesses at the end of each reporting period whether regulatory assets are probable of future recovery by considering factors such as the current regulatory environment, the issuance of rate orders on recovery of the specific or a similar incurred cost to SCE or other rate-regulated entities, and other factors that would indicate that the regulator will treat an incurred cost as allowable for ratemaking purposes. Using these factors, management has determined that existing regulatory assets and liabilities are probable of future recovery or settlement. This determination reflects the current regulatory climate and is subject to change in the future. SCE also considers whether any plant investments are probable of abandonment or disallowance.
Effect if Different Assumptions Used. Significant management judgment is required to evaluate the anticipated recovery of regulatory assets and plant investments, the recognition of incentives and revenue subject to refund, as well as the anticipated cost of regulatory liabilities or penalties. If future recovery of costs ceases to be probable, all or part of the regulatory assets, plant investments and/or liabilities would have to be written off against current period earnings. At December 31, 2022, the consolidated balance sheets included regulatory assets of $10.7 billion and regulatory liabilities of $9.2 billion. If different judgments were reached on recovery of costs and timing of income recognition, SCE's earnings may vary from the amounts reported.
Application to Southern California Wildfires
Application to 2017/2018 Wildfire/Mudslide Events
Recovery of SCE's losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent in which a California investor-owned utility has sought recovery for uninsured wildfire-related costs is SDG&E's requests for cost recovery related to 2007 wildfire activity, where the FERC allowed recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that SDG&E did not meet the CPUC's prudency standard. As a result, while SCE does not agree with the CPUC's decision, it believes that the CPUC's interpretation and application of the prudency standard to SDG&E creates substantial uncertainty regarding how that standard will be applied to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. SCE will continue to evaluate the probability of recovery based on available evidence, including judicial, legislative and regulatory decisions, including any CPUC
38
decisions illustrating the interpretation and/or application of the prudency standard when making determinations regarding recovery of uninsured wildfire-related costs. While the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates. SCE would record a regulatory asset at the time it obtains sufficient information to support a conclusion that recovery is probable.
Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded total expected recoveries within the FERC balancing account.
Application to Post-2018 Wildfires
Management judgment was required to assess the probability of recovery of SCE's losses realized in connection with the Post-2018 Wildfires in excess of available insurance.
The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. On July 12, 2019, AB 1054 clarified that the CPUC must allow recovery of costs and expenses arising from a covered wildfire if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time, and based on the information available at that time. Further, utilities with a valid safety certification at the time of the relevant wildfire will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates "serious doubt" as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to dispel that doubt and prove its conduct was prudent. The serious doubt standard in AB 1054 is modeled after the FERC cost recovery standard. SCE evaluates the probability of recovery for Post-2018 Wildfires in the context of the prudency standard laid out by AB 1054 above. This assessment is made based on SCE’s status as a holder of a valid safety certificate, facts known to date related to the ignition, and any regulatory decisions illustrating the interpretation and/or application of the prudency standard under AB 1054, which as of December 31, 2022 has not been applied by the CPUC to an actual cost recovery application filed by any California investor-owned utility. SCE also considers which costs are eligible for recovery based on precedents from other CPUC cost recovery proceedings. Management’s assessment of the probability of recovery may change, related to changes in any of these factors in the future.
Income Taxes
Nature of Estimates Required. As part of the process of preparing its consolidated financial statements, Edison International and SCE are required to estimate income taxes for each jurisdiction in which they operate. This process involves estimating actual current period tax expense together with assessing temporary differences resulting from differing treatment of items, such as depreciation, for tax and accounting purposes. These differences result in deferred tax assets and liabilities, which are included within Edison International's and SCE's consolidated balance sheets, including net operating loss and tax credit carryforwards. Certain estimates and assumptions are required to determine whether deferred tax assets can and will be utilized in future periods. Based on currently enacted tax laws, Edison International expects to generate sufficient taxable income beginning in 2023 to fully utilize all loss and credit carryovers set to expire beyond 2022.
Edison International and SCE take certain tax positions they believe are in accordance with the applicable tax laws. However, these tax positions are subject to interpretation by the Internal Revenue Service, state tax authorities and the courts. Edison International and SCE determine uncertain tax positions in accordance with the authoritative guidance.
Key Assumptions and Approach Used. In determining whether it is more likely than not that all or some portion of net operating loss and tax credit carryforwards can be utilized, management analyzes the trend of GAAP earnings and then
39
estimates the impact of future taxable income, reversing temporary differences and available prudent and feasible tax planning strategies based on currently enacted tax laws.
Accounting for tax obligations requires management judgment. Edison International's and SCE's management use judgment in determining whether the evidence indicates it is more likely than not, based solely on the technical merits, that a tax position will be sustained, and to determine the amount of tax benefits to be recognized. Judgment is also used in determining the likelihood a tax position will be settled and possible settlement outcomes. In assessing uncertain tax positions Edison International and SCE consider, among others, the following factors: the facts and circumstances of the position, regulations, rulings, and case law, opinions or views of legal counsel and other advisers, and the experience gained from similar tax positions. Edison International and SCE evaluate uncertain tax positions at the end of each reporting period and make adjustments when warranted based on changes in fact or law.
Effect if Different Assumptions Used. Should a change in facts or circumstances, including a change in enacted tax legislation, lead to a change in judgment about the ultimate realizability of a deferred tax asset, Edison International and SCE would record or adjust the related valuation allowance in the period that the change in facts and circumstances occurs, along with a corresponding increase or decrease in the provision for income taxes.
Actual income taxes may differ from the estimated amounts which could have a significant impact on the liabilities, revenue and expenses recorded in the financial statements. Edison International and SCE continue to be under audit or subject to audit for multiple years in various jurisdictions. Significant judgment is required to determine the tax treatment of particular tax positions that involve interpretations of complex tax laws. Such liabilities are based on judgment and a final determination could take many years from the time the liability is recorded. Furthermore, settlement of tax positions included in open tax years may be resolved by compromises of tax positions based on current factors and business considerations that may result in material adjustments to income taxes previously estimated. For a discussion of current and deferred taxes, net operating losses and tax credit carryforwards, accounting for uncertainty in income taxes, unrecognized tax benefits, and tax disputes, see "Notes to Consolidated Financial Statements—Note 8. Income Taxes."
Nuclear Decommissioning – Asset Retirement Obligation
Key Assumptions and Approach Used. San Onofre Units 1, 2 and 3 decommissioning cost estimates are updated in each Nuclear Decommissioning Cost Triennial Proceeding ("NDCTP") and when there are material changes to the timing or amount of estimated future cash flows. Palo Verde decommissioning cost estimates are updated by the operating agent, Arizona Public Services, every three years and when there are material changes to the timing or amount of estimated future cash flows. SCE estimates that it will spend approximately $6.3 billion, undiscounted through 2080, to decommission its nuclear facilities.
The current ARO estimates for San Onofre and Palo Verde are based on:
● | Decommissioning Costs. The estimated costs for labor, material, equipment and other, and low-level radioactive waste costs are included in each of the NRC decommissioning stages: license termination, site restoration and spent fuel storage. The liability to decommission SCE's nuclear power facilities is based on a 2020 decommissioning study, filed as part of the 2021 NDCTP, for San Onofre Unit 1, 2 and 3 and a 2019 decommissioning study for Palo Verde, with revisions to the cost estimate in 2020. |
● | Escalation Rates. Annual escalation rates are used to convert the decommissioning cost estimates in base year dollars to decommissioning cost estimates in future-year dollars. Escalation rates are primarily used for labor, material, equipment and low-level radioactive waste burial costs. SCE's current estimates are based upon SCE's decommissioning cost methodology used for ratemaking purposes. Average escalation rates range from 2.3% to 7.5% (depending on the cost element) annually. |
40
● | Timing. Initial decommissioning activities at San Onofre Unit 1 started in 1999 and at Units 2 and 3 in 2013. Cost estimates for San Onofre Units are currently based on completion of decommissioning activities by 2053. Cost estimates for Palo Verde are based on an assumption that decommissioning will commence promptly after the current NRC operating licenses expire. The Palo Verde 1, 2, 3 operating licenses currently expire in 2045, 2046 and 2047, respectively. |
● | Spent Fuel Dry Storage Costs. Cost estimates, including the impact of escalations, are based on an assumption that the U.S. Department of Energy will begin to take spent fuel from the nuclear industry in 2031 and will remove the last spent fuel from the San Onofre and Palo Verde sites by 2051 and 2078, respectively. |
● | Changes in Decommissioning Technology, Regulation and Economics. The current cost studies assume the use of current technologies under current regulations and at current cost levels. |
See "Liquidity and Capital Resources—SCE—Decommissioning of San Onofre" for further discussion of the plans for decommissioning of San Onofre.
Effect if Different Assumptions Used. The ARO for decommissioning SCE's nuclear facilities was $2.3 billion as of December 31, 2022, based on the decommissioning studies performed and the subsequent cost estimate updates. Changes in the estimated costs, execution strategy or timing of decommissioning, or in the assumptions and judgments by management underlying these estimates, could cause material revisions to the estimated total cost to decommission these facilities which could have a material effect on the recorded liability.
The following table illustrates the increase to the ARO liability if the cost escalation rate was adjusted while leaving all other assumptions constant:
Increase to ARO at | |||
(in millions) |
| December 31, 2022 | |
Uniform increase in escalation rate of 1 percentage point |
| $ | 584 |
The increase in the ARO liability driven by an increase in the escalation rate would result in a decrease in the regulatory liability for recoveries in excess of ARO liabilities.
Pensions and Postretirement Benefits Other than Pensions
Nature of Estimate Required. Authoritative accounting guidance requires companies to recognize the overfunded or underfunded status of defined benefit pension and other postretirement plans as assets and liabilities in the balance sheet; the assets and/or liabilities are normally offset through other comprehensive income (loss). In accordance with authoritative guidance for rate-regulated enterprises, regulatory assets and liabilities are recorded instead of charges and credits to other comprehensive income (loss) for its postretirement benefit plans that are recoverable in utility rates. Edison International and SCE have a fiscal year-end measurement date for all of their postretirement plans.
Key Assumptions of Approach Used. Pension and other postretirement benefit obligations and the related effects on results of operations are calculated using actuarial models. Two critical assumptions, discount rate and expected return on assets, are important elements of plan expense, and the discount rate is important to liability measurement. Additionally, health care cost trend rates are critical assumptions for postretirement health care plans. These critical assumptions are evaluated at least annually. Other assumptions, which require management judgment, such as rate of compensation increases and rates of retirement and turnover, are evaluated periodically and updated to reflect actual experience.
As of December 31, 2022, Edison International's and SCE's pension plans had a $3.5 billion and $3.2 billion projected benefit obligation, respectively, and total 2022 expense for these plans was $19 million and $16 million, respectively. As of December 31, 2022, the accumulated benefit obligation for both Edison International's and SCE's PBOP plans were
41
$1.3 billion, and total 2022 expense for Edison International's PBOP plan were $1 million, and no expense for SCE's PBOP plan. Annual contributions made to most of SCE's pension and PBOP plan are anticipated to be recovered through CPUC-approved regulatory mechanisms and are expected to be, at a minimum, equal to the related annual expense.
Pension expense is recorded for SCE based on the amount funded to the trusts, as calculated using an actuarial method required for ratemaking purposes, in which the impact of market volatility on plan assets is recognized in earnings on a more gradual basis. Any difference between pension expense calculated in accordance with ratemaking methods and pension expense calculated in accordance with authoritative accounting guidance for pension is accumulated as a regulatory asset or liability, and is expected, over time, to be recovered from or returned to customers. As of December 31, 2022, this cumulative difference amounted to $63 million, meaning that the ratemaking method has recognized less in expense than the accounting method since implementation of authoritative guidance for employers' accounting for pensions in 1987, which was offset by a regulatory liability for the current funding level of SCE's pension plan.
Edison International and SCE used the following critical assumptions to determine expense for pension and PBOP for 2022:
|
| Postretirement |
| ||
Pension | Benefits Other |
| |||
(in millions) | Plans | than Pensions |
| ||
Discount rate1 | 2.75 | % | 2.95 | % | |
Expected long-term return on plan assets2 |
| 5.50 | % | 3.50 | % |
Assumed health care cost trend rates3 |
| * | 6.25 | % |
* Not applicable to pension plans.
1 | The discount rate enables Edison International and SCE to state expected future cash flows at a present value on the measurement date. Edison International and SCE select its discount rate by performing a yield curve analysis. This analysis determines the equivalent discount rate on projected cash flows by matching the timing and amount of expected future benefit payments to the corresponding yields from the Willis Towers Watson RATE: Link 10th – 90th percentile yield curve model on the measurement date. |
2 | To determine the expected long-term rate of return on pension plan assets, current and expected asset allocations are considered, as well as historical and expected returns on plan assets. A portion of PBOP trusts asset returns are subject to taxation, so the 3.50% rate of return on plan assets above is determined on an after-tax basis. Actual time-weighted, annualized returns on the pension plan assets were (13.4)%, 5.1% and 7.4% for the one-year, five-year and ten-year periods ended December 31, 2022, respectively. Actual time-weighted, annualized returns on the PBOP plan assets were (18.9)%, 2.1% and 5.8% over these same periods. Accounting principles provide that differences between expected and actual returns are recognized over the average future service of employees. |
3 | The health care cost trend rate gradually declines to 5.0% for 2029 and beyond. |
As of December 31, 2022, Edison International and SCE had unrecognized pension gains of $122 million and $131 million, respectively, and unrecognized PBOP gains of $869 million and $867 million, respectively. The unrecognized pension and PBOP gains primarily consisted of the cumulative impact of the increased discount rates on the respective benefit obligations and the cumulative difference between the expected and actual rate of return on plan assets. Of these deferred gains, $139 million of SCE's pension gains and $867 million of SCE's PBOP gains are recorded as regulatory liabilities, respectively, and are expected to refund over the average expected future service of employees.
Edison International's and SCE's pension and PBOP plans are subject to limits established for federal tax deductibility. SCE funds its pension and PBOP plans in accordance with amounts allowed by the CPUC. Executive pension plans have no plan assets.
42
Effect if Different Assumptions Used. Changes in the estimated costs or timing of pension and other postretirement benefit obligations, or the assumptions and judgments used by management underlying these estimates, could have a material effect on the recorded expenses and liabilities.
The following table summarizes the increase or decrease to projected benefit obligation for pension and the accumulated benefit obligation for PBOP if the discount rate were changed while leaving all other assumptions constant:
| Edison International | SCE | ||||||||||
Increase in | Decrease in | Increase in | Decrease in | |||||||||
discount rate | discount rate | discount rate | discount rate | |||||||||
(in millions) |
| by 1% |
| by 1% |
| by 1% |
| by 1% | ||||
Change to projected benefit obligation for pension | $ | (135) | $ | 158 | $ | (108) | $ | 126 | ||||
Change to accumulated benefit obligation for PBOP |
| (142) |
| 174 |
| (141) |
| 173 |
A one percentage point increase in the expected rate of return on pension plan assets would decrease Edison International's and SCE's current year expense by $33 million and $31 million, respectively, and a one percentage point increase in the expected rate of return on PBOP plan assets would decrease both Edison International's and SCE's current year expense by $21 million.
Contributions to the Wildfire Insurance Fund
Nature of Estimates Required. At December 31, 2022, Edison International and SCE have a $2.2 billion long-term asset and a $204 million current asset reflected as "Wildfire Insurance Fund contributions" in the consolidated balance sheets for the initial $2.4 billion contribution made during 2019 and the present value of annual contributions SCE committed to make to the Wildfire Insurance Fund, reduced by amortization. At December 31, 2022, a long-term liability of $536 million has been reflected in "Other deferred credits and other long-term liabilities" for the present value of unpaid contribution amounts. Contributions were discounted to the present value at the date SCE committed to participate in the Wildfire Insurance Fund using US treasury interest rates.
Management concluded it would be most appropriate to account for the contributions to the Wildfire Insurance Fund similar to prepaid insurance, ratably allocating the expense to periods based on an estimated period of coverage.
Key Assumptions and Approach Used. The Wildfire Insurance Fund does not have a defined life. Instead, the Wildfire Insurance Fund will terminate when the administrator determines that the fund has been exhausted. In 2022, management estimated that the Wildfire Insurance Fund will provide insurance coverage for a period of 15 years from the date SCE committed to participate in the Wildfire Insurance Fund. The determination of the correct period in which to record an expense in relation to contributions to the Wildfire Insurance Fund depends, among other factors, on management's assessment of: the future occurrence and magnitude of wildfires; the involvement of SCE, or other electrical corporations which could access the Wildfire Insurance Fund, in the ignition of those fires; the probable future outcomes of CPUC cost recovery proceedings for wildfire claims, which may require reimbursement of the fund by electrical corporations; and the use of the contributions by the administrator of the Wildfire Insurance Fund. Further information regarding these factors may become available due to the actions of the fund administrator, or other entities, which could require management to reassess the period of coverage. In estimating the period of coverage, Edison International and SCE used Monte Carlo simulations based on eight years (2014 – 2021) of historical data from wildfires caused by electrical utility equipment to estimate expected loss. The details of the operation of the Wildfire Insurance Fund and estimates related to claims by SCE, PG&E and SDG&E against the fund have been applied to the expected loss simulations to estimate the period of coverage of the fund. The most sensitive inputs to the estimated period of coverage are the expected frequency of wildfire events caused by investor-owned utility electrical equipment and the estimated costs associated with those forecasted events. These inputs are most affected by the historical data used in estimating expected losses. Using a 15-year period (2007 – 2021) of historical data would increase the period of coverage to over 20 years.
43
Based on information available in the first quarter of 2023 regarding catastrophic wildfires during 2022, SCE reassessed its estimate of the life of the Wildfire Insurance Fund. After incorporating 2022 expected losses into the historical data for the Monte Carlo simulations, SCE determined the expected life of the Wildfire Insurance Fund remained 15 years from the date SCE committed to participate in the Wildfire Insurance Fund.
Effect if Different Assumptions Used. Changes in the estimated life of the insurance fund could have a material impact on the expense recognition.
NEW ACCOUNTING GUIDANCE
New accounting guidance is discussed in "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—New Accounting Guidance."
RISK FACTORS
RISKS RELATING TO EDISON INTERNATIONAL
Edison International's liquidity and ability to pay dividends depends on its ability to borrow funds, access to bank and capital markets, monetization of tax benefits held by Edison International, and SCE's ability to pay dividends and tax allocation payments to Edison International. Edison International is a holding company and, as such, it has no material operations of its own. Edison International's ability to meet its financial obligations, make investments, and to pay dividends on its common stock is primarily dependent on the earnings and cash flows of SCE and SCE's ability to make upstream distributions. If SCE does not make upstream distributions to Edison International and Edison International is unable to access the bank and capital markets on reasonable terms, Edison International may be unable to continue to pay dividends to its shareholders or meet its financial obligations.
Prior to paying dividends to Edison International, SCE has financial and regulatory obligations that must be satisfied, including, among others, debt service and preference stock dividends. Further, SCE and Edison International cannot pay dividends if California law requirements for the declaration of dividends are not met. For information on CPUC and California law requirements related to the declaration of dividends, see "Liquidity and Capital Resources—SCE—SCE Dividends" in the MD&A. SCE may also owe tax-allocation payments to Edison International under applicable tax-allocation agreements.
Edison International's ability to obtain financing, as well as its ability to refinance debt and make scheduled payments of principal and interest, are dependent on numerous factors, including its levels of indebtedness, maintenance of acceptable credit ratings, financial performance, liquidity and cash flow, and other market conditions. In addition, the factors affecting SCE's business will impact Edison International's ability to obtain financing. Edison International's inability to borrow funds from time to time could have a material effect on Edison International's liquidity and operations.
See "Risks Relating to Southern California Edison Company" below for further discussion.
RISKS RELATING TO SOUTHERN CALIFORNIA EDISON COMPANY
Regulatory and Legislative Risks
SCE's financial results depend upon its ability to recover its costs and to earn a reasonable rate of return on capital investments in a timely manner from its customers through regulated rates.
SCE's ongoing financial results depend on its ability to recover its costs from its customers, including the costs of electricity purchased for its customers, through the rates it charges its customers as approved by the CPUC and FERC. SCE's financial results also depend on its ability to earn a reasonable return on capital, including long-term debt and
44
equity. SCE's ability to recover its costs and earn a reasonable rate of return can be affected by many factors, including the time lag between when costs are incurred and when those costs are recovered in customers' rates and differences between the forecast or authorized costs embedded in rates (which are set on a prospective basis) and the amount of actual costs incurred.
The CPUC or the FERC may not allow SCE to recover costs on the basis that such costs were not reasonably or prudently incurred or for other reasons. Further, SCE may incur expenses before the relevant regulatory agency approves the recovery of such costs. For example, SCE has incurred, and expects to further incur, wildfire mitigation expenses and increased labor and material costs due to supply chain constraints and elevated levels of inflation before it is clear whether such costs will be recoverable from customers. Also, the CPUC may deny recovery of costs incurred by SCE, including uninsured wildfire-related costs, if the CPUC determines that SCE was not prudent. For further information on recovery of uninsured wildfire-related costs, including costs related to the 2017/2018 Wildfire/Mudslide Events, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs" and "Management Overview—Southern California Wildfires and Mudslides" in the MD&A. In addition, while SCE supports California's environmental goals, it may be prevented from fully executing on its strategy to support such goals by regulatory delay or lack of approval of cost-recovery for the costs of such strategic actions and electrification programs from the relevant regulatory agencies.
SCE's authorized return on investment is established by multiplying an authorized rate of return, determined by the CPUC in standalone cost of capital proceedings, by SCE's authorized CPUC rate base. SCE's CPUC-authorized cost of capital is subject to potential adjustment should interest rates move substantially in years between cost of capital proceedings. For further information on the cost of capital mechanism see "Management Overview—Cost of Capital Applications" in the MD&A.
SCE's capital investment plan, increasing procurement of renewable power and energy storage, inflation, commodity price volatility, increasing self-generation, load departures to CCAs or Electric Service Providers, and increasing environmental regulations, among other things, collectively place continuing upward pressure on customer rates. If customer rates continue to increase, the CPUC may face greater pressure to approve lesser amounts in SCE’s ratemaking or cost recovery proceedings. To relieve some of this upward rate pressure, the CPUC may authorize lower revenues or increase the period over which SCE is allowed to recover amounts, which could impact SCE’s ability to timely recover its operating costs. For example, in track 3 of the 2021 GRC, while the CPUC authorized SCE to recover costs through electric rates over a 36-month period, SCE may not recover all of its interest expense incurred as a result of financing such costs because the CPUC has only authorized interest accruals on the balances at a short-term rate of interest. If SCE is unable to obtain a sufficient rate increase or modify its rate design to recover its costs and an adequate return on capital in rates in a timely manner, its financial condition and results of operations could be materially affected.
SCE is subject to extensive regulation and the risk of adverse regulatory and legislative decisions, delays in regulatory or legislative decisions, and changes in applicable regulations or legislation.
SCE operates in a highly regulated environment. SCE's business is subject to extensive federal, state and local energy, environmental and other laws and regulations. Among other things, the CPUC regulates SCE's retail rates and capital structure, and the FERC regulates SCE's wholesale rates and capital structure. The NRC regulates the decommissioning of San Onofre in addition to the local and state agencies that require permits. The construction, planning, siting and operation of SCE's power plants, energy storage projects, and transmission lines in California are also subject to regulation by the CPUC and other local, state and federal agencies.
SCE must periodically apply for licenses and permits from these various regulatory authorities, including environmental regulatory authorities, and must abide by their respective rules, regulations and orders. Should SCE be unsuccessful in obtaining necessary licenses or permits or should these regulatory authorities initiate any investigations or enforcement
45
actions or impose fines, penalties or disallowances on SCE, SCE may be prevented from executing its strategy and its business could be materially affected. The process of obtaining licenses and permits from regulatory authorities may be delayed or defeated by opponents and such delay or defeat could have a material effect on SCE's business.
To the extent the Wildfire Insurance Fund and other provisions of AB 1054 do not effectively mitigate the significant risk faced by California investor-owned utilities related to liability for damages arising from catastrophic wildfires where utility facilities are a substantial cause, not achieving a more comprehensive solution could have a detrimental effect on SCE's business and financial condition. The effectiveness of AB 1054 to mitigate the wildfire-related risk faced by SCE is conditioned in part on the performance of OEIS and various entities formed under AB 1054 and related legislation to, among other things, administer the Wildfire Insurance Fund, approve WMPs, issue safety certifications, oversee and enforce compliance with wildfire safety standards, and develop metrics to reduce risk and measure compliance with risk reduction. In addition, CPUC approval is required to recover the costs SCE is incurring to strengthen its wildfire mitigation and prevention efforts described in SCE's WMPs. See "Business—Southern California Wildfires" and "Liquidity and Capital Resources—SCE—Regulatory Proceedings—Wildfire Related Regulatory Proceedings" in the MD&A.
In addition, existing regulations may be revised or re-interpreted and new laws and regulations may be adopted or become applicable to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs. In addition, regulations adopted via the public initiative or legislative process may apply to SCE, or its facilities or operations, in a manner that may have a detrimental effect on SCE's business or result in significant additional costs.
SCE's energy procurement activities are subject to regulatory and market risks that could materially affect its financial condition and liquidity.
SCE obtains energy, capacity, environmental credits and ancillary services needed to serve its customers from its own generating plants and through contracts with energy producers and sellers. California law and CPUC decisions allow SCE to recover, through the rates it is allowed to charge its customers, reasonable procurement costs incurred in compliance with an approved procurement plan. Nonetheless, SCE's cash flows remain subject to volatility primarily resulting from changes in commodity prices, including as a result of gas supply constraints. Additionally, significant and prolonged gas use restrictions may adversely impact the reliability of the electric grid if critical generation resources are limited in their operations. For further information, see "Business—SCE—Purchased Power and Fuel Supply." SCE is also subject to the risks of unfavorable or untimely CPUC decisions about the compliance with SCE's procurement plan and the reasonableness of certain procurement-related costs.
SCE may not be able to hedge its risk for commodities on economic terms or fully recover the costs of hedges through the rates it is allowed to charge its customers, which could materially affect SCE's liquidity and results of operations, see "Market Risk Exposures" in the MD&A.
Operating Risks
Damage claims against SCE for wildfire-related losses may materially affect SCE's financial condition and results of operations.
Prolonged drought conditions and shifting weather patterns in California resulting from climate change as well as, among other things, buildup of dry vegetation in areas severely impacted by years of historic drought and lack of adequate clearing of hazardous fuels by responsible parties have increased the duration of the wildfire season and the risk of severe wildfire events.
Severe wildfires and increased urban development in high fire risk areas in California have given rise to large damage claims against California utilities for fire-related losses alleged to be the result of utility practices and/or the failure of
46
electric and other utility equipment. Catastrophic wildfires can occur in SCE's service territory even if SCE effectively implements its WMPs. California courts have previously found utilities to be strictly liable for property damage, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. The rationale generally stated by these courts for applying this theory to investor-owned utilities is that property losses resulting from a public improvement, such as the distribution of electricity, can be spread across the larger community that benefited from such improvement. However, in November 2017, the CPUC issued a decision denying an investor-owned utility's request to include in its rates uninsured wildfire-related costs arising from several 2007 fires, finding that the investor-owned utility did not prudently manage and operate its facilities prior to or at the outset of the 2007 wildfires. An inability to recover uninsured wildfire-related costs could materially affect SCE's business, financial condition and results of operations. For example, if SCE is unable to, or believes that it may be unable to, recover damages related to catastrophic wildfires through insurance, the Wildfire Insurance Fund (which is only available for fires ignited after July 12, 2019) or electric rates, or access the bank and capital markets on reasonable terms, SCE may not have sufficient cash or equity to pay dividends or may be restricted from declaring such dividends because it does not meet CPUC or California law requirements related to the declaration of dividends. For information on the California law requirements on the declaration of dividends, see "Liquidity and Capital Resources—SCE—SCE Dividends" in the MD&A. Also see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
Edison International's and SCE's costs of accessing capital markets has increased due to the risks associated with wildfires in Southern California. Edison International's and SCE's access to the bank and capital markets could also be constrained and/or the costs of accessing those markets could increase further as a result of wildfire risk, including if Edison International's and/or SCE's credit ratings are downgraded or placed on negative watch due to concerns about Edison International and/or SCE's financial health as a result of wildfires.
SCE's insurance coverage for wildfires may not be sufficient.
Edison International has experienced increased costs and difficulties in obtaining insurance coverage for wildfires that could arise in connection with SCE's ordinary operations. Edison International, SCE and its contractors may experience coverage reductions and/or increased wildfire insurance costs in future years. No assurance can be given that losses will not exceed the limits of SCE's or its contractors' insurance coverage. SCE may not be able to recover uninsured losses (including amounts paid for self-insured retention and co-insurance) and increases in the cost of insurance in electric rates. Losses which are not fully insured or cannot be recovered through the Wildfire Insurance Fund or electric rates could materially affect Edison International's and SCE's financial condition and results of operations. For more information on wildfire insurance risk, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
SCE may not effectively implement its wildfire mitigation plans.
SCE will face a higher likelihood of catastrophic wildfires in its service territory if it cannot effectively implement its WMPs. For example, SCE may not be able to effectively implement its WMPs if it experiences unanticipated difficulties relative to sourcing, engaging, and retaining effectively trained contract workers or procuring materials it needs to fulfill its mitigation obligations under the WMPs. In addition, if SCE does not have an approved WMP, SCE will not be issued a safety certification from the CPUC and will consequently not benefit from the presumption of prudency or the AB 1054 Liability Cap.
The CPUC may assess penalties on SCE if it finds that SCE has failed to substantially comply with its WMP. In addition, SCE may be subject to mandated changes to, or restrictions on, its operational wildfire mitigation practices or be subject to regulatory fines and penalties or claims for damages and reputational harm if SCE does not execute its wildfire mitigation practices in compliance with applicable rules and regulations. SCE’s wildfire mitigation practices
47
include PSPS and using fast-curve settings. In addition, SCE may be subject to regulatory fines and penalties or claims for damages and reputational harm if it is determined that SCE has placed excessive or unreasonable reliance on PSPS.
SCE establishes the criteria under which it implements PSPS in its territory. To the extent SCE's criteria for implementing PSPS are not sufficient to mitigate the risk of wildfires during high wind events, SCE does not fully implement PSPS when criteria are met due to other overriding conditions or SCE's regulators or others mandate changes to, or restrictions on, its criteria or other operational PSPS practices, SCE will face a higher likelihood of catastrophic wildfires in its territory during high wind events. Similarly, if SCE is prohibited from implementing its desired fast-curve settings, SCE will face a higher likelihood of catastrophic wildfires in its territory.
For more information on AB 1054, see "Business—Southern California Wildfires—Recovery of Wildfire-Related Costs—2019 Wildfire Legislation."
SCE will not benefit from all of the features of AB 1054 if the Wildfire Insurance Fund is exhausted.
Catastrophic wildfires could rapidly exhaust the Wildfire Insurance Fund and SCE will not be reimbursed by the Wildfire Insurance Fund or benefit from the AB 1054 Liability Cap if the fund has been exhausted as a result of damage claims previously incurred by SCE or the other participating utilities.
For more information on AB 1054, see "Business—Southern California Wildfires and Mudslides—Recovery of Wildfire-Related Costs—2019 Wildfire Legislation."
Climate change exacerbated weather-related incidents and other natural disasters could materially affect SCE's financial condition and results of operations.
Weather-related incidents, including storms and events caused, or exacerbated, by climate change, such as wildfires, flooding and debris flows, and other natural disasters such as earthquakes can disrupt the generation and transmission of electricity, and can seriously damage the infrastructure necessary to deliver power to SCE's customers. The impacts of climate change continue to evolve and remain dynamic and unpredictable.
Climate change has caused, and exacerbated, extreme weather events and wildfires in southern California, and wildfires could cause, among other things, public safety issues, property damage and operational issues. In addition, the risk of flooding and debris flows occurring as a result of rain may be heightened. For example, the 2017/2018 Wildfire/Mudslide Events resulted in, among other things, loss of life, property damage and loss of service. For more information on the impact of the 2017/2018 Wildfire/Mudslide Events on SCE and Edison International, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
Extreme heat events can lead to prolonged widespread outages due to, among other things, state-wide capacity supply shortages or equipment failure. Extreme weather events can also lead to use of PSPS. Weather-related events, such as debris flows, flooding and melting of a significantly higher than normal snowpack, and earthquakes can cause over-topping or failure at an SCE dam resulting in a rapid release of water that could cause, among other things, public safety issues, property damage and operational issues.
Weather-related incidents and other natural disasters can lead to lost revenue and increased expense, including higher maintenance and repair costs, which SCE may not be able to recover from its customers. These incidents can also result in regulatory penalties and disallowances, particularly if SCE encounters difficulties in restoring power to its customers on a timely basis or if fire-related losses are found to be the result of utility practices and/or the failure of electric and other utility equipment. In addition, these occurrences could lead to significant claims for damages, including for loss of life and property damage. These occurrences could materially affect SCE's business, financial condition and results of
48
operations, and the inability to restore power to SCE's customers could also materially damage the business reputation of SCE and Edison International.
For additional information related to climate related risks, see “Business—Environmental Considerations—Environmental Risks.”
The generation, transmission and distribution of electricity are dangerous and involve inherent risks of damage to private property and injury to SCE’s workforce and the general public.
Electricity poses hazards for SCE’s workforce and the general public should they come in contact with electrical current or equipment, including through energized downed power lines or if equipment malfunctions. In addition, the risks associated with the operation of transmission and distribution assets and power generation and storage facilities include public and workforce safety issues and the risk of utility assets causing or contributing to wildfires.
Injuries and property damage caused by such events can subject SCE to liability that, despite the existence of insurance coverage, can be significant. In addition, SCE may be held responsible for the actions of its contractors. No assurance can be given that future losses will not exceed the limits of SCE's or its contractors' insurance coverage. The CPUC has increased its focus on public safety with an emphasis on heightened compliance with construction and operating standards and the potential for penalties being imposed on utilities. Additionally, the CPUC has delegated to its staff the authority to issue citations to electric utilities, which can impose fines of up to $100,000 per violation per day (capped at a maximum of $8 million), pursuant to the CPUC's jurisdiction for violations of safety rules found in statutes, regulations, and the CPUC's General Orders. The CPUC also can issue fines greater than $8 million outside of the citation program. Such penalties and liabilities could be significant and materially affect SCE's liquidity and results of operations.
SCE's financial condition and results of operations could be materially affected if it is unable to successfully manage the risks inherent in constructing, operating, and maintaining its facilities and workforce.
SCE's infrastructure is aging and could pose a risk to system reliability. SCE is also constructing utility owned storage to mitigate possible state-wide capacity shortages in 2023 and later years, and any delays in construction may result in those facilities being unavailable to reduce the impact of any capacity shortages in summer 2023. In addition, as described above, wildfires in SCE's service territory can cause significant public safety issues, property damage and operational issues.
In order to mitigate these risks, SCE is engaged in a significant and ongoing infrastructure investment program. This substantial investment program has inherent operational risks and elevates the need for superior execution in SCE's activities. SCE's financial condition and results of operations could be materially affected if it is unable to successfully manage these risks as well as the risks inherent in constructing, operating, and maintaining its facilities, the operation of which can be hazardous and important for system reliability. SCE's inherent operating risks include such matters as the risks of human performance, workforce capabilities, contractor management, data and records accuracy, public opposition to infrastructure projects, delays, environmental remediation and mitigation costs, difficulty in estimating costs or in recovering costs that are above original estimates, system limitations and degradation, maintaining physical security of workforce and assets, maintaining cybersecurity of data and assets, and delays and interruptions in necessary supplies, including key components necessary for the timely construction of utility owned storage. For example, SCE's financial condition may be materially affected as a result of safety incidents, delays, permitting violations and violations of regulatory requirements, among other things, caused by SCE's failure to appropriately manage its contractor workforce or from contractual violations by SCE's contractors and the inability for SCE to recover through contractual indemnities or insurance held by the contractor. SCE's financial condition may also be materially affected as a result of data or records inaccuracies, for example inaccurate records could lead to missing or delayed compliance with SCE's policies and regulatory requirements, and could contribute to safety incidents. SCE's financial condition and results of
49
operations could also be materially affected if SCE is unable to attract, train and retain a qualified and diverse workforce, including due to the constrained labor market in California and nationally and SCE's relations with its unionized workforce. SCE's financial condition and results of operations could also be materially affected as a result of atypical resolutions to litigation proceedings arising from its operations, including atypical settlements and verdicts. For instance, SCE was subject to an atypical jury verdict in a recent employment litigation matter.
There are inherent risks associated with owning and decommissioning nuclear power generation facilities and obtaining cost reimbursement, including, among other things, insufficiency of nuclear decommissioning trust funds, costs exceeding current estimates, execution risks, potential harmful effects on the environment and human health and the hazards of storage, handling and disposal of radioactive materials. Existing insurance and ratemaking arrangements may not protect SCE fully against losses from a nuclear incident.
SCE funds decommissioning costs with assets that are currently held in nuclear decommissioning trusts. Based upon the financial performance of the nuclear decommissioning trust fund investments, as well as the resolution of a number of other uncertainties, assumptions and estimates, additional contributions to the nuclear decommissioning trust’s funds may be required. If additional contributions to the nuclear decommissioning trust funds become necessary, recovery of any such additional funds through electric rates is subject to the CPUC's review and approval.
The costs of decommissioning San Onofre are subject to reasonableness reviews by the CPUC. These costs may not be recoverable through regulatory processes or otherwise unless SCE can establish that the costs were reasonably incurred. In addition, SCE faces inherent execution risks including such matters as the risks of human performance, workforce capabilities, public opposition, permitting delays, and governmental approvals. Decommissioning costs ultimately incurred could exceed the current estimates and cost increases resulting from contractual disputes, delays in performance by the contractor, elevated levels of inflation, or permitting delays, among other things, could cause SCE to materially overrun current decommissioning cost estimates and could materially impact the sufficiency of trust funds. See "Liquidity and Capital Resources—SCE—Decommissioning of San Onofre" in the MD&A.
50
Even though San Onofre is being decommissioned, the presence of spent nuclear fuel still poses a potential risk of a nuclear incident. Federal law limits public liability claims from a nuclear incident to the amount of available financial protection, which is currently approximately $13.7 billion for Palo Verde and $560 million for San Onofre. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available of $450 million per site. In the case of San Onofre, the balance is covered by a US Government indemnity. In the case of Palo Verde, the balance is covered by a loss sharing program among nuclear reactor licensees. There is no assurance that the CPUC would allow SCE to recover the required contribution made pursuant to this loss sharing program in the case of one or more nuclear incidents with claims that exceeded $450 million at a nuclear reactor which is participating in the program. If this public liability limit of $13.7 billion is insufficient, federal law contemplates that additional funds may be appropriated by Congress. There can be no assurance of SCE's ability to recover uninsured costs in the event the additional federal appropriations are insufficient. For more information on nuclear insurance risk, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Nuclear Insurance."
SCE's distribution of water and propane gas on Catalina Island involves inherent risks of damage to private property and the environment and injury to employees and the general public.
SCE owns and operates the water distribution system that serves Catalina Island, California and a propane gas distribution system that serves the City of Avalon on Catalina Island, California. Production, storage, treatment and distribution of water for human use and the transportation, storage, distribution and use of gas can be hazardous, and can cause damage to private property and the environment and injury to employees and the general public if equipment fails or does not perform as anticipated. For example, the risks of operating a water distribution system include the potential for burst pipes and water contamination and the risks of operating gas distribution system include the potential for gas leaks, fire or explosion. The risks related to SCE's operation of its water and gas distribution systems may be exacerbated due to aging infrastructure. SCE has requested that the CPUC allow SCE to include certain water system costs in electric rates and may make similar requests for the water and gas systems in the future. If such requests are denied, significant costs may not be recoverable from customers. In addition, SCE may have to pay fines, penalties and remediation costs if it does not comply with laws and regulations in the operation of the water and gas distribution systems. An inability to recover costs associated with any such damages or injuries or any fines, penalties or remediation costs, from insurance or through electric rates, could materially affect SCE's business, financial condition and results of operations.
Financing Risks
As a capital-intensive company, SCE relies on access to the capital markets. If SCE were unable to access the capital markets or the cost of financing were to substantially increase, its liquidity and operations could be materially affected.
SCE regularly accesses the capital markets to finance its activities and is expected to do so by its regulators as part of its obligation to serve as a regulated utility. SCE's needs for capital for its ongoing infrastructure investment program are substantial. SCE's ability to obtain financing, as well as its ability to refinance debt and make scheduled payments of principal and interest, are dependent on numerous factors, including SCE's levels of indebtedness, maintenance of acceptable credit ratings, financial performance, liquidity and cash flow, and other market conditions. In addition, the actions of other California investor-owned utilities and legal, regulatory and legislative decisions impacting investor-owned utilities can affect market conditions and therefore, SCE's ability to obtain financing. SCE's inability to obtain additional capital from time to time could have a material effect on SCE's liquidity and operations.
51
Competitive and Market Risks
SCE's inability to effectively and timely respond to the changes that the electricity industry is undergoing, as a result of increased competition, technological advances, and changes to the regulatory environment, could materially impact SCE's business model, financial condition and results of operations.
Customers and third parties are increasingly deploying distributed energy resources ("DERs"), such as solar generation, energy storage, energy efficiency and demand response technologies. California's environmental policy objectives are accelerating the pace and scope of industry change. This change will require modernization of the electric distribution grid to, among other things, accommodate two-way flows of electricity and increase the grid's capacity to interconnect DERs. In addition, enabling California's clean energy economy goals will require sustained investments in grid modernization, renewable integration projects, energy efficiency programs, energy storage options and electric vehicle infrastructure. If SCE is unable to effectively adapt to these changes, its business model, its ability to execute on its strategy, and ultimately its financial condition and results of operations could be materially impacted.
Customer-owned generation and load departures to CCAs or Electric Service Providers each reduce the amount of electricity that customers purchase from utilities and have the effect of increasing utility rates unless customer rates are designed to allocate the costs of the distribution grid across all customers that benefit from its use. For example, some customers in California who generate their own power are not currently required to pay all transmission and distribution charges and non-bypassable charges, subject to limitations, which results in increased costs for those customers who do not own their generation. If regulations aren't changed such that customers pay their share of transmission and distribution costs and non-bypassable charges and the demand for electricity reduces so significantly that SCE is no longer effectively able to recover such costs from its customers, SCE's business, financial condition and results of operations will be materially impacted.
In addition, the FERC has opened transmission development to competition from independent developers, allowing such developers to compete with incumbent utilities for the construction and operation of transmission facilities.
For more information. See "Business—SCE—Competition."
Cybersecurity and Physical Security Risks
SCE's systems and network infrastructure are targets for physical and cyber attacks, intrusions or other catastrophic events that could result in their failure or reduced functionality.
Regulators such as NERC and U.S. Government agencies, including the Departments of Defense, Homeland Security and Energy, have increasingly stressed that threat sources continue to seek to exploit potential vulnerabilities in the U.S. national electric grid and other energy infrastructures, and that such attacks and disruptions, both physical and cyber, are highly sophisticated and dynamic. Several U.S. Government agencies have highlighted the increasing risks related to physical attacks, ransomware attacks and cybersecurity risks related to the electric sector, including its supply chains, and that the risks may escalate during periods of heightened geopolitical tensions.
SCE's operations require the continuous availability of critical information technology systems, sensitive customer and employee data and network infrastructure and information, all of which are targets for malicious actors. New cyber and physical threats arise as SCE moves from an analog to a digital electric grid. For example, SCE's grid modernization efforts and the move to a network-connected grid increases the number of “threat surfaces” and potential vulnerabilities that an adversary can target. SCE system data and architecture are also disclosed, either intentionally or unintentionally, to third parties and the public by regulators, employees, contractors and vendors. This system information may be used by malicious actors to understand SCE’s systems to prepare for a cyber or physical attack.
52
SCE depends on a wide array of vendors to provide it with services and equipment. Malicious actors may attack vendors to disrupt the services they provide to SCE, or to use those vendors as a conduit to attack SCE. Additionally, the equipment and material provided by SCE's vendors may contain cyber vulnerabilities. A compromise of equipment and/or exfiltration of SCE data, whether by physical or by electronic means, could result in loss or changes to confidential or sensitive electronic data, loss of intellectual property and interruption of business processes. While some of SCE's vendors have experienced cybersecurity incidents, such incidents have not, to SCE's knowledge, resulted in a material impact to SCE to date.
SCE's systems have experienced, and will continue to experience, cybersecurity incidents involving attacks of malicious code, unauthorized access attempts, and other illicit activities, but to SCE's knowledge it has not experienced a material cybersecurity or data breach to date. Though SCE actively monitors developments in this area, no security measures can completely shield its systems, infrastructure and data from cyber attacks, intrusions or other catastrophic events that could result in their failure or reduced functionality.
If SCE's information technology and operational technology systems' security measures were to be breached, or a critical system failure were to occur without timely recovery, SCE could be unable to fulfill critical business functions, such as delivery of electricity to customers, and/or sensitive confidential personal and other data could be compromised, which could result in violations of applicable privacy and other laws, material financial loss to SCE or to its customers, loss of confidence in SCE's security measures, customer dissatisfaction, and significant litigation and/or regulatory exposure, all of which could materially affect SCE's financial condition and results of operations and materially damage the business reputation of Edison International and SCE.
RISKS RELATING TO EDISON INTERNATIONAL AND SOUTHERN CALIFORNIA EDISON COMPANY
Edison International's and SCE's financial condition and results of operations could be materially impacted by events, like the COVID-19 pandemic, that cause significant disruption to workforces, supply chains, economies, or societies on a regional, statewide, national or global basis.
