ENTERGY TEXAS, INC. - Quarter Report: 2022 March (Form 10-Q)

Table of Contents

__________________________________________________________________________________________
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q
(Mark One)
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF
THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31, 2022
OR
TRANSITION REPORT PURSUANT TO SECTION 13
OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ____________ to ____________

Commission
File Number
Registrant, State of Incorporation or Organization, Address of Principal Executive Offices, Telephone Number, and IRS Employer Identification No.

Commission
File Number
Registrant, State of Incorporation or Organization, Address of Principal Executive Offices, Telephone Number, and IRS Employer Identification No.
1-11299ENTERGY CORPORATION1-35747ENTERGY NEW ORLEANS, LLC
(a Delaware corporation)
639 Loyola Avenue
New Orleans, Louisiana 70113
Telephone (504) 576-4000
(a Texas limited liability company)
1600 Perdido Street
New Orleans, Louisiana 70112
Telephone (504) 670-3700
72-122975282-2212934
1-10764ENTERGY ARKANSAS, LLC1-34360ENTERGY TEXAS, INC.
(a Texas limited liability company)
425 West Capitol Avenue
Little Rock, Arkansas 72201
Telephone (501) 377-4000
(a Texas corporation)
2107 Research Forest Drive
The Woodlands, Texas 77380
Telephone (409) 981-2000
83-191866861-1435798
1-32718ENTERGY LOUISIANA, LLC1-09067SYSTEM ENERGY RESOURCES, INC.
(a Texas limited liability company)
4809 Jefferson Highway
Jefferson, Louisiana 70121
Telephone (504) 576-4000
(an Arkansas corporation)
1340 Echelon Parkway
Jackson, Mississippi 39213
Telephone (601) 368-5000
47-446964672-0752777
1-31508ENTERGY MISSISSIPPI, LLC
(a Texas limited liability company)
308 East Pearl Street
Jackson, Mississippi 39201
Telephone (601) 368-5000
83-1950019
__________________________________________________________________________________________



Table of Contents



Table of Contents

Securities registered pursuant to Section 12(b) of the Act:
RegistrantTitle of ClassTrading
Symbol
Name of Each Exchange
on Which Registered
Entergy Corporation
Common Stock, $0.01 Par Value
ETR
New York Stock Exchange
Common Stock, $0.01 Par Value
ETR
NYSE Chicago, Inc.
 
 
 
Entergy Arkansas, LLC
Mortgage Bonds, 4.875% Series due September 2066
EAI
New York Stock Exchange
 
 
 
Entergy Louisiana, LLC
Mortgage Bonds, 4.875% Series due September 2066
ELC
New York Stock Exchange
 
 
 
Entergy Mississippi, LLC
Mortgage Bonds, 4.90% Series due October 2066
EMP
New York Stock Exchange
 
 
 
Entergy New Orleans, LLC
Mortgage Bonds, 5.0% Series due December 2052
ENJ
New York Stock Exchange
Mortgage Bonds, 5.50% Series due April 2066
ENO
New York Stock Exchange
 
 
 
Entergy Texas, Inc.
5.375% Series A Preferred Stock, Cumulative, No Par Value (Liquidation Value $25 Per Share)
ETI/PR
New York Stock Exchange




Table of Contents
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days. Yes No

Indicate by check mark whether the registrants have submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit such files).  Yes No

Indicate by check mark whether each registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company.  See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Securities Exchange Act of 1934.
Large accelerated filerAccelerated
filer
Non-accelerated filerSmaller
reporting
company
Emerging
growth
company
Entergy Corporationü
Entergy Arkansas, LLCü
Entergy Louisiana, LLCü
Entergy Mississippi, LLCü
Entergy New Orleans, LLCü
Entergy Texas, Inc.ü
System Energy Resources, Inc.ü

If an emerging growth company, indicate by check mark if the registrants have elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.

Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Exchange Act). Yes No

Common Stock OutstandingOutstanding at April 29, 2022
Entergy Corporation($0.01 par value)203,374,308

Entergy Corporation, Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., and System Energy Resources, Inc. separately file this combined Quarterly Report on Form 10-Q.  Information contained herein relating to any individual company is filed by such company on its own behalf.  Each company reports herein only as to itself and makes no other representations whatsoever as to any other company.  This combined Quarterly Report on Form 10-Q supplements and updates the Annual Report on Form 10-K for the calendar year ended December 31, 2021, filed by the individual registrants with the SEC, and should be read in conjunction therewith.



Table of Contents
TABLE OF CONTENTS
Page Number
Part I. Financial Information
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy Arkansas, LLC and Subsidiaries
Entergy Louisiana, LLC and Subsidiaries
i

Table of Contents
TABLE OF CONTENTS
Page Number
Entergy Mississippi, LLC
Entergy New Orleans, LLC and Subsidiaries
Entergy Texas, Inc. and Subsidiaries
System Energy Resources, Inc.
Part II. Other Information
ii

Table of Contents
FORWARD-LOOKING INFORMATION

In this combined report and from time to time, Entergy Corporation and the Registrant Subsidiaries each makes statements as a registrant concerning its expectations, beliefs, plans, objectives, goals, projections, strategies, and future events or performance.  Such statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995.  Words such as “may,” “will,” “could,” “project,” “believe,” “anticipate,” “intend,” “expect,” “estimate,” “continue,” “potential,” “plan,” “predict,” “forecast,” and other similar words or expressions are intended to identify forward-looking statements but are not the only means to identify these statements.  Although each of these registrants believes that these forward-looking statements and the underlying assumptions are reasonable, it cannot provide assurance that they will prove correct.  Any forward-looking statement is based on information current as of the date of this combined report and speaks only as of the date on which such statement is made.  Except to the extent required by the federal securities laws, these registrants undertake no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise.

Forward-looking statements involve a number of risks and uncertainties.  There are factors that could cause actual results to differ materially from those expressed or implied in the forward-looking statements, including (a) those factors discussed or incorporated by reference in Item 1A. Risk Factors in the Form 10-K and in this report, (b) those factors discussed or incorporated by reference in Management’s Financial Discussion and Analysis in the Form 10-K and in this report, and (c) the following factors (in addition to others described elsewhere in this combined report and in subsequent securities filings):

resolution of pending and future rate cases and related litigation, formula rate proceedings and related negotiations, including various performance-based rate discussions, Entergy’s utility supply plan, and recovery of fuel and purchased power costs, as well as delays in cost recovery resulting from these proceedings;
regulatory and operating challenges and uncertainties and economic risks associated with the Utility operating companies’ participation in MISO, including the benefits of continued MISO participation, the effect of current or projected MISO market rules and market and system conditions in the MISO markets, the allocation of MISO system transmission upgrade costs, the MISO-wide base rate of return on equity allowed or any MISO-related charges and credits required by the FERC, and the effect of planning decisions that MISO makes with respect to future transmission investments by the Utility operating companies;
changes in utility regulation, including with respect to retail and wholesale competition, the ability to recover net utility assets and other potential stranded costs, and the application of more stringent return on equity criteria, transmission reliability requirements or market power criteria by the FERC or the U.S. Department of Justice;
changes in the regulation or regulatory oversight of Entergy’s owned or operated nuclear generating facilities and nuclear materials and fuel, including with respect to the planned shutdown and sale of Palisades, and the effects of new or existing safety or environmental concerns regarding nuclear power plants and fuel;
resolution of pending or future applications, and related regulatory proceedings and litigation, for license modifications or other authorizations required of nuclear generating facilities and the effect of public and political opposition on these applications, regulatory proceedings, and litigation;
the performance of and deliverability of power from Entergy’s generation resources, including the capacity factors at Entergy’s nuclear generating facilities;
increases in costs and capital expenditures that could result from changing regulatory requirements, changing economic conditions, and emerging operating and industry issues, and the risks related to recovery of these costs and capital expenditures from Entergy’s customers (especially in an increasing cost environment);
the commitment of substantial human and capital resources required for the safe and reliable operation and maintenance of Entergy’s nuclear generating facilities;
iii

Table of Contents

FORWARD-LOOKING INFORMATION (Continued)

Entergy’s ability to develop and execute on a point of view regarding future prices of electricity, natural gas, and other energy-related commodities;
the prices and availability of fuel and power Entergy must purchase for its Utility customers, and Entergy’s ability to meet credit support requirements for fuel and power supply contracts;
volatility and changes in markets for electricity, natural gas, uranium, emissions allowances, and other energy-related commodities, and the effect of those changes on Entergy and its customers;
changes in law resulting from federal or state energy legislation or legislation subjecting energy derivatives used in hedging and risk management transactions to governmental regulation;
changes in environmental laws and regulations, agency positions or associated litigation, including requirements for reduced emissions of sulfur dioxide, nitrogen oxide, greenhouse gases, mercury, particulate matter and other regulated air emissions, heat and other regulated discharges to water, requirements for waste management and disposal and for the remediation of contaminated sites, wetlands protection and permitting, and changes in costs of compliance with environmental laws and regulations;
changes in laws and regulations, agency positions, or associated litigation related to protected species and associated critical habitat designations;
the effects of changes in federal, state, or local laws and regulations, and other governmental actions or policies, including changes in monetary, fiscal, tax, environmental, trade/tariff, domestic purchase requirements, or energy policies and related laws, regulations, and other governmental actions;
the effects of full or partial shutdowns of the federal government or delays in obtaining government or regulatory actions or decisions;
uncertainty regarding the establishment of interim or permanent sites for spent nuclear fuel and nuclear waste storage and disposal and the level of spent fuel and nuclear waste disposal fees charged by the U.S. government or other providers related to such sites;
variations in weather and the occurrence of hurricanes and other storms and disasters, including uncertainties associated with efforts to remediate the effects of hurricanes (including from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Hurricane Ida), ice storms, or other weather events and the recovery of costs associated with restoration, including accessing funded storm reserves, federal and local cost recovery mechanisms, securitization, and insurance, as well as any related unplanned outages;
effects of climate change, including the potential for increases in extreme weather events and sea levels or coastal land and wetland loss;
the risk that an incident at any nuclear generation facility in the U.S. could lead to the assessment of significant retrospective assessments and/or retrospective insurance premiums as a result of Entergy’s participation in a secondary financial protection system and a utility industry mutual insurance company;
changes in the quality and availability of water supplies and the related regulation of water use and diversion;
Entergy’s ability to manage its capital projects, including completion of projects timely and within budget and to obtain the anticipated performance or other benefits, and its operation and maintenance costs;
the effects of supply chain disruptions, including those driven by the COVID-19 global pandemic or by trade-related governmental actions, on Entergy’s ability to complete its capital projects in a timely and cost-effective manner;
Entergy’s ability to purchase and sell assets at attractive prices and on other attractive terms;
the economic climate, and particularly economic conditions in Entergy’s Utility service area and events and circumstances that could influence economic conditions in those areas, including power prices and inflation, and the risk that anticipated load growth may not materialize;
changes to federal income tax laws and regulations, including the continued impact of the Tax Cuts and Jobs Act and its intended and unintended consequences on financial results and future cash flows;
the effects of Entergy’s strategies to reduce tax payments;
changes in the financial markets and regulatory requirements for the issuance of securities, particularly as they affect access to capital and Entergy’s ability to refinance existing securities and fund investments and acquisitions;

iv

Table of Contents

FORWARD-LOOKING INFORMATION (Concluded)

actions of rating agencies, including changes in the ratings of debt and preferred stock, changes in general corporate ratings, and changes in the rating agencies’ ratings criteria;
changes in inflation and interest rates;
the effects of litigation and government investigations or proceedings;
changes in technology, including (i) Entergy’s ability to implement new or emerging technologies, (ii) the impact of changes relating to new, developing, or alternative sources of generation such as distributed energy and energy storage, renewable energy, energy efficiency, demand side management and other measures that reduce load and government policies incentivizing development of the foregoing, and (iii) competition from other companies offering products and services to Entergy’s customers based on new or emerging technologies or alternative sources of generation;
Entergy’s ability to effectively formulate and implement plans to reduce its carbon emission rate and aggregate carbon emissions, including its commitment to achieve net-zero carbon emissions by 2050, and the potential impact on its business of attempting to achieve such objectives;
the effects, including increased security costs, of threatened or actual terrorism, cyber-attacks or data security breaches, natural or man-made electromagnetic pulses that affect transmission or generation infrastructure, accidents, and war or a catastrophic event such as a nuclear accident or a natural gas pipeline explosion;
the effects of a global or geopolitical event or pandemic, such as the COVID-19 global pandemic and the military activities between Russia and Ukraine, including economic and societal disruptions; volatility in the capital markets (and any related increased cost of capital or any inability to access the capital markets or draw on available bank credit facilities); reduced demand for electricity, particularly from commercial and industrial customers; increased or unrecoverable costs; supply chain, vendor, and contractor disruptions; delays in completion of capital or other construction projects, maintenance, and other operations activities, including prolonged or delayed outages; impacts to Entergy’s workforce availability, health, or safety; increased cybersecurity risks as a result of many employees telecommuting; increased late or uncollectible customer payments; regulatory delays; executive orders affecting, or increased regulation of, Entergy’s business; changes in credit ratings or outlooks as a result of any of the foregoing; or other adverse impacts on Entergy’s ability to execute on its business strategies and initiatives or, more generally, on Entergy’s results of operations, financial condition, and liquidity;
Entergy’s ability to attract and retain talented management, directors, and employees with specialized skills;
Entergy’s ability to attract, retain, and manage an appropriately qualified workforce;
changes in accounting standards and corporate governance;
declines in the market prices of marketable securities and resulting funding requirements and the effects on benefits costs for Entergy’s defined benefit pension and other postretirement benefit plans;
future wage and employee benefit costs, including changes in discount rates and returns on benefit plan assets;
changes in decommissioning trust fund values or earnings or in the timing of, requirements for, or cost to decommission Entergy’s nuclear plant sites and the implementation of decommissioning of such sites following shutdown;
the decision to cease merchant power generation at all Entergy Wholesale Commodities nuclear power plants by mid-2022, including the implementation of the planned shutdown and sale of Palisades;
the effectiveness of Entergy’s risk management policies and procedures and the ability and willingness of its counterparties to satisfy their financial and performance commitments; and
Entergy and its subsidiaries’ ability to successfully execute on their business strategies, including their ability to complete strategic transactions that they may undertake.


v

Table of Contents


DEFINITIONS

Certain abbreviations or acronyms used in the text and notes are defined below:
Abbreviation or AcronymTerm
ALJ
Administrative Law Judge
ANO 1 and 2
Units 1 and 2 of Arkansas Nuclear One (nuclear), owned by Entergy Arkansas
APSC
Arkansas Public Service Commission
ASU
Accounting Standards Update issued by the FASB
Board
Board of Directors of Entergy Corporation
Cajun
Cajun Electric Power Cooperative, Inc.
capacity factor
Actual plant output divided by maximum potential plant output for the period
City Council
Council of the City of New Orleans, Louisiana
COVID-19
The novel coronavirus disease declared a pandemic by the World Health Organization and the Centers for Disease Control and Prevention in March 2020
D.C. Circuit
U.S. Court of Appeals for the District of Columbia Circuit
DOE
United States Department of Energy
Entergy
Entergy Corporation and its direct and indirect subsidiaries
Entergy Corporation
Entergy Corporation, a Delaware corporation
Entergy Gulf States, Inc.
Predecessor company for financial reporting purposes to Entergy Gulf States Louisiana that included the assets and business operations of both Entergy Gulf States Louisiana and Entergy Texas
Entergy Gulf States Louisiana
Entergy Gulf States Louisiana, L.L.C., a Louisiana limited liability company formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. and the successor company to Entergy Gulf States, Inc. for financial reporting purposes.  The term is also used to refer to the Louisiana jurisdictional business of Entergy Gulf States, Inc., as the context requires. Effective October 1, 2015, the business of Entergy Gulf States Louisiana was combined with Entergy Louisiana.
Entergy Louisiana
Entergy Louisiana, LLC, a Texas limited liability company formally created as part of the combination of Entergy Gulf States Louisiana and the company formerly known as Entergy Louisiana, LLC (Old Entergy Louisiana) into a single public utility company and the successor to Old Entergy Louisiana for financial reporting purposes.
Entergy Texas
Entergy Texas, Inc., a Texas corporation formally created as part of the jurisdictional separation of Entergy Gulf States, Inc.  The term is also used to refer to the Texas jurisdictional business of Entergy Gulf States, Inc., as the context requires.
Entergy Wholesale Commodities
Entergy’s non-utility business segment primarily comprised of the ownership, operation, and decommissioning of nuclear power plants, the ownership of interests in non-nuclear power plants, and the sale of the electric power produced by its operating power plants to wholesale customers
EPA
United States Environmental Protection Agency
FASB
Financial Accounting Standards Board
FERC
Federal Energy Regulatory Commission
Form 10-K
Annual Report on Form 10-K for the calendar year ended December 31, 2021 filed with the SEC by Entergy Corporation and its Registrant Subsidiaries
Grand Gulf
Unit No. 1 of Grand Gulf Nuclear Station (nuclear), 90% owned or leased by System Energy
GWh
Gigawatt-hour(s), which equals one million kilowatt-hours
HLBVHypothetical liquidation at book value
vi

Table of Contents

DEFINITIONS (Continued)
Abbreviation or AcronymTerm
Independence
Independence Steam Electric Station (coal), owned 16% by Entergy Arkansas, 25% by Entergy Mississippi, and 7% by Entergy Power, LLC
Indian Point 2
Unit 2 of Indian Point Energy Center (nuclear), previously owned by an Entergy subsidiary in the Entergy Wholesale Commodities business segment, which ceased power production in April 2020 and was sold in May 2021
Indian Point 3
Unit 3 of Indian Point Energy Center (nuclear), previously owned by an Entergy subsidiary in the Entergy Wholesale Commodities business segment, which ceased power production in April 2021 and was sold in May 2021
IRS
Internal Revenue Service
ISO
Independent System Operator
kW
Kilowatt, which equals one thousand watts
kWh
Kilowatt-hour(s)
LPSC
Louisiana Public Service Commission
MISO
Midcontinent Independent System Operator, Inc., a regional transmission organization
MMBtu
One million British Thermal Units
MPSC
Mississippi Public Service Commission
MW
Megawatt(s), which equals one thousand kilowatts
MWh
Megawatt-hour(s), which equals one thousand kilowatts
Nelson Unit 6
Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, 70% of which is co-owned by Entergy Louisiana (57.5%) and Entergy Texas (42.5%) and 10.9% of which is owned by an Entergy subsidiary in the Entergy Wholesale Commodities business segment
Net debt to net capital ratio
Gross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents
NRC
Nuclear Regulatory Commission
Palisades
Palisades Nuclear Plant (nuclear), owned by an Entergy subsidiary in the Entergy Wholesale Commodities business segment
Parent & Other
The portions of Entergy not included in the Utility or Entergy Wholesale Commodities segments, primarily consisting of the activities of the parent company, Entergy Corporation
PPA
Purchased power agreement or power purchase agreement
PUCT
Public Utility Commission of Texas
Registrant Subsidiaries
Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., and System Energy Resources, Inc.
River Bend
River Bend Station (nuclear), owned by Entergy Louisiana
SEC
Securities and Exchange Commission
System Agreement
Agreement, effective January 1, 1983, as modified, among the Utility operating companies relating to the sharing of generating capacity and other power resources. The agreement terminated effective August 2016.
System Energy
System Energy Resources, Inc.
TWh
Terawatt-hour(s), which equals one billion kilowatt-hours
vii

Table of Contents

DEFINITIONS (Concluded)
Abbreviation or AcronymTerm
Unit Power Sales Agreement
Agreement, dated as of June 10, 1982, as amended and approved by the FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy’s share of Grand Gulf
Utility
Entergy’s business segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution
Utility operating companies
Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas
Vermont Yankee
Vermont Yankee Nuclear Power Station (nuclear), previously owned by an Entergy subsidiary in the Entergy Wholesale Commodities business segment, which ceased power production in December 2014 and was disposed of in January 2019
Waterford 3
Unit No. 3 (nuclear) of the Waterford Steam Electric Station, owned by Entergy Louisiana
weather-adjusted usage
Electric usage excluding the effects of deviations from normal weather
White Bluff
White Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas
viii

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Entergy operates primarily through two business segments: Utility and Entergy Wholesale Commodities.

The Utility business segment includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operation of a small natural gas distribution business.
The Entergy Wholesale Commodities business segment includes the ownership, operation, and decommissioning of nuclear power plants located in the northern United States and the sale of the electric power produced by its operating plants to wholesale customers.  Entergy Wholesale Commodities also provides services to other nuclear power plant owners and owns interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers. See “Entergy Wholesale Commodities Exit from the Merchant Power Business” below and in the Form 10-K for discussion of the operation and planned shutdown and sale of each of the Entergy Wholesale Commodities nuclear power plants, including the planned shutdown and sale of Palisades, the only remaining operating plant in Entergy Wholesale Commodities’ merchant nuclear fleet.

See Note 7 to the financial statements herein for financial information regarding Entergy’s business segments.



1

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
Results of Operations

First Quarter 2022 Compared to First Quarter 2021

Following are income statement variances for Utility, Entergy Wholesale Commodities, Parent & Other, and Entergy comparing the first quarter 2022 to the first quarter 2021 showing how much the line item increased or (decreased) in comparison to the prior period:

Utility
Entergy
Wholesale
Commodities

Parent &
Other (a)

Entergy
(In Thousands)
2021 Net Income (Loss) Attributable to Entergy Corporation$356,567 $37,577 ($59,579)$334,565 
Operating revenues131,540 (98,442)(11)33,087 
Fuel, fuel-related expenses, and gas purchased for resale160,924 4,836 11 165,771 
Purchased power(105,937)(4,160)(11)(110,108)
Other regulatory charges (credits) - net(60,704)— — (60,704)
Other operation and maintenance26,207 (57,721)3,540 (27,974)
Asset write-offs, impairments, and related charges— (2,529)— (2,529)
Taxes other than income taxes20,344 3,069 33 23,446 
Depreciation and amortization29,121 (4,219)(449)24,453 
Other income (deductions)(46,264)(47,309)(1,834)(95,407)
Interest expense15,442 (3,027)9,238 21,653 
Other expenses1,698 (39,029)— (37,331)
Income taxes15,625 (12,706)(2,364)555 
Preferred dividend requirements of subsidiaries and noncontrolling interest(1,339)— (48)(1,387)
2022 Net Income (Loss) Attributable to Entergy Corporation$340,462 $7,312 ($71,374)$276,400 

(a)Parent & Other includes eliminations, which are primarily intersegment activity.

2

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
Operating Revenues

Utility

Following is an analysis of the change in operating revenues comparing the first quarter 2022 to the first quarter 2021:
Amount
(In Millions)
2021 operating revenues$2,597 
Fuel, rider, and other revenues that do not significantly affect net income30 
Retail electric price91 
Return of unprotected excess accumulated deferred income taxes to customers24 
Volume/weather(14)
2022 operating revenues$2,728 

The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to:

increases in Entergy Arkansas’s formula rate plan rates effective May 2021 and January 2022;
an increase in Entergy Louisiana’s formula rate plan revenues, including increases in the distribution and transmission recovery mechanisms, effective September 2021;
increases in Entergy Mississippi’s formula rate plan rates effective April 2021 and July 2021;
an increase in Entergy New Orleans’s formula rate plan rates effective November 2021; and
increases in the transmission cost recovery factor rider effective March 2021 and March 2022, an increase in the distribution cost recovery factor rider effective January 2022, and an increase in the generation cost recovery rider effective January 2022, each at Entergy Texas.

See Note 2 to the financial statements herein and in the Form 10-K for further discussion of the regulatory proceedings discussed above.

The return of unprotected excess accumulated deferred income taxes to customers resulted from activity at the Utility operating companies in response to the enactment of the Tax Cuts and Jobs Act. The return of unprotected excess accumulated deferred income taxes began in second quarter 2018. In the first quarter 2022, $17 million was returned to customers through reductions in operating revenues as compared to $41 million in the first quarter 2021. There is no effect on net income as the reductions in operating revenues were offset by reductions in income tax expense. See Note 2 to the financial statements in the Form 10-K for further discussion of regulatory activity regarding the Tax Cuts and Jobs Act.

The volume/weather variance is primarily due to the effect of less favorable weather on residential sales and a decrease in weather-adjusted residential usage, including the effect of the COVID-19 pandemic on first quarter 2021, partially offset by increases in industrial and commercial usage. The increase in industrial usage was due to an increase in demand from cogeneration customers, an increase in demand from existing customers, primarily in the chemicals and pulp and paper industries as a result of prior year temporary plant shutdowns and operational issues, an increase in demand from expansion projects, primarily in the chemicals, transportation, and petroleum

3

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis

refining industries, and an increase in demand from small industrial customers. The increase in commercial usage was primarily due to an increase in customers and the effect of the COVID-19 pandemic on businesses in first quarter 2021. The increased usage from these industrial and commercial customers has a relatively smaller effect on operating revenues because a larger portion of the revenues from those customers comes from fixed charges.

Total electric energy sales for Utility for the three months ended March 31, 2022 and 2021 are as follows:
20222021% Change
(GWh)
Residential8,454 8,663 (2)
Commercial6,271 6,111 
Industrial12,496 11,738 
Governmental584 581 
Total retail27,805 27,093 
Sales for resale3,641 4,299 (15)
Total31,446 31,392 — 

See Note 13 to the financial statements herein for additional discussion of operating revenues.

Entergy Wholesale Commodities

Operating revenues for Entergy Wholesale Commodities decreased from $248 million for the first quarter 2021 to $150 million for the first quarter 2022 primarily due to the shutdown of Indian Point 3 in April 2021.

Following are key performance measures for Entergy Wholesale Commodities for the first quarters 2022 and 2021:
20222021
Owned capacity (MW) (a)1,2052,246
GWh billed2,2254,413
Entergy Wholesale Commodities Nuclear Fleet (b)
Capacity factor100%99%
GWh billed1,7663,988
Average energy price ($/MWh)$59.21$51.86
Average capacity price ($/kW-month)$0.15$0.23

(a)The reduction in owned capacity is due to the shutdown of the 1,041 MW Indian Point 3 plant in April 2021.
(b)The Entergy Wholesale Commodities nuclear power plants had no refueling outage days in the first quarters 2022 and 2021.

4

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis

Other Income Statement Items

Utility

Other operation and maintenance expenses increased from $602 million for the first quarter 2021 to $628 million for the first quarter 2022 primarily due to:

an increase of $6 million in customer service center support costs primarily due to higher contract costs;
an increase of $5 million in nuclear generation expenses primarily due to a higher scope of work performed in 2022 as compared to prior year, partially offset by lower spending in 2022 on sanitation and social distancing protocols as a result of the COVID-19 pandemic;
an increase of $4 million in transmission expenses, including higher vegetation maintenance costs;
an increase of $3 million in distribution operations expenses primarily due to higher reliability costs and higher safety and training costs, partially offset by a decrease in meter reading expenses as a result of the deployment of advanced metering systems; and
several individually insignificant items.

The increase was partially offset by higher nuclear insurance refunds of $8 million.

Taxes other than income taxes increased primarily due to increases in franchise taxes and increases in ad valorem taxes resulting from higher assessments.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Other regulatory charges (credits) - net includes the reversal in 2021 of the remaining $39 million regulatory liability for Entergy Arkansas’s 2019 historical year netting adjustment as part of its 2020 formula rate plan proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2020 formula rate plan filing. In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation related costs collected in revenue.

Other income decreased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of the decommissioning trust funds in the first quarter 2021.

Interest expense increased primarily due to:

the issuance by Entergy Arkansas of $400 million of 3.35% Series mortgage bonds in March 2021;
the issuances by Entergy Louisiana of $500 million of 2.35% Series mortgage bonds and $500 million of 3.10% Series mortgage bonds, each in March 2021;
the issuance by Entergy Louisiana of $1 billion of 0.95% Series mortgage bonds in October 2021;
the issuance by Entergy Mississippi of $200 million of 3.50% Series mortgage bonds in March 2021;
the $1.2 billion unsecured term loan proceeds received by Entergy Louisiana in January 2022;
the issuance by Entergy Mississippi of $200 million of 2.55% Series mortgage bonds in November 2021; and
the issuances by Entergy New Orleans of $70 million of 4.51% Series mortgage bonds and $90 million of 4.19% Series mortgage bonds, each in November 2021.

The increase was partially offset by the repayment by Entergy Arkansas of $350 million of 3.75% Series mortgage bonds in February 2021 and the repayment by Entergy Louisiana of $200 million of 4.8% Series mortgage bonds in May 2021.

5

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis


Entergy Wholesale Commodities

Other operation and maintenance expenses decreased from $99 million for the first quarter 2021 to $41 million for the first quarter 2022 primarily due to:

a decrease of $44 million resulting from the absence of expenses from Indian Point 3, after it was shut down in April 2021; and
a decrease of $10 million in severance and retention expenses. Severance and retention expenses were incurred in 2022 and 2021 due to management’s strategy to exit the Entergy Wholesale Commodities merchant power business.

See “Entergy Wholesale Commodities Exit from the Merchant Power Business” below and in the Form 10-K for a discussion of management’s strategy to shut down and sell all plants in Entergy Wholesale Commodities’ merchant nuclear fleet. See Note 7 to the financial statements herein for further discussion of severance and retention expenses.

Other income decreased primarily due to the absence of earnings from the nuclear decommissioning trust funds that were transferred in the sale of the Indian Point Energy Center in May 2021 and lower gains on Palisades decommissioning trust fund investments, partially offset by lower non-service pension costs. See Notes 8 and 9 to the financial statements herein for a discussion of decommissioning trust fund investments. See Note 14 to the financial statements in the Form 10-K for further discussion of the sale of the Indian Point Energy Center. See Note 6 to the financial statements herein for a discussion of pension and other postretirement benefits costs.

Other expenses decreased primarily due to the absence of decommissioning expense from Indian Point 2 and Indian Point 3, after the sale of the Indian Point Energy Center in May 2021. See Note 14 to the financial statements in the Form 10-K for further discussion of the sale of the Indian Point Energy Center.

Income Taxes

The effective income tax rates were 19.2% for the first quarter 2022 and 16.3% for the first quarter 2021. The differences in the effective income tax rates for the first quarter 2022 and the first quarter 2021 versus the federal statutory rate of 21% were primarily due to the amortization of excess accumulated deferred income taxes and certain book and tax differences related to utility plant items, partially offset by state income taxes. See Note 10 to the financial statements herein and Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the effects and regulatory activity regarding the Tax Cuts and Jobs Act.

Entergy Wholesale Commodities Exit from the Merchant Power Business

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Entergy Wholesale Commodities Exit from the Merchant Power Business” in the Form 10-K for a discussion of management’s strategy to shut down and sell all plants in the Entergy Wholesale Commodities merchant nuclear fleet.  Following are updates to that discussion.

In April 2022, Entergy and Nebraska Public Power District signed an agreement to mutually terminate the management support services contract, under which Entergy provides plant operation support services for the 800 MW Cooper Nuclear Station located near Brownville, Nebraska, effective July 31, 2022.

Planned Shutdown and Sale of Palisades

As discussed in the Form 10-K, in July 2018, Entergy entered into a purchase and sale agreement to sell 100% of the equity interests in the subsidiary that owns Palisades and the Big Rock Point Site, for $1,000 (subject

6

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
to adjustment for net liabilities and other amounts) to a Holtec subsidiary. The sale will include the transfer of the nuclear decommissioning trust and obligation for spent fuel management and plant decommissioning.

Entergy intends to shut down Palisades permanently no later than May 31, 2022. Subject to the conditions discussed in the Form 10-K, the sale of Palisades is expected to close in mid-2022. As of March 31, 2022, Entergy’s adjusted net investment in Palisades was approximately ($100) million. The primary variables in the ultimate loss or gain that Entergy will incur on the transaction are the values of the nuclear decommissioning trust and the asset retirement obligations at closing, the financial results from plant operations until the closing, and the level of any unrealized deferred tax balances at closing.

Costs Associated with Exit of the Entergy Wholesale Commodities Business

Entergy expects to incur employee retention and severance expenses associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business of approximately $5 million in 2022, of which $4 million has been incurred as of March 31, 2022.

Liquidity and Capital Resources

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy’s capital structure, capital expenditure plans and other uses of capital, and sources of capital.  Following are updates to that discussion.

Capital Structure and Resources

Entergy’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy as of March 31, 2022 is primarily due to the net issuance of debt in 2022.
March 31,
2022
December 31,
2021
Debt to capital70.5 %69.5 %
Effect of excluding securitization bonds(0.1 %)(0.1 %)
Debt to capital, excluding securitization bonds (a)70.4 %69.4 %
Effect of subtracting cash(0.5 %)(0.3 %)
Net debt to net capital, excluding securitization bonds (a)69.9 %69.1 %

(a)Calculation excludes the New Orleans and Texas securitization bonds, which are non-recourse to Entergy New Orleans and Entergy Texas, respectively.

As of March 31, 2022, 21.5% of the debt outstanding is at the parent company, Entergy Corporation, 78% is at the Utility, and 0.5% is at Entergy Wholesale Commodities. Net debt consists of debt less cash and cash equivalents.  Debt consists of notes payable and commercial paper, finance lease obligations, and long-term debt, including the currently maturing portion.  Capital consists of debt, common shareholders’ equity, and subsidiaries’ preferred stock without sinking fund.  Net capital consists of capital less cash and cash equivalents.  Entergy uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy’s financial condition because the securitization bonds are non-recourse to Entergy, as more fully described in Note 5 to the financial statements in the Form 10-K.  Entergy also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy’s financial condition because net debt indicates Entergy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in June 2026.  The facility includes fronting commitments for the issuance of letters of credit against $20 million of the

7

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis

total borrowing capacity of the credit facility.  The commitment fee is currently 0.225% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the three months ended March 31, 2022 was 1.81% on the drawn portion of the facility. As of March 31, 2022, amounts outstanding and capacity available under the $3.5 billion credit facility are:

Capacity BorrowingsLetters
of Credit
Capacity
Available
(In Millions)
$3,500$150$3$3,347
A covenant in Entergy Corporation’s credit facility requires Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization.  The calculation of this debt ratio under Entergy Corporation’s credit facility is different than the calculation of the debt to capital ratio above.  Entergy is currently in compliance with the covenant and expects to remain in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur.  See Note 4 to the financial statements herein for additional discussion of the Entergy Corporation credit facility and discussion of the Utility operating companies’ credit facilities.

Entergy Corporation has a commercial paper program with a Board-approved program limit of up to $2 billion. As of March 31, 2022, Entergy Corporation had $1.343 billion of commercial paper outstanding. The weighted-average interest rate for the three months ended March 31, 2022 was 0.48%.

Entergy Mississippi had $33 million in its storm reserve escrow account at March 31, 2022.

In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization. A City Council decision is expected in third quarter 2022.

