KBR, INC. - Quarter Report: 2018 June (Form 10-Q)



 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 
 
FORM 10-Q
ý
Quarterly Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934
For the quarterly period ended June 30, 2018
OR
¨
Transition Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 for the transition period from             to
Commission File Number: 1-33146
 
 
 
kbrlogoa32.gif
KBR, Inc.
(Exact name of registrant as specified in its charter)
Delaware
 
20-4536774
(State of incorporation)
 
(I.R.S. Employer Identification No.)
 
 
 
601 Jefferson Street, Suite 3400, Houston, Texas
 
77002
(Address of principal executive offices)
 
(Zip Code)

(713) 753-3011
(Registrant's telephone number including area code)
 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.     Yes  ý    No  ¨

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).     Yes  ý    No  ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company or an emerging growth company. See the definitions of "large accelerated filer," "accelerated filer," "smaller reporting company" and "emerging growth company" in Rule 12b-2 of the Exchange Act.
Large accelerated filer
 
ý
Accelerated filer
 
¨
Non-accelerated filer
 
¨ (Do not check if a smaller reporting company)
Smaller reporting company
 
¨
 
 
 
Emerging growth company
 
¨

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ¨ 

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).     Yes  ¨    No  ý

As of July 12, 2018, there were 140,698,716 shares of KBR, Inc. Common Stock, par value $0.001 per share, outstanding.

 





TABLE OF CONTENTS
 
 
 
 
Page
 
Condensed Consolidated Statements of Operations
Condensed Consolidated Balance Sheets
 



2



Forward-Looking and Cautionary Statements

This Quarterly Report on Form 10-Q contains certain statements that are, or may be deemed to be, "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Exchange Act, as amended. The Private Securities Litigation Reform Act of 1995 provides safe harbor provisions for forward-looking information. Some of the statements contained in this Quarterly Report on Form 10-Q are forward-looking statements. All statements other than statements of historical fact are, or may be deemed to be, forward-looking statements. The words "believe," "may," "estimate," "continue," "anticipate," "intend," "plan," "expect" and similar expressions are intended to identify forward-looking statements. Forward-looking statements include information concerning our possible or assumed future financial performance and results of operations.

We have based these statements on our assumptions and analyses in light of our experience and perception of historical trends, current conditions, expected future developments and other factors we believe are appropriate in the circumstances. Forward-looking statements by their nature involve substantial risks and uncertainties that could significantly affect expected results, and actual future results could differ materially from those described in such statements. While it is not possible to identify all factors, factors that could cause actual future results to differ materially include the risks and uncertainties disclosed in our 2017 Annual Report on Form 10-K contained in Part I under "Risk Factors" and in this Quarterly Report on Form 10-Q in Part II under "Risk Factors."

Many of these factors are beyond our ability to control or predict. Any of these factors, or a combination of these factors, could materially and adversely affect our future financial condition or results of operations and the ultimate accuracy of the forward-looking statements. These forward-looking statements are not guarantees of our future performance, and our actual results and future developments may differ materially and adversely from those projected in the forward-looking statements. We caution against putting undue reliance on forward-looking statements or projecting any future results based on such statements or on present or prior earnings levels. In addition, each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to publicly update or revise any forward-looking statement.


3



Glossary of Terms

The following frequently used abbreviations or acronyms are used in this Quarterly Report on Form 10-Q as defined below:
Acronym
 
Definition
Affinity
 
Affinity Flying Training Services Ltd.
AOCL
 
Accumulated other comprehensive loss
ASBCA
 
Armed Services Board of Contract Appeals
ASC
 
Accounting Standards Codification
ASU
 
Accounting Standards Update
BIE
 
Billings in excess of costs and estimated earnings on uncompleted contracts
CAS
 
Cost Accounting Standards
CIE
 
Costs and estimated earnings in excess of billings on uncompleted contracts
COFC
 
U.S. Court of Federal Claims
DCAA
 
Defense Contract Audit Agency
DCMA
 
Defense Contract Management Agency
DoD
 
Department of Defense
DOJ
 
U.S. Department of Justice
E&C
 
Engineering & Construction
EBIC
 
Egypt Basic Industries Corporation
EBITDA
 
Earnings before interest, taxes, depreciation and amortization
EPC
 
Engineering, procurement and construction
EPIC
 
EPIC Piping LLC
ESPP
 
Employee Stock Purchase Plan
Exchange Act
 
Securities Exchange Act of 1934
FAR
 
Federal Acquisition Regulation
FASB
 
Financial Accounting Standards Board
FCA
 
False Claims Act
FEED
 
Front end engineering and design
FKTC
 
First Kuwaiti Trading Company
FLNG
 
Floating liquefied natural gas
FPSO
 
Floating production, storage and offshore
FPUs
 
Floating production units
FSRU
 
Floating storage and regasification unit
GS
 
Government Services
GTL
 
Gas to liquids
HETs
 
Heavy equipment transporters
HS
 
Hydrocarbons Services
HTSI
 
Honeywell Technology Solutions Inc.
ICC
 
International Chamber of Commerce
JKC
 
JKC Australia LNG, an Australian joint venture executing the Ichthys LNG Project
LIBOR
 
London interbank offered rate
LNG
 
Liquefied natural gas
MD&A
 
Management's Discussion and Analysis of Financial Condition and Results of Operations (Part I, Item 2 of this Quarterly Report on Form 10-Q)
MFRs
 
Memorandums for Record
MoD
 
Ministry of Defense

4



Acronym
 
Definition
NCI
 
Noncontrolling interests
PEMEX
 
Petróleos Mexicanos
PEP
 
Pemex Exploration and Production
PFIs
 
Privately financed initiatives and projects
PIC
 
Paid-in capital
PLOC
 
Performance Letter of Credit facility
PPE
 
Property, Plant and Equipment
PSC
 
Private Security Contractor
RIO
 
Restore Iraqi Oil
SEC
 
U.S. Securities and Exchange Commission
SFO
 
U.K. Serious Fraud Office
TSA
 
Transition Service Agreement
U.K.
 
United Kingdom
U.S.
 
United States
U.S. GAAP
 
Accounting principles generally accepted in the United States
UKMFTS
 
U.K. Military Flying Training System
VAT
 
Value-added tax
VIEs
 
Variable interest entities


5



PART I. FINANCIAL INFORMATION

Item 1. Financial Information

KBR, Inc.
Condensed Consolidated Statements of Operations
(In millions, except for per share data)
(Unaudited)

 
Three Months Ended
 
Six Months Ended
 
June 30,
 
June 30,
 
2018
 
2017
 
2018
 
2017
Revenues
$
1,267

 
$
1,094

 
$
2,305

 
$
2,200

Cost of revenues
(1,137
)
 
(986
)
 
(2,094
)
 
(2,010
)
Gross profit
130

 
108

 
211

 
190

Equity in earnings of unconsolidated affiliates
10

 
32

 
33

 
41

General and administrative expenses
(41
)
 
(38
)
 
(76
)
 
(70
)
Acquisition and integration related costs
(1
)
 

 
(4
)
 

Gain on disposition of assets

 
1

 

 
5

Gain on consolidation of Aspire entities

 

 
115

 

Operating income
98

 
103

 
279

 
166

Interest expense
(17
)
 
(5
)
 
(23
)
 
(10
)
Other non-operating (loss) income
(1
)
 
2

 
(3
)
 
(5
)
Income before income taxes and noncontrolling interests
80

 
100

 
253

 
151

Provision for income taxes
(18
)
 
(21
)
 
(52
)
 
(34
)
Net income
62

 
79

 
201

 
117

Net income attributable to noncontrolling interests
(20
)
 
(2
)
 
(21
)
 
(3
)
Net income attributable to KBR
$
42

 
$
77

 
$
180

 
$
114

Net income attributable to KBR per share:
 
 
 
 
 
 
 
Basic
$
0.30

 
$
0.54

 
$
1.28

 
$
0.80

Diluted
$
0.30

 
$
0.54

 
$
1.27

 
$
0.80

Basic weighted average common shares outstanding
140

 
141

 
140

 
142

Diluted weighted average common shares outstanding
141

 
141

 
141

 
142

Cash dividends declared per share
$
0.08

 
$
0.08

 
$
0.16

 
$
0.16

See accompanying notes to condensed consolidated financial statements.

6



KBR, Inc.
Condensed Consolidated Statements of Comprehensive Income (Loss)
(In millions)
(Unaudited)

 
Three Months Ended
 
Six Months Ended
 
June 30,
 
June 30,
 
2018
 
2017
 
2018
 
2017
Net income
$
62

 
$
79

 
$
201

 
$
117

Other comprehensive income (loss), net of tax:
 
 
 
 
 
 
 
Foreign currency translation adjustments:
 
 
 
 
 
 
 
Foreign currency translation adjustments, net of tax
(26
)
 
(9
)
 
(28
)
 
5

Reclassification adjustment included in net income

 

 
5

 

Foreign currency translation adjustments, net of taxes of $(2), $1, $(3) and $5
(26
)
 
(9
)
 
(23
)
 
5

Pension and post-retirement benefits, net of tax:
 
 
 
 
 
 
 
Actuarial losses, net of tax

 

 

 

Reclassification adjustment included in net income
7

 
7

 
13

 
13

Pension and post-retirement benefits, net of taxes of $(1), $(2), $(2) and $(3)
7

 
7

 
13

 
13

Changes in fair value of derivatives:
 
 
 
 
 
 
 
Changes in fair value of derivatives, net of tax
(4
)
 

 
(4
)
 

Reclassification adjustment included in net income

 

 

 

Changes in fair value of derivatives, net of taxes of $0, $0, $0 and $0
(4
)
 

 
(4
)
 

Other comprehensive (loss) income, net of tax
(23
)
 
(2
)
 
(14
)
 
18

Comprehensive income
39

 
77

 
187

 
135

Less: Comprehensive income attributable to noncontrolling interests
(20
)
 

 
(21
)
 
(1
)
Comprehensive income attributable to KBR
$
19

 
$
77

 
$
166

 
$
134

See accompanying notes to condensed consolidated financial statements.


7



KBR, Inc.
Condensed Consolidated Balance Sheets
(In millions, except share data)
 
June 30,
 
December 31,
 
2018
 
2017
 
(Unaudited)
 
 
Assets
 
 
 
Current assets:
 
 
 
Cash and equivalents
$
519

 
$
439

Accounts receivable, net of allowance for doubtful accounts of $13 and $12
779

 
510

Contract assets
248

 
383

Other current assets
117

 
93

Total current assets
1,663

 
1,425

Claims and accounts receivable
104

 
101

Property, plant, and equipment, net of accumulated depreciation of $355 and $329 (including net PPE of $40 and $34 owned by a variable interest entity)
133

 
130

Goodwill
1,271

 
968

Intangible assets, net of accumulated amortization of $137 and $122
544

 
239

Equity in and advances to unconsolidated affiliates
622

 
387

Deferred income taxes
215

 
300

Other assets
158

 
124

Total assets
$
4,710

 
$
3,674

Liabilities and Shareholders’ Equity
 
 
 
Current liabilities:
 
 
 
Accounts payable
$
445

 
$
350

Contract liabilities
465

 
368

Accrued salaries, wages and benefits
216

 
186

Nonrecourse project debt
10

 
10

Other current liabilities
161

 
157

Total current liabilities
1,297

 
1,071

Pension obligations
349

 
391

Employee compensation and benefits
104

 
118

Income tax payable
85

 
85

Deferred income taxes
17

 
18

Nonrecourse project debt
22

 
28

Revolving credit agreement
115

 
470

Long term debt
928

 

Deferred income from unconsolidated affiliates

 
101

Other liabilities
183

 
171

Total liabilities
3,100

 
2,453

KBR shareholders’ equity:
 
 
 
Preferred stock, $0.001 par value, 50,000,000 shares authorized, 0 shares issued and outstanding

 

Common stock, $0.001 par value 300,000,000 shares authorized,177,257,918 and 176,638,882 shares issued, and 140,696,510 and 140,166,589 shares outstanding

 

Paid-in capital in excess of par ("PIC")
2,171

 
2,091

Accumulated other comprehensive loss
(935
)
 
(921
)
Retained earnings
1,179

 
877

Treasury stock, 36,561,408 shares and 36,472,293 shares, at cost
(819
)
 
(818
)
Total KBR shareholders’ equity
1,596

 
1,229

Noncontrolling interests
14

 
(8
)
Total shareholders’ equity
1,610

 
1,221

Total liabilities and shareholders’ equity
$
4,710

 
$
3,674

See accompanying notes to condensed consolidated financial statements.

8



KBR, Inc.
Condensed Consolidated Statements of Cash Flows
(In millions)
(Unaudited)
 
Six Months Ended June 30,
 
2018
 
2017
Cash flows from operating activities:
 
 
 
Net income
$
201

 
$
117

Adjustments to reconcile net income to net cash provided by (used in) operating activities:
 
 
 
Depreciation and amortization
30

 
27

Equity in earnings of unconsolidated affiliates
(33
)
 
(41
)
Deferred income tax expense (benefit)
34

 
(85
)
Gain on consolidation of Aspire entities
(115
)
 

Other
6

 
11

 
 
 
 
Changes in operating assets and liabilities:
 
 
 
Accounts receivable, net of allowance for doubtful accounts
(70
)
 
70

Contract assets
(38
)
 
41

Claims receivable

 
400

Accounts payable
36

 
(126
)
Contract liabilities
(58
)
 
(167
)
Accrued salaries, wages and benefits
4

 
2

Reserve for loss on uncompleted contracts
(5
)
 
(35
)
Payments from unconsolidated affiliates, net
6

 
5

Distributions of earnings from unconsolidated affiliates
9

 
30

Income taxes payable
7

 
(5
)
Pension funding
(19
)
 
(18
)
Net settlement of derivative contracts
1

 
1

Other assets and liabilities
(32
)
 
(17
)
Total cash flows (used in) provided by operating activities
$
(36
)
 
$
210

Cash flows from investing activities:
 
 
 
Purchases of property, plant and equipment
$
(11
)
 
$
(6
)
Proceeds from sale of assets or investments
1

 
2

Investments in equity method joint ventures
(162
)
 

Acquisition of businesses, net of cash acquired
(357
)
 
2

Adjustments to cash due to consolidation of Aspire entities
197

 

Other

 
(1
)
Total cash flows used in investing activities
$
(332
)
 
$
(3
)

9



KBR, Inc.
Condensed Consolidated Statements of Cash Flows
(In millions)
(Unaudited)
 
Six Months Ended June 30,
 
2018
 
2017
Cash flows from financing activities:
 
 
 
Payments to reacquire common stock
$
(3
)
 
$
(52
)
Acquisition of remaining ownership interest in joint ventures
(56
)
 

Distributions to noncontrolling interests

 
(1
)
Payments of dividends to shareholders
(23
)
 
(23
)
Net proceeds from issuance of common stock
1

 

Borrowings on revolving credit agreements
250

 

Borrowings on long term debt
959

 

Payments on revolving credit agreements
(605
)
 
(180
)
Payments on short-term and long-term borrowings
(5
)
 
(5
)
Debt issuance costs
(46
)
 

Total cash flows provided by (used in) financing activities
$
472

 
$
(261
)
Effect of exchange rate changes on cash
(24
)
 
9

Increase (decrease) in cash and equivalents
80

 
(45
)
Cash and equivalents at beginning of period
439

 
536

Cash and equivalents at end of period
$
519

 
$
491

Supplemental disclosure of cash flows information:
 
 
 
Cash paid for interest
$
18

 
$
11

Cash paid for income taxes (net of refunds)
$
16

 
$
125

Noncash financing activities
 
 
 
Dividends declared
$
11

 
$
11

See accompanying notes to condensed consolidated financial statements.

10



KBR, Inc.
Notes to Condensed Consolidated Financial Statements
(Unaudited)

Note 1. Description of Company and Significant Accounting Policies

KBR, Inc., a Delaware corporation, was formed on March 21, 2006 and is headquartered in Houston, Texas. KBR, Inc. and its wholly owned and majority-owned subsidiaries (collectively referred to herein as "KBR", the "Company", "we", "us" or "our") is a global provider of differentiated, professional services and technologies across the asset and program life-cycle within the government services and hydrocarbons industries. Our capabilities include research and development, feasibility and solutions development, specialized technical consulting, systems integration, engineering and design service, process technologies, program management, construction services, commissioning and startup services, highly specialized mission and logistics support solutions, and asset operations and maintenance services and other support services to a diverse customer base, including government and military organizations of the U.S., U.K. and Australia and a wide range of customers across the hydrocarbons value chain.
  
Principles of Consolidation

Our condensed consolidated financial statements have been prepared in accordance with U.S. GAAP and include the accounts of KBR and our wholly owned and majority-owned subsidiaries and VIEs of which we are the primary beneficiary. We account for investments over which we have significant influence but not a controlling financial interest using the equity method of accounting. See Note 12 to our condensed consolidated financial statements for further discussion on our equity investments and VIEs. The cost method is used when we do not have the ability to exert significant influence. All material intercompany balances and transactions are eliminated in consolidation.

Amounts classified as "Costs and estimated earnings in excess of billings on uncompleted contracts" and "Billings in excess of costs and estimated earnings on uncompleted contracts" on the consolidated balance sheets of our Annual Report on Form 10-K for the year ended December 31, 2017 have been reclassified as "Contract assets" and "Contract liabilities" on the condensed consolidated balance sheets.