Edison International and SCE could be materially and adversely impacted by events, such as the widespread outbreak of a communicable disease, that result in, among other things, significant disruption to supply chains, economies, societies or workforces on a regional, statewide, national or global basis. For example, the global spread of COVID-19, which was declared a pandemic by the World Health Organization in March 2020, created significant uncertainty, volatility and disruption globally and has impacted the operations of Edison International and SCE.
Many of the risks and uncertainties identified in this Form 10-K are, and will be, exacerbated by the impacts of an event like a pandemic and the actions being taken by governmental entities, businesses, individuals and others in response to such an event. For example, SCE may be unable to effectively execute its PSPS program due to, among other things, requests from local and State authorities not to shut off the power during a pandemic or other event, and thereby may increase the risk of SCE equipment being associated with the ignition of wildfires.
In addition, impacts of a pandemic or similar event on SCE's customers and third parties could also result in SCE facing, among other things, significant reductions in demand for electricity and payment delays and/or defaults from customers which could result in significant under-collections. In addition, Edison International and SCE could also face payment delays and/or defaults from insurers and other counterparties. Furthermore, Edison International's and SCE's access to the bank and capital markets could also be constrained and/or the costs of accessing those markets could increase as a result of a pandemic or similar event, including if Edison International's and/or SCE's credit ratings are downgraded, or placed on negative watch due to concerns about Edison International and/or SCE's financial health as a result of the impacts of the pandemic. SCE may also incur significant incremental costs as a result of actions it is taking in response to a pandemic or a similar event, including costs being incurred to maintain its operations and assist its employees who are required to telework or are otherwise impacted by the event. SCE could also face delays in important legal and
53
regulatory proceedings. These impacts, among others, could materially and adversely impact Edison International's and SCE's business, operations, cash flows, liquidity and financial results.
Edison International's and SCE's business activities are concentrated in one industry and in one region.
Edison International's and SCE's business activities are concentrated in the electric utility industry. Edison International's principal subsidiary, SCE, serves customers only in southern and central California. As a result, Edison International's and SCE's future performance may be affected by events and economic factors unique to California or by regional regulation, legislation or judicial decisions. For example, California courts have applied strict liability to investor-owned utilities in wildfire and other litigation matters. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Information responding to this section is included in the MD&A under the heading "Market Risk Exposures."
FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
54
Report of Independent Registered Public Accounting Firm
To the Board of Directors and Shareholders of Edison International
Opinions on the Financial Statements and Internal Control over Financial Reporting
We have audited the accompanying consolidated balance sheets of Edison International and its subsidiaries (the “Company”) as of December 31, 2022 and 2021, and the related consolidated statements of income, of comprehensive income, of changes in equity and of cash flows for each of the three years in the period ended December 31, 2022, including the related notes and schedule of condensed financial information of parent as of December 31, 2022 and 2021 and for each of the three years in the period ended December 31, 2022 appearing under Item 15 (collectively referred to as the “consolidated financial statements”). We also have audited the Company's internal control over financial reporting as of December 31, 2022, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2022 and 2021, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2022 in conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2022, based on criteria established in Internal Control - Integrated Framework (2013) issued by the COSO.
Basis for Opinions
The Company's management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting, included in Management’s Report on Internal Control over Financial Reporting appearing under Item 9A. Our responsibility is to express opinions on the Company’s consolidated financial statements and on the Company's internal control over financial reporting based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal control over financial reporting was maintained in all material respects.
Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.
55
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Critical Audit Matters
The critical audit matters communicated below are matters arising from the current period audit of the consolidated financial statements that were communicated or required to be communicated to the audit committee and that (i) relate to accounts or disclosures that are material to the consolidated financial statements and (ii) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.
Contingent Liability – 2017/2018 Wildfire/Mudslide Events
As described in Note 12 to the consolidated financial statements, the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire (collectively, the "2017/2018 Wildfire/Mudslide Events") within the Company's service territory caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers in the Santa Barbara, Ventura, and Los Angeles Counties. Numerous claims related to wildfire events have been initiated against the Company. The Company has incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events. As of December 31, 2022, SCE had paid $7.6 billion under executed settlements, had $185 million to be paid under executed settlements, including $120 million to be paid under the SED executed Agreement, and had $934 million of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, SCE had assets for expected recoveries through FERC electric rates of $142 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. For instance, as a result of additional information, in 2022 management accrued additional estimated losses of $1.3 billion for claims related to the 2017/2018 Wildfire/Mudslide Events, against which SCE has recorded expected recoveries through FERC electric rates of $76 million. The resulting net charge to earnings was $1.2 billion ($879 million after-tax).
The principal considerations for our determination that performing procedures relating to the 2017/2018 Wildfire/Mudslide Events contingent liability is a critical audit matter are the significant judgment by management when determining the probability of a loss being incurred and the best estimate of expected potential loss for these
56
contingencies related to assumptions and subjective factors based on currently available information and assessments, opinions regarding litigation risk, and prior experience with litigating and settling other wildfire cases. This in turn led to a high degree of auditor judgment, subjectivity, and effort in performing procedures and evaluating management's conclusion related to these loss contingencies.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to management's evaluation of loss contingencies associated with wildfires and mudslides. These procedures also included, among others, obtaining and evaluating the letters of audit inquiry with internal and external legal counsel, assessing the reasonableness of management's assessment regarding whether it is reasonably possible or probable and reasonably estimable that a loss has been incurred, evaluating the assumptions and methods used by management in developing the best estimate of expected potential losses, including currently available information and assessments, opinions regarding litigation risk, and prior experience with litigating and settling other wildfire cases, and testing damage claim settlements. When assessing the assumptions related to the best estimate of expected potential losses, the assumptions used were evaluated for reasonableness considering (i) current damage claim settlements, (ii) past wildfire litigation history, and (iii) third-party source data.
Recoverability of Regulatory Assets That Are Not Currently Reflected In Rates
As described in Notes 1 and 11 to the consolidated financial statements, the Company's accounting policies conform to accounting principles generally accepted in the United States of America, including the accounting principles for rate-regulated enterprises, which reflect the ratemaking policies of the CPUC and the FERC. Management applies authoritative guidance for rate-regulated enterprises to the portion of its operations in which regulators set rates at levels intended to recover the estimated costs of providing service, plus a return on net investments in assets, or rate base. Regulators may also impose certain penalties or grant certain incentives. Due to timing and other differences in the collection of electric utility revenue, these accounting principles require an incurred cost that would otherwise be charged to expense by a non-regulated entity to be capitalized as a regulatory asset if it is probable that the cost is recoverable through future rates. As disclosed by management, management assesses at the end of each reporting period whether regulatory assets are probable of future recovery by considering factors such as the current regulatory environment, the issuance of rate orders on recovery of the specific or a similar incurred cost of the Company or other rate-regulated entities, and other factors that would indicate that the regulator will treat an incurred cost as allowable for ratemaking purposes. As of December 31, 2022, $1.52 billion recorded in wildfire and drought restoration accounts and wildfire-related memorandum accounts represent wildfire and drought restoration costs that are probable of future recovery from customers.
The principal consideration for our determination that performing procedures relating to the Company's recoverability of regulatory assets that are not currently reflected in rates is a critical audit matter is the significant judgment by management in determining the costs probable of recovery and reported as an asset on the balance sheet. This in turn led to a high degree of auditor judgment, subjectivity, and effort in performing procedures and evaluating management's assessment of the recoverability of regulatory assets not currently reflected in rates.
57
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to the Company's regulatory accounting process, including controls over management's assessment of the probability of recovering regulatory assets not currently reflected in rates. These procedures also included, among others, obtaining the Company's correspondence with regulators, evaluating management's assessment regarding the probability of recovery of the regulatory assets at the balance sheet date, evaluating the accounting and disclosure implications, and calculating regulatory assets balances based on provisions outlined in the rate orders. This evidence included reference to historical precedence of similar items and accounting treatment utilized by comparable companies under similar regulatory jurisdictions as well as evaluating progress in discussions between management and the regulator.
/s/PricewaterhouseCoopers LLP
Los Angeles, California
February 23, 2023
We have served as the Company’s auditor since 2002.
58
Report of Independent Registered Public Accounting Firm
To the Board of Directors and Shareholders of Southern California Edison Company
Opinions on the Financial Statements and Internal Control over Financial Reporting
We have audited the accompanying consolidated balance sheets of Southern California Edison Company and its subsidiaries (the “Company”) as of December 31, 2022 and 2021, and the related consolidated statements of income, of comprehensive income, of changes in equity and of cash flows for each of the three years in the period ended
December 31, 2022, including the related notes (collectively referred to as the “consolidated financial statements”).
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2022 and 2021, and the results of its operations and its cash flows for each of the three years in the period ended December 31,2022 in conformity with accounting principles generally accepted in the United States of America.
Basis for Opinions
These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express opinions on the Company’s consolidated financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal control over financial reporting was maintained in all material respects. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.
Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinions.
Critical Audit Matters
The critical audit matters communicated below are matters arising from the current period audit of the consolidated financial statements that were communicated or required to be communicated to the audit committee and that (i) relate to accounts or disclosures that are material to the consolidated financial statements and (ii) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.
Contingent Liability – 2017/2018 Wildfire/Mudslide Events
As described in Note 12 to the consolidated financial statements, the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire (collectively, the "2017/2018 Wildfire/Mudslide Events") within the Company's service territory caused loss of life, substantial damage to both residential and business properties, and service outages for SCE
59
customers in the Santa Barbara, Ventura, and Los Angeles Counties. Numerous claims related to wildfire events have been initiated against the Company. The Company has incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events. As of December 31, 2022, SCE had paid $7.6 billion under executed settlements, had $185 million to be paid under executed settlements, including $120 million to be paid under the SED executed Agreement, and had $934 million of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, SCE had assets for expected recoveries through FERC electric rates of $142 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. For instance, as a result of additional information, in 2022 management accrued additional estimated losses of $1.3 billion for claims related to the 2017/2018 Wildfire/Mudslide Events, against which SCE has recorded expected recoveries through FERC electric rates of $76 million. The resulting net charge to earnings was $1.2 billion ($879 million after-tax).
The principal considerations for our determination that performing procedures relating to the 2017/2018 Wildfire/Mudslide Events contingent liability is a critical audit matter are the significant judgment by management when determining the probability of a loss being incurred and the best estimate of expected potential loss for these contingencies related to assumptions and subjective factors based on currently available information and assessments, opinions regarding litigation risk, and prior experience with litigating and settling other wildfire cases. This in turn led to a high degree of auditor judgment, subjectivity, and effort in performing procedures and evaluating management's conclusion related to these loss contingencies.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to management's evaluation of loss contingencies associated with wildfires and mudslides. These procedures also included, among others, obtaining and evaluating the letters of audit inquiry with internal and external legal counsel, assessing the reasonableness of management's assessment regarding whether it is reasonably possible or probable and reasonably estimable that a loss has been incurred, evaluating the assumptions and methods used by management in developing the best estimate of expected potential losses, including currently available information and assessments, opinions regarding litigation risk, and prior experience with litigating and settling other wildfire cases, and testing damage claim settlements. When assessing the assumptions related to the best estimate of expected potential losses, the assumptions used were evaluated for reasonableness considering (i) current damage claim settlements, (ii) past wildfire litigation history, and (iii) third-party source data.
Recoverability of Regulatory Assets That Are Not Currently Reflected In Rates
As described in Notes 1 and 11 to the consolidated financial statements, the Company's accounting policies conform to accounting principles generally accepted in the United States of America, including the accounting principles for rate-regulated enterprises, which reflect the ratemaking policies of the CPUC and the FERC. Management applies authoritative guidance for rate-regulated enterprises to the portion of its operations in which regulators set rates at levels intended to recover the estimated costs of providing service, plus a return on net investments in assets, or rate base. Regulators may also impose certain penalties or grant certain incentives. Due to timing and other differences in the collection of electric utility revenue, these accounting principles require an incurred cost that would otherwise be charged to expense by a non-regulated entity to be capitalized as a regulatory asset if it is probable that the cost is recoverable through future rates. As disclosed by management, management assesses at the end of each reporting period whether regulatory assets are probable of future recovery by considering factors such as the current regulatory environment, the issuance of rate orders on recovery of the specific or a similar incurred cost of the Company or other rate-regulated entities, and other factors that would indicate that the regulator will treat an incurred cost as allowable for ratemaking purposes. As of December 31, 2022, $1.52 billion recorded in wildfire and drought restoration accounts and wildfire-related memorandum accounts represent wildfire and drought restoration costs that are probable of future
60
recovery from customers.
The principal consideration for our determination that performing procedures relating to the Company's recoverability of regulatory assets that are not currently reflected in rates is a critical audit matter is the significant judgment by management in determining the costs probable of recovery and reported as an asset on the balance sheet. This in turn led to a high degree of auditor judgment, subjectivity, and effort in performing procedures and evaluating management's assessment of the recoverability of regulatory assets not currently reflected in rates.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial statements. These procedures included testing the effectiveness of controls relating to the Company's regulatory accounting process, including controls over management's assessment of the probability of recovering regulatory assets not currently reflected in rates. These procedures also included, among others, obtaining the Company's correspondence with regulators, evaluating management's assessment regarding the probability of recovery of the regulatory assets at the balance sheet date, evaluating the accounting and disclosure implications, and calculating regulatory assets balances based on provisions outlined in the rate orders. This evidence included reference to historical precedence of similar items and accounting treatment utilized by comparable companies under similar regulatory jurisdictions as well as evaluating progress in discussions between management and the regulator.
/s/PricewaterhouseCoopers LLP
Los Angeles, California
February 23, 2023
We have served as the Company’s auditor since 2002.
61
CONSOLIDATED FINANCIAL STATEMENTS
Years ended December 31, | |||||||||
(in millions, except per-share amounts) |
| 2022 |
| 2021 |
| 2020 | |||
Total operating revenue | $ | 17,220 | $ | 14,905 | $ | 13,578 | |||
Purchased power and fuel |
| 6,375 |
| 5,540 |
| 4,932 | |||
Operation and maintenance |
| 4,724 |
| 3,645 |
| 3,609 | |||
Wildfire-related claims, net of insurance recoveries |
| 1,313 |
| 1,276 |
| 1,328 | |||
Wildfire Insurance Fund expense |
| 214 |
| 215 |
| 336 | |||
Depreciation and amortization |
| 2,561 |
| 2,218 |
| 1,967 | |||
Property and other taxes |
| 501 |
| 465 |
| 438 | |||
Impairment, net of other (income) |
| 54 |
| 71 |
| (116) | |||
Gain on sale of lease interest and other operating income |
| (5) |
| (2) |
| (133) | |||
Total operating expenses |
| 15,737 |
| 13,428 |
| 12,361 | |||
Operating income |
| 1,483 |
| 1,477 |
| 1,217 | |||
Interest expense |
| (1,169) |
| (925) |
| (902) | |||
Other income |
| 348 |
| 237 |
| 251 | |||
Income before income taxes |
| 662 |
| 789 |
| 566 | |||
Income tax benefit |
| (162) |
| (136) |
| (305) | |||
Net income |
| 824 |
| 925 |
| 871 | |||
Less: Preference stock dividend requirements of SCE |
| 107 |
| 106 |
| 132 | |||
Less: Preferred stock dividend requirement of Edison International | 105 | 60 | — | ||||||
Net income attributable to Edison International common shareholders | $ | 612 | $ | 759 | $ | 739 | |||
Basic earnings per share: |
|
|
|
|
|
| |||
Weighted average shares of common stock outstanding |
| 381 |
| 380 |
| 373 | |||
Basic earnings per common share attributable to Edison International common shareholders | $ | 1.61 | $ | 2.00 | $ | 1.98 | |||
Diluted earnings per share: |
|
|
|
|
|
| |||
Weighted average shares of common stock outstanding, including effect of dilutive securities |
| 383 |
| 380 |
| 374 | |||
Diluted earnings per common share attributable to Edison International common shareholders | $ | 1.60 | $ | 2.00 | $ | 1.98 |
The accompanying notes are an integral part of these consolidated financial statements.
62
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Net income | $ | 824 | $ | 925 | $ | 871 | |||
Other comprehensive income, net of tax: |
|
|
|
|
|
| |||
Pension and postretirement benefits other than pensions |
| 43 |
| 15 |
| — | |||
Other comprehensive income, net of tax |
| 43 |
| 15 |
| — | |||
Comprehensive income |
| 867 |
| 940 |
| 871 | |||
Less: Comprehensive income attributable to noncontrolling interests |
| 107 |
| 106 |
| 132 | |||
Comprehensive income attributable to Edison International | $ | 760 | $ | 834 | $ | 739 |
The accompanying notes are an integral part of these consolidated financial statements.
63
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
ASSETS |
|
|
|
| ||
Cash and cash equivalents | $ | 914 | $ | 390 | ||
Receivables, less allowances of $347 and $193 for uncollectible accounts at respective dates |
| 1,695 |
| 1,398 | ||
Accrued unbilled revenue |
| 641 |
| 794 | ||
Inventory |
| 474 |
| 420 | ||
Prepaid expenses |
| 248 |
| 258 | ||
Regulatory assets |
| 2,497 |
| 1,778 | ||
Wildfire Insurance Fund contributions |
| 204 |
| 204 | ||
Other current assets |
| 397 |
| 249 | ||
Total current assets |
| 7,070 |
| 5,491 | ||
Nuclear decommissioning trusts |
| 3,948 |
| 4,870 | ||
Marketable securities | 5 | 12 | ||||
Other investments |
| 50 |
| 39 | ||
Total investments |
| 4,003 |
| 4,921 | ||
Utility property, plant and equipment, less accumulated depreciation and amortization of $12,260 and $11,407 at respective dates |
| 53,274 |
| 50,497 | ||
Nonutility property, plant and equipment, less accumulated depreciation of $106 and $98 at respective dates |
| 212 |
| 203 | ||
Total property, plant and equipment |
| 53,486 |
| 50,700 | ||
Receivables, less allowances of $7 and $116 for uncollectible accounts at respective dates | 2 | 122 | ||||
Regulatory assets (include $834 and $325 related to Variable Interest Entities "VIEs" at respective dates) |
| 8,181 |
| 7,660 | ||
Wildfire Insurance Fund contributions |
| 2,155 |
| 2,359 | ||
Operating lease right-of-use assets |
| 1,442 |
| 1,932 | ||
Long-term insurance receivables | 465 | 75 | ||||
Other long-term assets |
| 1,237 |
| 1,485 | ||
Total long-term assets |
| 13,482 |
| 13,633 | ||
Total assets | $ | 78,041 | $ | 74,745 |
The accompanying notes are an integral part of these consolidated financial statements.
64
December 31, | ||||||
(in millions, except share amounts) |
| 2022 |
| 2021 | ||
LIABILITIES AND EQUITY |
|
|
|
| ||
Short-term debt | $ | 2,015 | $ | 2,354 | ||
Current portion of long-term debt |
| 2,614 |
| 1,077 | ||
Accounts payable |
| 2,359 |
| 2,002 | ||
Wildfire-related claims | 121 | 131 | ||||
Customer deposits |
| 167 |
| 193 | ||
Regulatory liabilities |
| 964 |
| 603 | ||
Current portion of operating lease liabilities |
| 506 |
| 582 | ||
Other current liabilities |
| 1,601 |
| 1,667 | ||
Total current liabilities |
| 10,347 |
| 8,609 | ||
Long-term debt (include $809 and $314 related to VIEs at respective dates) |
| 27,025 |
| 24,170 | ||
Deferred income taxes and credits |
| 6,149 |
| 5,740 | ||
Pensions and benefits |
| 422 |
| 496 | ||
Asset retirement obligations |
| 2,754 |
| 2,772 | ||
Regulatory liabilities |
| 8,211 |
| 8,981 | ||
Operating lease liabilities |
| 936 |
| 1,350 | ||
Wildfire-related claims |
| 1,687 |
| 1,733 | ||
Other deferred credits and other long-term liabilities |
| 2,988 |
| 3,105 | ||
Total deferred credits and other liabilities |
| 23,147 |
| 24,177 | ||
Total liabilities |
| 60,519 |
| 56,956 | ||
Commitments and contingencies (Note 12) |
|
|
|
| ||
Preferred stock (50,000,000 shares authorized; 1,250,000 shares of Series A and 750,000 shares of Series B issued and outstanding at respective dates) | 1,978 | 1,977 | ||||
Common stock, no par value (800,000,000 shares authorized; 382,208,498 and 380,378,145 shares and at respective dates) |
| 6,200 |
| 6,071 | ||
Accumulated other comprehensive loss |
| (11) |
| (54) | ||
Retained earnings |
| 7,454 |
| 7,894 | ||
Total Edison International's shareholders' equity |
| 15,621 |
| 15,888 | ||
Noncontrolling interests – preference stock of SCE |
| 1,901 |
| 1,901 | ||
Total equity |
| 17,522 |
| 17,789 | ||
Total liabilities and equity | $ | 78,041 | $ | 74,745 |
The accompanying notes are an integral part of these consolidated financial statements.
65
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Cash flows from operating activities: |
|
|
|
|
|
| |||
Net income | $ | 824 | $ | 925 | $ | 871 | |||
Adjustments to reconcile to net cash provided by operating activities: |
|
|
|
|
| ||||
Depreciation and amortization |
| 2,633 |
| 2,288 |
| 2,029 | |||
Allowance for equity during construction |
| (137) |
| (118) |
| (121) | |||
Impairment and other expense (income) |
| 54 |
| 71 |
| (116) | |||
Gain on sale of lease interest and other operating income | (5) | (2) | (133) | ||||||
Deferred income taxes |
| (177) |
| 43 |
| (296) | |||
Wildfire Insurance Fund amortization expense |
| 214 |
| 215 |
| 336 | |||
Other |
| 80 |
| 40 |
| 36 | |||
Nuclear decommissioning trusts |
| (123) |
| (256) |
| (197) | |||
Proceeds from Morongo Transmission LLC | — | 400 | — | ||||||
Contributions to Wildfire Insurance Fund |
| (95) |
| (95) |
| (95) | |||
Changes in operating assets and liabilities: |
|
|
|
|
| ||||
Receivables |
| (252) |
| (514) |
| (283) | |||
Inventory |
| (58) |
| (21) |
| (43) | |||
Accounts payable |
| 367 |
| 138 |
| 87 | |||
Tax receivables and payables |
| 18 |
| 13 |
| 113 | |||
Other current assets and liabilities |
| 322 |
| (333) |
| 4 | |||
Regulatory assets and liabilities, net |
| (51) |
| (720) |
| (1,799) | |||
Wildfire-related insurance receivable |
| (390) |
| 708 |
| 932 | |||
Wildfire-related claims |
| (56) |
| (2,648) |
| (56) | |||
Other noncurrent assets and liabilities |
| 48 |
| (123) |
| (6) | |||
Net cash provided by operating activities |
| 3,216 |
| 11 |
| 1,263 | |||
Cash flows from financing activities: |
|
|
|
|
|
| |||
Long-term debt issued, plus premium and net of discount and issuance costs of $(62), $(43) and $23 for the respective years |
| 5,971 |
| 5,412 |
| 3,073 | |||
Long-term debt repaid |
| (1,085) |
| (1,037) |
| (1,099) | |||
Short-term debt issued |
| 1,000 |
| 2,654 |
| 2,994 | |||
Short-term debt repaid |
| (1,543) |
| (2,255) |
| (1,126) | |||
Common stock issued |
| 13 |
| 32 |
| 912 | |||
Preferred stock issued, net |
| — |
| 1,977 |
| — | |||
Preferred and preference stock redeemed |
| — |
| — |
| (308) | |||
Commercial paper borrowing (repayments), net |
| (317) |
| (254) |
| 304 | |||
Dividends and distribution to noncontrolling interests |
| (110) |
| (106) |
| (118) | |||
Common stock dividends paid |
| (1,050) |
| (988) |
| (928) | |||
Preferred stock dividends paid | (99) | (35) | — | ||||||
Other |
| 101 |
| 45 |
| 23 | |||
Net cash provided by financing activities |
| 2,881 |
| 5,445 |
| 3,727 | |||
Cash flows from investing activities: |
|
|
|
|
|
| |||
Capital expenditures |
| (5,778) |
| (5,505) |
| (5,484) | |||
Proceeds from sale of nuclear decommissioning trust investments |
| 4,177 |
| 3,961 |
| 5,927 | |||
Purchases of nuclear decommissioning trust investments |
| (4,054) |
| (3,705) |
| (5,730) | |||
Other |
| 81 |
| 98 |
| 316 | |||
Net cash used in investing activities |
| (5,574) |
| (5,151) |
| (4,971) | |||
Net increase in cash, cash equivalents and restricted cash |
| 523 |
| 305 |
| 19 | |||
Cash, cash equivalents and restricted cash at beginning of year |
| 394 |
| 89 |
| 70 | |||
Cash, cash equivalents and restricted cash at end of year | $ | 917 | $ | 394 | $ | 89 |
The accompanying notes are an integral part of these consolidated financial statements.
66
Noncontrolling | |||||||||||||||||||||
| Equity Attributable to Edison International Shareholders |
| Interests | ||||||||||||||||||
| | | Accumulated | | | Preferred | | ||||||||||||||
| | Other | | and | | ||||||||||||||||
Preferred | Common | Comprehensive | Retained | Preference | Total | ||||||||||||||||
(in millions, except per share amounts) | Stock | Stock | Loss | Earnings | Subtotal | Stock | Equity | ||||||||||||||
Balance at December 31, 2019 |
| $ | — | $ | 4,990 | $ | (69) | $ | 8,382 | $ | 13,303 | $ | 2,193 | $ | 15,496 | ||||||
Net income | — |
| — |
| — |
| 739 |
| 739 |
| 132 |
| 871 | ||||||||
Common stock issued, net of issuance cost | — |
| 942 |
| — |
| — | 942 |
| — | 942 | ||||||||||
Common stock dividends declared ($2.5750 per share) | — |
| — |
| — |
| (965) |
| (965) |
| — |
| (965) | ||||||||
Dividends to noncontrolling interests ($0.757 - $0.886 per share for preferred stock; $62.50 - $143.75 per share for preference stock) | — |
| — |
| — |
| — |
| — |
| (117) |
| (117) | ||||||||
Noncash stock-based compensation | — |
| 30 |
| — |
| (1) |
| 29 |
| 1 |
| 30 | ||||||||
Redemption of preferred and preference stock | — | — | — | — | — | (308) | (308) | ||||||||||||||
Balance at December 31, 2020 | $ | — | $ | 5,962 | $ | (69) | $ | 8,155 | $ | 14,048 | $ | 1,901 | $ | 15,949 | |||||||
Net income | — |
| — |
| — |
| 819 |
| 819 |
| 106 |
| 925 | ||||||||
Other comprehensive income | — |
| — |
| 15 |
| — |
| 15 |
| — |
| 15 | ||||||||
Common stock issued, net of issuance cost | — |
| 71 |
| — |
| — |
| 71 |
| — |
| 71 | ||||||||
Preferred stock issued, net of issuance cost | 1,977 | — | — | — | 1,977 | — | 1,977 | ||||||||||||||
Common stock dividends declared ($2.6875 per share) | — |
| — |
| — |
| (1,021) |
| (1,021) |
| — |
| (1,021) | ||||||||
Preferred stock dividend accrued ($43.5972 per share for Series A and $6.8056 per share for Series B) | — | — | — | (60) | (60) | — | (60) | ||||||||||||||
Dividends to noncontrolling interests ($62.50 - $143.75 per share for preference stock) | — |
| — |
| — |
| — |
| — |
| (106) |
| (106) | ||||||||
Noncash stock-based compensation | — |
| 38 |
| — |
| 1 |
| 39 |
| — |
| 39 | ||||||||
Balance at December 31, 2021 | $ | 1,977 | $ | 6,071 | $ | (54) | $ | 7,894 | $ | 15,888 | $ | 1,901 | $ | 17,789 | |||||||
Net income | — |
| — |
| — |
| 717 |
| 717 |
| 107 |
| 824 | ||||||||
Other comprehensive income | — |
| — |
| 43 |
| — |
| 43 |
| — |
| 43 | ||||||||
Common stock issued, net of issuance cost | — |
| 87 |
| — |
| — |
| 87 |
| — |
| 87 | ||||||||
Common stock dividends declared ($2.8375 per share) | — |
| — |
| — |
| (1,083) |
| (1,083) |
| — |
| (1,083) | ||||||||
Preferred stock dividend declared ($53.750 per share for Series A and $42.08333 per share for Series B) | — | — | — | (74) | (74) | — | (74) | ||||||||||||||
Dividends to noncontrolling interests ($65.1098 - $143.75 per share for preference stock) | — |
| — |
| — |
| — |
| — |
| (107) |
| (107) | ||||||||
Noncash stock-based compensation | — |
| 42 |
| — |
| — |
| 42 |
| — |
| 42 | ||||||||
Other | 1 | — | — | — | 1 | — | 1 | ||||||||||||||
Balance at December 31, 2022 | $ | 1,978 | $ | 6,200 | $ | (11) | $ | 7,454 | $ | 15,621 | $ | 1,901 | $ | 17,522 |
The accompanying notes are an integral part of these consolidated financial statements.
67
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Operating revenue | $ | 17,172 | $ | 14,874 | $ | 13,546 | |||
Purchased power and fuel |
| 6,375 |
| 5,540 |
| 4,932 | |||
Operation and maintenance |
| 4,659 |
| 3,588 |
| 3,523 | |||
Wildfire-related claims, net of insurance recoveries |
| 1,305 |
| 1,276 |
| 1,328 | |||
Wildfire Insurance Fund expense |
| 214 |
| 215 |
| 336 | |||
Depreciation and amortization |
| 2,559 |
| 2,216 |
| 1,965 | |||
Property and other taxes |
| 497 |
| 462 |
| 435 | |||
Impairment, net of other (income) |
| 50 |
| 67 |
| (151) | |||
Total operating expenses |
| 15,659 |
| 13,364 |
| 12,368 | |||
Operating income |
| 1,513 |
| 1,510 |
| 1,178 | |||
Interest expense |
| (1,005) |
| (791) |
| (768) | |||
Other income |
| 337 |
| 233 |
| 255 | |||
Income before taxes |
| 845 |
| 952 |
| 665 | |||
Income tax (benefit) expense |
| (109) |
| 17 |
| (277) | |||
Net income |
| 954 |
| 935 |
| 942 | |||
Less: Preference stock dividend requirements |
| 107 |
| 106 |
| 132 | |||
Net income available for common stock | $ | 847 | $ | 829 | $ | 810 |
| | | | | | | | | |
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Net income | $ | 954 | $ | 935 | $ | 942 | |||
Other comprehensive income (loss), net of tax: |
|
|
|
|
| ||||
Pension and postretirement benefits other than pensions |
| 24 |
| 9 |
| (2) | |||
Other comprehensive income (loss), net of tax |
| 24 |
| 9 |
| (2) | |||
Comprehensive income | $ | 978 | $ | 944 | $ | 940 |
The accompanying notes are an integral part of these consolidated financial statements.
69
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
ASSETS |
|
|
|
| ||
Cash and cash equivalents | $ | 766 | $ | 279 | ||
Receivables, less allowances of $347 and $193 for uncollectible accounts at respective dates |
| 1,675 |
| 1,393 | ||
Accrued unbilled revenue |
| 638 |
| 794 | ||
Inventory | 474 | 420 | ||||
Prepaid expenses |
| 292 |
| 257 | ||
Regulatory assets |
| 2,497 |
| 1,778 | ||
Wildfire Insurance Fund contributions |
| 204 |
| 204 | ||
Other current assets |
| 384 |
| 222 | ||
Total current assets |
| 6,930 |
| 5,347 | ||
Nuclear decommissioning trusts |
| 3,948 |
| 4,870 | ||
Other investments |
| 36 |
| 34 | ||
Total investments |
| 3,984 |
| 4,904 | ||
Utility property, plant and equipment, less accumulated depreciation and amortization of $12,260 and $11,407 at respective dates |
| 53,274 |
| 50,497 | ||
Nonutility property, plant and equipment, less accumulated depreciation of $94 and $88 at respective dates |
| 206 |
| 196 | ||
Total property, plant and equipment |
| 53,480 |
| 50,693 | ||
Receivables, less allowances of $7 and $116 for uncollectible accounts at respective dates | 2 | 122 | ||||
Regulatory assets (include $834 and $325 related to VIEs at respective dates) |
| 8,181 |
| 7,660 | ||
Wildfire Insurance Fund contributions |
| 2,155 |
| 2,359 | ||
Operating lease right-of-use assets |
| 1,433 |
| 1,925 | ||
Long-term insurance receivables | 139 | 75 | ||||
Long-term insurance receivables due from affiliate |
| 334 |
| — | ||
Other long-term assets |
| 1,169 |
| 1,453 | ||
Total long-term assets |
| 13,413 |
| 13,594 | ||
Total assets | $ | 77,807 | $ | 74,538 |
The accompanying notes are an integral part of these consolidated financial statements.
70
December 31, | ||||||
(in millions, except share amounts) |
| 2022 |
| 2021 | ||
LIABILITIES AND EQUITY |
|
|
|
| ||
Short-term debt | $ | 925 | $ | 2,354 | ||
Current portion of long-term debt |
| 2,214 |
| 377 | ||
Accounts payable |
| 2,351 |
| 1,999 | ||
Wildfire-related claims | 121 | 131 | ||||
Customer deposits |
| 167 |
| 193 | ||
Regulatory liabilities |
| 964 |
| 603 | ||
Current portion of operating lease liabilities |
| 505 |
| 582 | ||
Other current liabilities |
| 1,578 |
| 1,631 | ||
Total current liabilities |
| 8,825 |
| 7,870 | ||
Long-term debt (include $809 and $314 related to VIEs at respective dates) |
| 24,044 |
| 21,733 | ||
Deferred income taxes and credits |
| 7,545 |
| 7,181 | ||
Pensions and benefits |
| 105 |
| 111 | ||
Asset retirement obligations |
| 2,754 |
| 2,772 | ||
Regulatory liabilities |
| 8,211 |
| 8,981 | ||
Operating lease liabilities |
| 928 |
| 1,343 | ||
Wildfire-related claims |
| 1,687 |
| 1,733 | ||
Other deferred credits and other long-term liabilities |
| 2,919 |
| 2,979 | ||
Total deferred credits and other liabilities |
| 24,149 |
| 25,100 | ||
Total liabilities |
| 57,018 |
| 54,703 | ||
Commitments and contingencies (Note 12) |
|
|
|
| ||
Preference stock |
| 1,945 |
| 1,945 | ||
Common stock, no par value (560,000,000 shares authorized; 434,888,104 shares issued and outstanding at respective dates) |
| 2,168 |
| 2,168 | ||
Additional paid-in capital |
| 8,441 |
| 7,033 | ||
Accumulated other comprehensive loss |
| (8) |
| (32) | ||
Retained earnings |
| 8,243 |
| 8,721 | ||
Total equity |
| 20,789 |
| 19,835 | ||
Total liabilities and equity | $ | 77,807 | $ | 74,538 |
The accompanying notes are an integral part of these consolidated financial statements.
71
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Cash flows from operating activities: |
|
|
|
|
|
| |||
Net income | $ | 954 | $ | 935 | $ | 942 | |||
Adjustments to reconcile to net cash provided by operating activities: |
|
|
|
|
|
| |||
Depreciation and amortization |
| 2,626 |
| 2,280 |
| 2,021 | |||
Allowance for equity during construction |
| (137) |
| (118) |
| (121) | |||
Impairment and other expense (income) |
| 50 |
| 67 |
| (151) | |||
Deferred income taxes |
| (111) |
| 62 |
| (263) | |||
Wildfire Insurance Fund amortization expense |
| 214 |
| 215 |
| 336 | |||
Other |
| 59 |
| 28 |
| 18 | |||
Nuclear decommissioning trusts |
| (123) |
| (256) |
| (197) | |||
Proceeds from Morongo Transmission LLC | — | 400 | — | ||||||
Contributions to Wildfire Insurance Fund |
| (95) |
| (95) |
| (95) | |||
Changes in operating assets and liabilities: |
|
|
|
|
|
| |||
Receivables |
| (245) |
| (513) |
| (290) | |||
Inventory |
| (58) |
| (21) |
| (43) | |||
Accounts payable |
| 366 |
| 131 |
| 63 | |||
Tax receivables and payables |
| (1) |
| 31 |
| 141 | |||
Other current assets and liabilities |
| 265 |
| (333) |
| (7) | |||
Regulatory assets and liabilities, net |
| (51) |
| (720) |
| (1,799) | |||
Wildfire-related insurance receivable |
| (398) |
| 708 |
| 932 | |||
Wildfire-related claims |
| (56) |
| (2,648) |
| (56) | |||
Other noncurrent assets and liabilities |
| 60 |
| 5 |
| (4) | |||
Net cash provided by operating activities |
| 3,319 |
| 158 |
| 1,427 | |||
Cash flows from financing activities: |
|
|
|
|
|
| |||
Long-term debt issued, plus premium and net of discount and issuance costs of $(51), $(43) and $26 for the respective years |
| 5,032 |
| 5,411 |
| 2,676 | |||
Long-term debt repaid | (385) | (1,037) | (699) | ||||||
Short-term debt borrowed |
| — |
| 2,654 |
| 2,194 | |||
Short-term debt repaid |
| (1,543) |
| (2,255) |
| (326) | |||
Capital contributions from Edison International Parent |
| 1,400 |
| 1,633 |
| 1,432 | |||
Preferred and preference stock redeemed |
| — |
| — |
| (308) | |||
Commercial paper (repayments) borrowing, net |
| (406) |
| (124) |
| 175 | |||
Common stock dividends paid | (1,300) | (975) | (1,332) | ||||||
Preferred and preference stock dividends paid |
| (110) |
| (106) |
| (118) | |||
Other |
| 36 |
| 17 |
| 5 | |||
Net cash provided by financing activities |
| 2,724 |
| 5,218 |
| 3,699 | |||
Cash flows from investing activities: |
|
|
|
|
|
| |||
Capital expenditures |
| (5,776) |
| (5,503) |
| (5,480) | |||
Proceeds from sale of nuclear decommissioning trust investments |
| 4,177 |
| 3,961 |
| 5,927 | |||
Purchases of nuclear decommissioning trust investments |
| (4,054) |
| (3,705) |
| (5,730) | |||
Other |
| 96 |
| 95 |
| 189 | |||
Net cash used in investing activities |
| (5,557) |
| (5,152) |
| (5,094) | |||
Net increase in cash, cash equivalents and restricted cash |
| 486 |
| 224 |
| 32 | |||
Cash, cash equivalents and restricted cash at beginning of year |
| 280 |
| 56 |
| 24 | |||
Cash, cash equivalents and restricted cash at end of year | $ | 766 | $ | 280 | $ | 56 |
The accompanying notes are an integral part of these consolidated financial statements.
72
|
| Preferred |
| |
| | |
| Accumulated |
| |
| | |||||
and | | Additional | Other | | | |||||||||||||
Preference | Common | Paid-in | Comprehensive | Retained | Total | |||||||||||||
(in millions, except per share amounts) | Stock | Stock | Capital | Loss | Earnings | Equity | ||||||||||||
Balance at December 31, 2019 | $ | 2,245 | $ | 2,168 | $ | 3,939 | $ | (39) | $ | 9,514 | $ | 17,827 | ||||||
Net income |
| — |
| — |
| — |
| — |
| 942 |
| 942 | ||||||
Other comprehensive loss |
| — |
| — |
| — |
| (2) |
| — |
| (2) | ||||||
Capital contribution from Edison International Parent | — |
| — |
| 1,432 |
| — |
| — | 1,432 | ||||||||
Dividends declared on common stock ($2.6030 per share) |
| — |
| — |
| — |
| — |
| (1,132) |
| (1,132) | ||||||
Dividends declared on preferred stock ($0.757 - $0.886 per share) and preference stock ($62.50 - $143.75 per share) |
| — |
| — |
| — |
| — |
| (117) |
| (117) | ||||||
Stock-based compensation |
| — |
| — |
| (5) |
| — |
| — |
| (5) | ||||||
Noncash stock-based compensation |
| — | — | 14 | — | (1) |
| 13 | ||||||||||
Redemption of preferred and preference stock | (300) | — | 7 | — | (15) | (308) | ||||||||||||
Balance at December 31, 2020 | $ | 1,945 | $ | 2,168 | $ | 5,387 | $ | (41) | $ | 9,191 | $ | 18,650 | ||||||
Net income |
| — |
| — |
| — |
| — |
| 935 |
| 935 | ||||||
Other comprehensive income |
| — |
| — |
| — |
| 9 |
| — |
| 9 | ||||||
Capital contribution from Edison International Parent |
| — |
| — |
| 1,633 |
| — |
| — |
| 1,633 | ||||||
Dividends declared on common stock ($2.9893 per share) |
| — |
| — |
| — |
| — |
| (1,300) |
| (1,300) | ||||||
Dividends declared on preference stock ($62.50 - $143.75 per share) |
| — |
| — |
| — |
| — |
| (106) |
| (106) | ||||||
Stock-based compensation |
| — |
| — |
| (7) |
| — |
| — |
| (7) | ||||||
Noncash stock-based compensation | — |
| — |
| 20 |
| — |
| 1 | 21 | ||||||||
Balance at December 31, 2021 | $ | 1,945 | $ | 2,168 | $ | 7,033 | $ | (32) | $ | 8,721 | $ | 19,835 | ||||||
Net income |
| — |
| — |
| — |
| — |
| 954 |
| 954 | ||||||
Other comprehensive income |
| — |
| — |
| — |
| 24 |
| — |
| 24 | ||||||
Capital contribution from Edison International Parent |
| — |
| — |
| 1,400 |
| — |
| — |
| 1,400 | ||||||
Dividends declared on common stock ($3.0468 per share) |
| — |
| — |
| — |
| — |
| (1,325) |
| (1,325) | ||||||
Dividends declared on preference stock ($65.1098 - $143.75 per share) |
| — |
| — |
| — |
| — |
| (107) |
| (107) | ||||||
Stock-based compensation |
| — |
| — |
| (14) |
| — |
| — |
| (14) | ||||||
Noncash stock-based compensation |
| — |
| — |
| 22 |
| — |
| — |
| 22 | ||||||
Balance at December 31, 2022 | $ | 1,945 | $ | 2,168 | $ | 8,441 | $ | (8) | $ | 8,243 | $ | 20,789 |
The accompanying notes are an integral part of these consolidated financial statements.
73
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
Note 1.Summary of Significant Accounting Policies
Organization and Basis of Presentation
Edison International is the ultimate parent holding company of Southern California Edison Company ("SCE") and Edison Energy, LLC ("Edison Energy Group"). SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of Southern California. Edison Energy Group is an indirect wholly-owned subsidiary of Edison International and a holding company for Edison Energy, LLC ("Edison Energy") which is engaged in the competitive business of providing decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe. Edison Energy's business activities are currently not material to report as a separate business segment. These combined notes to the consolidated financial statements apply to both Edison International and SCE unless otherwise described. Edison International's consolidated financial statements include the accounts of Edison International, SCE, and other wholly owned and controlled subsidiaries. References to Edison International refer to the consolidated group of Edison International and its subsidiaries. References to "Edison International Parent and Other" refer to Edison International Parent and its competitive subsidiaries and "Edison International Parent" refer to Edison International on a stand-alone basis, not consolidated with its subsidiaries. SCE's consolidated financial statements include the accounts of SCE, its wholly owned and controlled subsidiaries and a variable interest entity of which SCE is the primary beneficiary, SCE Recovery Funding LLC. All intercompany transactions have been eliminated from the consolidated financial statements.
Edison International's and SCE's accounting policies conform to accounting principles generally accepted in the United States of America ("GAAP"), including the accounting principles for rate-regulated enterprises, which reflect the ratemaking policies of the California Public Utility Commission ("CPUC") and the Federal Energy Regulatory Commission ("FERC"). SCE applies authoritative guidance for rate-regulated enterprises to the portion of its operations in which regulators set rates at levels intended to recover the estimated costs of providing service, plus a return on net investments in assets, or rate base. Regulators may also impose certain penalties or grant certain incentives. Due to timing and other differences in the collection of electric utility revenue, these principles require an incurred cost that would otherwise be charged to expense by a non-regulated entity to be capitalized as a regulatory asset if it is probable that the cost is recoverable through future rates; and conversely the principles require recording of a regulatory liability for amounts collected in rates to recover costs expected to be incurred in the future or amounts collected in excess of costs incurred and refundable to customers. In addition, SCE recognizes revenue and regulatory assets from alternative revenue programs, which enables the utility to adjust future rates in response to past activities or completed events, if certain criteria are met. SCE assesses, at the end of each reporting period, whether regulatory assets are probable of future recovery. See Note 11 for composition of regulatory assets and liabilities.
The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenue and expenses during the reported period. Actual results could differ from those estimates. Certain prior year amounts have been conformed to the current year's presentation, including separate presentation of common stock and preferred and preference stock dividends in SCE's consolidated statements of cash flows.
Cash, Cash Equivalents and Restricted Cash
Cash equivalents consist of investments in money market funds. Generally, the carrying value of cash equivalents equals the fair value, as these investments have original maturities of three months or less. The cash equivalents were as follows:
74
| Edison International | SCE | ||||||||||
December 31, | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 | ||||
Money market funds | $ | 784 | $ | 329 | $ | 647 | $ | 230 |
Cash is temporarily invested until required for check clearing. Checks issued, but not yet paid by the financial institution, are reclassified from cash to accounts payable at the end of each reporting period.