Equity Issuances and Equity Distribution Program

As discussed in the Form 10-K, in January 2021, Entergy entered into an equity distribution sales agreement with several counterparties establishing an at the market equity distribution program, pursuant to which Entergy may offer and sell from time to time shares of its common stock. The sales agreement provides that, in addition to the issuance and sale of shares of Entergy common stock, Entergy may also enter into forward sale agreements for the sale of its common stock. The aggregate number of shares of common stock sold under this sales agreement and under any forward sale agreement may not exceed an aggregate gross sales price of $1 billion. Through March 31, 2022, Entergy has utilized the equity distribution program either to sell or to enter into forward sale agreements with respect to shares of common stock with an aggregate gross sales price of approximately $630 million, of which approximately $430 million of aggregate gross sales price is the subject of forward sale agreements that have not been settled and is subject to adjustment pursuant to the forward sale agreements. In addition to settlement of existing forward sale agreements, Entergy Corporation currently expects to issue approximately $570 million of equity through 2024. See Note 3 to the financial statements herein for discussion of the forward sale agreements and common stock issuances and sales under the equity distribution program.

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida (Entergy Louisiana)

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during

8

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild. In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms were estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital costs. Including carrying costs through January 2022, Entergy Louisiana was seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, was eligible for recovery from customers. Additionally, Entergy Louisiana was requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million was appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.

In August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review.

After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests in regard to Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contained the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and were eligible for recovery; carrying costs of $51 million were recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana was authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC issued an order approving the settlement in March 2022. As a result of the financing order, in first quarter 2022, Entergy Louisiana reclassified $1.339 billion from utility plant to other regulatory assets. The securitization process is expected to be completed in second quarter 2022.

In April 2022, Entergy Louisiana filed an application with the LPSC relating to Hurricane Ida restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by Hurricane Ida currently are estimated to be approximately $2.54 billion, including approximately $1.96 billion in capital costs and approximately $586 million in non-capital costs. Including carrying costs through December 2022, Entergy Louisiana is seeking an LPSC determination that $2.60 billion was prudently incurred and, therefore, is eligible for recovery from customers. As part of this filing, Entergy Louisiana also is seeking an LPSC determination that an additional $32 million in restoration costs associated with the restoration of Entergy Louisiana’s electric facilities damaged by Hurricane Laura, Hurricane Delta, and Hurricane Zeta as well as Winter Storm Uri was prudently incurred. This amount is exclusive of the requested $3 million in carrying costs through December 2022. In total, Entergy Louisiana is requesting an LPSC determination that $2.64 billion was prudently incurred and, therefore, is eligible for recovery from customers. As discussed above, in March 2022 the LPSC

9

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis

approved financing of a $1 billion storm escrow that can be withdrawn to finance costs associated with Hurricane Ida restoration. Entergy Louisiana expects to supplement the April 2022 application with a request that the LPSC authorize Entergy Louisiana to finance the remaining storm restoration costs included in the April 2022 application, currently expected to be through the securitization process authorized by Louisiana Act 55, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.

Hurricane Ida (Entergy New Orleans)

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida” in the Form 10-K for a discussion of Hurricane Ida, which caused significant damage to Entergy’s service area, including Entergy’s electrical grid. Entergy New Orleans expects to initiate its storm cost recovery proceeding in late second quarter 2022.

Hurricane Laura, Hurricane Delta, and Winter Storm Uri (Entergy Texas)

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of certain system restoration costs, which were approved by the PUCT as eligible for securitization in December 2021. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement. As a result of the financing order, in first quarter 2022, Entergy Texas reclassified $153 million from utility plant to other regulatory assets.

In April 2022, Entergy Texas Restoration Funding II, LLC, a company wholly-owned and consolidated by Entergy Texas, issued $290.85 million of senior secured system restoration bonds (securitization bonds). With the proceeds, Entergy Texas Restoration Funding II purchased from Entergy Texas the transition property, which is the right to recover from customers through a system restoration charge amounts sufficient to service the securitization bonds. Entergy Texas began cost recovery through the system restoration charge effective with the first billing cycle of May 2022 and the system restoration charge is expected to remain in place up to 15 years. See Note 4 to the financial statements herein for a discussion of the April 2022 issuance of the securitization bonds.

Capital Expenditure Plans and Other Uses of Capital

See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital,” that sets forth the amounts of planned construction and other capital investments by operating segment for 2022 through 2024. Following are updates to that discussion. While Entergy is still assessing the effect on its planned solar projects, a recently commenced investigation by the U.S. Department of Commerce into potential circumvention of duties and tariffs may result in increased duties or tariffs on imported solar panels and has created supply chain disruptions which will affect the ultimate timing and could increase the cost of completion of these projects.

West Memphis Solar Facility

As discussed in the Form 10-K, in October 2021 the APSC directed Entergy Arkansas to file a report within 180 days detailing its efforts to obtain a tax equity partnership. In April 2022, Entergy Arkansas filed its tax equity partnership status report and will file subsequent reports until a tax equity partnership is obtained or a tax equity partnership is no longer sought. Entergy Arkansas views the progress of the outreach to potential tax equity

10

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
investors and the current status of the discussions as consistent with its expectations for the timeline for achieving a tax equity partnership. Closing had been expected to occur in 2023. The counter-party has notified Entergy Arkansas that it is seeking changes to certain terms of the build-own-transfer agreement, including both cost and schedule. Negotiations are ongoing, but at this time the project is not expected to achieve commercial operation in 2023.

Driver Solar Facility

In April 2022, Entergy Arkansas filed a petition with the APSC seeking a finding that the purchase of the 250 MW Driver Solar Facility is in the public interest. The acquisition of Driver Solar will be contingent upon receiving all necessary regulatory and Board approvals. Entergy Arkansas requested a decision by the APSC by June 2022 and requested cost recovery through the formula rate plan rider. The APSC established a procedural schedule with a hearing scheduled in June 2022. The facility is expected to be in service by the end of 2024.

2021 Solar Certification and the Geaux Green Option

As discussed in the Form 10-K, in November 2021, Entergy Louisiana filed an application with the LPSC seeking certification of and approval for the addition of four new solar photovoltaic resources with a combined nameplate capacity of 475 megawatts (the 2021 Solar Portfolio) and the implementation of a new green tariff, the Geaux Green Option (Rider GGO). The LPSC has established a procedural schedule that is expected to result in an LPSC decision by the end of 2022. In March 2022 direct testimony from Walmart, the Louisiana Energy Users Group (LEUG) and the LPSC staff was filed. Each party recommended that the LPSC approve the resources proposed in Entergy Louisiana’s application, and the LPSC staff witness indicated that the process through which Entergy Louisiana solicited or obtained the proposals for the resources complies with applicable LPSC orders. LPSC staff and LEUG’s witnesses made recommendations to modify the proposed Rider GGO and Entergy Louisiana’s proposed rate relief. In April 2022, LPSC staff and LEUG filed cross-answering testimony concerning the other party’s proposed modifications to Rider GGO and the proposed rate recovery. Discovery concerning these parties’ testimonies is ongoing.

Sunflower Solar Facility

As discussed in the Form 10-K, in November 2018, Entergy Mississippi announced that it signed an agreement for the purchase of an approximately 100 MW solar photovoltaic facility that will be sited on approximately 1,000 acres in Sunflower County, Mississippi. The estimated total investment, including the base purchase price and other related costs, for Entergy Mississippi to acquire the Sunflower Solar Facility is approximately $153.2 million. Entergy Mississippi will purchase the facility upon mechanical completion and after the other purchase contingencies have been met. In April 2020 the MPSC issued an order approving certification of the Sunflower Solar Facility and its recovery through Entergy Mississippi’s interim capacity rate adjustment mechanism, subject to certain conditions including: (i) that Entergy Mississippi pursue a partnership structure through which the partnership would acquire and own the facility under the build-own-transfer agreement, and (ii) that if Entergy Mississippi does not consummate the partnership structure under the terms of the order, there will be a cap of $136 million on the level of recoverable costs. In April 2022, Entergy Mississippi confirmed mechanical completion of the Sunflower Solar Facility. The initial closing is targeted to occur in May 2022. In conjunction with closing, Entergy Mississippi is executing a partnership structure through which the partnership will acquire and own the Sunflower Solar Facility. Final payment of the purchase price will be made upon substantial completion of the facility, which is currently expected in third quarter 2022.

Orange County Advanced Power Station

As discussed in the Form 10-K, in September 2021, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Orange County Advanced Power Station, a new 1,215 MW combined-cycle combustion turbine facility to be

11

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis

located in Bridge City, Texas at an initially-estimated expected total cost of $1.2 billion inclusive of the estimated costs of the generation facilities, transmission upgrades, contingency, an allowance for funds used during construction, and necessary regulatory expenses, among others. The project includes combustion turbine technology with dual fuel capability, able to co-fire up to 30% hydrogen by volume upon commercial operation and upgradable to support 100% hydrogen operations in the future. In December 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. In March 2022 certain intervenors filed testimony opposing the hydrogen co-firing component of the proposed project and others filed opposing the project outright. Also in March 2022, PUCT staff filed testimony opposing the hydrogen co-firing component of the proposed project, but otherwise taking no specific position on the merits of the project. The PUCT staff also proposed that the PUCT establish a maximum amount that Entergy Texas may recover in rates attributable to the project. In April 2022, Entergy Texas filed rebuttal testimony addressing and rebutting these various arguments. Also in April 2022 the ALJs with the State Office of Administrative Hearings approved a continuance of the hearing on the merits from April 2022 to June 2022, providing Entergy Texas an opportunity to accelerate the determination and fixing of pricing for the Orange County Advanced Power Station prior to the hearing. A final order by the PUCT is expected in third or fourth quarter of 2022. Entergy Texas also is pursuing environmental permitting that is required prior to the commencement of construction. Subject to receipt of required regulatory approvals, permits, and other conditions, the facility is expected to be in service by May 2026.

Dividends

Declarations of dividends on Entergy’s common stock are made at the discretion of the Board.  Among other things, the Board evaluates the level of Entergy’s common stock dividends based upon earnings per share from the Utility operating segment and the Parent and Other portion of the business, financial strength, and future investment opportunities.  At its April 2022 meeting, the Board declared a dividend of $1.01 per share, which is the same quarterly dividend per share that Entergy has paid since the third quarter 2021.

Cash Flow Activity

As shown in Entergy’s Consolidated Statements of Cash Flows, cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Millions)
Cash and cash equivalents at beginning of period$443 $1,759 
Net cash provided by (used in):  
Operating activities538 (49)
Investing activities(1,551)(1,513)
Financing activities1,272 1,546 
Net increase (decrease) in cash and cash equivalents259 (16)
Cash and cash equivalents at end of period$702 $1,743 

Operating Activities

Entergy’s operating activities provided $538 million of cash for the three months ended March 31, 2022 compared to using $49 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

higher collections from Utility customers;

12

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis
decreased fuel costs, including costs related to Winter Storm Uri in 2021. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery;
a decrease of $84 million in pension contributions in 2022 as compared to the same period in 2021. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K and Note 6 to the financial statements herein for a discussion of qualified pension and other postretirement benefits funding; and
an increase of $43 million in proceeds received from the DOE resulting from litigation regarding spent nuclear fuel storage costs that were previously expensed. See Note 1 to the financial statements herein and Note 8 to the financial statements in the Form 10-K for discussion of the spent nuclear fuel litigation.

The above activity was partially offset by:

an increase of approximately $128 million in storm spending primarily due to Hurricane Ida. See MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida in the Form 10-K for discussion of storm restoration efforts; and
lower Entergy Wholesale Commodities revenues in 2022.

Investing Activities

Net cash flow used in investing activities increased $38 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

an increase of $50 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2022;
a decrease of $44 million in net receipts from storm reserve escrow accounts;
an increase of $35 million in nuclear fuel purchases due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and
an increase of $27 million in information technology capital expenditures primarily due to increased spending on various technology projects in 2022.

The increase was partially offset by:

a decrease of $92 million in transmission construction expenditures primarily due to lower capital expenditures for storm restoration in 2022; and
a decrease of $25 million in non-nuclear generation construction expenditures primarily due to higher spending in 2021 on the Montgomery County Power Station project.

Financing Activities

Net cash flow provided by financing activities decreased $274 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to long-term debt activity providing approximately $1,329 million of cash in 2022 compared to providing approximately $2,330 million of cash in 2021. The decrease was partially offset by an increase of $741 million in net issuances of commercial paper in 2022 compared to 2021. For details of Entergy’s commercial paper program and long-term debt, see Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K.

Rate, Cost-recovery, and Other Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Rate, Cost-recovery, and Other Regulation” in the Form 10-K for discussions of rate regulation, federal regulation, and related regulatory proceedings.

13

Table of Contents
Entergy Corporation and Subsidiaries
Management's Financial Discussion and Analysis


State and Local Rate Regulation and Fuel-Cost Recovery

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding these proceedings.

Federal Regulation

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding federal regulatory proceedings.

Market and Credit Risk Sensitive Instruments

Entergy Wholesale Commodities Portfolio

Some of the agreements to sell the power produced by Entergy Wholesale Commodities’ power plants contain provisions that require an Entergy subsidiary to provide credit support to secure its obligations under the agreements. The primary form of credit support to satisfy these requirements is an Entergy Corporation guarantee.  Cash and letters of credit are also acceptable forms of credit support. At March 31, 2022, based on power prices at that time, Entergy had liquidity exposure of $26 million under the guarantees in place supporting Entergy Wholesale Commodities transactions and $8 million of posted cash collateral. In the event of a decrease in Entergy Corporation’s credit rating to below investment grade, based on power prices as of March 31, 2022, Entergy would have been required to provide approximately $30 million of additional cash or letters of credit under some of the agreements. As of March 31, 2022, the liquidity exposure associated with Entergy Wholesale Commodities assurance requirements, including return of previously posted collateral from counterparties, would increase by an insignificant amount for a $1 per MMBtu increase in gas prices in both the short- and long-term markets.

As of March 31, 2022, substantially all of the credit exposure associated with the planned energy output under contract for the Palisades plant through 2022 is with counterparties or their guarantors that have public investment grade credit ratings.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy’s accounting for nuclear decommissioning costs, utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See Note 1 to the financial statements in the Form 10-K for discussion of new accounting pronouncements.


14

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands, Except Share Data)
OPERATING REVENUES
Electric$2,655,776 $2,538,420 
Natural gas72,361 58,168 
Competitive businesses149,788 248,250 
TOTAL2,877,925 2,844,838 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale666,938 501,167 
Purchased power269,626 379,734 
Nuclear refueling outage expenses43,002 43,739 
Other operation and maintenance678,812 706,786 
Asset write-offs, impairments, and related charges744 3,273 
Decommissioning62,048 98,642 
Taxes other than income taxes180,148 156,702 
Depreciation and amortization438,972 414,519 
Other regulatory charges (credits) - net(28,425)32,279 
TOTAL2,311,865 2,336,841 
OPERATING INCOME 566,060 507,997 
OTHER INCOME
Allowance for equity funds used during construction15,871 14,577 
Interest and investment income (loss)(21,918)143,315 
Miscellaneous - net7,603 (60,929)
TOTAL1,556 96,963 
INTEREST EXPENSE
Interest expense227,622 205,886 
Allowance for borrowed funds used during construction(6,096)(6,013)
TOTAL221,526 199,873 
INCOME BEFORE INCOME TAXES
346,090 405,087 
Income taxes66,497 65,942 
CONSOLIDATED NET INCOME279,593 339,145 
Preferred dividend requirements of subsidiaries and noncontrolling interest3,193 4,580 
NET INCOME ATTRIBUTABLE TO ENTERGY CORPORATION
$276,400 $334,565 
Earnings per average common share:
Basic$1.36 $1.67 
Diluted$1.36 $1.66 
Basic average number of common shares outstanding202,943,628 200,525,549 
Diluted average number of common shares outstanding203,888,483 201,059,665 
See Notes to Financial Statements.


15

Table of Contents






























(Page left blank intentionally)

16

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
Net Income $279,593 $339,145 
Other comprehensive loss
Cash flow hedges net unrealized gain (loss) (net of tax benefit of $— and $7,869)
24 (29,580)
Pension and other postretirement liabilities (net of tax expense of $2,542, and $6,314)
8,328 22,967 
Net unrealized investment loss (net of tax benefit of $7,221 and $25,581)
(12,402)(44,687)
Other comprehensive loss(4,050)(51,300)
Comprehensive Income 275,543 287,845 
Preferred dividend requirements of subsidiaries and noncontrolling interest3,193 4,580 
Comprehensive Income Attributable to Entergy Corporation$272,350 $283,265 
See Notes to Financial Statements.

17

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Consolidated net income $279,593 $339,145 
Adjustments to reconcile consolidated net income to net cash flow provided by (used in) operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization561,731 580,571 
Deferred income taxes, investment tax credits, and non-current taxes accrued70,780 240,431 
Asset write-offs, impairments, and related charges744 3,278 
Changes in working capital:
Receivables122,987 (52,690)
Fuel inventory14,795 26,878 
Accounts payable(283,175)(175,651)
Taxes accrued(79,941)(231,182)
Interest accrued32,862 (3,778)
Deferred fuel costs(58,932)(353,099)
Other working capital accounts(95,033)(43,582)
Changes in provisions for estimated losses8,206 (60,923)
Changes in other regulatory assets(1,424,270)89,910 
Changes in other regulatory liabilities(250,358)(14,464)
Storm restoration costs approved for securitization recognized as regulatory asset1,491,942 — 
Changes in pension and other postretirement liabilities(101,641)(166,733)
Other247,676 (227,676)
Net cash flow provided by (used in) operating activities537,966 (49,565)
INVESTING ACTIVITIES
Construction/capital expenditures(1,501,578)(1,552,103)
Allowance for equity funds used during construction15,871 14,577 
Nuclear fuel purchases(83,326)(47,916)
Litigation proceeds from settlement agreement9,829 — 
Changes in securitization account13,532 (1,304)
Payments to storm reserve escrow account— (10)
Receipts from storm reserve escrow account— 44,205 
Decrease (increase) in other investments(11,862)12,521 
Litigation proceeds for reimbursement of spent nuclear fuel storage costs32,367 15,735 
Proceeds from nuclear decommissioning trust fund sales479,937 3,225,510 
Investment in nuclear decommissioning trust funds(505,989)(3,224,487)
Net cash flow used in investing activities(1,551,219)(1,513,272)
See Notes to Financial Statements.

18

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
FINANCING ACTIVITIES
Proceeds from the issuance of:
Long-term debt2,553,369 3,676,242 
Treasury stock9,629 979 
Retirement of long-term debt(1,224,091)(1,346,172)
Changes in credit borrowings and commercial paper - net141,634 (599,860)
Other1,382 10,380 
Dividends paid:
Common stock(205,058)(190,595)
Preferred stock(4,580)(4,580)
Net cash flow provided by financing activities1,272,285 1,546,394 
Net increase (decrease) in cash and cash equivalents259,032 (16,443)
Cash and cash equivalents at beginning of period442,559 1,759,099 
Cash and cash equivalents at end of period$701,591 $1,742,656 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$186,269 $202,451 
Income taxes($11,505)$9,015 
See Notes to Financial Statements.

19

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$76,146 $44,944 
Temporary cash investments625,445 397,615 
Total cash and cash equivalents701,591 442,559 
Accounts receivable:
Customer668,620 786,866 
Allowance for doubtful accounts(31,486)(68,608)
Other171,858 231,843 
Accrued unbilled revenues406,010 420,255 
Total accounts receivable1,215,002 1,370,356 
Deferred fuel costs375,670 324,394 
Fuel inventory - at average cost139,780 154,575 
Materials and supplies - at average cost1,066,535 1,041,515 
Deferred nuclear refueling outage costs125,192 133,422 
Prepayments and other215,231 156,774 
TOTAL3,839,001 3,623,595 
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds5,210,130 5,514,016 
Non-utility property - at cost (less accumulated depreciation)357,092 357,576 
Other159,728 159,455 
TOTAL5,726,950 6,031,047 
PROPERTY, PLANT, AND EQUIPMENT
Electric63,405,911 64,263,250 
Natural gas666,646 658,989 
Construction work in progress1,556,651 1,511,966 
Nuclear fuel547,706 577,006 
TOTAL PROPERTY, PLANT, AND EQUIPMENT66,176,914 67,011,211 
Less - accumulated depreciation and amortization24,982,767 24,767,051 
PROPERTY, PLANT, AND EQUIPMENT - NET41,194,147 42,244,160 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $34,145 as of March 31, 2022 and $49,579 as of December 31, 2021)
8,037,526 6,613,256 
Deferred fuel costs241,002 240,953 
Goodwill377,172 377,172 
Accumulated deferred income taxes58,388 54,186 
Other359,340 269,873 
TOTAL9,073,428 7,555,440 
TOTAL ASSETS$59,833,526 $59,454,242 
See Notes to Financial Statements.

20

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$1,039,335 $1,039,329 
Notes payable and commercial paper1,342,811 1,201,177 
Accounts payable1,741,052 2,610,132 
Customer deposits402,600 395,184 
Taxes accrued339,887 419,828 
Interest accrued224,013 191,151 
Deferred fuel costs— 7,607 
Pension and other postretirement liabilities60,249 68,336 
Current portion of unprotected excess accumulated deferred income taxes35,241 53,385 
Other177,997 204,613 
TOTAL5,363,185 6,190,742 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued4,796,208 4,706,797 
Accumulated deferred investment tax credits209,921 211,975 
Regulatory liability for income taxes-net1,233,417 1,255,692 
Other regulatory liabilities2,433,906 2,643,845 
Decommissioning and asset retirement cost liabilities4,816,524 4,757,084 
Accumulated provisions165,328 157,122 
Pension and other postretirement liabilities1,855,771 1,949,325 
Long-term debt (includes securitization bonds of $54,674 as of March 31, 2022 and $83,639 as of December 31, 2021)
26,176,449 24,841,572 
Other786,581 815,284 
TOTAL42,474,105 41,338,696 
Commitments and Contingencies
Subsidiaries' preferred stock without sinking fund219,410 219,410 
EQUITY
Preferred stock, no par value, authorized 1,000,000 shares in 2022 and 2021; issued shares in 2022 and 2021 - none
— — 
Common stock, $.01 par value, authorized 499,000,000 shares in 2022 and 2021; issued 271,965,510 shares in 2022 and 2021
2,720 2,720 
Paid-in capital6,735,154 6,766,239 
Retained earnings10,311,894 10,240,552 
Accumulated other comprehensive loss(336,578)(332,528)
Less - treasury stock, at cost (68,808,788 shares in 2022 and 69,312,326 shares in 2021)
5,003,087 5,039,699 
Total common shareholders' equity11,710,103 11,637,284 
Subsidiaries' preferred stock without sinking fund and noncontrolling interest66,723 68,110 
TOTAL11,776,826 11,705,394 
TOTAL LIABILITIES AND SHAREHOLDERS' EQUITY$59,833,526 $59,454,242 
See Notes to Financial Statements.

21

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
Common Shareholders’ Equity
Subsidiaries’ Preferred Stock and Noncontrolling InterestCommon
Stock
Treasury
Stock
Paid-in
Capital
Retained EarningsAccumulated Other Comprehensive LossTotal
(In Thousands)
Balance at December 31, 2020$35,000 $2,700 ($5,074,456)$6,549,923 $9,897,182 ($449,207)$10,961,142 
Consolidated net income (a)4,580 — — — 334,565 — 339,145 
Other comprehensive loss— — — — — (51,300)(51,300)
Common stock issuances related to stock plans
— — 28,235 (29,871)— — (1,636)
Common stock dividends declared— — — — (190,595)— (190,595)
Preferred dividend requirements of subsidiaries (a)
(4,580)— — — — — (4,580)
Balance at March 31, 2021$35,000 $2,700 ($5,046,221)$6,520,052 $10,041,152 ($500,507)$11,052,176 

Balance at December 31, 2021$68,110 $2,720 ($5,039,699)$6,766,239 $10,240,552 ($332,528)$11,705,394
Consolidated net income (a)3,193 — — — 276,400 — 279,593 
Other comprehensive loss— — — — — (4,050)(4,050)
Common stock issuances related to stock plans
— — 36,612 (31,085)— — 5,527 
Common stock dividends declared— — — — (205,058)— (205,058)
Preferred dividend requirements of subsidiaries (a)
(4,580)— — — — — (4,580)
Balance at March 31, 2022$66,723 $2,720 ($5,003,087)$6,735,154 $10,311,894 ($336,578)$11,776,826 
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2022 and first quarter 2021 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.

22

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES

NOTES TO FINANCIAL STATEMENTS
(Unaudited)

NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In October 2021 the U.S. Court of Federal Claims issued a final judgment in the amount of $83 million in favor of Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC against the DOE in the Indian Point Unit 2 third round and Unit 3 second round combined damages case. Entergy received payment from the U.S. Treasury in January 2022. The effect of recording the judgment was a reduction to asset write-offs, impairments, and related charges. The damages awarded included $32 million related to costs previously recorded as plant, $47 million related to costs previously recorded as other operation and maintenance expenses, and $4 million related to costs previously recorded as taxes other than income taxes.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.


23

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.


NOTE 2.  RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Regulatory Assets and Regulatory Liabilities

See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets and regulatory liabilities in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that discussion.

Fuel and purchased power cost recovery

Entergy Arkansas

Energy Cost Recovery Rider

In March 2022, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase from $0.00959 per kWh to $0.01785 per kWh. The primary reason for the rate increase is a large under-recovery balance as a result of higher natural gas prices in 2021, particularly in the fourth quarter 2021. At the request of the APSC general staff, Entergy Arkansas deferred its request for recovery of $32 million from the under-recovery related to the 2021 February winter storms until the 2023 energy cost rate redetermination, unless a request for an interim adjustment to the energy cost recovery rider is necessary. This resulted in a redetermined rate of $0.016390 per kWh, which became effective with the first billing cycle in April 2022 through the normal operation of the tariff.

Retail Rate Proceedings

See Note 2 to the financial statements in the Form 10-K for information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that discussion.

Filings with the APSC (Entergy Arkansas)

COVID-19 Orders

See the Form 10-K for discussion of APSC orders issued in light of the COVID-19 pandemic. As of March 31, 2022, Entergy Arkansas had a regulatory asset of $34.4 million for costs associated with the COVID-19 pandemic.


24

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Filings with the LPSC (Entergy Louisiana)

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the LPSC issued an order authorizing utilities to record as a regulatory asset expenses incurred from the suspension of disconnections and collection of late fees imposed by LPSC orders associated with the COVID-19 pandemic. In addition, utilities may seek future recovery, subject to LPSC review and approval, of losses and expenses incurred due to compliance with the LPSC’s COVID-19 orders. Utilities seeking to recover the regulatory asset must formally petition the LPSC to do so, identifying the direct and indirect costs for which recovery is sought. Any such request is subject to LPSC review and approval. As of March 31, 2022, Entergy Louisiana had a regulatory asset of $47.8 million for costs associated with the COVID-19 pandemic.

Filings with the MPSC (Entergy Mississippi)

2022 Formula Rate Plan Filing

In March 2022, Entergy Mississippi submitted its formula rate plan 2022 test year filing and 2021 look-back filing showing Entergy Mississippi’s earned return for the historical 2021 calendar year to be below the formula rate plan bandwidth and projected earned return for the 2022 calendar year to be below the formula rate plan bandwidth. The 2022 test year filing shows a $69 million rate increase is necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 6.70% return on rate base, within the formula rate plan bandwidth. The change in formula rate plan revenues, however, is capped at 4% of retail revenues, which equates to a revenue change of $48.6 million. The 2021 look-back filing compares actual 2021 results to the approved benchmark return on rate base and reflects the need for a $34.5 million interim increase in formula rate plan revenues. In fourth quarter 2021, Entergy Mississippi recorded a regulatory asset of $19 million to reflect the then-current estimate in connection with the look-back feature of the formula rate plan. In accordance with the provisions of the formula rate plan, Entergy Mississippi implemented a $24.3 million interim rate increase, reflecting a cap equal to 2% of 2021 retail revenues, effective in April 2022, subject to refund, pending a final MPSC order. A final order is expected in the second quarter 2022, with the resulting final rates, including amounts above the 2% cap of 2021 retail revenues, effective July 2022.

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the MPSC issued an order authorizing utilities to defer incremental costs and expenses associated with COVID-19 compliance and to seek future recovery through rates of the prudently incurred incremental costs and expenses. As of March 31, 2022, Entergy Mississippi had a regulatory asset of $14.1 million for costs associated with the COVID-19 pandemic.

Filings with the City Council (Entergy New Orleans)

2022 Formula Rate Plan Filing

In April 2022, Entergy New Orleans submitted to the City Council its formula rate plan 2021 test year filing. The 2021 test year evaluation report produced an earned return on equity of 6.88% compared to the authorized return on equity of 9.35%. Entergy New Orleans seeks approval of a $40.2 million rate increase based on the formula set by the City Council in the 2018 rate case. The formula results in an increase in authorized electric revenues of $32.3 million and an increase in authorized gas revenues of $3.2 million. Entergy New Orleans also seeks to commence collecting $4.7 million in electric revenues that were previously approved by the City Council for collection through the formula rate plan. The filing is subject to review by the City Council and other parties over a 75-day review period, followed by a 25-day period to resolve any disputes among the parties. Resulting rates will be effective with the first billing cycle of September 2022 pursuant to the formula rate plan

25

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
tariff. For any disputed rate adjustments, however, the City Council would set a procedural schedule that would extend the process for City Council approval of disputed rate adjustments.

COVID-19 Orders

As discussed in the Form 10-K, in May 2020 the City Council issued an accounting order authorizing Entergy New Orleans to establish a regulatory asset for incremental COVID-19-related expenses. As of March 31, 2022, Entergy New Orleans had a regulatory asset of $14.5 million for costs associated with the COVID-19 pandemic.

Filings with the PUCT and Texas Cities (Entergy Texas)

Distribution Cost Recovery Factor (DCRF) Rider

As discussed in the Form 10-K, in August 2021, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The proposed rider is designed to collect from Entergy Texas’s retail customers approximately $40.2 million annually, or $13.9 million in incremental annual revenues beyond Entergy Texas’s currently effective DCRF rider based on its capital invested in distribution between September 1, 2020 and June 30, 2021. In September 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. A procedural schedule was established with a hearing scheduled in December 2021. In December 2021 the parties filed an unopposed settlement recommending that Entergy Texas be allowed to collect its full requested DCRF revenue requirement and resolving all issues in the proceeding, including a motion for interim rates to take effect for usage on and after January 24, 2022. Also, in December 2021, the ALJ with the State Office of Administrative Hearings issued an order granting the motion for interim rates, which went into effect in January 2022, admitting evidence, and remanding the proceeding to the PUCT to consider the settlement. In March 2022 the PUCT issued an order approving the settlement.

Generation Cost Recovery Rider

As discussed in the Form 10-K, in October 2020, Entergy Texas filed an application to establish a generation cost recovery rider to begin recovering a return of and on its generation capital investment in the Montgomery County Power Station through August 31, 2020, which was approved by the PUCT on an interim basis in January 2021. In March 2021, Entergy Texas filed to update its generation cost recovery rider to include its generation capital investment in Montgomery County Power Station after August 31, 2020 and an unopposed settlement agreement filed on behalf of the parties by Entergy Texas in October 2021 was approved by the PUCT in January 2022. In February 2022, Entergy Texas filed a relate-back rider to collect over five months an additional approximately $5 million, which is the difference between the interim revenue requirement approved in January 2021 and the revenue requirement approved in January 2022 that reflects Entergy Texas’s full generation capital investment and ownership in Montgomery County Power Station on January 1, 2021, plus carrying costs from January 2021 through January 2022 when the updated revenue requirement took effect. In April 2022, Entergy Texas and PUCT staff filed a joint proposed order that supports approval of Entergy Texas’s as-filed request.

In December 2020, Entergy Texas also filed an application to amend its generation cost recovery rider to reflect its acquisition of the Hardin County Peaking Facility, which closed in June 2021. Because Hardin was to be acquired in the future, the initial generation cost recovery rider rates proposed in the application represented no change from the generation cost recovery rider rates established in Entergy Texas’s previous generation cost recovery rider proceeding. In July 2021 the PUCT issued an order approving the application. In August 2021, Entergy Texas filed an update application to recover its actual investment in the acquisition of the Hardin County Peaking Facility. In September 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. A procedural schedule was established with a hearing scheduled in April 2022. In January 2022, Entergy Texas filed an update to its application to align the requested revenue requirement with the terms of the generation cost recovery rider settlement approved by the PUCT in January 2022. In March 2022, Entergy Texas filed on

26

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
behalf of the parties an unopposed motion, which motion was granted by the ALJ with the State Office of Administrative Hearings, to abate the procedural schedule indicating that the parties had reached an agreement in principle. In April 2022, Entergy Texas filed on behalf of the parties a unanimous settlement agreement that would adjust its generation cost recovery rider to recover an annual revenue requirement of approximately $92.8 million, which is $4.5 million in incremental annual revenue above the $88.3 million approved in January 2022, related to Entergy Texas’s actual investment in the acquisition of the Hardin County Peaking Facility.

COVID-19 Orders

As discussed in the Form 10-K, in March 2020 the PUCT authorized electric utilities to record as a regulatory asset expenses resulting from the effects of the COVID-19 pandemic. In future proceedings, the PUCT will consider whether each utility's request for recovery of these regulatory assets is reasonable and necessary, the appropriate period of recovery, and any amount of carrying costs thereon. As of March 31, 2022, Entergy Texas had a regulatory asset of $10.4 million for costs associated with the COVID-19 pandemic.

Entergy Arkansas Opportunity Sales Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding. As discussed in the Form 10-K, in September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of the opportunity sales payments made to the other Utility operating companies. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint. In March 2022 the court denied the APSC’s motion to dismiss and, in April 2022, issued a scheduling order including a trial date in February 2023.

Complaints Against System Energy

See Note 2 to the financial statements in the Form 10-K for information regarding pending complaints against System Energy. The following are updates to that discussion.

Return on Equity and Capital Structure Complaints

As discussed in the Form 10-K, in March 2021 the FERC ALJ issued an initial decision in the proceeding against System Energy regarding the return on equity component of the Unit Power Sales Agreement. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $61 million, which includes interest through March 31, 2022, and the estimated resulting annual rate reduction would be approximately $50 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $38 million, including interest, as of March 31, 2022.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on

27

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

As discussed in the Form 10-K, in May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through March 31, 2022, is approximately $422 million, plus interest, which is approximately $135 million through March 31, 2022. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through March 31, 2022.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

LPSC Authorization of Additional Complaints

As discussed in the Form 10-K, in May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement.

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC and the City Council in September 2020. The first complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in

28

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
abeyance pending the FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of the FERC’s decision as related to matters set for hearing that were beyond the scope of the FERC’s jurisdiction or authority. The complainants sought rehearing of the FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of the FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures, System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.