We have evaluated all events and transactions occurring after the balance sheet date but before the financial statements were issued and have included the appropriate disclosures.

Segment Reorganization

We changed the name of our Engineering & Construction segment to the "Hydrocarbons Services" segment. This change reflects strategic shifts we have made in this business over recent years to evolve to more recurring and reimbursable engineering, consulting and industrial maintenance services, coupled with our de-emphasis in engaging in fixed price EPC projects except for those that fit within our commercial discipline.

Effective January 1, 2018, we changed the structure of our internal organization in a manner that caused our consulting business to be moved from the Technology & Consulting business segment to the Hydrocarbons Services (formerly E&C) business segment. As of January 1, 2018, our segments consist of the following five reportable segments:

Government Services
Technology
Hydrocarbons Services
Non-Strategic Business
Other

See Note 3 to our condensed consolidated financial statements for further discussion on our segments. We have presented our segment results reflecting these changes for all periods presented. In conjunction with the change in segments, the Company evaluated its goodwill associated with the technology and consulting reporting units using Level 3 fair value inputs, and no impairment indicators were identified.

Use of Estimates

The preparation of our condensed consolidated financial statements in conformity with U.S. GAAP requires us to make estimates, assumptions and judgments that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the condensed consolidated financial statements and the reported amounts of revenues and expenses

11



during the reporting period. Actual results could differ from those estimates. Areas requiring significant estimates and assumptions by our management include but are not limited to the following:

project revenues, costs and profits on engineering and construction contracts, including recognition of estimated losses on uncompleted contracts
project revenues, award fees, costs and profits on government services contracts
provisions for uncollectible receivables
provisions for client claims and recoveries of costs from subcontractors, vendors and others
provisions for income taxes and related valuation allowances and tax uncertainties
recoverability of goodwill
recoverability of other intangibles and long-lived assets and related estimated lives
recoverability of equity method and cost method investments
valuation of pension obligations and pension assets
accruals for estimated liabilities, including litigation accruals
consolidation of VIEs
valuation of share-based compensation
valuation of assets and liabilities acquired in business combinations

In accordance with normal practice in the construction industry, we include in current assets and current liabilities certain amounts related to construction contracts realizable and payable over a period in excess of one year. If the underlying estimates and assumptions upon which the financial statements are based change in the future, actual amounts may differ from those included in the accompanying condensed consolidated financial statements.

Adoption of New Accounting Standards

ASU 2014-09, Revenue from Contracts with Customers, codified as ASC Topic 606. On January 1, 2018, we adopted ASC Topic 606 and the related amendments ("ASC 606") using the modified retrospective method applied to those contracts which were not completed as of December 31, 2017. Results for operating periods beginning after January 1, 2018 are presented under ASC 606, while comparative information has not been restated and continues to be reported in accordance with the accounting standards in effect for those periods. See Note 2 for a description of our accounting policy resulting from adoption of ASC 606.

We recognized the cumulative effect of initially applying ASC 606 as an adjustment to retained earnings in the balance sheet as of January 1, 2018 as follows:
 
Balance at
 
Adjustments Due to
 
Balance at
Dollars in millions
December 31, 2017
 
ASC 606
 
January 1, 2018
Assets
 
 
 
 
 
Accounts receivable
$
510

 
$
157

 
$
667

Contract assets
383

 
(191
)
 
192

Other current assets
93

 
5

 
98

Equity in and advances to unconsolidated affiliates
387

 
87

 
474

Deferred income taxes
300

 
(6
)
 
294

Other assets
124

 
1

 
125

 
 
 
 
 
 
Liabilities
 
 
 
 
 
Contract liabilities
368

 
9

 
377

Deferred income from unconsolidated affiliates
101

 
(101
)
 

Other liabilities
171

 
1

 
172

 
 
 
 
 
 
Equity
 
 
 
 
 
Retained Earnings
877

 
144

 
1,021



12




The impact of adoption on our consolidated statement of operations, balance sheet and cash flows for the period ended June 30, 2018 was as follows:
 
Three Months Ended June 30, 2018
 
As
 
Balances Without
 
Effect of Change
Dollars in millions
Reported
 
Adoption of ASC 606
 
Higher/(Lower)
Statement of Operations
 
 
 
 
 
Revenues
$
1,267

 
$
1,258

 
$
9

Income before income taxes and noncontrolling interests
80

 
71

 
9

Net income
62

 
54

 
8

 
 
 
 
 
 
EPS
 
 
 
 
 
Basic
$
0.30

 
$
0.24

 
$
0.06

Diluted
$
0.30

 
$
0.24

 
$
0.06


 
Six Months Ended June 30, 2018
 
As
 
Balances Without
 
Effect of Change
Dollars in millions
Reported
 
Adoption of ASC 606
 
Higher/(Lower)
Statement of Operations
 
 
 
 
 
Revenues
$
2,305

 
$
2,294

 
$
11

Income before income taxes and noncontrolling interests
253

 
243

 
10

Net income
201

 
192

 
9

 
 
 
 
 
 
EPS
 
 
 
 
 
Basic
$
1.28

 
$
1.21

 
$
0.07

Diluted
$
1.27

 
$
1.21

 
$
0.06


 
As of June 30, 2018
 
As
 
Balances Without
 
Effect of Change
Dollars in millions
Reported
 
Adoption of ASC 606
 
Higher/(Lower)
Assets
 
 
 
 
 
Accounts receivable
$
779

 
$
571

 
$
208

Contract assets
248

 
463

 
(215
)
Other current assets
117

 
112

 
5

Equity in and advances to unconsolidated affiliates
622

 
617

 
5

Deferred income taxes
215

 
222

 
(7
)
 
 
 
 
 
 
Liabilities
 
 
 
 
 
Contract liabilities
465

 
519

 
(54
)
Deferred income from unconsolidated affiliates

 
99

 
(99
)
 
 
 
 
 
 
Equity
 
 
 
 
 
Retained earnings
1,179

 
1,026

 
153

Accumulated other comprehensive loss
(935
)
 
(931
)
 
(4
)


13



 
Six Months Ended June 30, 2018
 
As
 
Balances Without
 
Effect of Change
Dollars in millions
Reported
 
Adoption of ASC 606
 
Higher/(Lower)
Cash flows from operating activities
 
 
 
 
 
Net income
$
201

 
$
192

 
$
9

Adjustments to reconcile net income to net cash provided by operating activities:
 
 
 
 
 
Equity in earnings of unconsolidated affiliates
(33
)
 
(32
)
 
(1
)
Deferred income tax (benefit) expense
34

 
33

 
1

 
 
 
 
 
 
Changes in operating assets and liabilities, net of acquired businesses:
 
 
 
 
 
Accounts receivable, net of allowances for doubtful accounts
(70
)
 
138

 
(208
)
Contract assets
(38
)
 
(254
)
 
216

Contract liabilities
(58
)
 
(41
)
 
(17
)
Total cash flows used in operating activities
(36
)
 
(36
)
 


The impacts of adoption were primarily related to: (1) conforming our contracts recorded over time from previously acceptable methods to the cost-to-cost percentage of completion methodology, (2) combining certain deliverables that were previously considered separate deliverables into a single performance obligation as defined by ASC 606, and (3) separating certain contracts that were previously considered one deliverable into multiple performance obligations.

The impacts of adoption on our opening balance sheet were primarily related to: reclassification of amounts between "Accounts receivable, net of allowance for doubtful accounts" and "Contract assets" based on whether an unconditional right to consideration has been established or not, and the deferral of costs incurred and payments received to fulfill a contract which were previously recorded in income in the period incurred or received but under the new standard will generally be capitalized and amortized over the period of contract performance.

In connection with the consolidation of certain previously unconsolidated VIEs associated with the Aspire Defence project in the first quarter of 2018, we elected to early adopt ASC 606 for each of the Aspire Defence project joint ventures effective January 1, 2018. As a result of the adoption by the Aspire Defence Limited joint ventures, we identified multiple performance obligations associated with the project deliverables that were previously accounted for as a single deliverable under its contract with the MoD. In addition to the above impacts of adoption on revenue and gross margin, the cumulative effect of the adoption by Aspire Defence Limited resulted in sufficient additional income that had been previously recorded as "Deferred income from unconsolidated affiliates" on our condensed consolidated balance sheets in the amount of $101 million which was reversed and included in the cumulative effect adjustment. Also, deferred construction income in the amount of $87 million previously recorded in "Equity in and advance to unconsolidated affiliates" was reversed and included in the cumulative effect adjustment as a result of the early adoption of ASC 606 by the Aspire Defence project joint ventures. Except for the Aspire Defence project joint ventures, we have availed the SEC exemption relating to deferring the application of ASC Topic 606 to our remaining unconsolidated joint ventures until January 1, 2019.


14





Additional Balance Sheet Information

Other Current Liabilities

The components of "Other current liabilities" on our condensed consolidated balance sheets as of June 30, 2018 and December 31, 2017 are presented below:
 
June 30,
 
December 31,
Dollars in millions
2018
 
2017
Current maturities of long-term debt
$
12

 
$

Reserve for estimated losses on uncompleted contracts (a)
10

 
15

Retainage payable
31

 
30

Income taxes payable
16

 
17

Restructuring reserve
6

 
9

Taxes payable not based on income
8

 
11

Value-added tax payable
31

 
13

Insurance payable
4

 
9

Dividend payable
11

 
11

Other miscellaneous liabilities
32

 
42

Total other current liabilities
$
161

 
$
157

 
(a)
See Note 3 to our condensed consolidated financial statements for further discussion on significant reserves for estimated losses on uncompleted contracts.

Other Liabilities

Included in "Other liabilities" on our condensed consolidated balance sheets as of June 30, 2018 and December 31, 2017 is noncurrent deferred rent of $96 million and $99 million, respectively. Also included in "Other liabilities" is a payable to our former parent of $5 million as of June 30, 2018 and December 31, 2017, respectively.

Note 2. Significant Accounting Policies

Our significant accounting policies are detailed in "Note 1. Description of Company and Significant Accounting Policies" of our Annual Report on Form 10-K for the year ended December 31, 2017. The following section represents revisions to those accounting policies due to the adoption of ASC Topic 606 and the separate presentation of acquisition and integration related costs.

Revenue Recognition

Revenue is measured based on the amount of consideration specified in a contract with a customer. Revenue is recognized when and as our performance obligations under the terms of the contract are satisfied which generally occurs with the transfer of control of the goods or services to the customer.

To determine the proper revenue recognition method for contracts, we evaluate whether two or more contracts should be combined and accounted for as one single contract and whether the combined or single contract should be accounted for as more than one performance obligation. This evaluation requires significant judgment and the decision to combine a group of contracts or separate a combined or single contract into multiple performance obligations could change the amount of revenue and profit recorded in a given period. Contracts are considered to have a single performance obligation if the promise to transfer the individual goods or services is not separately identifiable from other promises in the contracts, which is mainly because we provide a significant service of integrating a complex set of tasks and components into a single project or capability. Contracts that cover multiple phases of the product lifecycle (development, construction and maintenance & support) are typically considered to have multiple performance obligations even when they are part of a single contract.


15



For contracts with multiple performance obligations, we allocate the transaction price to each performance obligation using our best estimate of the standalone selling price of each distinct good or service in the contract. In cases where we do not provide the distinct good or service on a standalone basis, the primary method used to estimate standalone selling price is the expected cost plus a margin approach, under which we forecast our expected costs of satisfying a performance obligation and then add an appropriate margin for that distinct good or service.

We provide product warranties to customers that are included in the sale and are not priced or sold separately or do not provide customers with a service in addition to assurance of compliance with agreed-upon specifications. We do not consider these types of warranties to be separate performance obligations.

The following is a description of the principal activities from which we generate revenues by reportable segment:

Government Services

For most of government services, the customer contracts with us to provide support solutions to defense, space, aviation and other programs and missions through long-term service contracts. The performance obligations related to these long-term service contracts are primarily created through the issuance of task orders by the customer because a service contract generally does not meet the criteria to be considered a contract under ASC 606 since it does not obligate the customer to issue any task orders and could be canceled without substantive penalty under termination for convenience clauses. Accordingly, each task order releases us to perform specific portions of the overall scope in the service contract and is typically accounted for as a separate contract because the task order establishes the enforceable rights and obligations, and payment terms. Task orders can include option periods that may be approved by the customer at a later date depending on the customer's future needs and budget availability.

Many of our government services contracts include variable consideration consisting of base fees (a profit percentage applied to our target cost) or award fees (additional consideration based on performance criteria, subject to final customer approval). Variable consideration can also arise from modifications to the scope of services resulting in unapproved change orders or customer claims. Variable consideration is included in the transaction price to the extent it is probable that a significant reversal of cumulative revenue recognized will not occur once the uncertainty associated with the variable consideration is resolved. Our estimates of variable consideration and determination of whether to include such amounts in the transaction price are based largely on our assessment of legal enforceability, performance and any other information (historical, current, and forecasted) that is reasonably available to us.

Many of our government services contracts are for labor at agreed hourly rates on a cost reimbursable basis to the customer. These contracts are accounted for as a series of distinct services because (a) the labor is provided as a continuous service, (b) each time increment of labor provided is distinct, (c) the nature of the services provided is substantially the same, and (d) the pattern of transfer is the same. In these types of contracts, the entire amount of consideration is recognized as labor is provided.

We also enter into base operations support contracts to provide the resources to operate bases, installations, camps, and stations of military departments. Our base operations support contracts are either fixed price contracts or cost reimbursable contracts. For fixed price contracts, we bill the customer a fixed monthly fee and recognize revenue over time on a straight-line basis where our level of effort remains substantially the same from month to month or where that is not the case, using a cost-to-cost input measure of progress as services are provided. For cost reimbursable contracts, we bill the customer all direct costs incurred each month plus an agreed provisional rate for overhead and fee which are finalized at a later date. Revenue for cost reimbursable contracts is recognized as the direct costs are incurred and billed because the base operations represent a series of distinct services and the direct costs are consistent with our level of effort each month. For the purpose of revenue recognition of the variable elements of the contracts, we apply the variable consideration considerations described above.

Revenue on our other types of government services contracts is primarily recognized over time using the cost-to-cost input measure (e.g., costs incurred to date relative to total estimated costs at completion) to measure progress because it best depicts the transfer of assets to the customer which occurs as we incur costs on the contracts. Contract costs include actual direct project costs incurred and an allocation of our indirect costs.

Under the typical payment terms of our government services contracts, amounts are billed as work progresses in accordance with agreed-upon contractual terms, either at periodic intervals (e.g., biweekly or monthly) or upon achievement of contractual milestones.

Hydrocarbons Services


16



For most of our hydrocarbons services projects, the customer contracts with us to provide a significant service of integrating a complex set of tasks and components into a single project or capability and are therefore accounted for as single performance obligations.

It is common for our hydrocarbons services contracts to contain incentive fees, performance bonuses, penalties (liquidated damages) or other provisions, including claims and change orders, that may either increase or decrease the transaction price. Incentives and other performance bonuses generally are awarded upon achievement of certain performance metrics, program milestones or cost targets. Liquidated damage penalties in our contracts are generally capped at a percentage of the total contract value. Liquidated damages may be related to schedule delays, (typically calculated based on a daily rate), or tied to performance guarantees.

Substantially all of our performance obligations related to hydrocarbons services contracts are satisfied over time as work progresses due to the continuous transfer of control to the customer. Typically, revenue is recognized over time using the cost-to-cost input measure to measure progress because it best depicts the transfer of goods and services to the customer which occurs as we incur costs on our contracts. Contract costs include all direct material and labor costs and those indirect costs related to contract performance. Indirect costs, included in cost of revenues, include charges for such items as facilities, engineering, project management, quality control, bids and proposals and procurement.

Under the typical payment terms of our hydrocarbons services contracts, the customer makes advance payments as well as interim payments as work progresses. The advance payment generally is not considered a significant financing component as we normally expect to recognize the advance payments in revenue within a year of receipt as work progresses on the related performance obligation.

Technology

Our technology contracts consist primarily of licensing, basic engineering design (together, the "LBED"), proprietary equipment ("PEQ") or catalyst contracts. LBED contracts are combined into one performance obligation as they are entered into at the same time and the licensed technology requires engineering and design. We may further combine LBED and PEQ contracts into one performance obligation if the contracts were negotiated as a package with a single commercial objective, and the customer contracts with us to provide a significant service of integrating these distinct goods and services into a single project or capability.

It is common for our technology contracts to contain variable consideration including contingent milestone payments and penalties (liquidated damages) that may increase or decrease the transaction price. Contingent milestone payments are primarily related to decisions made by the customer after the LBED has been completed, such as go or no-go decision on the project. Liquidated damage penalties in our technology contracts are typically calculated based on a weekly rate and are capped at a percentage of the total contract value.

Substantially all of our performance obligations related to technology contracts are satisfied over time as work progresses. Typically, revenue is recognized over time using the cost-to-cost input measure to measure progress because it best depicts the transfer of assets to the customer which occurs as we incur costs on our contracts. Contract costs include all direct material and labor costs and those indirect costs related to contract performance and are recognized as the performance obligation is satisfied.