The following table sets forth the cash, cash equivalents and restricted cash included in the consolidated statements of cash flows:
December 31, |
| December 31, | ||||
(in millions) |
| 2022 |
| 2021 | ||
Edison International: |
|
| ||||
Cash and cash equivalents | $ | 914 | $ | 390 | ||
| 3 |
| 4 | |||
Total cash, cash equivalents and restricted cash | $ | 917 | $ | 394 | ||
SCE: |
|
|
| |||
Cash and cash equivalents | $ | 766 | $ | 279 | ||
| — |
| 1 | |||
Total cash, cash equivalents and restricted cash | $ | 766 | $ | 280 |
1 | Reflected in "Other current assets" on Edison International's and SCE's consolidated balance sheets. |
Allowance for Uncollectible Accounts
The allowance for uncollectible accounts is recorded based on SCE's estimate of expected credit losses and adjusted over the life of the receivables as needed. Since the customer base of SCE is concentrated in Southern California and exposes SCE to a homogeneous set of economic conditions, the allowance is measured on a collective basis on the historical amounts written-off, assessment of customer collectibility and current economic trends, including unemployment rates and likelihood of recession for the region. At December 31, 2022, this included the estimated impacts of the COVID-19 pandemic. In addition, in June 2022, California's state assembly passed legislation to authorize, fund and implement the California Arrearage Payment Program ("CAPP") 2022, which reduced customer arrearages for certain residential customers. The allowance for uncollectible accounts recorded against qualified arrearages was reduced by $83 million based on the receipt of CAPP in the fourth quarter of 2022.
75
The following table sets forth the changes in allowance for uncollectible accounts for SCE:
(in millions) | | Customers | | | All others | | Total | ||
Balance at December 31, 2019 |
| $ | 35 |
| $ | 14 | $ | 49 | |
Current period provision for uncollectible accounts | |||||||||
Included in operation and maintenance expenses in earning activities1 |
| 36 |
| 9 |
| 45 | |||
Included in operation and maintenance expenses in cost-recovery activities2 | 15 | — | 15 | ||||||
Deferred to regulatory memorandum accounts |
| 105 |
| — |
| 105 | |||
Write-offs, net of recoveries |
| (16) |
| (10) |
| (26) | |||
Balance at December 31, 2020 |
| $ | 175 |
| $ | 13 | $ | 188 | |
Current period provision for uncollectible accounts | | | | | | | | | |
Included in operation and maintenance expenses in earning activities1 | |
| 33 |
| 11 |
| 44 | ||
Included in operation and maintenance expenses in cost-recovery activities2 | | 74 | — | 74 | |||||
Deferred to regulatory memorandum accounts | |
| 17 |
| — |
| 17 | ||
Write-offs, net of recoveries | |
| (6) |
| (8) |
| (14) | ||
Balance at December 31, 2021³ | $ | 293 |
| $ | 16 | $ | 309 | ||
Current period provision for uncollectible accounts | | | | | | | | | |
Included in operation and maintenance expenses in earning activities1 | |
| 71 |
| 11 |
| 82 | ||
Included in operation and maintenance expenses in cost-recovery activities2,4 | | 58 | — | 58 | |||||
Deferred to regulatory memorandum accounts4 | |
| (18) |
| — |
| (18) | ||
Write-offs, net of recoveries | |
| (70) |
| (7) |
| (77) | ||
Balance at December 31, 2022³ | $ | 334 |
| $ | 20 | $ | 354 |
1 | Earning activities is one of SCE's disaggregated revenue sources. See Note 7 for further details. |
2 | Cost-recovery activities is one of SCE's disaggregated revenue sources. See Note 7 for further details. This portion of costs from the allowance for uncollectible expenses is recovered through the residential uncollectibles balancing account. |
3 | Approximately $7 million and $116 million of allowance for uncollectible accounts are included in long-term "Receivables" on SCE's consolidated balance sheets as of December 31, 2022 and December 31, 2021, respectively. |
4 | Represents current year changes in the allowance for uncollectible accounts and excludes authorized recovery of previously deferred balances. |
Inventory
SCE's inventory is primarily composed of materials, supplies and spare parts, and generally stated at weighted average cost.
Emission Allowances and Energy Credits
SCE is allocated greenhouse gas ("GHG") allowances annually which it is then required to sell into quarterly auctions. GHG proceeds from the auctions are recorded as a regulatory liability to be refunded to customers. SCE purchases GHG allowances in quarterly auctions or from counterparties to satisfy its GHG emission compliance obligations and recovers such costs of GHG allowances from customers. GHG allowances held for use are classified as "Other current assets" on the consolidated balance sheets and are stated, similar to an inventory method, at the lower of weighted average cost or market. SCE will evaluate GHG allowances for impairment upon a triggering event that would indicate SCE might not recover the full cost of an allowance. SCE had GHG allowances held for use of $87 million and $47 million at December 31, 2022 and 2021, respectively. GHG emission obligations were $55 million and $34 million at December 31, 2022 and 2021, respectively, and are classified as "Other current liabilities" on the consolidated balance sheets.
76
SCE is allocated low carbon fuel standard ("LCFS") credits which it sells to market participants. Proceeds from the sales, net of selling fees and program administration expenses, are recorded in a balancing account to be refunded to eligible customers. SCE's net proceeds from the sale of these LCFS credits were $218 million and $193 million and are classified as "Regulatory liabilities" on the consolidated balance sheets at December 31, 2022 and 2021, respectively.
Property, Plant and Equipment
SCE plant additions, including replacements and betterments, are capitalized. Direct material and labor and indirect costs such as construction overhead, administrative and general costs, pension and benefits, and property taxes are capitalized as part of plant additions. The CPUC authorizes a capitalization rate for each of the indirect costs which are allocated to each project based on either labor or total costs.
Estimated useful lives authorized by the CPUC in the 2021 General Rate Case ("GRC") and weighted average useful lives of SCE's property, plant and equipment, are as follows:
| Weighted Average | |||
| Estimated Useful Lives |
| Useful Lives | |
Generation plant | 10 years to 55 years | 39 years | ||
Distribution plant |
| 20 years to 67 years | 50 years | |
Transmission plant |
| 30 years to 65 years | 53 years | |
General plant and other |
| 5 years to 60 years | 20 years |
Depreciation of utility property, plant and equipment is computed on a straight-line, remaining-life basis. SCE's depreciation expense was $2.5 billion, $2.0 billion and $1.8 billion for 2022, 2021 and 2020, respectively. Depreciation expense stated as a percent of average original cost of depreciable utility plant was, on a composite basis, 4.2%, 3.7% and 3.6% for 2022, 2021 and 2020, respectively. The original costs of retired property are charged to accumulated depreciation. See Note 2 for further information.
Nuclear fuel for the Palo Verde Nuclear Generating Station ("Palo Verde") is recorded as utility plant (nuclear fuel in the fabrication and installation phase is recorded as construction in progress) in accordance with CPUC ratemaking procedures. Palo Verde nuclear fuel is amortized using the units of production method.
Allowance for funds used during construction ("AFUDC") represents the estimated cost of debt and equity funds that finance utility-plant construction and is capitalized during certain plant construction. AFUDC is recovered in rates through depreciation expense over the useful life of the related asset. AFUDC equity represents a method to compensate SCE for the estimated cost of equity used to finance utility plant additions and is recorded as part of construction in progress. AFUDC equity was $137 million, $118 million and $121 million in 2022, 2021 and 2020, respectively, and is reflected in "Other income." AFUDC debt was $53 million, $50 million and $53 million in 2022, 2021 and 2020, respectively and is reflected as a reduction of "Interest expense."
Major Maintenance
Major maintenance costs for SCE's facilities and equipment are expensed as incurred.
Impairment of Long-Lived Assets
Impairments of long-lived assets are evaluated based on a review of estimated future cash flows expected to be generated whenever events or changes in circumstances indicate that the carrying amount of such investments or assets may not be recoverable. If the carrying amount of a long-lived asset exceeds expected future cash flows, undiscounted and without interest charges, an impairment loss is recognized in the amount of the excess of fair value over the carrying amount. Fair value is determined via market, cost and income-based valuation techniques, as appropriate.
77
Accounting principles for rate-regulated enterprises also require recognition of an impairment loss if it becomes probable that the regulated utility will abandon a plant investment, or if it becomes probable that the cost of a recently completed plant will be disallowed, either directly or indirectly, for ratemaking purposes and a reasonable estimate of the amount of the disallowance can be made.
In September 2022, the CPUC approved the settlement agreement between SCE and The Utility Reform Network for SCE's Customer Service Re-platform ("CSRP") proceeding filed in 2021 for expenditures incurred through April 2021. As a result of the settlement agreement, SCE recorded a $47 million ($34 million after-tax) impairment of property, plant and equipment, reflected in "Impairment, net of other (income)" in the consolidated statements of income.
In August 2021, as a result of adoption of 2021 GRC, SCE recorded $79 million ($47 million after-tax) in impairment charges related to disallowed historical capital expenditures of pole replacements the CPUC determined were performed prematurely in 2021. The impairment is included in "Impairment, net of other (income)" in the consolidated statements of income.
As of December 31, 2022 and 2021, SCE has $177 million and $186 million in assets recorded in property, plant and equipment in relation to restoration costs related to the 2017/2018 Wildfire/Mudslide Events, respectively, which may not be recoverable. These assets would be impaired if the restoration costs are permanently disallowed by the CPUC in future cost recovery proceedings. For further details, see Note 12.
Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054 (the "Wildfire Insurance Fund" and "AB 1054")
Edison International and SCE accounted for the contributions to the Wildfire Insurance Fund similarly to prepaid insurance. No period of coverage was provided in AB 1054, therefore expense is being allocated to periods ratably based on an estimated period of coverage. At December 31, 2022 and 2021, Edison International and SCE had a $2.2 billion and a $2.4 billion long-term asset, respectively, as well as a $204 million current asset for both years, reflected as "Wildfire Insurance Fund contributions" in their consolidated balance sheets for the initial $2.4 billion contribution made during 2019 and the present value of annual contributions SCE committed to make to the Wildfire Insurance Fund, reduced by amortization. At December 31, 2022 and 2021, long-term liabilities of $536 million and $620 million, respectively, have been reflected in "Other deferred credits and other long-term liabilities" for the present value of unpaid contributions. Contributions were discounted to the present value using US treasury interest rates at the date SCE committed to participate in the Wildfire Insurance Fund.
In 2022 and 2021, the asset was amortized based on an estimated period of coverage of 15 years. All expenses related to the contributions are being reflected in "Wildfire Insurance Fund Expense" in the consolidated statements of income. Changes in the estimated period of coverage provided by the Wildfire Insurance Fund could lead to material changes in future expense recognition. In estimating the period of coverage, Edison International and SCE used Monte Carlo simulations based on historical data from wildfires caused by electrical utility equipment to estimate expected losses, using eight years (2014 – 2021) of available historical data in 2022 and seven years (2014 – 2020) of available historical data in 2021. The details of the operation of the Wildfire Insurance Fund and estimates related to claims by SCE, Pacific Gas & Electric Company ("PG&E"), and San Diego Gas & Electric ("SDG&E") against the fund have been applied to the expected loss simulations to estimate the period of coverage of the fund. The most sensitive inputs to the estimated period of coverage are the expected frequency of wildfire events caused by investor-owned utility electrical equipment and the estimated costs associated with those forecasted events. Edison International and SCE evaluate all inputs annually, or upon claims being made from the fund for catastrophic wildfires, and the expected life of the insurance fund will be adjusted as required. Based on information available in the first quarter of 2023 regarding catastrophic wildfires during 2022, SCE reassessed its estimate of the life of the Wildfire Insurance Fund. Using nine years of historical data (2014 – 2022) of wildfires caused by electrical utility equipment to create Monte Carlo simulations of expected losses,
78
the expected life of the Wildfire Insurance Fund remained 15 years from the date SCE committed to participate in the Wildfire Insurance Fund.
Edison International and SCE will assess the Wildfire Insurance Fund contribution assets for impairment in the event that a participating utility's electrical equipment is found to be the substantial cause of a catastrophic wildfire, based on the ability of SCE to benefit from the coverage provided by the Wildfire Insurance Fund in an amount equal to the recorded assets.
Nuclear Decommissioning and Asset Retirement Obligations
The fair value of a liability for an asset retirement obligation ("ARO") is recorded in the period in which it is incurred, including a liability for the fair value of a conditional ARO, if the fair value can be reasonably estimated even though uncertainty exists about the timing and/or method of settlement. When an ARO liability is initially recorded, SCE capitalizes the cost by increasing the carrying amount of the related long-lived asset. For each subsequent period, the liability is increased for accretion expense and the capitalized cost is depreciated over the useful life of the related asset.
SCE has not recorded an ARO for assets that are expected to operate indefinitely or where SCE cannot estimate a settlement date (or range of potential settlement dates). As such, ARO liabilities are not recorded for certain retirement activities, including certain hydroelectric facilities.
The following table summarizes the changes in SCE's ARO liability:
| December 31, | |||||
(in millions) |
| 2022 |
| 2021 | ||
Beginning balance | $ | 2,772 | $ | 2,930 | ||
Accretion1 |
| 143 |
| 157 | ||
Revisions |
| 28 |
| (77) | ||
Liabilities settled |
| (189) |
| (238) | ||
Ending balance | $ | 2,754 | $ | 2,772 |
1 | An ARO represents the present value of a future obligation. Accretion is an increase in the liability to account for the time value of money resulting from discounting. |
AROs related to decommissioning of SCE's nuclear power facilities are based on site-specific studies conducted as part of each Nuclear Decommissioning Cost Triennial Proceeding ("NDCTP") conducted before the CPUC. Revisions of an ARO are established for updated site-specific decommissioning cost estimates.
The ARO for decommissioning SCE's San Onofre Nuclear Generating Station ("San Onofre") and Palo Verde nuclear power facilities is $2.3 billion as of December 31, 2022. The liability to decommission SCE's nuclear power facilities is based on a 2020 decommissioning study, filed as part of the 2021 NDCTP, for San Onofre Unit 1, 2 and 3 and a 2019 decommissioning study for Palo Verde, with revisions to the cost estimate in 2020.
SCE records an ARO regulatory liability as a result of timing differences between the recognition of costs and the recovery of costs through the ratemaking process. For further information, see Note 11.
Decommissioning of San Onofre Unit 1 began in 1999 and the transfer of spent nuclear fuel from Unit 1 to dry cask storage in the Independent Spent Fuel Storage Installation ("ISFSI") 1 was completed in 2005. Major decommissioning work for Unit 1 has been completed except for certain underground work.
Decommissioning of San Onofre Units 2 and 3 began in June 2013 and the transfer of spent nuclear fuel from San Onofre Units 2 and 3 to dry cask storage in the two ISFSIs was completed in August 2020. In October 2019, the California Coastal Commission approved SCE's application for a Coastal Development Permit, the principal discretionary permit required to start major decommissioning activities at San Onofre Units 2 and 3. In August 2020,
79
SCE commenced, and is currently conducting, major decommissioning activities in accordance with the terms of the permit.
Decommissioning costs, which are recovered through customer rates over the term of each nuclear facility's operating license, are recorded as a component of depreciation expense, with a corresponding credit to the ARO regulatory liability. Due to regulatory recovery of SCE's nuclear decommissioning expense, prudently incurred costs for nuclear decommissioning activities do not affect SCE's earnings. Amortization of the ARO asset (included within the unamortized nuclear investment) and accretion of the ARO liability are deferred as decreases to the ARO regulatory liability account, resulting in no impact on earnings.
SCE has collected in rates amounts for the future decommissioning of its nuclear assets and has placed those amounts in independent trusts. Amounts collected in rates in excess of the ARO liability are classified as regulatory liabilities.
Changes in the estimated costs, timing of decommissioning or the assumptions underlying these estimates could cause material revisions to the estimated total cost to decommission. SCE currently estimates that it will spend approximately $6.3 billion through 2080 to decommission its nuclear facilities. This estimate is based on SCE's decommissioning cost methodology used for ratemaking purposes, escalated at rates ranging from 2.3% to 7.5% (depending on the cost element) annually. These costs are expected to be funded from independent decommissioning trusts. SCE estimates annual after-tax earnings on the decommissioning funds of 1.6% to 4.9% dependent on asset class. If the assumed return on trust assets is not earned or costs escalate at higher rates, SCE expects that additional funds needed for decommissioning will be recoverable through future rates, subject to a reasonableness review. See Note 10 for further information.
Due to regulatory recovery of SCE's nuclear decommissioning expense, prudently incurred costs for nuclear decommissioning activities do not affect SCE's earnings. SCE's nuclear decommissioning costs are subject to CPUC review through the triennial regulatory proceedings. SCE's nuclear decommissioning trust investments primarily consist of fixed income investments that are classified as available-for-sale and equity investments. Due to regulatory mechanisms, investment earnings and realized gains and losses have no impact on earnings. Unrealized gains and losses on decommissioning trust funds, including impairment, increase or decrease the trust assets and the related regulatory asset or liability and have no impact on electric utility revenue or decommissioning expense. SCE reviews each fixed income security for impairment on the last day of each month. If the fair value on the last day of the month is less than the amortized cost for that security, SCE impairs the disclosed amortized cost. If the fair value is greater or less than the carrying value for that security at the time of sale, SCE recognizes a related realized gain or loss, respectively.
Deferred Financing Costs
Debt premium, discount and issuance expenses incurred in connection with obtaining financing are deferred and amortized on a straight-line basis. Under CPUC ratemaking procedures, SCE's debt reacquisition expenses are amortized over the remaining life of the reacquired debt or, if refinanced, the life of the new debt. SCE had unamortized losses on reacquired debt of $109 million and $121 million at December 31, 2022 and 2021, respectively, reflected as long-term "Regulatory assets" in the consolidated balance sheets. In addition, Edison International and SCE had debt issuance costs related to issuances of long-term debt of $178 million and $165 million at December 31, 2022 and $153 million and $143 million at December 31, 2021, respectively. These costs are recorded as an offset to long-term debt.
80
Amortization of deferred financing costs charged to interest expense is as follows:
| Edison International |
| SCE | |||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Amortization of deferred financing costs charged to interest expense | $ | 37 | $ | 34 | $ | 32 | $ | 31 | $ | 29 | $ | 27 |
Revenue Recognition
Revenue is recognized by Edison International and SCE when a performance obligation to transfer control of the promised goods is satisfied or when services are rendered to customers. This typically occurs when electricity is delivered to customers, which includes amounts for services rendered but unbilled at the end of a reporting period.
SCE's Revenue from Contracts with Customers
Provision of Electricity
SCE principally generates revenue through supplying and delivering electricity to its customers. Rates charged to customers are based on tariff rates, approved by the CPUC and FERC. Starting with SCE's 2021 GRC, revenue will be authorized through quadrennial GRC proceedings, which are intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its CPUC-jurisdictional rate base. The CPUC sets an annual revenue requirement for the base year and the remaining three years are set by a methodology established in the GRC proceeding. Revenue was previously authorized by the CPUC in triennial GRC proceedings. As described above, SCE also earns revenue, with no return, to recover costs for power procurement, certain wildfire related expenses and other activities.
Revenue is authorized by the FERC through a formula rate which is intended to provide SCE a reasonable opportunity to recover transmission capital and operating costs that are prudently incurred, including a return on its FERC-jurisdictional rate base. Under the operation of the formula rate, transmission revenue is updated to actual cost of service annually.
For SCE's electricity sales for both residential and non-residential customers, SCE satisfies the performance obligation of delivering electricity over time as the customers simultaneously receive and consume the delivered electricity.
Energy sales are typically on a month-to-month implied contract for transmission, distribution and generation services. Revenue is recognized over time as the energy is supplied and delivered to customers and the respective revenue is billed and paid on a monthly basis.
CPUC and FERC rates decouple authorized revenue from the volume of electricity sales and the price of energy procured so that SCE receives revenue equal to amounts authorized by the relevant regulatory agencies. As a result, the volume of electricity sold to customers and specific customer classes does not have a direct impact on SCE's financial results. See Note 7 for further information on SCE's revenue.
Sales and Use Taxes
SCE bills certain sales and use taxes levied by state or local governments to its customers. Included in these sales and use taxes are franchise fees, which SCE pays to various municipalities (based on contracts with these municipalities) in order to operate within the limits of the municipality. SCE bills these franchise fees to its customers based on a CPUC-authorized rate. These franchise fees, which are required to be paid regardless of SCE's ability to collect from the customer, are accounted for on a gross basis. SCE's franchise fees billed to customers were $172 million, $147 million and $131 million for the years ended December 31, 2022, 2021, and 2020, respectively. When SCE acts as an agent for sales and use tax, the taxes are accounted for on a net basis. Amounts billed to and collected from customers for these taxes are remitted to the taxing authorities and are not recognized as electric utility revenue.
81
SCE's Alternative Revenue Programs
The CPUC and FERC have authorized additional, alternative revenue programs which adjust billings for the effects of broad external factors. These alternative revenue programs allow SCE to recover costs that SCE has been authorized to pass on to customers, including costs of certain operations and maintenance activities, costs to purchase electricity and natural gas, and to fund public purpose, demand response, and customer energy efficiency programs. In general, revenue is recognized for these alternative revenue programs at the time the costs are incurred. SCE begins recognizing revenues for these programs when a program has been established by an order from either the CPUC or FERC that allows for automatic adjustment of future rates, the amount of revenue for the period is objectively determinable and probable of recovery and the revenue will be collected within 24 months following the end of the annual period.
Power Purchase Agreements
SCE enters into power purchase agreements ("PPAs") in the normal course of business. A power purchase agreement may be considered a variable interest in a variable interest entity ("VIE"). If SCE is the primary beneficiary in the VIE, SCE should consolidate the VIE. None of SCE's PPAs resulted in consolidation at December 31, 2022 and 2021. See Note 3 for further discussion of PPAs that are considered variable interests.
A PPA may also contain a lease for accounting purposes. See "Leases" below and Note 12 and Note 13 for further discussion of SCE's PPAs. A PPA that does not contain a lease may be classified as a derivative which is recorded at fair value on the consolidated balance sheets. These PPAs may be eligible for an election to designate as a normal purchase or sale, which is accounted for on an accrual basis as an executory contract.
PPAs that do not meet the above classifications are accounted for on an accrual basis.
Derivative Instruments
SCE records derivative instruments on its consolidated balance sheets as either assets or liabilities measured at fair value unless otherwise exempted from derivative treatment as normal purchases or sales. The normal purchases and sales exception requires, among other things, physical delivery in quantities expected to be used or sold over a reasonable period in the normal course of business.
Realized gains and losses from SCE's derivative instruments are expected to be recovered from or refunded to customers through regulatory mechanisms and, therefore, SCE's fair value changes have no impact on purchased power expense or earnings. SCE does not use hedge accounting for derivative transactions due to regulatory accounting treatment.
Where SCE's derivative instruments are subject to a master netting agreement and certain criteria are met, SCE presents its derivative assets and liabilities on a net basis on its consolidated balance sheets. In addition, derivative positions are offset against margin and cash collateral deposits. The results of derivative activities are recorded as part of cash flows from operating activities on the consolidated statements of cash flows. See Note 6 for further information on derivative instruments.
Leases
A lease is defined as a contract, or part of a contract, that conveys the right to control the use of identified assets for a period of time in exchange for consideration. An entity controls the use when it has a right to obtain substantially all of the benefits from the use of the identified asset and has the right to direct the use of the asset. SCE determines if an arrangement is a lease at contract inception. For all classes of underlying assets, except battery storage assets which were first contracted in 2020 and for which each component will be separately accounted for, SCE includes both the lease and non-lease components as a single component and accounts for it as a lease. Lease liabilities are recognized based on the present value of the lease payments over the lease term at the commencement date. SCE calculates and uses the rate implicit in the lease if the information is readily available or if not available, SCE uses its incremental borrowing rate in
82
determining the present value of lease payments. Incremental borrowing rates are comprised of underlying risk-free rates and secured credit spreads relative to first mortgage bonds with like tenors of lease term durations. Lease right-of-use ("ROU") assets are based on the liability, subject to adjustments, such as lease incentives. The ROU assets also include any lease payments made at or before the commencement date. SCE excludes variable lease payments in measuring lease assets and lease liabilities, other than those that depend on an index or a rate or are in substance fixed payments. SCE's lease terms include options to extend or terminate the lease when it is reasonably certain that such options will be exercised. SCE elected to exclude from the balance sheet short-term lease contracts of one year or less.
SCE enters into power purchase agreements that may contain leases. This occurs when a power purchase agreement designates a specific power plant, SCE obtains substantially all of the economic benefits from the use of the plant and has the right to direct the use of the plant. SCE also enters into a number of agreements to lease property and equipment in the normal course of business, primarily related to vehicles, office space and other equipment. See Note 13 for further discussion of SCE's contracts that are classified as operating and finance leases.
Edison International Parent and Other's leases primarily relate to Edison Energy Group. The leases for Edison International Parent and Other are immaterial to Edison International.
Stock-Based Compensation
Stock options, performance shares, deferred stock units and restricted stock units have been granted under Edison International's long-term incentive compensation programs. For equity awards that are settled in common stock, Edison International either issues new common stock, or uses a third party to purchase shares from the market and deliver such shares for the settlement of the awards. Stock options, performance shares, deferred stock units and restricted stock units are settled in common stock. For awards that are otherwise settled entirely in common stock, Edison International substitutes cash awards to the extent necessary to satisfy applicable tax withholding obligations or government levies.
Stock-based compensation expense is recognized, net of estimated forfeitures, on a straight-line basis over the requisite service period based on estimated fair values. For equity awards paid in common stock, fair value is determined at the grant date. For equity awards that have market conditions defined in the grants, expense is recognized based on grant date fair value if the requisite service period is fulfilled. However, with respect to the portion of the performance shares payable in common stock that are subject to financial performance conditions defined in the grants, the number of performance shares expected to be earned is subject to revision and updated at each reporting period, with a related adjustment to compensation expense.
For awards granted to retirement-eligible participants, stock compensation expense is recognized on a prorated basis over the initial year. For awards granted to participants who become eligible for retirement during the requisite service period, stock compensation expense is recognized over the period between the date of grant and the date the participant first becomes eligible for retirement. Edison International and SCE estimate the number of awards that are expected to vest rather than account for forfeitures when they occur. Share-based payments may create a permanent difference between the amount of compensation expense recognized for book and tax purposes. The tax impact of this permanent difference is recognized in earnings in the period it is created. See Note 9 for further information.
Employee Stock Purchase Plan
The Edison International Employee Stock Purchase Plan ("ESPP"), effective beginning July 2021, allows eligible employees to make purchases of Edison International’s common stock. The maximum aggregate numbers of shares that may be issued under the ESPP is 3,000,000 shares. Eligible employees may authorize payroll deductions of between 1% and 10% of their compensation, up to a maximum of $25,000, to purchase shares of common stock at 97% of the market price on the last day of each six months offering period. The ESPP is considered noncompensatory and stock issuances under the ESPP are recorded directly in equity.
83
SCE Dividends
CPUC holding company rules require that SCE's dividend policy be established by SCE's Board of Directors on the same basis as if SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's electricity service obligations, shall receive first priority from the Boards of Directors of both Edison International and SCE. In addition, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders.
The common equity component of SCE's CPUC authorized capital structure is 52% on a weighted average basis over the January 1, 2023 to December 31, 2025 compliance period ("Capital Structure Compliance Period"). This is unchanged from the January 1, 2020 to December 31, 2022 compliance period. The CPUC authorized capital structure differs from the capital structure calculated based on GAAP due to certain exclusions allowed by CPUC, including the impact of SCE's contributions to the Wildfire Insurance Fund under AB 1054. For further information, see "Business—SCE—Overview of Ratemaking Process" and "Business—Southern California Wildfires."
In May 2020, the CPUC issued a decision on SCE's application to the CPUC for waiver of compliance with its equity ratio requirement, that allows SCE to exclude from its equity ratio calculations (i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. With these exclusions, SCE was in compliance with its authorized capital structure for the compliance period from January 1, 2020 to December 31, 2022. The temporary exclusion lapsed on May 7, 2022. In April 2022, SCE filed another application requesting continued waiver of compliance with its equity ratio requirement. Under the CPUC's rules, SCE will not be deemed to be in violation of the equity ratio requirement while the waiver application is pending resolution. While the exclusion is in place, SCE is required to notify the CPUC if an adverse financial event reduces SCE's spot equity ratio by more than one percent from the level most recently filed with the CPUC in the proceeding. The last spot equity ratio SCE filed with the CPUC in the proceeding did not exclude the then $1.8 billion net charge and was 45.2% as of December 31, 2018 (at the time the common equity component of SCE's CPUC authorized capital structure was required to remain at or above 48% on a weighted average basis over the applicable period). SCE's spot equity ratio on December 31, 2018 would have been 48.7% had the $1.8 billion net charge at December 31, 2018 been excluded, therefore SCE will notify the CPUC if its spot ratio drops below 47.7% in any quarter. For further information, see "Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
SCE monitors its compliance with the CPUC's equity ratio requirement based on the weighted average of the common equity component of SCE's CPUC authorized capital structure over the Capital Structure Compliance Period using its actual capital structure from the beginning of the Capital Structure Compliance Period through the reporting date together with forecasted performance and expected financing activities for the remainder of the Capital Structure Compliance Period. SCE expects to be compliant with its CPUC authorized capital structure at the end of its current compliance period, December 31, 2025.
SCE's ability to declare and pay common dividends may be restricted under the terms of its outstanding series of preference stock. For further information see Note 14.
As a California corporation, SCE's ability to pay dividends is also governed by the California General Corporation Law. California law requires that for a dividend to be declared: (a) retained earnings must equal or exceed the proposed dividend, or (b) immediately after the dividend is made, the value of the corporation's assets must exceed the value of its liabilities plus amounts required to be paid, if any, in order to liquidate stock senior to the shares receiving the dividend. Additionally, a California corporation may not declare a dividend if it is, or as a result of the dividend would be, likely to be unable to meet its liabilities as they mature. Prior to declaring dividends, SCE's Board of Directors evaluates available information, including when applicable, information pertaining to the 2017/2018 Wildfire/Mudslide Events, to ensure
84
that the California law requirements for the declarations are met. On February 23, 2023, SCE declared a dividend to Edison International of $350 million.
The timing and amount of future dividends are also dependent on a number of other factors including SCE's requirements to fund other obligations and capital expenditures, and its ability to access the capital markets and generate operating cash flows and earnings. If SCE incurs significant costs related to catastrophic wildfires and is unable to recover such costs through insurance, the Wildfire Insurance Fund (for fires after July 12, 2019), or from customers or is unable to access capital markets on reasonable terms, SCE may be limited in its ability to pay future dividends to Edison International and its preference shareholders.
Edison International Dividend
In December 2022, Edison International declared a 5% increase to the annual dividend rate from $2.80 per share to $2.95 per share. On February 23, 2023, Edison International declared a dividend of $0.7375 per share to be paid on April 30, 2023. Edison International intends to maintain its target payout ratio of 45% – 55% of SCE's core earnings.
Earnings Per Share
Edison International computes earnings per common share ("EPS") using the two-class method, which is an earnings allocation formula that determines EPS for each class of common stock and participating security. Edison International's participating securities are stock-based compensation awards, payable in common shares, which earn dividend equivalents on an equal basis with common shares once the awards are vested. See Note 9 and Note 14 for further information.
EPS attributable to Edison International common shareholders was computed as follows:
| Years ended December 31, | ||||||||
(in millions, except per-share amounts) |
| 2022 |
| 2021 |
| 2020 | |||
Basic earnings per share: |
| ||||||||
Net income attributable to common shareholders | $ | 612 | $ | 759 | $ | 739 | |||
Net income available to common shareholders | $ | 612 | $ | 759 | $ | 739 | |||
Weighted average common shares outstanding | 381 | 380 | 373 | ||||||
Basic earnings per share | $ | 1.61 | $ | 2.00 | $ | 1.98 | |||
Diluted earnings per share: |
|
| |||||||
Net income attributable to common shareholders | $ | 612 | $ | 759 | $ | 739 | |||
Net income available to common shareholders | $ | 612 | $ | 759 | $ | 739 | |||
Income impact of assumed conversions | 1 | 1 | — | ||||||
Net income available to common shareholders and assumed conversions | $ | 613 | $ | 760 | $ | 739 | |||
Weighted average common shares outstanding | 381 | 380 | 373 | ||||||
Incremental shares from assumed conversions | 2 | — | 1 | ||||||
Adjusted weighted average shares – diluted | 383 | 380 | 374 | ||||||
Diluted earnings per share | $ | 1.60 | $ | 2.00 | $ | 1.98 |
In addition to the participating securities discussed above, Edison International also may award stock options, which are payable in common shares and are included in the diluted earnings per share calculation. Stock option awards to purchase 5,839,549, 10,239,501, and 9,066,753 shares of common stock for the years ended December 31, 2022, 2021, and 2020, respectively, were outstanding, but were not included in the computation of diluted earnings per share because the effect would have been antidilutive.
Income Taxes
Edison International and SCE estimate their income taxes for each jurisdiction in which they operate. This involves estimating current period tax expense along with assessing temporary differences resulting from differing treatment of
85
items (such as depreciation) for tax and accounting purposes. These differences result in deferred tax assets and liabilities, which are included in the consolidated balance sheets.
Income tax expense includes the current tax liability from operations and the change in deferred income taxes during the year. Interest income, interest expense, and penalties associated with income taxes are generally reflected in "Income tax benefit" on the consolidated statements of income.
Edison International's eligible subsidiaries are included in Edison International's consolidated federal income tax and combined state tax returns. Edison International has tax-allocation and payment agreements with certain of its subsidiaries. Pursuant to an income tax-allocation agreement approved by the CPUC, SCE's tax liability is computed as if it filed its federal and state income tax returns on a separate return basis.
Business Acquisition
In October 2022, Edison Energy acquired 100% of Alfa Energy Ltd., an international energy and sustainability consultancy based in the United Kingdom, for total consideration of $22 million, including the estimated fair value of contingent consideration up to 14 million British pounds ($17 million U.S. dollars at December 31, 2022) that the sellers will be entitled to if certain financial thresholds are achieved after 3 years. As a result of the acquisition, Edison Energy recognized goodwill of $16 million, which is included in "Other long-term assets" on Edison International's consolidated balance sheets as of December 31, 2022.
New Accounting Guidance
Accounting Guidance Adopted
In November 2021, the Financial Accounting Standards Board ("FASB") issued an accounting standards update to require business entities that account for transactions with a government by providing additional details about the transactions and their accounting impact. Edison International and SCE have adopted this standard on January 1, 2022 using the prospective adoption approach. The adoption of this standard did not have a material impact on Edison International's and SCE's annual disclosure.
In December 2022, the FASB issued an accounting standards update to defer the original sunset date for applying the reference rate reform relief in Accounting Standards Codification ("ASC") 848 to December 31, 2024 from
December 31, 2022. Edison International and SCE have adopted the standard as of December 1, 2022 prospectively. SCE has certain preference stocks, for which the distributions will be payable at a floating rate referenced to the London Interbank Offered Rate ("LIBOR") from 2022. Upon adoption of this standard, if contract amendments are made where LIBOR is no longer valid, SCE expects to utilize the expedients in ASC 848 through the allowed period of
December 31, 2024.
86
Note 2.Property, Plant and Equipment
SCE's utility property, plant and equipment included in the consolidated balance sheets is composed of the following:
| December 31, | |||||
(in millions) |
| 2022 |
| 2021 | ||
Distribution | $ | 32,754 | $ | 30,821 | ||
Transmission |
| 18,106 |
| 17,016 | ||
Generation |
| 3,880 |
| 3,769 | ||
General plant and other |
| 6,121 |
| 6,108 | ||
Accumulated depreciation |
| (12,260) |
| (11,407) | ||
| 48,601 |
| 46,307 | |||
Construction work in progress |
| 4,551 |
| 4,067 | ||
Nuclear fuel, at amortized cost |
| 122 |
| 123 | ||
Total utility property, plant and equipment | $ | 53,274 | $ | 50,497 |
Capitalized Software Costs
SCE capitalizes costs incurred during the application development stage of internal use software projects to property, plant and equipment. SCE amortizes capitalized software costs ratably over the expected lives of the software, primarily ranging from 5 to 7 years and commencing upon operational use. Capitalized software costs, included in general plant and other above, was $2.0 billion at both December 31, 2022 and 2021, and accumulated amortization was $0.7 billion and $0.6 billion, at December 31, 2022 and 2021, respectively. Amortization expense for capitalized software was
$344 million, $311 million and $218 million in 2022, 2021 and 2020, respectively. At December 31, 2022, amortization expense is estimated to be $342 million, $309 million, $262 million, $190 million and $110 million for 2023 through 2027, respectively.
Jointly Owned Utility Projects
SCE owns undivided interests in transmission and generating assets for which each participant provides its own financing. SCE's proportionate share of these assets is reflected in the consolidated balance sheets and included in the above table. SCE's proportionate share of expenses for each project is reflected in the consolidated statements of income.
The following is SCE's investment in each asset as of December 31, 2022:
Construction | ||||||||||||||||||
| Plant in |
| Work in |
| Accumulated |
| Nuclear Fuel |
| Net Book |
| Ownership |
| ||||||
(in millions) |
| Service |
| Progress |
| Depreciation |
| (at amortized cost) |
| Value |
| Interest |
| |||||
Transmission systems: |
|
|
|
|
|
|
| |||||||||||
Eldorado | $ | 351 | $ | 107 | $ | (56) | $ | — | $ | 402 | 77 | % | ||||||
Pacific Intertie |
| 354 |
| 2 |
| (82) |
| — |
| 274 |
| 50 | % | |||||
Generating station: |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Palo Verde (nuclear) |
| 2,180 |
| 56 |
| (1,653) |
| 122 |
| 705 |
| 16 | % | |||||
Total | $ | 2,885 | $ | 165 | $ | (1,791) | $ | 122 | $ | 1,381 |
|
|
In addition to the jointly owned assets in the table above, SCE has ownership interests in jointly owned power poles with other companies.
Note 3.Variable Interest Entities
A VIE is defined as a legal entity that meets one of two conditions: (1) the equity owners do not have sufficient equity at risk, or (2) the holders of the equity investment at risk, as a group, lack any of the following three characteristics: decision-making rights, the obligation to absorb losses or the right to receive the expected residual returns of the entity. The primary beneficiary is identified as the variable interest holder that has both the power to direct the activities of the
87
VIE that most significantly impact the entity's economic performance and the obligation to absorb losses or the right to receive benefits from the entity that could potentially be significant to the VIE. The primary beneficiary is required to consolidate the VIE. Commercial and operating activities are generally the factors that most significantly impact the economic performance of such VIEs. Commercial and operating activities include construction, operation and maintenance, fuel procurement, dispatch and compliance with regulatory and contractual requirements.
Variable Interest in VIEs that are Consolidated
SCE Recovery Funding LLC is a bankruptcy remote, wholly owned special purpose subsidiary, consolidated by SCE. SCE Recovery Funding LLC is a VIE and SCE is the primary beneficiary. SCE Recovery Funding LLC was formed in 2021 for the purpose of issuing and servicing securitized bonds related to SCE's AB 1054 Excluded Capital Expenditures.
In February 2022 and 2021, SCE Recovery Funding LLC issued $533 million and $338 million of securitized bonds, respectively, and used the proceeds to acquire SCE's right, title and interest in and to non-bypassable rates and other charges to be collected from certain existing and future customers in SCE's service territory, associated with the AB 1054 Excluded Capital Expenditures ("Recovery Property"), until the bonds are paid in full and all financing costs have been recovered. The securitized bonds are secured by the Recovery Property and cash collections from the non-bypassable rates and other charges are the sole source of funds to satisfy the debt obligation. The bondholders have no recourse to SCE. For further details, see Note 5.
The following table summarizes the impact of SCE Recovery Funding LLC on SCE's and Edison International's consolidated balance sheets.
| December 31, | December 31, | |||
(in millions) | | 2022 | 2021 | ||
Other current assets | $ | 45 | $ | 19 | |
Regulatory assets: non-current | 834 | 325 | |||
Regulatory liabilities: current | 33 | 14 | |||
Current portion of long-term debt | 29 | 14 | |||
Other current liabilities | 4 | 1 | |||
Long-term debt1 |
| 809 | 314 |
1 | The bondholders have no recourse to SCE. Balance is net of unamortized debt issuance costs. |
Variable Interest in VIEs that are not Consolidated
Power Purchase Agreements
SCE has PPAs that are classified as variable interests in VIEs, including agreements through which SCE provides the natural gas to fuel the plants, fixed price contracts for renewable energy, and resource adequacy agreements that, upon the seller's election, include the purchase of energy at fixed prices. SCE has concluded that it is not the primary beneficiary of these VIEs since it does not control the commercial and operating activities of these entities. Since payments for capacity are the primary source of income, the most significant economic activity for these VIEs is the operation and maintenance of the power plants.
As of the balance sheet date, the carrying amount of assets and liabilities in SCE's consolidated balance sheet that relate to involvement with VIEs that are not consolidated result from amounts due under the PPAs. Under these contracts, SCE recovers the costs incurred through demonstration of compliance with its CPUC-approved long-term power procurement plans. SCE has no residual interest in the entities and has not provided or guaranteed any debt or equity support, liquidity arrangements, performance guarantees or other commitments associated with these contracts other than the purchase commitments described in Note 12. As a result, there is no significant potential exposure to loss to SCE from its variable
88
interest in these VIEs. The aggregate contracted capacity dedicated to SCE from these VIE projects was 3,907 megawatts ("MW") and 3,545 MW at December 31, 2022 and 2021, respectively, and the amounts that SCE paid to these projects were $608 million and $673 million for the years ended December 31, 2022 and 2021, respectively. These amounts are recoverable in customer rates, subject to reasonableness review.
Unconsolidated Trusts of SCE
SCE Trust II, Trust III, Trust IV, Trust V and Trust VI were formed in 2013, 2014, 2015, 2016 and 2017, respectively, for the exclusive purpose of issuing the 5.10%, 5.75%, 5.375%, 5.45% and 5.00% trust preference securities, respectively ("trust securities"). The trusts are VIEs. SCE has concluded that it is not the primary beneficiary of these VIEs as it does not have the obligation to absorb the expected losses or the right to receive the expected residual returns of the trusts. SCE Trust II, Trust III, Trust IV, Trust V and Trust VI issued to the public trust securities in the face amounts of $400 million, $275 million, $325 million, $300 million and $475 million (cumulative, liquidation amounts of $25 per share), respectively, and $10,000 of common stock each to SCE. The trusts invested the proceeds of these trust securities in Series G, Series H, Series J, Series K and Series L Preference Stock issued by SCE in the principal amounts of $400 million, $275 million, $325 million, $300 million and $475 million (cumulative, $2,500 per share liquidation values), respectively, which have substantially the same payment terms as the respective trust securities.
The Series G, Series H, Series J, Series K and Series L Preference Stock and the corresponding trust securities do not have a maturity date. Upon any redemption of any shares of the Series G, Series H, Series J, Series K or Series L Preference Stock, a corresponding dollar amount of trust securities will be redeemed by the applicable trust (see Note 14 for further information). The applicable trust will make distributions at the same rate and on the same dates on the applicable series of trust securities if and when the SCE board of directors declares and makes dividend payments on the related Preference Stock. The applicable trust will use any dividends it receives on the related Preference Stock to make its corresponding distributions on the applicable series of trust securities. If SCE does not make a dividend payment to any of these trusts, SCE would be prohibited from paying dividends on its common stock. SCE has fully and unconditionally guaranteed the payment of the trust securities and trust distributions, if and when SCE pays dividends on the related Preference Stock.
The Trust II, Trust III, Trust IV, Trust V and Trust VI balance sheets as of December 31, 2022 and 2021, consisted of investments of $220 million, $275 million, $325 million, $300 million and $475 million in the Series G, Series H, Series J, Series K and Series L Preference Stock, respectively, $220 million, $275 million, $325 million, $300 million and $475 million of trust securities, respectively, and $10,000 each of common stock.
The following table provides a summary of the trusts' income statements:
Years ended December 31, | |||||||||||||||
(in millions) |
| Trust II |
| Trust III |
| Trust IV |
| Trust V |
| Trust VI | |||||
2022 |
| ||||||||||||||
Dividend income | $ | 11 | $ | 16 | $ | 17 | $ | 16 | $ | 24 | |||||
Dividend distributions |
| 11 |
| 16 |
| 17 |
| 16 |
| 24 | |||||
2021 |
|
|
|
|
|
|
|
|
|
| |||||
Dividend income | $ | 20 | $ | 16 | $ | 17 | $ | 16 | $ | 24 | |||||
Dividend distributions |
| 20 |
| 16 |
| 17 |
| 16 |
| 24 | |||||
2020 |
|
|
|
|
|
|
|
|
|
| |||||
Dividend income | $ | 20 | $ | 16 | $ | 17 | $ | 16 | $ | 24 | |||||
Dividend distributions |
| 20 |
| 16 |
| 17 |
| 16 |
| 24 |
89
Note 4.Fair Value Measurements
Recurring Fair Value Measurements
Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (referred to as an "exit price"). Fair value of an asset or liability considers assumptions that market participants would use in pricing the asset or liability, including assumptions about nonperformance risk. As of December 31, 2022 and 2021, nonperformance risk was not material for Edison International and SCE.
Assets and liabilities are categorized into a three-level fair value hierarchy based on valuation inputs used to determine fair value.
Level 1 – The fair value of Edison International's and SCE's Level 1 assets and liabilities is determined using unadjusted quoted prices in active markets that are available at the measurement date for identical assets and liabilities. This level includes exchange-traded equity securities, U.S. treasury securities, mutual funds and money market funds.
Level 2 – Edison International's and SCE's Level 2 assets and liabilities include fixed income securities, primarily consisting of U.S. government and agency bonds, municipal bonds and corporate bonds, and over-the-counter derivatives. The fair value of fixed income securities is determined using a market approach by obtaining quoted prices for similar assets and liabilities in active markets and inputs that are observable, either directly or indirectly, for substantially the full term of the instrument.