29

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
In March 2022 the FERC trial staff filed direct and answering testimony in response to the LPSC, APSC, and City Council’s direct testimony. In its testimony, the FERC trial staff recommends refunds for two primary reasons: (1) it concluded that System Energy should have excluded specified accumulated deferred income tax balances in account 190 associated with rate refunds; and (2) it concluded that System Energy should have excluded specified accumulated deferred income tax balances in account 190 associated with a deemed contract satisfaction and reissuance that occurred in 2005. The FERC trial staff recommends refunds of $84.1 million, exclusive of any tax gross-up or FERC interest. In addition, the FERC trial staff recommends the following prospective modifications to the Unit Power Sales Agreement: (1) inclusion of a rate base credit to recognize the time value of money associated with the advance collection of lease payments; (2) exclusion of executive incentive compensation costs for members of the Office of the Chief Executive and long-term performance unit costs where awards are based solely or primarily on financial metrics; and (3) exclusion of unvested, accrued amounts for stock options, performance units, and restricted stock awards. With respect to issues that ultimately concern the reasonableness of System Energy’s rate of return, the FERC trial staff states that it is unnecessary to consider such issues in this proceeding, in light of the pending case concerning System Energy’s return on equity and capital structure. On all other material issues raised by the LPSC, APSC, and City Council, the FERC trial staff recommends either no refunds or no modification to the Unit Power Sales Agreement.

System Energy Formula Rate Annual Protocols Formal Challenge Concerning 2020 Calendar Year Bills

System Energy’s Unit Power Sales Agreement includes formula rate protocols that provide for the disclosure of cost inputs, an opportunity for informal discovery procedures, and a challenge process. In February 2022, pursuant to the protocols procedures, the LPSC, the APSC, the MPSC, the City Council, and the Mississippi Public Utilities Staff filed with the FERC a formal challenge to System Energy’s implementation of the formula rate during calendar year 2020. The formal challenge alleges: (1) that it was imprudent for System Energy to accept the IRS’s partial acceptance of a previously uncertain tax position; (2) that System Energy should have delayed recording the result of the IRS’s partial acceptance of the previously uncertain tax position until after internal tax allocation payments were made; (3) that the equity ratio charged in rates was excessive; (4) that sale-leaseback rental payments should have been excluded from rates; and (5) that all issues in the ongoing Unit Power Sales Agreement Complaint proceeding should also be reflected in calendar year 2020 bills. While System Energy disagrees that any refunds are owed for the 2020 calendar year bills, the formal challenge estimates that the financial impact of the first through fourth allegations is approximately $53 million; it does not provide an estimate of the financial impact of the fifth allegation.

In March 2022, System Energy filed an answer to the formal challenge in which it requested that the FERC deny the formal challenge as a matter of law, or else hold the proceeding in abeyance pending the resolution of related dockets.

Storm Cost Recovery Filings with Retail Regulators

See Note 2 to the financial statements in the Form 10-K for discussion regarding storm cost recovery filings. The following are updates to that discussion.

Entergy Louisiana

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild. In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice

30

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms were estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital costs. Including carrying costs through January 2022, Entergy Louisiana was seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, was eligible for recovery from customers. Additionally, Entergy Louisiana was requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million was appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.

In August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review.

After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests in regard to Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contained the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and were eligible for recovery; carrying costs of $51 million were recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana was authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC issued an order approving the settlement in March 2022. As a result of the financing order, in first quarter 2022, Entergy Louisiana reclassified $1.339 billion from utility plant to other regulatory assets. The securitization process is expected to be completed in second quarter 2022.

In April 2022, Entergy Louisiana filed an application with the LPSC relating to Hurricane Ida restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by Hurricane Ida currently are estimated to be approximately $2.54 billion, including approximately $1.96 billion in capital costs and approximately $586 million in non-capital costs. Including carrying costs through December 2022, Entergy Louisiana is seeking an LPSC determination that $2.60 billion was prudently incurred and, therefore, is eligible for recovery from customers. As part of this filing, Entergy Louisiana also is seeking an LPSC determination that an additional $32 million in restoration costs associated with the restoration of Entergy Louisiana’s electric facilities damaged by Hurricane Laura, Hurricane Delta, and Hurricane Zeta as well as Winter Storm Uri was prudently incurred. This amount is exclusive of the requested $3 million in carrying costs through December 2022. In total, Entergy Louisiana is requesting an LPSC determination that $2.64 billion was prudently incurred and, therefore, is eligible for recovery from customers. As discussed above, in March 2022 the LPSC approved financing of a $1 billion storm escrow that can be withdrawn to finance costs associated with Hurricane Ida restoration. Entergy Louisiana expects to supplement the April 2022 application with a request that the LPSC authorize Entergy Louisiana to finance the remaining storm restoration costs included in the April 2022 application,

31

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
currently expected to be through the securitization process authorized by Louisiana Act 55, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.

Entergy Texas

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of certain system restoration costs, which were approved by the PUCT as eligible for securitization in December 2021. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement. As a result of the financing order, in first quarter 2022, Entergy Texas reclassified $153 million from utility plant to other regulatory assets.

In April 2022, Entergy Texas Restoration Funding II, LLC, a company wholly-owned and consolidated by Entergy Texas, issued $290.85 million of senior secured system restoration bonds (securitization bonds). With the proceeds, Entergy Texas Restoration Funding II purchased from Entergy Texas the transition property, which is the right to recover from customers through a system restoration charge amounts sufficient to service the securitization bonds. Entergy Texas began cost recovery through the system restoration charge effective with the first billing cycle of May 2022 and the system restoration charge is expected to remain in place up to 15 years. See Note 4 to the financial statements herein for a discussion of the April 2022 issuance of the securitization bonds.


NOTE 3.  EQUITY (Entergy Corporation and Entergy Louisiana)

Common Stock

Earnings per Share

The following table presents Entergy’s basic and diluted earnings per share calculations included on the consolidated income statements:
For the Three Months Ended March 31,
20222021
(In Millions, Except Per Share Data)
IncomeShares$/shareIncomeShares$/share
Basic earnings per share
Net income attributable to Entergy Corporation$276.4 202.9 $1.36 $334.6 200.5 $1.67 
Average dilutive effect of:
Stock options0.5 — 0.4 (0.01)
Other equity plans0.4 — 0.2 — 
Equity forwards0.1 — — — 
Diluted earnings per share$276.4 203.9 $1.36 $334.6 201.1 $1.66 


32

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The number of stock options not included in the calculation of diluted common shares outstanding due to their antidilutive effect was approximately 0.9 million for the three months ended March 31, 2022 and approximately 1 million for the three months ended March 31, 2021.

Entergy’s stock options and other equity compensation plans are discussed in Note 5 to the financial statements herein and in Note 12 to the financial statements in the Form 10-K.

Dividends declared per common share were $1.01 for the three months ended March 31, 2022 and $0.95 for the three months ended March 31, 2021.

Equity Distribution Program

In January 2021, Entergy entered into an equity distribution sales agreement with several counterparties establishing an at the market equity distribution program, pursuant to which Entergy may offer and sell from time to time shares of its common stock. The sales agreement provides that, in addition to the issuance and sale of shares of Entergy common stock, Entergy may enter into forward sale agreements for the sale of its common stock. The aggregate number of shares of common stock sold under this sales agreement and under any forward sale agreement may not exceed an aggregate gross sales price of $1 billion, of which an aggregate gross sales price of approximately $633 million has been sold through March 31, 2022. See Note 7 to the financial statements in the Form 10-K for discussion of the common stock issued and unsettled forward sale agreements entered into during 2021. For the three months ended March 31, 2022, there were no shares of common stock issued under the at the market equity distribution program.

In March 2022, Entergy entered into a forward sale agreement for 1,538,010 shares of common stock. No amounts have or will be recorded on Entergy’s balance sheet with respect to the equity offering until settlements of the equity forward sale agreement occur. The forward sale agreement requires Entergy to, at its election prior to September 29, 2023, either (i) physically settle the transactions by issuing the total of 1,538,010 shares of its common stock to the forward counterparty in exchange for net proceeds at the then-applicable forward sale price specified by the agreement (initially approximately $108.14 per share) or (ii) net settle the transaction in whole or in part through the delivery or receipt of cash or shares. The forward sale price is subject to adjustment on a daily basis based on a floating interest rate factor and will decrease by other fixed amounts specified in the agreement. In connection with the forward sale agreement, the forward seller, or its affiliates, borrowed from third parties and sold 1,538,010 shares of Entergy Corporation’s common stock. The gross sales price of these shares totaled approximately $168 million. In connection with the sale of these shares, Entergy paid the forward sellers fees of approximately $1.7 million, which have not been deducted from the gross sales price. Entergy did not receive any proceeds from such sales of borrowed shares.

Until settlement of the forward sale agreement, earnings per share dilution resulting from the agreement, if any, will be determined under the treasury stock method. Share dilution occurs when the average market price of Entergy’s common stock is higher than the average forward sales price. For the three months ended March 31, 2022, 1,775,251 shares under the forward sale agreements were not included in the calculation of diluted earnings per share because their effect would have been antidilutive.

Treasury Stock

During the three months ended March 31, 2022, Entergy Corporation issued 503,538 shares of its previously repurchased common stock to satisfy stock option exercises, vesting of shares of restricted stock, and other stock-based awards.  Entergy Corporation did not repurchase any of its common stock during the three months ended March 31, 2022.


33

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Retained Earnings

On April 11, 2022, Entergy Corporation’s Board of Directors declared a common stock dividend of $1.01 per share, payable on June 1, 2022 to holders of record as of May 5, 2022.

Comprehensive Income

Accumulated other comprehensive income (loss) is included in the equity section of the balance sheets of Entergy and Entergy Louisiana. The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the three months ended March 31, 2022 by component:
Cash flow
hedges
net
unrealized
gain (loss)
Pension
and
other
postretirement
liabilities
Net
unrealized
investment
gain (loss)
Total
Accumulated
Other
Comprehensive
Income (Loss)
(In Thousands)
Beginning balance, January 1, 2022($1,035)($338,647)$7,154 ($332,528)
Other comprehensive income (loss) before reclassifications(14)— (15,875)(15,889)
Amounts reclassified from accumulated other comprehensive income (loss)38 8,328 3,473 11,839 
Net other comprehensive income (loss) for the period24 8,328 (12,402)(4,050)
Ending balance, March 31, 2022($1,011)($330,319)($5,248)($336,578)

The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the three months ended March 31, 2021 by component:

Cash flow
hedges
net
unrealized
gain (loss)
Pension
and
other
postretirement
liabilities
Net
unrealized
investment
gain (loss)
Total
Accumulated
Other
Comprehensive
Income (Loss)
(In Thousands)
Beginning balance, January 1, 2021$28,719 ($534,576)$56,650 ($449,207)
Other comprehensive income (loss) before reclassifications1,482 — (45,301)(43,819)
Amounts reclassified from accumulated other comprehensive income (loss)(31,062)22,967 614 (7,481)
Net other comprehensive income (loss) for the period(29,580)22,967 (44,687)(51,300)
Ending balance, March 31, 2021($861)($511,609)$11,963 ($500,507)

34

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The following table presents changes in accumulated other comprehensive income (loss) for Entergy Louisiana for the three months ended March 31, 2022 and 2021:
Pension and Other
Postretirement Liabilities
20222021
(In Thousands)
Beginning balance, January 1,$8,278 $4,327 
Amounts reclassified from accumulated other comprehensive income (loss)(613)(407)
Net other comprehensive income (loss) for the period(613)(407)
Ending balance, March 31,$7,665 $3,920 
Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) into income for Entergy for the three months ended March 31, 2022 and 2021 were as follows:
Amounts reclassified
from AOCI
Income Statement Location
20222021
(In Thousands)
Cash flow hedges net unrealized gain (loss)
   Power contracts$— $39,367 Competitive business operating revenues
   Interest rate swaps(48)(48)Miscellaneous - net
Total realized gain (loss) on cash flow hedges(48)39,319 
Income taxes10 (8,257)Income taxes
Total realized gain (loss) on cash flow hedges (net of tax)($38)$31,062 
Pension and other postretirement liabilities
   Amortization of prior-service credit$3,837 $5,248 (a)
   Amortization of loss(13,925)(34,529)(a)
   Settlement loss(782)— (a)
Total amortization(10,870)(29,281)
Income taxes2,542 6,314 Income taxes
Total amortization (net of tax)($8,328)($22,967)
Net unrealized investment gain (loss)
Realized gain (loss)($5,495)($972)Interest and investment income
Income taxes2,022 358 Income taxes
Total realized investment gain (loss) (net of tax)($3,473)($614)
Total reclassifications for the period (net of tax)($11,839)$7,481 

(a)These accumulated other comprehensive income (loss) components were included in the computation of net periodic pension and other postretirement cost.  See Note 6 to the financial statements herein for additional details.

35

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) into income for Entergy Louisiana for the three months ended March 31, 2022 and 2021 were as follows:

Amounts reclassified
from AOCI
Income Statement Location
20222021
(In Thousands)
Pension and other postretirement liabilities
   Amortization of prior-service credit$1,158 $1,230 (a)
   Amortization of loss(319)(679)(a)
Total amortization839 551 
Income taxes(226)(144)Income taxes
Total amortization (net of tax)613 407 
Total reclassifications for the period (net of tax)$613 $407 

(a)These accumulated other comprehensive income (loss) components were included in the computation of net periodic pension and other postretirement cost.  See Note 6 to the financial statements herein for additional details.


NOTE 4.  REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in June 2026.  The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.225% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the three months ended March 31, 2022 was 1.81% on the drawn portion of the facility.  As of March 31, 2022, amounts outstanding and capacity available under the $3.5 billion credit facility are:

Capacity BorrowingsLetters
of Credit
Capacity
Available
(In Millions)
$3,500$150$3$3,347

Entergy Corporation’s credit facility requires Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur.

Entergy Corporation has a commercial paper program with a Board-approved program limit of up to $2 billion.  As of March 31, 2022, Entergy Corporation had $1.343 billion of commercial paper outstanding.  The weighted-average interest rate for the three months ended March 31, 2022 was 0.48%.


36

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each had credit facilities available as of March 31, 2022 as follows:
CompanyExpiration
Date
Amount of
Facility
Interest Rate
(a)
Amount Drawn
as of
March 31, 2022
Letters of Credit
Outstanding as of
March 31, 2022
Entergy ArkansasApril 2022 (e)$25 million (b)3.00%$—$—
Entergy ArkansasJune 2026$150 million (c)1.58%$—$—
Entergy LouisianaJune 2026$350 million (c)1.71%$—$—
Entergy MississippiApril 2022 (f)$37.5 million (d)1.96%$—$—
Entergy MississippiApril 2022 (f)$35 million (d)1.96%$—$—
Entergy MississippiApril 2022 (f)$10 million (d)1.96%$—$—
Entergy New OrleansJune 2024$25 million (c)2.08%$—$—
Entergy TexasJune 2026$150 million (c)1.71%$—$1.3 million

(a)The interest rate is the estimated interest rate as of March 31, 2022 that would have been applied to outstanding borrowings under the facility.
(b)Borrowings under this Entergy Arkansas credit facility may be secured by a security interest in its accounts receivable at Entergy Arkansas’s option.
(c)The credit facility includes fronting commitments for the issuance of letters of credit against a portion of the borrowing capacity of the facility as follows: $5 million for Entergy Arkansas; $15 million for Entergy Louisiana; $10 million for Entergy New Orleans; and $30 million for Entergy Texas.
(d)Borrowings under the Entergy Mississippi credit facilities may be secured by a security interest in its accounts receivable at Entergy Mississippi’s option.
(e)In April 2022, Entergy Arkansas extended the expiration of the credit facility to July 2022.
(f)In April 2022, Entergy Mississippi renewed its three existing short-term credit facilities, increased the aggregate amount available under the facilities to $95 million, and extended the expiration date of each credit facility to April 2023. Also in April 2022, Entergy Mississippi entered into a long-term credit facility in the amount of $150 million with an expiration date of July 2024. The interest rates for these facilities will be based on the Secured Overnight Financing Rate.

The commitment fees on the credit facilities range from 0.075% to 0.375% of the undrawn commitment amount for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas, and of the entire facility amount for Entergy New Orleans. Each of the credit facilities requires the Registrant Subsidiary borrower to maintain a debt ratio, as defined, of 65% or less of its total capitalization.  Each Registrant Subsidiary is in compliance with this covenant.

In addition, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each entered into an uncommitted standby letter of credit facility as a means to post collateral to support its

37

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
obligations to MISO. Following is a summary of the uncommitted standby letter of credit facilities as of March 31, 2022:
CompanyAmount of
Uncommitted Facility
Letter of Credit FeeLetters of Credit
Issued as of
March 31, 2022
(a) (b)
Entergy Arkansas$25 million0.78%$7.5 million
Entergy Louisiana$125 million 0.78%$11.0 million
Entergy Mississippi$65 million0.78%$2.3 million
Entergy New Orleans$15 million1.00%$1.0 million
Entergy Texas$80 million0.875%$79.6 million

(a)As of March 31, 2022, letters of credit posted with MISO covered financial transmission right exposure of $0.3 million for Entergy Arkansas and $0.4 million for Entergy Mississippi. See Note 8 to the financial statements herein for discussion of financial transmission rights.
(b)As of March 31, 2022, in addition to the $2.3 million MISO letter of credit, Entergy Mississippi has $1 million of non-MISO letters of credit outstanding under this facility.

The short-term borrowings of the Registrant Subsidiaries are limited to amounts authorized by the FERC.  The current FERC-authorized short-term borrowing limits for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy are effective through October 2023. In addition to borrowings from commercial banks, these companies may also borrow from the Entergy System money pool and from other internal short-term borrowing arrangements.  The money pool and the other internal borrowing arrangements are inter-company borrowing arrangements designed to reduce the Utility subsidiaries’ dependence on external short-term borrowings.  Borrowings from internal and external short-term borrowings combined may not exceed the FERC-authorized limits.  The following were the FERC-authorized limits for short-term borrowings and the outstanding short-term borrowings as of March 31, 2022 (aggregating both internal and external short-term borrowings) for the Registrant Subsidiaries:
 AuthorizedBorrowings
 (In Millions)
Entergy Arkansas$250$—
Entergy Louisiana $450 $—
Entergy Mississippi$200$22
Entergy New Orleans$150$—
Entergy Texas$200$171
System Energy$200$—

Vermont Yankee Credit Facility (Entergy Corporation)

In January 2019, Entergy Nuclear Vermont Yankee was transferred to NorthStar and its credit facility was assumed by Entergy Assets Management Operations, LLC (formerly Vermont Yankee Asset Retirement, LLC), Entergy Nuclear Vermont Yankee’s parent company that remains an Entergy subsidiary after the transfer. The credit facility has a borrowing capacity of $139 million and expires in December 2022. The commitment fee is currently 0.20% of the undrawn commitment amount.  As of March 31, 2022, $139 million in cash borrowings were outstanding under the credit facility.  The weighted average interest rate for the three months ended March 31, 2022 was 1.72% on the drawn portion of the facility. See Note 14 to the financial statements in the Form 10-K for discussion of the transfer of Entergy Nuclear Vermont Yankee to NorthStar.


38

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of the consolidation of the nuclear fuel company variable interest entities (VIEs).  To finance the acquisition and ownership of nuclear fuel, the nuclear fuel company VIEs have credit facilities and three of the four VIEs also issue commercial paper, details of which follow as of March 31, 2022:
CompanyExpiration
Date
Amount
of
Facility
Weighted
 Average Interest
 Rate on
 Borrowings (a)
Amount
Outstanding as of
March 31, 2022
(Dollars in Millions)
Entergy Arkansas VIEJune 2024$801.10%$—
Entergy Louisiana River Bend VIEJune 2024$1051.14%$30.8
Entergy Louisiana Waterford VIEJune 2024$1051.15%$82.1
System Energy VIEJune 2024$1201.17%$100

(a)Includes letter of credit fees and bank fronting fees on commercial paper issuances by the nuclear fuel company variable interest entities for Entergy Arkansas, Entergy Louisiana, and System Energy. The nuclear fuel company variable interest entity for Entergy Louisiana River Bend does not issue commercial paper, but borrows directly on its bank credit facility.

The commitment fees on the credit facilities are 0.100% of the undrawn commitment amount for the Entergy Arkansas, Entergy Louisiana, and System Energy VIEs.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio, as defined, of 70% or less of its total capitalization. Each lessee is in compliance with this covenant.

The nuclear fuel company variable interest entities had notes payable that were included in debt on the respective balance sheets as of March 31, 2022 as follows:
CompanyDescriptionAmount
Entergy Arkansas VIE
3.17% Series M due December 2023
$40 million
Entergy Arkansas VIE
1.84% Series N due July 2026
$90 million
Entergy Louisiana River Bend VIE
2.51% Series V due June 2027
$70 million
Entergy Louisiana Waterford VIE
3.22% Series I due December 2023
$20 million
System Energy VIE
2.05% Series K due September 2027
$90 million

In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities’ credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Entergy Arkansas, Entergy Louisiana, and System Energy each has obtained financing authorization from the FERC that extends through October 2023 for issuances by its nuclear fuel company variable interest entities.

Debt Issuances

(Entergy Arkansas)

In March 2022, Entergy Arkansas issued $200 million of 4.20% Series mortgage bonds due April 2049. Entergy Arkansas expects to use the proceeds for general corporate purposes, including the repayment of borrowings from the Entergy System money pool.

39

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements

(Entergy Louisiana)

In December 2021, Entergy Louisiana entered into a term loan credit agreement providing a $1.2 billion unsecured term loan due June 2023. The term loan bears interest at a variable interest rate based on an adjusted term Secured Overnight Financing Rate plus the applicable margin. The weighted average interest rate for the three months ended March 31, 2022 was 0.976%. Entergy Louisiana received the funds in January 2022 and used the proceeds for general corporate purposes, including storm restoration costs related to Hurricane Ida.

Entergy Texas Securitization Bonds

In January 2022, the PUCT authorized the issuance of securitization bonds to recover $242.9 million of Entergy Texas’ Hurricanes Laura and Delta and Winter Storm Uri restoration costs, plus carrying costs, plus $13.3 million relating to a system restoration regulatory asset, plus up-front qualified costs. In April 2022, Entergy Texas Restoration Funding II, LLC, a company wholly-owned and consolidated by Entergy Texas, issued $290.85 million of senior secured restoration bonds (securitization bonds), as follows:
Amount
(In Thousands)
Senior Secured Restoration Bonds:
Tranche A-1 (3.051%) due December 2028
$100,000 
Tranche A-2 (3.697%) due December 2036
190,850 
Total senior secured restoration bonds$290,850 

Although the principal amount of each tranche is not due until the dates given above, Entergy Texas Restoration Funding II expects to make principal payments on the securitization bonds over the next five years in the amounts of $12.3 million for 2022, $17.8 million for 2023, $18.3 million for 2024, $18.8 million for 2025, and $19.4 million for 2026. All of the expected principal payments for 2022-2026 are for Tranche A-1.

With the proceeds, Entergy Texas Restoration Funding II purchased from Entergy Texas the transition property, which is the right to recover from customers through a system restoration charge amounts sufficient to service the securitization bonds. Entergy Texas expects to use the proceeds to reduce its outstanding debt. The creditors of Entergy Texas do not have recourse to the assets or revenues of Entergy Texas Restoration Funding II, including the transition property, and the creditors of Entergy Texas Restoration Funding II do not have recourse to the assets or revenues of Entergy Texas. Entergy Texas has no payment obligations to Entergy Texas Restoration Funding II except to remit system restoration charge collections.


40

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Fair Value

The book value and the fair value of long-term debt for Entergy Corporation and the Registrant Subsidiaries as of March 31, 2022 were as follows:
Book Value
of Long-Term Debt
Fair Value
of Long-Term Debt (a)
(In Thousands)
Entergy$27,215,784 $26,731,277 
Entergy Arkansas$4,163,602 $4,101,516 
Entergy Louisiana$12,022,131 $11,959,123 
Entergy Mississippi$2,180,197 $2,152,275 
Entergy New Orleans$788,501 $775,566 
Entergy Texas$2,325,371 $2,254,487 
System Energy$805,353 $769,552 

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

The book value and the fair value of long-term debt for Entergy Corporation and the Registrant Subsidiaries as of December 31, 2021 were as follows:
Book Value
of Long-Term Debt
Fair Value
of Long-Term Debt (a)
(In Thousands)
Entergy$25,880,901 $27,061,171 
Entergy Arkansas$3,958,862 $4,176,577 
Entergy Louisiana$10,914,346 $11,492,650 
Entergy Mississippi$2,179,989 $2,346,230 
Entergy New Orleans$788,165 $765,538 
Entergy Texas$2,354,148 $2,483,995 
System Energy$741,296 $743,040 

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

NOTE 5.  STOCK-BASED COMPENSATION (Entergy Corporation)

Entergy grants stock and stock-based awards, which are described more fully in Note 12 to the financial statements in the Form 10-K.  Awards under Entergy’s plans generally vest over three years.

Stock Options

Entergy granted options on 444,028 shares of its common stock under the 2019 Omnibus Incentive Plan during the first quarter 2022 with a fair value of $16.25 per option.  As of March 31, 2022, there were options on 3,128,304 shares of common stock outstanding with a weighted-average exercise price of $94.35.  The intrinsic value, which has no effect on net income, of the outstanding stock options is calculated by the positive difference

41

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
between the weighted average exercise price of the stock options granted and Entergy Corporation’s common stock price as of March 31, 2022.  The aggregate intrinsic value of the stock options outstanding as of March 31, 2022 was $77.6 million.

The following table includes financial information for outstanding stock options for the three months ended March 31, 2022 and 2021:
20222021
(In Millions)
Compensation expense included in Entergy’s consolidated net income$1.1 $1.0 
Tax benefit recognized in Entergy’s consolidated net income$0.3 $0.3 
Compensation cost capitalized as part of fixed assets and materials and supplies$0.4 $0.4 
Other Equity Awards

In January 2022 the Board approved and Entergy granted 328,849 restricted stock awards and 170,966 long-term incentive awards under the 2019 Omnibus Incentive Plan.  The restricted stock awards were made effective on January 27, 2022 and were valued at $109.59 per share, which was the closing price of Entergy’s common stock on that date.  Shares of restricted stock have the same dividend and voting rights as other common stock, are considered issued and outstanding shares of Entergy upon vesting, and are expensed ratably over the three-year vesting period. One-third of the restricted stock awards and accrued dividends will vest upon each anniversary of the grant date.  

In addition, long-term incentive awards were also granted in the form of performance units that represent the value of, and are settled with, one share of Entergy Corporation common stock at the end of the three-year performance period, plus dividends accrued during the performance period on the number of performance units earned. To emphasize the importance of strong cash generation for the long-term health of its business, a credit measure – adjusted funds from operations/debt ratio – was selected for the 2022-2024 performance period. Performance will be measured based eighty percent on relative total shareholder return and twenty percent on the credit measure.  The performance units were granted on January 27, 2022 and eighty percent were valued at $138.99 per share based on various factors, primarily market conditions; and twenty percent were valued at $109.59 per share, the closing price of Entergy’s common stock on that date.  Performance units have the same dividend rights as shares of Entergy common stock and are considered issued and outstanding shares of Entergy upon vesting. Performance units are expensed ratably over the three-year vesting period and compensation cost for the portion of the award based on cumulative adjusted earnings per share will be adjusted based on the number of units that ultimately vest. See Note 12 to the financial statements in the Form 10-K for a description of the Long-Term Performance Unit Program.

The following table includes financial information for other outstanding equity awards for the three months ended March 31, 2022 and 2021:
20222021
(In Millions)
Compensation expense included in Entergy’s consolidated net income$11.4 $10.8 
Tax benefit recognized in Entergy’s consolidated net income$2.9 $2.7 
Compensation cost capitalized as part of fixed assets and materials and supplies$4.4 $4.0 

42

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
NOTE 6.  RETIREMENT AND OTHER POSTRETIREMENT BENEFITS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Components of Qualified Net Pension Cost    
Entergy’s qualified pension costs, including amounts capitalized, for the first quarters of 2022 and 2021, included the following components:
20222021
(In Thousands)
Service cost - benefits earned during the period$37,660 $45,241 
Interest cost on projected benefit obligation51,119 46,099 
Expected return on assets(103,607)(105,713)
Amortization of net loss60,579 104,392 
Net pension costs$45,751 $90,019 
The Registrant Subsidiaries’ qualified pension costs, including amounts capitalized, for their employees for the first quarters of 2022 and 2021, included the following components:

2022Entergy
Arkansas
Entergy
Louisiana
Entergy
 Mississippi
Entergy
New Orleans
Entergy
Texas
System
Energy
(In Thousands)
Service cost - benefits earned during the period$6,858 $9,137 $2,130 $752 $1,632 $2,045 
Interest cost on projected benefit obligation9,317 10,499 2,678 1,139 2,175 2,338 
Expected return on assets(19,247)(21,133)(5,203)(2,515)(4,937)(4,623)
Amortization of net loss13,426 12,597 3,810 1,368 2,555 3,266 
Net pension cost$10,354 $11,100 $3,415 $744 $1,425 $3,026 

2021Entergy
Arkansas
Entergy
Louisiana
Entergy
 Mississippi
Entergy
New Orleans
Entergy
Texas
System
Energy
(In Thousands)
Service cost - benefits earned during the period$7,418 $10,043 $2,364 $796 $1,801 $2,314 
Interest cost on projected benefit obligation8,341 9,562 2,462 1,029 1,949 2,142 
Expected return on assets(19,670)(22,538)(5,587)(2,622)(5,237)(4,778)
Amortization of net loss19,303 19,204 5,668 2,270 3,711 5,326 
Net pension cost$15,392 $16,271 $4,907 $1,473 $2,224 $5,004 

Non-Qualified Net Pension Cost

Entergy recognized $10.2 million and $4.6 million in pension cost for its non-qualified pension plans in the first quarters of 2022 and 2021, respectively. Reflected in the pension cost for non-qualified pension plans in the first quarter of 2022 were settlement charges of $5.3 million related to the payment of lump sum benefits out of the plan. In the first quarter of 2021 there were no settlement charges related to the payment of lump sum benefits out of the plan.

43

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The Registrant Subsidiaries recognized the following pension cost for their employees for their non-qualified pension plans for first quarters of 2022 and 2021:
Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New Orleans
Entergy
Texas
(In Thousands)
2022$72 $27 $80 $29 $215 
2021$90 $44 $96 $8 $115 

Reflected in Entergy Texas’ non-qualified pension costs in the first quarter of 2022 were settlement charges of $119 thousand related to the payment of lump sum benefits out of the plan.

Components of Net Other Postretirement Benefit Cost (Income)
Entergy’s other postretirement benefit income, including amounts capitalized, for the first quarters of 2022 and 2021, included the following components:
 20222021
 (In Thousands)
Service cost - benefits earned during the period$6,184 $6,645 
Interest cost on accumulated postretirement benefit obligation (APBO)6,827 5,320 
Expected return on assets(10,855)(10,805)
Amortization of prior service credit(6,388)(8,267)
Amortization of net loss1,083 713 
Net other postretirement benefit income($3,149)($6,394)
The Registrant Subsidiaries’ other postretirement benefit cost (income), including amounts capitalized, for their employees for the first quarters of 2022 and 2021, included the following components:

2022Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New Orleans
Entergy
Texas
System
Energy
(In Thousands)
Service cost - benefits earned during the period$1,114 $1,408 $339 $99 $331 $310 
Interest cost on APBO1,263 1,443 350 174 399 279 
Expected return on assets(4,483)— (1,394)(1,499)(2,568)(791)
Amortization of prior service credit471 (1,158)(443)(229)(1,093)(80)
Amortization of net (gain) loss218 (186)56 (225)162 30 
Net other postretirement benefit cost (income)($1,417)$1,507 ($1,092)($1,680)($2,769)($252)


44

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
2021Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New Orleans
Entergy
Texas
System
Energy
(In Thousands)
Service cost - benefits earned during the period$1,034 $1,544 $362 $109 $346 $335 
Interest cost on APBO932 1,130 278 130 317 220 
Expected return on assets(4,505)— (1,384)(1,438)(2,548)(789)
Amortization of prior service credit(280)(1,230)(444)(229)(936)(109)
Amortization of net (gain) loss49 (91)19 (178)100 15 
Net other postretirement benefit cost (income)($2,770)$1,353 ($1,169)($1,606)($2,721)($328)

Reclassification out of Accumulated Other Comprehensive Income (Loss)
Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the first quarters of 2022 and 2021:
2022Qualified
Pension
Costs
Other
Postretirement
Costs
Non-Qualified
Pension Costs
Total
(In Thousands)
Entergy
Amortization of prior service (cost) credit$— $4,014 ($177)$3,837 
Amortization of net loss(12,910)(596)(419)(13,925)
Settlement loss— — (782)(782)
($12,910)$3,418 ($1,378)($10,870)
Entergy Louisiana
Amortization of prior service credit$— $1,158 $— $1,158 
Amortization of net gain (loss)(504)186 (1)(319)
($504)$1,344 ($1)$839 

2021Qualified
Pension
Costs
Other
Postretirement
Costs
Non-Qualified
Pension Costs
Total
(In Thousands)
Entergy
Amortization of prior service (cost) credit$— $5,288 ($40)$5,248 
Amortization of net loss(33,439)(495)(595)(34,529)
($33,439)$4,793 ($635)($29,281)
Entergy Louisiana
Amortization of prior service credit$— $1,230 $— $1,230 
Amortization of net gain (loss)(769)91 (1)(679)
($769)$1,321 ($1)$551 

45

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements

Accounting for Pension and Other Postretirement Benefits

In accordance with ASU No. 2017-07, “Compensation - Retirement Benefits (Topic 715): Improving the Presentation of Net Periodic Pension Cost and Net Periodic Postretirement Benefit Cost,” the other components of net benefit cost are required to be presented in the income statement separately from the service cost component and outside a subtotal of income from operations and are presented by Entergy in miscellaneous - net in other income.

Entergy Texas Reserve

In September 2020, Entergy Texas elected to establish a reserve, in accordance with PUCT regulations, for the difference between the amount recorded for pension and other postretirement benefits expense under generally accepted accounting principles during 2019, the first year that rates from Entergy Texas’s last general rate proceeding were in effect, and the annual amount of actuarially determined pension and other postretirement benefits chargeable to Entergy Texas’s expense. The reserve amount will be evaluated in the next scheduled PUCT rate case and a reasonable amortization period will be determined by the PUCT at that time. At March 31, 2022, the balance in this reserve was approximately $14.5 million.

Employer Contributions

Based on current assumptions, Entergy expects to contribute $200 million to its qualified pension plans in 2022.  As of March 31, 2022, Entergy had contributed $67.9 million to its pension plans.  Based on current assumptions, the Registrant Subsidiaries expect to contribute the following to qualified pension plans for their employees in 2022:
Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New Orleans
Entergy
Texas
System
Energy
(In Thousands)
Expected 2022 pension contributions$40,840 $22,917 $12,852 $922 $1,924 $12,760 
Pension contributions made through March 2022$15,096 $10,241 $2,972 $922 $1,340 $3,996 
Remaining estimated pension contributions to be made in 2022$25,744 $12,676 $9,880 $— $584 $8,764 


NOTE 7.  BUSINESS SEGMENT INFORMATION (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy’s reportable segments as of March 31, 2022 were Utility and Entergy Wholesale Commodities.  Utility includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Louisiana, Mississippi, and Texas, and natural gas utility service in portions of Louisiana.  Entergy Wholesale Commodities includes the ownership, operation, and decommissioning of nuclear power plants located in the northern United States and the sale of the electric power produced by its operating plants to wholesale customers.  Entergy Wholesale Commodities also includes the ownership of interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers.  See Note 13 to the financial statements in the Form 10-K for discussion of the planned shutdown and sale of each of the Entergy Wholesale Commodities nuclear power plants, including the planned shutdown and sale of Palisades, the only remaining operating plant in Entergy Wholesale Commodities’ merchant nuclear fleet as of March 31, 2022. “All Other” includes the parent company, Entergy Corporation, and other business activity.