Under the typical payment terms of our technology contracts, the customer makes advance payments as well as interim payments as work progresses and certain progress milestones are met. The advance payment generally is not considered a significant financing component as we normally expect to recognize the advance payments in revenue within a year of receipt as work progresses on the related performance obligation.

Contract Estimates

Contract Modifications

Due to the nature of the work required to be performed on many of our performance obligations, the estimation of total revenue and cost at completion is complex, subject to many variables and requires significant judgment.

As a significant change in one or more of these estimates could affect the profitability of our contracts, we review and update our contract-related estimates regularly through a Company-wide disciplined project review process in which management reviews the progress and execution of our performance obligations and the estimate at completion (EAC). As part of this process, management reviews information including, but not limited to, any outstanding key contract matters, progress towards completion and the related program schedule and the related changes in estimates of revenues and costs. Management must make assumptions

17



and estimates regarding labor productivity and availability, the complexity of the work to be performed, the cost and availability of materials, the performance of subcontractors, and the availability and timing of funding from the customer, among other variables.

We recognize adjustments in estimated profit on contracts under the cumulative catch-up method. Under this method, the impact of the adjustment on profit recorded to date is recognized in the period the adjustment is identified. Revenue and profit in future periods of contract performance is recognized using the adjusted estimate. If at any time the estimate of contract profitability indicates an anticipated loss on the contract, we recognize the total loss in the period it is identified.

Contracts are often modified to account for changes in contract specifications and requirements. We consider contract modifications to exist when the modification either creates new or changes the existing enforceable rights and obligations. Most of our contract modifications are for goods or services that are not distinct from existing contracts due to the significant integration provided in the context of the contract and are accounted for as if they were part of the original contract. The effect of a contract modification on the transaction price and our measure of progress for the performance obligation to which it relates, is recognized as an adjustment to revenue (either as an increase in or a reduction of revenue) on a cumulative catch-up basis.

We account for contract modifications as a separate contract when the modification results in the promise to deliver additional goods or services that are distinct and the increase in price of the contract is for the same amount as the stand-alone selling price of the additional goods or services included in the modification.

We estimate variable consideration at the most likely amount to which we expect to be entitled. Any variable consideration is included in the transaction price to the extent it is probable that a significant reversal of cumulative revenue recognized will not occur once the uncertainty associated with the variable consideration is resolved. Our estimates of variable consideration and determination of whether to include such amounts in the transaction price are based largely on our assessment of legal enforceability, performance and any other information (historical, current, and forecasted) that is reasonably available to us.

We allocate variable consideration entirely to a performance obligation or to a distinct good or service within a performance obligation if it relates specifically to our efforts to satisfy the performance obligation or transfer the distinct good or service, and the allocation depicts the amount of consideration to which we expect to be entitled.

Claims Against Vendors and Subcontractors

We include claims to vendors, subcontractors and others as a receivable and a reduction in recognized costs when enforceability of the claim is established by the contract and the amounts are reasonably estimable and probable of being recovered. Reductions in recognized costs are recognized to the extent of the lesser of the amounts management expects to recover or to costs incurred.

Accounts receivable

Accounts receivable are recorded based on contracted prices when we obtain an unconditional right to payment under the terms of our contracts.

We establish an allowance for doubtful accounts based on the assessment of our clients' willingness and ability to pay. In addition to such allowances, there are often items in dispute or being negotiated that may require us to make an estimate as to the ultimate outcome. Past due receivable balances are written off when our internal collection efforts have been unsuccessful in collecting the amounts due.

Contract assets and liabilities

Billing practices are governed by the contract terms of each project based upon costs incurred, achievement of milestones or pre-agreed schedules. Billings do not necessarily correlate with revenue recognized using the cost-to-cost method of revenue recognition. Contract assets include unbilled amounts typically resulting from revenue under long-term contracts when the cost-to-cost method of revenue recognition is utilized and revenue recognized exceeds the amount billed to the customer, and right to payment is not unconditional. Contract liabilities consist of advance payments and billings in excess of revenue recognized and deferred revenue.

Retainage, included in contract assets, represents the amounts withheld from billings by our clients pursuant to provisions in the contracts and may not be paid to us until the completion of specific tasks or the completion of the project and, in some instances, for even longer periods. Retainage may also be subject to restrictive conditions such as performance guarantees.


18



Our contract assets and liabilities are reported in a net position on a contract-by-contract basis at the end of each reporting period. We classify contract liabilities as current or noncurrent based on the timing of when we expect to recognize revenue. The noncurrent portion of contract liabilities is included in "Other liabilities" in our condensed consolidated balance sheets.

Acquisition and integration related costs

Acquisition and integration related costs consist of third party transaction expenses representing legal, consulting and investment banking-related costs that are direct, incremental costs incurred prior to the closing of an acquisition and direct, incremental costs incurred to integrate the operations of newly acquired businesses into the Company's existing infrastructure as well as other initiatives to combine the newly merged companies into new infrastructure.

Note 3. Business Segment Information

We are organized into three core business segments and two non-core business segments. Our three core business segments focus on our core strengths in technical services relating to government services, technology, and hydrocarbons services. Our two non-core business segments are our Non-strategic Business segment, which includes businesses we intend to exit upon completion of existing contracts because they are no longer a part of our future strategic focus, and "Other," which includes our corporate expenses and general and administrative expenses not allocated to the other business segments.  Our business segments are described below:
Government Services. Our GS business segment provides full life-cycle support solutions to defense, space, aviation and other programs and missions for military and other government agencies in the U.S., U.K. and Australia. As program management integrator, KBR covers the full spectrum of defense, space, aviation and other government programs and missions from research and development; through systems engineering, test and evaluation, systems integration and program management; to operations support, maintenance and field logistics. Our recent acquisitions, as described in Note 5 to our condensed consolidated financial statements, have been combined with our existing U.S. operations within this business segment and operate under the single "KBRwyle" brand.

Technology. Our Technology business segment combines KBR's proprietary technologies, equipment and catalyst supply and associated knowledge-based services into a global business for refining, petrochemicals, inorganic and specialty chemicals as well as gasification, syngas, ammonia, nitric acid and fertilizers. From early planning through scope definition, advanced technologies and project lifecycle support, KBR's Technology segment works closely with customers to provide the optimal approach to maximize their return on investment.
Hydrocarbons Services. Our HS business segment provides comprehensive project and program delivery capability globally. Our key capabilities leverage our operational and technical excellence as a global provider of EPC for onshore oil and gas; LNG/GTL; oil refining; petrochemicals; chemicals; fertilizers; offshore oil and gas (shallow-water, deep-water and subsea); floating solutions (FPUs, FPSO, FLNG & FSRU); maintenance services (via the “Brown & Root Industrial Services” brand); and consulting services provided under our three specialist consulting brands, Granherne, Energo and GVA.
Non-strategic Business. Our Non-strategic Business segment represents the operations or activities that we intend to exit upon completion of existing contracts. All Non-Strategic Business projects are substantially complete. We continue to finalize project close-out activities and negotiate the settlement of claims and various other matters associated with these projects.
Other. Our Other business segment includes corporate expenses and general and administrative expenses not allocated to the business segments above.

The following table presents revenues, gross profit (loss), equity in earnings of unconsolidated affiliates, and operating income (loss) by reporting segment. The prior year balances have been recast to reflect the change in segments as described in Note 1 to our condensed consolidated financial statements.

Operations by Reportable Segment


19



 
Three Months Ended
 
Six Months Ended
 
June 30,
 
June 30,
Dollars in millions
2018
 
2017
 
2018
 
2017
Revenues:
 
 
 
 
 
 
 
Government Services
$
868

 
$
543

 
$
1,545

 
$
1,058



20



Technology
72

 
70

 
134

 
136

Hydrocarbons Services
327

 
474

 
626

 
973

Subtotal
1,267

 
1,087

 
2,305

 
2,167

Non-strategic Business

 
7

 

 
33

Total revenues
$
1,267

 
$
1,094

 
$
2,305

 
$
2,200

Gross profit (loss):
 
 
 
 
 
 
 
Government Services
$
71

 
$
37

 
$
123

 
$
74

Technology
22

 
17

 
38

 
31

Hydrocarbons Services
37

 
55

 
52

 
88

Subtotal
130

 
109

 
213

 
193

Non-strategic Business

 
(1
)
 
(2
)
 
(3
)
Total gross profit
$
130

 
$
108

 
$
211

 
$
190

Equity in earnings of unconsolidated affiliates:
 
 
 
 
 
 
 
Government Services
$
6

 
$
18

 
$
14

 
$
27

Hydrocarbons Services
4

 
14

 
19

 
14

Subtotal
10

 
32

 
33

 
41

Non-strategic Business

 

 

 

Total equity in earnings of unconsolidated affiliates
$
10

 
$
32

 
$
33

 
$
41

General and administrative expenses:
 
 
 
 
 
 
 
Government Services
$
(12
)
 
$
(6
)
 
$
(18
)
 
$
(12
)
Technology

 
(1
)
 
(1
)
 
(2
)
Hydrocarbons Services
(8
)
 
(8
)
 
(15
)
 
(13
)
Other
(21
)
 
(23
)
 
(42
)
 
(43
)
Subtotal
(41
)
 
(38
)
 
(76
)
 
(70
)
Non-strategic Business

 

 

 

Total general and administrative expenses
$
(41
)
 
$
(38
)
 
$
(76
)
 
$
(70
)
Acquisition and integration related costs:
 
 
 
 
 
 
 
Government Services
$
(1
)
 
$

 
$
(4
)
 
$

Technology

 

 

 

Hydrocarbons Services

 

 

 

Other

 

 

 

Subtotal
(1
)
 

 
(4
)
 

Non-strategic Business

 

 

 

Total acquisition and integration related costs
$
(1
)
 
$

 
$
(4
)
 
$

Gain on disposition of assets:
 
 
 
 
 
 
 
Government Services
$

 
$

 
$

 
$

Technology

 

 

 

Hydrocarbons Services

 
1

 

 
5

Other

 

 

 

Subtotal

 
1

 

 
5

Non-strategic Business

 

 

 

Total gain on disposition of assets
$

 
$
1

 
$

 
$
5

Gain on consolidation of Aspire entities:
 
 
 
 
 
 
 
Government Services
$

 
$

 
$
120

 
$

Technology

 

 

 

Hydrocarbons Services

 

 

 

Other

 

 
(5
)
 

Subtotal

 

 
115

 

Non-strategic Business

 

 

 

Total gain on consolidation of Aspire entities
$

 
$

 
$
115

 
$

Segment operating income (loss):
 
 
 
 
 
 
 
Government Services
$
64

 
$
48

 
$
236

 
$
88

Technology
21

 
16

 
36

 
29

Hydrocarbons Services
34

 
63

 
57

 
95

Other
(21
)
 
(23
)
 
(48
)
 
(43
)
Subtotal
98

 
104

 
281

 
169

Non-strategic Business

 
(1
)
 
(2
)
 
(3
)
Total segment operating income (loss)
$
98

 
$
103

 
$
279

 
$
166


 

Changes in Project-related Estimates

There are many factors that may affect the accuracy of our cost estimates and ultimately our future profitability. These include, but are not limited to, the availability and costs of resources (such as labor, materials and equipment), productivity and weather, and for unit rate and construction service contracts, the availability and detail of customer supplied engineering drawings. With a portfolio of more than one thousand contracts, we sometimes realize both lower and higher than expected margins on projects in any given period. We recognize revisions of revenues and costs in the period in which the revisions are known. This may result in the recognition of costs before the recognition of related revenue recovery, if any.

Changes in project-related estimates by business segment which significantly impacted operating income were as follows:

Hydrocarbons Services

We recognized changes to equity in earnings as a result of various changes to estimates on the Ichthys LNG project during the three and six months ended June 30, 2017. See Notes 9 and 18 for a discussion of the matters impacting this project during the three and six months ended June 30, 2018.

In the second quarter of 2018, we recognized a favorable change in estimated revenues and net income associated with variable consideration recognized as a result of successful completion and performance testing of a major Hydrocarbons Services project.

The PEMEX and PEP arbitration settlement (see Note 17 to our condensed consolidated financial statements) resulted in additional revenues and gross profit of $35 million during the three and six months ended June 30, 2017.

Note 4. Revenue

We disaggregate our revenue from customers by type of service, geographic destination and contract type for each of our segments, as we believe it best depicts how the nature, amount, timing and uncertainty of our revenue and cash flows are affected by economic factors. See details in the tables below.

Revenue by Service/Product line was as follows:

21



 
Three Months Ended
Six Months Ended
 
June 30,
June 30,
Dollars in millions
2018
 
2018
By Service / Product Types
 
 
 
     Government Services
 
 
 
          Science and Space
$
169

 
$
247

          Engineering
302

 
554

          Logistics
397

 
744

     Total Government Services
868

 
1,545

 
 
 
 
     Hydrocarbons
 
 
 
          Technology
72

 
134

 
 
 
 
          Hydrocarbons Services
 
 
 
               Onshore
266

 
504

               Offshore
25

 
49

               Industrial Services
18

 
41

               Consulting
18

 
32

          Total Hydrocarbons Services
327

 
626

 
 
 
 
     Total Hydrocarbons
399

 
760

 
 
 
 
Total net revenue
$
1,267

 
$
2,305


Government Services revenue earned from key U.S. Government customers including U.S. DoD agencies and NASA was $637 million and $1.1 billion for the three and six months ended June 30, 2018, respectively. Government Services revenue earned from non-U.S. Government customers including the U.K. MoD, the Australian Defence Force and others was $231 million and $416 million for the three and six months end June 30, 2018, respectively.
  

22



Revenue by geographic destination was as follows:
 
Three Months Ended June 30, 2018
 
 
 
Hydrocarbons
 
 
Total by Countries/Regions
Dollars in millions
Government Services
 
Technology
 
Hydrocarbons Services
 
Total
     United States
$
431

 
$
4

 
$
125

 
$
560

     Middle East
183

 
4

 
31

 
218

     Europe
208

 
13

 
52

 
273

     Australia
15

 

 
95

 
110

     Canada

 

 
4

 
4

     Africa
20

 
5

 
4

 
29

     China

 
14

 

 
14

     Other countries
11

 
32

 
16

 
59

Total net revenue
$
868

 
$
72

 
$
327

 
$
1,267


 
Six Months Ended June 30, 2018
 
 
 
Hydrocarbons
 
 
Total by Countries/Regions
Dollars in millions
Government Services
 
Technology
 
Hydrocarbons Services
 
Total
     United States
$
745

 
$
10

 
$
251

 
$
1,006

     Middle East
348

 
11

 
61

 
420

     Europe
364

 
21

 
98

 
483

     Australia
28

 
1

 
167

 
196

     Canada

 
2

 
15

 
17

     Africa
38

 
12

 
6

 
56

     China

 
35

 

 
35

     Other countries
22

 
42

 
28

 
92

Total net revenue
$
1,545

 
$
134

 
$
626

 
$
2,305


Many of our contracts contain both fixed price and cost reimbursable components. We define contract type based on the component that represents the majority of the contract. Revenue by contract type was as follows:
 
Three Months Ended June 30, 2018
 
 
 
Hydrocarbons
 
 
Dollars in millions
Government Services
 
Technology
 
Hydrocarbons Services
 
Total
     Fixed Price
$
283

 
$
68

 
$
48

 
$
399

     Cost Reimbursable
585

 
4

 
279

 
868

Total net revenue
$
868

 
$
72

 
$
327

 
$
1,267



23



 
Six Months Ended June 30, 2018
 
 
 
Hydrocarbons
 
 
Dollars in millions
Government Services
 
Technology
 
Hydrocarbons Services
 
Total
     Fixed Price
$
501

 
$
127

 
$
104

 
$
732

     Cost Reimbursable
1,044

 
7

 
522

 
1,573

Total net revenue
$
1,545

 
$
134

 
$
626

 
$
2,305


We recognized revenue of $30 million and $31 million from performance obligations satisfied in previous periods for the three and six month periods ended June 30, 2018, respectively.

On June 30, 2018, we had $10.1 billion of transaction price allocated to remaining performance obligations. We expect to recognize approximately 31% of our remaining performance obligations as revenue within one year, 23% in years two through five, and 46% thereafter. Revenue associated with our remaining performance obligations to be recognized beyond one year includes performance obligations related to Aspire Defence and Fasttrax projects, which have contract terms extending through 2041 and 2023, respectively. The balance of remaining performance obligations does not include variable consideration that was determined to be constrained as of June 30, 2018.


Note 5. Acquisitions, Dispositions and Other Transactions

Stinger Ghaffarian Technologies Acquisition

On April 25, 2018, we acquired 100% of the outstanding stock of Stinger Ghaffarian Technologies ("SGT"). SGT is a leading provider of high-value engineering, mission operations, scientific and IT software solutions in the government services market. We accounted for this transaction using the acquisition method under ASC 805, Business Combinations. The acquisition is reported within our GS business segment. Aggregate base consideration for the acquisition was $355 million, plus $13 million of working capital and other purchase price adjustments set forth in the purchase agreement. We initially recognized goodwill of $260 million arising from the acquisition, which primarily relates to future growth opportunities based on an expanded service offering and other expected synergies from the combined operations. Approximately $240 million of the goodwill is deductible for tax purposes. The intangible assets recognized were comprised of customer relationships and backlog. These intangibles will be amortized over a weighted-average period of 19 years. The final settlement of the working capital adjustment is expected in the third quarter of 2018. Accordingly, adjustments to the initial purchase accounting will likely be completed during the second half of 2018.