The fair value of SCE's over-the-counter derivative contracts is determined using an income approach. SCE uses standard pricing models to determine the net present value of estimated future cash flows. Inputs to the pricing models include forward published or posted clearing prices from an exchange (Intercontinental Exchange) for similar instruments and discount rates. A primary price source that best represents trade activity for each market is used to develop observable forward market prices in determining the fair value of these positions. Broker quotes, prices from exchanges or comparison to executed trades are used to validate and corroborate the primary price source. These price quotations reflect mid-market prices (average of bid and ask) and are obtained from sources believed to provide the most liquid market for the commodity.
Level 3 – The fair value of SCE's Level 3 assets and liabilities is determined using the income approach through various models and techniques that require significant unobservable inputs. This level includes derivative contracts that trade infrequently such as congestion revenue rights ("CRRs"). Edison International Parent and Other does not have any Level 3 assets and liabilities.
Assumptions are made in order to value derivative contracts in which observable inputs are not available. In circumstances where fair value cannot be verified with observable market transactions, it is possible that a different valuation model could produce a materially different estimate of fair value. Modeling methodologies, inputs, and techniques are reviewed and assessed as markets continue to develop and more pricing information becomes available and the fair value is adjusted when it is concluded that a change in inputs or techniques would result in a new valuation that better reflects the fair value of those derivative contracts. See Note 6 for a discussion of derivative instruments.
90
SCE
The following table sets forth assets and liabilities of SCE that were accounted for at fair value by level within the fair value hierarchy:
| December 31, 2022 | ||||||||||||||
Netting | |||||||||||||||
and |
| ||||||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| Level 3 |
| Collateral1 |
| Total | |||||
Assets at fair value | |||||||||||||||
Derivative contracts | $ | — | 392 | 67 | (218) | $ | 241 | ||||||||
Money market funds and other |
| 647 | 22 | — | — |
| 669 | ||||||||
Nuclear decommissioning trusts: |
|
| |||||||||||||
Stocks2 |
| 1,610 | — | — | — |
| 1,610 | ||||||||
Fixed Income3 |
| 941 | 1,281 | — | — |
| 2,222 | ||||||||
Short-term investments, primarily cash equivalents |
| 137 | 64 | — | — |
| 201 | ||||||||
Subtotal of nuclear decommissioning trusts4 |
| 2,688 |
| 1,345 |
| — |
| — |
| 4,033 | |||||
Total assets |
| 3,335 |
| 1,759 |
| 67 |
| (218) |
| 4,943 | |||||
Liabilities at fair value |
|
|
|
|
|
|
|
|
|
| |||||
Derivative contracts |
| — | 116 | 4 | (119) |
| 1 | ||||||||
Total liabilities |
| — |
| 116 |
| 4 |
| (119) |
| 1 | |||||
Net assets | $ | 3,335 | $ | 1,643 | $ | 63 | $ | (99) | $ | 4,942 |
| December 31, 2021 | ||||||||||||||
Netting | |||||||||||||||
and |
| ||||||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| Level 3 |
| Collateral1 |
| Total | |||||
Assets at fair value | |||||||||||||||
Derivative contracts | $ | — | $ | 26 | $ | 49 | $ | (31) | $ | 44 | |||||
Money market funds and other |
| 230 |
| 23 |
| — |
| — |
| 253 | |||||
Nuclear decommissioning trusts: |
|
|
|
|
|
|
|
|
|
| |||||
Stocks2 |
| 1,972 |
| — |
| — |
| — |
| 1,972 | |||||
Fixed Income3 |
| 1,083 |
| 1,607 |
| — |
| — |
| 2,690 | |||||
Short-term investments, primarily cash equivalents |
| 102 |
| 125 |
| — |
| — |
| 227 | |||||
Subtotal of nuclear decommissioning trusts4 |
| 3,157 |
| 1,732 |
| — |
| — |
| 4,889 | |||||
Total assets |
| 3,387 |
| 1,781 |
| 49 |
| (31) |
| 5,186 | |||||
Liabilities at fair value |
|
|
|
|
|
|
|
|
|
| |||||
Derivative contracts |
| — |
| 42 |
| 5 |
| (47) |
| — | |||||
Total liabilities |
| — |
| 42 |
| 5 |
| (47) |
| — | |||||
Net assets | $ | 3,387 | $ | 1,739 | $ | 44 | $ | 16 | $ | 5,186 |
1 | Represents the netting of assets and liabilities under master netting agreements and cash collateral. |
2 | Approximately 74% and 75% of SCE's equity investments were in companies located in the United States at December 31, 2022 and 2021, respectively. |
3 | Includes corporate bonds, which were diversified by the inclusion of collateralized mortgage obligations and other asset backed securities of $49 million and $30 million at December 31, 2022 and 2021, respectively. |
4 | Excludes net payables of $85 million and $19 million at December 31, 2022 and 2021, respectively, which consist of interest and dividend receivables as well as receivables and payables related to SCE's pending securities sales and purchases. |
91
SCE Fair Value of Level 3
The following table sets forth a summary of changes in SCE's fair value of Level 3 net derivative assets and liabilities:
Years ended December 31, | ||||||
(in millions) | 2022 | 2021 | ||||
Fair value of net assets at beginning of period | $ | 44 | $ | 108 | ||
Sales | (8) | (2) | ||||
Settlements |
| (54) |
| (63) | ||
Total realized/unrealized gains1 |
| 81 |
| 1 | ||
Fair value of net assets at end of period | $ | 63 | $ | 44 |
1 | Due to regulatory mechanisms, SCE's realized and unrealized gains and losses are recorded as regulatory assets and liabilities. |
There were no material transfers into or out of Level 3 during 2022 and 2021.
The following table sets forth SCE's valuation techniques and significant unobservable inputs used to determine fair value for significant Level 3 assets and liabilities:
| Fair Value | Significant | Weighted | ||||||||||||
(in millions) | Valuation | Unobservable | Range | Average | |||||||||||
| Assets |
| Liabilities |
| Technique |
| Input |
| (per MWh) |
| (per MWh) | ||||
Congestion revenue rights |
|
|
|
|
|
| |||||||||
December 31, 2022 | $ | 67 | $ | 4 |
| Auction prices |
| CAISO CRR auction prices |
| $(7.91) - $3,856.67 | $ | 1.64 | |||
December 31, 2021 |
| 49 |
| 5 |
| Auction prices |
| CAISO CRR auction prices |
| (18.87) - 43.03 | 1.46 |
Level 3 Fair Value Uncertainty
For CRRs, increases or decreases in CAISO auction prices would result in higher or lower fair value, respectively.
Nuclear Decommissioning Trusts
SCE's nuclear decommissioning trust investments include equity securities, U.S. treasury securities and other fixed income securities. Equity and treasury securities are classified as Level 1 as fair value is determined by observable market prices in active or highly liquid and transparent markets. The remaining fixed income securities are classified as Level 2. The fair value of these financial instruments is based on evaluated prices that reflect significant observable market information such as reported trades, actual trade information of similar securities, benchmark yields, broker/dealer quotes, issuer spreads, bids, offers and relevant credit information. There are no securities classified as Level 3 in the nuclear decommissioning trusts.
SCE's investment policies and CPUC requirements place limitations on the types and investment grade ratings of the securities that may be held by the nuclear decommissioning trust funds. These policies restrict the trust from holding alternative investments and limit the trust funds' exposures to investments in highly illiquid markets. With respect to equity and fixed income securities, the trustee obtains prices from third-party pricing services which SCE is able to independently corroborate as described below. The trustee monitors prices supplied by pricing services, including reviewing prices against defined parameters' tolerances and performs research and resolves variances beyond the set parameters. SCE corroborates the fair values of securities by comparison to other market-based price sources obtained by SCE's investment managers. Differences outside established thresholds are followed-up with the trustee and resolved. For each reporting period, SCE reviews the trustee determined fair value hierarchy and overrides the trustee level classification when appropriate.
92
Edison International Parent and Other
Edison International Parent and Other assets measured at fair value and classified as Level 1 consisted of equity investments of $5 million and $12 million and money market funds of $137 million and $99 million at December 31, 2022 and December 31, 2021, respectively. Assets measured at fair value and classified as Level 2 consisted of short-term investments of $2 million and $6 million at December 31, 2022 and December 31, 2021, respectively.
Fair Value of Debt Recorded at Carrying Value
The carrying value and fair value of Edison International's and SCE's long-term debt (including current portion of long-term debt) are as follows:
| December 31, 2022 |
| December 31, 2021 | |||||||||
| Carrying | Fair | Carrying | Fair | ||||||||
(in millions) |
| Value1 |
| Value2 |
| Value1 |
| Value2 | ||||
Edison International | $ | 29,639 | $ | 26,824 | $ | 25,247 | $ | 27,718 | ||||
SCE |
| 26,258 |
| 23,469 |
| 22,110 |
| 24,375 |
1 Carrying value is net of debt issuance costs.
2 The fair value of Edison International's and SCE's short-term and long-term debt is classified as Level 2.
Note 5.Debt and Credit Agreements
Long-Term Debt
The following table summarizes long-term debt (rates and terms are as of December 31, 2022) of Edison International and SCE:
93
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Edison International Parent and Other: |
|
|
|
| ||
Debentures and notes: |
|
|
|
| ||
2023 – 2029 (2.95% to 6.95%) | $ | 3,400 | $ | 3,150 | ||
Current portion of long-term debt |
| (400) |
| (700) | ||
Unamortized debt discount/premium and issuance costs, net |
| (19) |
| (13) | ||
Total Edison International Parent and Other |
| 2,981 |
| 2,437 | ||
SCE: |
|
|
|
| ||
First and refunding mortgage bonds: |
|
|
|
| ||
2023 – 2052 (0.70% to 6.05%) |
| 23,900 |
| 20,314 | ||
Pollution-control bonds: |
|
| ||||
2023 – 2035 (1.45% to 2.63%) |
| 752 |
| 752 | ||
Debentures and notes: |
|
|
|
| ||
2029 – 2053 (5.06% to 6.65%) |
| 306 |
| 306 | ||
Senior secured recovery bonds1: | ||||||
2028 – 2046 (0.86% to 3.24%) | 849 | 333 | ||||
Other long-term debt2 | 600 | 518 | ||||
Current portion of long-term debt |
| (2,214) |
| (377) | ||
Unamortized debt discount/premium and issuance costs, net |
| (149) |
| (113) | ||
Total SCE |
| 24,044 |
| 21,733 | ||
Total Edison International | $ | 27,025 | $ | 24,170 |
1 | The senior secured recovery bonds are payable only from and secured by the Recovery Property at SCE Recovery Funding LLC, and do not constitute a debt or other legal obligation of, or interest in, SCE or any of its affiliates, except for SCE Recovery Funding LLC. For further details, see Note 3. |
2 | 2022 amount represents a term loan due in 2024 with an interest rate of adjusted term secured overnight financing rate ("SOFR") plus 0.90%. 2021 amount represent short-term obligations refinanced on a long-term basis subsequent to December 31, 2021. |
Edison International and SCE long-term debt maturities over the next five years are as follows:
Edison |
| |||||
(in millions) |
| International |
| SCE | ||
2023 | $ | 2,614 | $ | 2,214 | ||
2024 |
| 2,680 |
| 2,180 | ||
2025 |
| 2,030 |
| 1,230 | ||
2026 |
| 381 |
| 381 | ||
2027 |
| 1,981 |
| 1,381 |
Liens and Security Interests
Almost all of SCE's properties are subject to a trust indenture lien. SCE has pledged first and refunding mortgage bonds as collateral for borrowed funds obtained from pollution-control bonds issued by government agencies. SCE has a debt covenant that requires a debt to total capitalization ratio to be less than or equal to 0.65 to 1. At December 31, 2022, SCE's debt to total capitalization ratio was 0.56 to 1 and was in compliance with all other financial covenants that affect access to capital. Edison International Parent's credit facility requires a consolidated debt to total capitalization ratio as defined in the applicable agreements of less than or equal to 0.70 to 1. At December 31, 2022, Edison International consolidated debt to total capitalization ratio was 0.64 to 1.
Credit Agreements and Short-Term Debt
The following table summarizes the status of the credit facilities at December 31, 2022:
94
(in millions, except for rates) | ||||||||||||||||
Termination | SOFR | Outstanding | Outstanding | Amount | ||||||||||||
Borrower | date | plus (bps) |
| Commitment |
| borrowings |
| letters of credit |
| available | ||||||
Edison International Parent1, 3 | May 2026 | 128 | $ | 1,500 | $ | 90 | $ | — | $ | 1,410 | ||||||
SCE2, 3 | May 2026 | 108 | 3,350 | 195 | 431 | 2,724 | ||||||||||
Total Edison International | $ | 4,850 | $ | 285 | $ | 431 | $ | 4,134 |
1 | At December 31, 2022, Edison International Parent had $90 million outstanding commercial paper, net of discount, at a weighted-average interest rate of 4.92%. At December 31, 2021 Edison International Parent did not have any outstanding commercial paper. |
2 | At December 31, 2022 and December 31, 2021, SCE had $195 million and $601 million outstanding commercial paper, net of discount, at a weighted-average interest rate of 5.20% and 0.45%, respectively. |
3 | Proceeds are used to support commercial paper borrowings and general corporate purposes. The aggregate maximum principal amount under the SCE and Edison International Parent revolving credit facilities may be increased up to $4.0 billion and $2.0 billion, respectively, provided that additional lender commitments are obtained. |
Short-term Term Loans
As of December 31, 2022, Edison International Parent had outstanding term loans of $600 million due in April 2023 and $400 million due in November 2023, each bearing interest at either an adjusted term SOFR plus 0.70% and 0.95%, respectively, or a base rate with no applicable margin. The term loan proceeds were used for general corporate purposes.
As of December 31, 2022, SCE had a $730 million outstanding balance on its green term loan agreement due in May 2023 and bears interest at an adjusted term SOFR plus 0.55%.
Note 6.Derivative Instruments
Derivative financial instruments are used to manage exposure to commodity price risk. These risks are managed in part by entering into forward commodity transactions, including options, swaps and futures. To mitigate credit risk from counterparties in the event of nonperformance, master netting agreements are used whenever possible and counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.
Commodity Price Risk
Commodity price risk represents the potential impact that can be caused by a change in the market value of a particular commodity. SCE's electricity price exposure arises from energy purchased from and sold to wholesale markets as a result of differences between SCE's load requirements and the amount of energy delivered from its generating facilities and PPAs. SCE's natural gas price exposure arises from natural gas purchased for the Mountainview power plants, Peaker plants and Qualifying Facilities contracts where pricing is based on a monthly natural gas index and PPAs in which SCE has agreed to provide the natural gas needed for generation, referred to as tolling arrangements.
Credit and Default Risk
Credit and default risk represent the potential impact that can be caused if a counterparty were to default on its contractual obligations and SCE would be exposed to spot markets for buying replacement power or selling excess power. In addition, SCE would be exposed to the risk of non-payment of accounts receivable, primarily related to the sales of excess power and realized gains on derivative instruments.
95
Certain power and gas contracts contain master netting agreements or similar agreements, which generally allow counterparties subject to the agreement to offset amounts when certain criteria are met, such as in the event of default. The objective of netting is to reduce credit exposure. Additionally, to reduce SCE's risk exposures counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.
Certain power and gas contracts contain a provision that requires SCE to maintain an investment grade rating from the major credit rating agencies that have credit ratings for SCE, referred to as a credit-risk-related contingent feature. If SCE's credit rating were to fall below investment grade, SCE may be required to post additional collateral to cover derivative liabilities and the related outstanding payables. The net fair value of all derivative liabilities with these credit-risk-related contingent features was less than $1 million as of December 31, 2022 and 2021, for which SCE posted collateral of $24 million and no collateral to its counterparties for its derivative liabilities and related outstanding payables as of December 31, 2022, and 2021, respectively. If the credit-risk-related contingent features underlying these agreements were triggered on December 31, 2022, SCE would be required to post $58 million of collateral, most of which is related to outstanding payables.
Fair Value of Derivative Instruments
SCE presents its derivative assets and liabilities on a net basis on its consolidated balance sheets when subject to master netting agreements or similar agreements. Derivative positions are also offset against margin and cash collateral deposits. In addition, SCE has provided collateral in the form of letters of credit. Collateral requirements can vary depending upon the level of unsecured credit extended by counterparties, changes in market prices relative to contractual commitments and other factors. See Note 4 for a discussion of fair value of derivative instruments. The following table summarizes the gross and net fair values of SCE's commodity derivative instruments:
December 31, 2022 | |||||||||||||||||||||
Derivative Assets | Derivative Liabilities | ||||||||||||||||||||
(in millions) |
| Short-Term1 |
| Long-Term |
| Subtotal |
| Short-Term3 |
| Long-Term |
| Subtotal |
| Net Assets | |||||||
Commodity derivative contracts |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
Gross amounts recognized | $ | 459 | $ | — | $ | 459 | $ | 120 | $ | — | $ | 120 | $ | 339 | |||||||
Gross amounts offset in the consolidated balance sheets |
| (119) |
| — |
| (119) | (119) |
| — |
| (119) |
| — | ||||||||
Cash collateral received4 |
| (99) |
|
| (99) |
|
|
| — |
| (99) | ||||||||||
Net amounts presented in the consolidated balance sheets | $ | 241 | $ | — | $ | 241 | $ | 1 | $ | — | $ | 1 | $ | 240 |
96
December 31, 2021 | |||||||||||||||||||||
Derivative Assets | Derivative Liabilities | ||||||||||||||||||||
(in millions) |
| Short-Term1 |
| Long-Term2 |
| Subtotal |
| Short-Term |
| Long-Term |
| Subtotal |
| Net Assets | |||||||
Commodity derivative contracts |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
Gross amounts recognized | $ | 70 | $ | 6 | $ | 76 | $ | 46 | $ | 2 | $ | 48 | $ | 28 | |||||||
Gross amounts offset in the consolidated balance sheets |
| (30) |
| (2) |
| (32) |
| (30) |
| (2) |
| (32) |
| — | |||||||
Cash collateral posted4 |
| — |
| — |
| — |
| (16) |
| — |
| (16) |
| 16 | |||||||
Net amounts presented in the consolidated balance sheets | $ | 40 | $ | 4 | $ | 44 | $ | — | $ | — | $ | — | $ | 44 |
1 | Included in "Other current assets" on Edison International's and SCE's consolidated balance sheets. |
2 | Included in "Other long-term assets" on Edison International's and SCE's consolidated balance sheets. |
3 | Included in "Other current liabilities" on Edison International's and SCE's consolidated balance sheets. |
4 | At December 31, 2022, SCE received cash collateral and accrued the obligation to return cash collateral totaled $99 million, all of which was offset against derivative assets. At December 31, 2021, SCE posted $65 million of cash, of which $16 million was offset against derivative liabilities and $49 million was reflected in "Other current assets" on the consolidated balance sheets. |
Financial Statement Impact of Derivative Instruments
SCE recognizes realized gains and losses on derivative instruments as purchased power expense and expects that such gains or losses will be part of the purchased power costs recovered from customers. As a result, realized gains and losses do not affect earnings, but may temporarily affect cash flows. Due to expected future recovery from customers, unrealized gains and losses are recorded as regulatory assets and liabilities and therefore also do not affect earnings. The remaining effects of derivative activities and related regulatory offsets are reported in cash flows from operating activities in the consolidated statements of cash flows.
The following table summarizes the components of SCE's economic hedging activity:
Years ended December 31, | |||||||||
(in millions) |
| 2022 | 2021 | 2020 | |||||
Realized gains | $ | 178 | $ | 200 | $ | 87 | |||
Unrealized gains (losses) |
| 310 |
| (75) |
| 17 |
Notional Volumes of Derivative Instruments
The following table summarizes the notional volumes of derivatives used for SCE's economic hedging activities:
| Economic Hedges | |||||
Unit of | December 31, | |||||
Commodity |
| Measure |
| 2022 |
| 2021 |
Electricity options, swaps and forwards |
| GWh |
| 1,022 |
| 1,869 |
Natural gas options, swaps and forwards |
| Bcf |
| 42 |
| 58 |
Congestion revenue rights |
| GWh |
| 44,028 |
| 33,216 |
97
Note 7.Revenue
SCE's revenue is disaggregated by two revenue sources:
● | Earning activities – representing revenue authorized by the CPUC and FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue and regulatory charges or disallowances. |
● | Cost-recovery activities – representing CPUC- and FERC- authorized balancing accounts, which allow for recovery of specific project or program costs, subject to a reasonableness review or compliance with upfront standards as well as non-bypassable rates collected for SCE Recovery Funding LLC. Cost-recovery activities include rates which provide recovery, subject to a reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), certain operation and maintenance expenses, and repayment of bonds and financing costs of SCE Recovery Funding LLC. SCE earns no return on these activities. |
The following table is a summary of SCE's revenue:
2022 | 2021 | 2020 | |||||||||||||||||||||||||
Cost- | Cost- | Cost- | |||||||||||||||||||||||||
Earning | Recovery | Total | Earning | Recovery | Total | Earning | Recovery | Total | |||||||||||||||||||
(in millions) |
| Activities |
| Activities |
| Consolidated |
| Activities |
| Activities |
| Consolidated |
| Activities |
| Activities |
| Consolidated | |||||||||
Revenues from contracts with customers1,2 | $ | 8,327 | 8,433 | $ | 16,760 | $ | 7,523 |
| $ | 6,824 |
| 14,347 |
| $ | 6,920 |
| $ | 5,539 |
| $ | 12,459 | ||||||
Alternative revenue programs and other operating revenue3 |
| 681 |
| (269) |
| 412 |
| 349 |
| 178 |
| 527 |
| 548 |
| 539 |
| 1,087 | |||||||||
Total operating revenue | $ | 9,008 | $ | 8,164 | $ | 17,172 | $ | 7,872 | $ | 7,002 | $ | 14,874 | $ | 7,468 | $ | 6,078 | $ | 13,546 |
1 | SCE recorded CPUC revenue based on an annual revenue requirement set by a methodology established in the GRC proceeding and FERC revenue authorized through a formula rate. For further information, see Note 1. |
2 | At December 31, 2022 and 2021, SCE's receivables related to contracts from customers were $2.3 billion and $2.3 billion, which included accrued unbilled revenue of $638 million and $794 million, respectively. |
3 | Includes differences between amounts billed and authorized levels for both the CPUC and FERC. |
Deferred Revenue
In July 2021, Morongo Transmission LLC ("Morongo") paid SCE $400 million for the use of a portion of the West of Devers transmission line transfer capability for a period of 30 years. SCE recognized the entire proceeds as deferred revenue and is amortizing deferred revenue from the use of the transfer capability over the 30-year term on a straight-line basis resulting in revenue of $13 million per year. As of December 31, 2022, the deferred revenue was $381 million, of which $13 million and $368 million are included in "Other current liabilities" and "Other deferred credits and other long-term liabilities," respectively, on SCE's consolidated balance sheets. For the years ended December 31, 2022 and 2021, SCE has recognized revenue of $13 million and $6 million, respectively.
98
Note 8.Income Taxes
Current and Deferred Taxes
The components of income tax (benefit) expense by location of taxing jurisdiction are:
Edison International | SCE | |||||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Current: |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Federal | $ | 2 | $ | — | $ | 13 | $ | — | $ | — | $ | 12 | ||||||
State |
| 13 |
| (179) |
| (22) |
| 2 |
| (45) |
| (26) | ||||||
| 15 |
| (179) |
| (9) |
| 2 |
| (45) |
| (14) | |||||||
Deferred: |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Federal |
| (103) |
| 83 |
| (230) |
| (44) |
| 83 |
| (207) | ||||||
State |
| (74) |
| (40) |
| (66) |
| (67) |
| (21) |
| (56) | ||||||
| (177) |
| 43 |
| (296) |
| (111) |
| 62 |
| (263) | |||||||
Total | $ | (162) | $ | (136) | $ | (305) | $ | (109) | $ | 17 | $ | (277) |
The components of net accumulated deferred income tax liability are:
Edison International | SCE | |||||||||||
December 31, | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 | ||||
Deferred tax assets: |
|
|
|
|
|
|
|
| ||||
Property | $ | 859 | $ | 856 | $ | 840 | $ | 835 | ||||
Wildfire-related1 |
| 458 |
| 558 |
| 457 |
| 558 | ||||
Nuclear decommissioning trust assets in excess of nuclear ARO liability |
| 321 |
| 517 |
| 321 |
| 517 | ||||
Loss and credit carryforwards2 |
| 3,479 |
| 3,078 |
| 2,157 |
| 1,697 | ||||
Regulatory balances |
| 641 |
| 652 |
| 641 |
| 652 | ||||
Pension and postretirement benefits other than pensions, net |
| 130 |
| 153 |
| 26 |
| 30 | ||||
Leases | 406 | 543 | 406 | 543 | ||||||||
Other |
| 162 |
| 165 |
| 135 |
| 179 | ||||
Sub-total |
| 6,456 |
| 6,522 |
| 4,983 |
| 5,011 | ||||
Less: valuation allowance3 |
| 39 |
| 44 |
| — |
| 6 | ||||
Total |
| 6,417 |
| 6,478 |
| 4,983 |
| 5,005 | ||||
Deferred tax liabilities: |
|
|
|
|
|
|
| |||||
Property |
| 10,091 |
| 9,645 |
| 10,078 |
| 9,633 | ||||
Regulatory balances |
| 1,462 |
| 1,242 |
| 1,462 |
| 1,242 | ||||
Nuclear decommissioning trust assets |
| 321 |
| 517 |
| 321 |
| 517 | ||||
Leases | 406 | 543 | 406 | 543 | ||||||||
Other |
| 225 |
| 207 |
| 200 |
| 186 | ||||
Total |
| 12,505 |
| 12,154 |
| 12,467 |
| 12,121 | ||||
Accumulated deferred income tax liability, net4 | $ | 6,088 | $ | 5,676 | $ | 7,484 | $ | 7,116 |
1 | Relates to accrued estimated losses for wildfire-related claims, net of expected recoveries from insurance and FERC customers, and contributions to the Wildfire Insurance Fund. For further information, see Note 12 and Note 1. |
2 | As of December 31, 2022, unrecognized tax benefits of $310 million and $254 million for Edison International and SCE, respectively, are presented net against the deferred tax asset for the loss and tax credit carryforwards. As of December 31, 2021, the unrecognized tax benefits netted against deferred tax assets and tax credit carryforwards were $277 million and $221 million for Edison International and SCE, respectively. |
99
3 | As of December 31, 2022, Edison International has recorded a valuation allowance on deferred tax assets which are estimated to expire before being utilized. The valuation allowance for Edison International includes $35 million for non-California state net operating loss carryforwards and $4 million for California capital losses generated from sale of SoCore Energy in 2018. As of December 31, 2021, the valuation allowance on deferred tax assets which are estimated to expire before being utilized for Edison International includes $33 million for non-California state net operating loss carryforwards, $4 million for California capital losses generated from sale of SoCore Energy in 2018, and $7 million for federal and California charitable contribution carryover from 2017. Valuation allowance for SCE includes $6 million for federal and California charitable contribution carryover from 2017. |
4 | Included in "Deferred income taxes and credits" on the consolidated balance sheets. |
Net Operating Loss and Tax Credit Carryforwards
The amounts of net operating loss and tax credit carryforwards (after-tax) are as follows:
Edison International | SCE | |||||||||||
December 31, 2022 | ||||||||||||
Loss | Credit | Loss | Credit | |||||||||
(in millions) |
| Carryforwards |
| Carryforwards |
| Carryforwards |
| Carryforwards | ||||
Expire in 2023 | $ | 10 | $ | — | $ | 6 | $ | — | ||||
Expire between 2024 to 2027 |
| 26 |
| — |
| 25 |
| — | ||||
Expire between 2029 to 2042 |
| 1,670 |
| 544 |
| 870 |
| 60 | ||||
No expiration date1 |
| 1,529 |
| 10 |
| 1,450 |
| — | ||||
Total | $ | 3,235 | $ | 554 | $ | 2,351 | $ | 60 |
1 | Under the Tax Cut and Jobs Act signed into law on December 22, 2017 ("Tax Reform"), that it was an event vs. net operating losses generated after December 31, 2017 can carryforward indefinitely. |
Edison International consolidates for federal income tax purposes, but not for financial accounting purposes, a group of wind projects referred to as Capistrano Wind. The amount of net operating loss and tax credit carryforwards recognized as part of deferred income taxes includes $121 million and $223 million related to Capistrano Wind for 2022 and 2021, respectively. The change in Capistrano's carryforwards is primarily due to a sale of the Capistrano Wind projects consummated in the third quarter of 2022. The tax impact of the sale and cancellation of debt is approximately $125 million. The tax attributes not utilized as of December 31, 2022 will be available for the Edison International consolidated group to utilize in the future. When the remaining Capistrano tax attributes are used in the future by Edison International, payments will be made to those entities under a tax allocation agreement. Under the tax allocation agreement, Edison International has recorded a corresponding liability as part of other long-term liabilities related to its obligation to make payments to Capistrano Wind when these tax benefits are realized.
100
Effective Tax Rate
The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision:
| | Edison International | SCE | | |||||||||||||||
Years ended December 31, | |||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 |
| ||||||
Income from operations before income taxes | $ | 662 | $ | 789 | $ | 566 | $ | 845 | $ | 952 | $ | 665 | |||||||
Provision for income tax at federal statutory rate of 21% |
| 139 |
| 166 |
| 119 |
| 177 |
| 200 |
| 140 | |||||||
Increase (decrease) in income tax from: |
|
|
|
|
|
|
|
|
|
|
|
| |||||||
State tax, net of federal benefit |
| (70) |
| (47) |
| (61) |
| (57) |
| (33) |
| (52) | |||||||
Property-related |
| (219) |
| (233) |
| (320) |
| (219) |
| (233) |
| (320) | |||||||
Change related to uncertain tax position1 |
| — |
| (147) |
| (15) |
| — |
| (37) |
| (19) | |||||||
Wildfire related charges2 | — | 31 | — | — | 31 | — | |||||||||||||
Average rate assumption method ("ARAM") adjustment3 | — | 87 | — | — | 87 | — | |||||||||||||
Corporate-owned life insurance cash surrender value |
| (9) |
| (8) |
| (8) |
| (9) |
| (8) |
| (8) | |||||||
Other |
| (3) |
| 15 |
| (20) |
| (1) |
| 10 |
| (18) | |||||||
Total income tax (benefit) expense | $ | (162) | $ | (136) | $ | (305) | $ | (109) | $ | 17 | $ | (277) | |||||||
Effective tax rate |
| (24.5) | % |
| (17.2) | % |
| (53.9) | % |
| (12.9) | % |
| 1.8 | % |
| (41.7) | % |
1 | In 2021, Edison International and SCE recognized tax benefits related to a settlement with the California Franchise Tax Board "FTB" for tax years 2007 – 2012. See further discussion in Tax Disputes below. In 2020, Edison International and SCE recognized tax expense and benefit, respectively, primarily due to the re-measurement of uncertain tax positions related to the 2010 – 2012 California state tax filings currently under audit. |
2 | Relates to the non-tax deductible portions of the SED Agreement (as defined in Note 12). See Note 12 for further discussion under 2017/2018 Wildfire/Mudslide Events. |
3 | In July 2021, SCE received the IRS' response to its private letter ruling request, regarding the scope of the deferred tax normalization requirements and the computations required to comply with the average rate assumption method. As a result, SCE's estimate changed and a cumulative true-up of $87 million reduction in tax benefits was recorded in the third quarter of 2021, for the period of January 1, 2018 to June 30, 2021. |
The CPUC requires flow-through ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences which reverse over time. Flow-through items reduce current authorized revenue requirements in SCE's rate cases and result in a regulatory asset for recovery of deferred income taxes in future periods. The difference between the authorized amounts as determined in SCE's rate cases, adjusted for balancing and memorandum account activities, and the recorded flow-through items also result in increases or decreases in regulatory assets with a corresponding impact on the effective tax rate to the extent that recorded deferred amounts are expected to be recovered in future rates. For further information, see Note 11.
Accounting for Uncertainty in Income Taxes
Authoritative guidance related to accounting for uncertainty in income taxes requires an enterprise to recognize, in its financial statements, the best estimate of the impact of a tax position by determining if the weight of available evidence indicates it is more likely than not, based solely on the technical merits, that the position will be sustained upon examination. The guidance requires the disclosure of all unrecognized tax benefits, which includes both the reserves recorded for tax positions on filed tax returns and the unrecognized portion of affirmative claims.
101
Unrecognized Tax Benefits
The following table provides a reconciliation of unrecognized tax benefits:
Edison International | SCE | |||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Balance at January 1, | $ | 613 | $ | 679 | $ | 370 | $ | 340 | $ | 320 | $ | 282 | ||||||
Tax positions taken during the current year: |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Increases |
| 54 |
| 53 |
| 55 |
| 54 |
| 53 |
| 56 | ||||||
Tax positions taken during a prior year: |
|
|
|
|
|
|
| |||||||||||
Increases1 |
| — |
| 3 |
| 274 |
| — |
| 1 |
| 4 | ||||||
Decreases2 |
| (21) |
| (118) |
| (20) |
| (20) |
| (29) |
| (22) | ||||||
Settlements with taxing authorities3 |
| — |
| (4) |
| — |
| — |
| (5) |
| — | ||||||
Balance at December 31, | $ | 646 | $ | 613 | $ | 679 | $ | 374 | $ | 340 | $ | 320 |
1 | Edison International recorded favorable tax positions in 2020 in connection with the Edison Mission Energy bankruptcy that required a revaluation of the reserve for uncertain tax positions. |
2 | Decrease in 2021 was related to re-measurement as a result of a settlement with the FTB for tax years 2007 – 2012. |
3 | In 2021, Edison International reached a settlement with the FTB for tax years 2007 – 2012. |
As of December 31, 2022, if recognized, $341 million of unrecognized tax benefits would impact Edison International's effective tax rate and $69 million of the unrecognized tax benefits would impact SCE's effective tax rate.
Tax Disputes
Tax years that remain open for examination by the IRS and FTB are 2019 – 2021 and 2013 – 2021, respectively.
Accrued Interest and Penalties
The total amount of accrued interest and penalties related to income tax liabilities are:
Edison International | SCE | |||||||||||
December 31, | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 | ||||
Accrued interest and penalties | $ | — | $ | — | $ | 23 | $ | 20 |
The net after-tax interest and penalties recognized in income tax (benefit) expense are:
Edison International | SCE | |||||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Net after-tax interest and penalties tax (benefit) expense | $ | — | $ | (41) | $ | 4 | $ | 2 | $ | (2) | $ | 6 |
102
Note 9.Compensation and Benefit Plans
Employee Savings Plan
The 401(k) defined contribution savings plan is designed to supplement employees' retirement income. The employer contributions were as follows:
Edison | ||||||
International |
| SCE | ||||
(in millions) |
| Years ended December 31, | ||||
2022 | $ | 103 | $ | 101 | ||
2021 |
| 97 |
| 96 | ||
2020 |
| 93 |
| 92 |
Pension Plans and Postretirement Benefits Other Than Pensions
Pension Plans
Noncontributory defined benefit pension plans (some with cash balance features) cover most employees meeting minimum service requirements. Employees hired by the participating companies on or after December 31, 2017 are no longer eligible to participate in the pension plan. In lieu of that, an additional non-contributory employer contribution is deposited into the Edison 401(k) Savings Plan. SCE recognizes pension expense for its nonexecutive plan as calculated by the actuarial method used for ratemaking. The expected contributions (all by the employer) for Edison International and SCE are approximately $35 million and $8 million, respectively, for the year ending December 31, 2023. Annual contributions made by SCE to most of SCE's pension plans are anticipated to be recovered through CPUC-approved regulatory mechanisms.
The funded position of Edison International's pension is sensitive to changes in market conditions. Changes in overall interest rate levels significantly affect the company's liabilities, while assets held in the various trusts established to fund Edison International's pension are affected by movements in the equity and bond markets. Due to SCE's regulatory recovery treatment, a regulatory asset is recorded equal to the unfunded status and a regulatory liability is recorded equal to the funded status. See Note 11 for further information.
103
Information on pension plan assets and benefit obligations for continuing and discontinued operations is shown below.
Edison International | SCE |
| |||||||||||
| Years ended December 31, | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 | |||||
Change in projected benefit obligation |
|
|
|
|
|
|
|
| |||||
Projected benefit obligation at beginning of year | $ | 4,171 | $ | 4,476 | $ | 3,694 | $ | 3,984 | |||||
Service cost |
| 120 |
| 130 |
| 115 |
| 126 | |||||
Interest cost |
| 111 |
| 103 |
| 97 |
| 92 | |||||
Actuarial gain |
| (589) |
| (245) |
| (503) |
| (246) | |||||
Benefits paid |
| (289) |
| (293) |
| (244) |
| (262) | |||||
Projected benefit obligation at end of year | $ | 3,524 | $ | 4,171 | $ | 3,159 | $ | 3,694 | |||||
Change in plan assets |
|
|
|
|
|
|
|
| |||||
Fair value of plan assets at beginning of year | $ | 4,296 | $ | 4,171 | $ | 4,061 | $ | 3,940 | |||||
Actual return on plan assets |
| (575) |
| 368 |
| (544) |
| 348 | |||||
Employer contributions |
| 30 |
| 50 |
| 2 |
| 35 | |||||
Benefits paid |
| (289) |
| (293) |
| (244) |
| (262) | |||||
Fair value of plan assets at end of year |
| 3,462 |
| 4,296 |
| 3,275 |
| 4,061 | |||||
Funded status at end of year | $ | (62) | $ | 125 | $ | 116 | $ | 367 | |||||
Amounts recognized in the consolidated balance sheets consist of 1: |
|
|
|
|
|
|
|
| |||||
Long-term assets | $ | 139 | $ | 384 | $ | 128 | $ | 384 | |||||
Current liabilities |
| (26) |
| (26) |
| (2) |
| (2) | |||||
Long-term liabilities |
| (175) |
| (233) |
| (10) |
| (15) | |||||
$ | (62) | $ | 125 | $ | 116 | $ | 367 | ||||||
Amounts recognized in accumulated other comprehensive loss consist of: |
|
|
|
|
|
|
|
| |||||
Net loss1 | $ | 17 |
| 74 |
| 8 |
| 12 | |||||
Amounts recognized as a regulatory liability | | (139) |
| (395) |
| (139) |
| (395) | |||||
Accumulated benefit obligation at end of year | $ | 3,401 | $ | 3,947 | $ | 3,049 | $ | 3,491 | |||||
Pension plans with plan assets in excess of an accumulated benefit obligation: |
|
|
|
|
|
|
|
| |||||
Projected benefit obligation |
| 3,524 |
| 4,171 |
| 3,159 |
| 3,694 | |||||
Accumulated benefit obligation |
| 3,401 |
| 3,947 |
| 3,049 |
| 3,491 | |||||
Fair value of plan assets |
| 3,462 |
| 4,296 |
| 3,275 |
| 4,061 | |||||
Weighted average assumptions used to determine obligations at end of year: |
|
|
|
|
|
| |||||||
Discount rate |
| 5.36 | % |
| 2.75 | % |
| 5.36 | % |
| 2.75 | % | |
Rate of compensation increase |
| 4.00 | % |
| 4.00 | % |
| 4.00 | % |
| 4.00 | % |
1 | The SCE liability excludes a long-term payable due to Edison International Parent of $93 million and $132 million at December 31, 2022 and 2021, respectively, related to certain SCE postretirement benefit obligations transferred to Edison International Parent. SCE's accumulated other comprehensive loss of $8 million and $12 million at December 31, 2022 and 2021, excludes net losses of $3 million and $32 million related to these benefits, respectively. |
For Edison International and SCE, respectively, the 2022 actuarial gains are primarily related to $1.0 billion and $929 million in gains from an increase in the discount rate (from 2.75% as of December 31, 2021 to 5.36% as of December 31, 2022), partially offset by $456 million and $430 million in losses from economic assumption and experience. For Edison International and SCE, respectively, the 2021 actuarial gains are primarily related to $159 million and $149 million in gains from an increase in discount rate (from 2.38% as of December 31, 2020 to 2.75% as of December 31, 2021), $69 million and $83 million in gains from valuation and experience.
104
Net periodic pension expense components are:
Edison International | SCE | ||||||||||||||||
| Years ended December 31, | ||||||||||||||||
(in millions) | 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Service cost | $ | 120 | $ | 130 | $ | 121 | $ | 118 | $ | 127 | $ | 119 | |||||
Non-service cost (benefit) |
|
|
|
|
|
|
|
|
|
| |||||||
Interest cost |
| 111 |
| 103 |
| 124 |
| 101 |
| 95 |
| 114 | |||||
Expected return on plan assets |
| (227) |
| (222) |
| (215) |
| (215) |
| (211) |
| (203) | |||||
Settlement costs |
| 4 |
| — |
| — |
| 4 |
| — |
| — | |||||
Amortization of prior service cost |
| — |
| 1 |
| 2 |
| — |
| 1 |
| 1 | |||||
Amortization of net loss |
| 5 |
| 11 |
| 10 |
| 2 |
| 7 |
| 7 | |||||
Regulatory adjustment |
| 6 |
| 25 |
| 16 |
| 6 |
| 25 |
| 16 | |||||
Total non-service benefit1 |
| (101) |
| (82) |
| (63) |
| (102) |
| (83) |
| (65) | |||||
Total expense recognized | $ | 19 | $ | 48 | $ | 58 | $ | 16 | $ | 44 | $ | 54 |
1 | Included in "Other income" on Edison International's and SCE's consolidated income statements. For further details, see Note 16. |
Other changes in pension plan assets and benefit obligations recognized in other comprehensive income:
Edison International | SCE | |||||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Net (gain) loss | $ | (45) | $ | (10) | $ | 11 | $ | (24) | $ | (5) | $ | 9 | ||||||
Settlement charges |
| (4) |
| — |
| — |
| (4) |
| — |
| — | ||||||
Amortization of net loss |
| (8) |
| (11) |
| (10) |
| (5) |
| (7) |
| (7) | ||||||
Total (gain) loss recognized in other comprehensive income |
| (57) |
| (21) |
| 1 |
| (33) |
| (12) |
| 2 | ||||||
Total recognized in expense and other comprehensive income | $ | (38) | $ | 27 | $ | 59 | $ | (17) | $ | 32 | $ | 56 |
In accordance with authoritative guidance on rate-regulated enterprises, SCE records regulatory assets and liabilities instead of charges and credits to other comprehensive income for the portion of SCE's postretirement benefit plans that are recoverable in utility rates.
Edison International and SCE used the following weighted average assumptions to determine pension expense:
Years ended December 31, |
| ||||||
| 2022 |
| 2021 |
| 2020 |
| |
Discount rate |
| 2.75 | % | 2.38 | % | 3.11 | % |
Rate of compensation increase |
| 4.00 | % | 4.00 | % | 4.10 | % |
Expected long-term return on plan assets |
| 5.50 | % | 5.50 | % | 6.00 | % |
Interest crediting rate for cash balance account | |||||||
Starting rate | 3.12 | % | 3.03 | % | 3.61 | % | |
Ultimate rate | 4.50 | % | 4.50 | % | 5.00 | % | |
Year ultimate rate is reached | 2026 | 2025 | 2025 |
105
The following benefit payments, which reflect service rendered and expected future service, are expected to be paid:
Edison | ||||||
(in millions) | International |
| SCE | |||
2023 | $ | 310 | $ | 269 | ||
2024 |
| 314 |
| 274 | ||
2025 |
| 313 |
| 276 | ||
2026 |
| 321 |
| 282 | ||
2027 |
| 308 |
| 276 | ||
2028 – 2032 |
| 1,428 |
| 1,291 |
Postretirement Benefits Other Than Pensions ("PBOP(s)")
Employees hired prior to December 31, 2017 who are retiring at or after age 55 with at least 10 years of service may be eligible for postretirement healthcare benefits. Eligibility for a company contribution toward the cost of these benefits in retirement depends on a number of factors, including the employee's years of service, age, hire date, and retirement date. Employees hired on or after December 31, 2017 are no longer eligible for retiree healthcare benefits. In lieu of those benefits, Edison International will provide a health reimbursement account of $200 per month available only after meeting certain age and service year requirements. Under the terms of the Edison International Welfare Benefit Plan ("PBOP Plan"), each participating employer (Edison International or its participating subsidiaries) is responsible for the costs and expenses of PBOP Plan benefits with respect to its employees and former employees that exceed the participants' share of contributions. A participating employer may terminate the PBOP Plan benefits with respect to its employees and former employees, as may SCE (as PBOP Plan sponsor), and, accordingly, the participants' PBOP Plan benefits are not vested benefits.
The expected contributions (substantially all of which are expected to be made by SCE) for PBOP benefits are $8 million for the year ended December 31, 2023. Annual contributions related to SCE employees made to SCE plans are anticipated to be recovered through CPUC-approved regulatory mechanisms and are expected to be, at a minimum, equal to the total annual expense for these plans.
SCE has three voluntary employees' beneficiary association trusts ("VEBA Trusts") that can only be used to pay for retiree health care benefits of SCE and its subsidiaries. Once funded into the VEBA Trusts, neither SCE nor Edison International can subsequently recover remaining amounts in the VEBA Trusts. Participants of the PBOP Plan do not have a beneficial interest in the VEBA Trusts. The VEBA Trust assets are sensitive to changes in market conditions. Changes in overall interest rate levels significantly affect the company's liabilities, while assets held in the various trusts established to fund Edison International's other postretirement benefits are affected by movements in the equity and bond markets. Due to SCE's regulatory recovery treatment, the funded status is offset by a regulatory liability.