46

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy’s segment financial information for the first quarters of 2022 and 2021 were as follows:
UtilityEntergy
Wholesale
Commodities
All OtherEliminationsConsolidated
(In Thousands)
2022
Operating revenues$2,728,156 $149,777 $— ($8)$2,877,925 
Income taxes$75,359 $2,854 ($11,716)$— $66,497 
Consolidated net income (loss)$343,156 $7,859 ($39,476)($31,946)$279,593 
Total assets as of March 31, 2022$61,684,609 $1,137,843 $601,479 ($3,590,405)$59,833,526 
2021
Operating revenues$2,596,616 $248,219 $23 ($20)$2,844,838 
Income taxes$59,734 $15,560 ($9,352)$— $65,942 
Consolidated net income (loss)$360,600 $38,124 ($27,680)($31,899)$339,145 
Total assets as of December 31, 2021$59,733,625 $1,242,675 $561,168 ($2,083,226)$59,454,242 

The Entergy Wholesale Commodities business is sometimes referred to as the “competitive businesses.”  Eliminations are primarily intersegment activity. Almost all of Entergy’s goodwill is related to the Utility segment.

As discussed in Note 13 to the financial statements in the Form 10-K, Entergy management has undertaken a strategy to manage and reduce the risk of the Entergy Wholesale Commodities business, which includes taking actions to shut down and sell all of its plants in the merchant nuclear fleet resulting in the cessation of merchant power generation at all Entergy Wholesale Commodities nuclear power plants owned and operated by Entergy by mid-2022. The decisions to shut down these plants and the related transactions resulted in asset impairments; employee retention and severance expenses and other benefits-related costs; and contracted economic development contributions.
Total restructuring charges for the first quarters of 2022 and 2021 were comprised of the following:
20222021
Employee retention and severance
expenses and other benefits-related costs
Contracted economic development costsTotalEmployee retention and severance
expenses and other benefits-related costs
Contracted economic development costsTotal
 (In Millions)
Balance as of January 1,$37 $— $37 $145 $14 $159 
Restructuring costs accrued— 13 — 13 
Cash paid out— — — — 
Balance as of March 31,$41 $— $41 $157 $14 $171 

In addition, Entergy Wholesale Commodities incurred $1 million in the first quarter 2022 and $3 million in the first quarter 2021 of impairment and other related charges associated with these strategic decisions and transactions.


47

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy expects to incur employee retention and severance expenses associated with management’s strategy to exit the Entergy Wholesale Commodities merchant power business of approximately $5 million in 2022, of which $4 million has been incurred as of March 31, 2022.

Registrant Subsidiaries

Each of the Registrant Subsidiaries has one reportable segment, which is an integrated utility business, except for System Energy, which is an electricity generation business.  Each of the Registrant Subsidiaries’ operations is managed on an integrated basis by that company because of the substantial effect of cost-based rates and regulatory oversight on the business process, cost structures, and operating results.


NOTE 8.  RISK MANAGEMENT AND FAIR VALUES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Market Risk

In the normal course of business, Entergy is exposed to a number of market risks.  Market risk is the potential loss that Entergy may incur as a result of changes in the market or fair value of a particular commodity or instrument.  All financial and commodity-related instruments, including derivatives, are subject to market risk including commodity price risk, equity price, and interest rate risk.  Entergy uses derivatives primarily to mitigate commodity price risk, particularly power price and fuel price risk.

The Utility has limited exposure to the effects of market risk because it operates primarily under cost-based rate regulation.  To the extent approved by their retail regulators, the Utility operating companies use derivative instruments to hedge the exposure to price volatility inherent in their purchased power, fuel, and gas purchased for resale costs, that are recovered from customers.

As a wholesale generator, Entergy Wholesale Commodities’ core business is selling energy, measured in MWh, to its customers.  Entergy Wholesale Commodities entered into forward contracts with its customers and also sold energy and capacity in the day ahead or spot markets.  In addition to its forward physical power and gas contracts, Entergy Wholesale Commodities used a combination of financial contracts, including swaps, collars, and options, to mitigate commodity price risk.  When the market price fell, the combination of financial contracts was expected to settle in gains that offset lower revenue from generation, which resulted in a more predictable cash flow.

Consistent with management’s strategy to shut down and sell all plants in the Entergy Wholesale Commodities merchant fleet, the Entergy Wholesale Commodities portfolio of derivative instruments expired in April 2021, which was the settlement date for the last financial derivative contracts in the Entergy Wholesale Commodities portfolio.

Entergy’s exposure to market risk is determined by a number of factors, including the size, term, composition, and diversification of positions held, as well as market volatility and liquidity.  For instruments such as options, the time period during which the option may be exercised and the relationship between the current market price of the underlying instrument and the option’s contractual strike or exercise price also affects the level of market risk.  A significant factor influencing the overall level of market risk to which Entergy is exposed is its use of hedging techniques to mitigate such risk.  Hedging instruments and volumes are chosen based on ability to mitigate risk associated with future energy and capacity prices; however, other considerations are factored into hedge product and volume decisions including corporate liquidity, corporate credit ratings, counterparty credit risk, hedging costs, firm settlement risk, and product availability in the marketplace.  Entergy manages market risk by actively monitoring compliance with stated risk management policies as well as monitoring the effectiveness of its hedging policies and strategies.  Entergy’s risk management policies limit the amount of total net exposure and

48

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
rolling net exposure during the stated periods.  These policies, including related risk limits, are regularly assessed to ensure their appropriateness given Entergy’s objectives.

Derivatives

Some derivative instruments are classified as cash flow hedges due to their financial settlement provisions while others are classified as normal purchase/normal sale transactions due to their physical settlement provisions.  Normal purchase/normal sale risk management tools include power purchase and sales agreements, fuel purchase agreements, capacity contracts, and tolling agreements.  Financially-settled cash flow hedges can include natural gas and electricity swaps and options.  Entergy may enter into financially-settled swap and option contracts to manage market risk that may or may not be designated as hedging instruments.

Entergy entered into derivatives to manage natural risks inherent in its physical or financial assets or liabilities.  Electricity over-the-counter instruments and futures contracts that financially settled against day-ahead power pool prices were used to manage price exposure for Entergy Wholesale Commodities generation.  Planned generation currently under contract from Entergy Wholesale Commodities nuclear power plants is 99% for the balance of 2022, all of which is sold under normal purchase/normal sale contracts.  Total planned generation for the balance of 2022 is 1.1 TWh.

Entergy used standardized master netting agreements to help mitigate the credit risk of derivative instruments. These master agreements facilitated the netting of cash flows associated with a single counterparty and may have included collateral requirements. Cash, letters of credit, and parental/affiliate guarantees were obtained as security from counterparties in order to mitigate credit risk. The collateral agreements required a counterparty to post cash or letters of credit in the event an exposure exceeded an established threshold. The threshold represented an unsecured credit limit, which may have been supported by a parental/affiliate guarantee, as determined in accordance with Entergy’s credit policy. In addition, collateral agreements allowed for termination and liquidation of all positions in the event of a failure or inability to post collateral.

Certain of the agreements to sell the power produced by Entergy Wholesale Commodities power plants contained provisions that required an Entergy subsidiary to provide credit support to secure its obligations depending on the mark-to-market values of the contracts. The primary form of credit support to satisfy these requirements was an Entergy Corporation guarantee. If the Entergy Corporation credit rating fell below investment grade, Entergy would have had to post collateral equal to the estimated outstanding liability under the contract at the applicable date.  There were no outstanding derivative contracts held by Entergy Wholesale Commodities as of March 31, 2022 and December 31, 2021. As of March 31, 2022, $8 million in cash collateral was required to be posted by the Entergy subsidiary to its counterparties. As of December 31, 2021, $8 million in cash collateral was required to be posted by the Entergy subsidiary to its counterparties.   

Entergy manages fuel price volatility for its Louisiana jurisdictions (Entergy Louisiana and Entergy New Orleans) and Entergy Mississippi through the purchase of natural gas swaps and options that financially settle against either the average Henry Hub Gas Daily prices or the NYMEX Henry Hub. These swaps and options are marked-to-market through fuel expense with offsetting regulatory assets or liabilities. All benefits or costs of the program are recorded in fuel costs. The notional volumes of these swaps are based on a portion of projected annual exposure to gas price volatility for electric generation at Entergy Louisiana and Entergy Mississippi and projected winter purchases for gas distribution at Entergy New Orleans. The maximum length of time over which Entergy has executed natural gas swaps and options as of March 31, 2022 is 2 years for Entergy Louisiana and the maximum length of time over which Entergy has executed natural gas swaps as of March 31, 2022 is 7 months for Entergy Mississippi. The total volume of natural gas swaps and options outstanding as of March 31, 2022 is 37,339,100 MMBtu for Entergy, including 14,620,000 MMBtu for Entergy Louisiana and 22,719,100 MMBtu for Entergy Mississippi. Credit support for these natural gas swaps and options is covered by master agreements that do not require Entergy to provide collateral based on mark-to-market value, but do carry adequate assurance language that may lead to requests for collateral.

49

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements

During the second quarter 2021, Entergy participated in the annual financial transmission rights auction process for the MISO planning year of June 1, 2021 through May 31, 2022. Financial transmission rights are derivative instruments that represent economic hedges of future congestion charges that will be incurred in serving Entergy’s customer load. They are not designated as hedging instruments. Entergy initially records financial transmission rights at their estimated fair value and subsequently adjusts the carrying value to their estimated fair value at the end of each accounting period prior to settlement. Unrealized gains or losses on financial transmission rights held by Entergy Wholesale Commodities are included in operating revenues. The Utility operating companies recognize regulatory liabilities or assets for unrealized gains or losses on financial transmission rights. The total volume of financial transmission rights outstanding as of March 31, 2022 is 23,303 GWh for Entergy, including 4,969 GWh for Entergy Arkansas, 10,681 GWh for Entergy Louisiana, 2,529 GWh for Entergy Mississippi, 1,070 GWh for Entergy New Orleans, and 3,959 GWh for Entergy Texas. Credit support for financial transmission rights held by the Utility operating companies is covered by cash and/or letters of credit issued by each Utility operating company as required by MISO. Credit support for financial transmission rights held by Entergy Wholesale Commodities is covered by cash. No cash or letters of credit were required to be posted for financial transmission rights exposure for Entergy Wholesale Commodities as of March 31, 2022 and December 31, 2021. Letters of credit posted with MISO covered the financial transmission rights exposure for Entergy Arkansas and Entergy Mississippi as of March 31, 2022 and for Entergy Mississippi and Entergy Texas as of December 31, 2021.

The fair values of Entergy’s derivative instruments in the consolidated balance sheet as of March 31, 2022 are shown in the table below.  Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Business
(In Millions)
Derivatives not designated as hedging instruments
Assets:
Natural gas swaps and optionsPrepayments and other$54$—$54Utility
Natural gas swaps and optionsOther deferred debits and other assets$8$—$8Utility
Financial transmission rightsPrepayments and other$2($1)$1Utility and Entergy Wholesale Commodities


50

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair values of Entergy’s derivative instruments in the consolidated balance sheet as of December 31, 2021 are shown in the table below.  
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Business
(In Millions)
Derivatives not designated as hedging instruments    
Assets:    
Natural gas swaps and optionsPrepayments and other$6$—$6Utility
Natural gas swaps and optionsOther deferred debits and other assets$5$—$5Utility
Financial transmission rightsPrepayments and other$4$—$4Utility and Entergy Wholesale Commodities
Liabilities:    
Natural gas swaps and optionsOther current liabilities$7$—$7Utility

(a)Represents the gross amounts of recognized assets/liabilities
(b)Represents the netting of fair value balances with the same counterparty
(c)Represents the net amounts of assets/liabilities presented on the Entergy Corporation and Subsidiaries’ Consolidated Balance Sheet
(d)Excludes cash collateral in the amount of $8 million posted as of March 31, 2022 and $8 million posted as of December 31, 2021. Also excludes letters of credit in the amount of $1 million posted as of March 31, 2022.
As discussed above, the Entergy Wholesale Commodities portfolio of derivative instruments expired in April 2021, which was the settlement date for the last financial derivative contracts in the Entergy Wholesale Commodities portfolio. The effects of Entergy’s derivative instruments designated as cash flow hedges on the consolidated income statements for the three months ended March 31, 2021 were as follows:
InstrumentAmount of gain (loss)
recognized in other
comprehensive income
Income Statement locationAmount of gain
(loss)
reclassified from
accumulated
other
comprehensive
income into
income (a)
(In Millions)(In Millions)
Electricity swaps and options$2Competitive businesses operating revenues$39

(a)Before taxes of $8 million for the three months ended March 31, 2021

Prior to the expiration of the Entergy Wholesale Commodities portfolio of derivative instruments, Entergy may have effectively liquidated a cash flow hedge instrument by entering into a contract offsetting the original hedge, and then de-designating the original hedge in this situation.  Gains or losses accumulated in other

51

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
comprehensive income prior to de-designation would have continued to be deferred in other comprehensive income until they were included in income as the original hedged transaction occurred. From the point of de-designation, the gains or losses on the original hedge and the offsetting contract were recorded as assets or liabilities on the balance sheet and offset as they flowed through to earnings.
The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the three months ended March 31, 2022 and 2021 were as follows:
InstrumentIncome Statement
location
Amount of gain (loss)
recorded in the income statement
(In Millions)
2022
Natural gas swaps and optionsFuel, fuel-related expenses, and gas purchased for resale(a)$55
Financial transmission rightsPurchased power(b)$23
2021
Natural gas swaps and optionsFuel, fuel-related expenses, and gas purchased for resale(a)$7
Financial transmission rightsPurchased power(b)$128
Electricity swaps and options (c)Competitive business operating revenues($2)

(a)Due to regulatory treatment, the natural gas swaps and options are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability.  The gains or losses recorded as fuel expenses when the swaps and options are settled are recovered or refunded through fuel cost recovery mechanisms.
(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability.  The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.
(c)There were no gains (losses) recognized in accumulated other comprehensive income from electricity swaps and options prior to the expiration of the Entergy Wholesale Commodities portfolio of derivative instruments in April 2021.


52

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair values of the Registrant Subsidiaries’ derivative instruments not designated as hedging instruments on their balance sheets as of March 31, 2022 are shown in the table below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Natural gas swaps and optionsPrepayments and other$19.3$—$19.3Entergy Louisiana
Natural gas swaps and optionsOther deferred debits and other assets$8.3$—$8.3Entergy Louisiana
Natural gas swapsPrepayments and other$35.0$—$35.0Entergy Mississippi
Financial transmission rightsPrepayments and other$0.6($0.2)$0.4Entergy Arkansas
Financial transmission rightsPrepayments and other$0.3$—$0.3Entergy Louisiana
Financial transmission rightsPrepayments and other$0.2$—$0.2Entergy Mississippi
Financial transmission rightsPrepayments and other$0.1$—$0.1Entergy New Orleans
Financial transmission rightsPrepayments and other$0.5$—$0.5Entergy Texas


53

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair values of the Registrant Subsidiaries’ derivative instruments not designated as hedging instruments on their balance sheets as of December 31, 2021 were as follows:
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
Assets:
Natural gas swaps and optionsPrepayments and other $5.7$—$5.7Entergy Louisiana
Natural gas swaps and optionsOther deferred debits and other assets$5.3$—$5.3Entergy Louisiana
Financial transmission rightsPrepayments and other$2.3$—$2.3Entergy Arkansas
Financial transmission rightsPrepayments and other$0.6$—$0.6Entergy Louisiana
Financial transmission rightsPrepayments and other$0.3$—$0.3Entergy Mississippi
Financial transmission rightsPrepayments and other$0.1$—$0.1Entergy New Orleans
Financial transmission rightsPrepayments and other$0.8$—$0.8Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$6.7$—$6.7Entergy Mississippi
Natural gas swapsOther current liabilities$0.5$—$0.5Entergy New Orleans

(a)Represents the gross amounts of recognized assets/liabilities
(b)Represents the netting of fair value balances with the same counterparty
(c)Represents the net amounts of assets/liabilities presented on the Registrant Subsidiaries’ balance sheets
(d)As of March 31, 2022, letters of credit posted with MISO covered financial transmission rights exposure of $0.3 million for Entergy Arkansas and $0.4 million for Entergy Mississippi. As of December 31, 2021, letters of credit posted with MISO covered financial transmission rights exposure of $0.2 million for Entergy Mississippi and $0.1 million for Entergy Texas.


54

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The effects of the Registrant Subsidiaries’ derivative instruments not designated as hedging instruments on their income statements for the three months ended March 31, 2022 and 2021 were as follows:
InstrumentIncome Statement LocationAmount of gain
(loss) recorded
in the income statement
Registrant
(In Millions)
2022
Natural gas swaps and optionsFuel, fuel-related expenses, and gas purchased for resale$11.1(a)Entergy Louisiana
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$42.8(a)Entergy Mississippi
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$1.1(a)Entergy New Orleans
Financial transmission rightsPurchased power$7.5(b)Entergy Arkansas
Financial transmission rightsPurchased power$9.4(b)Entergy Louisiana
Financial transmission rightsPurchased power$1.0(b)Entergy Mississippi
Financial transmission rightsPurchased power$0.8(b)Entergy New Orleans
Financial transmission rightsPurchased power$3.8(b)Entergy Texas
2021
Natural gas swaps and optionsFuel, fuel-related expenses, and gas purchased for resale$1.8(a)Entergy Louisiana
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$5.2(a)Entergy Mississippi
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale($0.1)(a)Entergy New Orleans
Financial transmission rightsPurchased power$26.1(b)Entergy Arkansas
Financial transmission rightsPurchased power$12.3(b)Entergy Louisiana
Financial transmission rightsPurchased power$7.2(b)Entergy Mississippi
Financial transmission rightsPurchased power$1.3(b)Entergy New Orleans
Financial transmission rightsPurchased power$77.9(b)Entergy Texas

(a)Due to regulatory treatment, the natural gas swaps and options are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability.  The gains or losses recorded as fuel expenses when the swaps and options are settled are recovered or refunded through fuel cost recovery mechanisms.
(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability.  The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

Fair Values

The estimated fair values of Entergy’s financial instruments and derivatives are determined using historical prices, bid prices, market quotes, and financial modeling.  Considerable judgment is required in developing the

55

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
estimates of fair value.  Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange.  Gains or losses realized on financial instruments are reflected in future rates and therefore do not affect net income. Entergy considers the carrying amounts of most financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments.

Accounting standards define fair value as an exit price, or the price that would be received to sell an asset or the amount that would be paid to transfer a liability in an orderly transaction between knowledgeable market participants at the date of measurement.  Entergy and the Registrant Subsidiaries use assumptions or market input data that market participants would use in pricing assets or liabilities at fair value.  The inputs can be readily observable, corroborated by market data, or generally unobservable.  Entergy and the Registrant Subsidiaries endeavor to use the best available information to determine fair value.

Accounting standards establish a fair value hierarchy that prioritizes the inputs used to measure fair value.  The hierarchy establishes the highest priority for unadjusted market quotes in an active market for the identical asset or liability and the lowest priority for unobservable inputs.  

The three levels of the fair value hierarchy are:

Level 1 - Level 1 inputs are unadjusted quoted prices in active markets for identical assets or liabilities that the entity has the ability to access at the measurement date. Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide pricing information on an ongoing basis.  Level 1 primarily consists of individually owned common stocks, cash equivalents (temporary cash investments, securitization recovery trust account, and escrow accounts), debt instruments, and gas swaps traded on exchanges with active markets.  Cash equivalents includes all unrestricted highly liquid debt instruments with an original or remaining maturity of three months or less at the date of purchase.

Level 2 - Level 2 inputs are inputs other than quoted prices included in Level 1 that are, either directly or indirectly, observable for the asset or liability at the measurement date.  Assets are valued based on prices derived by independent third parties that use inputs such as benchmark yields, reported trades, broker/dealer quotes, and issuer spreads.  Prices are reviewed and can be challenged with the independent parties and/or overridden by Entergy if it is believed such would be more reflective of fair value.  Level 2 inputs include the following:

quoted prices for similar assets or liabilities in active markets;
quoted prices for identical assets or liabilities in inactive markets;
inputs other than quoted prices that are observable for the asset or liability; or
inputs that are derived principally from or corroborated by observable market data by correlation or other means.

Level 2 consists primarily of individually-owned debt instruments and gas swaps and options valued using observable inputs.

Level 3 - Level 3 inputs are pricing inputs that are generally less observable or unobservable from objective sources.  These inputs are used with internally developed methodologies to produce management’s best estimate of fair value for the asset or liability.  Level 3 consists primarily of financial transmission rights and derivative power contracts used as cash flow hedges of power sales at merchant power plants.

Consistent with management’s strategy to shut down and sell all plants in the Entergy Wholesale Commodities merchant fleet, the Entergy Wholesale Commodities portfolio of derivative instruments expired in

56

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
April 2021, which was the settlement date for the last financial derivative contracts in the Entergy Wholesale Commodities portfolio.

The values for power contract assets or liabilities prior to expiration in April 2021 were based on both observable inputs including public market prices and interest rates, and unobservable inputs such as implied volatilities, unit contingent discounts, expected basis differences, and credit adjusted counterparty interest rates.  They were classified as Level 3 assets and liabilities.  The valuations of these assets and liabilities were performed by the Office of Corporate Risk Oversight and the Entergy Wholesale Commodities Accounting group.  The primary related functions of the Office of Corporate Risk Oversight included: gathering, validating and reporting market data, providing market risk analyses and valuations in support of Entergy Wholesale Commodities’ commercial transactions, developing and administering protocols for the management of market risks, and implementing and maintaining controls around changes to market data in the energy trading and risk management system.  The Office of Corporate Risk Oversight was also responsible for managing the energy trading and risk management system, forecasting revenues, forward positions and analysis.  The Entergy Wholesale Commodities Accounting group performed functions related to market and counterparty settlements, revenue reporting and analysis, and financial accounting. The Office of Corporate Risk Oversight reports to the Vice President and Treasurer while the Entergy Wholesale Commodities Accounting group reports to the Chief Accounting Officer.

The amounts reflected as the fair value of electricity swaps were based on the estimated amount that the contracts were in-the-money at the balance sheet date (treated as an asset) or out-of-the-money at the balance sheet date (treated as a liability) and equaled the estimated amount receivable to or payable by Entergy if the contracts were settled at that date.  These derivative contracts included cash flow hedges that swapped fixed for floating cash flows for sales of the output from the Entergy Wholesale Commodities business.  The fair values were based on the mark-to-market comparison between the fixed contract prices and the floating prices determined each period from quoted forward power market prices.  The differences between the fixed price in the swap contract and these market-related prices multiplied by the volume specified in the contract and discounted at the counterparties’ credit adjusted risk free rate were recorded as derivative contract assets or liabilities.  For contracts that had unit contingent terms, a further discount was applied based on the historical relationship between contract and market prices for similar contract terms.

The amounts reflected as the fair values of electricity options were valued based on a Black Scholes model, and were calculated at the end of each month for accounting purposes.  Inputs to the valuation included end of day forward market prices for the period when the transactions settled, implied volatilities based on market volatilities provided by a third-party data aggregator, and U.S. Treasury rates for a risk-free return rate.  As described further below, prices and implied volatilities were reviewed and could be adjusted if it was determined that there was a better representation of fair value.  

On a daily basis, the Office of Corporate Risk Oversight calculated the mark-to-market for electricity swaps and options.  The Office of Corporate Risk Oversight also validated forward market prices by comparing them to other sources of forward market prices or to settlement prices of actual market transactions.  Significant differences were analyzed and potentially adjusted based on these other sources of forward market prices or settlement prices of actual market transactions.  Implied volatilities used to value options were also validated using actual counterparty quotes for Entergy Wholesale Commodities transactions when available and compared with other sources of market implied volatilities.  Moreover, on a quarterly basis, the Office of Corporate Risk Oversight confirmed the mark-to-market calculations and prepared price scenarios and credit downgrade scenario analysis.  The scenario analysis was communicated to senior management within Entergy and within Entergy Wholesale Commodities.  Finally, for all proposed derivative transactions, an analysis was completed to assess the risk of adding the proposed derivative to Entergy Wholesale Commodities’ portfolio.  In particular, the credit and liquidity effects were calculated for this analysis.  This analysis was communicated to senior management within Entergy and Entergy Wholesale Commodities.


57

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The values of financial transmission rights are based on unobservable inputs, including estimates of congestion costs in MISO between applicable generation and load pricing nodes based on the 50th percentile of historical prices.  They are classified as Level 3 assets and liabilities.  The valuations of these assets and liabilities are performed by the Office of Corporate Risk Oversight.  The values are calculated internally and verified against the data published by MISO. Entergy’s Entergy Wholesale Commodities Accounting group reviews these valuations for reasonableness, with the assistance of others within the organization with knowledge of the various inputs and assumptions used in the valuation. The Office of Corporate Risk Oversight reports to the Vice President and Treasurer.  The Entergy Wholesale Commodities Accounting group reports to the Chief Accounting Officer.

The following tables set forth, by level within the fair value hierarchy, Entergy’s assets and liabilities that are accounted for at fair value on a recurring basis as of March 31, 2022 and December 31, 2021.  The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect its placement within the fair value hierarchy levels.
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$625 $— $— $625 
Decommissioning trust funds (a):
Equity securities103 — — 103 
Debt securities (b)736 1,334 — 2,070 
Common trusts (c)3,040 
Securitization recovery trust account15 — — 15 
Escrow accounts49 — — 49 
Gas hedge contracts54 — 62 
Financial transmission rights— — 
$1,582 $1,342 $1 $5,965 

2021Level 1Level 2Level 3Total
(In Millions)
Assets:    
Temporary cash investments$398 $— $— $398 
Decommissioning trust funds (a):    
Equity securities132 — — 132 
Debt securities (b)770 1,407 — 2,177 
Common trusts (c)3,205 
Securitization recovery trust account29 — — 29 
Escrow accounts49 — — 49 
Gas hedge contracts— 11 
Financial transmission rights— — 
 $1,384 $1,412 $4 $6,005 
Liabilities:    
Gas hedge contracts$7 $— $— $7 

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices.  Fixed income securities are held in various governmental and corporate securities.  See Note 9 to the financial statements herein for additional information on the investment portfolios.
(b)The decommissioning trust funds fair value presented herein does not include the recognition pursuant to ASU 2016-13 of a credit loss valuation allowance of $3.2 million as of March 31, 2022 and $0.4 million as

58

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
of December 31, 2021 on debt securities. See Note 9 to the financial statements herein for additional information on the allowance for expected credit losses.
(c)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.
The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of derivatives classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2022 and 2021:
20222021
Financial transmission rightsPower ContractsFinancial transmission rights
(In Millions)
Balance as of January 1,$4 $38 $9 
Total gains (losses) for the period (a)
Included in earnings— (2)
Included in other comprehensive income— — 
Included as a regulatory liability/asset20 — 119 
Settlements(23)(38)(128)
Balance as of March 31,$1 $— $4 

(a)Change in unrealized gains or losses for the period included in earnings for derivatives held at the end of the reporting period was $0.7 million for the three months ended March 31, 2021.

The fair values of the Level 3 financial transmission rights are based on unobservable inputs calculated internally and verified against historical pricing data published by MISO.

The following table sets forth an analysis of each of the types of unobservable inputs impacting the fair value of items classified as Level 3 within the fair value hierarchy, and the sensitivity to changes to those inputs:
Significant
Unobservable
Input
Transaction TypePositionChange to InputEffect on
Fair Value
Unit contingent discountElectricity swapsSellIncrease (Decrease)Decrease (Increase)

The following table sets forth, by level within the fair value hierarchy, the Registrant Subsidiaries’ assets and liabilities that are accounted for at fair value on a recurring basis as of March 31, 2022 and December 31, 2021.  The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect its placement within the fair value hierarchy levels.


59

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy Arkansas
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$107.2 $— $— $107.2 
Decommissioning trust funds (a):
Equity securities2.7 — — 2.7 
Debt securities132.4 376.9 — 509.3 
Common trusts (b)848.6 
Financial transmission rights— — 0.4 0.4 
$242.3 $376.9 $0.4 $1,468.2 

2021Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$4.8 $— $— $4.8 
Decommissioning trust funds (a):
Equity securities16.7 — — 16.7 
Debt securities119.5 406.8 — 526.3 
Common trusts (b)895.4 
Financial transmission rights— — 2.3 2.3 
$141.0 $406.8 $2.3 $1,445.5 

Entergy Louisiana
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$140.7 $— $— $140.7 
Decommissioning trust funds (a):
Equity securities22.8 — — 22.8 
Debt securities230.0 517.5 — 747.5 
Common trusts (b)1,235.1 
Gas hedge contracts19.3 8.3 — 27.6 
Financial transmission rights— — 0.3 0.3 
$412.8 $525.8 $0.3 $2,174.0 


60

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
2021Level 1Level 2Level 3Total
 (In Millions)
Assets:    
Temporary cash investments$18.4 $— $— $18.4 
Decommissioning trust funds (a):    
Equity securities20.2 — — 20.2 
Debt securities262.6 531.6 — 794.2 
Common trusts (b)1,300.1 
Gas hedge contracts5.7 5.3 — 11.0 
Financial transmission rights— — 0.6 0.6 
 $306.9 $536.9 $0.6 $2,144.5 

Entergy Mississippi
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Escrow accounts$48.9 $— $— $48.9 
Gas hedge contracts35.0 — — 35.0 
Financial transmission rights— — 0.2 0.2 
$83.9 $— $0.2 $84.1 

2021Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$47.6 $— $— $47.6 
Escrow accounts48.9 — — 48.9 
Financial transmission rights— — 0.3 0.3 
 $96.5 $— $0.3 $96.8 
Liabilities:
Gas hedge contracts$6.7 $— $— $6.7 

Entergy New Orleans
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$31.1 $— $— $31.1 
Securitization recovery trust account5.1 — — 5.1 
Financial transmission rights— — 0.1 0.1 
$36.2 $— $0.1 $36.3 


61

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
2021Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$42.8 $— $— $42.8 
Securitization recovery trust account2.0 — — 2.0 
Financial transmission rights— — 0.1 0.1 
$44.8 $— $0.1 $44.9 
Liabilities:
Gas hedge contracts$0.5 $— $— $0.5 

Entergy Texas
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Securitization recovery trust account$10.0 $— $— $10.0 
Financial transmission rights— — 0.5 0.5 
$10.0 $— $0.5 $10.5 

2021Level 1Level 2Level 3Total
(In Millions)
Assets:
Securitization recovery trust account$26.6 $— $— $26.6 
Financial transmission rights— — 0.8 0.8 
$26.6 $— $0.8 $27.4 

System Energy
2022Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$98.2 $— $— $98.2 
Decommissioning trust funds (a):
Equity securities4.9 — — 4.9 
Debt Securities251.5 248.1 — 499.6 
Common trusts (b)803.7 
$354.6 $248.1 $— $1,406.4 


62

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
2021Level 1Level 2Level 3Total
(In Millions)
Assets:
Temporary cash investments$89.1 $— $— $89.1 
Decommissioning trust funds (a):
Equity securities12.9 — — 12.9 
Debt securities273.0 251.5 — 524.5 
Common trusts (b)847.9 
$375.0 $251.5 $— $1,474.4 

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices.  Fixed income securities are held in various governmental and corporate securities.  See Note 9 to the financial statements herein for additional information on the investment portfolios.
(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.
The following table sets forth a reconciliation of changes in the net assets for the fair value of derivatives classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2022.
Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
 (In Millions)
Balance as of January 1,$2.3 $0.6 $0.3 $0.1 $0.8 
Gains (losses) included as a regulatory liability/asset5.6 9.1 0.9 0.8 3.5 
Settlements(7.5)(9.4)(1.0)(0.8)(3.8)
Balance as of March 31,$0.4 $0.3 $0.2 $0.1 $0.5 

The following table sets forth a reconciliation of changes in the net assets for the fair value of derivatives classified as Level 3 in the fair value hierarchy for the three months ended March 31, 2021.
Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
 (In Millions)
Balance as of January 1,$2.7 $4.2 $0.6 $0.1 $1.6 
Gains (losses) included as a regulatory liability/asset24.8 9.3 6.9 1.2 76.8 
Settlements(26.1)(12.3)(7.2)(1.2)(77.9)
Balance as of March 31,$1.4 $1.2 $0.3 $0.1 $0.5 



63

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
NOTE 9.  DECOMMISSIONING TRUST FUNDS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

The NRC requires Entergy subsidiaries to maintain nuclear decommissioning trusts to fund the costs of decommissioning ANO 1, ANO 2, River Bend, Waterford 3, Grand Gulf, and Palisades. Entergy’s nuclear decommissioning trust funds invest in equity securities, fixed-rate debt securities, and cash and cash equivalents.

Entergy records decommissioning trust funds on the balance sheet at their fair value.  Because of the ability of the Registrant Subsidiaries to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, the Registrant Subsidiaries have recorded an offsetting amount of unrealized gains/(losses) on investment securities in other regulatory liabilities/assets.  For the 30% interest in River Bend formerly owned by Cajun, Entergy Louisiana records an offsetting amount in other deferred credits for the unrealized trust earnings not currently expected to be needed to decommission the plant.  Decommissioning trust funds for the Entergy Wholesale Commodities nuclear plants do not meet the criteria for regulatory accounting treatment.  Accordingly, unrealized gains/(losses) recorded on the equity securities in the trust funds are recognized in earnings. Unrealized gains recorded on the available-for-sale debt securities in the trust funds are recognized in the accumulated other comprehensive income component of shareholders’ equity.  Unrealized losses (where cost exceeds fair market value) on the available-for-sale debt securities in the trust funds are also recorded in the accumulated other comprehensive income component of shareholders’ equity unless the unrealized loss is other than temporary and therefore recorded in earnings. Generally, Entergy records gains and losses on its debt and equity securities using the specific identification method to determine the cost basis of its securities.

The unrealized gains/(losses) recognized during the three months ended March 31, 2022 on equity securities still held as of March 31, 2022 were ($175) million. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index.  A relatively small percentage of the equity securities are held in funds intended to replicate the return of the Wilshire 4500 Index or the Russell 3000 Index. The debt securities are generally held in individual government and credit issuances.

The available-for-sale securities held as of March 31, 2022 and December 31, 2021 are summarized as follows:
Fair
Value
Total
Unrealized
Gains
Total
Unrealized
Losses
(In Millions)
2022
Debt Securities$2,070 $15 $99 
2021
Debt Securities$2,177 $65 $12 

The unrealized gains/(losses) above are reported before deferred taxes of ($5) million as of March 31, 2022 and $2 million as of December 31, 2021 for debt securities. The amortized cost of available-for-sale debt securities was $2,153 million as of March 31, 2022 and $2,125 million as of December 31, 2021.  As of March 31, 2022, available-for-sale debt securities had an average coupon rate of approximately 2.77%, an average duration of approximately 6.63 years, and an average maturity of approximately 10.40 years.