We funded the acquisition with borrowings under our new Senior Credit Facility that were entered into concurrently with the acquisition. See Note 14 to our condensed consolidated financial statements for information related to our new Senior Secured Credit Facilities. We recognized direct, incremental costs related to this acquisition of $1 million and $3 million during the three and six months ended June 30, 2018, respectively, which are included in "Acquisition and integration related costs" on the condensed consolidated statements of operations.

The following table summarizes the consideration paid for this acquisition and the fair value of the assets acquired and liabilities assumed as of the acquisition date.

24



Dollars in millions
SGT
Fair value of total consideration transferred
$
368

Recognized amounts of identifiable assets acquired and liabilities assumed:
 
   Cash and equivalents
11

   Accounts receivable
52

   Contract assets
21

   Other current assets
2

      Total current assets
86

   Property, plant and equipment, net
2

   Equity in and advances to unconsolidated affiliates
2

   Intangible assets
74

   Deferred income taxes
6

   Other assets
8

      Total assets
178

   Accounts payable
27

   Contract liabilities
6

   Accrued salaries, wages and benefits
28

   Other current liabilities
5

      Total current liabilities
66

   Employee compensation and benefits
2

   Other liabilities
2

      Total liabilities
70

Goodwill
$
260



The acquired SGT business contributed $90 million of revenues and $7 million of gross profit for the period from April 25, 2018 through June 30, 2018.

Aspire Defence Subcontracting Joint Ventures

On January 15, 2018, Carillion plc ("Carillion"), our U.K. partner in the joint ventures that provide the construction and related support services to Aspire Defence Limited, entered into compulsory liquidation. Carillion no longer performs any of the services for the project, as we have stepped in to deliver both construction and support services without disruption. In accordance with the commercial arrangements of the project company and its lenders, Carillion was excluded from future business and benefit from its interest in the project and we have assumed operational management of the subcontracting joint ventures.

During the first quarter of 2018, we evaluated our rights and obligations under the joint venture agreements and other commercial arrangements of the project company and its lenders. We concluded Carillion's liquidation was a reconsideration event for KBR to reevaluate the primary beneficiary of the subcontracting joint ventures in which we were partners. We concluded KBR is the primary beneficiary as it has the power to direct activities having the most significant impact on the economic performance of the subcontracting joint ventures. Consequently, KBR consolidated these entities in its financial statements effective January 15, 2018.


25



Prior to obtaining control of these entities, we accounted for our 50% investment in each of the subcontracting joint ventures under the equity method of accounting. The balance of our net equity investments in these entities was approximately $5 million as of January 15, 2018. As a result of obtaining control of the subcontracting joint ventures, we accounted for these transactions under the acquisition method of accounting for business combination in accordance with ASC 805. Consequently, we remeasured our equity interests in each of the subcontracting joint ventures to fair value which resulted in a gain of approximately $115 million recognized in the first quarter of 2018 and included in "Gain on consolidation of Aspire entities" in our condensed consolidated statements of operations. The fair value of each of the subcontracting joint ventures was determined using a discounted cash flow model with future cash flows based on internal forecasts of revenue and expenses over the remaining life of the subcontract agreement. To arrive at our future cash flows, we used estimates of economic and market assumptions, including growth rates in revenues, costs, estimates of future expected changes in operating margins, tax rates and cash expenditures. The estimated cash flows were discounted using a weighted-average cost of capital that reflected current market conditions and risk profile for each of the subcontracting joint ventures.

We recognized goodwill of approximately $45 million which was primarily related to the deferred tax liabilities associated with the contract-related intangible assets acquired in the transaction. None of the goodwill is deductible for tax purposes. The contract-related intangible assets have estimated useful lives ranging 4 to 23 years. During the second quarter of 2018, we made immaterial adjustments and reclassifications to the previously reported assets acquired and liabilities assumed upon obtaining control of the subcontracting joint ventures including a reduction to cash and equivalents of $8 million and increase to intangible assets of approximately $10 million. Certain data necessary to complete the purchase price allocation is not yet available and primarily relates to the final determination of certain working capital balances and the fair value of the acquired intangibles as well as the final tax returns that provide the underlying tax basis of the assets and liabilities. The following table summarizes the fair value of the assets acquired and liabilities assumed as of the date we obtained control of the subcontracting joint ventures.

Dollars in millions
Aspire
Fair value of Aspire Defence subcontracting entities
$
240

Recognized amounts of identifiable assets acquired and liabilities assumed:
 
   Cash and equivalents
197

   Accounts receivable
4

   Other current assets
12

      Total current assets
213

   Property, plant and equipment, net
9

   Intangible assets
253

   Other assets

      Total assets
475

   Accounts payable
52

   Contract liabilities
161

   Accrued salaries, wages and benefits
1

   Other current liabilities
21

      Total current liabilities
235

   Deferred income taxes
43

   Other liabilities
2

      Total liabilities
280

Goodwill
$
45



On April 18, 2018, we completed the acquisition of Carillion's interests in the subcontracting entities for $50 million pursuant to a share and business purchase agreement and approval by Aspire Defence Limited, the Aspire Defence Limited project lenders and the MoD. We accounted for the change in KBR's interest as an equity transaction. The difference between the noncontrolling interests of $124 million in the subcontracting entities at the date of acquisition and the cash consideration paid to Carillion was recognized as a net increase to "PIC" of $74 million for the six month period ended June 30, 2018. We incurred $0 million and $1 million of acquisition-related costs for the three and six months ended June 30, 2018, which were recorded in "Acquisition and integration related costs" on our condensed consolidated statements of operations.


26



The results of operations of the subcontracting entities have been included in our condensed consolidated statements of operations for periods subsequent to obtaining control on January 15, 2018. The acquired subcontracting joint ventures contributed $144 million and $249 million of revenues and $15 million and $28 million of gross profit for the three and six month periods ended June 30, 2018, respectively, within our GS business segment.

The following supplemental pro forma condensed consolidated results of operations assume that SGT and the Aspire Defence subcontracting joint ventures had been acquired as of January 1, 2017. The supplemental pro forma information was prepared based on the historical financial information of SGT and the Aspire Defence subcontracting joint ventures and has been adjusted to give effect to pro forma adjustments that are both directly attributable to the transaction and factually supportable. Pro forma adjustments were primarily related to the amortization of intangibles, interest on borrowings related to the acquisitions, and the reclassification of the gain on consolidation of the Aspire entities to January 1, 2017. Accordingly, this supplemental pro forma financial information is presented for informational purposes only and is not necessarily indicative of what the actual results of operations of the combined company would have been had the acquisitions occurred on January 1, 2017, nor is it indication of future results of operations.

 
Three Months Ended June 30,
 
Six Months Ended June 30,
Dollars in millions
2018
 
2017
 
2018
 
2017
Revenue
$
1,291

 
$
1,319

 
$
2,453

 
$
2,644

Net income attributable to KBR
42

 
87

 
86

 
207

Diluted earnings per share
$
0.30

 
$
0.62

 
$
0.61

 
$
1.46


 
Sigma Bravo Pty Ltd Acquisition

During the fourth quarter of 2017, we acquired 100% of the outstanding common shares of Sigma Bravo Pty Ltd ("Sigma Bravo"). Sigma Bravo provides information management, technical support and training services as well as operational support to the Australian Defence Force.

The aggregate purchase price of the acquisition was $9 million. We recognized goodwill of $1 million arising from the acquisition, which relates primarily to customer relationships and future growth opportunities to expand services provided to the Australian Defence Force. None of the goodwill is deductible for income tax purposes. The final settlement of the working capital adjustment occurred in the second quarter and did not have a material effect on our condensed consolidated financial statements.

Note 6. Cash and Equivalents

We consider all highly liquid investments with an original maturity of three months or less to be cash equivalents. Cash and equivalents include cash balances held by our wholly owned subsidiaries as well as cash held by joint ventures that we consolidate. Joint venture and the Aspire project cash balances are limited to specific project activities and are not available for other projects, general cash needs or distribution to us without approval of the board of directors of the respective entities. We expect to use this cash for project costs and distributions of earnings. However, some of the earnings distributions may be paid to other KBR entities where the cash can be used for general corporate needs.


27



The components of our cash and equivalents balance are as follows:
 
June 30, 2018
Dollars in millions
International (a)
 
Domestic (b)
 
Total
Operating cash and equivalents
$
106

 
$
87

 
$
193

Short-term investments (c)
15

 
9

 
24

Cash and equivalents held in consolidated joint ventures and Aspire project entities
300

 
2

 
302

Total
$
421

 
$
98

 
$
519


 
December 31, 2017
Dollars in millions
International (a)
 
Domestic (b)
 
Total
Operating cash and equivalents
$
112

 
$
124

 
$
236

Short-term investments (c)
82

 
60

 
142

Cash and equivalents held in consolidated joint ventures
59

 
2

 
61

Total
$
253

 
$
186

 
$
439

 
(a)
Includes deposits held in non-U.S. operating accounts.
(b)
Includes U.S. dollar and foreign currency deposits held in operating accounts that constitute onshore cash for tax purposes but may reside either in the U.S. or in a foreign country.
(c)
Includes time deposits, money market funds, and other highly liquid short-term investments.

Note 7. Accounts Receivable
    
The components of our accounts receivable, net of allowance for doubtful accounts balance, are as follows:
 
June 30, 2018
Dollars in millions
Unbilled
 
Trade & Other
 
Total
Government Services
$
198

 
$
279

 
$
477

Technology

 
41

 
41

Hydrocarbons Services
65

 
192

 
257

Subtotal
263

 
512

 
775

Non-strategic Business

 
4

 
4

Total
$
263

 
$
516

 
$
779


As a result of the adoption of ASC 606 on January 1, 2018, unbilled accounts receivable is classified in "Accounts receivable" in our condensed consolidated balance sheets as it represents the amounts that have been recorded in revenue based on contracted prices for which we have obtained an unconditional right to payment under the terms of our contracts. Retainage is now recorded in "Contract Assets" in our condensed consolidated balance sheets when the right to payment of the retainage is conditional under the terms of our contracts. Prior to the adoption of ASC 606, unbilled accounts receivables were classified as "Costs and estimated earnings in excess of billings on uncompleted contracts" and retainage was classified within "Accounts receivable".

 
December 31, 2017
Dollars in millions
Retainage
 
Trade & Other
 
Total
Government Services
$
6

 
$
189

 
$
195

Technology

 
72

 
72

Hydrocarbons Services
53

 
186

 
239

Subtotal
59

 
447

 
506

Non-strategic Business
4

 

 
4

Total
$
63

 
$
447

 
$
510




28



Note 8. Contract Assets and Contract Liabilities

The timing of revenue recognition, billings and cash collections results in accounts receivable, contract assets, and contract liabilities on the condensed consolidated balance sheets.
Our contract assets by business segment are as follows:
 
June 30,
 
December 31,
 
 
 
 
Dollars in millions
2018
 
2017
 
$ Change
 
% Change
Government Services
$
159

 
$
274

 
$
(115
)
 
(42
)%
Technology
31

 
39

 
(8
)
 
(21
)%
Hydrocarbons Services
58

 
70

 
(12
)
 
(17
)%
Subtotal
248

 
383

 
(135
)
 
(35
)%
Non-strategic Business

 

 

 
N/A

Total
$
248

 
$
383

 
$
(135
)
 
(35
)%

The decrease in contract assets was primarily caused by the initial adjustment due to the adoption of ASC 606, offset by normal business operations and the acquisition of $21 million of contract assets from the purchase of SGT as described in Note 5 to our condensed consolidated financial statements.

Our contract liabilities by business segment are as follows:
 
June 30,
 
December 31,
 
 
 
 
Dollars in millions
2018
 
2017
 
$ Change
 
% Change
Government Services
$
250

 
$
85

 
165

 
194
 %
Technology
90

 
62

 
28

 
45
 %
Hydrocarbons Services
118

 
213

 
(95
)
 
(45
)%
Subtotal
458

 
360

 
98

 
27
 %
Non-strategic Business
7

 
8

 
(1
)
 
(13
)%
Total
$
465

 
$
368

 
97

 
26
 %

The increase in contract liabilities was primarily related to the acquisition of $161 million of contract liabilities associated with the Aspire Defence project joint ventures, partially offset by normal business operations and the recognition of the incentive fee associated with an Australian LNG project.
    
Revenue recognized for the six months ended June 30, 2018, that was included in the contract liability balance at December 31, 2017 was $181 million.

Note 9. Unapproved Change Orders, Claims, and Estimated Recoveries of Claims Against Suppliers and Subcontractors

The amounts of unapproved change orders, claims and estimated recoveries of claims against suppliers and subcontractors included in determining the profit or loss on contracts are as follows:
Dollars in millions
2018
 
2017
Amounts included in project estimates-at-completion at January 1,
$
924

 
$
294

Increase (decrease), net of foreign currency effect
10

 
280

Approved change orders, net of foreign currency effect
(1
)
 
(3
)
Amounts included in project estimates-at-completion at June 30,
$
933

 
$
571

Amounts recognized over time based on progress at June 30,
$
887

 
$
490



As of June 30, 2018, most of the change orders, customer claims and estimated recoveries of claims against suppliers and subcontractors above relate to our proportionate share of unapproved change orders and claims associated with our 30% ownership interest in JKC, which has contracted to perform the engineering, procurement, supply, construction and commissioning of onshore

29



LNG facilities for a client in Darwin, Australia (the "Ichthys LNG Project"). The contract between JKC and its client is a hybrid contract containing both cost-reimbursable and fixed-price (including unit-rate) scopes.
Further, there are additional claims we believe that we or our joint ventures are entitled to recover from clients which have been excluded from estimated revenues and profit at completion as appropriate under U.S. GAAP.
These commercial matters may not be resolved in the near term. Our current estimates for the above unapproved change orders, customer claims and estimated recoveries of claims against suppliers and subcontractors may prove inaccurate and could result in significant changes to the estimated revenue, costs and profits at completion on the underlying projects. Significant contingencies related to JKC are discussed further in Note 18 to our condensed consolidated financial statements.
Liquidated damages

Some of our hydrocarbons services contracts have schedule dates and performance obligations that, if not met, could subject us to penalties for liquidated damages. These generally relate to specified activities that must be completed by a set contractual date or by achievement of a specified level of output or throughput. Each contract defines the conditions under which a customer may make a claim for liquidated damages. However, in some instances, liquidated damages are not asserted by the customer, but the potential to do so is used in negotiating or settling claims and closing out the contract. Any accrued liquidated damages are recognized as a reduction in revenues in our condensed consolidated statements of operations.

In addition to the accrued liquidated damages, it is possible that liquidated damages that have not been included in our estimates at completion in determining project income related to several projects totaling $9 million and $9 million at June 30, 2018 and December 31, 2017, respectively, could be incurred if the projects are completed as currently forecasted. However, based upon our evaluation of our performance and other mitigating factors, we have concluded these liquidated damages are not probable.

Note 10. Claims and Accounts Receivable

Our claims and accounts receivable balance not expected to be collected within the next 12 months was $104 million and $101 million as of June 30, 2018 and December 31, 2017, respectively. Claims and accounts receivable primarily reflects claims filed with the U.S. government related to payments not yet received for costs incurred under various U.S. government cost reimbursable contracts within our GS business segment. These claims relate to disputed costs or contracts where our costs have exceeded the U.S. government's funded value on the task order.  Included in the amount is $77 million as of June 30, 2018 and $79 million as of December 31, 2017, respectively, related to Form 1s issued by the U.S. government questioning or objecting to costs billed to them. See Note 16 of our condensed consolidated financial statements for additional discussions. The amount also includes $27 million and $22 million as of June 30, 2018 and December 31, 2017, respectively, related to contracts where our reimbursable costs have exceeded the U.S. government's funded values on the underlying task orders or task orders where the U.S. government has not authorized us to bill. We believe the remaining disputed costs will be resolved in our favor, at which time the U.S. government will be required to obligate funds from appropriations for the year in which resolution occurs.

Note 11. Restructuring

In connection with our long-term strategic reorganization, we announced that beginning in the fourth quarter of 2014 we would undertake a restructuring, which would include actions such as reducing the amount of real estate we utilized and significantly reducing our workforce. There were additional actions undertaken in 2015 and 2016, including staff reductions to support current business levels. The employees affected by these reductions were eligible for separation benefits upon termination dates which occurred through 2017. The table below provides a rollforward of one-time charges associated with employee terminations based on the fair value of the termination benefits. These amounts are included in "Other current liabilities" on our condensed consolidated balance sheets.

30



Dollars in millions
Severance Accrual
Balance at December 31, 2017
$
1

Payments
(1
)
Balance at June 30, 2018
$

 
 
Balance at December 31, 2016
$
8

Payments
(5
)
Balance at June 30, 2017
$
3



 
Note 12. Equity Method Investments and Variable Interest Entities

We conduct some of our operations through joint ventures, which operate through partnership, corporation, undivided interest and other business forms and are principally accounted for using the equity method of accounting. Additionally, the majority of our joint ventures are VIEs.