106
Information on PBOP Plan assets and benefit obligations is shown below:
Edison International | SCE |
| |||||||||||
Years ended December 31, |
| ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 |
| ||||
Change in benefit obligation |
|
|
|
|
|
|
|
| |||||
Benefit obligation at beginning of year | $ | 1,904 | $ | 2,073 | $ | 1,895 | $ | 2,064 | |||||
Service cost |
| 34 |
| 40 |
| 34 |
| 40 | |||||
Interest cost |
| 56 |
| 52 |
| 55 |
| 52 | |||||
Actuarial gain |
| (598) |
| (190) |
| (596) |
| (190) | |||||
Plan participants' contributions |
| 29 |
| 29 |
| 29 |
| 29 | |||||
Benefits paid |
| (94) |
| (100) |
| (94) |
| (100) | |||||
Benefit obligation at end of year | $ | 1,331 | $ | 1,904 | $ | 1,323 | $ | 1,895 | |||||
Change in plan assets |
|
|
|
|
|
|
|
| |||||
Fair value of plan assets at beginning of year | $ | 2,772 | $ | 2,717 | $ | 2,772 | $ | 2,717 | |||||
Actual return on assets |
| (527) |
| 119 |
| (527) |
| 119 | |||||
Employer contributions |
| 7 |
| 7 |
| 7 |
| 7 | |||||
Plan participants' contributions |
| 29 |
| 29 |
| 29 |
| 29 | |||||
Benefits paid |
| (94) |
| (100) |
| (94) |
| (100) | |||||
Fair value of plan assets at end of year |
| 2,187 |
| 2,772 |
| 2,187 |
| 2,772 | |||||
Funded status at end of year | $ | 856 | $ | 868 | $ | 864 | $ | 877 | |||||
Amounts recognized in the consolidated balance sheets consist of: |
|
|
|
|
|
|
| ||||||
Long-term assets | $ | 871 | $ | 885 | $ | 871 | $ | 885 | |||||
Current liabilities |
| (8) |
| (8) |
| (7) |
| (8) | |||||
Long-term liabilities |
| (7) |
| (9) |
| — |
| — | |||||
$ | 856 | $ | 868 | $ | 864 | $ | 877 | ||||||
Amounts recognized in accumulated other comprehensive loss consist of: |
|
|
|
|
|
|
|
| |||||
Net (gain)/loss | $ | (2) | $ | 1 | $ | — | $ | — | |||||
Amounts recognized as a regulatory liability |
| (867) |
| (886) |
| (867) |
| (886) | |||||
Weighted average assumptions used to determine obligations at end of year: |
|
|
|
|
|
|
|
| |||||
Discount rate |
| 5.43 | % |
| 2.95 | % |
| 5.43 | % |
| 2.95 | % | |
Assumed health care cost trend rates: |
|
|
|
|
| ||||||||
Rate assumed for following year |
| 6.75 | % |
| 6.25 | % |
| 6.75 | % |
| 6.25 | % | |
Ultimate rate |
| 5.00 | % |
| 5.00 | % |
| 5.00 | % |
| 5.00 | % | |
Year ultimate rate reached |
| 2029 |
| 2029 |
| 2029 |
| 2029 |
For Edison International and SCE, the 2022 actuarial gains are primarily related to $546 million and $543 million in gains from an increase in the discount rate (from 2.95% as of December 31, 2021 to 5.43% as of December 31, 2022), respectively. For both Edison International and SCE, the 2021 actuarial gains are primarily related to $113 million in gains from valuation and experience and $83 million in gains from an increase in the discount rate (from 2.67% as of December 31, 2020 to 2.95% as of December 31, 2021).
107
Net periodic PBOP expense components are:
Edison International | SCE | ||||||||||||||||
Years ended December 31, | |||||||||||||||||
(in millions) | 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Service cost | $ | 34 | $ | 40 | $ | 38 | $ | 34 | $ | 40 | $ | 37 | |||||
Non-service cost (benefit) |
|
|
|
|
|
|
|
|
|
| |||||||
Interest cost |
| 56 |
| 52 |
| 63 |
| 55 |
| 52 |
| 63 | |||||
Expected return on plan assets |
| (97) |
| (106) |
| (119) |
| (97) |
| (106) |
| (119) | |||||
Amortization of prior service cost |
| (2) |
| (1) |
| (1) |
| (2) |
| (1) |
| (1) | |||||
Amortization of net gain |
| (45) |
| (35) |
| (29) |
| (45) |
| (36) |
| (29) | |||||
Regulatory adjustment |
| 55 |
| 51 |
| 49 |
| 55 |
| 51 |
| 49 | |||||
Total non-service benefit1 |
| (33) |
| (39) |
| (37) |
| (34) |
| (40) |
| (37) | |||||
Total expense | $ | 1 | $ | 1 | $ | 1 | $ | — | $ | — | $ | — |
1 | Included in "Other income" on Edison International's and SCE's consolidated income statements. For further details, see Note 16. |
In accordance with authoritative guidance on rate-regulated enterprises, SCE records regulatory assets and liabilities instead of charges and credits to other comprehensive income (loss) for the portion of SCE's postretirement benefit plans that are recoverable in utility rates.
Edison International and SCE used the following weighted average assumptions to determine PBOP expense:
Years ended December 31, |
| ||||||
| 2022 |
| 2021 |
| 2020 |
| |
Discount rate |
| 2.95 | % | 2.67 | % | 3.32 | % |
Expected long-term return on plan assets |
| 3.50 | % | 4.00 | % | 4.90 | % |
Assumed health care cost trend rates: |
|
|
|
|
| ||
Current year |
| 6.25 | % | 6.50 | % | 6.50 | % |
Ultimate rate |
| 5.00 | % | 5.00 | % | 5.00 | % |
Year ultimate rate reached |
| 2029 |
| 2029 |
| 2029 |
The following benefit payments (net of plan participants' contributions) are expected to be paid:
Edison | ||||||
(in millions) | International |
| SCE | |||
2023 | $ | 78 | $ | 78 | ||
2024 |
| 81 |
| 80 | ||
2025 |
| 82 |
| 82 | ||
2026 |
| 84 |
| 84 | ||
2027 |
| 86 |
| 85 | ||
2028 – 2032 |
| 450 |
| 447 |
Plan Assets
Description of Pension and Postretirement Benefits Other than Pensions Investment Strategies
The investment of plan assets is overseen by a fiduciary investment committee. Plan assets are invested using a combination of asset classes and may have active and passive investment strategies within asset classes. Target allocations for 2022 pension plan assets were 19.1% for U.S. equities, 10.9% for non-U.S. equities, 55% for fixed income and 15% for opportunistic and/or alternative investments. Target allocations for 2022 PBOP plan assets (except for Represented VEBA which is 95% for fixed income and 5% for U.S. and non-U.S. equities) are 44% for U.S. and non-U.S. equities, 50% for fixed income and 6% for opportunistic and/or alternative investments. Edison International employs multiple investment management firms. Investment managers within each asset class cover a range of
108
investment styles and approaches. Risk is managed through diversification among multiple asset classes, managers, styles and securities. Plan asset classes and individual manager performances are measured against targets. Edison International also monitors the stability of its investment managers' organizations.
Allowable investment types under CPUC investment guidelines include:
● | United States equities: common and preferred stocks of large, medium, and small companies which are predominantly United States-based. |
● | Non-United States equities: equity securities issued by companies domiciled outside the United States and in depository receipts which represent ownership of securities of non-United States companies. |
● | Fixed income: fixed income securities issued or guaranteed by the United States government, non-United States governments, government agencies and instrumentalities including municipal bonds, mortgage backed securities and corporate debt obligations. A portion of the fixed income positions may be held in debt securities that are below investment grade. |
● | Opportunistic, alternative and other investments: Opportunistic investments in short to intermediate term market opportunities. Investments may have fixed income and/or equity characteristics and may be either liquid or illiquid. Alternative investments are limited partnerships that invest in non-publicly traded entities. Other investments are diversified among multiple asset classes such as global equity, fixed income currency and commodities markets. Investments are made in liquid or illiquid instruments within and across markets. The investment returns are expected to approximate the plans' expected investment returns. |
Asset class portfolio weights are permitted to range within plus or minus 5%. Where approved by the fiduciary investment committee, futures contracts are used for portfolio rebalancing and to reallocate portfolio cash positions. Where authorized, a few of the plans' investment managers employ limited use of derivatives, including futures contracts, options, options on futures and interest rate swaps in place of direct investment in securities to gain efficient exposure to markets. Derivatives are not used to leverage the plans or any portfolios.
Determination of the Expected Long-Term Rate of Return on Assets
The overall expected long-term rate of return on assets assumption is based on the long-term target asset allocation for plan assets and capital markets return forecasts for asset classes employed. A portion of the PBOP trust asset returns is subject to taxation, so the expected long-term rate of return for these assets is determined on an after-tax basis.
Capital Markets Return Forecasts
SCE's capital markets return forecast methodologies primarily use a combination of historical market data, current market conditions, proprietary forecasting expertise, complex models to develop asset class return forecasts and a building block approach. The forecasts are developed using variables such as real risk-free interest, inflation and asset class specific risk premiums. For equities, the risk premium is based on an assumed average equity risk premium of 5% over cash. The forecasted return on private equity and opportunistic investments are estimated at a 4% premium above public equity, reflecting a premium for higher volatility and lower liquidity. For fixed income, the risk premium is based on a comprehensive modeling of credit spreads.
Fair Value of Plan Assets
The PBOP Plan and the Southern California Edison Company Retirement Plan Trust assets include investments in equity securities, U.S. treasury securities, other fixed-income securities, common/collective funds, mutual funds, other investment entities, foreign exchange and interest rate contracts, and partnership/joint ventures. Equity securities, U.S. treasury securities, mutual and money market funds are classified as Level 1 as fair value is determined by observable,
109
unadjusted quoted market prices in active or highly liquid and transparent markets. The fair value of the underlying investments in equity mutual funds are based on stock-exchange prices. The fair value of the underlying investments in fixed-income mutual funds and other fixed income securities including municipal bonds are based on evaluated prices that reflect significant observable market information such as reported trades, actual trade information of similar securities, benchmark yields, broker/dealer quotes, issuer spreads, bids, offers and relevant credit information. Foreign exchange and interest rate contracts are classified as Level 2 because the values are based on observable prices but are not traded on an exchange. Futures contracts trade on an exchange and therefore are classified as Level 1. No investment is classified as Level 3 as of December 31, 2022 and 2021. Common/collective funds and partnerships are measured at fair value using the net asset value per share ("NAV") and have not been classified in the fair value hierarchy. Other investment entities are valued similarly to common/collective funds and are therefore classified as NAV. The Level 1 registered investment companies are either mutual or money market funds. The remaining funds in this category are readily redeemable and classified as NAV and are discussed further at note 8 to the pension plan trust investments table below.
Edison International reviews the process/procedures of both the pricing services and the trustee to gain an understanding of the inputs/assumptions and valuation techniques used to price each asset type/class. The trustee and Edison International's validation procedures for pension and PBOP equity and fixed income securities are the same as the nuclear decommissioning trusts. For further discussion, see Note 4. The values of Level 1 mutual and money market funds are publicly quoted. The trustees obtain the values of common/collective and other investment funds from the fund managers. The values of partnerships are based on partnership valuation statements updated for cash flows. SCE's investment managers corroborate the trustee fair values.
Pension Plan
The following table sets forth the investments for Edison International and SCE that were accounted for at fair value as of December 31, 2022 and December 31, 2021, respectively, by asset class and level within the fair value hierarchy:
| December 31, 2022 | |||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| NAV1 |
| Total | ||||
U.S. government and agency securities2 | $ | 281 | $ | 293 | $ | — | $ | 574 | ||||
Corporate stocks3 |
| 227 | 3 |
| — |
| 230 | |||||
Corporate bonds4 |
| — |
| 973 |
| — |
| 973 | ||||
Common/collective funds5 |
| — |
| — |
| 658 |
| 658 | ||||
Partnerships/joint ventures6 |
| — |
| — |
| 613 |
| 613 | ||||
Other investment entities7 |
| — |
| — |
| 63 |
| 63 | ||||
Registered investment companies8 |
| 206 |
| — |
| 159 |
| 365 | ||||
Interest-bearing cash |
| 14 |
| — |
| — |
| 14 | ||||
Other |
| — |
| 48 |
| 7 |
| 55 | ||||
Total | $ | 728 | $ | 1,317 | $ | 1,500 | $ | 3,545 | ||||
Receivables and payables, net |
| |
|
|
|
|
| (83) | ||||
Combined net plan assets available for benefits |
| |
|
|
|
|
| 3,462 | ||||
SCE's share of net plan assets | |
|
|
|
| $ | 3,275 |
110
| December 31, 2021 | |||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| NAV1 |
| Total | ||||
U.S. government and agency securities2 | $ | 217 | $ | 918 | $ | — | $ | 1,135 | ||||
Corporate stocks3 |
| 466 |
| 4 |
| — |
| 470 | ||||
Corporate bonds4 |
| — |
| 815 |
| — |
| 815 | ||||
Common/collective funds5 |
| — |
| — |
| 964 |
| 964 | ||||
Partnerships/joint ventures6 |
| — |
| — |
| 688 |
| 688 | ||||
Other investment entities7 |
| — |
| — |
| 110 |
| 110 | ||||
Registered investment companies8 |
| 57 |
| — |
| 31 |
| 88 | ||||
Interest-bearing cash |
| 8 |
| — |
| — |
| 8 | ||||
Other |
| — |
| 45 |
| — |
| 45 | ||||
Total | $ | 748 | $ | 1,782 | $ | 1,793 | $ | 4,323 | ||||
Receivables and payables, net |
| |
|
|
|
|
| (27) | ||||
Combined net plan assets available for benefits |
| |
|
|
|
|
| 4,296 | ||||
SCE's share of net plan assets | | |
|
|
|
| $ | 4,061 |
1 | These investments are measured at fair value using the net asset value per share practical expedient and have not been classified in the fair value hierarchy. The fair value amounts presented in this table are intended to permit reconciliation of the fair value hierarchy to the net plan assets available for benefits. |
2 | Level 1 U.S. government and agency securities are U.S. treasury bonds and notes. Level 2 primarily relates to the Federal National Mortgage Association and the Federal Home Loan Mortgage Corporation. |
3 | Corporate stocks are diversified. At December 31, 2022 and 2021, respectively, performance for actively managed separate accounts is primarily benchmarked against the Russell Indexes (36% and 44%) and Morgan Stanley Capital International (MSCI) index (64% and 56%). |
4 | Corporate bonds are diversified. At December 31, 2022 and 2021, respectively, this category includes $67 million and $61 million for collateralized mortgage obligations and other asset backed securities. |
5 | The common/collective assets are invested in equity index funds that seek to track performance of the Standard and Poor's 500 Index (41% at both December 31, 2022 and 2021). 10% are invested on Russell 1000 indexes at December 31, 2021. In addition, at December 31, 2022 and 2021, respectively, 46% and 38% of the assets in this category are in index funds which seek to track performance in the MSCI All Country World Index ex-US and 11% and 9% of this category are in non-index U.S. equity fund, which is actively managed. |
6 | At December 31, 2022 and 2021, respectively, 76% and 62% are invested in private equity funds with investment strategies that include branded consumer products and clean technology companies, 18% and 17% are invested in ABS including distressed mortgages and commercial and residential loans, 2% and 3% are invested in a broad range of financial assets in all global markets. 15% are invested in publicly traded fixed income securities at December 31, 2021. |
7 | At December 31, 2022, 64% are invested in domestic mortgage backed securities and 36% in high yield debt securities, respectively. At December 31, 2021, 71% are invested in emerging market equity securities and 20% in domestic mortgage backed securities, respectively. |
8 | At December 31, 2022, 56% are invested in Level 1 corporate bond fund, 21% in fixed income fund used for cash management and 22% in US equity fund, respectively. At December 31, 2021, 63% were invested in Level 1 registered investment companies that primarily consisted of a global equity mutual fund which seeks to outperform the MSCI World Total Return Index and 35% on fixed income fund used for cash management. |
At December 31, 2022 and 2021, respectively, approximately 61% and 62% of the publicly traded equity investments, including equities in the common/collective funds, were located in the United States.
111
Postretirement Benefits Other than Pensions
The following table sets forth the VEBA Trust assets for Edison International and SCE that were accounted for at fair value as of December 31, 2022 and December 31, 2021, respectively, by asset class and level within the fair value hierarchy:
| December 31, 2022 | |||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| NAV1 |
| Total | ||||
U.S. government and agency securities2 | $ | 222 | $ | 304 | $ | — | $ | 526 | ||||
Corporate stocks3 |
| 103 |
| 2 |
| — |
| 105 | ||||
Corporate notes and bonds4 |
| — |
| 860 |
| — |
| 860 | ||||
Common/collective funds5 |
| — |
| — |
| 413 |
| 413 | ||||
Partnerships6 |
| — |
| — |
| 119 |
| 119 | ||||
Registered investment companies7 |
| 55 |
| — |
| — |
| 55 | ||||
Interest bearing cash |
| — |
| 56 |
| — |
| 56 | ||||
Other8 |
| — |
| 59 |
| — |
| 59 | ||||
Total | $ | 380 | $ | 1,281 | $ | 532 | $ | 2,193 | ||||
Receivables and payables, net |
| |
|
|
|
|
| (6) | ||||
Combined net plan assets available for benefits |
| |
|
|
|
|
| 2,187 | ||||
SCE's share of net plan assets | | |
|
|
|
| $ | 2,187 |
112
| December 31, 2021 | |||||||||||
(in millions) |
| Level 1 |
| Level 2 |
| NAV1 |
| Total | ||||
U.S. government and agency securities2 | $ | 813 | $ | 10 | $ | — | $ | 823 | ||||
Corporate stocks3 |
| 145 |
| 3 |
| — |
| 148 | ||||
Corporate notes and bonds4 |
| — |
| 997 |
| — |
| 997 | ||||
Common/collective funds5 |
| — |
| — |
| 544 |
| 544 | ||||
Partnerships6 |
| — |
| — |
| 107 |
| 107 | ||||
Registered investment companies7 |
| 44 |
| — |
| — |
| 44 | ||||
Interest bearing cash |
| — |
| 51 |
| — |
| 51 | ||||
Other8 |
| — |
| 59 |
| — |
| 59 | ||||
Total | $ | 1,002 | $ | 1,120 | $ | 651 | $ | 2,773 | ||||
Receivables and payables, net |
|
|
|
|
|
|
| (1) | ||||
Combined net plan assets available for benefits |
|
|
|
|
|
| $ | 2,772 | ||||
SCE's share of net plan assets | | |
|
|
|
| $ | 2,772 |
1 | These investments are measured at fair value using the net asset value per share practical expedient and have not been classified in the fair value hierarchy. The fair value amounts presented in this table are intended to permit reconciliation of the fair value hierarchy to the net plan assets available for benefits. |
2 | Level 1 U.S. government and agency securities are U.S. treasury bonds and notes. Level 2 primarily relates to the Federal Home Loan Mortgage Corporation and the Federal National Mortgage Association. |
3 | Corporate stock performance for actively managed separate accounts is primarily benchmarked against the Russell Indexes (73%) and the MSCI All Country World Index (27%) for both 2022 and 2021. |
4 | Corporate notes and bonds are diversified and include approximately $150 million for commercial collateralized mortgage obligations and other asset backed securities at both December 31, 2022 and 2021. |
5 | At December 31, 2022 and 2021, respectively, 53% and 65% of the common/collective assets are invested in index funds which seek to track performance in the MSCI All Country World Index Investable Market Index. 27% and 25% are invested in a non-index U.S. equity fund which is actively managed. The remaining assets in this category are primarily invested in fixed income fund and emerging market fund. |
6 | At December 31, 2022 and 2021, respectively, 63% and 54% of the partnerships are invested in private equity and venture capital funds. Investment strategies for these funds include branded consumer products, clean and information technology and healthcare. Of the remaining partnerships category, 31% and 35% are invested in asset backed securities including distressed mortgages, distressed companies and commercial and residential loans and debt and equity of banks, 6% and 11% are invested in a broad range of financial assets in all global markets. |
7 | At December 31, 2022 and 2021, respectively, registered investment companies were primarily invested in a money market fund (75% and 61%) and exchange rate trade funds which seek to track performance of MSCI Emerging Market Index, Russell 2000 Index and international small cap equities (25% and 39%) |
8 | Other includes $53 million and $44 million of municipal securities at December 31, 2022 and 2021, respectively. |
At December 31, 2022 and 2021, respectively, approximately 70% and 68% of the publicly traded equity investments, including equities in the common/collective funds, were located in the United States.
Stock-Based Compensation
Edison International maintains a shareholder-approved incentive plan (the "2007 Performance Incentive Plan") that includes stock-based compensation. The maximum number of shares of Edison International's common stock authorized to be issued or transferred pursuant to awards under the 2007 Performance Incentive Plan, as amended, is approximately 71 million shares. As of December 31, 2022, Edison International had approximately 16 million shares remaining available for new award grants under its stock-based compensation plans.
113
The following table summarizes total expense and tax benefits associated with stock-based compensation:
Edison International | SCE | |||||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Stock-based compensation expense1: |
|
|
|
|
|
|
|
|
|
|
| |||||||
Stock options | $ | 13 | $ | 16 | $ | 15 | $ | 7 | $ | 8 | $ | 7 | ||||||
Performance shares |
| 13 |
| 9 |
| 5 |
| 6 |
| 4 |
| 2 | ||||||
Restricted stock units |
| 14 |
| 12 |
| 8 |
| 9 |
| 8 |
| 4 | ||||||
Other |
| 2 |
| 2 |
| 1 |
| — |
| — |
| — | ||||||
Total stock-based compensation expense | $ | 42 | $ | 39 | $ | 29 | $ | 22 | $ | 20 | $ | 13 | ||||||
Income tax benefits related to stock-based compensation expense | $ | 9 | $ | 4 | $ | 4 | $ | 5 | $ | 3 | $ | 3 |
1 | Reflected in "Operation and maintenance" on Edison International's and SCE's consolidated statements of income. |
Stock Options
Under the 2007 Performance Incentive Plan, Edison International has granted stock options at exercise prices equal to the closing price at the grant date. Edison International may grant stock options and other awards related to, or with a value derived from, its common stock to directors and certain employees. Options generally expire 10 years after the grant date and vest over a period of
or four years of continuous service in equal annual increments, except for awards granted to retirement-eligible participants, which vest on an accelerated basis.The fair value for each option granted was determined as of the grant date using the Black-Scholes option-pricing model. The Black-Scholes option-pricing model requires various assumptions noted in the following table:
Years ended December 31, | ||||||
| 2022 |
| 2021 |
| 2020 | |
Expected terms (in years) |
| 5.0 |
| 5.4 |
| 5.2 |
Risk-free interest rate |
| 1.6% - 4.1% | 1.1% - 1.3% | 0.4% - 0.6% | ||
Expected dividend yield |
| 4.0% - 5.0% | 4.1% - 4.8% | 4.2% - 5.0% | ||
Weighted average expected dividend yield |
| 4.0% | 4.5% | 4.7% | ||
Expected volatility |
| 27.8% - 28.6% | 26.9% - 27.1% | 24.9% - 26.9% | ||
Weighted average volatility |
| 27.8% | 26.9% | 25.0% |
The expected term represents the period of time for which the options are expected to be outstanding and is primarily based on historical exercise and post-vesting cancellation experience and stock price history. The risk-free interest rate for periods within the contractual life of the option is based on a zero-coupon U.S. Treasury STRIPS (separate trading of registered interest and principal of securities) whose maturity corresponds to the option's expected term on the measurement date. Expected volatility is based on the historical volatility of Edison International's common stock for the length of the option's expected term for 2022. The volatility period used was 60 months, 64 months and 63 months at December 31, 2022, 2021 and 2020, respectively.
114
The following is a summary of the status of Edison International's stock options:
Weighted Average | ||||||||||
|
|
| |
| Remaining |
| Aggregate | |||
Exercise | Contractual | Intrinsic Value | ||||||||
Shares | Price |
| Term (years) |
| (in millions) | |||||
Edison International: |
|
|
|
|
|
|
|
| ||
Outstanding at December 31, 2021 |
| 12,354,826 | $ | 62.78 |
|
|
|
| ||
Granted |
| 909,504 |
| 63.67 |
|
|
|
| ||
Forfeited or expired |
| (223,836) |
| 64.89 |
|
|
|
| ||
Exercised1 |
| (1,156,938) |
| 54.16 |
|
|
|
| ||
Outstanding at December 31, 2022 |
| 11,883,556 |
| 63.64 |
| 5.43 |
|
| ||
Vested and expected to vest at December 31, 2022 |
| 11,538,210 |
| 63.73 |
| 5.35 | $ | 30 | ||
Exercisable at December 31, 2022 |
| 8,074,165 | $ | 64.94 |
| 4.31 | $ | 17 | ||
SCE: |
|
|
|
|
|
|
|
| ||
Outstanding at December 31, 2021 |
| 6,180,154 | $ | 62.03 |
|
|
|
| ||
Granted |
| 470,852 |
| 63.51 |
|
|
|
| ||
Forfeited or expired |
| (143,235) |
| 64.83 |
|
|
|
| ||
Exercised1 |
| (810,294) |
| 53.78 |
|
|
|
| ||
Affiliate transfers, net |
| 100,155 |
| 66.09 |
|
|
|
| ||
Outstanding at December 31, 2022 |
| 5,797,632 |
| 63.31 |
| 5.45 |
|
| ||
Vested and expected to vest at December 31, 2022 |
| 5,620,440 |
| 63.40 |
| 5.38 | $ | 17 | ||
Exercisable at December 31, 2022 |
| 3,849,057 | $ | 64.64 |
| 4.28 | $ | 9 |
1 | Edison International and SCE recognized tax benefits of $5 million and $3 million, respectively, from stock options exercised in 2022. |
At December 31, 2022, total unrecognized compensation cost related to stock options and the weighted average period the cost is expected to be recognized are as follows:
| Edison International |
| SCE | |||
Unrecognized compensation cost, net of expected forfeitures (in millions) | $ | 12 | $ | 6 | ||
Weighted average period (in years) |
| 1.8 |
| 1.8 |
The following is a summary of supplemental data on stock options:
| | Edison International | SCE | |||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions, except per award amounts) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Weighted average grant date fair value per option granted | $ | 9.92 | $ | 7.26 | $ | 8.18 | $ | 9.92 | $ | 7.30 | $ | 8.16 | ||||||
Fair value of options vested |
| 8 |
| 3 |
| 2 |
| 5 |
| 3 |
| 2 | ||||||
Value of options exercised |
| 17 |
| 8 |
| 9 |
| 12 |
| 6 |
| 7 |
Performance Shares
A target number of contingent performance shares were awarded to executives in 2022, 2021 and 2020 and vest as of December 31, 2024, 2023 and 2022, respectively. The vesting of the grants is dependent upon market and financial performance and service conditions as defined in the grants for each of the years. The number of performance shares earned from each year's grants could range from zero to twice the target number (plus additional units credited as dividend equivalents).
The fair value of market condition performance shares is determined using a Monte Carlo simulation valuation model for the total shareholder return. The fair value of financial performance condition performance shares is determined (i) at
115
grant as the target number of shares (which Edison International determined to be the probable outcome) valued at the closing price on the grant date of Edison International common stock and (ii) subsequently using Edison International's earnings per share compared to pre-established targets.
The following is a summary of the status of Edison International's nonvested performance shares:
Equity Awards | |||||
| |
| Weighted Average | ||
Shares | Fair Value | ||||
Edison International: |
|
|
|
| |
Nonvested at December 31, 2021 |
| 262,808 | $ | 61.92 | |
Granted |
| 265,916 | 67.88 | ||
Forfeited |
| (17,643) | 64.68 | ||
Vested |
| (108,251) | 67.55 | ||
Nonvested at December 31, 2022 |
| 402,830 | $ | 64.22 | |
SCE: |
|
|
|
| |
Nonvested at December 31, 2021 |
| 137,807 | $ | 61.50 | |
Granted |
| 138,254 | 67.74 | ||
Forfeited |
| (12,565) | 65.60 | ||
Vested |
| (54,487) | 67.37 | ||
Affiliate transfers, net |
| 1,064 |
| 59.25 | |
Nonvested at December 31, 2022 |
| 210,073 | $ | 63.93 |
Restricted Stock Units
Restricted stock units were awarded to executives in 2022, 2021 and 2020 and vest and become payable on January 2, 2025, January 2, 2024 and January 3, 2023, respectively. Each restricted stock unit awarded includes a dividend equivalent feature and is a contractual right to receive one share of Edison International common stock, if vesting requirements are satisfied. The vesting of Edison International's restricted stock units is dependent upon continuous service through the end of the vesting period, except for awards granted to retirement-eligible participants, which vest on an accelerated basis.
The following is a summary of the status of Edison International's nonvested restricted stock units:
Edison International | SCE | |||||||||
|
| Weighted Average |
|
| Weighted Average | |||||
Grant Date | Grant Date | |||||||||
Shares |
| Fair Value | Shares |
| Fair Value | |||||
Nonvested at December 31, 2021 |
| 546,155 | $ | 59.44 |
| 344,932 | $ | 58.45 | ||
Granted |
| 298,558 | 63.58 | 218,721 | 63.58 | |||||
Forfeited |
| (24,780) | 60.42 | (19,073) | 60.37 | |||||
Vested |
| (121,751) | 62.76 | (62,034) | 62.91 | |||||
Affiliate transfers, net |
| — |
| — |
| 5,789 |
| 57.64 | ||
Nonvested at December 31, 2022 |
| 698,182 | $ | 60.60 |
| 488,335 | $ | 60.13 |
The fair value for each restricted stock unit awarded is determined as the closing price of Edison International common stock on the grant date.
116
Note 10. Investments
Nuclear Decommissioning Trusts
Future decommissioning costs related to SCE's nuclear assets are expected to be funded from independent decommissioning trusts.
The following table sets forth amortized cost and fair value of the trust investments (see Note 4 for a discussion of fair value of the trust investments):
Amortized Costs | Fair Value | |||||||||||||
Longest | December 31, | December 31, | December 31, | December 31, | ||||||||||
(in millions) | Maturity Date |
| 2022 |
| 2021 |
| 2022 |
| 2021 | |||||
Municipal bonds | 2061 |
| $ | 672 | $ | 875 | $ | 754 | $ | 1,033 | ||||
Government and agency securities |
| 2072 |
| 1,025 |
| 1,095 |
| 1,091 |
| 1,212 | ||||
Corporate bonds |
| 2070 |
| 351 |
| 386 |
| 377 |
| 446 | ||||
Short-term investments and receivables/payables1 |
| One-year |
| 110 |
| 199 |
| 116 |
| 207 | ||||
Total debt securities and other | $ | 2,158 | $ | 2,555 | 2,338 | 2,898 | ||||||||
Equity securities | |
|
| 1,610 | 1,972 | |||||||||
Total |
|
| $ | 3,948 | $ | 4,870 |
1 | Short-term investments include $41 million and $37 million of repurchase agreements payable by financial institutions which earn interest, were 97% and secured by U.S. Treasury securities and mature by January 3, 2023 and January 3, 2022 as of December 31, 2022 and 2021, respectively. |
Trust fund earnings (based on specific identification) increase the trust fund balance and the ARO regulatory liability. Unrealized holding gains, net of losses, were $1.6 billion and $2.1 billion at December 31, 2022 and 2021, respectively.
Trust assets are used to pay income taxes arising from trust investing activity. Deferred tax liabilities related to net unrealized gains were $321 million and $517 million at December 31, 2022 and 2021, respectively. Accordingly, the fair value of trust assets available to pay future decommissioning costs, net of deferred income taxes, totaled $3.6 billion and $4.4 billion at December 31, 2022 and 2021, respectively.
The following table summarizes the gains and losses for the trust investments:
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Gross realized gains | $ | 150 | $ | 339 | $ | 255 | |||
Gross realized losses |
| (127) |
| (24) |
| (6) | |||
Net unrealized (losses)/gains for equity securities |
| (369) |
| 103 |
| 176 |
Due to regulatory mechanisms, changes in assets of the trusts from income or loss items do not materially affect earnings.
Edison International Parent and Other's Investments
Edison International Parent and Other hold strategic investments in companies focused on developing electric technologies and services. As of December 31, 2022 and December 31, 2021, these investments consist of $5 million and $12 million of marketable securities, respectively, and $12 million and $3 million of equity investments without readily determinable fair values (included as "Other investments" on Edison International's consolidated balance sheets), respectively. For further information of fair value of marketable securities, see Note 4. The equity investments without readily determinable fair values balances included cumulative upward adjustments of $9 million and $1 million as of
117
December 31, 2022 and December 31, 2021, respectively. The cumulative upward adjustments resulted primarily from values determined by additional capital infusions.
The following table summarizes unrealized gains/(losses) for equity investments held at the reporting date, recorded as "Other income" on Edison International's consolidated statements of income.
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
Marketable securities | $ | (6) | $ | 3 | $ | — | |||
Equity investments without readily determinable fair values - upward adjustments |
| 8 |
| 1 |
| — | |||
Total unrealized gains | $ | 2 | | $ | 4 | | $ | — |
Note 11. Regulatory Assets and Liabilities
Included in SCE's regulatory assets and liabilities are regulatory balancing accounts. CPUC-authorized balancing account mechanisms require SCE to refund or recover any differences between forecasted and actual costs. The CPUC has authorized balancing accounts for specified costs or programs such as fuel, purchased power, demand-side management programs, wildfire related costs, nuclear decommissioning and public purpose programs. Certain of these balancing accounts include a return on rate base of 7.68% in both 2022 and 2021. The CPUC authorizes the use of a balancing account to recover from or refund to customers differences in revenue resulting from actual and forecasted electricity sales.
Amounts included in regulatory assets and liabilities are generally recorded with corresponding offsets to the applicable income statement accounts.
Regulatory Assets
SCE's regulatory assets included on the consolidated balance sheets are:
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Current: |
|
|
|
| ||
Regulatory balancing and memorandum accounts | $ | 2,400 | $ | 1,591 | ||
Power contracts |
| 71 |
| 168 | ||
Other |
| 26 |
| 19 | ||
Total current |
| 2,497 |
| 1,778 | ||
Long-term: |
|
|
|
| ||
Deferred income taxes, net of liabilities |
| 5,178 |
| 4,770 | ||
Power contracts |
| — |
| 71 | ||
Unamortized investments, net of accumulated amortization |
| 113 |
| 114 | ||
Unamortized loss on reacquired debt |
| 109 |
| 121 | ||
Regulatory balancing and memorandum accounts |
| 1,589 |
| 1,897 | ||
Environmental remediation |
| 241 |
| 242 | ||
Recovery assets | 834 | 325 | ||||
Other |
| 117 |
| 120 | ||
Total long-term |
| 8,181 |
| 7,660 | ||
Total regulatory assets | $ | 10,678 | $ | 9,438 |
In accordance with the accounting standards applicable to rate-regulated enterprises, SCE defers costs as regulatory assets that are probable of future recovery from customers and has recorded regulatory assets for these incremental costs
118
at December 31, 2022. While SCE believes such costs are probable of future recovery, there is no assurance that SCE will collect all amounts currently deferred as regulatory assets.
SCE's regulatory assets related to power contracts primarily represent derivative contracts that were designated as normal purchases and normal sales contracts. The liabilities for these power contracts are amortized over the remaining contract terms, approximately 1 to 4 years. For further information, see Note 1.
SCE's regulatory assets related to deferred income taxes represent tax benefits passed through to customers. The CPUC requires SCE to flow through certain deferred income tax benefits to customers by reducing electricity rates, thereby deferring recovery of such amounts to future periods. Based on current regulatory ratemaking and income tax laws, SCE expects to recover its regulatory assets related to deferred income taxes over the life of the assets that give rise to the accumulated deferred income taxes, approximately from 1 to 60 years. For further information, see Note 8.
SCE has long-term unamortized investments which include nuclear assets related to Palo Verde and the beyond the meter program. Nuclear assets related to Palo Verde and the beyond the meter program are expected to be recovered by 2046 and 2031, respectively, and both earned returns of 7.68% in 2022 and 2021.
SCE's net regulatory asset related to its unamortized loss on reacquired debt will be recovered over the original amortization period of the reacquired debt over periods ranging from 10 to 40 years or the life of the new issuance if the debt is refunded or refinanced.
SCE's regulatory assets related to environmental remediation represent a portion of the costs incurred at certain sites that SCE is allowed to recover through customer rates. See "Environmental Remediation" discussed in Note 12.
Recovery assets represent the balance associated with the AB 1054 Excluded Capital Expenditures Related Recovery Properties and prudently incurred financing costs securitized with issuance of the associated bond. The recovery period is until 2046, when the bonds and interest are paid in full. For further details, see Note 3.
Regulatory Liabilities
SCE's regulatory liabilities included on the consolidated balance sheets are:
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Current: |
|
|
|
| ||
Regulatory balancing and memorandum accounts | $ | 584 | $ | 553 | ||
Energy derivatives |
| 338 |
| 25 | ||
Other |
| 42 |
| 25 | ||
Total current |
| 964 |
| 603 | ||
Long-term: |
|
|
|
| ||
Costs of removal |
| 2,589 |
| 2,552 | ||
Re-measurement of deferred taxes |
| 2,250 |
| 2,315 | ||
Recoveries in excess of ARO liabilities |
| 1,231 |
| 2,155 | ||
Regulatory balancing and memorandum accounts |
| 1,116 |
| 648 | ||
Pension and other postretirement benefits |
| 1,007 |
| 1,281 | ||
Other |
| 18 |
| 30 | ||
Total long-term |
| 8,211 |
| 8,981 | ||
Total regulatory liabilities | $ | 9,175 | $ | 9,584 |
SCE's regulatory liabilities related to energy derivatives are primarily an offset to unrealized gains on derivatives.
SCE's regulatory liabilities related to costs of removal represent differences between asset removal costs recorded and amounts collected in rates for those costs.
119
SCE's regulatory liabilities include excess deferred income taxes resulting from statutory income tax rate changes. The regulatory liabilities are generally expected to be refunded to customers over the lives of the assets and liabilities that gave rise to the deferred income taxes.
SCE's regulatory liabilities related to recoveries in excess of ARO liabilities represents the cumulative differences between ARO expenses and amounts collected in rates primarily for the decommissioning of the SCE's nuclear generation facilities. Decommissioning costs recovered through rates are primarily placed in nuclear decommissioning trusts. This regulatory liability also represents the deferral of realized and unrealized gains and losses on the nuclear decommissioning trust investments. See Note 10 for further discussion.
SCE's regulatory liabilities related to pension and other post-retirement plans represent the overfunded net gains and prior service costs of the plans. This amount will be refunded through rates over time to customers. See "Pension Plans and Postretirement Benefits Other than Pensions" discussion in Note 9.
Net Regulatory Balancing and Memorandum Accounts
Balancing accounts track amounts that the CPUC or FERC have authorized for recovery. Balancing account over and under collections represent differences between cash collected in current rates for specified forecasted costs and such costs that are actually incurred. Undercollections are recorded as regulatory balancing account assets. Overcollections are recorded as regulatory balancing account liabilities. With some exceptions, SCE seeks to adjust rates on an annual basis or at other designated times to recover or refund the balances recorded in its balancing accounts. Memorandum accounts are authorized to track costs for potential future recovery.
Regulatory balancing and memorandum accounts that SCE does not expect to collect or refund in the next 12 months are reflected in the long-term section of the consolidated balance sheets. Regulatory balancing and memorandum accounts that do not have the right of offset are presented gross in the consolidated balance sheets. Under and over collections in balancing accounts and amounts recorded in memorandum accounts typically accrue interest based on a three-month commercial paper rate published by the Federal Reserve.
120
The following table summarizes the significant components of regulatory balancing and memorandum accounts included in the above tables of regulatory assets and liabilities:
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Asset (liability) |
|
|
|
| ||
Energy resource recovery account | $ | 1,580 | $ | 759 | ||
Portfolio allocation balancing account |
| (73) |
| (183) | ||
New system generation balancing account |
| (63) |
| 73 | ||
Public purpose programs and energy efficiency programs |
| (1,577) |
| (1,066) | ||
Base revenue requirement balancing account |
| 1,108 |
| 849 | ||
GRC wildfire mitigation balancing accounts1 | 67 | 12 | ||||
Greenhouse gas auction revenue and low carbon fuel standard revenue |
| (289) |
| (298) | ||
FERC balancing accounts |
| (123) |
| 55 | ||
Wildfire and drought restoration accounts2 |
| 352 |
| 299 | ||
Wildfire-related memorandum accounts3 | 1,168 | 1,456 | ||||
COVID-19-related memorandum accounts | 67 | 94 | ||||
Customer service re-platform memorandum account | 64 | 128 | ||||
Tax accounting memorandum account and pole loading balancing account | 90 | 171 | ||||
Excess bond and power charge balancing account | (56) | — | ||||
Other |
| (26) |
| (62) | ||
Asset | $ | 2,289 | $ | 2,287 |
1 | The 2021 GRC decision approved the establishment of the vegetation management balancing account ("VMBA") to track vegetation management expenses up to 115% of amounts authorized, the Wildfire Risk Mitigation balancing account ("WRMBA") to track the costs of SCE's Wildfire Covered Conductor Program up to 110% of amounts authorized and the risk management balancing account to track the authorized costs of wildfire insurance. The amount recorded to these balancing accounts represents the difference between costs tracked in the balancing accounts and authorized revenues for those costs recorded to the base revenue requirement balancing account. If spending is less than authorized, SCE will refund those amounts to customers. If spending is within the specified threshold, if any, for each balancing account, SCE will recover those costs from customers. Amounts above the specified threshold, or above amounts authorized if a higher threshold was not established, for each balancing account may be eligible for deferral to wildfire-related memorandum accounts. |
2 | The wildfire and drought restoration accounts regulatory assets represent restoration costs that are recorded in a Catastrophic Event Memorandum Account ("CEMA"). |
3 | The wildfire-related memorandum accounts regulatory assets represent wildfire-related costs that are probable of future recovery from customers, subject to a reasonableness review. The Fire Hazard Prevention Memorandum Account ("FHPMA") was used to track costs related to fire safety and to implement fire prevention corrective action measures in extreme and very high fire threat areas. The Wildfire Expense Memorandum Account ("WEMA") is used to track incremental wildfire insurance costs and uninsured wildfire-related financing, legal and claims costs related to the post-2018 wildfires that SCE believes are probable of recovery. See Note 12 for further details. The Wildfire Mitigation Plan Memorandum Account ("WMPMA") is used to track costs incurred to implement SCE's wildfire mitigation plan that are not currently reflected in SCE's revenue requirements. The Fire Risk Mitigation Memorandum Account ("FRMMA") is used to track costs related to the reduction of fire risk that are incremental to costs approved for recovery in SCE's GRCs that are not tracked in any other wildfire-related memorandum account. The balance also includes vegetation management spending in excess of the 115% threshold for the VMBA described above. |
Note 12. Commitments and Contingencies
Power Purchase Agreements
SCE entered into various agreements to purchase power, electric capacity and other energy products. At December 31, 2022, the undiscounted future expected minimum payments for the SCE PPAs (primarily related to renewable energy
121
contracts), which were approved by the CPUC and met other critical contract provisions (including completion of major milestones for construction), were as follows:
(in millions) |
| Total | |
2023 | $ | 3,106 | |
2024 |
| 2,596 | |
2025 |
| 2,409 | |
2026 |
| 2,401 | |
2027 |
| 2,221 | |
Thereafter |
| 18,000 | |
Total future commitments1 | $ | 30,733 |
1 | Certain power purchase agreements are treated as operating leases. For further discussion, see Note 13. |
Additionally, as of December 31, 2022, SCE has executed contracts (including capacity reduction contracts) that have not met the critical contract provisions that would increase contractual obligations by $29 million in 2023, $123 million in 2024, $171 million in 2025, $182 million in 2026, $186 million in 2027 and $1,864 million thereafter, if all critical contract provisions are completed. These obligations include long-term lease contracts commencing in 2023 with total future minimum lease payments of $393 million.
Costs incurred for PPAs were $5.1 billion in 2022, $4.7 billion in 2021 and $3.8 billion in 2020, which include costs associated with contracts with terms of less than one year.
Other Commitments
The following summarizes the estimated minimum future commitments for SCE's other commitments:
(in millions) |
| 2023 |
| 2024 |
| 2025 |
| 2026 |
| 2027 |
| Thereafter |
| Total | |||||||
Other contractual obligations | $ | 46 | $ | 52 | $ | 50 | $ | 46 | $ | 35 | $ | 203 | $ | 432 |
Costs incurred for other commitments were $58 million in 2022, $62 million in 2021 and $80 million in 2020. Other commitments include fuel supply contracts for Palo Verde which require payment only if the fuel is made available for purchase. Also included are commitments related to maintaining reliability and expanding SCE's transmission and distribution system.
The table above does not include asset retirement obligations, which are discussed in Note 1.
Indemnities
Edison International and SCE have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business.
Edison International and SCE have agreed to provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, indemnities for specified environmental liabilities and income taxes with respect to assets sold or other contractual arrangements. Edison International's and SCE's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International and SCE may have recourse against third parties. Edison International and SCE have not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.
122
Contingencies
In addition to the matters disclosed in these Notes, Edison International and SCE are involved in other legal, tax, and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International and SCE believe the outcome of each of these other proceedings will not materially affect its financial position, results of operations and cash flows.
Southern California Wildfires and Mudslides
California has experienced unprecedented weather conditions in recent years due to climate change and wildfires in SCE's territory, including those where SCE's equipment may be alleged to be associated with the fire's ignition, have caused loss of life and substantial damage in recent years. SCE's service territory remains susceptible to additional wildfire activity.