64

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2022 and December 31, 2021:
March 31, 2022December 31, 2021
Fair
Value
Gross
Unrealized
Losses
Fair
Value
Gross
Unrealized
Losses
(In Millions)
Less than 12 months$1,419 $83 $770 $8 
More than 12 months119 16 99 
Total$1,538 $99 $869 $12 

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of March 31, 2022 and December 31, 2021 were as follows:
20222021
(In Millions)
Less than 1 year$76 $— 
1 year - 5 years692 473 
5 years - 10 years600 655 
10 years - 15 years150 389 
15 years - 20 years158 130 
20 years+394 530 
Total$2,070 $2,177 

During the three months ended March 31, 2022 and 2021, proceeds from the dispositions of available-for-sale securities amounted to $303 million and $524 million, respectively.  During the three months ended March 31, 2022 and 2021, gross gains of $1 million and $11 million, respectively, and gross losses of $12 million and $11 million, respectively, related to available-for-sale securities were reclassified out of other comprehensive income or other regulatory liabilities/assets into earnings.

The fair value of the decommissioning trust funds related to the Entergy Wholesale Commodities nuclear plant as of March 31, 2022 and December 31, 2021 was $539 million and $576 million, respectively, for Palisades. The fair values of the decommissioning trust funds for the Registrant Subsidiaries’ nuclear plants are detailed below.


65

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy Arkansas

Entergy Arkansas holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts.  The available-for-sale securities held as of March 31, 2022 and December 31, 2021 are summarized as follows:
Fair
Value
Total
Unrealized
Gains
Total
Unrealized
Losses
(In Millions)
2022
Debt Securities$509.3 $1.4 $28.3 
2021
Debt Securities$526.3 $11.4 $4.7 

The amortized cost of available-for-sale debt securities was $536.2 million as of March 31, 2022 and $519.6 million as of December 31, 2021.  As of March 31, 2022, the available-for-sale debt securities had an average coupon rate of approximately 2.28%, an average duration of approximately 6.49 years, and an average maturity of approximately 7.74 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2022 on equity securities still held as of March 31, 2022 were ($50.5) million. The equity securities are generally held in funds that are designed to approximate the return of the Standard & Poor’s 500 Index.  A relatively small percentage of the equity securities are held in funds intended to replicate the return of the Wilshire 4500 Index.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2022 and December 31, 2021:
March 31, 2022December 31, 2021
Fair
Value
Gross
Unrealized
Losses
Fair
Value
Gross
Unrealized
Losses
(In Millions)
Less than 12 months$332.9 $21.3 $183.8 $2.9 
More than 12 months55.8 7.0 39.5 1.8 
Total$388.7 $28.3 $223.3 $4.7 


66

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair value of available-for-sale debt securities, summarized by contractual maturities, as of March 31, 2022 and December 31, 2021 were as follows:
 20222021
 (In Millions)
Less than 1 year$33.8 $— 
1 year - 5 years153.6 91.7 
5 years - 10 years220.8 217.4 
10 years - 15 years47.9 146.0 
15 years - 20 years27.3 35.7 
20 years+25.9 35.5 
Total$509.3 $526.3 

During the three months ended March 31, 2022 and 2021, proceeds from the dispositions of available-for-sale securities amounted to $7.2 million and $13.8 million, respectively.  During the three months ended March 31, 2022 and 2021, gross gains of $0.03 million and $0.8 million, respectively, and gross losses of $0.2 million and $0.1 million, respectively, related to available-for-sale securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Louisiana

Entergy Louisiana holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts.  The available-for-sale securities held as of March 31, 2022 and December 31, 2021 are summarized as follows:
Fair
Value
Total
Unrealized
Gains
Total
Unrealized
Losses
(In Millions)
2022
Debt Securities$747.5 $9.7 $30.2 
2021
Debt Securities$794.2 $31.3 $3.3 

The amortized cost of available-for-sale debt securities was $767.9 million as of March 31, 2022 and $766.3 million as of December 31, 2021.  As of March 31, 2022, the available-for-sale debt securities had an average coupon rate of approximately 3.37%, an average duration of approximately 6.36 years, and an average maturity of approximately 12.16 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2022 on equity securities still held as of March 31, 2022 were ($70) million. The equity securities are generally held in funds that are designed to approximate the return of the Standard & Poor’s 500 Index.  A relatively small percentage of the equity securities are held in funds intended to replicate the return of the Wilshire 4500 Index.


67

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2022 and December 31, 2021:
March 31, 2022December 31, 2021
Fair
Value
Gross
Unrealized
Losses
Fair
Value
Gross
Unrealized
Losses
(In Millions)
Less than 12 months$427.4 $25.1 $206.9 $1.4 
More than 12 months41.2 5.1 42.9 1.9 
Total$468.6 $30.2 $249.8 $3.3 

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of March 31, 2022 and December 31, 2021 were as follows:
20222021
(In Millions)
Less than 1 year$29.2 $— 
1 year - 5 years193.9 157.8 
5 years - 10 years170.0 173.0 
10 years - 15 years68.5 123.0 
15 years - 20 years82.9 80.2 
20 years+203.0 260.2 
Total$747.5 $794.2 

During the three months ended March 31, 2022 and 2021, proceeds from the dispositions of available-for-sale securities amounted to $120.5 million and $108.4 million, respectively.  During the three months ended March 31, 2022 and 2021, gross gains of $0.9 million and $3.3 million, respectively, and gross losses of $5.5 million and $3.2 million, respectively, related to available-for-sale securities were reclassified out of other regulatory liabilities/assets into earnings.

System Energy

System Energy holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts.  The available-for-sale securities held as of March 31, 2022 and December 31, 2021 are summarized as follows:
Fair
Value
Total
Unrealized
Gains
Total
Unrealized
Losses
(In Millions)
2022
Debt Securities$499.6 $1.9 $27.6 
2021
Debt Securities$524.5 $11.8 $2.9 

The amortized cost of available-for-sale debt securities was $525.3 million as of March 31, 2022 and $515.6 million as of December 31, 2021.  As of March 31, 2022, the available-for-sale debt securities had an

68

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
average coupon rate of approximately 2.38%, an average duration of approximately 6.97 years, and an average maturity of approximately 9.87 years.

The unrealized gains/(losses) recognized during the three months ended March 31, 2022 on equity securities still held as of March 31, 2022 were ($47.7) million. The equity securities are generally held in funds that are designed to approximate the return of the Standard & Poor’s 500 Index.  A relatively small percentage of the equity securities are held in funds intended to replicate the return of the Wilshire 4500 Index.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of March 31, 2022 and December 31, 2021:
March 31, 2022December 31, 2021
Fair
Value
Gross
Unrealized
Losses
Fair
Value
Gross
Unrealized
Losses
(In Millions)
Less than 12 months$418.4 $25.5 $276.6 $2.3 
More than 12 months13.3 2.1 11.3 0.6 
Total$431.7 $27.6 $287.9 $2.9 

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of March 31, 2022 and December 31, 2021 were as follows:
20222021
(In Millions)
Less than 1 year$6.9 $— 
1 year - 5 years217.3 156.8 
5 years - 10 years136.1 161.8 
10 years - 15 years9.5 58.6 
15 years - 20 years31.1 1.9 
20 years+98.7 145.4 
Total$499.6 $524.5 

During the three months ended March 31, 2022 and 2021, proceeds from the dispositions of available-for-sale securities amounted to $36.2 million and $74.1 million, respectively.  During the three months ended March 31, 2022 and 2021, gross gains of $0.1 million and $1.2 million, respectively, and gross losses of $0.7 million and $1.6 million, respectively, related to available-for-sale securities were reclassified out of other regulatory liabilities/assets into earnings.

Allowance for expected credit losses

Entergy estimates the expected credit losses for its available-for-sale securities based on the current credit rating and remaining life of the securities.  To the extent an individual security is determined to be uncollectible, it is written off against this allowance.  Entergy’s available-for-sale securities are held in trusts managed by third parties who operate in accordance with agreements that define investment guidelines and place restrictions on the purchases and sales of investments.  Specifically, available-for-sale securities are subject to credit worthiness restrictions, with requirements for both the average credit rating of the portfolio and minimum credit ratings for individual debt securities.  As of March 31, 2022 and December 31, 2021, Entergy’s allowance for expected credit losses related to available-for-sale securities were $3.2 million and $0.4 million, respectively. Entergy recorded $1.5 million in impairments of available-for-sale debt securities for the three months ended March 31, 2022.

69

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
Entergy did not record any impairments of available-for-sale debt securities for the three months ended March 31, 2021.


NOTE 10.  INCOME TAXES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See “Income Tax Audits” and “Other Tax Matters” in Note 3 to the financial statements in the Form 10-K for a discussion of income tax audits, the Tax Cuts and Jobs Act, and other income tax matters involving Entergy. The following are updates to that discussion.

Tax Cuts and Jobs Act

During the second quarter 2018, the Registrant Subsidiaries began returning unprotected excess accumulated deferred income taxes, associated with the effects of the Tax Cuts and Jobs Act, to their customers through rate riders and other means approved by their respective regulatory authorities. Return of the unprotected excess accumulated deferred income taxes results in a reduction in the regulatory liability for income taxes and a corresponding reduction in income tax expense. This manner of regulatory accounting affects the effective tax rate for the period as compared to the statutory tax rate. The return of unprotected excess accumulated deferred income taxes reduced Entergy’s and the Registrant Subsidiaries’ regulatory liability for income taxes as follows:

Three Months
Ended March 31,
20222021
(In Millions)
Entergy$17 $41 
Entergy Arkansas$— $8 
Entergy Louisiana$9 $8 
Entergy New Orleans$1 $— 
Entergy Texas$7 $7 
System Energy$— $18 


NOTE 11.  PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at March 31, 2022 were $402 million for Entergy, $33.5 million for Entergy Arkansas, $239.7 million for Entergy Louisiana, $13.8 million for Entergy Mississippi, $4 million for Entergy New Orleans, $35.1 million for Entergy Texas, and $34.5 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2021 were $723 million for Entergy, $35.6 million for Entergy Arkansas, $507.9 million for Entergy Louisiana, $26.5 million for Entergy Mississippi, $73.1 million for Entergy Texas, and $23.4 million for System Energy.



70

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
NOTE 12.  VARIABLE INTEREST ENTITIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of variable interest entities.  See Note 4 to the financial statements herein for details of the nuclear fuel companies’ credit facilities, commercial paper borrowings, and long-term debt.

System Energy is considered to hold a variable interest in the lessor from which it leases an undivided interest representing approximately 11.5% of the Grand Gulf nuclear plant. System Energy is the lessee under this arrangement, which is described in more detail in Note 5 to the financial statements in the Form 10-K. System Energy made payments under this arrangement, including interest, of $8.6 million in each of the three months ended March 31, 2022 and the three months ended March 31, 2021.

AR Searcy Partnership, LLC, is a tax equity partnership that qualifies as a variable interest entity, which Entergy Arkansas is required to consolidate as it is the primary beneficiary. See Note 14 to the financial statements in the Form 10-K for additional discussion on the establishment of AR Searcy Partnership, LLC and the acquisition of the Searcy Solar Facility. The entity is a VIE because the membership interests do not give Entergy Arkansas or the third party tax equity investor substantive kick out rights typical of equity owners. Entergy Arkansas is the primary beneficiary of the partnership because it is the managing member and has the right to a majority of the operating income of the partnership. See Note 1 to the financial statements in the Form 10-K for further discussion on the presentation of the third party tax equity partner’s noncontrolling interest and the HLBV method of accounting used to account for Entergy Arkansas’s investment in AR Searcy Partnership, LLC. As of March 31, 2022, AR Searcy Partnership, LLC recorded assets equal to $142 million, primarily consisting of property, plant, and equipment and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $113 million.



71

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
NOTE 13.  REVENUE (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Operating Revenues

See Note 19 to the financial statements in the Form 10-K for a discussion of revenue recognition.  Entergy’s total revenues for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Utility:
Residential$986,023 $966,855 
Commercial634,626 572,676 
Industrial743,634 597,652 
Governmental57,292 56,798 
    Total billed retail2,421,575 2,193,981 
Sales for resale (a)128,959 205,075 
Other electric revenues (b)93,880 80,261 
    Revenues from contracts with customers2,644,414 2,479,317 
Other revenues (c)11,362 59,103 
    Total electric revenues2,655,776 2,538,420 
Natural gas72,361 58,168 
Entergy Wholesale Commodities:
Competitive businesses sales from contracts with customers (a)144,823 232,113 
Other revenues (c)4,965 16,137 
    Total competitive businesses revenues149,788 248,250 
    Total operating revenues$2,877,925 $2,844,838 


r 30, 2021 and 2020 were as follows:



72

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
The Utility operating companies’ total revenues for the three months ended March 31, 2022 and 2021 were as follows:

2022Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
(In Thousands)
Residential$227,786 $353,567 $152,939 $58,658 $193,073 
Commercial113,238 257,591 110,661 45,572 107,564 
Industrial109,675 451,954 39,157 6,272 136,576 
Governmental4,460 19,016 12,000 15,033 6,783 
    Total billed retail455,159 1,082,128 314,757 125,535 443,996 
Sales for resale (a)70,414 107,701 21,641 26,540 17,644 
Other electric revenues (b)30,572 41,482 10,337 1,393 11,449 
Revenues from contracts with customers556,145 1,231,311 346,735 153,468 473,089 
Other revenues (c)2,811 5,926 2,294 1,178 (607)
    Total electric revenues558,956 1,237,237 349,029 154,646 472,482 
Natural gas— 28,735 — 43,626 — 
    Total operating revenues$558,956 $1,265,972 $349,029 $198,272 $472,482 

2021Entergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
(In Thousands)
Residential$237,182 $335,760 $147,636 $66,427 $179,850 
Commercial106,416 224,649 97,936 47,799 95,876 
Industrial103,412 347,009 33,980 6,789 106,462 
Governmental4,256 18,616 10,543 16,380 7,003 
    Total billed retail451,266 926,034 290,095 137,395 389,191 
Sales for resale (a)110,085 80,428 40,311 4,696 74,073 
Other electric revenues (b)19,583 43,910 3,950 (3,359)17,529 
Revenues from contracts with customers580,934 1,050,372 334,356 138,732 480,793 
Other revenues (c)2,452 29,291 2,263 416 (573)
    Total electric revenues583,386 1,079,663 336,619 139,148 480,220 
Natural gas— 27,981 — 30,187 — 
    Total operating revenues$583,386 $1,107,644 $336,619 $169,335 $480,220 
(a)Sales for resale and competitive businesses sales include day-ahead sales of energy in a market administered by an ISO. These sales represent financially binding commitments for the sale of physical energy the next day. These sales are adjusted to actual power generated and delivered in the real time market. Given the short duration of these transactions, Entergy does not consider them to be derivatives subject to fair value adjustments, and includes them as part of customer revenues.

73

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
(b)Other electric revenues consist primarily of transmission and ancillary services provided to participants of an ISO-administered market and unbilled revenue.
(c)Other revenues include the settlement of financial hedges, occasional sales of inventory, alternative revenue programs, provisions for revenue subject to refund, and late fees.

Allowance for doubtful accounts

The allowance for doubtful accounts reflects Entergy’s best estimate of expected losses on its accounts receivable balances. Due to the essential nature of utility services, Entergy has historically experienced a low rate of default on its accounts receivables. Due to the effect of the COVID-19 pandemic on customer receivables, however, Entergy recorded an increase in 2020 in its allowance for doubtful accounts. The following tables set forth a reconciliation of changes in the allowance for doubtful accounts for the three months ended March 31, 2022 and 2021.
EntergyEntergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
 (In Millions)
Balance as of December 31, 2021$68.6 $13.1 $29.2 $7.2 $13.3 $5.8 
Provisions(5.9)3.7 (6.1)(0.9)(2.4)(0.2)
Write-offs(45.3)(14.4)(17.5)(4.1)(5.4)(3.9)
Recoveries14.1 4.1 5.5 1.2 2.2 1.1 
Balance as of March 31, 2022$31.5 $6.5 $11.1 $3.4 $7.7 $2.8 
EntergyEntergy
Arkansas
Entergy
Louisiana
Entergy
Mississippi
Entergy
New
Orleans
Entergy
Texas
 (In Millions)
Balance as of December 31, 2020$117.7 $18.3 $45.7 $19.5 $17.4 $16.8 
Provisions3.2 2.4 2.3 (2.2)1.8 (1.1)
Write-offs(3.8)(0.1)(2.1)(0.8)— (0.8)
Recoveries1.9 0.6 0.7 0.3 0.2 0.1 
Balance as of March 31, 2021$119.0 $21.2 $46.6 $16.8 $19.4 $15.0 

The allowance for currently expected credit losses is calculated as the historical rate of customer write-offs multiplied by the current accounts receivable balance, taking into account the length of time the receivable balances have been outstanding. Although the rate of customer write-offs has historically experienced minimal variation, there were increases in customer write-offs beginning in second quarter 2021 primarily resulting from the effects of the COVID-19 pandemic. Management monitors the current condition of individual customer accounts to manage collections and ensure bad debt expense is recorded in a timely manner.

________________

In the opinion of the management of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented.  Entergy’s business is subject to seasonal fluctuations, however, with peak periods

74

Table of Contents
Entergy Corporation and Subsidiaries
Notes to Financial Statements
occurring typically during the first and third quarters.  The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

Part I, Item 3. Quantitative and Qualitative Disclosures About Market Risk

See “Market and Credit Risk Sensitive Instruments” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis.

Part I, Item 4. Controls and Procedures

Disclosure Controls and Procedures

As of March 31, 2022, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy (individually “Registrant” and collectively the “Registrants”) management, including their respective Principal Executive Officers (PEO) and Principal Financial Officers (PFO). The evaluations assessed the effectiveness of the Registrants’ disclosure controls and procedures. Based on the evaluations, each PEO and PFO has concluded that, as to the Registrant or Registrants for which they serve as PEO or PFO, the Registrant’s or Registrants’ disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant’s or Registrants’ disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant’s or Registrants’ management, including their respective PEOs and PFOs, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Controls over Financial Reporting

Under the supervision and with the participation of each Registrants’ management, including its respective PEO and PFO, each Registrant evaluated changes in internal control over financial reporting that occurred during the quarter ended March 31, 2022 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.




75

Table of Contents

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Net income decreased $27.5 million primarily due to the reversal in 2021 of the remaining regulatory liability for the formula rate plan 2019 historical year netting adjustment and higher depreciation and amortization expenses, partially offset by higher retail electric price.

Operating Revenues

Following is an analysis of the change in operating revenues comparing the first quarter 2022 to the first quarter 2021:
Amount
(In Millions)
2021 operating revenues$583.4 
Fuel, rider, and other revenues that do not significantly affect net income(55.4)
Volume/weather(3.1)
Return of unprotected excess accumulated deferred income taxes to customers8.0 
Retail electric price26.1 
2022 operating revenues$559.0 

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to the effect of less favorable weather on residential sales, partially offset by increases in commercial and industrial usage. The increase in commercial usage was primarily due to an increase in customers and the effect of the COVID-19 pandemic on businesses in first quarter 2021. The increase in industrial usage was primarily due to an increase in demand from existing customers, primarily in the wood products and petroleum refining industries.

The return of unprotected excess accumulated deferred income taxes to customers resulted from the return of unprotected excess accumulated deferred income taxes through a tax adjustment rider beginning in April 2018. In the first quarter 2021, $8 million was returned to customers. There is no effect on net income as the reduction in operating revenues was offset by a reduction in income tax expense. See Note 2 to the financial statements in the Form 10-K for further discussion of regulatory activity regarding the Tax Cuts and Jobs Act.

The retail electric price variance is primarily due to increases in formula rate plan rates effective May 2021 and January 2022. See Note 2 to the financial statements in the Form 10-K for further discussion of the 2020 formula rate plan filing and the 2021 formula rate plan filing.


76

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Total electric energy sales for Entergy Arkansas for the three months ended March 31, 2022 and 2021 are as follows:
20222021% Change
(GWh)
Residential2,092 2,185 (4)
Commercial1,307 1,262 
Industrial1,972 1,947 
Governmental55 54 
  Total retail 5,426 5,448 — 
Sales for resale:
  Associated companies486 597 (19)
  Non-associated companies1,391 2,030 (31)
Total7,303 8,075 (10)

See Note 13 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Other Income Statement Variances

Depreciation and amortization expenses increased primarily due to additions to plant in service, including the Searcy Solar facility, which was placed in service in December 2021.

Other regulatory charges (credits) - net includes the reversal in 2021 of the remaining $38.8 million regulatory liability for the 2019 historical year netting adjustment as part of its 2020 formula rate plan proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2020 formula rate plan filing. In addition, Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation related costs collected in revenue.

Other income decreased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of the ANO 1 and ANO 2 decommissioning trust funds in the first quarter 2021.

Noncontrolling interest reflects the earnings or losses attributable to the noncontrolling interest partner of the tax equity partnership for the Searcy Solar facility under HLBV accounting. Entergy Arkansas has recorded a regulatory charge of $1.5 million in first quarter 2022 to defer the difference between the losses allocated to the tax equity partner under the HLBV method of accounting and the earnings/loss that would have been allocated to the tax equity partner under its respective ownership percentage in the partnership. See Note 1 to the financial statements in the Form 10-K for discussion of the HLBV method of accounting.

Income Taxes

The effective income tax rate was 22.6% for the first quarter 2022. The difference in the effective income tax rate for the first quarter 2022 versus the federal statutory rate of 21% was primarily due to state income taxes, partially offset by certain book and tax differences related to utility plant items.

The effective income tax rate was 17.3% for the first quarter 2021. The difference in the effective income tax rate for the first quarter 2021 versus the federal statutory rate of 21% was primarily due to the amortization of excess accumulated deferred income taxes and certain book and tax differences related to utility plant items, partially offset by state income taxes. See Note 10 to the financial statements herein and Notes 2 and 3 to the

77

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis
financial statements in the Form 10-K for a discussion of the effects and regulatory activity regarding the Tax Cuts and Jobs Act.

Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
 20222021
 (In Thousands)
Cash and cash equivalents at beginning of period$12,915 $192,128 
Net cash provided by (used in):
Operating activities247,426 91,573 
Investing activities(214,477)(162,611)
Financing activities64,167 2,690 
Net increase (decrease) in cash and cash equivalents97,116 (68,348)
Cash and cash equivalents at end of period$110,031 $123,780 

Operating Activities

Net cash flow provided by operating activities increased $155.9 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

higher collections from customers;
decreased fuel costs, including costs related to Winter Storm Uri in 2021. See Note 2 to the financial statements in the 10-K for a discussion of fuel and purchased power cost recovery;
a decrease of $9.7 million in storm spending in 2022 primarily due to increased spending on Winter Storm Uri restoration efforts in 2021; and
a decrease of $6.3 million in pension contributions in 2022. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K and Note 6 to the financial statements herein for a discussion of qualified pension and other postretirement benefits funding.

Investing Activities

Net cash flow used in investing activities increased $51.9 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

money pool activity;
an increase of $14 million in distribution construction expenditures primarily due to higher capital expenditures for storm restoration, partially offset by lower spending on advanced metering infrastructure in 2022; and
an increase of $10.2 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2022.

The increase was partially offset by a decrease of $11.5 million as a result of fluctuations in nuclear fuel activity primarily due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle.


78

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Increases in Entergy Arkansas’s receivable from the money pool are a use of cash flow, and Entergy Arkansas’s receivable from the money pool increased by $60 million for the three months ended March 31, 2022 compared to increasing by $12.5 million for the three months ended March 31, 2021. The money pool is an inter-company borrowing arrangement designed to reduce the Utility subsidiaries’ need for external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $61.5 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

the repayment, at maturity, of $350 million of 3.75% Series mortgage bonds due February 2021;
the issuance of $200 million of 4.20% Series mortgage bonds in March 2022; and
the repayment, at maturity, of $45 million of 2.375% Series governmental bonds due January 2021.

The increase was partially offset by the issuance of $400 million of 3.35% Series mortgage bonds in March 2021 and money pool activity.

Decreases in Entergy Arkansas’s payable to the money pool are a use of cash flow, and Entergy Arkansas’s payable to the money pool decreased by $139.9 million for the three months ended March 31, 2022.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Arkansas’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio is primarily due to the issuance of long-term debt in 2022.
March 31,
2022
December 31,
2021
Debt to capital53.4 %52.6 %
Effect of subtracting cash(0.6 %)— %
Net debt to net capital52.8 %52.6 %

Net debt consists of debt less cash and cash equivalents.  Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion.  Capital consists of debt and equity.  Net capital consists of capital less cash and cash equivalents.  Entergy Arkansas uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition.  Entergy Arkansas also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition because net debt indicates Entergy Arkansas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources in the Form 10-K for a discussion of Entergy Arkansas’s uses and sources of capital. Following are updates to the information provided in the Form 10-K.

79

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis

Entergy Arkansas’s receivables from or (payables to) the money pool were as follows:
March 31,
2022
December 31,
2021
March 31,
2021
December 31,
2020
(In Thousands)
$59,981($139,904)$15,610$3,110

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Arkansas has a credit facility in the amount of $150 million scheduled to expire in June 2026. Entergy Arkansas also has a $25 million credit facility scheduled to expire in July 2022. The $150 million credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of March 31, 2022, there were no cash borrowings and no letters of credit outstanding under the credit facilities. In addition, Entergy Arkansas is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of March 31, 2022, $7.5 million in letters of credit were outstanding under Entergy Arkansas’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for further discussion of the credit facilities.

The Entergy Arkansas nuclear fuel company variable interest entity has a credit facility in the amount of $80 million scheduled to expire in June 2024.  As of March 31, 2022, there were no loans outstanding under the credit facility for the Entergy Arkansas nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for further discussion of the nuclear fuel company variable interest entity credit facility.

See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Uses of Capital,” that sets forth the amounts of planned construction and other capital investments for 2022 through 2024. While Entergy Arkansas is still assessing the effect on its planned solar projects, a recently commenced investigation by the U.S. Department of Commerce into potential circumvention of duties and tariffs may result in increased duties or tariffs on imported solar panels and has created supply chain disruptions which will affect the ultimate timing and could increase the cost of completion of these projects.

West Memphis Solar Facility

As discussed in the Form 10-K, in October 2021 the APSC directed Entergy Arkansas to file a report within 180 days detailing its efforts to obtain a tax equity partnership. In April 2022, Entergy Arkansas filed its tax equity partnership status report and will file subsequent reports until a tax equity partnership is obtained or a tax equity partnership is no longer sought. Entergy Arkansas views the progress of the outreach to potential tax equity investors and the current status of the discussions as consistent with its expectations for the timeline for achieving a tax equity partnership. Closing had been expected to occur in 2023. The counter-party has notified Entergy Arkansas that it is seeking changes to certain terms of the build-own-transfer agreement, including both cost and schedule. Negotiations are ongoing, but at this time the project is not expected to achieve commercial operation in 2023.

Driver Solar Facility

In April 2022, Entergy Arkansas filed a petition with the APSC seeking a finding that the purchase of the 250 MW Driver Solar Facility is in the public interest. The acquisition of Driver Solar will be contingent upon receiving all necessary regulatory and Board approvals. Entergy Arkansas requested a decision by the APSC by June 2022 and requested cost recovery through the formula rate plan rider. The APSC established a procedural schedule with a hearing scheduled in June 2022. The facility is expected to be in service by the end of 2024.


80

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis
State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel-Cost Recovery in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery.  The following are updates to that discussion.

Energy Cost Recovery Rider

In March 2022, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase from $0.00959 per kWh to $0.01785 per kWh. The primary reason for the rate increase is a large under-recovery balance as a result of higher natural gas prices in 2021, particularly in the fourth quarter 2021. At the request of the APSC general staff, Entergy Arkansas deferred its request for recovery of $32 million from the under-recovery related to the 2021 February winter storms until the 2023 energy cost rate redetermination, unless a request for an interim adjustment to the energy cost recovery rider is necessary. This resulted in a redetermined rate of $0.016390 per kWh, which became effective with the first billing cycle in April 2022 through the normal operation of the tariff.

Opportunity Sales Proceeding

As discussed in the Form 10-K, in September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s order denying Entergy Arkansas’s request to recover the costs of the opportunity sales payments made to the other Utility operating companies. In October 2020 the APSC filed a motion to dismiss Entergy Arkansas’s complaint. In March 2022 the court denied the APSC’s motion to dismiss and, in April 2022, issued a scheduling order including a trial date in February 2023.

COVID-19 Orders

See the Form 10-K for discussion of APSC orders issued in light of the COVID-19 pandemic. As of March 31, 2022, Entergy Arkansas had a regulatory asset of $34.4 million for costs associated with the COVID-19 pandemic.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas’s accounting for nuclear decommissioning costs, utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

81

Table of Contents
Entergy Arkansas, LLC and Subsidiaries
Management's Financial Discussion and Analysis

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.


82

Table of Contents
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$558,956 $583,386 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale86,225 126,181 
Purchased power57,471 70,221 
Nuclear refueling outage expenses14,070 12,647 
Other operation and maintenance157,257 154,908 
Decommissioning20,129 19,000 
Taxes other than income taxes33,202 29,743 
Depreciation and amortization95,610 88,279 
Other regulatory charges (credits) - net(20,542)(37,467)
TOTAL443,422 463,512 
OPERATING INCOME115,534 119,874 
OTHER INCOME
Allowance for equity funds used during construction3,055 2,993 
Interest and investment income6,320 27,887 
Miscellaneous - net(5,392)(5,791)
TOTAL3,983 25,089 
INTEREST EXPENSE
Interest expense36,047 33,786 
Allowance for borrowed funds used during construction(1,214)(1,290)
TOTAL34,833 32,496 
INCOME BEFORE INCOME TAXES84,684 112,467 
Income taxes19,117 19,430 
NET INCOME65,567 93,037 
Net loss attributable to noncontrolling interest(1,387)— 
EARNINGS APPLICABLE TO MEMBER'S EQUITY$66,954 $93,037 
See Notes to Financial Statements.



83

Table of Contents






























(Page left blank intentionally)

84

Table of Contents
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$65,567 $93,037 
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization133,634 126,630 
Deferred income taxes, investment tax credits, and non-current taxes accrued11,776 42,885 
Changes in assets and liabilities:
Receivables23,583 (56,256)
Fuel inventory7,199 17,930 
Accounts payable(33,409)(21,622)
Taxes accrued27,209 8,365 
Interest accrued32,233 18,837 
Deferred fuel costs(16,954)(55,704)
Other working capital accounts3,794 (8,025)
Provisions for estimated losses(309)(12,383)
Other regulatory assets(7,198)42,388 
Other regulatory liabilities(91,068)(38,604)
Pension and other postretirement liabilities(19,852)(25,116)
Other assets and liabilities111,221 (40,789)
Net cash flow provided by operating activities247,426 91,573 
INVESTING ACTIVITIES
Construction expenditures(162,108)(146,334)
Allowance for equity funds used during construction3,055 2,993 
Nuclear fuel purchases(27,258)(17,621)
Proceeds from sale of nuclear fuel37,157 16,059 
Proceeds from nuclear decommissioning trust fund sales64,608 143,575 
Investment in nuclear decommissioning trust funds(69,950)(148,783)
Changes in money pool receivable - net(59,981)(12,500)
Net cash flow used in investing activities(214,477)(162,611)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt212,060 604,760 
Retirement of long-term debt(7,506)(613,706)
Change in money pool payable - net(139,904)— 
Other(483)11,636 
Net cash flow provided by financing activities64,167 2,690 
Net increase (decrease) in cash and cash equivalents97,116 (68,348)
Cash and cash equivalents at beginning of period12,915 192,128 
Cash and cash equivalents at end of period$110,031 $123,780 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION: 
Cash paid during the period for:
Interest - net of amount capitalized$3,227 $14,359 
See Notes to Financial Statements.

85

Table of Contents
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$2,852 $8,155 
Temporary cash investments107,179 4,760 
Total cash and cash equivalents110,031 12,915 
Accounts receivable:
Customer136,178 154,412 
Allowance for doubtful accounts(6,513)(13,072)
Associated companies91,621 29,587 
Other43,337 51,064 
Accrued unbilled revenues95,429 101,663 
Total accounts receivable360,052 323,654 
Deferred fuel costs125,767 108,862 
Fuel inventory - at average cost43,693 50,892 
Materials and supplies - at average cost262,292 247,980 
Deferred nuclear refueling outage costs51,655 65,318 
Prepayments and other14,614 14,863 
TOTAL968,104 824,484 
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,360,604 1,438,416 
Other791 947 
TOTAL1,361,395 1,439,363 
UTILITY PLANT
Electric13,637,936 13,578,297 
Construction work in progress306,933 241,127 
Nuclear fuel132,841 182,055 
TOTAL UTILITY PLANT14,077,710 14,001,479 
Less - accumulated depreciation and amortization5,539,188 5,472,296 
UTILITY PLANT - NET8,538,522 8,529,183 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,696,876 1,689,678 
Deferred fuel costs68,800 68,751 
Other22,042 13,660 
TOTAL1,787,718 1,772,089 
TOTAL ASSETS$12,655,739 $12,565,119 
See Notes to Financial Statements.

86

Table of Contents
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Accounts payable:
Associated companies$46,527 $217,310 
Other187,777 190,476 
Customer deposits95,178 92,511 
Taxes accrued116,799 89,590 
Interest accrued49,341 17,108 
Other40,881 38,901 
TOTAL536,503 645,896 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued1,436,824 1,416,201 
Accumulated deferred investment tax credits28,998 29,299 
Regulatory liability for income taxes - net427,203 431,655 
Other regulatory liabilities656,698 743,314 
Decommissioning1,410,540 1,390,410 
Accumulated provisions76,775 77,084 
Pension and other postretirement liabilities165,903 185,789 
Long-term debt4,163,602 3,958,862 
Other111,271 110,754 
TOTAL8,477,814 8,343,368 
Commitments and Contingencies
EQUITY
Member's equity3,609,699 3,542,745 
Noncontrolling interest31,723 33,110 
TOTAL3,641,422 3,575,855 
TOTAL LIABILITIES AND EQUITY$12,655,739 $12,565,119 
See Notes to Financial Statements.

87

Table of Contents
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN MEMBER'S EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
Noncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2020$— $3,276,169 $3,276,169 
Net income— 93,037 93,037 
Balance at March 31, 2021$— $3,369,206 $3,369,206 
Balance at December 31, 2021$33,110 $3,542,745 $3,575,855 
Net income (loss)(1,387)66,954 65,567 
Balance at March 31, 2022$31,723 $3,609,699 $3,641,422 
See Notes to Financial Statements.

88

Table of Contents

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Net income decreased $15.8 million primarily due to higher other operation and maintenance expenses, higher interest expense, higher taxes other than income taxes, higher depreciation and amortization expenses, and lower volume/weather. The decrease was partially offset by higher retail electric price.

Operating Revenues

Following is an analysis of the change in operating revenues comparing the first quarter 2022 to the first quarter 2021:
Amount
(In Millions)
2021 operating revenues$1,107.6 
Fuel, rider, and other revenues that do not significantly affect net income153.5 
Retail electric price17.2 
Volume/weather(12.3)
2022 operating revenues$1,266.0 

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan revenues, including increases in the transmission and distribution recovery mechanisms, effective September 2021. See Note 2 to the financial statements in the Form 10-K for further discussion of the formula rate plan proceedings.