The following table presents a rollforward of our equity in and advances to unconsolidated affiliates:
 
June 30,
 
December 31,
Dollars in millions
2018
 
2017
Beginning balance
$
387

 
$
369

Cumulative effect of change in accounting policy (a)
87

 

Adjusted balance at January 1, 2018
474

 
369

Equity in earnings of unconsolidated affiliates
33

 
72

Distribution of earnings of unconsolidated affiliates (b)
(9
)
 
(62
)
Advances (receipts)
(6
)
 
(11
)
Investments (c)
162

 

Foreign currency translation adjustments
(11
)
 
12

Other
(21
)
 
5

Balance before reclassification
$
622

 
$
385

Reclassification of excess distributions (b)

 
11

Recognition of excess distributions (b)

 
(9
)
Ending balance
$
622

 
$
387


 
(a)
As further discussed in Note 1 to our condensed consolidated financial statements, deferred construction income in the amount of $87 million previously recorded in "Equity in and advance to unconsolidated affiliates" was reversed and included in the cumulative effect adjustment as a result of the early adoption of ASC 606 by the Aspire Defence project joint ventures.
(b)
From 2014 through 2017, we received cash dividends in excess of the carrying value of one of our unconsolidated joint ventures. We have no obligation to return any portion of the cash dividends received. We record excess dividends as "Deferred income from unconsolidated affiliates" on our condensed consolidated balance sheets and recognize these dividends as earnings are generated by the investment. As further discussed in Note 1 to our condensed consolidated financial statements, the adoption of ASC Topic 606 by this unconsolidated joint venture resulted in the reversal of the "Deferred income from unconsolidated affiliates" balance of $101 million in our condensed consolidated balance sheets as of December 31, 2017 in the cumulative effect adjustment of the change in accounting policy.
(c)
In 2018, investments included a $162 million investment to fund JKC.

Unconsolidated Variable Interest Entities

For the VIEs in which we participate, our maximum exposure to loss consists of our equity investment in the VIE and any amounts owed to us for services we may have provided to the VIE, reduced by any unearned revenues on the project. Our maximum exposure to loss may also include our obligation to fund our proportionate share of any future losses incurred. As of June 30,

31



2018, we do not project any losses related to these joint venture projects. Where our performance and financial obligations are joint and several to the client with our joint venture partners, we may be further exposed to losses above our ownership interest in the joint venture. In addition:

The Affinity, Aspire Defence and U.K. Road joint venture projects are further exposed to the risks of construction and insurance losses, if any, on a joint and several basis. Any losses may be limited to the extent that these joint ventures become insolvent as the joint venture customer does not have recourse against the joint venture partners.

JKC is further exposed to certain losses to the extent our joint venture partners are unable to meet their obligations, as we have joint and several liability to the customer. JKC has recorded significant unapproved change orders and claims with the client as well as estimated recoveries of claims against suppliers and subcontractors arising from issues related to changes to the work scope, delays and lower than planned subcontractor activity. During the six months ended June 30, 2018, we made additional investments in the joint venture of approximately $162 million to fund our proportionate share of the ongoing project execution activities. We anticipate making additional investments in the joint venture of approximately $140 million to $240 million over the next 12 months. See Notes 9 and 18 to our condensed consolidated financial statements for further discussion regarding contingencies related to the Ichthys JV.

The following summarizes the total assets and total liabilities as reflected in our condensed consolidated balance sheets related to our unconsolidated VIEs in which we have a significant variable interest but are not the primary beneficiary. The Aspire Defence joint venture amounts for 2017 reflect all joint ventures related to the Aspire Defence project.

 
June 30, 2018
Dollars in millions
Total assets
 
Total liabilities
Affinity joint venture (U.K. MFTS project)
$
19

 
$
3

Aspire Defence Limited
$
76

 
$
6

JKC joint venture (Ichthys LNG project)
$
293

 
$
27

U.K. Road project joint ventures
$
37

 
$
10

Middle East Petroleum Corporation (EBIC Ammonia project)
$
40

 
$
1

 
 
December 31, 2017
Dollars in millions
Total assets
 
Total liabilities
Affinity joint venture (U.K. MFTS project)
$
26

 
$
10

Aspire Defence joint ventures (Aspire Defence project)
$
10

 
$
125

JKC joint venture (Ichthys LNG project)
$
140

 
$
25

U.K. Road project joint ventures
$
36

 
$
10

Middle East Petroleum Corporation (EBIC Ammonia project)
$
38

 
$
1



Related Party Transactions

We often provide engineering, construction management and other subcontractor services to our joint ventures and our revenues include amounts related to these services. For the six months ended June 30, 2018 and 2017, our revenues included $105 million and $38 million, respectively, related to the services we provided to our joint ventures, primarily the Ichthys JV within our HS business segment. Under the terms of an alliance agreement with our EPIC joint venture, EPIC provides certain pipe fabrication services to KBR. EPIC provided no services to KBR under the agreement in the six months ended June 30, 2018 and $3 million of services to KBR under the agreement in the six months ended June 30, 2017.

Under the terms of our TSA with Brown & Root Industrial Services joint venture, we collect cash from customers and make payments to vendors and employees on behalf of the joint venture. For the six months ended June 30, 2018 and 2017, we incurred approximately $1 million and $3 million, respectively, of reimbursable costs under the TSA.


32



Amounts included in our condensed consolidated balance sheets related to services we provided to our unconsolidated joint ventures as of June 30, 2018 and December 31, 2017 are as follows:
 
June 30,
 
December 31,
Dollars in millions
2018
 
2017
Accounts receivable, net of allowance for doubtful accounts (a)
$
12

 
$
28

Contract assets (b)
$
2

 
$
2

Contract liabilities (b)
$
33

 
$
27

Accounts payable
$
2

 
$

 
(a)
Includes a $0 million and $4 million net receivable from the Brown & Root Industrial Services joint venture at June 30, 2018 and December 31, 2017, respectively.
(b)
Reflects contract assets and contract liabilities primarily related to joint ventures within our HS business segment as discussed above.

Consolidated Variable Interest Entities

We consolidate VIEs if we determine we are the primary beneficiary of the project entity because we control the activities that most significantly impact the economic performance of the entity. The following is a summary of the significant VIEs where we are the primary beneficiary:
Dollars in millions
June 30, 2018
Total assets
 
Total liabilities
KJV-G joint venture (Gorgon LNG project)
$
14

 
$
19

JKS joint venture (Escravos Gas-to-Liquids project)
$
8

 
$
13

Fasttrax Limited (Fasttrax project)
$
55

 
$
42

Aspire Defence Works/Services entities (Aspire Defence project)
$
575

 
$
313

 

Dollars in millions
December 31, 2017
Total assets
 
Total liabilities
KJV-G joint venture (Gorgon LNG project)
$
15

 
$
48

JKS joint venture (Escravos Gas-to-Liquids project)
$
8

 
$
13

Fasttrax Limited (Fasttrax project)
$
57

 
$
47



Note 13. Pension Plans

The components of net periodic benefit cost related to pension benefits for the three and six months ended June 30, 2018 and 2017 were as follows:

33



 
Three Months Ended June 30,
 
2018
 
2017
Dollars in millions
United States
 
Int’l
 
United States
 
Int’l
Components of net periodic benefit cost
 
 
 
 
 
 
 
Interest cost

 
13

 

 
13

Expected return on plan assets
(1
)
 
(20
)
 
(1
)
 
(19
)
Recognized actuarial loss
1

 
7

 
1

 
7

Net periodic benefit cost
$

 
$

 
$

 
$
1

 
 
 
 
 
 
 
 
 
Six Months Ended June 30,
 
2018
 
2017
Dollars in millions
United States
 
Int’l
 
United States
 
Int’l
Components of net periodic benefit cost
 
 
 
 
 
 
 
Interest cost
1

 
26

 
1

 
26

Expected return on plan assets
(2
)
 
(41
)
 
(2
)
 
(37
)
Recognized actuarial loss
1

 
14

 
1

 
15

Net periodic benefit cost
$

 
$
(1
)
 
$

 
$
4


For the six months ended June 30, 2018, we have contributed approximately $19 million of the $40 million we expect to contribute to our plans in 2018.

Note 14. Debt and Other Credit Facilities

Our outstanding debt consisted of the following at the dates indicated:

Dollars in millions
 
June 30, 2018
 
December 31, 2017
Revolving credit agreement, terminated April 2018
 
$

 
$
470

Revolver
 
115

 

Term Loan A
 
163

 

Term Loan B
 
800

 

Unamortized debt issuance costs - Term Loan A
 
(4
)
 

Unamortized debt issuance costs and discount - Term Loan B
 
(19
)
 

Total long-term debt
 
1,055

 
470

Less: current portion
 
12

 

Total long-term debt, net of current portion
 
$
1,043

 
$
470




Senior Credit Facility

On April 25, 2018, the Company refinanced its $1 billion Credit Agreement due September 2020. The new senior secured credit facility ("Senior Credit Facility") consists of a $500 million revolving credit facility ("Revolver"), a $500 million performance letter of credit facility ("PLOC"), a $350 million Delayed Draw Term Loan A, ("Term Loan A") and an $800 million Term Loan B ("Term Loan B"). The Revolver, PLOC and Term Loan A mature in April 2023 and the Term Loan B matures in April 2025. The Term Loan A may be drawn upon until the earlier of becoming fully drawn or June 30, 2019 (the "Availability Period"). Borrowings under the Term Loan A may only be used to fund investments in JKC. See Note 18 to our condensed consolidated financial statements for a discussion on JKC.


34



The interest rate with respect to the Term Loan B is LIBOR plus 3.75%.The interest rates with respect to the Revolver and Term Loan A are based on, at the Company's option, adjusted LIBOR plus an additional margin or base rate plus additional margin. The Senior Credit Facility provides for fees on letters of credit issued under the PLOC at varying rates, as shown below. Additionally, there is a commitment fee with respect to the Revolver, PLOC and Term Loan A. The details of the applicable margins and commitment fees are based on the Company's consolidated leverage ratio as follows:
 
 
Revolver and Term Loan A
 
 
 
 
Consolidated Leverage Ratio
 
LIBOR Margin
 
Base Rate Margin
 
Performance Letter of Credit Fee
 
Commitment Fee
Greater than or equal to 4.00 to 1.00
 
3.25
%
 
2.25
%
 
1.95
%
 
0.450
%
Less than 4.00 to 1.00 but greater than or equal to 3.00 to 1.00
 
3.00
%
 
2.00
%
 
1.80
%
 
0.400
%
Less than 3.00 to 1.00 but greater than or equal to 2.00 to 1.00
 
2.75
%
 
1.75
%
 
1.65
%
 
0.375
%
Less than 2.00 to 1.00
 
2.50
%
 
1.50
%
 
1.50
%
 
0.350
%


The Term Loan A provides for quarterly principal payments of 2.50% of the aggregate principal amount commencing with the fiscal quarter ending June 30, 2019. The Term Loan B provides for quarterly principal payments of 0.25% of the initial aggregate principal amounts commencing with the fiscal quarter ending September 30, 2018.

The Senior Credit Facility contains customary restrictive covenants, subject to certain permitted amounts and exceptions, including covenants limiting our ability to incur additional liens and indebtedness, enter into asset sales, repurchase our equity shares and make certain types of investments.

The Revolver, PLOC, and Term Loan A contain financial maintenance covenants of a maximum consolidated leverage ratio and a consolidated interest coverage ratio (as such terms are defined in the Senior Credit Facility). Our consolidated leverage ratio as of the last day of any fiscal quarter, commencing with the fiscal quarter ending June 30, 2018, may not exceed 4.50 to 1 and reducing gradually during 2019 and 2020 to 3.50 to 1. Our consolidated interest coverage ratio as of the last day of any fiscal quarter, commencing with the fiscal quarter ending June 30, 2018 and thereafter, may not be less than 3.00 to 1. As of June 30, 2018, we were in compliance with our financial covenants.

Nonrecourse Project Debt

Fasttrax Limited, a joint venture in which we indirectly own a 50% equity interest with an unrelated partner, was awarded a concession contract in 2001 with the U.K. MoD to provide a Heavy Equipment Transporter Service to the British Army. Under the terms of the arrangement, Fasttrax Limited operates and maintains 91 HETs for a term of 22 years. The purchase of the HETs by the joint venture was financed through two series of bonds secured by the assets of Fasttrax Limited and a bridge loan totaling approximately £84.9 million (approximately $120 million at the exchange rate on the date of the transaction). The secured bonds are an obligation of Fasttrax Limited and are not a debt obligation of KBR as they are nonrecourse to the joint venture partners. Accordingly, in the event of a default on the notes, the lenders may only look to the assets of Fasttrax Limited for repayment. The bridge loan of approximately £12.2 million (approximately $17 million at the exchange rate on the date of the transaction) was replaced when we and the other joint venture partners funded the joint venture with equity and subordinated notes in 2005.

The secured bonds were issued in two classes consisting of Class A 3.5% Index Linked Bonds in the amount of £56 million (approximately $79 million at the exchange rate on the date of the transaction) and Class B 5.9% Fixed Rate Bonds in the amount of £16.7 million (approximately $24 million at the exchange rate on the date of the transaction).  Semi-annual payments on both classes of bonds commenced in March 2005 and will continue through maturity in 2021.  The subordinated notes payable to each of the partners initially bear interest at 11.25% increasing to 16% over the term of the notes until maturity in 2025.  Semi-annual payments on the subordinated notes commenced in March 2006. For financial reporting purposes, the portion of the subordinated notes payable to us is eliminated in consolidation and consequently, only our partner's portion of the subordinated notes appears in the condensed consolidated financial statements.

Note 15. Income Taxes

The effective tax rate was approximately 22% and 20% for the three and six months ended June 30, 2018, respectively. The effective tax rate was approximately 21% and 23% for the three and six months ended June 30, 2017, respectively. The effective tax rate for the six months ended June 30, 2018 was impacted by a discrete tax expense as a result of obtaining control

35



of the Aspire Defence project subcontracting joint ventures, that was recorded at a lower rate than our estimated annual tax rate for 2018.

Our estimated annual effective tax rate for 2018 is 23% excluding the impact of obtaining control of the Aspire Defence project subcontracting joint ventures. Our estimated annual effective rate is subject to change based on the actual jurisdictions where our 2018 earnings are generated.

On December 22, 2017, the U.S. enacted comprehensive tax legislation commonly referred to as the Tax Cuts and Jobs Act (the "Tax Act") making broad and complex changes to the U.S. tax code. SEC Staff Accounting Bulletin (SAB) 118 provides a measurement period that should not extend beyond one year from the Tax Act enactment date for companies to complete the accounting under ASC 740. In January and April of 2018, the Internal Revenue Service ("IRS") issued guidance which provides additional clarification on certain aspects of the Deemed Repatriation Transition Tax ("Transition Tax") calculation. We applied this guidance which impacted certain tax elections, increasing our estimated Transition Tax liability by approximately $77 million resulting in a total estimated Transition Tax liability of approximately $223 million which was fully offset by foreign tax credits generated by the deemed repatriation as well as foreign tax credit carryforwards available for use. We anticipate additional IRS guidance relative to the Transition Tax and other aspects of the Tax Act to be forthcoming throughout the remainder of 2018. As of June 30, 2018, we have not yet completed our accounting for the income tax effects of the Tax Act and will continue to revise our provisional amounts as additional guidance becomes available.

The valuation allowance for deferred tax assets as of June 30, 2018 and December 31, 2017 was $149 million and $217 million, respectively. The change in the valuation allowance was a decrease of $67 million and decrease of $16 million for the three months ended June 30, 2018 and 2017, respectively, and a decrease of $68 million and decrease of $19 million for the six months ended June 30, 2018 and 2017, respectively. The decrease in valuation allowance primarily related to changes in foreign tax credit carryforwards due to the refinement of provisional impacts recorded related to the Transition Tax. The valuation allowance is primarily related to foreign tax credit carryforwards and foreign and state net operating loss carryforwards that, in the judgment of management, are not more likely than not to be realized. The ultimate realization of deferred tax assets is dependent on the generation of future taxable income during the periods in which those temporary differences become deductible. Management considers the scheduled reversal of deferred tax liabilities (including the impact of available carryback and carryforward periods), projected future taxable income and tax-planning strategies in making this assessment.

The reserve for uncertain tax positions included in "Other liabilities" and "Deferred income taxes" on our condensed consolidated balance sheets as of June 30, 2018 and December 31, 2017 was $105 million and $184 million, respectively. The change in the reserve for uncertain tax positions primarily relates to a settlement with a tax authority during the six months ended June 30, 2018, resulting in a write off of the deferred tax asset that was previously recorded against the uncertain tax position which had no impact on tax expense.

Note 16. U.S. Government Matters

We provide services to various U.S. governmental agencies, which include the U.S. DoD and the Department of State. We may have disagreements or experience performance issues on our U.S. government contracts. When performance issues arise under any of these contracts, the U.S. government retains the right to pursue various remedies, including challenges to expenditures, suspension of payments, fines and suspensions or debarment from future business with the U.S. government. The negotiation, administration and settlement of our contracts are subject to audit by the DCAA. The DCAA serves in an advisory role to the DCMA, and the DCMA is responsible for the administration of the majority of our contracts. The scope of these audits include, among other things, the validity of direct and indirect incurred costs, provisional approval of annual billing rates, approval of annual overhead rates, compliance with the FAR and CAS, compliance with certain unique contract clauses and audits of certain aspects of our internal control systems. Based on the information received to date, we do not believe the completed or ongoing government audits will have a material adverse impact on our results of operations, financial position or cash flows.