Numerous claims related to wildfire events have been initiated against SCE and Edison International. Edison International and SCE have incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events (defined below), which are described below. In addition, SCE's equipment has been, and may further be, alleged to be associated with wildfires that have originated in Southern California subsequent to 2018.
Liability Overview
The extent of legal liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether the utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be required to show negligence in addition to causation. California courts have previously found utilities to be strictly liable for property damage along with associated interest and attorneys' fees, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. If inverse condemnation is held to be inapplicable to SCE in connection with a wildfire, SCE still could be held liable for property damages and associated interest if the property damages were found to have been proximately caused by SCE's negligence. If SCE were to be found negligent, SCE could also be held liable for, among other things, fire suppression costs, business interruption losses, evacuation costs, clean-up costs, medical expenses, and personal injury/wrongful death claims. Additionally, SCE could potentially be subject to fines and penalties for alleged violations of CPUC rules and state laws investigated in connection with the ignition of a wildfire.
Final determinations of legal liability for wildfire events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes and settlements may be reached before determinations of legal liability are ever made. Even when investigations are still pending or legal liability is disputed, an assessment of likely outcomes, including through future settlement of disputed claims, may require estimated losses to be accrued under accounting standards. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged.
123
2017/2018 Wildfire/Mudslide Events
Wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The investigating government agencies, the Ventura County Fire Department ("VCFD") and California Department of Forestry and Fire Protection ("CAL FIRE"), have determined that the largest of the 2017 fires in SCE's territory originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by a second fire that originated near Koenigstein Road in the City of Santa Paula (the "Koenigstein Fire"). The December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. According to CAL FIRE, the Thomas and Koenigstein Fires, collectively, burned over 280,000 acres, destroyed or damaged an estimated 1,343 structures and resulted in two confirmed fatalities. The largest of the November 2018 fires in SCE's territory, known as the "Woolsey Fire," originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties. According to CAL FIRE, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three confirmed fatalities. Four additional fatalities are alleged to have been associated with the Woolsey Fire.
As described below, multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by debris flows and flooding in Montecito and surrounding areas in January 2018 (the "Montecito Mudslides") based on a theory alleging that SCE has responsibility for the Thomas and/or Koenigstein Fires and further alleging that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in 21 confirmed fatalities, with two additional fatalities presumed. One of the presumed fatalities has been confirmed.
The Thomas Fire, the Koenigstein Fire, the Montecito Mudslides (defined below) and the Woolsey Fire are each referred to as a "2017/2018 Wildfire/Mudslide Event," and, collectively, referred to as the "2017/2018 Wildfire/Mudslide Events."
In 2022, SCE accrued estimated losses of $1.3 billion for claims related to the 2017/2018 Wildfire/Mudslide Events, against which SCE has recorded expected recoveries through FERC electric rates of $76 million. The resulting net charge to earnings was $1.2 billion ($879 million after-tax).
As of December 31, 2022, SCE had paid $7.6 billion under executed settlements, had $185 million to be paid under executed settlements, including $120 million to be paid under the SED Agreement (as defined below), and had $934 million of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, SCE had assets for expected recoveries through FERC electric rates of $142 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events.
The estimated losses for the 2017/2018 Wildfire/Mudslide Events do not include an estimate of potential losses related to certain alleged and potential claims made by the California Governor's Office of Emergency Service ("Cal OES") seeking recovery on behalf of itself and 30 state and local government entities that did not pursue their own suits against SCE, but sustained damage in the 2017/2018 Wildfire/Mudslide Events and received funding through the Federal Emergency Management Agency ("FEMA") that was dispersed by the Cal OES. As of the filing of this report SCE has not concluded that losses related to FEMA funds disbursed by Cal OES are probable.
Edison International and SCE may incur a material loss in excess of amounts accrued in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Due to the number of uncertainties and
124
possible outcomes related to the 2017/2018 Wildfire/Mudslide Events litigation, Edison International and SCE cannot estimate the upper end of the range of reasonably possible losses that may be incurred.
Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged. For instance, SCE will receive additional information with respect to damages claimed as the claims mediation processes progress. Other factors that can cause actual losses incurred to be higher or lower than estimated include the ability to reach settlements and the outcomes of settlements reached through the ongoing claims mediation processes, uncertainties related to the sufficiency of insurance held by plaintiffs, uncertainties related to the litigation processes, including whether plaintiffs will ultimately pursue claims, uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements.
The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. SCE will seek rate recovery of prudently incurred losses and related costs realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance, other than for any obligations under the SED Agreement (as defined below). See "Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates" below for additional information.
External Investigations and Internal Review
The VCFD and CAL FIRE have jointly issued reports concerning their findings regarding the causes of the Thomas Fire and the Koenigstein Fire. The reports did not address the causes of the Montecito Mudslides. SCE has also received a non-final redacted draft of a report from the VCFD regarding Woolsey Fire (the "Redacted Woolsey Report"). SCE cannot predict when the VCFD will release its final report regarding the Woolsey Fire. The VCFD and CAL FIRE findings do not determine legal causation of or assign legal liability for the Thomas, Koenigstein or Woolsey Fires; final determinations of legal causation and liability would only be made during lengthy and complex litigation.
The CPUC's Safety and Enforcement Division ("SED") conducted investigations to assess SCE's compliance with applicable rules and regulations in areas impacted by the Thomas, Koenigstein and Woolsey Fires. As discussed below, in October 2021, SCE and the SED executed the SED Agreement (as defined below) to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events.
The California Attorney General's Office has completed its investigation of the Thomas Fire and the Woolsey Fire without pursuing criminal charges.
SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is complex and time consuming. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation processes.
Thomas Fire
On March 13, 2019, the VCFD and CAL FIRE jointly issued a report concluding, after ruling out other possible causes, that the Thomas Fire was started by SCE power lines coming into contact during high winds, resulting in molten metal falling to the ground. However, the report does not state that their investigation found molten metal on the ground. At this time, based on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the report's indicated start time, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's
125
system and at least 15 minutes prior to the start time indicated in the report. SCE is continuing to assess the extent of damages that may be attributable to the Thomas Fire.
Koenigstein Fire
On March 20, 2019, the VCFD and CAL FIRE jointly issued a report finding that the Koenigstein Fire was caused when an energized SCE electrical wire separated and fell to the ground along with molten metal particles and ignited the dry vegetation below. SCE believes that its equipment was associated with the ignition of the Koenigstein Fire. SCE is continuing to assess the extent of damages that may be attributable to the Koenigstein Fire.
Montecito Mudslides
SCE's internal review includes inquiry into whether the Thomas and/or Koenigstein Fires proximately caused or contributed to the Montecito Mudslides, whether, and to what extent, the Thomas and/or Koenigstein Fires were responsible for the damages in the Montecito area and other factors that potentially contributed to the losses that resulted from the Montecito Mudslides. Many other factors, including, but not limited to, weather conditions and insufficiently or improperly designed and maintained debris basins, roads, bridges and other channel crossings, could have proximately caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides.
At this time, based on available information, SCE has not been able to determine whether the Thomas Fire or the Koenigstein Fire, or both, were responsible for the damages in the Montecito area. In the event that SCE is determined to have caused the fire that spread to the Montecito area, SCE cannot predict whether, if fully litigated, the courts would conclude that the Montecito Mudslides were caused or contributed to by the Thomas and/or Koenigstein Fires or that SCE would be liable for some or all of the damages caused by the Montecito Mudslides.
Woolsey Fire
SCE's internal review into the facts and circumstances of the Woolsey Fire is ongoing. SCE has reported to the CPUC that there was an outage on SCE's electric system in the vicinity of where the Woolsey Fire reportedly began on November 8, 2018. SCE is aware of witnesses who saw fire in the vicinity of SCE's equipment at the time the fire was first reported. While SCE did not find evidence of downed electrical wires on the ground in the suspected area of origin, it observed a pole support wire in proximity to an electrical wire that was energized prior to the outage.
The Redacted Woolsey Report states that the VCFD investigation team determined that electrical equipment owned and operated by SCE was the cause of the Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment was associated with the ignition of the Woolsey Fire. SCE expects to obtain and review additional information and materials in the possession of CAL FIRE and others during the course of its internal review and the Woolsey Fire litigation process, including SCE equipment that has been retained by CAL FIRE.
Litigation
Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.
On October 4, 2018, the Los Angeles Superior Court denied Edison International's and SCE's challenge to the application of inverse condemnation to SCE with respect to the Thomas and Koenigstein Fires and, on February 26, 2019, the California Supreme Court denied SCE's petition to review the Superior Court's decision. In April 2022, following a stipulated judgment entered against SCE in the TKM litigation, SCE filed an appeal related to inverse condemnation in the California Court of Appeal.
126
In January 2019, SCE filed a cross-complaint against certain local public entities alleging that failures by these entities, such as failure to adequately plan for flood hazards and build and maintain adequate debris basins, roads, bridges and other channel crossings, among other things, caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. These cross-claims in the Montecito Mudslides litigation were not released as part of the Local Public Entity Settlements (as defined below).
Settlements
In the fourth quarter of 2019, SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Wildfire/Mudslide Events (the "Local Public Entity Settlements").
In the third quarter of 2020, Edison International and SCE entered into an agreement (the "TKM Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation (the "TKM Subrogation Plaintiffs") collective claims arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides have been resolved. Under the TKM Subrogation Settlement, SCE paid the TKM Subrogation Plaintiffs an aggregate of $1.2 billion in October 2020 and also agreed to pay $0.555 for each dollar in claims to be paid by the TKM Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.
In January 2021, Edison International and SCE entered into an agreement (the "Woolsey Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Woolsey Fire litigation (the "Woolsey Subrogation Plaintiffs") collective claims arising from the Woolsey Fire have been resolved. Under the Woolsey Subrogation Settlement, SCE paid the Woolsey Subrogation Plaintiffs an aggregate of $2.2 billion in March and April 2021. SCE has also agreed to pay $0.67 for each dollar in claims to be paid by the Woolsey Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.
As of December 31, 2022, SCE has also entered into settlements with approximately 9,500 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In 2020, 2021 and 2022, SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $300 million, $1.7 billion and $1.7 billion, respectively, to those individual plaintiffs. In the first, second, third and fourth quarters of 2022 SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $700 million, $400 million, $350 million and $280 million, respectively, to those individual plaintiffs. The statutes of limitations for individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events have expired.
Edison International and SCE did not admit wrongdoing or liability as part of any of the settlements described above. Other claims and potential claims related to the 2017/2018 Wildfire/Mudslide Events remain. SCE continues to explore reasonable settlement opportunities with other plaintiffs in the outstanding 2017/2018 Wildfire/Mudslide Events litigation.
SED Agreement
In October 2021, SCE and the SED executed an agreement (the "SED Agreement") to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events and three other 2017 wildfires for, among other things, aggregate costs of $550 million. The $550 million in costs comprised of a $110 million fine to be paid to the State of California General Fund, $65 million of shareholder-funded safety measures, and an agreement by SCE to waive its right to seek cost recovery in CPUC-jurisdictional rates for $375 million of third-party uninsured claims payments. The SED Agreement provides that SCE may, on a permanent basis, exclude from its ratemaking capital structure any after-tax charges to equity or debt borrowed to finance costs incurred under the SED Agreement. The SED Agreement also imposes other obligations on SCE, including reporting requirements and safety-focused studies. SCE's obligations under the SED
127
Agreement commenced on August 15, 2022, when CPUC approval of the SED Agreement became final and non-appealable. SCE did not admit imprudence, negligence or liability with respect to the 2017/2018 Wildfire/Mudslide Events in the SED Agreement.
Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates
At December 31, 2022 and December 31, 2021, Edison International's and SCE's balance sheets include fixed payments to be made under executed settlement agreements and accrued estimated losses of $1.1 billion and $1.7 billion, respectively, for the 2017/2018 Wildfire/Mudslide Events. The following table presents changes in estimated losses since December 31, 2021:
(in millions) |
| ||
Balance at December 31, 20211 | $ | 1,734 | |
Increase in accrued estimated losses |
| 1,296 | |
Amounts paid |
| (1,911) | |
Balance at December 31, 20222 | $ | 1,119 |
1 | At December 31, 2021, $131 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At December 31, 2021, the $1,733 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International's and SCE's best estimate of expected losses for the 2017/2018 Wildfire/Mudslide Events of $1,603 million and other wildfire-related claims estimates of $130 million. |
2 | At December 31, 2022, $121 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of $65 million of settlements executed and $56 million of a short term payables under the SED Agreement in connection with the 2017/2018 Wildfire/Mudslide Events. At December 31, 2022, the $1,687 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events of $934 million, $64 million of a long term payables under the SED Agreement and other wildfire-related claims estimates of $689 million. |
For the years-ended December 31, 2022 and 2021, Edison International’s and SCE’s income statements include charges for the estimated losses, net of expected recoveries from insurance and FERC customers, related to the 2017/2018 Wildfire/Mudslide Events as follows:
Years ended December 31, | |||||||
(in millions) |
| 2022 |
| 2021 | |||
Charge for wildfire-related claims | $ | 1,296 | $ | 1,265 | |||
Expected revenue from FERC customers |
| (76) |
| (67) | |||
Total pre-tax charge |
| 1,220 |
| 1,198 | |||
Income tax benefit |
| (341) |
| (304) | |||
Total after-tax charge | $ | 879 | $ | 894 |
For events that occurred in 2017 and early 2018, principally the Thomas and Koenigstein Fires and Montecito Mudslides, SCE had $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. For the Woolsey Fire, SCE had an additional $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence.
In total, through December 31, 2022, SCE has accrued estimated losses of $8.8 billion, has paid or is obligated to pay approximately $7.8 billion in settlements, including $120 million to be paid under the SED Agreement, and has recovered $2.0 billion from its insurance carriers in relation to the 2017/2018 Wildfire/Mudslide Events.
128
Recovery of SCE's losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent in which a California investor-owned utility has sought recovery for uninsured wildfire-related costs is San Diego Gas & Electric's ("SDG&E") requests for cost recovery related to 2007 wildfire activity, where the FERC allowed recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that SDG&E did not meet the CPUC's prudency standard. As a result, while SCE does not agree with the CPUC's decision, it believes that the CPUC's interpretation and application of the prudency standard to SDG&E creates substantial uncertainty regarding how that standard will be applied to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. SCE will continue to evaluate the probability of recovery based on available evidence, including judicial, legislative and regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard when making determinations regarding recovery of uninsured wildfire-related costs. While the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates. SCE would record a regulatory asset at the time it obtains sufficient information to support a conclusion that recovery is probable.
Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded total expected recoveries of $376 million within the FERC balancing account. This was the FERC portion of the total estimated losses accrued. As of December 31, 2022, collections have reduced the regulatory assets remaining in the FERC balancing account to $142 million.
In July 2019, SCE filed a CEMA application with the CPUC to seek recovery of, among other things, approximately $60 million of capital expenditures and capital related expenses incurred to restore service to customers and to repair, replace and restore buildings and SCE's facilities damaged or destroyed as a result of six 2017 fires, primarily the Thomas and Koenigstein Fires. In August 2021, the CPUC issued a final decision which denied without prejudice SCE's application to recover a revenue requirement of $8 million for all six 2017 wildfires on the basis that SCE did not demonstrate that it was prudent in relation to the Thomas and Rye fires and had failed to segregate the costs attributable to the other four fires. Of the $8 million revenue requirement that was denied, $6 million was for the Thomas and Rye fires. CAL FIRE has determined that the Thomas and Rye fires were caused by SCE equipment. The decision allows SCE to submit additional applications with the CPUC to recover the costs associated with the Thomas and Rye fires, does not specify a deadline for any such applications, and directs that SCE must prove it was prudent in relation to the Thomas and/or Rye fires, as applicable, in any such future applications. As required by the final decision with respect to the other four fires, SCE filed supplemental testimony in November 2021 segregating the restoration costs attributable to each such fire. In June 2022, the CPUC approved SCE's entire request with respect to the other four fires. As of December 31, 2022, SCE has $177 million in assets recorded in property, plant and equipment in relation to restoration costs related to the 2017/2018 Wildfire/Mudslide Events which may not be recoverable. These assets would be impaired if the restoration costs are permanently disallowed by the CPUC in future cost recovery proceedings. SCE expects to seek to recover costs incurred for reconstructing its system and restoring service to structures that were damaged or destroyed by the Thomas, Koenigstein and Woolsey Fires in future applications with the CPUC.
Post-2018 Wildfires
Several wildfires have significantly impacted portions of SCE's service territory after 2018 (the wildfires that originated in Southern California after 2018 where SCE's equipment may be alleged to be associated with the fire's ignition are referred to collectively as the "Post-2018 Wildfires").
129
In 2022, SCE accrued estimated losses of $572 million for claims related to the Post-2018 Wildfires, against which SCE has recorded expected recoveries from insurance of $399 million and expected recoveries through electric rates of $162 million. The resulting net charge to earnings was $11 million ($8 million after-tax).
Through December 31, 2022, SCE has recorded total estimated losses (established at the lower end of the estimated range of reasonably possible losses) of $696 million, and expected recoveries from insurance of $473 million and expected recoveries through electric rates of $166 million related to the Post-2018 Wildfires. The after-tax net charges to earnings recorded through December 31, 2022 have been $41 million. Expected recoveries from insurance recorded for the Post-2018 Wildfires are supported by SCE’s insurance coverage for multiple policy years.
As of December 31, 2022, SCE had paid $13 million under executed settlements related to the Post-2018 Wildfires. After giving effect to all payment obligations under settlements entered into through December 31, 2022, Edison International's and SCE's estimated losses (established at the lower end of the estimated range of reasonably possible losses) for remaining alleged and potential claims related to the Post-2018 Wildfires was $682 million. As of the same date, SCE had assets for expected recoveries through insurance of $473 million and through electric rates of $166 million on their consolidated balance sheets related to the Post-2018 Wildfires.
Expected recoveries from insurance recorded for the Post-2018 Wildfires are supported by SCE's insurance coverage for multiple policy years. While Edison International and SCE may incur material losses in excess of the amounts accrued for certain of the Post-2018 Wildfires, Edison International and SCE expect that any losses incurred in connection with any such fire will be covered by insurance, subject to self-insured retentions and co-insurance, and expect that any such losses after expected recoveries from insurance and through electric rates will not be material.
2019 Saddle Ridge Fire
The "Saddle Ridge Fire," originated in Los Angeles County in October 2019 and burned approximately 9,000 acres, destroyed an estimated 19 structures, damaged an estimated 88 structures, and resulted in one fatality and injuries to 8 fire fighters. In an unsigned and undated report that SCE received in December 2022, the Los Angeles Fire Department stated with respect to the Saddle Ridge Fire that the cause of ignition was unintentional, the form of heat was undetermined, the item first ignited was undetermined and the material type first ignited was undetermined. The Los Angeles Fire Department report noted that no other competent ignition sources other than SCE’s transmission lines were found in the specific origin area of the Saddle Ridge Fire. SCE has been advised that the Los Angeles Fire Department investigation of the Saddle Ridge Fire remains open. Based on pending litigation and without considering insurance recoveries, it is reasonably possible that SCE will incur a material loss in connection with the Saddle Ridge Fire, but the range of reasonably possible losses that could be incurred cannot be estimated at this time. SCE has not accrued a charge for potential losses relating to the Saddle Ridge Fire.
2020 Bobcat Fire
The "Bobcat Fire" was reported in the vicinity of Cogswell Dam in Los Angeles County in September 2020. The United States Forest Service ("USFS") has reported that the Bobcat Fire burned approximately 116,000 acres in Los Angeles County, destroyed an estimated 87 homes, 1 commercial property and 83 minor structures, damaged an estimated 28 homes and 19 minor structures, and resulted in injuries to 6 firefighters. In addition, fire authorities have estimated suppression costs at $80 million. While SCE’s investigation remains ongoing, SCE’s information reflects that a camera in the vicinity of Cogswell Dam captured the initial stages of a fire with the first observed smoke approximately six minutes before a SCE circuit in the area experienced an anomaly (a relay). An investigation into the cause of the Bobcat Fire is being led by the USFS, and the USFS has taken a specific section of an SCE overhead conductor in the vicinity of Cogswell Dam into possession as part of its investigation. SCE understands that the USFS has also taken three tree branches in the area into possession. The SED is also conducting an investigation of the Bobcat Fire. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal
130
reviews and the litigation process. SCE has accrued material charges for potential losses relating to the Bobcat Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Bobcat Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.
2022 Coastal Fire
The "Coastal Fire" originated in Orange County in May 2022 and burned approximately 200 acres. The Orange County Fire Authority ("OCFA") has reported that the Coastal Fire destroyed 20 residential structures and damaged 11 residential structures. Two firefighters also reportedly sustained minor injuries. In addition, fire authorities have estimated suppression costs at approximately $3 million. While SCE's investigation remains ongoing, SCE's information reflects that a SCE circuit in the area experienced an anomaly (a relay) approximately 2 minutes prior to the reported time of the fire. An investigation into the cause of the Coastal Fire is being led by the OCFA. The OCFA has retained SCE equipment in connection with its investigation. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation process. SCE has accrued material charges for potential losses relating to the Coastal Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Coastal Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.
2022 Fairview Fire
The "Fairview Fire" originated in Riverside County in September 2022 and burned approximately 28,000 acres. CAL FIRE has reported that the Fairview Fire destroyed 22 residential structures, damaged 5 residential structures, and destroyed or damaged 17 minor structures. CAL FIRE also reported 2 civilian fatalities, 1 civilian injury and 2 injuries to responding fire personnel. In addition, fire authorities have estimated suppression costs at $39 million. While SCE's investigation remains ongoing, SCE's information reflects that a SCE circuit in the area experienced an anomaly (relay) approximately 8 minutes prior to the reported start time of the fire. An investigation into the cause of the Fairview Fire is being led by the CAL FIRE. CAL FIRE has retained SCE equipment in connection with its investigation. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation process. SCE has accrued material charges for potential losses relating to the Fairview Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Fairview Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.
Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates
At December 31, 2022 and December 31, 2021, Edison International's and SCE's consolidated balance sheets include accrued estimated losses of $682 million and $123 million, respectively, for the Post-2018 Wildfires.
The following table presents changes in estimated losses since December 31, 2021:
(in millions) |
| ||
Balance at December 31, 2021 | $ | 123 | |
Increase in accrued estimated losses |
| 572 | |
Amounts paid |
| (13) | |
Balance at December 31, 2022 | $ | 682 |
131
For the years-ended December 31, 2022 and 2021, Edison International's and SCE's income statements include charges for the estimated losses, net of expected recoveries from insurance and customers, related to the Post-2018 Wildfires as follows, respectively:
| Years ended December 31, | ||||||
(in millions) |
| | 2022 |
| 2021 | ||
Edison International: | | | | | | | |
Charge for wildfire-related claims1 | | $ | 572 | $ | 7 | ||
Expected insurance recoveries2 | |
| (390) |
| — | ||
Expected revenue from CPUC and FERC customers | |
| (162) |
| — | ||
Total pre-tax charge | |
| 20 |
| 7 | ||
Income tax benefit | |
| (6) |
| (2) | ||
Total after-tax charge | | $ | 14 | $ | 5 |
Years ended December 31, | |||||||
(in millions) |
| 2022 |
| 2021 | |||
SCE: | | | | | | ||
Charge for wildfire-related claims1 | $ | 572 | $ | 7 | |||
Expected insurance recoveries |
| (399) |
| — | |||
Expected revenue from CPUC and FERC customers |
| (162) |
| — | |||
Total pre-tax charge |
| 11 |
| 7 | |||
Income tax benefit |
| (3) |
| (2) | |||
Total after-tax charge | $ | 8 | $ | 5 |
1 | Includes estimated co-insurance payments recorded as operations and maintenance expense. |
2 | In the third quarter of 2022. Edison Insurance Services, Inc. ("EIS"), a wholly-owned subsidiary of Edison International, paid $9 million insurance, which was included in the insurance recovery of SCE but was excluded in Edison International. |
Recovery of SCE's losses realized in connection with the Post-2018 Wildfires in excess of available insurance is subject to approval by regulators. The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. As discussed above, there is evidence of a California investor-owned utility seeking recovery for uninsured wildfire-related costs and FERC allowing recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that the utility did not meet the CPUC's prudency standard. This evidence was prior to the adoption of AB 1054 on July 12, 2019, after which date AB 1054 clarified that the CPUC must find a utility to be prudent if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time, and based on the information available at that time. Further, utilities with a valid safety certification at the time of the relevant wildfire will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was prudent. Each of the Post-2018 Wildfires was ignited after July 12, 2019, and SCE has held a valid safety certificate since July 15, 2019. While a California investor-owned utility has not yet sought recovery for uninsured claims and other costs related to wildfires ignited after the adoption of AB 1054, SCE believes that for fires ignited after July 12, 2019, and investor-owned utilities holding a safety certificate at the time of the fire, the CPUC will apply a standard of review similar to that applied by the FERC which presumes all costs requested by an investor-owned utility are reasonable and prudent unless serious doubt as to
132
the reasonableness of the utility’s conduct is raised. As such, SCE has concluded, at this time, that both uninsured CPUC-jurisdictional and uninsured FERC-jurisdictional wildfire-related costs related to the Post-2018 Wildfires, other than for those already authorized for inclusion in electric rates, are probable of recovery through electric rates. As of December 31, 2022, SCE has recorded total expected recoveries related to the Post-2018 Wildfires of $152 million within the WEMA and risk management balancing account and $14 million within the FERC balancing account. SCE will continue to evaluate the probability of recovery based on available evidence, including regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard under AB 1054, and, for each applicable fire, evidence that could cast serious doubt as to the reasonableness of SCE's conduct relative to that fire.
Wildfire Insurance Coverage
SCE has approximately $1.0 billion of wildfire-specific insurance coverage for events that may occur during the period July 1, 2022 through June 30, 2023, subject to up to $100 million of self-insured retention and co-insurance per fire, which results in aggregate net coverage of approximately $937 million. Of this coverage, approximately $102 million is provided by EIS and approximately $835 million is provided by other commercial insurance carriers (commercial insurance carriers other than EIS are referred to herein as "Third-Party Commercial Insurers"). SCE has approximately $1.0 billion of wildfire-specific insurance coverage for events that occurred during the period July 1, 2021 through June 30, 2022, subject to up to $100 million of self-insured retention and co-insurance per fire, as well as additional co-insurance of up to $63 million for the policy year, which resulted in net coverage of approximately $875 million provided by Third-Party Commercial Insurers and $28 million provided by EIS for part of the policy year.
SCE believes that its insurance coverage for the July 1, 2022 through June 30, 2023 period meets its obligation to maintain reasonable insurance coverage under AB 1054. Edison International and SCE record a receivable for insurance recoveries when recovery of a recorded loss is determined to be probable.
SCE's wildfire insurance expense for the July 1, 2022 through June 30, 2023 policy period will be approximately $450 million, of which $357 million is paid to Third-Party Commercial Insurers. SCE's wildfire insurance expense for the July 1, 2021 through June 30, 2022 policy period was approximately $437 million, of which $413 million was paid to Third-Party Commercial Insurers. The difference between the Third-Party Commercial Insurer cost and total cost in both policy years was paid in premiums to EIS. Wildfire insurance premiums paid for the July 1, 2021 through June 30, 2022 and July 1, 2022 through June 30, 2023 policy periods are being recovered through customer rates. See Note 18 for further information.
While SCE's cost of obtaining wildfire insurance coverage from Third-Party Commercial Insurers was lower in 2022 compared to 2021, SCE's cost of obtaining wildfire insurance coverage in recent years is significantly higher than costs incurred prior to the 2017/2018 Wildfire/Mudslide Events due to, among other things, the number of significant wildfire events throughout California and the application of inverse condemnation to investor-owned utilities. While SCE is required to maintain reasonable insurance coverage under AB 1054, SCE may not be able to obtain a reasonable amount of wildfire insurance, at a reasonable cost, from Third-Party Commercial Insurers for future policy periods.
Environmental Remediation
SCE records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operation and maintenance, monitoring and site closure. Unless there is a single probable
133
amount, SCE records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.
At December 31, 2022, SCE's recorded estimated minimum liability to remediate its 26 identified material sites (sites with a liability balance as of December 31, 2022, in which the upper end of the range of the costs is at least $1 million) was $256 million, including $164 million related to San Onofre. In addition to these sites, SCE also has 15 immaterial sites with a liability balance on December 31, 2022 for which the total minimum recorded liability was $3 million. Of the $259 million total environmental remediation
for SCE, $241 million has been recorded as a regulatory asset. SCE expects to recover $37 million through an incentive mechanism that allows SCE to recover 90% of its environmental remediation costs at certain sites (SCE may request to include additional sites in this mechanism), and $204 million through proceedings that allow SCE to recover up to 100% of the costs incurred at certain sites through customer rates. SCE's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.The ultimate costs to clean up SCE's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs at the identified material sites and immaterial sites could exceed its recorded liability by up to $121 million and $9 million, respectively. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes.
SCE expects to clean up and mitigate its identified sites over a period of up to 40 years. Remediation costs for each of the next 5 years are expected to range from $9 million to $28 million. Costs incurred for years ended December 31, 2022, 2021 and 2020 were $7 million, $9 million and $7 million, respectively, and were included in the "Operation and maintenance" expense on the consolidated statements of income.
Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, SCE believes that costs ultimately recorded will not materially affect its results of operations, financial position or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.
Nuclear Insurance
Federal law limits public offsite liability claims for bodily injury and property damage from a nuclear incident to the amount of available financial protection, which is currently approximately $13.7 billion for Palo Verde and $560 million for San Onofre. As of January 1, 2021, SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($450 million) through a Facility Form issued by American Nuclear Insurers ("ANI"). In the case of San Onofre, the balance is covered by a US Government indemnity. In the case of Palo Verde, the balance is covered by a loss sharing program among nuclear reactor licensees. If a nuclear incident at any licensed reactor in the United States, which is participating in the loss sharing program, results in claims and/or costs which exceed the primary insurance at that plant site, all participating nuclear reactor licensees could be required to contribute their share of the liability in the form of a deferred premium.
The ANI Facility Form coverage includes broad liability protection for bodily injury or offsite property damage caused by the nuclear energy hazard at San Onofre or Palo Verde, or while radioactive material is in transit to or from San Onofre or Palo Verde. The Facility Form, however, includes several exclusions. First, it excludes onsite property damage
134
to the nuclear facility itself and onsite cleanup costs, but as discussed below SCE maintains separate Nuclear Electric Insurance Limited ("NEIL") property damage coverage for such events. Second, tort claims of onsite workers are excluded, but SCE also maintains an ANI Master Worker Form policy that provides coverage for non-licensee workers. This program provides a shared industry aggregate limit of $450 million. Industry losses covered by this program could reduce limits available to SCE. Third, offsite environmental costs arising out of government orders or directives, including those issued under the Comprehensive Environmental Response, Compensation and Liability Act, also known as CERCLA, are excluded, with minor exceptions from clearly identifiable accidents.
SCE withdrew from participation in the secondary insurance pool for San Onofre for offsite liability insurance effective January 5, 2018. Based on its ownership interests in Palo Verde, SCE could be required to pay a maximum of approximately $65 million per nuclear incident for future incidents. However, it would have to pay no more than approximately $10 million per future incident in any one year. SCE could be required to pay a maximum of approximately $255 million per nuclear incident and a maximum of $38 million per year per incident for liabilities arising from events prior to January 5, 2018, although SCE is not aware of any such events. If the public liability limit above is insufficient, federal law contemplates that additional funds may be appropriated by Congress. This could include an additional assessment on all licensed reactor operators as a measure for raising further federal revenue.
SCE is a member of NEIL, a mutual insurance company owned by entities with nuclear facilities. NEIL provides insurance for nuclear property damage, including damages caused by acts of terrorism up to specified limits, and for accidental outages for active facilities. The amount of nuclear property damage insurance purchased for San Onofre and Palo Verde exceeds the minimum federal requirement of $50 million and $1.1 billion, respectively. These policies include coverage for decontamination liability. Additional outage insurance covers part of replacement power expenses during an accident-related nuclear unit outage. The accidental outage insurance at San Onofre has been canceled as a result of the permanent retirement, but that insurance continues to be in effect at Palo Verde.
If NEIL losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $30 million per year. Insurance premiums are charged to operating expense.
Note 13.Leases
Leases as Lessee
SCE enters into various agreements to purchase power, electric capacity and other energy products that may be accounted for as leases when SCE has dispatch rights that determine when and how a plant runs. SCE also leases property and equipment primarily related to vehicles, office space and other equipment. The terms of the lease contracts included in the table below are primarily 2 to 20 years for PPA leases, 3 to 72 years for office leases, and 5 to 13 years for the remaining other operating leases. Finance leases are immaterial to the periods presented.
135
The following table summarizes SCE's future lease payments for operating leases as of December 31, 2022:
PPA Operating | Other Operating | |||||
(in millions) |
| Leases1 |
| Leases2 | ||
2023 | $ | 493 | $ | 49 | ||
2024 |
| 82 |
| 42 | ||
2025 |
| 73 |
| 38 | ||
2026 |
| 70 |
| 35 | ||
2027 |
| 65 |
| 31 | ||
Thereafter |
| 633 |
| 117 | ||
Total lease payments |
| 1,416 |
| 312 | ||
Amount representing interest |
| 227 |
| 68 | ||
Lease liabilities | $ | 1,189 | $ | 244 |
1 | Excludes expected purchases from most renewable energy contracts, which do not meet the definition of a lease payment since renewable power generation is contingent on external factors. |
2 | Excludes escalation clauses based on consumer price or other indices and residual value guarantees that are not considered probable at the commencement date of the lease. |
The timing of SCE's recognition of the lease expense conforms to ratemaking treatment for SCE's recovery of the cost of electricity and is included in purchased power for operating leases. The following table summarizes the components of SCE's lease expense:
Years ended December 31, | |||||||||
(in millions) |
| 2022 |
| 2021 | 2020 | ||||
PPA leases: |
|
|
|
|
|
| |||
Operating lease cost | $ | 580 | $ | 305 | $ | 111 | |||
Variable lease cost1 | 2,661 | 2,098 | 1,918 | ||||||
Short term lease cost | — | 539 | — | ||||||
Total PPA lease cost |
| 3,241 |
| 2,942 |
| 2,029 | |||
Other operating leases cost | 52 | 47 | 47 | ||||||
Total lease cost | $ | 3,293 | $ | 2,989 | $ | 2,076 |
1 | Includes lease costs from renewable energy contracts where payments are based on contingent external factors such as wind, hydro and solar power generation. |
136
Other information related to leases was as follows:
Years ended December 31, | ||||||||||||
(in millions, except lease term and discount rate) |
| 2022 |
|
| 2021 |
| 2020 |
| ||||
Cash paid for amounts included in the measurement of lease liabilities: |
|
|
|
|
| |||||||
Operating cash flows from: |
|
|
|
|
| |||||||
PPA operating leases | $ | 580 | $ | 305 | $ | 111 | ||||||
Other operating leases |
| 50 |
| 45 |
| 44 | ||||||
ROU assets obtained in exchange for lease obligations: |
|
|
|
|
|
| ||||||
PPA operating leases | $ | 20 | $ | 1,084 | $ | 463 | ||||||
Other operating leases |
| 76 |
| 71 |
| 58 | ||||||
Weighted average remaining lease term (in years): |
|
|
|
|
|
| ||||||
PPA operating leases |
| 9.42 |
| 8.16 |
| 9.75 | ||||||
Other operating leases |
| 10.38 |
| 11.14 |
| 12.13 | ||||||
Weighted average discount rate: |
|
|
|
|
|
| ||||||
PPA operating leases |
| 2.95 | % |
| 2.43 | % |
| 3.12 | % | |||
Other operating leases |
| 3.78 | % |
| 3.34 | % |
| 3.63 | % |
Leases as Lessor
SCE also enters into operating leases to rent certain land and facilities as a lessor. These leases primarily have terms that range from 15 to 65 years. During the years ended December 31, 2022, 2021 and 2020, SCE recognized lease income of $18 million, $16 million and $17 million, respectively, which is included in operating revenue on the consolidated statements of income. At December 31, 2022, the undiscounted cash flow expected to be received from lease payments for the remaining years is as follows:
(in millions) |
|
| |
2023 | $ | 13 | |
2024 |
| 12 | |
2025 |
| 11 | |
2026 |
| 6 | |
2027 |
| 6 | |
Thereafter |
| 120 | |
Total | $ | 168 |
Note 14. Equity
Common Stock Issuances
Edison International continued to settle its ongoing common stock requirements of various internal programs through issuance of new common stock. During the twelve months ended December 31, 2022, 1,253,049 shares of common stock were issued as stock compensation awards for net cash receipts of $57 million, 273,642 shares of new common stock were issued in lieu of distributing $18 million to shareholders opting to receive dividend payments in the form of additional common stock, 157,000 shares of common stock were purchased by employees through the 401(k) defined contribution savings plan for net cash receipts of $10 million as dividend payments, 109,750 shares of common stock were issued related to optional cash investments of $7 million and 36,912 shares of common stock were issued to employees through the ESPP for net cash receipts of $2 million.
137
During the twelve months ended December 31, 2021, 629,092 shares of common stock were issued as stock compensation awards for net cash receipts of $25 million, 522,400 shares of common stock were purchased by employees through the 401(k) defined contribution savings plan for net cash receipts of $30 million, 293,031 shares of new common stock were issued in lieu of distributing $17 million to shareholders opting to receive dividend payments in the form of additional common stock and 26,475 shares of common stock were issued related to optional cash investments of $2 million. Starting July 2021, the 401(k) defined contribution savings plan no longer offered Edison International's stock as an investment option to employees. Subsequent to the change, stock issued through the 401(k) defined contribution savings plan were dividend payments made in the form of additional common stock.
At-the-Market Program
In the third quarter of 2022, Edison International filed a prospectus supplement and executed several distribution agreements with certain sales agents to establish an "at-the-market"("ATM") program under which it may sell shares of its common stock having an aggregate sales price of up to $500 million. As of December 31, 2022, no sales had occurred and Edison International has no obligation to sell the remaining shares available under the ATM program.
Preferred Stock Issuances
In 2021, Edison International issued 1,250,000 shares of 5.375% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series A, and 750,000 shares of its 5.00% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series B, each with a liquidation value of $1,000 per share. The dividends are payable on a semi-annual basis, commencing
September 15, 2021 and March 15, 2022, respectively. The dividend rate will be reset every five years beginning on March 15, 2026 and March 15, 2027, respectively, to equal the then-current five-year U.S. Treasury rate plus a spread of 4.698% and 3.901%, respectively. The net proceeds of $2.0 billion were used to repay commercial paper borrowings and for general corporate purposes, including making a total of $900 million equity contributions to SCE.
Edison International may, at its option, redeem its preferred stock in whole or in part during certain periods of time prior to each of the dividend reset dates at a price equal to $1,000 per share plus any accumulated and unpaid dividends. Edison International may also, at its option, redeem the preferred stocks in whole but not in part at a price equal to $1,020 per share plus any accumulated and unpaid dividends within a certain period of time following any change in the criteria rating agencies use that would have adverse effects on the equity credit attributed by rating agencies to the preferred stocks.
The preferred stocks rank senior to Edison International's common stock with respect to dividends rights and distribution rights upon liquidation. The preferred stocks are not subject to any mandatory sinking fund, retirement fund, purchase fund or other similar provisions. Holders of the shares of the preferred stocks do not have the right to require Edison International to repurchase or redeem shares of the preferred stocks.
Preferred and Preference Stock of Utility
SCE's authorized shares are: $100 cumulative preferred – 12 million shares, $25 cumulative preferred – 24 million shares and preference with no par value – 50 million shares. There are no dividends in arrears for the preferred or preference shares.
During 2020, SCE redeemed $120 million of cumulative preferred stock consisting of all of the outstanding shares of the 4.32% Series, 4.08% Series, 4.24% Series and the 4.78% Series at a price of $28.75, $25.50, $25.80 and $25.80, respectively. SCE recorded a $9 million loss on the redemption of the preferred stock as an adjustment to net income available to common stockholders. No preferred shares were issued or redeemed in the years ended December 31, 2022 and 2021. There is no sinking fund requirement for redemptions or repurchases of preferred shares.
138
Shares of SCE's preference stock rank senior to SCE’s common stock with respect to dividend rights and distribution rights upon liquidation. Shares of SCE's preference stock are not convertible into shares of any other class or series of SCE's capital stock or any other security. SCE's outstanding preference shares are not subject to mandatory redemption and there is no sinking fund requirement for redemptions or repurchases of preference shares.
Preference stocks are:
Redemption | Dividends | |||||||||||||
Shares | Price | Declared | December 31, | |||||||||||
(in millions, except shares and per share amounts) |
| Outstanding |
| per Share |
| per Share |
| 2022 |
| 2021 | ||||
No par value: |
|
|
|
|
|
|
|
|
|
| ||||
3-month LIBOR + 4.199% Series E (cumulative) |
| 350,000 | $ | 1,000.00 | $ | 65.110 | $ | 350 | $ | 350 | ||||
5.10% Series G (cumulative) |
| 88,004 |
| 2,500.00 |
| 127.500 |
| 220 |
| 220 | ||||
5.75% Series H (cumulative) |
| 110,004 |
| 2,500.00 |
| 143.750 |
| 275 |
| 275 | ||||
5.375% Series J (cumulative) |
| 130,004 |
| 2,500.00 |
| 134.375 |
| 325 |
| 325 | ||||
5.45% Series K (cumulative) |
| 120,004 |
| 2,500.00 |
| 136.250 |
| 300 |
| 300 | ||||
5.00% Series L (cumulative) |
| 190,004 |
| 2,500.00 |
| 125.000 |
| 475 |
| 475 | ||||
SCE's preference stock |
|
|
|
| 1,945 |
| 1,945 | |||||||
Less issuance costs |
|
|
|
|
|
|
| (44) |
| (44) | ||||
Edison International's preference stock of utility |
|
|
|
|
|
| $ | 1,901 | $ | 1,901 |
Shares of Series E preference stock issued in 2012 may be redeemed at par, in whole or in part, on or after February 1, 2022. Dividends are payable at a floating rate from and including February 1, 2022. Shares of Series G, H, J, K and L preference stock, issued in 2013, 2014, 2015, 2016 and 2017, respectively, may be redeemed at par, in whole, but not in part, at any time prior to March 15, 2018, March 15, 2024, September 15, 2025, March 15, 2026 and June 26, 2022, respectively, if certain changes in tax or investment company law or interpretation (or applicable rating agency equity credit criteria for Series L only) occur and certain other conditions are satisfied. On or after March 15, 2018, March 15, 2024, September 15, 2025, March 15, 2026 and June 26, 2022, SCE may redeem the Series G, H, J, K and L shares, respectively, at par, in whole or in part. For shares of Series H, J and K preference stock, distributions will accrue and be payable at a floating rate from and including March 15, 2024, September 15, 2025 and March 15, 2026, respectively. Shares of Series G, H, J, K and L preference stock were issued to SCE Trust II, SCE Trust III, SCE Trust IV, SCE Trust V and SCE Trust VI, respectively, special purpose entities formed to issue trust securities as discussed in Note 3. During 2020, SCE redeemed $180 million of the outstanding shares of the Series G preference stock. SCE recorded a $6 million loss on the redemption of the preference stock as an adjustment to net income available to common stockholders. No preference stocks were issued or redeemed in the years ended December 31, 2022 and 2021.
Note 15.Accumulated Other Comprehensive Loss
The changes in accumulated other comprehensive loss, net of tax, consist of:
| | | Edison International | | | SCE | ||||||
Years ended December 31, | ||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2022 |
| 2021 | ||||
Beginning balance | $ | (54) | $ | (69) | $ | (32) | $ | (41) | ||||
Pension and PBOP: |
|
|
|
|
|
|
|
| ||||
Other comprehensive income before reclassifications |
| 35 |
| 7 |
| 17 |
| 4 | ||||
Reclassified from accumulated other comprehensive loss1 |
| 8 |
| 8 |
| 7 |
| 5 | ||||
Change |
| 43 |
| 15 |
| 24 |
| 9 | ||||
Ending Balance | $ | (11) | $ | (54) | $ | (8) | $ | (32) |
1 These items are included in the computation of net periodic pension and PBOP expenses, including amortization of net loss and settlement costs. See Note 9 for additional information.
139
Note 16.Other Income
Other income net of expenses is as follows:
| | | | | | | | ||
Years ended December 31, | |||||||||
(in millions) | 2022 |
| 2021 |
| 2020 | ||||
SCE other income (expense): |
|
|
|
|
| ||||
Equity allowance for funds used during construction | $ | 137 | $ | 118 | $ | 121 | |||
Increase in cash surrender value of life insurance policies and life insurance benefits |
| 42 |
| 40 |
| 66 | |||
Interest income |
| 80 |
| 3 |
| 20 | |||
Net periodic benefit income – non-service components |
| 136 |
| 123 |
| 102 | |||
Civic, political and related activities and donations |
| (42) |
| (39) |
| (42) | |||
Other |
| (16) |
| (12) |
| (12) | |||
Total SCE other income |
| 337 |
| 233 |
| 255 | |||
Other income (expense) of Edison International Parent and Other: |
|
|
|
|
|
| |||
Interest income | 9 | — | — | ||||||
Net periodic benefit costs – non-service components | (2) | (2) | (2) | ||||||
Other |
| 4 |
| 6 |
| (2) | |||
Total Edison International other income | $ | 348 | $ | 237 | $ | 251 |
Note 17.Supplemental Cash Flows Information
Supplemental cash flows information is:
Edison International | SCE | |||||||||||||||||
Years ended December 31, | ||||||||||||||||||
(in millions) |
| 2022 |
| 2021 |
| 2020 |
| 2022 |
| 2021 |
| 2020 | ||||||
Cash payments (receipts): |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Interest, net of amounts capitalized | $ | 1,001 | $ | 887 | $ | 836 | $ | 864 | $ | 760 | $ | 713 | ||||||
Income taxes, net |
| (49) |
| (88) |
| (34) |
| (49) |
| (88) |
| (50) | ||||||
Non-cash financing and investing activities: |
|
|
|
|
|
|
|
|
|
|
| |||||||
Dividends declared but not paid: |
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Common stock |
| 282 |
| 266 |
| 251 |
| 350 |
| 325 |
| — | ||||||
Preference stock of SCE |
| 8 |
| 11 |
| 11 |
| 8 |
| 11 |
| 11 |
SCE's accrued capital expenditures at December 31, 2022, 2021 and 2020 were $652 million, $668 million and $730 million, respectively. Accrued capital expenditures will be included as an investing activity in the consolidated statements of cash flow in the period paid.