The volume/weather variance is primarily due to the effect of less favorable weather on residential sales and a decrease in weather-adjusted residential usage, including the effect of the COVID-19 pandemic on first quarter 2021, partially offset by increases in industrial and commercial usage. The increase in industrial usage was primarily due to increased demand from expansion projects, primarily in the chemicals, petroleum refining, and transportation industries, increased demand from existing customers, primarily in the chemicals and pulp and paper industries as a result of prior year temporary plant shutdowns and operational issues, and an increase in demand from cogeneration customers. The increase in commercial usage was primarily due to the effect of the COVID-19 pandemic on businesses in first quarter 2021. The increased usage from these industrial and commercial customers has a relatively smaller effect on operating revenues because a larger portion of the revenues from those customers comes from fixed charges.

89

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Total electric energy sales for Entergy Louisiana for the three months ended March 31, 2022 and 2021 are as follows:
20222021% Change
(GWh)
Residential3,069 3,197 (4)
Commercial2,421 2,395 
Industrial7,606 7,208 
Governmental191 196 (3)
  Total retail 13,287 12,996 
Sales for resale:
  Associated companies1,341 959 40 
  Non-associated companies853 386 121 
Total15,481 14,341 

See Note 13 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Other Income Statement Variances

Other operation and maintenance expenses increased primarily due to:

an increase of $7.3 million in distribution operations expenses primarily due to higher reliability costs, higher safety and training costs, and higher vegetation maintenance costs, partially offset by a decrease in meter reading expenses as a result of the deployment of advanced metering systems;
an increase of $2.6 million in nuclear generation expenses primarily due to a higher scope of work performed in 2022 as compared to prior year, partially offset by lower spending in 2022 on sanitation and social distancing protocols as a result of the COVID-19 pandemic;
an increase of $2.3 million in transmission expenses, including an increase in vegetation maintenance costs; and
an increase of $2.3 million in customer service center support costs primarily due to higher contract costs.

The increase was partially offset by higher nuclear insurance refunds of $2.6 million and a decrease of $2.6 million in non-nuclear generation expenses primarily due to a lower scope of work performed in 2022 as compared to the same period in 2021.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments and increases in franchise taxes.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Other income decreased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of the Waterford 3 and River Bend decommissioning trust funds in the first quarter of 2021.

Interest expense increased primarily due to:

the issuances of $500 million of 2.35% Series mortgage bonds and $500 million of 3.10% Series mortgage bonds, each in March 2021;
the $1.2 billion unsecured term loan proceeds received in January 2022; and
the issuance of $1 billion of 0.95% Series mortgage bonds in October 2021.

90

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis

The increase was partially offset by the repayment of $200 million of 4.8% Series mortgage bonds in May 2021.

Income Taxes

The effective income tax rates were 16.9% for the first quarter 2022 and 18.5% for the first quarter 2021. The differences in the effective income tax rates for the first quarter 2022 and the first quarter 2021 versus the federal statutory rate of 21% were primarily due to book and tax differences related to the non-taxable income distributions earned on preferred membership interests, certain book and tax differences related to utility plant items, and the amortization of excess accumulated deferred income taxes, partially offset by state income taxes. See Note 10 to the financial statements herein and Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the effects and regulatory activity regarding the Tax Cuts and Jobs Act.

Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Cash and cash equivalents at beginning of period$18,573 $728,020 
Net cash provided by (used in):
    Operating activities183,126 (54,598)
    Investing activities(1,032,121)(1,098,466)
    Financing activities987,069 1,026,860 
Net increase (decrease) in cash and cash equivalents138,074 (126,204)
Cash and cash equivalents at end of period$156,647 $601,816 

Operating Activities

Entergy Louisiana’s operating activities provided $183.1 million of cash for the three months ended March 31, 2022 compared to using $54.6 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

higher collections from customers;
timing of recovery of fuel and purchased power costs;
a decrease of $20 million in spending on nuclear refueling outages; and
a decrease of $18.9 million in pension contributions in 2022. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K and Note 6 to the financial statements herein for a discussion of qualified pension and other postretirement benefits funding.

The above activity was partially offset by an increase of approximately $139 million in storm spending in 2022, primarily due to Hurricane Ida restoration efforts. See MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida” in the Form 10-K for discussion of storm restoration efforts.


91

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Investing Activities

Net cash flow used in investing activities decreased $66.3 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

a decrease of $60.9 million in transmission construction expenditures primarily due to higher capital expenditures for storm restoration in 2021;
a decrease of $24.9 million in nuclear decommissioning trust fund activity as a result of a lump sum contribution in 2021 for amounts collected over a 17-month period. See Note 2 in the Form 10-K for a discussion of nuclear decommissioning expense recovery; and
a decrease of $23.2 million as a result of fluctuations in nuclear fuel activity, primarily due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle.

The decrease was partially offset by:

an increase of $35.1 million in distribution construction expenditures primarily due to higher capital expenditures for storm restoration in 2022, partially offset by lower spending in 2022 on advanced metering infrastructure;
an increase of $11.1 million in information technology capital expenditures primarily due to increased spending on various technology projects in 2022; and
an increase of $9 million in nuclear construction expenditures primarily due to higher capital expenditures for storm restoration in 2022.

Financing Activities

Net cash flow provided by financing activities decreased $39.8 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

the issuance of $500 million of 2.35% Series mortgage bonds and $500 million of 3.10% Series mortgage bonds, each in March 2021;
net repayments of long-term borrowings of $30.6 million in 2022 compared to net long-term borrowings of $85.5 million in 2021 on the nuclear fuel company variable interest entities’ credit facilities; and
$125 million in common equity distributions in 2022 to return to Entergy Corporation the $125 million capital contribution received in December 2021 to assist in paying for costs associated with Hurricane Ida.

The decrease was partially offset by the $1.2 billion of proceeds received from an unsecured term loan in January 2022 and the repayment of Entergy Louisiana Waterford VIE’s $40 million of 3.92% Series H secured notes in February 2021.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.


92

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Capital Structure

Entergy Louisiana’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Louisiana is primarily due to the $1.2 billion unsecured term loan proceeds received in January 2022.
March 31, 2022December 31,
2021
Debt to capital59.5 %57.2 %
Effect of subtracting cash(0.3 %)0.0 %
Net debt to net capital59.2 %57.2 %

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and common equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition. Entergy Louisiana also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition because net debt indicates Entergy Louisiana’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Louisiana’s uses and sources of capital. Following are updates to the information provided in the Form 10-K.

Entergy Louisiana’s receivables from or (payables to) the money pool were as follows:
March 31, 2022December 31,
2021
March 31, 2021December 31,
2020
(In Thousands)
$81,160$14,539$75,772$13,426

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Louisiana has a credit facility in the amount of $350 million scheduled to expire in June 2026.  The credit facility includes fronting commitments for the issuance of letters of credit against $15 million of the borrowing capacity of the facility. As of March 31, 2022, there were no cash borrowings and no letters of credit outstanding under the credit facility.  In addition, Entergy Louisiana is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of March 31, 2022, $11 million in letters of credit were outstanding under Entergy Louisiana’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Louisiana nuclear fuel company variable interest entities have two separate credit facilities, each in the amount of $105 million and scheduled to expire in June 2024.  As of March 31, 2022, $30.8 million in loans were outstanding under the credit facility for the Entergy Louisiana River Bend nuclear fuel company variable interest entity. As of March 31, 2022, $82.1 million in loans were outstanding under the credit facility for the Entergy Louisiana Waterford nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for additional discussion of the nuclear fuel company variable interest entity credit facilities.

See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Uses of Capital,” that sets forth the amounts of planned

93

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
construction and other capital investments for 2022 through 2024. While Entergy Louisiana is still assessing the effect on its planned solar projects, a recently commenced investigation by the U.S. Department of Commerce into potential circumvention of duties and tariffs may result in increased duties or tariffs on imported solar panels and has created supply chain disruptions which will affect the ultimate timing and could increase the cost of completion of these projects.

2021 Solar Certification and the Geaux Green Option

As discussed in the Form 10-K, in November 2021, Entergy Louisiana filed an application with the LPSC seeking certification of and approval for the addition of four new solar photovoltaic resources with a combined nameplate capacity of 475 megawatts (the 2021 Solar Portfolio) and the implementation of a new green tariff, the Geaux Green Option (Rider GGO). The LPSC has established a procedural schedule that is expected to result in an LPSC decision by the end of 2022. In March 2022 direct testimony from Walmart, the Louisiana Energy Users Group (LEUG) and the LPSC staff was filed. Each party recommended that the LPSC approve the resources proposed in Entergy Louisiana’s application, and the LPSC staff witness indicated that the process through which Entergy Louisiana solicited or obtained the proposals for the resources complies with applicable LPSC orders. LPSC staff and LEUG’s witnesses made recommendations to modify the proposed Rider GGO and Entergy Louisiana’s proposed rate relief. In April 2022, LPSC staff and LEUG filed cross-answering testimony concerning the other party’s proposed modifications to Rider GGO and the proposed rate recovery. Discovery concerning these parties’ testimonies is ongoing.

Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura, Hurricane Delta, and Hurricane Zeta caused significant damage to portions of Entergy Louisiana’s service area. The storms resulted in widespread outages, significant damage to distribution and transmission infrastructure, and the loss of sales during the outages. Additionally, as a result of Hurricane Laura’s extensive damage to the grid infrastructure serving the impacted area, large portions of the underlying transmission system required nearly a complete rebuild. In February 2021 two winter storms (collectively, Winter Storm Uri) brought freezing rain and ice to Louisiana. Ice accumulation sagged or downed trees, limbs and power lines, causing damage to Entergy Louisiana’s transmission and distribution systems. The additional weight of ice caused trees and limbs to fall into power lines and other electric equipment. When the ice melted, it affected vegetation and electrical equipment, causing additional outages.

In April 2021, Entergy Louisiana filed an application with the LPSC relating to Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri restoration costs and in July 2021, Entergy Louisiana made a supplemental filing updating the total restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by these storms were estimated to be approximately $2.06 billion, including approximately $1.68 billion in capital costs and approximately $380 million in non-capital costs. Including carrying costs through January 2022, Entergy Louisiana was seeking an LPSC determination that $2.11 billion was prudently incurred and, therefore, was eligible for recovery from customers. Additionally, Entergy Louisiana was requesting that the LPSC determine that re-establishment of a storm escrow account to the previously authorized amount of $290 million was appropriate. In July 2021, Entergy Louisiana supplemented the application with a request regarding the financing and recovery of the recoverable storm restoration costs. Specifically, Entergy Louisiana requested approval to securitize its restoration costs pursuant to Louisiana Act 55 financing, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.


94

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
In August 2021, Hurricane Ida caused extensive damage to Entergy Louisiana’s distribution and, to a lesser extent, transmission systems resulting in widespread power outages. In September 2021, Entergy Louisiana filed an application at the LPSC seeking approval of certain ratemaking adjustments in connection with the issuance of approximately $1 billion of shorter-term mortgage bonds to provide interim financing for restoration costs associated with Hurricane Ida, which bonds were issued in October 2021. Also in September 2021, Entergy Louisiana sought approval for the creation and funding of a $1 billion restricted escrow account for Hurricane Ida restoration costs, subject to a subsequent prudence review.

After filing of testimony by LPSC staff and intervenors, which generally supported or did not oppose Entergy Louisiana’s requests in regard to Hurricane Laura, Hurricane Delta, Hurricane Zeta, Winter Storm Uri, and Hurricane Ida, the parties negotiated and executed an uncontested stipulated settlement which was filed with the LPSC in February 2022. The settlement agreement contained the following key terms: $2.1 billion of restoration costs from Hurricane Laura, Hurricane Delta, Hurricane Zeta, and Winter Storm Uri were prudently incurred and were eligible for recovery; carrying costs of $51 million were recoverable; a $290 million cash storm reserve should be re-established; a $1 billion reserve should be established to partially pay for Hurricane Ida restoration costs; and Entergy Louisiana was authorized to finance $3.186 billion utilizing the securitization process authorized by Act 55, as supplemented by Act 293. The LPSC issued an order approving the settlement in March 2022. As a result of the financing order, in first quarter 2022, Entergy Louisiana reclassified $1.339 billion from utility plant to other regulatory assets. The securitization process is expected to be completed in second quarter 2022.

In April 2022, Entergy Louisiana filed an application with the LPSC relating to Hurricane Ida restoration costs. Total restoration costs for the repair and/or replacement of Entergy Louisiana’s electric facilities damaged by Hurricane Ida currently are estimated to be approximately $2.54 billion, including approximately $1.96 billion in capital costs and approximately $586 million in non-capital costs. Including carrying costs through December 2022, Entergy Louisiana is seeking an LPSC determination that $2.60 billion was prudently incurred and, therefore, is eligible for recovery from customers. As part of this filing, Entergy Louisiana also is seeking an LPSC determination that an additional $32 million in restoration costs associated with the restoration of Entergy Louisiana’s electric facilities damaged by Hurricane Laura, Hurricane Delta, and Hurricane Zeta as well as Winter Storm Uri was prudently incurred. This amount is exclusive of the requested $3 million in carrying costs through December 2022. In total, Entergy Louisiana is requesting an LPSC determination that $2.64 billion was prudently incurred and, therefore, is eligible for recovery from customers. As discussed above, in March 2022 the LPSC approved financing of a $1 billion storm escrow that can be withdrawn to finance costs associated with Hurricane Ida restoration. Entergy Louisiana expects to supplement the April 2022 application with a request that the LPSC authorize Entergy Louisiana to finance the remaining storm restoration costs included in the April 2022 application, currently expected to be through the securitization process authorized by Louisiana Act 55, as supplemented by Act 293 of the Louisiana Legislature’s Regular Session of 2021.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel Cost Recovery in the Form 10-K for a discussion of state and local rate regulation and fuel cost recovery. The following are updates to that discussion.

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the LPSC issued an order authorizing utilities to record as a regulatory asset expenses incurred from the suspension of disconnections and collection of late fees imposed by LPSC orders associated with the COVID-19 pandemic. In addition, utilities may seek future recovery, subject to LPSC review and approval, of losses and expenses incurred due to compliance with the LPSC’s COVID-19 orders. Utilities seeking to recover the regulatory asset must formally petition the LPSC to do so, identifying the direct and indirect costs for which recovery is sought. Any such request is subject to LPSC review and approval. As of

95

Table of Contents
Entergy Louisiana, LLC and Subsidiaries
Management's Financial Discussion and Analysis
March 31, 2022, Entergy Louisiana had a regulatory asset of $47.8 million for costs associated with the COVID-19 pandemic.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation in the Form 10-K for a discussion of federal regulation. 

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana’s accounting for nuclear decommissioning costs, utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.

96

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$1,237,237 $1,079,663 
Natural gas28,735 27,981 
TOTAL1,265,972 1,107,644 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale362,074 145,234 
Purchased power176,197 209,961 
Nuclear refueling outage expenses11,947 13,282 
Other operation and maintenance254,001 237,483 
Decommissioning17,688 16,823 
Taxes other than income taxes61,615 52,484 
Depreciation and amortization169,083 160,813 
Other regulatory charges (credits) - net(20,897)31,097 
TOTAL1,031,708 867,177 
OPERATING INCOME234,264 240,467 
OTHER INCOME
Allowance for equity funds used during construction6,726 6,101 
Interest and investment income15,900 72,515 
Miscellaneous - net15,517 (34,638)
TOTAL38,143 43,978 
INTEREST EXPENSE
Interest expense93,784 82,806 
Allowance for borrowed funds used during construction(3,026)(2,759)
TOTAL90,758 80,047 
INCOME BEFORE INCOME TAXES181,649 204,398 
Income taxes30,789 37,772 
NET INCOME$150,860 $166,626 
See Notes to Financial Statements.


97

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
Net Income$150,860 $166,626 
Other comprehensive loss
Pension and other postretirement liabilities (net of tax benefit of $226 and $144)
(613)(407)
Other comprehensive loss(613)(407)
Comprehensive Income$150,247 $166,219 
See Notes to Financial Statements.



98

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$150,860 $166,626 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization213,022 198,868 
Deferred income taxes, investment tax credits, and non-current taxes accrued95,785 67,823 
Changes in working capital:
Receivables71,237 (13,080)
Fuel inventory(46)1,194 
Accounts payable(262,042)(126,070)
Taxes accrued(42,950)20,619 
Interest accrued(857)(9,163)
Deferred fuel costs498 (203,815)
Other working capital accounts(24,241)(25,628)
Changes in provisions for estimated losses2,694 (258)
Changes in other regulatory assets(1,336,616)(70,784)
Changes in other regulatory liabilities(67,164)22,503 
Storm restoration costs approved for securitization recognized as regulatory asset1,338,559 — 
Changes in pension and other postretirement liabilities(11,608)(30,745)
Other55,995 (52,688)
Net cash flow provided by (used in) operating activities183,126 (54,598)
INVESTING ACTIVITIES
Construction expenditures(935,692)(945,831)
Allowance for equity funds used during construction6,726 6,101 
Nuclear fuel purchases(55,913)(52,435)
Proceeds from the sale of nuclear fuel26,681 — 
Changes to securitization account— (6,050)
Proceeds from nuclear decommissioning trust fund sales155,269 291,275 
Investment in nuclear decommissioning trust funds(168,283)(329,180)
Changes in money pool receivable - net(66,621)(62,346)
Litigation proceeds from settlement agreement5,695 — 
Other17 — 
Net cash flow used in investing activities(1,032,121)(1,098,466)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt1,506,637 1,399,245 
Retirement of long-term debt(401,411)(368,707)
Distributions paid:
Common equity(125,000)— 
Other6,843 (3,678)
Net cash flow provided by financing activities987,069 1,026,860 
Net increase (decrease) in cash and cash equivalents138,074 (126,204)
Cash and cash equivalents at beginning of period18,573 728,020 
Cash and cash equivalents at end of period$156,647 $601,816 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$91,441 $89,432 
See Notes to Financial Statements.

99

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$15,933 $195 
Temporary cash investments140,714 18,378 
Total cash and cash equivalents156,647 18,573 
Accounts receivable:
Customer256,931 355,265 
Allowance for doubtful accounts(11,092)(29,231)
Associated companies159,787 96,539 
Other49,735 36,674 
Accrued unbilled revenues174,038 174,768 
Total accounts receivable629,399 634,015 
Deferred fuel costs44,876 45,374 
Fuel inventory43,004 42,958 
Materials and supplies - at average cost490,752 485,325 
Deferred nuclear refueling outage costs33,947 39,582 
Prepayments and other58,384 44,187 
TOTAL1,457,009 1,310,014 
OTHER PROPERTY AND INVESTMENTS
Investment in affiliate preferred membership interests1,390,587 1,390,587 
Decommissioning trust funds2,005,369 2,114,523 
Non-utility property - at cost (less accumulated depreciation)338,365 337,247 
Other13,812 13,744 
TOTAL3,748,133 3,856,101 
UTILITY PLANT
Electric27,252,039 28,055,038 
Natural gas288,820 285,006 
Construction work in progress721,536 847,924 
Nuclear fuel200,163 209,418 
TOTAL UTILITY PLANT28,462,558 29,397,386 
Less - accumulated depreciation and amortization9,940,422 9,860,252 
UTILITY PLANT - NET18,522,136 19,537,134 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets4,113,282 2,776,666 
Deferred fuel costs168,122 168,122 
Other39,358 27,801 
TOTAL4,320,762 2,972,589 
TOTAL ASSETS$28,048,040 $27,675,838 
See Notes to Financial Statements.

100

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$200,000 $200,000 
Accounts payable:
Associated companies81,781 183,172 
Other872,120 1,481,902 
Customer deposits153,109 150,697 
Taxes accrued21,298 64,248 
Interest accrued92,195 93,052 
Current portion of unprotected excess accumulated deferred income taxes15,182 24,291 
Other56,709 68,995 
TOTAL1,492,394 2,266,357 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued2,523,361 2,433,854 
Accumulated deferred investment tax credits101,408 102,588 
Regulatory liability for income taxes - net307,779 313,693 
Other regulatory liabilities990,456 1,042,597 
Decommissioning1,673,809 1,653,198 
Accumulated provisions27,185 24,490 
Pension and other postretirement liabilities516,628 528,213 
Long-term debt11,822,131 10,714,346 
Other387,083 415,930 
TOTAL18,349,840 17,228,909 
Commitments and Contingencies
EQUITY
Member's equity8,198,141 8,172,294 
Accumulated other comprehensive income7,665 8,278 
TOTAL8,205,806 8,180,572 
TOTAL LIABILITIES AND EQUITY$28,048,040 $27,675,838 
See Notes to Financial Statements.

101

Table of Contents
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
Common Equity
Member’s
Equity
Accumulated
Other
Comprehensive
Income
Total
(In Thousands)
Balance at December 31, 2020$7,453,361 $4,327 $7,457,688 
Net income166,626 — 166,626 
Other comprehensive loss— (407)(407)
Other(16)— (16)
Balance at March 31, 2021$7,619,971 $3,920 $7,623,891 
Balance at December 31, 2021$8,172,294 $8,278 $8,180,572 
Net income150,860 — 150,860 
Other comprehensive loss— (613)(613)
Distributions declared on common equity(125,000)— (125,000)
Other(13)— (13)
Balance at March 31, 2022$8,198,141 $7,665 $8,205,806 
See Notes to Financial Statements.

102

Table of Contents

ENTERGY MISSISSIPPI, LLC

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Net income increased $4.4 million primarily due to higher retail electric price, partially offset by higher depreciation and amortization expenses and higher interest expenses.

Operating Revenues

Following is an analysis of the change in operating revenues comparing the first quarter 2022 to the first quarter 2021:
Amount
(In Millions)
2021 operating revenues$336.6 
Fuel, rider, and other revenues that do not significantly affect net income(2.2)
Retail electric price16.4 
Volume/weather(1.8)
2022 operating revenues$349.0 

Entergy Mississippi’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to increases in formula rate plan rates effective April 2021 and July 2021. See Note 2 to the financial statements in the Form 10-K for further discussion of the formula rate plan filings.

The volume/weather variance is primarily due to a decrease in weather-adjusted residential usage, including the effect of the COVID-19 pandemic on first quarter 2021, partially offset by the effect of more favorable weather on residential and commercial sales.


103

Table of Contents
Entergy Mississippi, LLC
Management's Financial Discussion and Analysis
Total electric energy sales for Entergy Mississippi for the three months ended March 31, 2022 and 2021 are as follows:
20222021% Change
(GWh)
Residential1,295 1,349 (4)
Commercial1,021 1,004 
Industrial561 527 
Governmental96 95 
  Total retail 2,973 2,975 — 
Sales for resale:
  Non-associated companies535 1,452 (63)
Total3,508 4,427 (21)

See Note 13 to the financial statements herein for additional discussion of Entergy Mississippi’s operating revenues.

Other Income Statement Variances

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments and millage rate increases.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Interest expense increased primarily due to the issuance of $200 million of 3.50% Series mortgage bonds in March 2021 and the issuance of $200 million of 2.55% Series mortgage bonds in November 2021.

Income Taxes

The effective income tax rates were 20.2% for the first quarter 2022 and 22.2% for the first quarter 2021. The differences in the effective income tax rates for the first quarter 2022 and the first quarter 2021 versus the federal statutory rate of 21% were primarily due to certain book and tax differences related to utility plant items, partially offset by state income taxes.

104

Table of Contents
Entergy Mississippi, LLC
Management's Financial Discussion and Analysis
Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Cash and cash equivalents at beginning of period$47,627 $18 
Net cash provided by (used in):
Operating activities(4,340)54,311 
Investing activities(61,154)(162,802)
Financing activities17,895 185,189 
Net increase (decrease) in cash and cash equivalents(47,599)76,698 
Cash and cash equivalents at end of period$28 $76,716 

Operating Activities

Entergy Mississippi’s operating activities used $4.3 million of cash for the three months ended March 31, 2022 compared to providing $54.3 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

timing of payments to vendors;
income tax refunds of $8 million received in 2021 in accordance with an intercompany income tax allocation agreement;
higher collections from customers; and
a decrease of $7.2 million in storm spending in 2022 primarily due to spending on Winter Storm Uri restoration efforts in 2021.

Investing Activities

Net cash flow used in investing activities decreased $101.6 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

a decrease of $51.3 million in distribution construction expenditures primarily due to a higher scope of work performed in 2021 as compared to 2022; and
money pool activity.

Decreases in Entergy Mississippi’s receivable from the money pool are a source of cash flow, and Entergy Mississippi’s receivable from the money pool decreased by $40.5 million for the three months ended March 31, 2022 compared to increasing $9.7 million for the three months ended March 31, 2021. The money pool is an inter-company borrowing arrangement designed to reduce the Utility’s subsidiaries’ need for external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities decreased $167.3 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to the issuance of $200 million of 3.50% Series mortgage bonds in March 2021, partially offset by money pool activity.

105

Table of Contents
Entergy Mississippi, LLC
Management's Financial Discussion and Analysis

Increases in Entergy Mississippi’s payable to the money pool are a source of cash flow and Entergy Mississippi’s payable to the money pool increased by $22.4 million for the three months ended March 31, 2022 compared to decreasing by $16.5 million for the three months ended March 31, 2021.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Mississippi’s debt to capital ratio is shown in the following table.
March 31,
 2022
December 31,
2021
Debt to capital53.9 %54.3 %
Effect of subtracting cash— %(0.5 %)
Net debt to net capital53.9 %53.8 %

Net debt consists of debt less cash and cash equivalents.  Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion.  Capital consists of debt and equity.  Net capital consists of capital less cash and cash equivalents.  Entergy Mississippi uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition.  Entergy Mississippi also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition because net debt indicates Entergy Mississippi’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources in the Form 10-K for a discussion of Entergy Mississippi’s uses and sources of capital. Following are updates to the information provided in the Form 10-K.

Entergy Mississippi’s receivables from or (payables to) the money pool were as follows:
March 31,
 2022
December 31,
2021
March 31,
 2021
December 31,
2020
(In Thousands)
($22,386)$40,456$9,683($16,516)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

As of March 31, 2022, Entergy Mississippi had three separate credit facilities in the aggregate amount of $82.5 million scheduled to expire in April 2022. No borrowings were outstanding under the credit facilities as of March 31, 2022. In April 2022, Entergy Mississippi renewed the three separate existing credit facilities and increased the aggregate amount available under the facilities to $95 million, and extended the expiration date of each credit facility to April 2023. Also in April 2022, Entergy Mississippi entered into a credit facility in the amount of $150 million with an expiration date of July 2024. In addition, Entergy Mississippi is a party to an uncommitted letter of credit facility primarily as a means to post collateral to support its obligations to MISO. As of March 31, 2022, $2.3 million in MISO letters of credit and $1 million in non-MISO letters of credit were outstanding under this facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

106

Table of Contents
Entergy Mississippi, LLC
Management's Financial Discussion and Analysis

Entergy Mississippi had $33.2 million in its storm reserve escrow account at March 31, 2022.

Sunflower Solar Facility

As discussed in the Form 10-K, in November 2018, Entergy Mississippi announced that it signed an agreement for the purchase of an approximately 100 MW solar photovoltaic facility that will be sited on approximately 1,000 acres in Sunflower County, Mississippi. The estimated total investment, including the base purchase price and other related costs, for Entergy Mississippi to acquire the Sunflower Solar Facility is approximately $153.2 million. Entergy Mississippi will purchase the facility upon mechanical completion and after the other purchase contingencies have been met. In April 2020 the MPSC issued an order approving certification of the Sunflower Solar Facility and its recovery through Entergy Mississippi’s interim capacity rate adjustment mechanism, subject to certain conditions including: (i) that Entergy Mississippi pursue a partnership structure through which the partnership would acquire and own the facility under the build-own-transfer agreement, and (ii) that if Entergy Mississippi does not consummate the partnership structure under the terms of the order, there will be a cap of $136 million on the level of recoverable costs. In April 2022, Entergy Mississippi confirmed mechanical completion of the Sunflower Solar Facility. The initial closing is targeted to occur in May 2022. In conjunction with closing, Entergy Mississippi is executing a partnership structure through which the partnership will acquire and own the Sunflower Solar Facility. Final payment of the purchase price will be made upon substantial completion of the facility, which is currently expected in third quarter 2022.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of the formula rate plan and fuel and purchased power cost recovery. The following are updates to that discussion.

2022 Formula Rate Plan Filing

In March 2022, Entergy Mississippi submitted its formula rate plan 2022 test year filing and 2021 look-back filing showing Entergy Mississippi’s earned return for the historical 2021 calendar year to be below the formula rate plan bandwidth and projected earned return for the 2022 calendar year to be below the formula rate plan bandwidth. The 2022 test year filing shows a $69 million rate increase is necessary to reset Entergy Mississippi’s earned return on common equity to the specified point of adjustment of 6.70% return on rate base, within the formula rate plan bandwidth. The change in formula rate plan revenues, however, is capped at 4% of retail revenues, which equates to a revenue change of $48.6 million. The 2021 look-back filing compares actual 2021 results to the approved benchmark return on rate base and reflects the need for a $34.5 million interim increase in formula rate plan revenues. In fourth quarter 2021, Entergy Mississippi recorded a regulatory asset of $19 million to reflect the then-current estimate in connection with the look-back feature of the formula rate plan. In accordance with the provisions of the formula rate plan, Entergy Mississippi implemented a $24.3 million interim rate increase, reflecting a cap equal to 2% of 2021 retail revenues, effective in April 2022, subject to refund, pending a final MPSC order. A final order is expected in the second quarter 2022, with the resulting final rates, including amounts above the 2% cap of 2021 retail revenues, effective July 2022.

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the MPSC issued an order authorizing utilities to defer incremental costs and expenses associated with COVID-19 compliance and to seek future recovery through rates of the prudently incurred incremental costs and expenses. As of March 31, 2022, Entergy Mississippi had a regulatory asset of $14.1 million for costs associated with the COVID-19 pandemic.


107

Table of Contents
Entergy Mississippi, LLC
Management's Financial Discussion and Analysis
Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation in the Form 10-K for a discussion of federal regulation. 

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Mississippi’s accounting for utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.

108

Table of Contents
ENTERGY MISSISSIPPI, LLC
INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$349,029 $336,619 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale67,277 60,197 
Purchased power61,212 68,591 
Other operation and maintenance65,811 67,831 
Taxes other than income taxes32,730 25,899 
Depreciation and amortization60,084 55,036 
Other regulatory charges (credits) - net3,907 8,129 
TOTAL291,021 285,683 
OPERATING INCOME58,008 50,936 
OTHER DEDUCTIONS
Allowance for equity funds used during construction1,078 1,668 
Interest and investment income64 42 
Miscellaneous - net(1,153)(2,313)
TOTAL(11)(603)
INTEREST EXPENSE
Interest expense20,434 17,613 
Allowance for borrowed funds used during construction(465)(677)
TOTAL19,969 16,936 
INCOME BEFORE INCOME TAXES38,028 33,397 
Income taxes7,673 7,425 
NET INCOME $30,355 $25,972 
See Notes to Financial Statements.



109

Table of Contents




























(Page left blank intentionally)

110

Table of Contents
ENTERGY MISSISSIPPI, LLC
STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$30,355 $25,972 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
Depreciation and amortization60,084 55,036 
Deferred income taxes, investment tax credits, and non-current taxes accrued3,979 22,593 
Changes in assets and liabilities:
Receivables(6,379)4,557 
Fuel inventory23 1,736 
Accounts payable989 26,391 
Taxes accrued(63,785)(75,886)
Interest accrued10,613 4,238 
Deferred fuel costs(24,076)(25,722)
Other working capital accounts(46,494)(3,425)
Provisions for estimated losses(179)(7,689)
Other regulatory assets16,301 11,015 
Other regulatory liabilities21,689 19,147 
Pension and other postretirement liabilities(3,906)(5,668)
Other assets and liabilities(3,554)2,016 
Net cash flow provided by (used in) operating activities(4,340)54,311 
INVESTING ACTIVITIES
Construction expenditures(102,686)(154,788)
Allowance for equity funds used during construction1,078 1,668 
Changes in money pool receivable - net40,456 (9,683)
Other(2)
Net cash flow used in investing activities(61,154)(162,802)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt— 200,573 
Changes in money pool payable - net22,386 (16,516)
Other(4,491)1,132 
Net cash flow provided by financing activities17,895 185,189 
Net increase (decrease) in cash and cash equivalents(47,599)76,698 
Cash and cash equivalents at beginning of period47,627 18 
Cash and cash equivalents at end of period$28 $76,716 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$9,160 $12,757 
Income taxes$— ($8,045)
See Notes to Financial Statements.

111

Table of Contents
ENTERGY MISSISSIPPI, LLC
BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
 20222021
 (In Thousands)
CURRENT ASSETS  
Cash and cash equivalents:  
Cash$26 $29 
Temporary cash investments47,598 
Total cash and cash equivalents28 47,627 
Accounts receivable:  
Customer86,389 84,048 
Allowance for doubtful accounts(3,396)(7,209)
Associated companies5,008 42,994 
Other17,994 14,609 
Accrued unbilled revenues50,404 56,034 
Total accounts receivable156,399 190,476 
Deferred fuel costs145,954 121,878 
Fuel inventory - at average cost10,288 10,311 
Materials and supplies - at average cost75,509 69,639 
Prepayments and other40,847 6,394 
TOTAL429,025 446,325 
OTHER PROPERTY AND INVESTMENTS  
Non-utility property - at cost (less accumulated depreciation)4,523 4,527 
Escrow accounts48,888 48,886 
TOTAL53,411 53,413 
UTILITY PLANT  
Electric6,650,580 6,613,109 
Construction work in progress120,538 95,452 
TOTAL UTILITY PLANT6,771,118 6,708,561 
Less - accumulated depreciation and amortization2,159,949 2,127,590 
UTILITY PLANT - NET4,611,169 4,580,971 
DEFERRED DEBITS AND OTHER ASSETS  
Regulatory assets:  
Other regulatory assets446,131 462,432 
Other18,880 14,248 
TOTAL465,011 476,680 
TOTAL ASSETS$5,558,616 $5,557,389 
See Notes to Financial Statements.  

112

Table of Contents
ENTERGY MISSISSIPPI, LLC
BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
 20222021
 (In Thousands)
CURRENT LIABILITIES  
Accounts payable:  
Associated companies$62,229 $42,929 
Other104,367 113,000 
Customer deposits87,307 86,167 
Taxes accrued42,488 106,273 
Interest accrued27,896 17,283 
Other29,735 36,731 
TOTAL354,022 402,383 
NON-CURRENT LIABILITIES  
Accumulated deferred income taxes and taxes accrued724,154 720,097 
Accumulated deferred investment tax credits10,857 10,913 
Regulatory liability for income taxes - net209,758 212,445 
Other regulatory liabilities73,689 49,313 
Asset retirement cost liabilities10,458 10,315 
Accumulated provisions37,849 38,028 
Pension and other postretirement liabilities55,101 59,065 
Long-term debt2,180,197 2,179,989 
Other32,608 35,273 
TOTAL3,334,671 3,315,438 
Commitments and Contingencies  
EQUITY  
Member's equity1,869,923 1,839,568 
TOTAL1,869,923 1,839,568 
TOTAL LIABILITIES AND EQUITY$5,558,616 $5,557,389 
See Notes to Financial Statements.  