Legacy U.S. Government Matters

Between 2002 and 2011, we provided significant support to the U.S. Army and other U.S. government agencies in support of the war in Iraq under the LogCAP III contract. We continue to support the U.S. government around the world under the LogCAP IV and other contracts. We have been in the process of closeout of the LogCAP III contract since 2011, and we expect the closeout process to continue through at least 2019. As a result of our work under LogCAP III, there are claims and disputes pending between us and the U.S. government which need to be resolved in order to close the contract. The closeout process includes resolving objections raised by the U.S. government through a billing dispute process referred to as Form 1s and MFRs. We continue to work with the U.S. government to resolve these issues and are engaged in efforts to reach mutually acceptable resolution of these outstanding matters. However, for certain of these matters, we have filed claims with the ASBCA or the COFC. We also have

36



matters related to ongoing litigation or investigations involving U.S. government contracts. We anticipate billing additional labor, vendor resolution and litigation costs as we resolve the open matters. At this time, we cannot determine the timing or net amounts to be collected or paid to close out these contracts.

Form 1s

The U.S. government has issued Form 1s questioning or objecting to costs we billed to them under cost reimbursable contracts primarily related to (1) our use of private security and our provision of containerized housing under the LogCAP III contract discussed above and (2) our provision of emergency construction services primarily to U.S. government facilities damaged by Hurricanes Katrina and Wilma, under our CONCAP III contract with the U.S. Navy. As a consequence of the issuance of the Form 1s, the U.S. government has withheld payment to us on outstanding invoices, pending resolution of these matters.

The U.S. government has issued and has outstanding Form 1s questioning $171 million of billed costs as of June 30, 2018. They had previously paid us $88 million of the questioned costs related to our services on these contracts. The remaining balance of $83 million as of June 30, 2018 is included on our condensed balance sheet in “Claims and accounts receivable", "Contract assets" and "Accounts Receivable" in the amounts of $77 million, $4 million, and $2 million respectively. In addition, we have withheld $26 million from our subcontractors at June 30, 2018 related to these questioned costs.

While we continue to believe that the amounts we have invoiced the U.S. government are in compliance with our contract terms and that recovery is probable, we also continue to evaluate our ability to recover these amounts as new information becomes known. As is common in the industry, negotiating and resolving these matters is often an involved and lengthy process, which sometimes necessitates the filing of claims or other legal action as discussed above. Concurrent with our continued negotiations with the U.S. government, we await the rulings on the filed claims. We are unable to predict when the rulings will be issued or when the matters will be settled or resolved with the U.S. government.

As a result of the Form 1s, and claims discussed above as well as open audits, we have accrued a reserve for unallowable costs at June 30, 2018 and December 31, 2017 of $55 million and $51 million, respectively, as a reduction to "Claims and accounts receivable" and in "Other liabilities" on our condensed consolidated balance sheets.

Private Security Contractors. Starting in February 2007, we received a series of Form 1s from the DCAA informing us of the U.S. government's intent to deny reimbursement to us under the LogCAP III cost reimbursable contract for amounts related to the use of PSCs by KBR and a subcontractor in connection with its work for KBR providing dining facility services in Iraq between 2003 and 2006. The government challenged $56 million in billings. The government had previously paid $11 million and has withheld payments of $45 million, which as of June 30, 2018 we have recorded as due from the government related to this matter in "Claims and accounts receivable" on our condensed consolidated balance sheets.

On June 16, 2014, we received a decision from the ASBCA which agreed with KBR's position (i) that the LogCAP III contract did not prohibit the use of PSCs to provide force protection to KBR or subcontractor personnel, (ii) that there was a need for force protection and (iii) that the costs were reasonable. The ASBCA also found that the Army breached its obligation to provide force protection. Accordingly, we believe that we are entitled to reimbursement by the Army for the amounts charged by our subcontractors, even if they incurred costs for PSCs. The Army appealed the decision.

On June 12, 2017, we received a second ruling from the ASBCA that we are entitled to recover the withheld costs in the approximate amount of $45 million plus interest related to the use of PSCs. The Army filed a notice of appeal on October 12, 2017 and filed its brief on April 10, 2018. We responded and the Army filed its final brief in June. Oral arguments are expected to occur later this year. At this time, we believe the likelihood that we will incur a loss related to this matter is remote, and therefore we have not accrued any loss provisions related to this matter.

Investigations, Qui Tams and Litigation

The following matters relate to ongoing litigation or federal investigations involving U.S. government contracts. Many of these matters involve allegations of violations of the FCA, which prohibits in general terms fraudulent billings to the U.S. government. Suits brought by private individuals are called "qui tams." We believe the costs of litigation and any damages that may be awarded in the FKTC and Burn Pit matters described below are billable under the LogCAP III contract and that any such costs or damages awarded in the Sodium Dichromate matter, which is now resolved and is described in our 2017 Annual Report on Form 10-K, are billable under the RIO contract and a related indemnity agreement with the U.S. government. All costs billed under LogCAP III or RIO are subject to audit by the DCAA for reasonableness.


37



First Kuwaiti Trading Company arbitration. In April 2008, FKTC, one of our LogCAP III subcontractors providing housing containers, filed for arbitration with the American Arbitration Association all its claims under various LogCAP III subcontracts. After complete hearings on all claims, the arbitration panel awarded FKTC $17 million plus interest for claims involving damages on lost or unreturned vehicles. In addition, we determined that we owe FKTC $32 million in connection with other subcontracts. We paid FKTC $19 million and will pay $4 million on pay-when-paid terms in the contract. We have accrued amounts we believe are payable to FKTC in "Accounts payable" and "Other current liabilities" on our condensed consolidated balance sheets. The remaining $26 million owed to FKTC under the contract has not been billed to the government and we will not do so until the related claims and disputes between KBR and the government over the FKTC living container contract are resolved (see KBR Contract Claim on FKTC containers below). At this time, we believe the likelihood that we would incur a loss related to this matter in excess of the amounts we have accrued is remote.

Burn Pit litigation. Since November 2008, KBR has been served with more than 60 lawsuits in various states alleging exposure to toxic materials resulting from the operation of burn pits in Iraq or Afghanistan in connection with services provided by KBR under the LogCAP III contract. These suits were consolidated in U.S. Federal District Court in Greenbelt, Maryland. The plaintiffs claimed unspecified damages. On January 13, 2017, KBR filed a renewed motion to dismiss and for summary judgment.

On July 19, 2017, the trial court issued its ruling granting KBR’s motions to dismiss on jurisdictional ground and for summary judgment.  In lengthy fact findings, the Court concluded that the military made all the relevant decisions about the use, location and operation of burn pits.  The plaintiffs filed a notice of appeal, and the cases are now pending before the U.S. Court of Appeals for the Fourth Circuit. All briefing has been filed and oral argument took place on May 9, 2018. On June 20, 2018, the Fourth Circuit Court of Appeals affirmed the District Court's dismissal. We anticipate that plaintiffs will consider filing an application for writ of certiorari to the U.S. Supreme Court. At this time, we believe the likelihood that we would incur a loss related to this matter is remote. As of June 30, 2018, no amounts have been accrued.

Qui tams. We have two qui tam or FCA cases pending, one of which has been joined by the U.S. government (see DOJ False Claims Act complaint - Iraq Subcontractor below) and one qui tam case that was concluded in the first quarter. At this time, we believe the likelihood that we would incur a loss in the qui tams the U.S. government has not joined is remote and as of June 30, 2018, no amounts have been accrued. Costs incurred in defending the qui tams cannot be billed to the U.S. government until those matters are successfully resolved in our favor. If successfully resolved, we can bill 80% of the costs to the U.S. government under federal regulations. As of June 30, 2018, we have incurred and expensed $4 million in legal costs incurred in defending ourselves in qui tams. These cases are discussed below:

Barko qui tam. Relator Harry Barko, a KBR subcontracts administrator in Iraq for a year in 2004/2005, filed a qui tam lawsuit in June 2005 in the U.S. District Court for the District of Columbia, alleging violations of the FCA by KBR and its subcontractors Daoud & Partners and Eamar Combined for General Trading and Contracting. The DOJ investigated Barko's allegations and elected not to intervene. The claim was unsealed in March of 2009. On March 14, 2017, the Court granted KBR's motion for summary judgment and dismissed the case. The plaintiff filed a notice of appeal and oral argument on the appeal took place in early December 2017. On December 27, 2017, the Court of Appeals issued its decision confirming the trial court's granting of KBR's motion for summary judgment. The Relator did not file an application for writ of certiorari to the U.S. Supreme Court and the time for such a filing has expired. The resolution of this matter did not have a material impact to our condensed consolidated financial statements.

Howard qui tam. In March 2011, Geoffrey Howard and Zella Hemphill filed a complaint in the U.S. District Court for the Central District of Illinois alleging that KBR mischarged the U.S. government $628 million for unnecessary materials and equipment. In October 2014, the DOJ declined to intervene and the case was partially unsealed. Discovery is ongoing in this case and is expected to continue into 2019. As of June 30, 2018, no amounts have been accrued.

DOJ False Claims Act complaint - Iraq Subcontractor. In January 2014, the DOJ filed a complaint in the U.S. District Court for the Central District of Illinois against KBR and two former KBR subcontractors, including FKTC, alleging that three former KBR employees were offered and accepted kickbacks from these subcontractors in exchange for favorable treatment in the award and performance of subcontracts to be awarded during the course of KBR's performance of the LogCAP III contract in Iraq. The complaint alleges that as a result of the kickbacks, KBR submitted invoices with inflated or unjustified subcontract prices, resulting in alleged violations of the FCA and the Anti-Kickback Act. The DOJ's investigation dates back to 2004. We self-reported most of the violations and tendered credits to the U.S. government as appropriate. On May 22, 2014, FKTC filed a motion to dismiss, which the U.S. government opposed. Following the submission of our answer in April 2014, the U.S. government was granted a Motion to Strike certain affirmative defenses in March 2015. We do not believe this limits KBR's ability to fully defend all allegations in this matter. As of June 30, 2018, we have accrued our best estimate of probable loss related to an unfavorable settlement of this matter in "Other liabilities" on our condensed consolidated balance sheets. At this time, we believe

38



the likelihood that we would incur a loss related to this matter in excess of the amounts we have accrued is remote. Discovery in the case has been extended to October 2018 and no trial date has been set.

Other matters

KBR Contract Claim on FKTC containers. KBR previously filed a claim before the ASBCA to recover the costs paid to FKTC to settle its requests for equitable adjustment. The DCMA had disallowed the majority of those costs. Those contract claims were stayed in 2013 at the request of the DOJ so that they could pursue the FCA case referenced above. Those claims were reinstated in 2016. We tried our contract appeal in September 2017. Final briefing was filed in early 2018, and closing arguments were held on March 22, 2018. We expect to receive a ruling in late 2018.

Note 17. Other Commitments and Contingencies

Litigation and regulatory matters related to the Company’s restatement of its 2013 annual financial statements
Butorin v. Blount et al, is a May 2014 shareholder derivative complaint pending in the U.S. District Court of Delaware and filed on behalf of the Company naming certain current and former members of the Company's board of directors as defendants and the Company as a nominal defendant. The complaint alleges that the named directors breached their fiduciary duties by permitting the Company's internal controls to be inadequate. KBR has filed a Motion to Dismiss, to which the derivative plaintiff has responded. At this time, we are not yet able to determine the likelihood of loss, if any, arising from this matter.
We also received requests for information and a subpoena for documents from the SEC in 2014 regarding the restatement of our 2013 annual financial statements. We reached a settlement with the SEC in July 2018 which was accrued in "Other current liabilities" on our condensed consolidated balance sheets as of June 30, 2018. The settlement did not have a material impact on our financial statements.

Other matters

Unaoil Investigation. The DOJ, SEC, and the SFO are conducting investigations of Unaoil, a Monaco based company, in relation to international projects involving several global companies, including KBR, whose interactions with Unaoil are a subject of those investigations. KBR believes it is cooperating with the DOJ, SEC, and the SFO in their investigations, including through the voluntary submission of information and responding to formal document requests.

In re KBR, Inc. Securities Litigation. On October 20, 2017, lead plaintiffs filed an amended consolidated complaint asserting violations of the federal securities laws in connection with KBR's disclosures associated with the U.K. Serious Fraud Office's ("SFO") investigations of KBR and its affiliates relating to Unaoil. The Company and individual defendants filed a motion to dismiss the lawsuit on December 4, 2017. Briefing on the motion to dismiss was completed on February 19, 2018. At this time we are not yet able to determine the likelihood of loss, if any, arising from this matter.

Tisnado vs DuPont, et al. In May 2016, KBR was served with a Fourth Amended Petition in Intervention and was brought into a lawsuit which was originally filed on November 14, 2014, in the 11th Judicial District Court of Harris County, Texas. This suit was brought by the family members of persons who died in an incident at the DuPont plant in LaPorte, Texas. We reached a settlement with the plaintiffs in 2018. This settlement was covered by insurance and did not have a material impact to our financial statements. This matter is now resolved.

PEMEX and PEP arbitration

On April 6, 2017, we entered into a settlement agreement with PEMEX and PEP related to a dispute from 2004. The settlement provided for a cash payment to Commisa of $435 million, payment by PEP of all VAT related to the settlement amount and mutual dismissals and releases of all claims related to the EPC 1 project. This matter is resolved and all amounts were paid by PEP in April 2017. As a result of the final settlement, we recognized additional revenues and gross profit of $35 million for the three and six months ended June 30, 2017.


Note 18. Ichthys LNG Project


39



We have a 30% interest in the JKC JV, which has contracted to perform the engineering, procurement, supply, construction and commissioning of onshore LNG facilities for a client in Darwin, Australia the Ichthys LNG Project. The contract between JKC and its client is a hybrid contract containing both cost-reimbursable and fixed-price (including unit-rate) scopes.

JKC has entered into commercial contracts with multiple suppliers and subcontractors to execute various scopes of work on the project. Certain of these suppliers and subcontractors have made contract claims against JKC for recovery of costs and extensions of time in order to progress the works under the scope of their respective contracts due to a variety of issues related to changes to the scope of work, delays and lower than planned subcontractor productivity. In addition, JKC has incurred costs related to scope increases and other factors, and has made claims to its client for matters for which JKC believes reimbursement is entitled under the contract.

As discussed below, the additional costs associated with these various claims and related issues have been included in determining estimated profit at completion. Estimated recoveries associated with the additional change orders, customer claims, and claims against suppliers and subcontractors have also been included in determining estimated profit at completion. Further, there are additional claims we believe our joint venture is entitled to recover from the client and subcontractors related to additional project costs which have been excluded from estimated revenues at completion as appropriate under U.S. GAAP.

Cost Reimbursable Scope

JKC believes any amounts paid or payable to the suppliers and subcontractors in settlement of their contract claims related to cost-reimbursable scope are an adjustment to the contract price, and accordingly JKC has made claims for contract price adjustments under the reimbursable portion of the contract between JKC and its client. However, the client has disputed some of these contract price adjustments and change orders. Those disputed change orders remain unapproved. In order to facilitate the continuation of work under the contract while we work to resolve this dispute, the client agreed to a contractual mechanism (“Deed of Settlement”) in 2016 providing funding in the form of an interim contract price adjustment to JKC for settlement of subcontractor claims as of that date related to the cost-reimbursable scope. While the client reserved its rights under this funding mechanism, those unapproved change orders have accordingly been paid by the client. JKC in turn settled these subcontractor claims which have been funded through the Deed of Settlement by the client.

If JKC's claims against its client which were funded under the Deed of Settlement remain unresolved by December 31, 2020, JKC will be required to refund sums funded by the client under the terms of the Deed of Settlement. We, along with our joint venture partners, are jointly and severally liable to the client for any amounts required to be refunded. While JKC continues to pursue settlement of these disputes with the client, JKC has initiated proceedings and is planning other arbitrations against the client to resolve these open reimbursable supplier and subcontractor claims prior to December 31, 2020.

Our proportionate share of the total amount of the contract price adjustments under the Deed of Settlement, included in the unapproved change orders and claims related to our unconsolidated affiliates discussed above is $168 million and $177 million as of June 30, 2018 and December 31, 2017, respectively.

In September and October 2017, additional change orders pertaining to suppliers and subcontractors under the cost reimbursable portion of the contract were presented to the client. The client funded these change orders, but did not formally approve them as contract price adjustments and have reserved its rights. JKC in turn settled these change orders with the associated suppliers and subcontractors. The formal contract price adjustment for these settlements remained pending at June 30, 2018, but there is no requirement to refund these amounts to the client by a date certain, unlike amounts funded under the Deed of Settlement.

There has been deterioration of paint on certain exterior areas of the plant. The client has requested, and is funding, paint remediation for a portion of the facilities. JKC and its client have not yet resolved the portions of other affected areas that may need to be remediated. JKC’s profit estimate at completion includes those revenues and costs for remediation activities that it has been directed to perform and are being funded by the client.