Note 18. Related-Party Transactions
Edison International and SCE provide and receive various services to and from its subsidiaries and affiliates. Services provided to Edison International by SCE are priced at fully loaded cost (i.e., direct cost of good or service and allocation of overhead cost). Specified administrative services performed by Edison International or SCE employees, such as payroll and employee benefit programs, are shared among all affiliates of Edison International. Costs are allocated based on one of the following formulas: percentage of time worked, equity in investment and advances, number of employees, or multi-factor (operating revenue, operating expenses, total assets and number of employees). Edison International allocates various corporate administrative and general costs to SCE and other subsidiaries using established allocation factors.
For the years ended December 31, 2022, 2021, and 2020, SCE purchased wildfire liability insurance for premiums of $273 million, $185 million, and $176 million respectively, from Edison Insurance Services, Inc. ("EIS"), a wholly-
140
owned subsidiary of Edison International. EIS fully reinsured the exposure for these policies through the commercial reinsurance market, with reinsurance limits and premiums equal to those of the insurance purchased by SCE, except for a contract for a premium of $93 million for the 12 months ending June 30, 2023 under which EIS provided insurance protection to SCE. SCE recorded the premium as insurance expense and recorded an equal amount of revenue due to customer funding through regulatory cost recovery mechanisms, therefore there was no earnings impact on SCE's consolidated statements of income. EIS recorded the premium as insurance revenue. On the Edison International consolidated statements of income, the EIS insurance revenue is eliminated with SCE's insurance expense, therefore the SCE customer revenues increased the earnings of Edison International.
The related-party transactions included in SCE's consolidated balance sheets for wildfire-related insurance purchased from EIS and related expected insurance recoveries were as follows:
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Prepaid insurance1 | $ | 106 | $ | 52 | ||
Long-term insurance receivable due from affiliate | 334 | — |
1 | Reflected in "Prepaid expenses" on SCE's consolidated balance sheets. |
The expense for wildfire-related insurance premiums paid to EIS were $213 million, $192 million, and $189 million for the years ended December 31, 2022, 2021, and 2020, respectively.
CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None.
CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
Based on an evaluation of Edison International's and SCE's disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the "Exchange Act"), as of December 31, 2022, Edison International's and SCE's respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by Edison International and SCE in reports that the companies file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. In addition, Edison International's and SCE's respective principal executive officers and principal financial officers have concluded that such controls and procedures were effective in ensuring that information required to be disclosed by Edison International and SCE in the reports that Edison International and SCE file or submit under the Exchange Act is accumulated and communicated to Edison International's and SCE's management, including Edison International's and SCE's respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.
Management's Report on Internal Control Over Financial Reporting
Edison International's and SCE's respective management are responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f), for Edison International and its subsidiaries and SCE, respectively. Under the supervision and with the participation of their respective principal executive officer and principal financial officer, Edison International's and SCE's management conducted an evaluation of the effectiveness of their respective internal controls over financial reporting based on the framework set forth in Internal Control—Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on their evaluations under the COSO framework, Edison
141
International's and SCE's respective management concluded that Edison International's and SCE's respective internal controls over financial reporting were effective as of December 31, 2022. Edison International's internal control over financial reporting as of December 31, 2022 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report included in this filing, which is incorporated herein by this reference. This annual report does not include an attestation report of SCE's independent registered public accounting firm regarding internal control over financial reporting. Management's report for SCE is not subject to attestation by the independent registered public accounting firm.
Changes in Internal Control Over Financial Reporting
There were no changes in Edison International's or SCE's internal control over financial reporting during the fourth quarter of 2022 that have materially affected, or are reasonably likely to materially affect, Edison International's or SCE's internal control over financial reporting.
Jointly Owned Utility Plant
Edison International's and SCE's respective scope of evaluation of internal control over financial reporting includes their Jointly Owned Utility Projects.
BUSINESS
CORPORATE STRUCTURE, INDUSTRY AND OTHER INFORMATION
Edison International was incorporated in 1987 as the parent holding company of SCE, a California public utility incorporated in 1909. Edison International also owns Edison Energy which is engaged in the competitive business of providing decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe.
The principal executive office of Edison International is located at 2244 Walnut Grove Avenue, P.O. Box 976, Rosemead, California 91770, and Edison International’s telephone numbers is (626) 302-2222. The principal executive office of SCE is located at 2244 Walnut Grove Avenue, P.O. Box 800, Rosemead, California 91770, and SCE’s telephone numbers is (626) 302-1212.
This is a combined Annual Report on Form 10-K for Edison International and SCE. Edison International and SCE make available at www.edisoninvestor.com: Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, Proxy Statements and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act, as soon as reasonably practicable after Edison International and SCE electronically file such material with, or furnishes it to, the SEC. Such reports are also available on the SEC's internet website at www.sec.gov. The information contained on, or connected to, the Edison investor website is not incorporated by reference into this report.
142
Subsidiaries of Edison International
SCE – Public Utility
SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity through SCE's electrical infrastructure to an approximately 50,000 square-mile area of southern California. SCE serves approximately 5 million customers in its service area. SCE's total number of customers by class were as follows:
(in thousands) |
| 2022 |
| 2021 |
| 2020 |
Residential |
| 4,541 |
| 4,499 |
| 4,531 |
Commercial |
| 609 |
| 605 |
| 577 |
Industrial |
| 6 |
| 7 |
| 9 |
Public authorities |
| 69 |
| 70 |
| 46 |
Agricultural and other |
| 19 |
| 20 |
| 20 |
Total |
| 5,244 |
| 5,201 |
| 5,183 |
In 2022, SCE's total operating revenue of $17.2 billion was derived as follows: 41.9% commercial customers, 39.9% residential customers, 4.0% public authorities, 3.0% industrial customers, 4.0% agricultural and other, and 7.2% other operating revenue.
CPUC and FERC rates decouple authorized revenue from the volume of electricity sales and the price of energy procured so that SCE has the opportunity to receive revenue equal to amounts authorized by the relevant regulatory agencies. As a result, the volume of electricity sold to customers does not have a direct impact on SCE's financial results. See "SCE—Overview of Ratemaking Process—CPUC" and "—FERC" for further information.
Edison Energy – Energy Service Provider
Edison Energy which is engaged in the competitive business of providing decarbonization and energy solutions to commercial, institutional and industrial customers in North America and Europe. Edison Energy aims to provide energy solutions that address cost, carbon and complex choices for their customers. To date, investments in Edison Energy are not material to be reported as a business segment.
Regulation of Edison International as a Holding Company
As a public utility holding company, Edison International is subject to the Public Utility Holding Company Act. The Public Utility Holding Company Act primarily obligates Edison International and its utility subsidiaries to provide access to their books and records to the FERC and the CPUC for ratemaking purposes.
Edison International is not a public utility and its capital structure is not regulated by the CPUC. The 1988 CPUC decision authorizing SCE to reorganize into a holding company structure, however, imposed certain obligations on Edison International and its affiliates. These obligations include a requirement that SCE's dividend policy continue to be established by SCE's Board of Directors as though SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's electricity service obligations, shall receive first priority from the Boards of Directors of Edison International and SCE. The CPUC has also promulgated Affiliate Transaction Rules, which, among other requirements, prohibit holding companies from (1) being used as a conduit to provide non-public information to a utility's affiliates and (2) causing or abetting a utility's violation of the rules, including providing preferential treatment to its affiliates.
Human Capital
At December 31, 2022, Edison International had an aggregate of 13,388 employees (excluding interns and employees on leaves of absence), of which 12,831 were full-time employees of SCE or its subsidiaries. In addition to employees, SCE's workforce includes a significant number of contract workers who support SCE's operations. Among these contract
143
workers are Safety Tier 1 Contractors. SCE estimates, based on contractors' self-reported hours worked and a 2,080-hour work year, that there were approximately 10,000 full-time equivalent Safety Tier 1 Contractors supporting SCE operations (other than for decommissioning activities at San Onofre) during 2022. All Safety Tier 1 Contractors engaged in decommissioning activities at San Onofre are managed by the DGC. In addition to Safety Tier 1 Contractors, SCE also uses other contract workers to support its transmission and distribution, vegetation management, information technology and customer service activities.
Approximately 3,900 of SCE's employees are covered by collective bargaining agreements with the International Brotherhood of Electrical Workers ("IBEW"). In February 2023, the IBEW membership ratified new collective bargaining agreements for the period January 1, 2023 through December 31, 2025. In addition, a substantial number of SCE's contract workers are also unionized.
Edison International focuses on various human capital measures and objectives in managing its business, including measures and objectives related to safety, diversity, equity and inclusion and workforce continuity.
Safety
Safety is the first of Edison International's core values. Edison International is committed to building and maintaining a safe environment for its employees, contract workers, customers and the public. Over the past several years, Edison International's efforts to improve workforce safety have included increased focus on, and investment in, maturing a culture of safety ownership among its workforce that empowers employees and contract workers to own their safety, support their team members' safety and contribute to a safe work environment.
Edison International makes efforts to eliminate fatalities and serious injuries and reduce all injuries. For instance, all full-time employees are provided with regular safety-related training, particularly for those who work in proximity to high-voltage electrical equipment and other high-risk activities. SCE implemented more safety requirements for both prime contractors and subcontractors in 2021 and continues to prioritize safety.
Edison International uses employee safety culture assessments to measure its progress relative to improving its safety culture. Edison International also uses various measures to assess safety performance, including, without limitation, fatalities and serious injury rates for employees and contract workers. The following represents data for 2022:
1 | Excludes employees of Alfa Energy Ltd., an entity acquired by Edison Energy in October 2022. |
2 | EEI SIF Rate is calculated by multiplying the total number of 2022 EEI SIF incidents (classified by SCE on or before January 13, 2023) by 200,000 and then dividing by the total number of reported hours worked. |
3 | DART Rate is calculated by multiplying the number of 2022 DARTs (reported to SCE on or before January 10, 2023 for Safety Tier 1 Contractors and classified as a DART by SCE on or before January 13, 2023 for employees) by 200,000 and then dividing by the total number of reported hours worked. The 2022 DART Rates will change based on information received by SCE after January 10, 2023 for Safety Tier 1 Contractors and after January 13, 2023 for employees. |
144
4 | Excludes contractors managed by the DGC engaged by SCE to undertake a significant scope of decommissioning activities at San Onofre. |
Diversity, Equity and Inclusion
Edison International is committed to developing a team that reflects the broad diversity of the customers and communities it serves. At Edison International, on average, employees in the same role receive equal pay for equal work. Similar to broader society, when looking at gender or race/ethnicity-specific groups across Edison International without regard to role, female employees and Black and Hispanic employees do not receive comparable pay to male and White employees, respectively, due to lower representation of female, Black and Hispanic employees in higher paying jobs. Edison International is committed to working towards increasing diversity in its higher paying jobs.
The table below provides Edison International's employee diversity data1 as of December 31, 2022:
Employees2 | Leaders3 | Executives4 | ||||
Females | 32 | % | 27 | % | 37 | % |
1 | Calculated using the guidelines SCE uses to calculate the diversity data it reports to the United States Equal Employment Opportunity Commission. Excludes employees of Alfa Energy Ltd., an entity acquired by Edison Energy in October 2022. |
2 | Excludes interns and employees on a leave of absence. |
3 | "Leaders" represents all non-executive manager and supervisor level employees. |
4 | "Executives" represents all officers and all director level employees. |
To support Edison International's diversity, equity and inclusion efforts, Executives and Leaders are offered training and tools to promote diverse representation throughout their teams. In addition, Edison International evaluates whether hiring processes include diverse candidates and diverse sets of decision makers. In addition to measuring diversity, Edison International also uses various other measures to assess success of diversity, equity and inclusion initiatives, including without limitation, monitoring hiring, promotion and turnover rates for diverse employees.
Workforce Continuity
Edison International is committed to identifying and developing the talents of its workforce and takes a variety of steps to increase employee engagement and provide employees opportunities for growth. Employees are provided with training opportunities, including an onboarding program, technical training, required ethics and compliance training and optional trainings to support career development. SCE estimates that over 95% of active SCE employees completed all assigned training required to be completed in 2022 as part of SCE's enterprise-wide training program. Employees may also be required to take additional trainings based on their job function.
Employees receive competitive compensation packages which include a wide selection of health plans, a 401(k) savings plan with a company match, wellness programs and initiatives, tuition reimbursement, competitive vacation/holiday program, professional development, volunteer programs, employee assistance program, and a philanthropy and matching contribution program.
Edison International uses various measures to assess employee engagement and satisfaction, including, without limitation, conducting regular employee engagement surveys and monitoring turnover. Edison International Parent and SCE's combined Turnover Rate was 7.6% and 7.5% in 2022 and 2021, respectively.
145
Executives engage in succession planning for leadership positions within the organization. Edison International's and SCE's Boards of Directors also engage in succession planning and talent development discussions for senior officers.
Edison International's Diversity, Equity and Inclusion Report and Sustainability Report are available at http://www.edison.com/sustainability. The reports and any other information contained on, or connected to, this website are not deemed part of, and are not incorporated by reference into, this Annual Report on Form 10-K.
Insurance
Edison International maintains a property and casualty insurance program for itself and its subsidiaries and excess liability insurance covering liabilities to third parties for bodily injury or property damage resulting from operations. These policies are subject to specific retentions, sub-limits and deductibles, which are comparable to those carried by other utility companies of similar size. Catastrophic events, such as hurricanes and storms, that do not impact Edison directly have had an impact, and can have future impacts, on insurance markets overall.
While SCE maintains insurance relating to cybersecurity events, such insurance is subject to a number of exclusions and may be insufficient to offset any losses, costs or damage experienced.
SCE also has separate insurance programs for nuclear property and liability, workers compensation and wildfires. For further information on nuclear and wildfire insurance, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies."
SCE
Regulation
CPUC
The CPUC has the authority to regulate, among other things, retail rates, utility distribution-level equipment and assets, energy purchases on behalf of retail customers, SCE capital structure, rate of return, issuance of securities, disposition of utility assets and facilities, oversight of nuclear decommissioning funding and costs, and aspects of the transmission system planning, site identification and construction, including safety and environmental mitigation. The CPUC can assess penalties on any public utility that violates or fails to comply with its rules and requirements, of up to $100,000, for each offense, which could be assessed daily for a continuing violation. In November 2020, the CPUC adopted a new Enforcement Policy authorizing the staff of the CPUC to draft proposed Administrative Consent Orders and Administrative Enforcement Orders, both of which can include fines and serve as alternatives to issuance of a citation or formal investigation proceeding, for CPUC consideration and approval.
FERC
The FERC has the authority to regulate wholesale rates as well as other matters, including unbundled transmission service pricing, rate of return, accounting practices, and licensing of hydroelectric projects. The FERC also has jurisdiction over a portion of the retail rates and associated rate design.
CAISO
The CAISO operates a wholesale energy market primarily in California through which competing electricity generators offer their electricity output to market participants, including electricity retailers. SCE has placed its transmission system under the operational control of the CAISO.
Major transmission projects required for reliability, economic and other policy reasons are identified and approved through the CAISO's annual transmission planning process. Depending on the nature of the project identified, it may be assigned to SCE or set for competitive bid.
146
The CAISO is conducting transmission planning studies to identify transmission needed to meet a 46 million metric ton GHG emissions target by 2030 set by the CPUC for California's electricity sector to support California's target of reducing overall GHG emissions statewide by 40 percent below 1990 levels by 2030.
NERC
The FERC assigned administrative responsibility to the NERC to establish and enforce reliability standards and critical infrastructure protection standards, which protect the bulk power system against potential disruptions from cyber and physical security breaches. The critical infrastructure protection standards focus on controlling access to critical physical and cyber security assets, including supervisory control and data acquisition systems for the electric grid. The reliability standards define the requirements for planning and operating the bulk power system. Compliance with these standards is mandatory. As of the date of this filing, the maximum penalty that may be levied for violating a NERC reliability or critical infrastructure protection standard is approximately $1.5 million per violation, per day.
SCE has formal cyber security and physical security programs that cover SCE's information technology and operational technology systems, including customer data. Program staff is engaged with industry groups as well as public-private initiatives to reduce risk and to strengthen the security and reliability of SCE's systems and infrastructure.
OEIS
Effective July 1, 2021, the OEIS became the successor to the CPUC's Wildfire Safety Division ("WSD"), and was vested with the powers, duties, and responsibilities of the WSD, as well as other statutory authority. OEIS is responsible for, among other things, approving and overseeing compliance with WMPs. As part of overseeing WMP compliance, OEIS can issue notices of violation and recommend that the Commission pursue an enforcement action against an electrical corporation for noncompliance with its approved WMP. Other OEIS tasks include conducting safety culture assessments, approving executive compensation structures, and issuing safety certifications.
Nuclear Power Plant Regulation
The NRC has jurisdiction with respect to the safety of San Onofre and Palo Verde Nuclear Generating Stations. The NRC regulates commercial nuclear power plants through licensing, oversight and inspection, performance assessment, and enforcement of its requirements. In June 2013, SCE decided to permanently retire and decommission San Onofre. The NRC regulates the decommissioning of San Onofre. For further information, see "Liquidity and Capital Resources—SCE—Decommissioning of San Onofre" in the MD&A.
Other Regulatory Agencies
The construction, planning and project site identification of SCE's transmission lines and substation facilities require the compliance with various laws and approval of many governmental agencies in addition to the CPUC and FERC. These include various state regulatory agencies depending on the project location; the CAISO; the U.S. Environmental Protection Agency and other environmental, land management and resource agencies such as the Bureau of Land Management, the U.S. Forest Service, the California Department of Fish and Wildlife, and the California Coastal Commission; and the State Water Resources Control Board. In addition, to the extent that SCE transmission line projects pass through lands owned or controlled by Native American tribes, consent and approval from the affected tribes and the Bureau of Indian Affairs are also necessary for the project to proceed.
147
Compliance with Government Regulations
SCE incurs significant costs to comply with government regulations. These costs, which include operation and maintenance expenses and capital expenses, including without limitation: costs incurred to maintain wildfire insurance coverage required under AB 1054; comply with environmental regulations, including licensing requirements, regulations governing California's renewable energy standards and regulations governing the decommissioning of SONGS; land use and construction regulations; privacy and cybersecurity regulations; and Occupational Safety and Health Administration regulations. SCE also incurs operation and maintenance expenses and capital expenses to comply with requirements set forth in various regulatory decisions, including, costs incurred to implement its approved capital projects and safety programs such as its WMPs.
Most costs incurred by SCE to comply with government regulations are authorized in its CPUC and FERC general rate cases and, are therefore, recovered through electric rates. To the extent SCE incurs costs to comply with government regulations above those that are authorized, or prior to obtaining authorization, for recovery through rates (for instance certain costs incurred in line with SCE's obligations under its WMPs and tracked in wildfire mitigation-related memorandum accounts), SCE will seek recovery of such costs through electric rates. There is no assurance that SCE will be allowed to fully recover these costs. For further information on wildfire mitigation and wildfire insurance costs, see "Liquidity and Capital Resources—SCE—Regulatory Proceedings—Wildfire Related Regulatory Proceedings."
SCE earns a rate of return on its authorized capital expenditures included in its rate base. Approximately $1.6 billion of spending by SCE on wildfire risk mitigation capital expenditures made after August 1, 2019 are not included in rate base under the terms of AB 1054.
Overview of Ratemaking Process
CPUC
Revenue authorized by the CPUC through GRC proceedings is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investments in generation and distribution assets and general plant (also referred to as "rate base") on a forecast basis. Revenue is authorized through quadrennial GRC proceedings where the CPUC sets an annual revenue requirement for the base year which is made up of the operation and maintenance costs, depreciation, taxes and a return consistent with the authorized cost of capital (discussed below). In the GRC proceedings, the CPUC also generally approves the level of capital spending on a forecast basis. Following the base year, the revenue requirements for the remaining three years will be set by a methodology established in the GRC proceeding, which has generally, among other items, included annual allowances for escalation in operation and maintenance costs and additional changes in capital-related investments.
SCE's 2021 GRC has authorized revenue requirements for 2021, 2022 and 2023 of $6.9 billion, $7.3 billion and $7.7 billion. In 2022, SCE made additional filings in the 2021 GRC proceeding seeking a revenue requirement of
$8.6 billion for 2024. For further discussion of the 2021 GRC, see "Liquidity and Capital Resources— SCE—Regulatory Proceedings— 2021 General Rate Case Track 4" in the MD&A. SCE expects to file its 2025 GRC application with the CPUC in May 2023, for the four-year period of 2025 – 2028.
By May 15 in the year preceding each GRC application filing date, SCE is required to file a Risk Assessment and Mitigation Phase ("RAMP") application with the CPUC to provide information about SCE's assessment of its key safety risks and its proposed programs and spending for mitigating those risks. SCE filed its RAMP application for the 2025 GRC in May 2022.The information developed during the RAMP informs SCE's proposed projects and funding requests in the subsequent phase of the GRC.
The CPUC regulates SCE's cost of capital, including its capital structure and authorized rates of return. SCE's currently authorized capital structure is 43% long-term debt, 5% preferred equity and 52% common equity. SCE's currently
148
authorized cost of capital for 2023, 2024 and 2025 consists of: cost of long-term debt of 4.39%, cost of preferred equity of 6.50% and ROE of 10.05% and includes an adjustment mechanism set by the CPUC that could adjust authorized cost of capital between SCE's cost of capital proceedings. Based on the capital structure and cost factors discussed above, SCE's weighted average return on rate base will be 7.44% for 2023. The CPUC also continued the cost of capital adjustment mechanism for 2023, 2024, and 2025, but opened a second phase in the proceeding to consider proposed changes to the mechanism. The benchmark value for the mechanism for SCE beginning in 2023 is the 12-month, October 1, 2021 through September 30, 2022, average Moody’s Baa utility bond yield of 4.37%. Under the cost of capital adjustment mechanism, if the difference between the benchmark and the average of the same index for the 12-month period to September 30, 2023 exceeds 100-basis points, SCE's CPUC-authorized ROE would be adjusted by half the amount of the difference (up or down) and SCE's costs of long-term debt and preferred equity would also be adjusted to reflect the then current embedded costs and projected interest rates effective January 1, 2024. For further information see "Management Overview—Cost of Capital Applications."
CPUC rates decouple authorized revenue from the volume of electricity sales so that SCE receives revenue equal to amounts authorized. Differences between amounts collected and authorized levels are either collected from or refunded to customers, and, therefore, such differences do not impact operating revenue. Accordingly, SCE is neither benefited nor burdened by the volume of retail electricity sales.
Cost-recovery balancing accounts track the difference between actual expenditures associated with the account, revenue authorized for recovery by the CPUC (authorized revenue requirement), and the actual revenues collected within customer rates to cover those specific expenditures. These balancing accounts are used to track and recover, among other things, SCE's decoupled costs of fuel and purchased power, as well as certain operation and maintenance expenses. SCE earns no return on these activities and although differences between forecasted and actual costs do not impact earnings, such differences do impact cash flows and can change rapidly. SCE also has capital-related balancing accounts on which it earns a return, such as the pole loading balancing account. Costs tracked in balancing accounts are not subject to after-the-fact reasonableness review unless the balancing accounts are one-way balancing accounts or otherwise subject to a cost cap. SCE uses balancing accounts for cost recovery of authorized wildfire insurance expenses, WCCP expenditures up to 110% of authorized WCCP amounts and up to 115% of authorized vegetation management expenses. SCE also has memorandum accounts, which track costs above authorized levels eligible for cost recovery upon a future reasonableness review. Under the 2021 GRC final decision SCE can seek recovery of wildfire insurance expenses above authorized levels, WCCP amounts above 110% of authorized levels and vegetation management expenses above 115% of authorized levels through reasonableness review applications. These incremental amounts are tracked in memorandum accounts.
SCE's cost-recovery mechanism for its fuel and purchased power-related costs is facilitated in three main balancing accounts, the ERRA, the PABA, and the NSGBA. For all three accounts, SCE sets rates based on an annual forecast of the costs that it expects to incur during the subsequent year. In addition, the CPUC has established a "trigger" mechanism for the ERRA and the PABA. The trigger mechanism requires SCE to request an expeditious rate change if the sum of the ERRA balance and the bundled service customers' pro-rata share of the PABA balance exceeds 4% of SCE's prior year generation rate revenue and SCE does not expect the aggregate overcollection or undercollection to fall below 5% of SCE's prior year generation rate revenue within 120 days. For 2023, SCE estimates the 4% and 5% trigger amounts to be approximately $216 million and $270 million, respectively.
149
For 2022, the 4% and 5% trigger amounts were approximately $200 million and $250 million, respectively. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings—ERRA Proceeding" for information regarding SCE filing an application to advice the CPUC that SCE’s undercollections had exceeded the trigger amount as of
September 30, 2022.
The majority of fuel and purchased power procurement-related costs eligible for recovery through cost-recovery rates are pre-approved by the CPUC through specific decisions and a procurement plan with predefined standards that establish the eligibility for cost-recovery. If such costs are subsequently found to be non-compliant with this procurement plan, then this could negatively impact SCE's earnings and cash flows. In addition, the CPUC retrospectively reviews outages associated with utility-owned generation and SCE's power procurement contract administration activities through the annual ERRA review proceeding. A CPUC finding that SCE was unreasonable or imprudent with respect to its utility-owned generation outages and contract administration activities, could negatively impact SCE's earnings and cash flows. The ERRA review proceeding is also used as a venue to review costs in various memorandum and balancing accounts including the Pole Loading and Deteriorated Pole Programs Balancing Account.
A California law adopted in 2022 has directed the CPUC to develop a definition of energy affordability and to use energy affordability metrics to guide the development of any protections, incentives, discounts, or new programs to assist residential customers facing hardships or disconnections due to electricity or gas bills and to assess the impact of proposed rate increases on different types of residential customers.
FERC
Transmission capital and operating costs that are prudently incurred, including a return on its net investment in transmission assets, are recovered through revenue authorized by the FERC. Since 2012, SCE has used a formula rate to determine SCE's FERC transmission revenue requirement, including its construction work in progress (CWIP) revenue requirement. Under operation of the formula rate, transmission revenue will be updated to actual cost of service annually. The transmission revenue requirement and rates are updated each December, to reflect a forecast of costs for the upcoming rate period, as well as a true up of the transmission revenue to actual costs incurred by SCE in the prior calendar year on its formula rate.
The FERC ROE is currently 10.3%. For further information on the FERC formula rates, related transmission revenue requirements and rate changes, see "Liquidity and Capital Resources—SCE—Regulatory Proceedings—2023 FERC Formula Rate Annual Update" in the MD&A.
Retail Rates Structure and Residential Rate Design
To develop retail rates, the authorized revenue requirements are allocated among all customer classes (residential, commercial, industrial, agricultural and street lighting) on a functional basis (i.e., generation, distribution, transmission, etc.). Specific rate components are designed to recover the authorized revenue allocated to each customer class.
SCE has a two-tier residential rate structure. The first tier is priced at below-average cost and is intended to cover the customer's essential electricity needs. The second tier is priced at 25% more than the first tier. The CPUC has ordered a transition from tiered to time-of-use ("TOU") rates for most residential customers unless they opt to stay on the tiered rate structure. Under a TOU rate structure, rates are based on the time of day and the season. TOU rates are typically lower early in the day, overnight, and on the weekends when energy resources are less in demand. SCE completed a multi-year transition of most customers to TOU rates in June 2022, and, as of December 31, 2022, approximately 60 percent of residential customers are on TOU rates. To recover a portion of the fixed costs of serving no- or low-usage residential customers, SCE assesses both fixed charges of less than $1 per month, and a minimum charge of $10 per month ($5 for low-income customers). There is currently an open proceeding pending at the CPUC where the CPUC is considering establishing an income-graduated fixed charge for residential rates for customers of all investor-owned
150
electric utilities. For information on residential rates for customers with renewable generation systems, see "—Competition" below.
Purchased Power and Fuel Supply
SCE obtains the power, energy, and local grid support needed to serve its customers primarily from purchases from external parties. SCE estimates that approximately 20% of power delivered to SCE's customers in 2022 came from SCE's own generating facilities.
Natural Gas Supply
SCE requires natural gas to meet contractual obligations for power tolling agreements (power contracts in which SCE has agreed to provide or pay for the natural gas used to generate electricity) and to fuel its Mountainview and peaker plants, which are generation units that operate in response to wholesale market signals related to power prices and reliability needs. The physical natural gas purchased by SCE is sourced in competitive interstate markets at trading points on the SoCalGas local distribution company system and the El Paso pipeline. SoCalGas is the primary provider of intrastate pipeline transportation service to the gas-fueled generation stations that SCE controls. In 2015 – 2016, SoCalGas experienced a significant natural gas fuel leak at its Aliso Canyon underground gas storage facility. As a result, there continue to be limitations on the use and capability of the facility, and the current available inventory at the Aliso Canyon facility is limited to 60% of maximum capacity. To date, SCE has found that gas storage-use restrictions combined with SoCalGas pipeline maintenance constraints contributed to increased electricity costs for customers but did not impact grid reliability. However, there is no certainty that these restrictions or pipeline constraints will not impact grid reliability in the future. Price increases faced by customers would not affect SCE's earnings because SCE expects recovery of these costs through the ERRA balancing account or other CPUC approved procurement plans. However, these higher prices may impact cash flow due to the timing of those recoveries. For more information on cost-recovery mechanisms, see "—Overview of Ratemaking Process" above. SCE is actively monitoring legislative and regulatory processes that are addressing pipeline and electric grid operations impacted by the Aliso Canyon leak, including an Order Instituting Investigation issued by the CPUC in February 2017 to consider the feasibility of minimizing or eliminating the use of the Aliso Canyon facility. SCE has also made additional procurement efforts to alleviate the impact of the partial closure of Aliso Canyon, including accelerating existing contracts for new capacity, procuring energy storage from third-parties, contracting for design, build, and transfer of utility-owned storage, procuring additional demand response and contracting for firm gas transportation capacity.
CAISO Wholesale Energy Market
The CAISO operates a wholesale energy market primarily in California through which competing electricity generators offer their electricity output to market participants, including electricity retailers. The CAISO schedules power in hourly increments with hourly prices through a day-ahead market in California and schedules power in fifteen-minute and five-minute increments with fifteen-minute and five-minute prices through two real-time markets that cover California and portions of six neighboring states through the Energy Imbalance Market. Both markets optimize energy procurement, ancillary service procurement, unit commitment and congestion management. SCE participates in the day-ahead and real-time markets for the sale of its own generation and generation under contract purchases for its load requirements. In February 2023 the CAISO Board and the Western Energy Imbalance Market ("Western EIM") Governing Body approved a proposal for an Extended Day-Ahead Market ("EDAM") which, if approved by the FERC, will give utilities in the Western EIM the option of joining a centralized day-ahead market run by the CAISO. The EDAM, if adopted, will give utilities an opportunity to lock in energy prices a day in advance, and thereby substantially avoid volatility in the real-time energy market.
151
The CPUC's Resource Adequacy program imposes resource adequacy requirements on load-serving entities like SCE that are designed to provide sufficient resources to the CAISO to ensure the safe and reliable operation of the grid in real time. The CPUC has adopted a central procurement structure in SCE's distribution service area for local resource adequacy that transfers the responsibility for procuring local resource adequacy from other local load-serving entities to SCE, as a central procurement entity ("CPE") for its distribution service area, starting with the 2023 resource adequacy compliance year. Under this structure, while SCE will procure local resource adequacy to meet the local resource adequacy requirement for its distribution service area, other load-serving entities can also procure their own local resources. Load-serving entities that procure their own local resources can: (i) sell the capacity to SCE, (ii) utilize the resources, or (iii) voluntarily show the resources to meet their own needs, thereby reducing the amount of local resource adequacy the CPE will need to procure and reducing the total CPE procurement costs shared by all load-serving entities in that distribution service area. In June 2022, the CPUC reformed the resource adequacy framework by adopting SCE's proposed "24-hour slice of day" structure, which addresses the large variations in renewable generation that result in costly over procurement if utilities assess resource need based on periods longer than one hour.
Following state-wide rotating outages in August 2020 that impacted a significant number of SCE's customers, the CPUC has taken action towards ensuring reliable electric service in the event that an extreme heat events occur during summer. In June 2021, the CPUC issued a decision requiring at least an aggregate of 11,500 MW of additional net qualifying renewable or zero-emitting capacity to be procured collectively by all of the load-serving entities subject to CAISO. The aggregate additional capacity is required by 2026, with 2,000 MW required by 2023, an additional 6,000 MW required by 2024, an additional 1,500 MW required by 2025, and an additional 2,000 MW required by 2026. SCE's allocation of the requirements is 705 MW by 2023, 2,114 MW by 2024, 529 MW by 2025 and 705 MW by 2026, for a total of 4,052 MW. In January 2023, the CPUC issued a Proposed Decision which, if adopted, would require all of the load-serving entities subject to CAISO to collectively procure an additional 4,000 MW of net qualifying renewable or zero-emitting capacity by 2028. SCE's allocation of the addition 4,000 MW is 1,410 MW. SCE continues to actively pursue and execute various actions to procure addition capacity. For instance, in January 2023, the CPUC approved SCE entering into four lithium-ion battery storage contracts with a total capacity of approximately 619 MW, which are expected to provide approximately 562 MW of capacity towards SCE’s allocation of the 11,500 MW requirement. The contracts range from 10-15 years and the projects are expected to be in service in 2023 and 2024.
In July 2021, California's Governor issued an Emergency Proclamation related to accelerating construction of new resources ahead of possible summer 2022 shortfalls. Subsequently, the CPUC opened a Phase 2 of its emergency reliability rulemaking proceeding to ensure there is adequate supply and demand management to achieve electrical system reliability in 2022 and 2023. In October 2021, SCE contracted for the construction of utility owned storage at three sites in SCE's service territory with an aggregate capacity of 537.5 MW, which SCE has been advised will be in-service prior to June 2023. See "Management Overview—Capital Program—Utility Owned Storage Projects" in the MD&A. In December 2021, the CPUC issued a final decision in Phase 2 of its emergency reliability rulemaking proceeding adopting several supply- and demand-side measures to help provide contingency resources with the goal of ensuring that there is adequate electric power in the event of an extreme weather event in the summers of 2022 or 2023, including directing the investor-owned utilities to continue their procurement efforts and endeavor to achieve an effective 20 to 22.5% planning reserve margin for the summers of 2022 and 2023.
Competition
SCE faces retail competition in the sale of electricity to the extent that federal and California laws permit other sources to provide electricity and related services to retail customers within SCE's service area. While retail competition impacts customer rates it does not impact SCE's earnings activities because the volume of electricity sales is decoupled from authorized revenue. The increased retail competition is from governmental entities formed by cities, counties, and
152
certain other public agencies to generate and/or purchase electricity for their local residents and businesses, known as CCAs. While California law provides only limited opportunities for customers in SCE's service area to choose to purchase power directly from an Electric Service Provider, a limited, phased-in expansion of customer choice ("Direct Access") for nonresidential customers was authorized beginning in 2009, and an additional limited expansion of Direct Access was authorized in 2018. When a customer who had previously taken bundled service from SCE converts to taking retail electricity service from an Electric Service Provider or a CCA, SCE remains that customer's transmission and distribution provider. Other forms of departing load include customer generation, and load that departs SCE service entirely to take electricity service from a publicly owned utility or a tribal utility.
California law requires bundled service customers remain financially indifferent to departing load customers and to the mass return of departing load customers in the event of an Electric Service Provider or CCA's failure or other service termination. The CPUC has issued a series of decisions designed to avoid cost shifting in the context of departing load, including revising the PCIA methodology to effectively address the cost shifts to bundled service customers.
Investor-owned utilities serve as the default providers of last resort in their respective service areas and can be significantly impacted by the Electric Service Providers or CCAs failing or otherwise exiting the market. In March 2021, the CPUC initiated a rulemaking to examine the risks of catastrophic failures by Electric Service Providers or CCAs on investor-owned utilities and the need for any changes in the regulatory framework to increase consumer protections and financial security requirements, among other measures.
As of year-end 2022, SCE had twelve CCAs serving customers in its service territory that represented approximately 27% of SCE's total service load. While one CCA deregistered and exited, two new CCAs implemented and two CCAs expanded in SCE's service territory in 2022. Two expanded CCAs have been approved by the CPUC to serve customers in SCE's service territory in 2023, however one of the implementations is likely to be deregistered. Based on recent load statistics, SCE anticipates that Direct Access and CCA load will be approximately 44% of its total service load by the end of 2023.
Customer-owned power generation and storage alternatives, such as rooftop solar facilities and battery systems, are increasingly used by SCE's customers as a result of technological developments, federal and state subsidies, and declining costs of such alternatives. Beginning in 2020, and subject to certain exceptions, all newly built homes in California are required to have solar installations.
California legislation passed in 1995 encouraged private residential and commercial investment in renewable energy resources by requiring SCE and other investor-owned utilities to offer a NEM billing option to customers who install eligible power generation systems to supply all or part of their energy needs. NEM customers are interconnected to SCE's grid and credited for the net difference between the electricity SCE supplied to them through the grid and the electricity the customer exported to SCE over a 12-month period. SCE is required to credit the NEM customer for most of the power they sell back to SCE at the retail rate. Through the credit they receive, NEM customers effectively avoid paying certain grid-related costs. NEM customers are also exempted from some non-bypassable, standby and departing load charges and interconnection fees. Electric Service Providers and CCAs are not required by law to offer NEM rates.
In January 2016, the CPUC issued a decision adopting a new standard NEM tariff for customers with renewable generation systems. The changes that the CPUC decision made to the existing NEM tariff did not significantly impact the NEM subsidy. Specifically, the decision required customers that take service on SCE's NEM tariff after June 2017 to continue to be compensated at the retail rate, minus certain non-bypassable charges. NEM customers also continued to be exempted from standby and departing load charges but were required to pay a $75 interconnection fee and to select a time-of-use retail rate.
153
The effect of these types of competition on SCE generally is to reduce the amount of electricity purchased from SCE by retail customers. Customers who use alternative electricity sources typically continue to utilize and pay for SCE's transmission and distribution services, however, current NEM customers utilize, but do not pay the full cost for, those services. While changes in volume or rates generally do not impact SCE's earnings activities, decreased retail electricity sales by SCE has the effect of increasing utility rates because the costs of the distribution grid are not currently borne by all customers that benefit from its use. See "Risk Factors—Risks Relating to Southern California Edison Company—Competitive and Market Risks."
In August 2020, the CPUC initiated a rulemaking to develop a successor to the NEM tariffs. In December 2022, the CPUC issued final decision reducing the current NEM subsidy by decoupling export compensation from the retail rate. Under the final decision, the CPUC deferred consideration of whether to assess a grid participation charge to address the costs participating customers avoid by reducing the electricity they purchase from SCE and whether to adopt other mechanisms that would allow SCE to recover its cost of service and the costs of many public policy programs to another pending proceeding. The final decision also provides an enhanced subsidy for lower income customers and customers who pair rooftop solar with energy storage systems. The final decision does not apply to existing NEM customers until after they have completed twenty years on their existing NEM tariff, at which time they will move to the new, reduced tariff.
In the area of transmission infrastructure, SCE has experienced increased competition from independent transmission providers under the FERC's transmission planning requirements rules, effective in 2011, that removed the incumbent public utility transmission owners' federally-based right of first refusal to construct certain new transmission facilities and mandated regional and interregional transmission planning. Regional entities, such as independent system operators, have processes for regional and interregional transmission planning and the competitive solicitation and selection of developers (including incumbent utilities) to build and own certain types of new transmission projects. The CAISO has held competitive solicitations pursuant to these rules and independent service providers were selected.
Properties
SCE supplies electricity to its customers through extensive transmission and distribution networks. Its transmission facilities, which are located primarily in California but also in Nevada and Arizona, deliver power from generating sources to the distribution network and consist of approximately 13,000 circuit-miles of lines ranging from 55 kV to 500 kV and approximately 80 transmission substations. SCE's distribution system, which takes power from distribution substations to customers, consists of approximately 38,000 circuit-miles of overhead lines, approximately 31,000 circuit-miles of underground lines and approximately 730 distribution substations.
At December 31, 2022, SCE had ownership interests in generating and energy storage facilities, primarily located in California, with approximately 7,000 MW of net physical capacity, of which SCE's pro-rata share is approximately 3,000 MW. SCE's pro rata share includes approximately 73 MW of capacity from facilities that were not operational or out of service at December 31, 2022, other than for routine maintenance purposes, and excludes retired facilities. In addition to its current facilities, in October 2021, SCE contracted for the construction of utility owned storage at three sites in SCE's service territory with an aggregate capacity of 537.5 MW, which SCE has been advised will be in-service prior to June 2023. See "Management Overview—Capital Program—Utility Owned Storage Projects " in the MD&A.
Certain of SCE's substations, and portions of its transmission, distribution and communication systems are located on lands owned by the federal, state or local governments under licenses, permits, easements or leases, or on public streets or highways pursuant to franchises. Certain of the documents evidencing such rights obligate SCE, under specified circumstances and at its expense, to relocate such transmission, distribution, and communication facilities located on lands owned or controlled by federal, state, or local governments.
154
SCE owns and operates hydroelectric plants and related reservoirs, the majority of which are located in whole or in part on U.S.-owned lands and are subject to FERC licenses. Slightly over half of these plants have FERC licenses that expire at various times through 2046. FERC licenses impose numerous restrictions and obligations on SCE, including the right of the United States to acquire projects upon payment of specified compensation. When existing licenses expire, the FERC has the authority to issue new licenses to third parties that have filed competing license applications, but only if their license application is superior to SCE's and then only upon payment of specified compensation to SCE. New licenses issued to SCE are expected to contain more restrictions and obligations than the expired licenses because laws enacted since the existing licenses were issued require the FERC to give environmental objectives greater consideration in the licensing process. In addition, SCE expects additional opposition to new licenses by environmental stakeholder groups. If, in the future, SCE decides to, or is forced to, decommission one or more hydroelectric projects, the costs related to the decommissioning will be substantial. The CPUC approved SCE recovering a portion of estimated of decommissioning costs for hydroelectric projects in the 2021 GRC.
Substantially all of SCE's properties are subject to the lien of a trust indenture securing first and refunding mortgage bonds. See "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Seasonality
Due to warm weather during the summer months and SCE's rate design, operating revenue during the third quarter of each year is generally higher than the other quarters. However, as discussed above, SCE earnings are not affected by changes in retail electricity sales. See "Overview of Ratemaking Process" above.
SOUTHERN CALIFORNIA WILDFIRES
Wildfires in SCE's territory, including those where SCE's equipment may be alleged to be associated with the fire's ignition, have caused loss of life and substantial damage in recent years. Multiple factors have contributed to increased wildfire activity and faster progression of wildfires across SCE's service territory and in other areas of California. These include the buildup of dry vegetation in areas severely impacted by years of historic drought, lack of adequate clearing of hazardous fuels by responsible parties, higher temperatures, lower humidity, increased incidence of dry lightning, and strong Santa Ana winds. At the same time that wildfire risk has been increasing in Southern California, residential and commercial development has occurred and is occurring in some of the highest-risk areas. Such factors can increase the likelihood and extent of wildfires. SCE has determined that approximately 27% of its service territory is in areas identified as high fire risk.
California has experienced unprecedented weather conditions in recent years due to climate change, and SCE's service territory remains susceptible to additional wildfire activity in 2023 and beyond. The worsening weather and fuel conditions across California increase the likelihood of wildfires, including those where SCE's equipment may be alleged to be associated with the fire's ignition. In response to worsening conditions and increased wildfire activity over the past several years, SCE has been focused on developing and implementing plans aimed at reducing the risk of SCE equipment contributing to the ignition of wildfires, from its 2018 Gris Safety and Resiliency Program to its WMPs. In addition, California has increased its investment in wildfire prevention and fire suppression capabilities.
Multiple lawsuits related to wildfire events have been initiated against SCE and Edison International. For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides," "Risk Factors" and "Management Overview—Southern California Wildfires and Mudslides" in the MD&A.
155
Recovery of Wildfire-Related Costs
Pre-AB 1054 Cost Recovery
California courts have previously found investor-owned utilities to be strictly liable for property damage, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. The rationale stated by these courts for applying this theory to investor-owned utilities is that property damages resulting from a public improvement, such as the distribution of electricity, can be spread across the larger community that benefited from such improvement through recovery of uninsured wildfire-related costs in electric rates. However, in November 2017, the CPUC issued a decision denying SDG&E's request to include in its rates uninsured wildfire-related costs arising from several 2007 wildfires, finding that SDG&E did not meet the prudency standard because it did not prudently manage and operate its facilities prior to or at the outset of the 2007 wildfires. In July 2018, the CPUC denied both SDG&E's application for rehearing on its cost recovery request and a joint application for rehearing filed by SCE and PG&E limited to the applicability of inverse condemnation principles in the same proceeding. The California Court of Appeal, the California Supreme Court and the United States Supreme Court have denied SDG&E's petitions for review of the CPUC's denial of SDG&E's application.