113

Table of Contents
ENTERGY MISSISSIPPI, LLC
STATEMENTS OF CHANGES IN MEMBER'S EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
  
 Member's Equity
 (In Thousands)
Balance at December 31, 2020$1,672,734 
Net income25,972 
Balance at March 31, 2021$1,698,706 
Balance at December 31, 2021$1,839,568 
Net income30,355 
Balance at March 31, 2022$1,869,923 
See Notes to Financial Statements.

114

Table of Contents

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Net income increased $13.4 million primarily due to higher retail electric price and lower other operation and maintenance expenses.

Operating Revenues

Following is an analysis of the change in operating revenues comparing first quarter 2022 to first quarter 2021:
Amount
(In Millions)
2021 operating revenues$169.3 
Fuel, rider, and other revenues that do not significantly affect net income15.9 
Retail electric price10.3 
Volume/weather2.8 
2022 operating revenues$198.3 

Entergy New Orleans’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to a rate increase effective November 2021 in accordance with the terms of the 2021 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for further discussion of the formula rate plan filing.

The volume/weather variance is primarily due to an increase in commercial usage. The increase in commercial usage was primarily due to the effect of the COVID-19 pandemic on businesses in first quarter 2021.

115

Table of Contents
Entergy New Orleans, LLC and Subsidiaries
Management's Financial Discussion and Analysis

Total electric energy sales for Entergy New Orleans for the three months ended March 31, 2022 and 2021 are as follows:
20222021% Change
(GWh)
Residential538 538 — 
Commercial465 446 
Industrial94 94 — 
Governmental178 172 
  Total retail 1,275 1,250 
Sales for resale:
  Non-associated companies716 89 704 
Total1,991 1,339 49 

See Note 13 to the financial statements herein for additional discussion of Entergy New Orleans’s operating revenues.

Other Income Statement Variances

Other operation and maintenance expenses decreased primarily due to a decrease of $2.4 million in non-nuclear generation expenses primarily due to the timing of the scope of work performed during plant outages in 2022 as compared to the same period in 2021 and a decrease of $2 million in energy efficiency expenses due to the timing of recovery from customers.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Interest expense increased primarily due to the issuance of $90 million of 4.19% Series mortgage bonds and the issuance of $70 million of 4.51% Series mortgage bonds, each in November 2021.

Income Taxes

The effective income tax rate was 17.8% for first quarter 2022. The difference in the effective income tax rate for first quarter 2022 versus the federal statutory rate of 21% was primarily due to the amortization of excess accumulated deferred income taxes and certain book and tax differences related to utility plant items, partially offset by state income taxes. See Note 10 to the financial statements herein and Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the effects of and regulatory activity regarding the Tax Cuts and Jobs Act.

The effective income tax rate was 33.9% for first quarter 2021. The difference in the effective income tax rate for first quarter 2021 versus the federal statutory rate of 21% was primarily due to the provision for uncertain tax positions and state income taxes, partially offset by certain book and tax differences related to utility plant items.


116

Table of Contents
Entergy New Orleans, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Cash and cash equivalents at beginning of period$42,862 $26 
Net cash provided by (used in):
Operating activities41,811 (14,114)
Investing activities(53,401)14,875 
Financing activities(107)14,825 
Net increase (decrease) in cash and cash equivalents(11,697)15,586 
Cash and cash equivalents at end of period$31,165 $15,612 

Operating Activities

Entergy New Orleans’s operating activities provided $41.8 million of cash for the three months ended March 31, 2022 compared to using $14.1 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

higher collections from customers;
the timing of payments to vendors;
an increase of $9.3 million in storm spending in 2022, primarily due to Hurricane Ida restoration efforts. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida” in the Form 10-K for discussion of hurricane restoration efforts; and
the timing of recovery of fuel and purchased power costs.

Investing Activities

Entergy New Orleans’s investing activities used $53.4 million of cash for the three months ended March 31, 2022 compared to providing $14.9 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

an increase of $50.2 million in distribution construction expenditures primarily due to higher capital expenditures for storm restoration in 2022. The increase in storm restoration spending is primarily due to Hurricane Ida restoration efforts. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida” in the Form 10-K for discussion of hurricane restoration efforts;
$44.2 million in receipts from storm reserve escrow accounts in 2021; and
money pool activity.

Decreases in Entergy New Orleans’s receivable from the money pool are a source of cash flow, and Entergy New Orleans’s receivable from the money pool decreased $18.3 million for the three months ended March 31, 2022. The money pool is an inter-company borrowing arrangement designed to reduce the Utility subsidiaries’ need for external short-term borrowings.


117

Table of Contents
Entergy New Orleans, LLC and Subsidiaries
Management's Financial Discussion and Analysis


Financing Activities

Entergy New Orleans’s financing activities used $0.1 million of cash for the three months ended March 31, 2022 compared to providing $14.8 million of cash for the three months ended March 31, 2021 primarily due to money pool activity.

Increases in Entergy New Orleans’s payable to the money pool are a source of cash flow, and Entergy New Orleans’s payable to the money pool increased $15 million for the three months ended March 31, 2021.

Capital Structure

Entergy New Orleans’s debt to capital ratio is shown in the following table.
March 31,
2022
December 31,
2021
Debt to capital54.8 %55.4 %
Effect of excluding securitization bonds (1.0 %)(1.0 %)
Debt to capital, excluding securitization bonds (a)53.8 %54.4 %
Effect of subtracting cash(1.0 %)(1.4 %)
Net debt to net capital, excluding securitization bonds (a)52.8 %53.0 %

(a)Calculation excludes the securitization bonds, which are non-recourse to Entergy New Orleans.

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, long-term debt, including the currently maturing portion, and the long-term payable due to an associated company. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy New Orleans uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition because the securitization bonds are non-recourse to Entergy New Orleans, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy New Orleans also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition because net debt indicates Entergy New Orleans’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy New Orleans’s uses and sources of capital. Following are updates to the information provided in the Form 10-K.  

Entergy New Orleans’s receivables from or (payables to) the money pool were as follows:
March 31,
2022
December 31,
2021
March 31,
2021
December 31,
2020
(In Thousands)
$18,122$36,410($25,229)($10,190)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.


118

Table of Contents
Entergy New Orleans, LLC and Subsidiaries
Management's Financial Discussion and Analysis
Entergy New Orleans has a credit facility in the amount of $25 million scheduled to expire in June 2024. The credit facility includes fronting commitments for the issuance of letters of credit against $10 million of the borrowing capacity of the facility. As of March 31, 2022, no cash borrowings and no letters of credit were outstanding under the facility. In addition, Entergy New Orleans is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of March 31, 2022, a $1 million letter of credit was outstanding under Entergy New Orleans’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

In February 2022, Entergy New Orleans filed with the City Council a securitization application requesting that the City Council review Entergy New Orleans’s storm reserve and increase the storm reserve funding level to $150 million, to be funded through securitization. A City Council decision is expected in third quarter 2022.

Hurricane Ida

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Hurricane Ida” in the Form 10-K for a discussion of Hurricane Ida, which caused significant damage to Entergy New Orleans’s service area, including Entergy’s electrical grid. Entergy New Orleans expects to initiate its storm cost recovery proceeding in late second quarter 2022.

State and Local Rate Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation in the Form 10-K for a discussion of state and local rate regulation. The following are updates to that discussion.

Retail Rates

2022 Formula Rate Plan Filing

In April 2022, Entergy New Orleans submitted to the City Council its formula rate plan 2021 test year filing. The 2021 test year evaluation report produced an earned return on equity of 6.88% compared to the authorized return on equity of 9.35%. Entergy New Orleans seeks approval of a $40.2 million rate increase based on the formula set by the City Council in the 2018 rate case. The formula results in an increase in authorized electric revenues of $32.3 million and an increase in authorized gas revenues of $3.2 million. Entergy New Orleans also seeks to commence collecting $4.7 million in electric revenues that were previously approved by the City Council for collection through the formula rate plan. The filing is subject to review by the City Council and other parties over a 75-day review period, followed by a 25-day period to resolve any disputes among the parties. Resulting rates will be effective with the first billing cycle of September 2022 pursuant to the formula rate plan tariff. For any disputed rate adjustments, however, the City Council would set a procedural schedule that would extend the process for City Council approval of disputed rate adjustments.

COVID-19 Orders

As discussed in the Form 10-K, in May 2020 the City Council issued an accounting order authorizing Entergy New Orleans to establish a regulatory asset for incremental COVID-19-related expenses. As of March 31, 2022, Entergy New Orleans had a regulatory asset of $14.5 million for costs associated with the COVID-19 pandemic.


119

Table of Contents
Entergy New Orleans, LLC and Subsidiaries
Management's Financial Discussion and Analysis

Reliability Investigation

As discussed in the Form 10-K, in April 2018 the City Council adopted a resolution directing Entergy New Orleans to demonstrate that it has been prudent in the management and maintenance of the reliability of its distribution system. The City Council also approved a resolution that opened a prudence investigation into whether Entergy New Orleans was imprudent for not acting sooner to address outages in New Orleans and whether fines should be imposed. In January 2019, Entergy New Orleans filed testimony in response to the prudence investigation and asserting that it had been prudent in managing system reliability. In April 2019 the City Council advisors filed comments and testimony asserting that Entergy New Orleans did not act prudently in maintaining and improving its distribution system reliability in recent years and recommending that a financial penalty in the range of $1.5 million to $2 million should be assessed.  Entergy New Orleans disagreed with the recommendation and submitted rebuttal testimony and rebuttal comments in June 2019. In November 2019 the City Council passed a resolution that penalized Entergy New Orleans $1 million for alleged imprudence in the maintenance of its distribution system. In December 2019, Entergy New Orleans filed suit in Louisiana state court seeking judicial review of the City Council’s resolution. In March 2022 the Civil District Court approved a scheduling order with briefing through May 2022 and oral argument in June 2022.

System Resiliency and Storm Hardening

As discussed in the Form 10-K, in October 2021 the City Council passed a resolution and order establishing a docket and procedural schedule with respect to system resiliency and storm hardening. The docket will identify a plan for storm hardening and resiliency projects with other stakeholders. In March 2022 the City Council granted Entergy New Orleans’s request for an extension of time to file a response until July 2022.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation in the Form 10-K for a discussion of federal regulation. 

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for further discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy New Orleans’s accounting for utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.


120

Table of Contents

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$154,646 $139,148 
Natural gas43,626 30,187 
TOTAL198,272 169,335 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale43,397 19,012 
Purchased power56,470 68,670 
Other operation and maintenance33,652 38,178 
Taxes other than income taxes13,989 12,556 
Depreciation and amortization19,815 18,161 
Other regulatory charges (credits) - net4,185 3,130 
TOTAL171,508 159,707 
OPERATING INCOME26,764 9,628 
OTHER INCOME (DEDUCTIONS)
Allowance for equity funds used during construction369 258 
Interest and investment income24 
Miscellaneous - net(271)(302)
TOTAL122 (35)
INTEREST EXPENSE
Interest expense8,694 7,029 
Allowance for borrowed funds used during construction(199)(116)
TOTAL8,495 6,913 
INCOME BEFORE INCOME TAXES18,391 2,680 
Income taxes3,265 909 
NET INCOME$15,126 $1,771 
See Notes to Financial Statements.


121

Table of Contents




























(Page left blank intentionally)

122

Table of Contents
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$15,126 $1,771 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
Depreciation and amortization19,815 18,161 
Deferred income taxes, investment tax credits, and non-current taxes accrued9,558 4,572 
Changes in assets and liabilities:
Receivables39,328 (1,975)
Fuel inventory446 2,234 
Accounts payable(14,168)(27,777)
Taxes accrued(2,803)13 
Interest accrued(613)(3,203)
Deferred fuel costs(9,959)(4,886)
Other working capital accounts(10,876)(11,103)
Provisions for estimated losses6,224 (40,680)
Other regulatory assets25,499 28,879 
Other regulatory liabilities(16,667)8,728 
Pension and other postretirement liabilities(2,782)(4,397)
Other assets and liabilities(16,317)15,549 
Net cash flow provided by (used in) operating activities41,811 (14,114)
INVESTING ACTIVITIES
Construction expenditures(68,959)(26,165)
Allowance for equity funds used during construction369 258 
Changes in money pool receivable - net18,288 — 
Receipts from storm reserve escrow account— 44,200 
Payments to storm reserve escrow account— (3)
Changes in securitization account(3,099)(3,415)
Net cash flow provided by (used in) investing activities(53,401)14,875 
FINANCING ACTIVITIES
Changes in money pool payable - net— 15,039 
Other(107)(214)
Net cash flow provided by (used in) financing activities(107)14,825 
Net increase (decrease) in cash and cash equivalents(11,697)15,586 
Cash and cash equivalents at beginning of period42,862 26 
Cash and cash equivalents at end of period$31,165 $15,612 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$8,957 $9,921 
See Notes to Financial Statements.

123

Table of Contents
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$26 $26 
Temporary cash investments31,139 42,836 
Total cash and cash equivalents31,165 42,862 
Securitization recovery trust account5,098 1,999 
Accounts receivable: 
Customer61,442 69,902 
Allowance for doubtful accounts(7,702)(13,282)
Associated companies21,557 74,146 
Other12,590 13,668 
Accrued unbilled revenues24,481 25,550 
Total accounts receivable112,368 169,984 
Deferred fuel costs2,352 — 
Fuel inventory - at average cost2,499 2,945 
Materials and supplies - at average cost20,610 19,216 
Prepayments and other15,621 5,428 
TOTAL189,713 242,434 
OTHER PROPERTY AND INVESTMENTS
Non-utility property at cost (less accumulated depreciation)1,016 1,016 
TOTAL1,016 1,016 
UTILITY PLANT
Electric1,964,963 1,976,202 
Natural gas377,826 373,983 
Construction work in progress23,047 22,199 
TOTAL UTILITY PLANT2,365,836 2,372,384 
Less - accumulated depreciation and amortization785,381 774,309 
UTILITY PLANT - NET1,580,455 1,598,075 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Deferred fuel costs4,080 4,080 
Other regulatory assets (includes securitization property of $22,924 as of March 31, 2022 and $25,761 as of December 31, 2021)
223,118 248,617 
Other60,565 56,101 
TOTAL287,763 308,798 
TOTAL ASSETS$2,058,947 $2,150,323 
See Notes to Financial Statements.

124

Table of Contents
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Payable due to associated company$1,326 $1,326 
Accounts payable:
Associated companies41,135 45,057 
Other59,501 146,921 
Customer deposits29,470 28,539 
Taxes accrued1,582 4,385 
Interest accrued7,378 7,991 
Deferred fuel costs— 7,607 
Current portion of unprotected excess accumulated deferred income taxes— 1,906 
Other6,019 6,204 
TOTAL146,411 249,936 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued375,056 365,384 
Accumulated deferred investment tax credits16,297 16,306 
Regulatory liability for income taxes - net39,208 40,589 
Asset retirement cost liabilities— 4,032 
Accumulated provisions12,553 6,329 
Long-term debt (includes securitization bonds of $29,721 as of March 31, 2022 and $29,661 as of December 31, 2021)
777,590 777,254 
Long-term payable due to associated company9,585 9,585 
Other28,406 42,193 
TOTAL1,258,695 1,261,672 
Commitments and Contingencies
EQUITY
Member's equity653,841 638,715 
TOTAL653,841 638,715 
TOTAL LIABILITIES AND EQUITY$2,058,947 $2,150,323 
See Notes to Financial Statements.

125

Table of Contents
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN MEMBER'S EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
  
 Member's Equity
 (In Thousands)
Balance at December 31, 2020$606,917 
Net income1,771 
Balance at March 31, 2021$608,688 
Balance at December 31, 2021$638,715 
Net income15,126 
Balance at March 31, 2022$653,841 
See Notes to Financial Statements. 


126

Table of Contents

ENTERGY TEXAS, INC. AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Net income remained relatively unchanged, increasing $0.3 million, primarily due to higher retail electric price, partially offset by higher other operation and maintenance expenses and higher depreciation and amortization expenses.

Operating Revenues

Following is an analysis of the change in operating revenues comparing the first quarter 2022 to the first quarter 2021:
Amount
(In Millions)
2021 operating revenues$480.2 
Fuel, rider, and other revenues that do not significantly affect net income(28.3)
Volume/weather0.1 
Retail electric price20.5 
2022 operating revenues$472.5 

Entergy Texas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is insignificant and primarily due to an increase in industrial usage, an increase in weather-adjusted commercial usage, and the effect of more favorable weather on residential and commercial sales. The increase in industrial usage was primarily due to an increase in demand from cogeneration and mid-to-small customers and an increase in demand from expansion projects, primarily in the transportation and chemicals industries. The increase in commercial usage was primarily due to an increase in customers and the effect of the COVID-19 pandemic on businesses in first quarter 2021. The increased usage from these industrial and commercial customers has a relatively smaller effect on operating revenues because a larger portion of the revenues from those customers comes from fixed charges.

The retail electric price variance is primarily due to:

increases in the transmission cost recovery factor rider effective March 2021 and March 2022;
an increase in the distribution cost recovery factor rider effective January 2022; and
an increase in the generation cost recovery rider effective January 2022.

See Note 2 to the financial statements herein and in the Form 10-K for further discussion of the generation cost recovery rider and transmission and distribution cost recovery factor rider filings.

127

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis
Total electric energy sales for Entergy Texas for the three months ended March 31, 2022 and 2021 are as follows:
2022
2021
% Change
(GWh)
Residential1,460 1,394 
Commercial1,059 1,004 
Industrial2,264 1,963 15 
Governmental64 62 
  Total retail 4,847 4,423 10 
Sales for resale:
  Associated companies190 296 (36)
  Non-associated companies144 341 (58)
Total5,181 5,060 

See Note 13 to the financial statements herein for additional discussion of Entergy Texas’s operating revenues.

Other Income Statement Variances

Other operation and maintenance expenses increased primarily due to:

an increase of $7.7 million in non-nuclear generation expenses primarily due to higher expenses associated with the Hardin County Peaking Facility, which was purchased in June 2021, and the Montgomery County Power Station and a higher scope of work performed during outages in 2022 as compared to the same period in 2021;
an increase of $1.7 million in distribution operations expenses primarily due to higher contractor costs, higher vegetation maintenance costs, and higher safety and training costs; and
several individually insignificant items.

The increase was partially offset by a decrease of $1.1 million in meter reading expenses as a result of the deployment of advanced metering systems.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Income Taxes

The effective income tax rates were 9.3% for the first quarter 2022 and 9.1% for the first quarter 2021. The differences in the effective income tax rates for the first quarter 2022 and the first quarter 2021 versus the federal statutory rate of 21% were primarily due to the amortization of excess accumulated deferred income taxes and certain book and tax differences related to utility plant items. See Note 10 to the financial statements herein and Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the effects and regulatory activity regarding the Tax Cuts and Jobs Act.


128

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis
Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Cash and cash equivalents at beginning of period$28 $248,596 
Net cash provided by (used in):
Operating activities82,338 (28,864)
Investing activities(144,536)(223,696)
Financing activities62,196 3,989 
Net decrease in cash and cash equivalents(2)(248,571)
Cash and cash equivalents at end of period$26 $25 

Operating Activities

Entergy Texas’s operating activities provided $82.3 million of cash for the three months ended March 31, 2022 compared to using $28.9 million of cash for the three months ended March 31, 2021 primarily due to the following activity:

the timing of recovery of fuel and purchased power costs, including increased fuel costs in 2021 as a result of Winter Storm Uri. See Note 2 to the financial statements in the Form 10-K for a discussion of fuel and purchased power cost recovery;
the timing of payments to vendors; and
higher collections from customers.

Investing Activities

Net cash flow used in investing activities decreased $79.2 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

a decrease of $49 million in distribution construction expenditures primarily due to lower capital expenditures for storm restoration in 2022 and lower spending on advanced metering infrastructure. The decrease in storm restoration spending is primarily due to Hurricane Laura restoration efforts in 2021;
a decrease of $21.4 million in transmission construction expenditures primarily due to a lower scope of work on projects performed in 2022 as compared to 2021; and
a decrease of $19.4 million in non-nuclear generation construction expenditures primarily due to a lower scope of work on projects performed in 2022 as compared to 2021.

The decrease was partially offset by cash collateral of $12 million posted in March 2022 to support Entergy Texas’s obligations to MISO.

Financing Activities

Net cash flow provided by financing activities increased $58.2 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to money pool activity.


129

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis
Increases in Entergy Texas’s payable to the money pool are a source of cash flow, and Entergy Texas’s payable to the money pool increased by $91.8 million for the three months ended March 31, 2022 compared to increasing by $30.9 million for the three months ended March 31, 2021. The money pool is an inter-company borrowing arrangement designed to reduce the Utility subsidiaries’ need for external short-term borrowings.

Capital Structure

Entergy Texas’s debt to capital ratio is shown in the following table.
March 31,
2022
December 31,
2021
Debt to capital47.9 %48.7 %
Effect of excluding the securitization bonds(0.2 %)(0.5 %)
Debt to capital, excluding securitization bonds (a)47.7 %48.2 %
Effect of subtracting cash— %— %
Net debt to net capital, excluding securitization bonds (a)47.7 %48.2 %

(a)Calculation excludes the securitization bonds, which are non-recourse to Entergy Texas.

Net debt consists of debt less cash and cash equivalents.  Debt consists of finance lease obligations and long-term debt, including the currently maturing portion.  Capital consists of debt and equity.  Net capital consists of capital less cash and cash equivalents.  Entergy Texas uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because the securitization bonds are non-recourse to Entergy Texas, as more fully described in Note 5 to the financial statements in the Form 10-K.  Entergy Texas also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because net debt indicates Entergy Texas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Texas’s uses and sources of capital. Following are updates to information provided in the Form 10-K.

Entergy Texas’s receivables from or (payables to) the money pool were as follows:

March 31,
2022
December 31,
2021
March 31,
2021
December 31,
2020
(In Thousands)
($171,393)($79,594)($30,858)$4,601

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Texas has a credit facility in the amount of $150 million scheduled to expire in June 2026.  The credit facility includes fronting commitments for the issuance of letters of credit against $30 million of the borrowing capacity of the facility. As of March 31, 2022, there were no cash borrowings and $1.3 million of letters of credit outstanding under the credit facility.  In addition, Entergy Texas is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of March 31, 2022, $79.6 million in letters of credit were outstanding under Entergy Texas’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

130

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis

Orange County Advanced Power Station

As discussed in the Form 10-K, in September 2021, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Orange County Advanced Power Station, a new 1,215 MW combined-cycle combustion turbine facility to be located in Bridge City, Texas at an initially-estimated expected total cost of $1.2 billion inclusive of the estimated costs of the generation facilities, transmission upgrades, contingency, an allowance for funds used during construction, and necessary regulatory expenses, among others. The project includes combustion turbine technology with dual fuel capability, able to co-fire up to 30% hydrogen by volume upon commercial operation and upgradable to support 100% hydrogen operations in the future. In December 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. In March 2022 certain intervenors filed testimony opposing the hydrogen co-firing component of the proposed project and others filed opposing the project outright. Also in March 2022, PUCT staff filed testimony opposing the hydrogen co-firing component of the proposed project, but otherwise taking no specific position on the merits of the project. The PUCT staff also proposed that the PUCT establish a maximum amount that Entergy Texas may recover in rates attributable to the project. In April 2022, Entergy Texas filed rebuttal testimony addressing and rebutting these various arguments. Also in April 2022 the ALJs with the State Office of Administrative Hearings approved a continuance of the hearing on the merits from April 2022 to June 2022, providing Entergy Texas an opportunity to accelerate the determination and fixing of pricing for the Orange County Advanced Power Station prior to the hearing. A final order by the PUCT is expected in third or fourth quarter of 2022. Entergy Texas also is pursuing environmental permitting that is required prior to the commencement of construction. Subject to receipt of required regulatory approvals, permits, and other conditions, the facility is expected to be in service by May 2026.

Hurricane Laura, Hurricane Delta, and Winter Storm Uri

As discussed in the Form 10-K, in August 2020 and October 2020, Hurricane Laura and Hurricane Delta caused extensive damage to Entergy Texas’s service area. In February 2021, Winter Storm Uri also caused damage to Entergy Texas’s service area. The storms resulted in widespread power outages, significant damage primarily to distribution and transmission infrastructure, and the loss of sales during the power outages. In July 2021, Entergy Texas filed with the PUCT an application for a financing order to approve the securitization of certain system restoration costs, which were approved by the PUCT as eligible for securitization in December 2021. In November 2021 the parties filed an unopposed settlement agreement supporting the issuance of a financing order consistent with Entergy Texas’s application and with minor adjustments to certain upfront and ongoing costs to be incurred to facilitate the issuance and serving of system restoration bonds. In January 2022 the PUCT issued a financing order consistent with the unopposed settlement. As a result of the financing order, in first quarter 2022, Entergy Texas reclassified $153 million from utility plant to other regulatory assets.

In April 2022, Entergy Texas Restoration Funding II, LLC, a company wholly-owned and consolidated by Entergy Texas, issued $290.85 million of senior secured system restoration bonds (securitization bonds). With the proceeds, Entergy Texas Restoration Funding II purchased from Entergy Texas the transition property, which is the right to recover from customers through a system restoration charge amounts sufficient to service the securitization bonds. Entergy Texas began cost recovery through the system restoration charge effective with the first billing cycle of May 2022 and the system restoration charge is expected to remain in place up to 15 years. See Note 4 to the financial statements herein for a discussion of the April 2022 issuance of the securitization bonds.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.


131

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis
Distribution Cost Recovery Factor (DCRF) Rider

As discussed in the Form 10-K, in August 2021, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The proposed rider is designed to collect from Entergy Texas’s retail customers approximately $40.2 million annually, or $13.9 million in incremental annual revenues beyond Entergy Texas’s currently effective DCRF rider based on its capital invested in distribution between September 1, 2020 and June 30, 2021. In September 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. A procedural schedule was established with a hearing scheduled in December 2021. In December 2021 the parties filed an unopposed settlement recommending that Entergy Texas be allowed to collect its full requested DCRF revenue requirement and resolving all issues in the proceeding, including a motion for interim rates to take effect for usage on and after January 24, 2022. Also, in December 2021, the ALJ with the State Office of Administrative Hearings issued an order granting the motion for interim rates, which went into effect in January 2022, admitting evidence, and remanding the proceeding to the PUCT to consider the settlement. In March 2022 the PUCT issued an order approving the settlement.

Generation Cost Recovery Rider

As discussed in the Form 10-K, in October 2020, Entergy Texas filed an application to establish a generation cost recovery rider to begin recovering a return of and on its generation capital investment in the Montgomery County Power Station through August 31, 2020, which was approved by the PUCT on an interim basis in January 2021. In March 2021, Entergy Texas filed to update its generation cost recovery rider to include its generation capital investment in Montgomery County Power Station after August 31, 2020 and an unopposed settlement agreement filed on behalf of the parties by Entergy Texas in October 2021 was approved by the PUCT in January 2022. In February 2022, Entergy Texas filed a relate-back rider to collect over five months an additional approximately $5 million, which is the difference between the interim revenue requirement approved in January 2021 and the revenue requirement approved in January 2022 that reflects Entergy Texas’s full generation capital investment and ownership in Montgomery County Power Station on January 1, 2021, plus carrying costs from January 2021 through January 2022 when the updated revenue requirement took effect. In April 2022, Entergy Texas and PUCT staff filed a joint proposed order that supports approval of Entergy Texas’s as-filed request.

In December 2020, Entergy Texas also filed an application to amend its generation cost recovery rider to reflect its acquisition of the Hardin County Peaking Facility, which closed in June 2021. Because Hardin was to be acquired in the future, the initial generation cost recovery rider rates proposed in the application represented no change from the generation cost recovery rider rates established in Entergy Texas’s previous generation cost recovery rider proceeding. In July 2021 the PUCT issued an order approving the application. In August 2021, Entergy Texas filed an update application to recover its actual investment in the acquisition of the Hardin County Peaking Facility. In September 2021 the PUCT referred the proceeding to the State Office of Administrative Hearings. A procedural schedule was established with a hearing scheduled in April 2022. In January 2022, Entergy Texas filed an update to its application to align the requested revenue requirement with the terms of the generation cost recovery rider settlement approved by the PUCT in January 2022. In March 2022, Entergy Texas filed on behalf of the parties an unopposed motion, which motion was granted by the ALJ with the State Office of Administrative Hearings, to abate the procedural schedule indicating that the parties had reached an agreement in principle. In April 2022, Entergy Texas filed on behalf of the parties a unanimous settlement agreement that would adjust its generation cost recovery rider to recover an annual revenue requirement of approximately $92.8 million, which is $4.5 million in incremental annual revenue above the $88.3 million approved in January 2022, related to Entergy Texas’s actual investment in the acquisition of the Hardin County Peaking Facility.

COVID-19 Orders

As discussed in the Form 10-K, in March 2020 the PUCT authorized electric utilities to record as a regulatory asset expenses resulting from the effects of the COVID-19 pandemic. In future proceedings, the PUCT will consider whether each utility's request for recovery of these regulatory assets is reasonable and necessary, the

132

Table of Contents
Entergy Texas, Inc. and Subsidiaries
Management's Financial Discussion and Analysis
appropriate period of recovery, and any amount of carrying costs thereon. As of March 31, 2022, Entergy Texas had a regulatory asset of $10.4 million for costs associated with the COVID-19 pandemic.

Green Pricing Option Tariffs

In January 2022, Entergy Texas filed an application requesting approval to implement two voluntary renewable option tariffs, Rider Small Volume Renewable Option (Rider SVRO) and Rider Large Volume Renewable Option (Rider LVRO). Both tariffs are voluntary offerings that give customers the ability to match some or all of their monthly electricity usage with renewable energy credits that are purchased by Entergy Texas and retired on the customer’s behalf. Voluntary participation in either Rider SVRO or Rider LVRO and the charges assessed under the respective tariff would be in addition to the charges paid by customers under their otherwise applicable rate schedules and riders. In April 2022, Entergy Texas filed on behalf of the parties an unopposed settlement agreement supporting approval of Entergy Texas’s proposed green pricing option tariffs. As part of the settlement agreement, Entergy Texas agreed to revise the cost allocation between the rate tiers of Rider SVRO and committed to collaborating with and considering the input of customers to develop an asset-backed green tariff program. This matter is awaiting placement on an open meeting agenda for PUCT consideration of the settlement.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation in the Form 10-K for a discussion of federal regulation. 

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for discussion of nuclear matters.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.

133

Table of Contents
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$472,482 $480,220 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale73,920 112,396 
Purchased power161,090 141,362 
Other operation and maintenance74,977 62,955 
Taxes other than income taxes20,449 21,875 
Depreciation and amortization56,061 50,936 
Other regulatory charges (credits) - net13,446 15,840 
TOTAL399,943 405,364 
OPERATING INCOME72,539 74,856 
OTHER INCOME
Allowance for equity funds used during construction2,596 2,445 
Interest and investment income188 224 
Miscellaneous - net307 (423)
TOTAL3,091 2,246 
INTEREST EXPENSE
Interest expense20,912 23,038 
Allowance for borrowed funds used during construction(865)(984)
TOTAL20,047 22,054 
INCOME BEFORE INCOME TAXES55,583 55,048 
Income taxes5,180 4,990 
NET INCOME50,403 50,058 
Preferred dividend requirements518 470 
EARNINGS APPLICABLE TO COMMON STOCK$49,885 $49,588 
See Notes to Financial Statements.




134

Table of Contents
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$50,403 $50,058 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
Depreciation and amortization56,061 50,936 
Deferred income taxes, investment tax credits, and non-current taxes accrued(1,175)(1,522)
Changes in assets and liabilities:
Receivables(1,674)(16,424)
Fuel inventory8,039 3,509 
Accounts payable4,492 (42,511)
Taxes accrued(15,188)(5,123)
Interest accrued(11,195)(10,989)
Deferred fuel costs(8,440)(62,970)
Other working capital accounts4,832 1,118 
Provisions for estimated losses54 (31)
Other regulatory assets(135,079)40,484 
Other regulatory liabilities(11,491)(13,649)
Storm restoration costs approved for securitization recognized as regulatory asset153,383 — 
Pension and other postretirement liabilities(4,146)(5,434)
Other assets and liabilities(6,538)(16,316)
Net cash flow provided by (used in) operating activities82,338 (28,864)
INVESTING ACTIVITIES
Construction expenditures(155,948)(238,903)
Allowance for equity funds used during construction2,596 2,445 
Litigation proceeds from settlement agreement4,134 — 
Change in money pool receivable - net— 4,601 
Changes in securitization account16,631 8,161 
Increase in other investments(11,949)— 
Net cash flow used in investing activities(144,536)(223,696)
FINANCING ACTIVITIES
Retirement of long-term debt(29,064)(27,951)
Changes in money pool payable - net91,799 30,858 
Preferred stock dividends paid(505)(470)
Other(34)1,552 
Net cash flow provided by financing activities62,196 3,989 
Net decrease in cash and cash equivalents(2)(248,571)
Cash and cash equivalents at beginning of period28 248,596 
Cash and cash equivalents at end of period$26 $25 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$31,513 $33,394 
Income taxes($1,913)($836)
See Notes to Financial Statements.

135

Table of Contents
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents$26 $28 
Securitization recovery trust account9,998 26,629 
Accounts receivable:
Customer88,964 83,797 
Allowance for doubtful accounts(2,783)(5,814)
Associated companies15,868 31,720 
Other23,315 13,404 
Accrued unbilled revenues61,658 62,241 
Total accounts receivable187,022 185,348 
Deferred fuel costs56,720 48,280 
Fuel inventory - at average cost34,673 42,712 
Materials and supplies - at average cost73,415 72,884 
Prepayments and other23,902 17,515 
TOTAL385,756 393,396 
OTHER PROPERTY AND INVESTMENTS
Investments in affiliates - at equity287 300 
Non-utility property - at cost (less accumulated depreciation)376 376 
Other17,730 18,128 
TOTAL18,393 18,804 
UTILITY PLANT
Electric7,071,317 7,181,567 
Construction work in progress207,167 183,965 
TOTAL UTILITY PLANT7,278,484 7,365,532 
Less - accumulated depreciation and amortization2,053,212 2,049,750 
UTILITY PLANT - NET5,225,272 5,315,782 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $11,221 as of March 31, 2022 and $23,818 as of December 31, 2021)
556,412 421,333 
Other119,734 112,096 
TOTAL676,146 533,429 
TOTAL ASSETS$6,305,567 $6,261,411 
See Notes to Financial Statements.  