JKC is entitled to an amount of profit and overhead (“TRC Fee”) which is a fixed percentage of the target reimbursable costs ("TRC") under the reimbursable component of the contract which was to be agreed by JKC and its client. At the time of the contract, JKC and its client agreed to postpone the fixing of the TRC until after a specific milestone in the project had been achieved. Although the milestone was achieved, JKC and its client have been unable to reach agreement on the TRC. This matter was taken to arbitration in 2017. A decision was issued in December 2017 which provided some basis for determination of the TRC amount and the TRC Fee. JKC has included an estimate for the TRC Fee in its determination of profit at completion at December 31, 2017 based on the contract provisions and the decision from the December 2017 arbitration.


40



If the above matters are not resolved for the amounts recorded, or to the extent JKC is unsuccessful in retaining amounts paid to it under the Deed of Settlement and other funding mechanisms used by the client, we would be responsible for our pro-rata portion of any additional costs and refunded sums in excess of the final adjusted contract price, which could have a material adverse effect on our results of operations, financial position and cash flows. Additionally, to the extent the client does not continue to provide adequate funding for project activities prior to resolution of these matters, the joint venture partners will be required to fund working capital requirements of JKC in the near term which could have a material adverse effect on our financial position and cash flows.

Fixed-Price Scope

Pursuant to JKC's fixed-price scope of its contract with its client, JKC awarded a fixed-price EPC contract to a subcontractor for the design, construction and commissioning of a combined cycle power plant ("Power Plant"). The subcontractor was a consortium consisting of General Electric and GE Electrical International Inc. and a joint venture between UGL Infrastructure Pty Limited and CH2M Hill (collectively, the "Consortium"). On January 25, 2017, JKC received a Notice of Termination from the Consortium, and the Consortium ceased work on the Power Plant. JKC believes the Consortium breached its contract and repudiated its obligation to complete the Power Plant, plus undertook actions making it more difficult and more costly for the works to be completed by others after the Consortium abandoned the site. Subsequently, the Consortium filed a request for arbitration with the ICC asserting that JKC was in repudiatory breach of the contract. JKC has responded to this request, denying JKC committed any breach of its contract with the Consortium and restated its claim that the Consortium breached and repudiated its contract with JKC and is furthermore liable to JKC for all costs to complete the Power Plant.

JKC prevailed in a legal action against the Consortium requiring the return of materials, drawings and tools following their unauthorized removal from the site. JKC discovered incomplete and defective engineering designs, defective workmanship on the site, missing, underreported and defective materials; and the improper termination of key vendors/suppliers. As a result, project progress claimed by the Consortium was over reported. JKC has evaluated the cost to complete the Consortium's work, which significantly exceeds the awarded fixed-price subcontract value. JKC cost to complete the Power Plant includes re-design efforts, additional materials and significant re-work represent estimated recoveries of claims against suppliers and subcontractors and have been included in JKC's estimate to complete the Consortium's remaining obligations.

JKC is pursuing recourse against the Consortium to recover all of the costs to complete the Power Plant, plus the additional interest, liquidated damages and other related costs, by means inclusive of calling parent guarantees provided by the Consortium partners. In April 2018, JKC prevailed in its legal action to call the Consortium's bank guarantees (bonds) and received the funds. Each of the Consortium partners has joint and several liability with respect to all obligations under the subcontract.

Estimated costs to complete the Power Plant that have been determined to be probable of recovery from the Consortium under U.S. GAAP have been included as a reduction of cost in our estimate of profit at completion. The estimated recoveries exclude interest, liquidated damages and other related costs which JKC intends to pursue recovery from the Consortium.

On November 30, 2017, JKC made a notification of claim to the Consortium in the amount of $1.7 billion for recovery of these expected costs. The arbitration hearing has been set for October 2019 and we expect a decision in the first half of 2020.

To the extent JKC is unsuccessful in prevailing in the Arbitration and in recovering costs to complete the Power Plant, we would be responsible for our pro-rata portion of unrecovered costs from the Consortium. This could have a material adverse impact on the profit at completion of the contract and thus on our consolidated statements of operations, financial position and cash flow. Additionally, to the extent JKC does not resolve this matter with the Consortium in the near term, the joint venture partners will be required to fund JKC's completion of the combined cycle power plant which could have a material adverse effect on our financial position and cash flows.

Our proportionate share of unapproved change orders, customer claims and estimated recoveries of claims against suppliers and subcontractors related to JKC included in determining estimated profit at completion of the contract are included in the amounts disclosed in Note 9 to our consolidated financial statements.

JKC intends to vigorously pursue approval and collection of amounts under all unapproved change orders and claims, as well as resolution of contingencies within reserved amounts with subcontractors and the client. Further, there are additional claims that JKC believes it is entitled to recover from its client and from subcontractors which have been excluded from estimated revenue and profit at completion as appropriate under U.S. GAAP. These commercial matters may not be resolved in the near term.


41



Note 19. Shareholders’ Equity

The following tables summarize our activity in shareholders’ equity:
Dollars in millions
Total
 
PIC
 
Retained
Earnings
 
Treasury
Stock
 
AOCL
 
NCI
Balance at December 31, 2017
$
1,221

 
$
2,091

 
$
877

 
$
(818
)
 
$
(921
)
 
$
(8
)
Cumulative effect of change in accounting policy, net of tax of $6
144

 

 
144

 

 

 

Adjusted balance at January 1, 2018
1,365

 
2,091

 
1,021

 
(818
)
 
(921
)
 
(8
)
Consolidation and acquisition of noncontrolling in Aspire entities (see Note 5)
74

 
74

 

 

 

 

Share-based compensation
6

 
6

 

 

 

 

Dividends declared to shareholders
(22
)
 

 
(22
)
 

 

 

Repurchases of common stock
(3
)
 

 

 
(3
)
 

 

Issuance of ESPP shares
2

 

 

 
2

 

 

Other noncontrolling interests activity
1

 

 

 

 

 
1

Net income
201

 

 
180

 

 

 
21

Other comprehensive income, net of tax
(14
)
 

 

 

 
(14
)
 

Balance at June 30, 2018
$
1,610

 
$
2,171

 
$
1,179

 
$
(819
)
 
$
(935
)
 
$
14

 
 
 
 
 
 
 
 
 
 
 
 
Dollars in millions
Total
 
PIC
 
Retained
Earnings
 
Treasury
Stock
 
AOCL
 
NCI
Balance at December 31, 2016
$
745

 
$
2,088

 
$
488

 
$
(769
)
 
$
(1,050
)
 
$
(12
)
Share-based compensation
5

 
5

 

 

 

 

Dividends declared to shareholders
(22
)
 

 
(22
)
 

 

 

Repurchases of common stock
(52
)
 

 

 
(52
)
 

 

Issuance of ESPP shares
1

 

 

 
1

 

 

Distributions to noncontrolling interests
(1
)
 

 

 

 

 
(1
)
Net income
117

 

 
114

 

 

 
3

Other comprehensive income, net of tax
18

 

 

 

 
20

 
(2
)
Balance at June 30, 2017
$
811

 
$
2,093

 
$
580

 
$
(820
)
 
$
(1,030
)
 
$
(12
)



Accumulated other comprehensive loss, net of tax
 
June 30,
Dollars in millions
2018
 
2017
Accumulated foreign currency translation adjustments, net of tax of $1 and $3
$
(281
)
 
$
(255
)
Pension and post-retirement benefits, net of tax of $225 and $251
(647
)
 
(772
)
Fair value of derivatives, net of tax of $0 and $0
(7
)
 
(3
)
Total accumulated other comprehensive loss
$
(935
)
 
$
(1,030
)


42




Changes in accumulated other comprehensive loss, net of tax, by component
Dollars in millions
Accumulated foreign currency translation adjustments
 
Accumulated pension liability adjustments
 
Changes in fair value of derivatives
 
Total
Balance at December 31, 2017
$
(258
)
 
$
(660
)
 
$
(3
)
 
$
(921
)
Other comprehensive income adjustments before reclassifications
(28
)
 

 
(4
)
 
(32
)
Amounts reclassified from accumulated other comprehensive income
5

 
13

 

 
18

Balance at June 30, 2018
$
(281
)
 
$
(647
)
 
$
(7
)
 
$
(935
)


Dollars in millions
Accumulated foreign currency translation adjustments
 
Accumulated pension liability adjustments
 
Changes in fair value of derivatives
 
Total
Balance at December 31, 2016
$
(262
)
 
$
(785
)
 
$
(3
)
 
$
(1,050
)
Other comprehensive income adjustments before reclassifications
7

 

 

 
7

Amounts reclassified from accumulated other comprehensive income

 
13

 

 
13

Balance at June 30, 2017
$
(255
)
 
$
(772
)
 
$
(3
)
 
$
(1,030
)



Reclassifications out of accumulated other comprehensive loss, net of tax, by component
 
Six Months Ended June 30,
 
 
Dollars in millions
2018
 
2017
 
Affected line item on the Condensed Consolidated Statements of Operations
Accumulated pension liability adjustments
 
 
 
 
 
    Amortization of actuarial loss (a)
$
(15
)
 
$
(16
)
 
See (a) below
Tax benefit
2

 
3

 
Provision for income taxes
Net pension and post-retirement benefits
$
(13
)
 
$
(13
)
 
Net of tax
 
(a)
This item is included in the computation of net periodic pension cost. See Note 13 to our condensed consolidated financial statements for further discussion.

 
Six Months Ended June 30,
 
 
Dollars in millions
2018
 
2017
 
Affected line item on the Condensed Consolidated Statements of Operations
Accumulated foreign currency adjustments
 
 
 
 
 
    Reclassification of foreign currency adjustments
$
(5
)
 
$

 
Gain on consolidation of Aspire entities
Tax benefit

 

 
Provision for income taxes
Net accumulated foreign currency
$
(5
)
 
$

 
Net of tax


Note 20. Share Repurchases

Authorized Share Repurchase Program

On February 25, 2014, our Board of Directors authorized a plan to repurchase up to $350 million of our outstanding common shares, which replaced and terminated the August 26, 2011 share repurchase program. The authorization does not obligate the

43



Company to acquire any particular number of common shares and may be commenced, suspended or discontinued without prior notice. The share repurchases are intended to be funded through the Company’s current and future cash and the authorization does not have an expiration date.

Withheld to Cover Program

In addition to the plans above, we also have in place a "withheld to cover" program, which allows us to withhold common shares from employees in connection with the settlement of income tax and related benefit withholding obligations arising from the issuance of share based equity awards under the KBR, Inc. 2006 Stock and Incentive Plan.

The table below presents information on our share repurchases activity under these programs:
 
Three Months Ended
 
Six Months Ended
 
June 30, 2018
 
June 30, 2018
 
Number of Shares
 
Average Price per Share
 
Dollars in Millions
 
Number of Shares
 
Average Price per Share
 
Dollars in Millions
Repurchases under the $350 million authorized share repurchase program

 
$

 
$

 

 
$

 
$

Withheld to cover shares
16,321

 
$
18.14

 

 
170,606

 
$
15.69

 
3

Total
16,321

 
$
18.14

 
$

 
170,606

 
$
15.69

 
$
3

 
 
 
 
 
Three Months Ended
 
Six Months Ended
 
June 30, 2017
 
June 30, 2017
 
Number of Shares
 
Average Price per Share
 
Dollars in Millions
 
Number of Shares
 
Average Price per Share
 
Dollars in Millions
Repurchases under the $350 million authorized share repurchase program
3,345,366

 
$
14.93

 
$
50

 
3,345,366

 
$
14.93

 
$
50

Withheld to cover shares
15,475

 
$
14.45

 

 
165,143

 
$
15.08

 
2

Total
3,360,841

 
$
14.92

 
$
50

 
3,510,509

 
$
14.93

 
$
52



Note 21. Income per Share

Basic income per share is based upon the weighted average number of common shares outstanding during the period. Dilutive income per share includes additional common shares that would have been outstanding if potential common shares with a dilutive effect had been issued using the treasury stock method.

A reconciliation of the number of shares used for the basic and diluted income per share calculations is as follows:
 
Three Months Ended June 30,
 
Six Months Ended June 30,
Shares in millions
2018
 
2017
 
2018
 
2017
Basic weighted average common shares outstanding
140

 
141

 
140

 
142

Stock options and restricted shares
1

 

 
1

 

Diluted weighted average common shares outstanding
141

 
141

 
141

 
142



For purposes of applying the two-class method in computing income per share, there were $0.3 million and $1.1 million net earnings allocated to participating securities, or a negligible amount per share and $0.01 per share, for the three and six months ended June 30, 2018, respectively. Net earnings allocated to participating securities for the three and six months ended June 30, 2017 were $0.6 million and $0.8 million, or a negligible amount per share, respectively. The diluted income per share calculation did not include 1.7 million and 1.7 million antidilutive weighted average shares for the three and six months ended June 30, 2018, respectively. The diluted income per share calculation did not include 2.3 million and 2.4 million antidilutive weighted average shares for the three and six months ended June 30, 2017, respectively.


44



Note 22. Financial Instruments and Risk Management

Foreign currency risk. We conduct business globally in numerous currencies and are therefore exposed to foreign currency fluctuations. We may use derivative instruments to reduce the volatility of earnings and cash flows associated with changes in foreign currency exchange rates. We do not use derivative instruments for speculative trading purposes. We generally utilize foreign exchange forwards and currency option contracts to hedge exposures associated with forecasted future cash flows and to hedge exposures present on our balance sheet.

As of June 30, 2018, the gross notional value of our foreign currency exchange forwards and option contracts used to hedge balance sheet exposures was $69 million, all of which had durations of 11 days or less. We also had approximately $181 million (gross notional value) of cash flow hedges which had durations of approximately 25 months or less. The cash flow hedges are primarily related to the British Pound and Australian Dollar. The Australian Dollar hedges are primarily utilized to reduce the volatility of cash flows associated with the forecasted funding of JKC in Australian Dollars.

The fair value of our balance sheet and cash flow hedges included in "Other current assets" and "Other current liabilities" on our condensed consolidated balance sheets was immaterial at June 30, 2018 and December 31, 2017. The fair values of these derivatives are considered Level 2 under ASC 820, Fair Value Measurement, as they are based on quoted prices directly observable in active markets.
The following table summarizes the recognized changes in fair value of our balance sheet hedges offset by remeasurement of balance sheet positions. These amounts are recognized in our condensed consolidated statements of operations for the periods presented. The net of our changes in fair value of hedges and the remeasurement of our assets and liabilities is included in "Other non-operating income (expense)" on our condensed consolidated statements of operations.


 
Three Months Ended
 
Six Months Ended
 
June 30,
 
June 30,
Gains (losses) dollars in millions
2018
 
2017
 
2018
 
2017
Balance sheet hedges - fair value
$
(1
)
 
$
3

 
$
1

 
$
4

Balance sheet position - remeasurement
2

 
(4
)
 
(6
)
 
(11
)
Net
$
1

 
$
(1
)
 
$
(5
)
 
$
(7
)


Note 23. Recent Accounting Pronouncements

In August 2017, the FASB issued ASU No. 2017-12, Derivatives and Hedging (Topic 815) - Targeted Improvements to Accounting for Hedge Activities. This ASU is intended to improve and simplify accounting rules around hedge accounting. This ASU is effective for annual periods beginning after December 15, 2018 and interim periods within those annual periods. Early adoption is permitted. We do not expect adoption of this ASU to be material to our ongoing financial reporting or on known trends, demand, uncertainties and events in our business.

In January 2017, the FASB issued ASU No. 2017-04, Intangibles - Goodwill and Other (Topic 350) - Simplifying the Test for Goodwill Impairment. This ASU eliminates Step 2 from the goodwill impairment test. In addition, income tax effects from any tax deductible goodwill on the carrying amount of the reporting unit should be considered when measuring the goodwill impairment loss, if applicable. The amendments also eliminate the requirements for any reporting unit with a zero or negative carrying amount to perform a qualitative assessment and, if it fails that qualitative test, to perform Step 2 of the goodwill impairment test. An entity still has the option to perform the qualitative assessment for a reporting unit to determine if the quantitative impairment test is necessary. This ASU is effective for annual periods beginning after December 15, 2019 and interim periods within those annual periods. Early adoption is permitted, for interim or annual goodwill impairment tests performed on testing dates after January 1, 2017. We do not expect adoption of this ASU to be material to our ongoing financial reporting or on known trends, demands, uncertainties and events in our business.

In June 2016, the FASB issued ASU No. 2016-13, Financial Instruments - Credit Losses (Topic 326) - Measurement of Credit Losses on Financial Instruments. This ASU requires the measurement of all expected credit losses for financial assets held at the reporting date based on historical experience, current conditions, and reasonable supportable forecast and is effective for annual periods beginning after December 15, 2019 and interim periods within those annual periods. Early adoption is permitted for annual periods after December 15, 2018, including interim periods within those annual periods. We are currently in the process

45



of assessing the impact of this ASU on our financial statements. We have not yet determined the effect of the standard on our ongoing financial reporting or the future impact of adoption on known trends, demands, uncertainties and events in our business.