2019 Wildfire Legislation
In July 2019, AB 1054 was signed by the Governor of California and became effective immediately. The summary of the wildfire legislation below is based on SCE's interpretation of AB 1054.
AB 1054 Prudency Standard
Under AB 1054, the CPUC must apply a revised standard when assessing the prudency of a utility in connection with a request for recovery of wildfire costs for wildfires ignited after July 12, 2019. Under AB 1054, the CPUC is required to find a utility to be prudent if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have undertaken under similar circumstances, at the relevant point in time, and based on the information available at that time. Prudent conduct under the AB 1054 standard is not limited to the optimum practice, method, or act to the exclusion of others, but rather encompasses a spectrum of possible practices, methods, or acts consistent with utility system needs, the interest of the ratepayers, and the requirements of governmental agencies. AB 1054 also clarifies that the CPUC may determine that wildfire costs may be recoverable, in whole or in part, by taking into account factors within and outside the utility's control, including humidity, temperature, and winds. Further, utilities with a valid safety certification will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was prudent. If a utility does not have a valid safety certification, it will have the burden to prove, based on a preponderance of evidence, that its conduct was prudent. The new prudency standard will survive the termination of the Wildfire Insurance Fund.
Utilities participating in the Wildfire Insurance Fund that are found to be prudent are not required to reimburse the fund for amounts withdrawn from the fund and can recover wildfire costs through electric rates if the fund has been exhausted.
Wildfire Insurance Fund
AB 1054 provided for the Wildfire Insurance Fund to reimburse a utility for payment of third-party damage claims arising from certain wildfires that exceed, in aggregate in a calendar year, the greater of $1.0 billion or the insurance coverage required to be maintained under AB 1054. The Wildfire Insurance Fund was established in September 2019 and is available for claims related to wildfires ignited after July 12, 2019 that are determined by the responsible government investigatory agency to have been caused by a utility.
156
SCE and SDG&E collectively made their initial contributions totaling approximately $2.7 billion (SCE share is $2.4 billion) to the Wildfire Insurance Fund in September 2019. Upon its emergence from bankruptcy, on July 1, 2020, PG&E made its initial contribution of approximately $4.8 billion to the Wildfire Insurance Fund. PG&E, SCE and SDG&E are also collectively expected to make aggregate contributions of approximately $3.0 billion (SCE share is $950 million) to the Wildfire Insurance Fund through annual contributions to the fund over a 10-year period by no later than January 1 of each year, of which they have made three annual contributions totaling approximately $1.2 billion (SCE share is approximately $380 million). In addition to PG&E's, SCE's and SDG&E's contributions to the Wildfire Insurance Fund, PG&E, SCE and SDG&E are expected to collect $6.1 billion, $6.1 billion and $1.3 billion, respectively, from their customers over a 15-year period through a dedicated rate component. The amount collected from customers may be directly contributed to the Wildfire Insurance Fund or used to support the issuance of up to $10.5 billion in bonds by the California Department of Water Resources, the proceeds of which would be contributed to the fund. In addition to funding contributions to the Wildfire Insurance Fund, the amount collected from utility customers will pay for, among other things, any interest and financing costs related to any bonds that are issued by the California Department of Water Resources to support the contributions to the Wildfire Insurance Fund.
SCE's contributions to the Wildfire Insurance Fund will not be recoverable through electric rates and will be excluded from the measurement of SCE's CPUC-jurisdictional authorized capital structure. SCE will also not be entitled to cost recovery for any borrowing costs incurred in connection with its contributions to the Wildfire Insurance Fund. For information on the accounting impact of SCE's contributions to the Wildfire Insurance Fund see "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054 " in this report.
Reimbursement from Wildfire Insurance Fund and AB 1054 Liability Cap
Participating investor-owned utilities will be reimbursed from the Wildfire Insurance Fund for eligible claims, subject to the fund administrator's review. SCE will reimburse the fund for any withdrawn amounts if SCE receives payment of such amounts under an indemnification agreement or from an insurance provider or other third-party. SCE will also be required to reimburse the fund for withdrawn amounts that the CPUC disallows, subject to the AB 1054 Liability Cap. If the utility has maintained a valid safety certification and its actions or inactions that resulted in the wildfire are not found to constitute conscious or willful disregard of the rights and safety of others, the aggregate requirement to reimburse the fund over a trailing three calendar year period is capped at 20% of the equity portion of the utility's transmission and distribution rate base in the year of the prudency determination. Based on SCE's forecasted weighted-average 2023 transmission and distribution rate base, excluding general plant and intangibles, and using the equity portion of SCE's CPUC authorized capital structure of 52%, SCE's requirement to reimburse the Wildfire Insurance Fund for eligible claims disallowed in 2023 would be capped at approximately $3.8 billion.
SCE will not be allowed to recover borrowing costs incurred to reimburse the fund for amounts that the CPUC disallows. The Wildfire Insurance Fund and, consequently, the AB 1054 Liability Cap will terminate when the administrator determines that the fund has been exhausted.
Safety Certification and Wildfire Mitigation Plan
Under AB 1054, SCE can obtain an annual safety certification upon the submission by September 14th of each year of certain required safety information, including an approved WMP. Under AB 1054, SCE is also required to submit a comprehensive WMP to the CPUC at least once every three years for review and approval. Each such comprehensive plan is now required to cover at least a three-year period. In addition, SCE anticipates updating its comprehensive three-year plans annually in the intervening years.
SCE submitted its 2020 – 2022 WMP in February 2020 and most recently submitted updates to its plan in February 2022 to, among other things, report on implementation of its plan, describe new and ongoing wildfire mitigation activities and
157
report on its progress on remedying issues identified in an action statement issued by the OEIS in August 2021. In July 2022, the OEIS approved SCE's 2022 updates to its 2020 – 2022 WMP and the CPUC ratified the OEIS approval in August 2022.
On December 13, 2022, SCE obtained a safety certification that will be valid for 12 months. Notwithstanding its 12-month term, if SCE requested a new safety certification by September 14, 2023, then its current safety certification would remain valid until OEIS acts on SCE's request for a new safety certification.
SCE expects to file its 2023 – 2025 WMP in March 2023.
Public Safety Power Shutoffs
In addition to the investments SCE is making as part of its WMP, SCE also uses Public Safety Power Shutoffs ("PSPS") to proactively de-energize power lines as a last resort to mitigate the risk of catastrophic wildfires during extreme weather events. SCE initiated PSPS 12 times in 2020 as part of its wildfire mitigation efforts resulting in an aggregate of approximately 268 million customer minutes interrupted. On a risk informed basis, SCE made efforts to reduce the frequency and impacts of PSPS in 2021 as compared to 2020. SCE initiated PSPS ten times in 2021 resulting in approximately 222 million customer minutes interrupted. The 2021 events include a January 2021 event that resulted in approximately 118 million customer minutes interrupted. While SCE's wildfire mitigation efforts contributed to the reduction in use and impact of PSPS in 2021, the use of PSPS also depends on weather and fuel conditions. SCE initiated PSPS six times in 2022 resulting in approximately seven million customer minutes interrupted. As of February 16, 2023, SCE had not initiated any PSPS events in 2023.
In January 2021, the President of the CPUC sent SCE a letter expressing her concern regarding SCE's execution of PSPS in 2020 and notifying SCE that it must implement a PSPS action plan to reduce the impacts of PSPS on the customers and communities it serves. SCE has one item left to implement on its PSPS action plan. In June 2021, the CPUC issued a final decision which, among other things, will reduce future authorized revenue for the volumetric reductions in electricity sales resulting from PSPS events initiated after June 2021 until the CPUC determines that improvements in the PSPS program have been made.
In June 2022, the SED issued an Administrative Enforcement Order ("AEO") against SCE proposing penalties of $10 million for alleged noncompliance with customer notification requirements related to PSPS events in 2020. In October 2022, the SED and SCE reached a settlement agreement under which SCE agreed to pay $7 million and complete certain corrective actions to resolve the AEO. SCE did not admit wrongdoing or liability as part of the settlement. SCE's obligations under the settlement agreement will commence after CPUC approval of the agreement is final and non-appealable. SCE has made and continues to make significant investments and progress in improving its PSPS protocols, including through increased automation of customer notifications.
ENVIRONMENTAL CONSIDERATIONS
Greenhouse Gas Regulation
Edison International recognizes that its industry and the global economy are in the midst of a profound transformation toward a low-carbon future as a response to climate change. SCE plans to be a key enabler of the adoption of new energy technologies that benefit customers of the electric grid. See "Management Overview—Electricity Industry Trends" in the MD&A.
Approximately 66% of SCE's sources of utility-owned generation were carbon-free in 2022. SCE estimates that approximately 20% of power delivered to SCE's customers in 2022 came from SCE's own generating facilities, with approximately 9% nuclear, 3% large hydroelectric, less than 1% small hydroelectric, and less than 1% solar generation. Approximately 7% were natural gas sources. Since 2010, SCE has reported its annual GHG emissions from
158
utility-owned generation each year to the U.S Environmental Protection Agency by March 31 of the following year. SCE's 2022 GHG emissions from utility-owned generation are estimated to be approximately 1,500,000 metric tons.
California is committed to reducing its GHG emissions, improving local air quality and supporting continued economic growth. California's major initiatives for reducing GHG emissions include a law that targets the reduction of GHG emissions across the entire state economy to 40% below 1990 levels by 2030 and a California cap-and-trade program established by the California Air Resources Board ("CARB"). Other major policy measures include the Low Carbon Fuel Standard program established by CARB. In 2022, the California Climate Crisis Act declared the policy of the state to achieve net zero greenhouse gas emissions as soon as possible, but no later than 2045, to achieve and maintain net negative greenhouse gas emissions thereafter, and to ensure that by 2045, statewide anthropogenic greenhouse gas emissions are reduced to at least 85% below the 1990 levels. Edison International is committed to achieving net-zero GHG emissions by 2045, in alignment with economywide climate actions planned by California. This commitment covers the power SCE delivers to customers and Edison International's enterprise-wide operations.
In the California cap-and-trade program, all covered GHG emitters, including SCE, are subject to an annually declining program "cap" on emissions designed to encourage entities to reduce emissions from their operations. Covered entities must remit a compliance instrument for each ton of carbon dioxide equivalent gas emitted and can do so buying state-issued emission allowances at auction or purchasing them in the secondary allowance market. From 2013 to 2020, GHG emitters could have met up to 8% of their cap-and-trade obligations by procuring GHG offset credits from verified offset programs, such as reforestation, that have recognized effects on reducing atmospheric GHGs. The offset usage limit has decreased to 4% for 2021 – 2025 emissions and will then increase to 6% for 2026 – 2030 emissions. Starting with 2021 emissions, no more than one-half of the quantitative offset usage limit may be sourced from projects that do not provide direct environmental benefits in California.
California has adopted RPS targets that require California retail sellers of electricity to provide certain percentages of energy sales from renewable resources defined in the statute, including 33% of retail sales by December 2020; 44% of retail sales by December 2024, 52% of retail sales by December 2027, and 60% of retail sales by December 2030. Approximately 35% of SCE's supply portfolio in 2020 came from renewable sources eligible under California's RPS, of which 32% was delivered to customers and 3% was sold for resale. As such, SCE met California's 2020 RPS target. Approximately 39% of SCE's supply portfolio in 2022 came from renewable sources eligible under California's RPS, of which 36% was delivered to customers and 3% was sold for resale. SCE's climate change objectives align with California's requirements, and SCE remains well-positioned to meet California’s 2030 and 2045 RPS targets.
Separate from RPS targets, California requires the following percentages of retail sales of electricity to California end-use customers must be from carbon-free resources by the following deadlines: 90% by December 31, 2035, 95% by December 31, 2040, and 100% by December 31, 2045. California also requires each state agency to ensure that carbon free resources supply 100% of electricity procured on its behalf by December 31, 2035. SCE plans to propose for CPUC approval new programs to help state agency customers meet their accelerated 100% clear power needs. SCE estimates that approximately 48% of SCE's customer deliveries in 2022 came from carbon-free resources. SCE believes that it is well-positioned to meet California’s carbon-free requirements.
Additionally, the CPUC and the California Energy Commission adopted GHG emission performance standards that apply to California investor-owned and publicly owned utilities' long-term arrangements for the purchase of electricity. The standards prohibit these entities, including SCE, from owning or entering into long-term financial commitments with generators, such as coal plants, that emit more GHG than a combined-cycle natural gas turbine generator. California also supports climate action to meet the December 2015 Paris Agreement.
159
Edison International supports these California environmental initiatives and has undertaken analysis which, consistent with third-party analysis, shows that electrification across multiple sectors, including transportation and industrial sectors, is among the most cost-effective ways to achieve California's requirements and goals. Edison International and SCE believe that these initiatives will lead to increased electrification across the economy and SCE is investing in grid technologies and charging infrastructure to support California's goals.
Environmental Risks
Climate change has, and continues to, impact California. Southern California has warmed 3 degrees Fahrenheit in the last century, snowpack has declined, and the Western United States and Northern Mexico are experiencing their driest period in at least 1,200 years. Severe droughts and windstorms contributed to the devastating wildfires that swept through parts of California in recent years, demonstrating the serious threat that weather extremes caused by climate change pose to California's communities and the environment. See "Management Overview—Southern California Wildfires and Mudslides" in the MD&A and "Business—Southern California Wildfires."
Severe weather events, including drought, increasingly severe windstorms and rising sea-levels, pose risks to SCE's infrastructure and SCE and Edison International are investing in building a more resilient grid to reduce climate- and weather-related vulnerabilities. See " Liquidity and Capital Resources—SCE—Regulatory Proceedings—Wildfire Related Regulatory Proceedings" in the MD&A.
In May 2022, SCE provided its climate adaptability vulnerability assessment (“CAVA”) to the CPUC. The CAVA addresses the projected climate impacts of temperature, sea level, precipitation, wildfire, and cascading impacts (such as rain on snow or debris flow) on SCE in the 2030, 2050, and 2070 timeframes. SCE’s CAVA will inform planning related to SCE assets, operations, and services, with the goal of maintaining a resilient electric grid in the face of climate change and will inform future investment in the grid.
For more information on risks related to climate change, environmental regulation and SCE's business strategy, see "Risk Factors—Risks Relating to Southern California Edison Company—Operating Risks."
UNRESOLVED STAFF COMMENTS
None.
PROPERTIES
As a holding company, Edison International does not directly own any significant properties other than the stock of its subsidiaries. The principal properties of SCE are described above under "Business—SCE—Properties."
LEGAL PROCEEDINGS
2017/2018 Wildfire/Mudslide Events
Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.
As of February 16, 2023, SCE was aware of approximately 120 currently pending lawsuits, representing approximately 1,000 plaintiffs, related to the Thomas and Koenigstein Fires naming SCE as a defendant. Approximately 95 of the approximately 120 pending lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. One of the lawsuits was filed as a purported class action. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties allege, among other things, negligence, inverse
160
condemnation, trespass, private nuisance, and violations of the public utilities and health and safety codes. SCE and certain of the individual plaintiffs in the Thomas and Koenigstein Fire litigation have been pursuing settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs have opted to pursue trial outside of the settlement program.
Approximately 30 of the approximately 120 pending lawsuits mentioned in the paragraph above allege that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides, resulting in the plaintiffs' claimed damages. Many of the Montecito Mudslides lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. In addition to other causes of action, some of the Montecito Mudslides lawsuits also allege personal injury and wrongful death. A bellwether jury trial previously scheduled for October 12, 2020 was vacated due to the wide-spread disruption caused by the COVID-19 pandemic.
As of February 16, 2023, SCE was aware of approximately 370 currently pending lawsuits, representing approximately 3,000 plaintiffs, related to the Woolsey Fire naming SCE as a defendant. Approximately 110 of the 370 lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least one of the lawsuits was filed as a purported class action. The lawsuits, which have been filed in the superior courts of Ventura and Los Angeles Counties allege, among other things, negligence, inverse condemnation, personal injury, wrongful death, trespass, private nuisance, and violations of the public utilities and health and safety codes. SCE and certain of the individual plaintiffs in the Woolsey Fire litigation have been pursuing settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs may opt to pursue trial outside of the settlement program.
The Thomas and Koenigstein Fires and Montecito Mudslides lawsuits are being coordinated in the Los Angeles Superior Court. The Woolsey Fire lawsuits have also been coordinated in the Los Angeles Superior Court.
For further information, including regarding settlement activity related to the 2017/2018 Wildfire/Mudslide Events, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
Environmental Proceedings
Each of Edison International and SCE have elected to disclose environmental proceedings described in Item 103(c)(3)(iii) of Regulation SK unless it reasonably believes that such proceeding will result in no monetary sanctions, or in monetary sanctions, exclusive of interest and costs, of less than $1,000,000.
Mission Canyon
SCE performed 1.6 miles of access road grading and vegetation clearing in the Mission Canyon area of Santa Barbara County in December 2019, resulting in debris moving downslope into a creek bed and other impacts in the area (the "Mission Canyon Incident"). Several state and federal environmental agencies and the County and City of Santa Barbara have investigated the unpermitted grading and discharges to the creek, and SCE has received Notices of Violation from the Army Corps of Engineers, the County of Santa Barbara, the California Department of Fish & Wildlife and the Regional Water Quality Control Board. In December 2020, SCE and the Santa Barbara County District Attorney entered into a settlement regarding alleged criminal and civil violations related to the Mission Canyon Incident. Under the settlement, SCE pled no contest to a single misdemeanor charge for violation of the California Water Code and agreed to pay a $10,000 fine. SCE also agreed to pay a civil penalty of $3.5 million and is subject to an injunction compelling it to complete planned remediation work related to the Mission Canyon Incident and not commit similar violations for five years. It is presently unknown whether any regulatory agencies will impose additional fines or penalties on SCE with respect to the Mission Canyon Incident and, if so, in what amounts. SCE does not expect fines or penalties that are
161
imposed in connection with the Mission Canyon Incident to be material.
MINE SAFETY DISCLOSURE
Not applicable.
CERTAIN INFORMATION ABOUT EDISON INTERNATIONAL
INFORMATION ABOUT OUR EXECUTIVE OFFICERS
Executive Officer |
| Age at |
| Company Position |
Pedro J. Pizarro | 57 | President and Chief Executive Officer | ||
Maria Rigatti | 59 | Executive Vice President and Chief Financial Officer | ||
Adam S. Umanoff | 63 | Executive Vice President and General Counsel | ||
Caroline Choi | 54 | Senior Vice President, Corporate Affairs | ||
J. Andrew Murphy | 62 | Senior Vice President, Strategy and Corporate Development | ||
Natalie K. Schilling | 63 | Senior Vice President, Human Resources | ||
Steven D. Powell | 44 | President and Chief Executive Officer, SCE | ||
Jill C. Anderson | 42 | Executive Vice President, Operations, SCE |
As set forth in Article IV of Edison International's Bylaws, the elected officers of Edison International are chosen annually by, and serve at the pleasure of, Edison International's Board of Directors and hold their respective offices until their resignation, removal, other disqualification from service, or until their respective successors are elected. All of the officers of Edison International have been actively engaged in the business of Edison International and its subsidiaries for more than five years, except for Ms. Schilling, and have served in their present positions for the periods stated below. Additionally, those officers who have had other or additional principal positions in the past five years had the following business experience during that period:
Executive Officers |
| Company Position |
| Effective Dates |
Pedro J. Pizarro | Chief Executive Officer, Edison International | October 2016 to present | ||
Maria Rigatti | Executive Vice President and Chief Financial Officer, Edison International | October 2016 to present | ||
Adam S. Umanoff | Executive Vice President and General Counsel, Edison International | January 2015 to present | ||
Caroline Choi | Senior Vice President, Corporate Affairs, Edison International and SCE | February 2019 to present | ||
J. Andrew Murphy | Senior Vice President, Strategy and Corporate Development, Edison International | September 2015 to present | ||
Natalie K. Schilling | Senior Vice President, Human Resources Edison International and SCE Chief Human Resources Officer, Aerojet Rocketdyne Holdings, Inc.1 | March 2022 to present April 2018 to January 2020 | ||
Steven D. Powell | President and Chief Executive Officer, SCE Executive Vice President, Operations, SCE | December 2021 to present September 2019 to December 2021 | ||
Jill C. Anderson | Executive Vice President, Operations, SCE Senior Vice President, Strategic Planning and Power Supply, SCE | December 2021 to present September 2019 to March 2020 |
1 Aerojet Rocketdyne Holdings, Inc. is an aerospace and defense firm, and is not a parent, affiliate or subsidiary of Edison International
162
DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
Information concerning executive officers of Edison International is set forth above under "Information about our Executive Officers." Other information responding to this section will appear in the Edison International Proxy Statement under the headings "Our Director Nominees," "Experience, Skills and Attributes on the Board," "Director Biographies," and "Delinquent Section 16(a) Reports" and is incorporated herein by this reference.
The Edison International Employee Code of Conduct is applicable to all officers and employees of Edison International and its subsidiaries. The Code is available on Edison International's Internet website at www.edisoninvestor.com at "Corporate Governance." Any amendments or waivers of Code provisions for the Company's principal executive officer, principal financial officer, principal accounting officer or controller, or persons performing similar functions, will be posted on Edison International's Internet website at www.edisoninvestor.com.
EXECUTIVE COMPENSATION
Information responding to this section will appear in the Edison International Proxy Statement under the headings "Compensation Discussion and Analysis," "Executive Compensation" (other than "—Pay Versus Performance”) and "Director Compensation" and is incorporated herein by this reference.
SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Information responding to this section will appear in the Edison International Proxy Statement under the heading "Stock Ownership" and is incorporated herein by this reference.
Equity Compensation Plan Information
All of Edison International's equity compensation plans that were in effect as of December 31, 2022 have been approved by security holders. The following table sets forth, for each of Edison International's equity compensation plans, the number of shares of Edison International Common Stock subject to outstanding options, warrants and rights to acquire such stock, the weighted average exercise price of those outstanding options, warrants and rights, and the number of shares remaining available for future award grants as of December 31, 2022.
Number of securities to | Weighted average | Number of securities remaining for |
| ||||
be issued upon exercise | exercise price of | future issuance under equity |
| ||||
of outstanding options, | outstanding options, | compensation plans (excluding |
| ||||
warrants and rights | warrants and rights | securities reflected in column |
| ||||
Plan Category |
| (a) |
| (b) |
| (a)(c) |
|
Equity compensation plans approved by security holders |
| 13,355,067 | 1 | $ 63.64 |
| 16,244,934 | 2 |
1 | This amount includes 11,883,556 shares covered by outstanding stock options, 753,174 shares covered by outstanding restricted stock unit awards, 167,836 shares covered by outstanding deferred stock unit awards, and 550,501 shares covered by outstanding performance share awards (calculated at 100% of the target number of shares subject to each performance share award; the actual payout for each award will be zero to twice the target number of shares for the award, depending on performance), with the outstanding shares covered by outstanding restricted stock unit, deferred stock unit, and performance share awards including the crediting of dividend equivalents through December 31, 2022. The weighted average exercise price of awards outstanding under equity compensation plans approved by security holders reflected in column (b) above is calculated based on the outstanding stock options under these plans as the other forms of awards outstanding have no exercise price. Awards payable solely in cash are not reflected in this table. |
2 | This amount is the aggregate number of shares available for new awards under the Edison International 2007 Performance Incentive Plan and the Edison International Employee Stock Purchase Plan as of December 31, 2022. The maximum number of |
163
shares of Edison International Common Stock that may be issued or transferred pursuant to awards under the Edison International 2007 Performance Incentive Plan is 71,031,524. Shares available under the Edison International 2007 Performance Incentive Plan may generally, subject to certain limits set forth in the plan, be used for any type of award authorized under that plan, including stock options, restricted stock, performance shares, restricted or deferred units, and stock bonuses. The maximum number of shares of Edison International Common Stock that may be acquired under the Edison International Employee Stock Purchase Plan is 3,000,000.
CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
Information responding to this section will appear in the Edison International Proxy Statement under the headings "Governance Structure and Processes—Certain Relationships and Related Party Transactions," and "Governance Structure and Processes—Director Independence," and is incorporated herein by this reference.
PRINCIPAL ACCOUNTANT FEES AND SERVICES
PricewaterhouseCoopers LLP ("PwC") served as Edison International's and SCE's principal accountant in 2022. Information responding to this section for Edison International will appear in the Edison International Proxy Statement under the heading "Independent Auditor Fees," and is incorporated herein by this reference.
The following table sets forth the aggregate fees billed by PwC to SCE for the fiscal years ended December 31, 2022 and December 31, 2021:
(1) Represent fees for professional services provided in connection with the audit of SCE's annual financial statements and reviews of SCE's quarterly financial statements and for services regularly provided by PwC in connection with regulatory filings or engagements.
(2) Represent fees for assurance and related services related to the performance of the audit or review of the financial statements and not reported under "Audit Fees" above, including assessments of new accounting pronouncements.
(3) Represent fees for tax-related compliance and other tax-related services to support compliance with federal and state tax reporting and payment requirements, including tax return review and review of tax laws, regulations or case precedent.
(4) Represent fees for miscellaneous services. "All Other Fees" includes fees for attestation services related to securitizations for the year ended December 31, 2022 and fees for a CSRP assessment and a CPUC required attestation report on wildfire memorandum accounts for the year ended December 31, 2021.
(5) "Audit Fees" for the year ended December 31, 2021 includes $228,000 of fees, for services performed in connection with regulatory reports, inadvertently excluded from the 2021 Annual Report on Form 10-K.
The SCE Audit and Finance Committee annually approves all proposed audit fees in executive session without PwC present, considering several factors, including a breakdown of the services to be provided, proposed staffing and hourly rates, and changes in SCE and industry from the prior year. The audit fees are the culmination of a process which included a comparison of the prior year's proposed fees to actual fees incurred and fee proposals for known and anticipated 2022 services in the audit, audit-related, tax and other categories. The committee's deliberations consider
164
balancing the design of an audit scope that will achieve a high-quality audit with driving efficiencies from both SCE and PwC while compensating PwC fairly.
The SCE Audit and Finance Committee is required to pre-approve all audit and permitted non-audit services performed by PwC to ensure these services will not impair the firm's independence. The SCE Audit and Finance Committee has delegated to the Committee Chair the authority to pre-approve services between committee meetings, provided that any pre-approval decisions are presented to the committee at its next meeting. PwC must assure that all audit and non-audit services provided to SCE have been approved by the SCE Audit and Finance Committee.
During the fiscal year ended December 31, 2022, all services performed by PwC were pre-approved by the SCE Audit and Finance Committee, irrespective of whether the services required pre-approval under the Securities Exchange Act of 1934.
MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
Edison International
Edison International Common Stock is traded on the New York Stock Exchange under the symbol "EIX."
There are restrictions on the ability of SCE to transfer funds to Edison International that materially limit the ability of Edison International to pay cash dividends. Such restrictions are discussed in the MD&A under the heading "Liquidity and Capital Resources—SCE—SCE Dividends," and in "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—SCE Dividends." The number of common stockholders of record of Edison International was 25,645 on February 16, 2023. In addition, Edison International cannot pay dividends if it does not meet California law requirements on retained earnings and solvency.
Southern California Edison Company
As a result of the formation of a holding company described under the heading "Business" above, all of the issued and outstanding common stock of SCE is owned by Edison International and there is no market for such stock. There are restrictions on SCE's ability to pay dividends to Edison International and to its preference shareholders. Such restrictions are discussed in the MD&A under the heading "Liquidity and Capital Resources—SCE—SCE Dividends," and in "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—SCE Dividends."
165
Comparison of Five-Year Cumulative Total Return
At December 31, | ||||||||||||||||||
| 2017 |
| 2018 |
| 2019 |
| 2020 |
| 2021 |
| 2022 | |||||||
Edison International | $ | 100 | $ | 93 | $ | 128 | $ | 112 | $ | 127 | $ | 124 | ||||||
S & P 500 Index | $ | 100 | $ | 96 | $ | 126 | $ | 149 | $ | 191 | $ | 157 | ||||||
Philadelphia Utility Index | $ | 100 | $ | 104 | $ | 131 | $ | 135 | $ | 159 | $ | 160 |
Note: Assumes $100 invested on December 31, 2017 in stock or index including reinvestment of dividends. Performance of the Philadelphia Utility Index is regularly reviewed by management and the Board of Directors in understanding Edison International's relative performance and is used in conjunction with elements of Edison International's compensation program.
FORM 10-K SUMMARY
None.
OTHER INFORMATION
None.
PART II, ITEM 6. Reserved.
This item no longer requires disclosure.
DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
Not applicable.
EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
(a) (1) Financial Statements
See Consolidated Financial Statements listed in the Table of Contents of this report.
166
(a) (2) Report of Independent Registered Public Accounting Firm and Schedules Supplementing Financial Statements
Edison International
The following documents may be found in this report at the indicated page numbers under the headings "Financial Statements and Supplementary Data—Reports of Independent Registered Accounting Firm" and "Exhibits and Financial Statement Schedules—Schedules Supplementing Financial Statements" in the Table of Contents of this report.
Schedules II through V, inclusive, for Edison International are omitted as not required or not applicable.
Southern California Edison Company
The following documents may be found in this report at the indicated page numbers under the headings "Financial Statements and Supplementary Data—Reports of Independent Registered Accounting Firm" and "Exhibits and Financial Statement Schedules—Schedules Supplementing Financial Statements" in the Table of Contents of this report.
Schedules I through V, inclusive, for SCE are omitted as not required or not applicable.
(a) (3) Exhibits
167
EXHIBIT INDEX
Exhibit |
| Description |
---|---|---|
Edison International | ||
3.1 | ||
3.2 | ||
Southern California Edison Company | ||
3.3 | ||
3.4 | ||
Edison International | ||
4.1 | Edison International - Description of Registered Securities (File No. 1-9936, filed as Exhibit 4.1 to Edison International's Form 10-K for the year ended December 31, 2019)* | |
4.2 | ||
4.3 | ||
4.4 | ||
Southern California Edison Company | ||
4.5 | ||
168
Exhibit |
| Description |
---|---|---|
4.6 | ||
Edison International and Southern California Edison Company | ||
10.1** | ||
10.2** | ||
10.3** | Edison International 2008 Executive Deferred Compensation Plan, as amended and restated effective January 1, 2021 (File No. 1-9936, filed as Exhibit No. 10.3 to Edison International’s Form 10-Q for the quarter ended September 30, 2020)* | |
10.4** | ||
10.4.1** | ||
10.5** | ||
10.6** | ||
10.7** | ||
10.7.1** | ||
10.7.2** | ||
10.7.3** | ||
169
Exhibit |
| Description |
---|---|---|
10.7.4** | ||
10.7.5** | ||
10.7.6** | ||
10.7.7** | ||
10.7.8** | ||
10.7.9** | Edison International 2020 Long-Term Incentives Terms and Conditions (File, No. 1-9936, filed as Exhibit 10.4 to Edison International's Form 10-Q for the quarter ended March 31, 2020)* | |
10.7.10** | ||
10.7.11** | ||
10.8** | ||
10.9** | ||
10.10** | ||
10.11 | ||
10.12 | ||
170
Exhibit |
| Description |
---|---|---|
10.12.1 | ||
10.12.2 | ||
10.12.3 | ||
10.13** | ||
10.14 | ||
10.15 | ||
10.16 | ||
10.17 | ||
10.18 | ||
171
Exhibit |
| Description |
---|---|---|
10.19 | ||
10.20 | ||
10.21 | ||
10.22 | ||
10.23 | ||
10.24 | ||
10.25 | ||
21 | ||
23.1 | Consent of Independent Registered Public Accounting Firm (Edison International) | |
23.2 | Consent of Independent Registered Public Accounting Firm (Southern California Edison Company) | |
24.1 | Powers of Attorney of Edison International and Southern California Edison Company | |
24.2 | ||
172
Exhibit |
| Description |
---|---|---|
31.1 | ||
31.2 | ||
32.1 | ||
32.2 | ||
101.1 | Financial statements from the annual report on Form 10-K of Edison International for the year ended December 31, 2022, filed on February 23, 2023, formatted in Inline XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; (v) Consolidated Statements of Changes in Equity and (vi) the Notes to Consolidated Financial Statements | |
101.2 | Financial statements from the annual report on Form 10-K of Southern California Edison Company for the year ended December 31, 2022, filed on February 23, 2023, formatted in Inline XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; (v) Consolidated Statements of Changes in Equity and (vi) the Notes to Consolidated Financial Statements | |
104 | The cover page of this report formatted in Inline XBRL (included as Exhibit 101) |
* Incorporated by reference pursuant to Rule 12b-32.
** Indicates a management contract or compensatory plan or arrangement, as required by Item 15(a)(3).
Edison International and SCE will furnish a copy of any exhibit listed in the accompanying Exhibit Index upon written request and upon payment to Edison International or SCE of their reasonable expenses of furnishing such exhibit, which shall be limited to photocopying charges and, if mailed to the requesting party, the cost of first-class postage.
173
SCHEDULES SUPPLEMENTING FINANCIAL STATEMENTS
EDISON INTERNATIONAL
SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT
CONDENSED BALANCE SHEETS
December 31, | ||||||
(in millions) |
| 2022 |
| 2021 | ||
Assets: |
|
|
|
| ||
Cash and cash equivalents | $ | 4 | $ | 52 | ||
Other current assets |
| 447 |
| 403 | ||
Total current assets |
| 451 |
| 455 | ||
Investments in subsidiaries |
| 19,922 |
| 18,924 | ||
Deferred income taxes |
| 626 |
| 697 | ||
Other long-term assets |
| 62 |
| 68 | ||
Total assets | $ | 21,061 | $ | 20,144 | ||
Liabilities and equity: |
|
|
|
| ||
Short-term debt | $ | 1,090 | $ | — | ||
Current portion of long-term debt |
| 400 |
| 700 | ||
Other current liabilities |
| 575 |
| 583 | ||
Total current liabilities |
| 2,065 |
| 1,283 | ||
Long-term debt |
| 2,981 |
| 2,438 | ||
Other long-term liabilities |
| 394 |
| 535 | ||
Total equity |
| 15,621 |
| 15,888 | ||
Total liabilities and equity | $ | 21,061 | $ | 20,144 |
174
EDISON INTERNATIONAL
SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT
CONDENSED STATEMENTS OF INCOME
For the Years Ended December 31, 2022, 2021 and 2020
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Interest income from affiliates | $ | 3 | $ | — | $ | 1 | |||
Operating, interest and other expenses |
| 209 |
| 176 |
| 189 | |||
Loss before equity in earnings of subsidiaries |
| (206) |
| (176) |
| (188) | |||
Equity in earnings of subsidiaries |
| 867 |
| 956 |
| 851 | |||
Income before income taxes |
| 661 |
| 780 |
| 663 | |||
Income tax benefit |
| (56) |
| (39) |
| (76) | |||
Income from continuing operations |
| 717 |
| 819 |
| 739 | |||
Preferred stock dividend requirements of Edison International | 105 | 60 | — | ||||||
Net income | $ | 612 | $ | 759 | $ | 739 |
175
CONDENSED STATEMENTS OF COMPREHENSIVE INCOME
For the Years Ended December 31, 2022, 2021 and 2020
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Net income | $ | 717 | $ | 819 | $ | 739 | |||
Other comprehensive income, net of tax |
| 43 |
| 15 |
| — | |||
Comprehensive income | $ | 760 | $ | 834 | $ | 739 |
176
EDISON INTERNATIONAL
SCHEDULE I – CONDENSED FINANCIAL INFORMATION OF PARENT
CONDENSED STATEMENTS OF CASH FLOWS
For the Years Ended December 31, 2022, 2021 and 2020
(in millions) |
| 2022 |
| 2021 |
| 2020 | |||
Net cash provided by operating activities | $ | 1,133 | $ | 817 | $ | 1,171 | |||
Cash flows from financing activities: |
|
|
|
|
|
| |||
Long-term debt issued |
| 945 |
| — |
| 400 | |||
Long-term debt issuance costs |
| (6) |
| — |
| (3) | |||
Long-term debt repaid |
| (700) |
| — |
| (400) | |||
Short-term debt issued |
| 1,000 |
| — |
| 800 | |||
Short-term debt repaid |
| — |
| — |
| (800) | |||
Common stock issued |
| 13 |
| 32 |
| 912 | |||
Preferred stock issued | — | 1,977 | — | ||||||
Payable due to affiliates |
| (14) |
| (13) |
| 135 | |||
Commercial paper borrowing (repayments), net |
| 89 |
| (130) |
| 129 | |||
Payments for stock-based compensation |
| (8) |
| (3) |
| (3) | |||
Receipts for stock-based compensation |
| 72 |
| 31 |
| 21 | |||
Common stock dividends paid |
| (1,050) |
| (988) |
| (928) | |||
Preferred stock dividends paid | (99) | (35) | — | ||||||
Net cash provided by financing activities |
| 242 |
| 871 |
| 263 | |||
Capital contributions to affiliate |
| (1,426) |
| (1,639) |
| (1,446) | |||
Dividends from affiliate |
| 3 |
| — |
| — | |||
Net cash used in investing activities: |
| (1,423) |
| (1,639) |
| (1,446) | |||
Net (decrease) increase in cash and cash equivalents |
| (48) |
| 49 |
| (12) | |||
Cash and cash equivalents, beginning of year |
| 52 |
| 3 |
| 15 | |||
Cash and cash equivalents, end of year | $ | 4 | $ | 52 | $ | 3 |
177
Note 1. Basis of Presentation
The accompanying condensed financial statements of Edison International Parent should be read in conjunction with the consolidated financial statements and notes thereto of Edison International and subsidiaries ("Registrant") included in this Form 10-K. Edison International Parent's significant accounting policies are consistent with those of the Registrant, SCE and other wholly owned and controlled subsidiaries.
Dividends Received
Edison International Parent received cash dividends from SCE of $1.3 billion, $975 million and $1.3 billion in 2022, 2021 and 2020, respectively.
Dividend Restrictions
CPUC holding company rules require that SCE's dividend policy be established by SCE's Board of Directors on the same basis as if SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's electricity service obligations, shall receive first priority from the Boards of Directors of both Edison International and SCE. In addition, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders.
The common equity component of SCE's CPUC authorized capital structure is 52% on a weighted average basis over the January 1, 2023 to December 31, 2025 compliance period. This is unchanged from the January 1, 2020 to December 31, 2022 compliance period. The CPUC authorized capital structure differs from the capital structure calculated based on GAAP due to certain exclusions allowed by CPUC, including the impact of SCE's contributions to the Wildfire Insurance Fund under AB 1054. For further information, see "Business—SCE—Overview of Ratemaking Process" and "Business—Southern California Wildfires."
In May 2020, the CPUC issued a decision on SCE's application to the CPUC for waiver of compliance with its equity ratio requirement, that allows SCE to exclude from its equity ratio calculations (i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. With these exclusions, SCE was in compliance with its authorized capital structure for the compliance period from January 1, 2020 to December 31, 2022. The temporary exclusion lapsed on May 7, 2022. In April 2022, SCE filed another application requesting continued waiver of compliance with its equity ratio requirement. Under the CPUC's rules, SCE will not be deemed to be in violation of the equity ratio requirement while the waiver application is pending resolution. While the exclusion is in place, SCE is required to notify the CPUC if an adverse financial event reduces SCE's spot equity ratio by more than one percent from the level most recently filed with the CPUC in the proceeding. The last spot equity ratio SCE filed with the CPUC in the proceeding did not exclude the then $1.8 billion net charge and was 45.2% as of December 31, 2018 (at the time the common equity component of SCE's CPUC authorized capital structure was required to remain at or above 48% on a weighted average basis over the applicable 37-month period). SCE's spot equity ratio on December 31, 2018 would have been 48.7% had the $1.8 billion net charge at December 31, 2018 been excluded, therefore SCE will notify the CPUC if its spot ratio drops below 47.7% in any quarter. For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
Note 2. Debt and Equity Financing
Long-Term Debt
At December 31, 2022, Edison International Parent had, $400 million of 2.95% senior notes due in 2023, $500 million of 3.55% senior notes due in 2024, $400 million of 4.95% senior notes and $400 million of 4.70% senior notes due in
178
2025, $600 million of 5.75% senior notes due in 2027, $550 million of 4.125% senior notes due in 2028 and $550 million 6.95% senior notes due in 2029.
Credit Agreements and Short-Term Debt
The following table summarizes the status of the credit facility at December 31, 2022:
(in millions) |
|
| |
Commitment | $ | 1,500 | |
Outstanding borrowings |
| 90 | |
Amount available | $ | 1,410 |
In May 2022, Edison International Parent amended its revolving credit facility to extend the termination date to May 2026. The aggregate maximum principal amount under the Edison International Parent revolving credit facility may be increased up to $2.0 billion, provided that additional lender commitments are obtained.
As of December 31, 2022, Edison International Parent has outstanding term loans of $600 million due in April 2023 and $400 million due in November 2023, each bearing interest at either an adjusted term SOFR plus 0.70% and 0.95%, respectively, or a base rate with no applicable margin. Edison International used the proceeds for general corporate purposes.
The debt covenant in Edison International Parent's credit facility requires a consolidated debt to total capitalization ratio of less than or equal to 0.70 to 1. At December 31, 2022, Edison International's consolidated debt to total capitalization ratio was 0.64 to 1.
Equity
In the third quarter of 2022, Edison International filed a prospectus supplement and executed several distribution agreements with certain sales agents to establish an "at-the-market"("ATM") program, under which it may sell shares of its common stock having an aggregate sales price of up to $500 million. As of December 31, 2022, no sales had occurred and Edison International has no obligation to sell the remaining available shares.
Edison International continued to settle its ongoing common stock requirements of various internal programs through issuance of new common stock. During the twelve months ended December 31, 2022, 1,253,049 shares of common stock were issued as stock compensation awards for net cash receipts of $57 million, 273,642 shares of new common stock were issued in lieu of distributing $18 million to shareholders opting to receive dividend payments in the form of additional common stock, 157,000 shares of common stock were purchased by employees through the 401(k) defined contribution savings plan for net cash receipts of $10 million as dividend payments, 109,750 shares of common stock were issued related to optional cash investments of $7 million and 36,912 shares of common stock were issued to employees through the ESPP for net cash receipts of $2 million.
179
During the twelve months ended December 31, 2021, 629,092 shares of common stock were issued as stock compensation awards for net cash receipts of $25 million, 522,400 shares of common stock were purchased by employees through the 401(k) defined contribution savings plan for net cash receipts of $30 million, 293,031 shares of new common stock were issued in lieu of distributing $17 million to shareholders opting to receive dividend payments in the form of additional common stock and 26,475 shares of common stock related to optional cash investments of $2 million. Starting July 2021, the 401(k) defined contribution savings plan no longer offers Edison International's stock as an investment option to employees. Subsequent to the change, stock issued through the 401(k) defined contribution savings plan were dividend payments made in the form of additional common stock.
Preferred Stock Issuance
In 2021, Edison International issued 1,250,000 shares of 5.375% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series A, and 750,000 shares of its 5.00% Fixed-Rate Reset Cumulative Perpetual Preferred Stock, Series B, each with a liquidation value of $1,000 per share. The dividends are payable on a semi-annual basis, commencing September 15, 2021 and March 15, 2022, respectively. The dividend rate will be reset every five years beginning on March 15, 2026 and March 15, 2027, respectively, to equal the then-current five-year U.S. Treasury rate plus a spread of 4.698% and 3.901%, respectively. The net proceeds of $2.0 billion were used to repay commercial paper borrowings and for general corporate purposes, including making a total of $900 million equity contribution to SCE.
Note 3. Related-Party Transactions
Edison International's Parent expense from services provided by SCE was $2 million in 2022, $2 million in 2021 and $2 million in 2020. Edison International Parent's interest expense from loans due to affiliates was $3 million in 2022, $5 million in 2021 and $4 million in 2020. Edison International Parent had current related-party receivables of $389 million and $361 million and current related-party payables of $166 million and $211 million at December 31, 2022 and 2021, respectively. Edison International Parent had long-term related-party receivables of $8 million and $52 million at December 31, 2022 and 2021, respectively, and long-term related-party payables of $130 million and $227 million at December 31, 2022 and 2021, respectively.
Note 4. Contingencies
For a discussion of material contingencies see "Notes to Consolidated Financial Statements—Note 8. Income Taxes" and "—Note 12. Commitments and Contingencies."
180
SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorized.
EDISON INTERNATIONAL | SOUTHERN CALIFORNIA EDISON COMPANY | |||
Kate Sturgess | Kate Sturgess | |||
181
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrants and in the capacities and on the date indicated.
Signature |
| Title |
A. Principal Executive Officers | ||
Pedro J. Pizarro* | President, Chief Executive Officer and Director | |
Steven D. Powell* | President and Chief Executive Officer and Director (Southern California Edison Company) | |
B. Principal Financial Officers | ||
Maria Rigatti* | Executive Vice President and Chief Financial Officer | |
Aaron D. Moss* | Senior Vice President and Chief Financial Officer | |
C. Principal Accounting Officers | ||
/s/ Kate Sturgess | Vice President and Controller | |
Kate Sturgess | ||
/s/ Kate Sturgess | Vice President and Controller | |
Kate Sturgess | ||
D. Directors (Edison International and Southern California Edison Company, unless otherwise noted) | ||
Jeanne Beliveau-Dunn* | Director | |
Michael C. Camuñez* | Director | |
Vanessa C.L. Chang* | Director | |
James T. Morris* | Director | |
Timothy T. O'Toole* | Director | |
Pedro J. Pizarro* | Director | |
Steven D. Powell (SCE only)* | Director | |
Marcy L. Reed* | Director | |
Carey A. Smith* | Director | |
Linda G. Stuntz* | Director | |
Peter J. Taylor* | Chair of the Edison International Board and Director | |
Keith Trent* | Director |
Kate Sturgess | Kate Sturgess | ||
182