136

Table of Contents
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Accounts payable:
Associated companies$225,441 $142,929 
Other140,760 164,981 
Customer deposits37,535 37,271 
Taxes accrued33,830 49,018 
Interest accrued7,807 19,002 
Current portion of unprotected excess accumulated deferred income taxes20,059 27,188 
Other15,797 16,120 
TOTAL481,229 456,509 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued695,150 692,496 
Accumulated deferred investment tax credits9,172 9,325 
Regulatory liability for income taxes - net137,959 144,145 
Other regulatory liabilities38,884 37,060 
Asset retirement cost liabilities8,638 8,520 
Accumulated provisions8,296 8,242 
Long-term debt (includes securitization bonds of $24,953 as of March 31, 2022 and $53,979 as of December 31, 2021)
2,325,371 2,354,148 
Other67,777 67,760 
TOTAL3,291,247 3,321,696 
Commitments and Contingencies
EQUITY
Common stock, no par value, authorized 200,000,000 shares; issued and outstanding 46,525,000 shares in 2022 and 2021
49,452 49,452 
Paid-in capital1,050,125 1,050,125 
Retained earnings1,394,764 1,344,879 
Total common shareholder's equity2,494,341 2,444,456 
Preferred stock without sinking fund38,750 38,750 
TOTAL2,533,091 2,483,206 
TOTAL LIABILITIES AND EQUITY$6,305,567 $6,261,411 
See Notes to Financial Statements.

137

Table of Contents
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
Common Equity
Preferred StockCommon
Stock
Paid-in
Capital
Retained
Earnings
Total
(In Thousands)
Balance at December 31, 2020$35,000 $49,452 $955,162 $1,117,964 $2,157,578 
Net income— — — 50,058 50,058 
Preferred stock dividends— — — (470)(470)
Balance at March 31, 2021$35,000 $49,452 $955,162 $1,167,552 $2,207,166 
Balance at December 31, 2021$38,750 $49,452 $1,050,125 $1,344,879 $2,483,206 
Net income— — — 50,403 50,403 
Preferred stock dividends— — — (518)(518)
Balance at March 31, 2022$38,750 $49,452 $1,050,125 $1,394,764 $2,533,091 
See Notes to Financial Statements.

138

Table of Contents

SYSTEM ENERGY RESOURCES, INC.

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

System Energy’s principal asset currently consists of an ownership interest and a leasehold interest in Grand Gulf.  The capacity and energy from its 90% interest is sold under the Unit Power Sales Agreement to its only four customers, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.  System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% interest in Grand Gulf pursuant to the Unit Power Sales Agreement.  Payments under the Unit Power Sales Agreement are System Energy’s only source of operating revenues. As discussed in “Complaints Against System Energy” below, System Energy is currently involved in proceedings at the FERC commenced by the retail regulators of its customers regarding its return on equity, its capital structure, its renewal of the sale-leaseback of 11.5% of Grand Gulf, the treatment of uncertain tax positions in rate base, the prudence of its operation of Grand Gulf, and the rates it charges under the Unit Power Sales Agreement.

Results of Operations

Net Income

Net income increased $7.6 million primarily due to the increase in operating revenues resulting from changes in rate base.

Income Taxes

The effective income tax rate was 23.2% for the first quarter 2022. The difference in the effective income tax rate for the first quarter 2022 versus the federal statutory rate of 21% was primarily due to state income taxes, partially offset by book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rate was (79.5%) for the first quarter 2021. The difference in the effective income tax rate for the first quarter 2021 versus the federal statutory rate of 21% was primarily due to the amortization of excess accumulated deferred income taxes, certain book and tax differences related to utility plant items, the amortization of investment tax credits, and book and tax differences related to the allowance for equity funds used during construction, partially offset by state income taxes. See Note 10 to the financial statements herein and Notes 2 and 3 to the financial statements in the Form 10-K for a discussion of the effects and regulatory activity regarding the Tax Cuts and Jobs Act.


139

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
Liquidity and Capital Resources

Cash Flow

Cash flows for the three months ended March 31, 2022 and 2021 were as follows:
20222021
(In Thousands)
Cash and cash equivalents at beginning of period$89,201 $242,469 
Net cash provided by (used in):
Operating activities40,011 (29,242)
Investing activities(94,802)(23,437)
Financing activities63,845 (57,563)
Net increase (decrease) in cash and cash equivalents9,054 (110,242)
Cash and cash equivalents at end of period$98,255 $132,227 

Operating Activities

System Energy’s operating activities provided $40 million of cash for the three months ended March 31, 2022 compared to using $29.2 million of cash for the three months ended March 31, 2021 primarily due to income tax payments of $39.1 million in 2021 and timing of payments to vendors, partially offset by an increase in spending of $12.7 million on nuclear refueling outages in 2022 as compared to the same period in 2021 and timing of collections of receivables. System Energy had income tax payments in 2021 as a result of the amended Mississippi tax returns filed based on federal adjustments related to the resolution of the 2014-2015 IRS audit, as well as a portion of the payments made in accordance with an intercompany income tax allocation agreement. See Note 3 to the financial statements in the Form 10-K for discussion of the 2014-2015 IRS audit.

Investing Activities

Net cash flow used in investing activities increased $71.4 million for the three months ended March 31, 2022 compared to the three months ended March 31, 2021 primarily due to:

an increase of $71.9 million as a result of fluctuations in nuclear fuel activity because of variations from year to year in the timing and pricing of fuel reload requirements in the Utility business, material and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and
an increase of $31.3 million in nuclear construction expenditures due to increased spending on various nuclear projects in 2022.

The increase was offset by money pool activity.

Decreases in System Energy’s receivable from the money pool are a source of cash flow and System Energy’s receivable from the money pool decreased by $18.6 million for the three months ended March 31, 2022 compared to increasing by $12.7 million for the three months ended March 31, 2021. The money pool is an inter-company borrowing arrangement designed to reduce the Utility subsidiaries’ need for external short-term borrowings.


140

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
Financing Activities

System Energy’s financing activities provided $63.8 million of cash for the three months ended March 31, 2022 compared to using $57.6 million of cash for the three months ended March 31, 2021 primarily due to:

the repayment in February 2021 of $100 million of 3.42% Series J notes by the System Energy nuclear fuel company variable interest entity; and
a decrease of $21 million in common stock dividends and distributions. No common stock dividends or distributions were made in 2022 in order to maintain System Energy’s capital structure.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

System Energy’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio is primarily due to the net repayment of long-term debt in 2021.

 March 31,
2022
December 31,
2021
Debt to capital41.8 %40.4 %
Effect of subtracting cash(3.2 %)(3.0 %)
Net debt to net capital38.6 %37.4 %

Net debt consists of debt less cash and cash equivalents.  Debt consists of short-term borrowings and long-term debt, including the currently maturing portion.  Capital consists of debt and common equity.  Net capital consists of capital less cash and cash equivalents.  System Energy uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition.  System Energy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition because net debt indicates System Energy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of System Energy’s uses and sources of capital. Following are updates to the information provided in the Form 10-K.

System Energy’s receivables from the money pool were as follows:
March 31,
2022
December 31,
2021
March 31,
2021
December 31, 2020
(In Thousands)
$57,139$75,745$16,682$4,004

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

The System Energy nuclear fuel company variable interest entity has a credit facility in the amount of $120 million scheduled to expire in June 2024. As of March 31, 2022, $100 million in loans were outstanding under the

141

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
System Energy nuclear fuel company variable interest entity credit facility. See Note 4 to the financial statements herein for additional discussion of the variable interest entity credit facility.

Federal Regulation

See the “Rate, Cost-recovery, and Other Regulation - Federal Regulation” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Complaints Against System Energy

Return on Equity and Capital Structure Complaints

As discussed in the Form 10-K, in March 2021 the FERC ALJ issued an initial decision in the proceeding against System Energy regarding the return on equity component of the Unit Power Sales Agreement. With regard to System Energy’s authorized return on equity, the ALJ determined that the existing return on equity of 10.94% is no longer just and reasonable, and that the replacement authorized return on equity, based on application of the Opinion No. 569-A methodology, should be 9.32%. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (January 2017-April 2018) based on the difference between the current return on equity and the replacement authorized return on equity. The ALJ determined that the April 2018 complaint concerning the authorized return on equity should be dismissed, and that no refunds for a second fifteen-month refund period should be due. With regard to System Energy’s capital structure, the ALJ determined that System Energy’s actual equity ratio is excessive and that the just and reasonable equity ratio is 48.15% equity, based on the average equity ratio of the proxy group used to evaluate the return on equity for the second complaint. The ALJ further determined that System Energy should pay refunds for a fifteen-month refund period (September 2018-December 2019) based on the difference between the actual equity ratio and the 48.15% equity ratio. If the ALJ’s initial decision is upheld, the estimated refund for this proceeding is approximately $61 million, which includes interest through March 31, 2022, and the estimated resulting annual rate reduction would be approximately $45 million. The estimated refund will continue to accrue interest until a final FERC decision is issued. Based on the course of the proceeding to date, System Energy has recorded a provision of $38 million, including interest, as of March 31, 2022.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. In April 2021, System Energy filed its brief on exceptions, in which it challenged the initial decision’s findings on both the return on equity and capital structure issues. Also in April 2021 the LPSC, APSC, MPSC, City Council, and the FERC trial staff filed briefs on exceptions. Reply briefs opposing exceptions were filed in May 2021 by System Energy, the FERC trial staff, the LPSC, APSC, MPSC, and the City Council. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

As discussed in the Form 10-K, in May 2018 the LPSC filed a complaint against System Energy and Entergy Services related to System Energy’s renewal of a sale-leaseback transaction originally entered into in December 1988 for an 11.5% undivided interest in Grand Gulf Unit 1. A hearing was held before a FERC ALJ in November 2019. In April 2020 the ALJ issued the initial decision. Among other things, the ALJ determined that refunds were due on three main issues. First, with regard to the lease renewal payments, the ALJ determined that System Energy is recovering an unjust acquisition premium through the lease renewal payments, and that System Energy’s recovery from customers through rates should be limited to the cost of service based on the remaining net book value of the leased assets, which is approximately $70 million. The ALJ found that the remedy for this issue should be the refund of lease payments (approximately $17.2 million per year since July 2015) with interest determined at the FERC quarterly interest rate, which would be offset by the addition of the net book value of the

142

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
leased assets in the cost of service. The ALJ did not calculate a value for the refund expected as a result of this remedy. In addition, System Energy would no longer recover the lease payments in rates prospectively. Second, with regard to the liabilities associated with uncertain tax positions, the ALJ determined that the liabilities are accumulated deferred income taxes and that System Energy’s rate base should have been reduced for those liabilities. If the ALJ’s initial decision is upheld, the estimated refund for this issue through March 31, 2022, is approximately $422 million, plus interest, which is approximately $135 million through March 31, 2022. The ALJ also found that System Energy should include liabilities associated with uncertain tax positions as a rate base reduction going forward. Third, with regard to the depreciation expense adjustments, the ALJ found that System Energy should correct for the error in re-billings retroactively and prospectively, but that System Energy should not be permitted to recover interest on any retroactive return on enhanced rate base resulting from such corrections. If the initial decision is affirmed on this issue, System Energy estimates refunds of approximately $19 million, which includes interest through March 31, 2022.

The ALJ initial decision is an interim step in the FERC litigation process, and an ALJ’s determinations made in an initial decision are not controlling on the FERC. The ALJ in the initial decision acknowledges that these are issues of first impression before the FERC. The case is pending before the FERC, which will review the case and issue an order on the proceeding, and the FERC may accept, reject, or modify the ALJ’s initial decision in whole or in part. Refunds, if any, that might be required will only become due after the FERC issues its order reviewing the initial decision.

LPSC Authorization of Additional Complaints

As discussed in the Form 10-K, in May 2020 the LPSC authorized its staff to file additional complaints at the FERC related to the rates charged by System Energy for Grand Gulf energy and capacity supplied to Entergy Louisiana under the Unit Power Sales Agreement.

Unit Power Sales Agreement Complaint

The first of the additional complaints was filed by the LPSC, the APSC, the MPSC and the City Council in September 2020. The first complaint raises two sets of rate allegations: violations of the filed rate and a corresponding request for refunds for prior periods; and elements of the Unit Power Sales Agreement are unjust and unreasonable and a corresponding request for refunds for the 15-month refund period and changes to the Unit Power Sales Agreement prospectively. In May 2021 the FERC issued an order addressing the complaint, establishing a refund effective date of September 21, 2020, establishing hearing procedures, and holding those procedures in abeyance pending the FERC’s review of the initial decision in the Grand Gulf sale-leaseback renewal complaint discussed above. System Energy agreed that the hearing should be held in abeyance but sought rehearing of the FERC’s decision as related to matters set for hearing that were beyond the scope of the FERC’s jurisdiction or authority. The complainants sought rehearing of the FERC’s decision to hold the hearing in abeyance and filed a motion to proceed, which motion System Energy subsequently opposed. In June 2021, System Energy’s request for rehearing was denied by operation of law, and System Energy filed an appeal of the FERC’s orders in the Court of Appeals for the Fifth Circuit. The appeal was initially stayed for a period of 90 days, but the stay expired. In November 2021 the Fifth Circuit dismissed the appeal as premature.

In November 2021 the LPSC, APSC, and City Council filed direct testimony and requested the FERC to order refunds for prior periods and prospective amendments to the Unit Power Sales Agreement. The LPSC’s refund claims include, among other things, allegations that: (1) System Energy should not have included certain sale-leaseback transaction costs in prepayments; (2) System Energy should have credited rate base to reflect the time value of money associated with the advance collection of lease payments; (3) System Energy incorrectly included refueling outage costs that were recorded in account 174 in rate base; and (4) System Energy should have excluded several accumulated deferred income tax balances in account 190 from rate base. The LPSC is also seeking a retroactive adjustment to retained earnings and capital structure in conjunction with the implementation of

143

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
its proposed refunds. In addition, the LPSC seeks amendments to the Unit Power Sales Agreement going forward to address below-the-line costs, incentive compensation, the working capital allowance, litigation expenses, and the 2019 termination of the capital funds agreement. The APSC argues that: (1) System Energy should have included borrowings from the Entergy System money pool in its determination of short-term debt in its cost of capital; and (2) System Energy should credit customers with System Energy’s allocation of earnings on money pool investments. The City Council alleges that System Energy has maintained excess cash on hand in the money pool and that retention of excess cash was imprudent. Based on this allegation, the City Council’s witness recommends a refund of approximately $98.8 million for the period 2004-September 2021 or other alternative relief. The City Council further recommends that the FERC impose a hypothetical equity ratio such as 48.15% equity to capital on a prospective basis.

In January 2022, System Energy filed answering testimony arguing that the FERC should not order refunds for prior periods or any prospective amendments to the Unit Power Sales Agreement. In response to the LPSC’s refund claims, System Energy argues, among other things, that (1) the inclusion of sale-leaseback transaction costs in prepayments was correct; (2) the filed rate doctrine bars the request for a retroactive credit to rate base for the time value of money associated with the advance collection of lease payments; (3) an accounting misclassification for deferred refueling outage costs has been corrected, caused no harm to customers, and requires no refunds; and (4) its accounting and ratemaking treatment of specified accumulated deferred income tax balances in account 190 has been correct. System Energy further responds that no retroactive adjustment to retained earnings or capital structure should be ordered because there is no general policy requiring such a remedy and there was no showing that the retained earnings element of the capital structure was incorrectly implemented. Further, System Energy presented evidence that all of the costs that are being challenged were long known to the retail regulators and were approved by them for inclusion in retail rates, and the attempt to retroactively challenge these costs, some of which have been included in rates for decades, is unjust and unreasonable. In response to the LPSC’s proposed going-forward adjustments, System Energy presents evidence to show that none of the proposed adjustments are needed. On the issue of below-the-line expenses, during discovery procedures, System Energy identified a historical allocation error in certain months and agreed to provide a bill credit to customers to correct the error. In response to the APSC’s claims, System Energy argues that the Unit Power Sales Agreement does not include System Energy’s borrowings from the Entergy System money pool or earnings on deposits to the Entergy System money pool in the determination of the cost of capital; and accordingly, no refunds are appropriate on those issues. In response to the City Council’s claims, System Energy argues that it has reasonably managed its cash and that the City Council’s theory of cash management is defective because it fails to adequately consider the relevant cash needs of System Energy and it makes faulty presumptions about the operation of the Entergy System money pool. System Energy further points out that the issue of its capital structure is already subject to pending FERC litigation.

In March 2022 the FERC trial staff filed direct and answering testimony in response to the LPSC, APSC, and City Council’s direct testimony. In its testimony, the FERC trial staff recommends refunds for two primary reasons: (1) it concluded that System Energy should have excluded specified accumulated deferred income tax balances in account 190 associated with rate refunds; and (2) it concluded that System Energy should have excluded specified accumulated deferred income tax balances in account 190 associated with a deemed contract satisfaction and reissuance that occurred in 2005. The FERC trial staff recommends refunds of $84.1 million, exclusive of any tax gross-up or FERC interest. In addition, the FERC trial staff recommends the following prospective modifications to the Unit Power Sales Agreement: (1) inclusion of a rate base credit to recognize the time value of money associated with the advance collection of lease payments; (2) exclusion of executive incentive compensation costs for members of the Office of the Chief Executive and long-term performance unit costs where awards are based solely or primarily on financial metrics; and (3) exclusion of unvested, accrued amounts for stock options, performance units, and restricted stock awards. With respect to issues that ultimately concern the reasonableness of System Energy’s rate of return, the FERC trial staff states that it is unnecessary to consider such issues in this proceeding, in light of the pending case concerning System Energy’s return on equity and capital structure. On all other material issues raised by the LPSC, APSC, and City Council, the FERC trial staff recommends either no refunds or no modification to the Unit Power Sales Agreement.


144

Table of Contents
System Energy Resources, Inc.
Management's Financial Discussion and Analysis
System Energy Formula Rate Annual Protocols Formal Challenge Concerning 2020 Calendar Year Bills

System Energy’s Unit Power Sales Agreement includes formula rate protocols that provide for the disclosure of cost inputs, an opportunity for informal discovery procedures, and a challenge process. In February 2022, pursuant to the protocols procedures, the LPSC, the APSC, the MPSC, the City Council, and the Mississippi Public Utilities Staff filed with the FERC a formal challenge to System Energy’s implementation of the formula rate during calendar year 2020. The formal challenge alleges: (1) that it was imprudent for System Energy to accept the IRS’s partial acceptance of a previously uncertain tax position; (2) that System Energy should have delayed recording the result of the IRS’s partial acceptance of the previously uncertain tax position until after internal tax allocation payments were made; (3) that the equity ratio charged in rates was excessive; (4) that sale-leaseback rental payments should have been excluded from rates; and (5) that all issues in the ongoing Unit Power Sales Agreement Complaint proceeding should also be reflected in calendar year 2020 bills. While System Energy disagrees that any refunds are owed for the 2020 calendar year bills, the formal challenge estimates that the financial impact of the first through fourth allegations is approximately $53 million; it does not provide an estimate of the financial impact of the fifth allegation.

In March 2022, System Energy filed an answer to the formal challenge in which it requested that the FERC deny the formal challenge as a matter of law, or else hold the proceeding in abeyance pending the resolution of related dockets.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in System Energy’s accounting for nuclear decommissioning costs, utility regulatory accounting, impairment of long-lived assets, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements.

145

Table of Contents
SYSTEM ENERGY RESOURCES, INC.
INCOME STATEMENTS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING REVENUES
Electric$141,376 $117,746 
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale7,923 16,859 
Nuclear refueling outage expenses5,927 6,718 
Other operation and maintenance43,904 41,960 
Decommissioning9,917 9,529 
Taxes other than income taxes7,851 6,825 
Depreciation and amortization29,923 28,194 
Other regulatory charges (credits) - net(8,524)11,550 
TOTAL96,921 121,635 
OPERATING INCOME (LOSS)44,455 (3,889)
OTHER INCOME
Allowance for equity funds used during construction2,047 1,111 
Interest and investment income5,232 27,442 
Miscellaneous - net(1,639)(2,024)
TOTAL5,640 26,529 
INTEREST EXPENSE
Interest expense9,481 9,535 
Allowance for borrowed funds used during construction(327)(188)
TOTAL9,154 9,347 
INCOME BEFORE INCOME TAXES40,941 13,293 
Income taxes9,509 (10,571)
NET INCOME$31,432 $23,864 
See Notes to Financial Statements.


146

Table of Contents
SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF CASH FLOWS
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
20222021
(In Thousands)
OPERATING ACTIVITIES
Net income$31,432 $23,864 
Adjustments to reconcile net income to net cash flow provided by (used in) operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization46,566 53,433 
Deferred income taxes, investment tax credits, and non-current taxes accrued(8,690)(10,197)
Changes in assets and liabilities:
Receivables(3,845)9,255 
Accounts payable(15,017)(21,296)
Taxes accrued5,939 (33,364)
Interest accrued(475)(1,088)
Other working capital accounts(20,646)2,347 
Other regulatory assets(2,331)20,923 
Other regulatory liabilities(85,655)(12,591)
Pension and other postretirement liabilities(4,542)(7,424)
Other assets and liabilities97,275 (53,104)
Net cash flow provided by (used in) operating activities40,011 (29,242)
INVESTING ACTIVITIES
Construction expenditures(46,509)(14,890)
Allowance for equity funds used during construction2,047 1,111 
Nuclear fuel purchases(75,251)(4,745)
Proceeds from the sale of nuclear fuel11,257 12,626 
Proceeds from nuclear decommissioning trust fund sales62,717 211,481 
Investment in nuclear decommissioning trust funds(67,669)(216,342)
Changes in money pool receivable - net18,606 (12,678)
Net cash flow used in investing activities(94,802)(23,437)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt225,956 189,244 
Retirement of long-term debt(162,111)(225,807)
Common stock dividends and distributions paid— (21,000)
Net cash flow provided by (used in) financing activities63,845 (57,563)
Net increase (decrease) in cash and cash equivalents9,054 (110,242)
Cash and cash equivalents at beginning of period89,201 242,469 
Cash and cash equivalents at end of period$98,255 $132,227 
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$9,749 $10,720 
Income taxes$— $39,085 
See Notes to Financial Statements.

147

Table of Contents
SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
ASSETS
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$72 $87 
Temporary cash investments98,183 89,114 
Total cash and cash equivalents98,255 89,201 
Accounts receivable:
Associated companies102,258 118,977 
Other8,961 7,003 
Total accounts receivable111,219 125,980 
Materials and supplies - at average cost124,639 127,093 
Deferred nuclear refueling outage costs32,250 10,123 
Prepayments and other2,843 1,870 
TOTAL369,206 354,267 
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,308,172 1,385,254 
TOTAL1,308,172 1,385,254 
UTILITY PLANT
Electric5,357,646 5,362,494 
Construction work in progress149,025 97,968 
Nuclear fuel210,446 171,438 
TOTAL UTILITY PLANT5,717,117 5,631,900 
Less - accumulated depreciation and amortization3,414,249 3,396,136 
UTILITY PLANT - NET2,302,868 2,235,764 
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets397,877 395,546 
Other1,728 1,793 
TOTAL399,605 397,339 
TOTAL ASSETS$4,379,851 $4,372,624 
See Notes to Financial Statements.

148

Table of Contents
SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
LIABILITIES AND EQUITY
March 31, 2022 and December 31, 2021
(Unaudited)
20222021
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$50,335 $50,329 
Accounts payable:
Associated companies11,736 23,682 
Other70,571 62,573 
Taxes accrued38,857 32,918 
Interest accrued11,239 11,714 
Other4,101 4,101 
TOTAL186,839 185,317 
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued373,447 382,931 
Accumulated deferred investment tax credits42,684 43,003 
Regulatory liability for income taxes - net111,511 113,165 
Other regulatory liabilities660,943 744,944 
Decommissioning1,017,520 1,007,603 
Pension and other postretirement liabilities71,562 76,104 
Long-term debt755,018 690,967 
Other37,535 37,230 
TOTAL3,070,220 3,095,947 
Commitments and Contingencies
COMMON EQUITY
Common stock, no par value, authorized 1,000,000 shares; issued and outstanding 789,350 shares in 2022 and 2021
951,850 951,850 
Retained earnings170,942 139,510 
TOTAL1,122,792 1,091,360 
TOTAL LIABILITIES AND EQUITY$4,379,851 $4,372,624 
See Notes to Financial Statements.

149

Table of Contents
SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF CHANGES IN COMMON EQUITY
For the Three Months Ended March 31, 2022 and 2021
(Unaudited)
Common Equity
Common
Stock
Retained
Earnings
Total
(In Thousands)
Balance at December 31, 2020$951,850 $128,696 $1,080,546 
Net income— 23,864 23,864 
Common stock dividends and distributions— (21,000)(21,000)
Balance at March 31, 2021$951,850 $131,560 $1,083,410 
Balance at December 31, 2021$951,850 $139,510 $1,091,360 
Net income— 31,432 31,432 
Balance at March 31, 2022$951,850 $170,942 $1,122,792 
See Notes to Financial Statements.


150

Table of Contents
ENTERGY CORPORATION AND SUBSIDIARIES
PART II. OTHER INFORMATION

Item 1.  Legal Proceedings

See “PART I, Item 1, Litigation” in the Form 10-K for a discussion of legal, administrative, and other regulatory proceedings affecting Entergy.  Also see Notes 1 and 2 to the financial statements herein and “Item 5, Other Information, Environmental Regulation” below for updates regarding environmental proceedings and regulation.

Item 1A.  Risk Factors

See the risk factors discussed in "Part I, Item 1A. RISK FACTORS" in the Form 10-K, which could materially affect Entergy's and its Registrant Subsidiaries' business, financial condition, or future results. The information set forth in this report, including the risk factor presented below, updates and should be read in conjunction with the risk factors and information disclosed in the Form 10-K.

The completion of capital projects, including the construction of power generation facilities, and other capital improvements involve substantial risks. Should such efforts be unsuccessful, the financial condition, results of operations, or liquidity of Entergy and the Utility operating companies could be materially affected.

Entergy’s and the Utility operating companies’ ability to complete capital projects, including the construction of power generation facilities, or make other capital improvements, in a timely manner and within budget is contingent upon many variables and subject to substantial risks. These variables include, but are not limited to, project management expertise, escalating costs for materials, labor, and environmental compliance, reliance on suppliers for timely and satisfactory performance, and pandemic-related delays and cost increases. Delays in obtaining permits, shortages in materials and qualified labor, levels of public support or opposition, suppliers and contractors not performing as expected or required under their contracts and/or experiencing financial problems that inhibit their ability to fulfill their obligations under contracts, changes in the scope and timing of projects, poor quality initial cost estimates from contractors, the inability to raise capital on favorable terms, changes in commodity prices affecting revenue, fuel costs, or materials costs, downward changes in the economy, changes in law or regulation, including environmental compliance requirements, trade and tariff issues associated with imported solar panels, supply chain delays or disruptions, and other events beyond the control of the Utility operating companies or the Entergy Wholesale Commodities business may occur that may materially affect the schedule, cost, and performance of these projects. If these projects or other capital improvements are significantly delayed or become subject to cost overruns or cancellation, Entergy and the Utility operating companies could incur additional costs and termination payments, or face increased risk of potential write-off of the investment in the project. In addition, the Utility operating companies could be exposed to higher costs and market volatility, which could affect cash flow and cost recovery, should their respective regulators decline to approve the construction of the project or new generation needed to meet the reliability needs of customers at the lowest reasonable cost.

For further information regarding capital expenditure plans and other uses of capital in connection with capital projects, including the potential construction and/or purchase of additional generation supply sources within the Utility operating companies’ service territory, see the “Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital” section of Management’s Financial Discussion and Analysis for Entergy herein and in the Form 10-K and the “Liquidity and Capital Resources - Uses of Capital” section of Management’s Financial Discussion and Analysis in the Form 10-K and the “Liquidity and Capital Resources - Uses and Sources of Capital” section of Management’s Financial Discussion and Analysis herein for each of the Registrant Subsidiaries.


151

Table of Contents
Item 2.  Unregistered Sales of Equity Securities and Use of Proceeds

Issuer Purchases of Equity Securities (a)
PeriodTotal Number of
Shares Purchased
Average Price Paid
per Share
Total Number of
Shares Purchased
as Part of a
Publicly
Announced Plan
Maximum $
Amount
of Shares that May
Yet be Purchased
Under a Plan (b)
1/01/2022-1/31/2022— $— — $350,052,918 
2/01/2022-2/28/2022— $— — $350,052,918 
3/01/2022-3/31/2022— $— — $350,052,918 
Total— $— —  

In accordance with Entergy’s stock-based compensation plans, Entergy periodically grants stock options to key employees, which may be exercised to obtain shares of Entergy’s common stock.  According to the plans, these shares can be newly issued shares, treasury stock, or shares purchased on the open market.  Entergy’s management has been authorized by the Board to repurchase on the open market shares up to an amount sufficient to fund the exercise of grants under the plans.  In addition to this authority, the Board has authorized share repurchase programs to enable opportunistic purchases in response to market conditions. In October 2010 the Board granted authority for a $500 million share repurchase program. The amount of share repurchases under these programs may vary as a result of material changes in business results or capital spending or new investment opportunities.  In addition, in the first quarter 2022, Entergy withheld 79,738 shares of its common stock at $110.35 per share, 77,207 shares of its common stock at $111.16 per share, 35,940 shares of its common stock at $111.77 per share, 1,219 shares of its common stock at $109.01 per share, 577 shares of its common stock at $106.62 per share, 232 shares of its common stock at $110.77 per share, 87 shares of its common stock at $109.01 per share, and 82 shares of its common stock at $111.47 per share to pay income taxes due upon vesting of restricted stock granted and payout of performance units as part of its long-term incentive program.

(a)See Note 12 to the financial statements in the Form 10-K for additional discussion of the stock-based compensation plans.
(b)Maximum amount of shares that may yet be repurchased relates only to the $500 million plan and does not include an estimate of the amount of shares that may be purchased to fund the exercise of grants under the stock-based compensation plans.

Item 5.  Other Information

Regulation of the Nuclear Power Industry

Following is an update to the “Regulation of the Nuclear Power Industry” section of Part I, Item 1 of the Form 10-K.

Nuclear Waste Policy Act of 1982

Nuclear Plant Decommissioning

In March 2022 filings with the NRC were made reporting on decommissioning funding for Palisades and the Big Rock Point dry fuel storage facility. Those reports showed that decommissioning funding for those facilities met the NRC’s financial assurance requirements.


152

Table of Contents
Environmental Regulation

Following are updates to the “Environmental Regulation” section of Part I, Item 1 of the Form 10-K.

National Ambient Air Quality Standards

See the Form 10-K for discussion of the National Ambient Air Quality Standards (NAAQS) set by the EPA in accordance with the Clean Air Act. Following are updates to that discussion.

Hazardous Air Pollutants

The EPA released the final Mercury and Air Toxics Standard (MATS) rule in December 2011, which had a compliance date, with a widely granted one-year extension, of April 2016. The required controls have been installed and are operational at all affected Entergy units. In May 2020 the EPA finalized a rule that finds that it is not “appropriate and necessary” to regulate hazardous air pollutants from electric steam generating units under the provisions of section 112(n) of the Clean Air Act. This is a reversal of the EPA’s previous finding requiring such regulation. The final appropriate and necessary finding does not revise the underlying MATS rule. Several lawsuits have been filed challenging the appropriate and necessary finding. In February 2021 the D.C. Circuit granted the EPA’s motion to hold the litigation in abeyance pending the agency’s review of the appropriate and necessary rule. In February 2022 the EPA issued a proposed rule revoking the 2020 rule and determining, again, that it is “appropriate and necessary” to regulate hazardous air pollutants. The EPA is seeking additional information, which it could use to further tighten the standard. Entergy will continue to monitor this situation.

Cross-State Air Pollution

As discussed in the Form 10-K, the Cross-State Air Pollution Rule (CSAPR) has been remanded to and modified by the EPA on multiple occasions. In April 2022 the EPA published a rule to address interstate transport for the 2015 ozone NAAQS and which will increase the stringency of the CSAPR program in all four of the states where the Utility operating companies operate. If finalized as proposed, the rule will significantly reduce emission allowances and would likely require the installation of post-combustion nitrogen oxides (NOx) emissions controls on any coal or large legacy gas units that will operate beyond 2026 and are not currently equipped with such controls, including certain of Entergy’s plants. Additionally the EPA is proposing controls on certain non-electric generating NOx sources. Since releasing the proposed rule, the price for Group 3 allowances has increased to $8,500 per allowance. Comments on the proposed rule are due in June 2022, and Entergy is currently evaluating the publication.

Regional Haze

As discussed in the Form 10-K, the second planning period (2018-2028) for the regional haze program required states to examine sources for impacts on visibility and to prepare State Implementation Plans (SIPs) by July 31, 2021 which the Arkansas Department of Energy and Environment, Division of Environmental Quality (ADEQ) did not meet. The ADEQ released a draft proposed SIP in February 2022. The ADEQ reviewed Entergy’s Independence plant, but determined that additional air emission controls would not be cost-effective considering the facility’s commitment to cease coal-fired combustion by December 31, 2030. The ADEQ is expected to finalize this SIP and submit to the EPA for review by the end of 2022.

The Texas Commission on Environmental Quality has completed its second-planning period SIP and submitted it to the EPA for review. There were no Entergy sources selected for additional emission controls. The Mississippi Department of Environmental Quality continues to develop its SIP, but there are no Entergy sources that are expected to be impacted.



153

Table of Contents
Item 6.  Exhibits
4(a) -
*31(a) -
*31(b) -
*31(c) -
*31(d) -
*31(e) -
*31(f) -
*31(g) -
*31(h) -
*31(i) -
*31(j) -
*31(k) -
*31(l) -
*31(m) -
*31(n) -
**32(a) -
**32(b) -
**32(c) -
**32(d) -
**32(e) -
**32(f) -
**32(g) -
**32(h) -
**32(i) -
**32(j) -
**32(k) -
**32(l) -
**32(m) -
**32(n) -
*101 INS -
Inline XBRL Instance Document - The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
*101 SCH -
Inline XBRL Schema Document.
*101 PRE -
Inline XBRL Presentation Linkbase Document.
*101 LAB -
Inline XBRL Label Linkbase Document.
*101 CAL -
Inline XBRL Calculation Linkbase Document.
*101 DEF -
Inline XBRL Definition Linkbase Document.

154

Table of Contents
*104 -
Cover Page Interactive Data File (formatted in Inline XBRL and contained in Exhibits 101).
___________________________
Pursuant to Item 601(b)(4)(iii) of Regulation S-K, Entergy Corporation agrees to furnish to the Commission upon request any instrument with respect to long-term debt that is not registered or listed herein as an Exhibit because the total amount of securities authorized under such agreement does not exceed ten percent of the total assets of Entergy Corporation and its subsidiaries on a consolidated basis.
*Filed herewith.
**Furnished, not filed, herewith.

155

Table of Contents
SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, each registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.  The signature for each undersigned company shall be deemed to relate only to matters having reference to such company or its subsidiaries.
ENTERGY CORPORATION
ENTERGY ARKANSAS, LLC
ENTERGY LOUISIANA, LLC
ENTERGY MISSISSIPPI, LLC
ENTERGY NEW ORLEANS, LLC
ENTERGY TEXAS, INC.
SYSTEM ENERGY RESOURCES, INC.
/s/ Kimberly A. Fontan
Kimberly A. Fontan
Senior Vice President and Chief Accounting Officer
(For each Registrant and for each as
Principal Accounting Officer)

Date:    May 5, 2022


156