In February 2016, the FASB issued ASU No. 2016-02, Leases (Topic 842), which requires lessees to recognize in the balance sheet a liability to make lease payments (the lease liability) and a right-of-use asset representing its right to use the underlying asset for the lease term for all leases with terms longer than 12 months. Leases with a term of 12 months or less will be accounted for similar to existing guidance for operating leases. Recognition, measurement and presentation of expenses will depend on classification as a finance or operating lease. This ASU is effective for annual periods beginning after December 15, 2018 and interim periods within those annual periods. Early adoption is permitted. We have developed a detailed plan to implement the new standard and, through a cross functional team, are assessing contractual arrangements that may qualify as leases under the new standard. The impact of the new standard will be a material increase to right of use assets and lease liabilities on the consolidated balance sheet, primarily as a result of operating leases currently not recognized on the balance sheet.

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Introduction

The purpose of MD&A is to disclose material changes in our financial condition since the most recent fiscal year-end and results of operations during the current fiscal period as compared to the corresponding period of the preceding fiscal year. The MD&A should be read in conjunction with the condensed consolidated financial statements, accompanying notes, and our 2017 Annual Report on Form 10-K.

Overview

Our business is organized into three core and two non-core business segments supporting the government services and hydrocarbons markets as follows:

Core business segments

Government Services
Technology
Hydrocarbons Services

Non-core business segments

Non-strategic Business
Other

See additional information on our business segments in Notes 1 and 3 to our condensed consolidated financial statements.

Business Environment and Trends

Our business portfolio includes full life-cycle professional services, project delivery and technologies aligned with the following:
Early Project Advisory
Project Definition
Project Delivery
Operations & Maintenance

Our core business capabilities and offerings include research and development, feasibility and solutions development, specialized technical consulting, systems integration, engineering and design service, process technologies, program management, construction services, commissioning and startup services, highly specialized mission and logistics support solutions, and asset operations and maintenance services. We primarily provide these services to the governments of the U.S., U.K. and Australia and a wide range of customers across the hydrocarbons value chain.
The outlook for government services has improved, with greater interest for increased defense budgets in light of political instability, military conflicts and terrorism coupled with aging military platforms and need for technology upgrades. At the same

46



time, the government services industry remains competitive and the government procurement cycle often is affected by delays, protests, and other challenging dynamics.
We expect that a majority of the U.S. Government business that we seek in the foreseeable future will be awarded through a competitive bidding process. Additionally, our business may be affected by changes in the overall level of U.S. government spending and the alignment of our service and product offerings and capabilities with current and future budget priorities of the U.S. government.
We expect continued opportunities within our global government services business as we add higher value solutions to complement our existing training, operations, maintenance, sustainment and other mission support and logistics services. The Wyle and HTSI acquisitions in the third quarter of 2016 moved KBR’s GS business into the highly technical and professional services industry for clients in the U.S. such as NASA, DoD and other Federal agencies. The completion of the SGT acquisition in April 2018 will position us as one of the top tier service providers at NASA, across multiple space centers and delivers enhanced life-cycle capabilities to support our customers' needs in current and evolving markets for NASA, military, and commercial space. The services we provide include space health and human sciences, systems engineering and technical assistance, test and evaluation, and other high value services. Additionally, we increased our involvement in the Aspire Defence project in the U.K as a result of the acquisition of our partner's 50% interest in the joint venture entities that provide construction and other services to the MoD. As a result of the SGT acquisition and increased involvement in the execution of the Aspire Defence project, we expect a significant increase in total revenues in our GS business segment in 2018 as compared to 2017.
In the hydrocarbons sector, demand for our services depends on the level of capital and operating expenditure of our customers, which is dependent on prevailing market conditions and the availability of resources to support and fund projects. Significant volatility in commodity prices in recent years has resulted in many of our hydrocarbons customers taking steps to defer, suspend or terminate capital expenditures which have resulted in delayed or reduced volumes of business for us. Upstream oil projects have experienced the largest reductions in capital expenditure, as the effect of low oil prices has been more pronounced in this sector. In recent years, our business in the hydrocarbons sector has shifted towards non-oil facing markets, significantly reducing our exposure to lower oil prices. We continue to see opportunities in certain markets, including midstream gas projects such as LNG to satisfy future demand, particularly at locations where major supporting infrastructure already exists (i.e., near existing gas pipelines and electric power grids, port facilities, etc.). Additionally, downstream projects such as petrochemicals, chemicals and fertilizers generally benefit from low feedstock prices and are positively impacted by depressed oil prices. For example, low feedstock prices allow refineries to produce petrochemical end products at higher margins which, in turn, stimulates demand for our process technologies and consulting services. We seek to collaborate with our customers in developing these prospects by using integrated teams, from project conceptualization and technical solutions selection through project award and implementation.
Overall, we believe we have a balanced portfolio of global professional services, program delivery and technologies across the government services and hydrocarbons markets. We believe our increased mix of recurring government services and industrial services offers greater stability and predictability, which enables us to be selective and disciplined to pursue EPC projects in the hydrocarbons markets which are economically attractive.


47



Three months ended June 30, 2018 compared to the three months ended June 30, 2017

Overview of Financial Results

For the quarter ended June 30, 2018, we generated revenues of $1.3 billion and net income attributable to KBR of $42 million. Highlights in the quarter include:

Our GS business segment, which provides full life-cycle support solutions to defense, space, aviation and missions for governmental agencies in the U.S., U.K. and Australia, generated revenues of $868 million and gross profit plus equity in earnings of $77 million for the quarter ended June 30, 2018. This compares to revenues of $543 million and gross profits plus equity in earnings of $55 million for the quarter ended June 30, 2017. The current quarter improvements were driven by revenue and earnings from the consolidation of the Aspire Defence project entities, acquisition of SGT, and growth on LogCAP IV and other international base operation and support contracts for the U.S. military.

Our Technology business segment, which provides licensed technologies and knowledge-based services to the hydrocarbons value chain, generated revenues of $72 million and gross profits of $22 million for the quarter ended June 30, 2018. This compares to revenues of $70 million and gross profits of $17 million for the quarter ended June 30, 2017. The current quarter improvements were driven by mix of work and improved chargeability of our operating centers.

Our HS business segment, where we provide comprehensive project and program delivery capability globally for the hydrocarbons value chain, generated revenues of $327 million and gross profit plus equity in earnings of $41 million in the quarter ended June 30, 2018. This compares to revenues of $474 million and gross profits plus equity in earnings of $69 million in the quarter ended June 30, 2017. The decrease in revenue was primarily driven by projects that were completed or substantially completed during the past 12 months. Gross profits plus equity in earnings for the current quarter decreased compared to the prior year primarily due to the non-recurrence of the $35 million PEMEX settlement that was recognized in 2017, projects completing or nearing completion, the under recovery of resources, and reduced activity on the Ichthys LNG project as it nears completion. These decreases were partially offset by the recognition of the incentive fees associated with variable consideration recognized as a result of successful completion and performance testing of a major Hydrocarbons Services project.

Our Non-strategic Business segment generated no revenues and no gross profit during the quarter ended June 30, 2018 compared to revenues of $7 million and gross losses of $1 million in the quarter ended June 30, 2017. All Non-Strategic Business projects are substantially complete as of June 30, 2018. We continue to finalize project close-out activities and negotiate the settlement of claims and various other matters associated with these projects.

The information below is an analysis of our consolidated results for the three months ended June 30, 2018. See Results of Operations by Business Segment below for additional information describing the performance of each of our reportable segments.

Revenues
Three Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Revenues
$
1,267

 
$
1,094

 
$
173

 
16
%

The increase in consolidated revenues was primarily driven by the consolidation of the Aspire Defence project entities as discussed in Note 5 to our condensed consolidated financial statements, acquisition of SGT, and organic growth on LogCAP IV and other contracts within our GS business segment. The increase was partially offset by decreased revenue in our HS segment caused by reduced activity and the completion or near completion of several projects in the U.S. and Canada, the non-recurrence of $35 million in revenue from the PEMEX settlement that occurred in 2017, and decreased revenues in our non-strategic segment as we exit that business.


48



Gross Profit
Three Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Gross profit
$
130

 
$
108

 
$
22

 
20
%

The increase in consolidated gross profit was primarily caused by the consolidation of the Aspire Defence project entities as discussed in Note 5 to our condensed consolidated financial statements, acquisition of SGT, and organic growth on LogCAP IV and other contracts within our GS business segment and increased profit in our Technology segment. These increases were partially offset by decreased profit in our HS segment due to reduced activity and the non-recurrence of the PEMEX settlement.
 
Equity in Earnings of Unconsolidated Affiliates
Three Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Equity in earnings of unconsolidated affiliates
$
10

 
$
32

 
$
(22
)
 
(69
)%

The decrease in equity in earnings of unconsolidated affiliates was primarily due to the consolidation of the Aspire Defence project entities and reduced activity on the Ichthys LNG project as it nears completion.
 
General and Administrative Expenses
Three Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
General and administrative expenses
$
(41
)
 
$
(38
)
 
$
(3
)
 
8
%

The increase in general and administrative expenses was primarily due to $4 million of G&A expenses related to SGT which was acquired on April 25, 2018 and increased expense associated with the organic growth in our GS business segment. These increases were partially offset by reduced general and administrative expenses in our HS and Other business segments. General and administrative expenses in the second quarter of 2018 and 2017 included $21 million and $23 million, respectively, related to corporate activities and $20 million and $15 million, respectively, related to the business segments.

Interest Expense
Three Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Interest expense
$
(17
)
 
$
(5
)
 
$
(12
)
 
240
%

The increase in interest expense was primarily due to increased borrowings and an increase in the weighted-average interest rate on our borrowings as a result of the refinancing transaction as discussed in Note 14 to our condensed consolidated financial statements.

Other Non-operating Income (Expense)
Three Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Other non-operating income (expense)
$
(1
)
 
$
2

 
$
(3
)
 
(150
)%

Other non-operating income (expense) includes interest income, foreign exchange gains and losses and other non-operating income or expense items. The change in other non-operating income was primarily due to reduced foreign exchange gains in the current quarter and various other expenses.


49



Provision for Income Taxes
Three Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Income before provision for income taxes and noncontrolling interests
$
80

 
$
100

 
$
(20
)
 
(20
)%
(Provision) for income taxes
$
(18
)
 
$
(21
)
 
$
3

 
(14
)%

Our provision for income taxes for the three months ended June 30, 2018 reflects a 22% tax rate as compared to a 21% tax rate for the three months ended June 30, 2017. See Note 15 to our condensed consolidated financial statements for discussion of changes in our valuation allowance associated with deferred tax assets.

Net Income Attributable to Noncontrolling Interests
Three Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Net income attributable to noncontrolling interests
$
(20
)
 
$
(2
)
 
$
(18
)
 
900
%

The increase in net income attributable to noncontrolling interests was primarily caused by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.


50



Results of Operations by Business Segment

We analyze the financial results for each of our five business segments. The business segments presented are consistent with our reportable segments discussed in Note 3 to our condensed consolidated financial statements.

 
Three Months Ended June 30,
Dollars in millions
2018
 
2017
Revenues
 
 
 
Government Services
$
868

 
$
543

Technology
72

 
70

Hydrocarbons Services
327

 
474

Subtotal
1,267

 
1,087

Non-strategic Business

 
7

Total
$
1,267

 
$
1,094

 
 
 
 
Gross profit (loss)
 
 
 
Government Services
$
71

 
$
37

Technology
22

 
17

Hydrocarbons Services
37

 
55

Subtotal
130

 
109

Non-strategic Business

 
(1
)
Total
$
130

 
$
108

 
 
 
 
Equity in earnings of unconsolidated affiliates
 
 
 
Government Services
$
6

 
$
18

Hydrocarbons Services
4

 
14

Subtotal
10

 
32

Non-strategic Business

 

Total
$
10

 
$
32

 
 
 
 
Total general and administrative expenses
$
(41
)
 
$
(38
)
 
 
 
 
Acquisition and integration related costs
(1
)
 

 
 
 
 
Gain on disposition of assets
$

 
$
1

 
 
 
 
Total operating income
$
98

 
$
103


51



Government Services

GS revenues increased by $325 million, or 60%, to $868 million in the second quarter of 2018, compared to $543 million in the second quarter of 2017. This increase was primarily due to an additional $142 million of revenues from the consolidation of the Aspire Defence project entities due to us becoming the primary beneficiary of these entities as a result of Carillion's liquidation, an additional $90 million of revenues from the acquisition of SGT, strong organic growth in LogCAP IV, progress on Diego Garcia which was awarded in May 2017, and growth on various other contracts. See Note 5 to our condensed consolidated financial statements for more information on the consolidation of the Aspire entities and the acquisition of SGT.

GS gross profit increased by $34 million, or 92%, to $71 million in the second quarter of 2018 compared to $37 million in the second quarter of 2017. This increase was primarily due to $15 million of gross profit from the consolidation of the Aspire Defence project entities due to us becoming the primary beneficiary of these entities as a result of Carillion's liquidation, $7 million of gross profit from the acquisition of SGT, and increases from revenue growth on LogCAP IV.

GS equity in earnings of unconsolidated affiliates decreased by $12 million, or 67%, to $6 million in the second quarter of 2018 compared to $18 million in the second quarter of 2017 primarily due to the consolidation of the Aspire Defence project entities due to us becoming the primary beneficiary of these entities as a result of Carillion's liquidation.

Technology

Technology revenues increased by $2 million, or 3%, to $72 million in the second quarter of 2018 compared to $70 million in the second quarter of 2017. This was due primarily to an increase in our olefins business, partially offset by decreases in proprietary equipment sales and projects that have been completed.

Technology gross profit increased by $5 million, or 29%, to $22 million in the second quarter of 2018 compared to $17 million in the second quarter of 2017. This increase was primarily driven by mix of work and improved chargeability of our operating centers.

Hydrocarbons Services

HS revenues decreased by $147 million, or 31%, to $327 million in the second quarter of 2018, compared to $474 million in the second quarter of 2017. This decrease was primarily due to reduced activity on several projects nearing completion in the U.S and Canada, and the non-recurrence of $35 million in revenue from the PEMEX settlement that occurred in 2017. These decreases were partially offset by the recognition of the incentive fees associated with variable consideration recognized as a result of successful completion and performance testing of a major Hydrocarbons Services project and increased volume on Ichthys, along with new wins and growth on existing projects during the second quarter of 2018.

HS gross profit decreased by $18 million, or 33% to $37 million in the second quarter of 2018, compared to $55 million in the second quarter of 2017. This decrease was primarily due to the nonrecurring PEMEX settlement of $35 million in 2017, projects nearing completion and the under recovery of resources. These decreases were partially offset by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.

HS equity in earnings of unconsolidated affiliates decreased by $10 million, or 71% to $4 million in the second quarter of 2018, compared to earnings of $14 million in the second quarter of 2017. This decrease was primarily due to reduced activity on the Ichthys LNG project as it nears completion. See Notes 9, 12, and 18 to our condensed consolidated financial statements for more information on the Ichthys JV.
Non-strategic Business

Non-strategic Business revenues decreased by $7 million, or 100%, to $0 million in the second quarter of 2018 compared to $7 million in the second quarter of 2017. This decrease was primarily due to the substantial completion of several power projects as we exit that business.

Non-strategic Business gross profit was $0 million in the second quarter of 2018 compared to a gross loss of $1 million in the second quarter of 2017. This increase was primarily due to losses recognized in 2017 that did not recur in 2018.

Changes in Estimates

Information relating to our changes in estimates is discussed in Note 3 to our condensed consolidated financial statements.


52




Six months ended June 30, 2018 compared to the six months ended June 30, 2017

Overview of Financial Results

For the six months ended June 30, 2018, we generated revenues of $2.3 billion and net income attributable to KBR of $180 million, compared to revenues of $2.2 billion and net income attributable to KBR of $114 million for the six months ended June 30, 2017. The increase in revenues and net income were primarily driven by the consolidation of the Aspire Defence project entities, acquisition of SGT, and growth on existing projects in our GS business segment as well as the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.

Our GS business segment generated revenues of $1.5 billion and gross profits plus equity in earnings of $137 million for the six months ended June 30, 2018, compared to revenues of $1.1 billion and gross profits plus equity in earnings of $101 million for the six months ended June 30, 2017. The improvements were driven by the consolidation of the Aspire Defence project entities as discussed in Note 5 to our condensed consolidated financial statements, which resulted in $249 million of additional revenues, $90 million in revenues from the acquisition of SGT, and strong organic growth on LogCAP IV and other international base operation and support contracts for the U.S. military.

Our Technology business segment generated revenues of $134 million and gross profits of $38 million for the six months ended June 30, 2018, compared to revenues of $136 million and gross profits of $31 million for the six months ended June 30, 2017. The decrease in revenue was primarily caused by decreases in proprietary equipment sales, partially offset by increases in syngas, chemicals, and olefins revenues. However, profit margins were favorably impacted by mix of work and improved chargeability of our operating centers in the six months ended June 30, 2018, resulting in higher gross profits compared to the six months ended June 30, 2017.

Our HS business segment generated revenues of $626 million and gross profit plus equity in earnings of $71 million for the six months ended June 30, 2018 compared to revenues of $973 million and gross profits plus equity in earnings of $102 million for the six months ended June 30, 2017. The decrease in revenue was primarily caused by projects that were completed or substantially completed during the last 12 months. The decrease in gross profit plus equity in earnings was primarily due to the reduction in revenues and the non-recurrence of the $35 million PEMEX settlement recognized in 2017. These decreases were partially offset by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.

Our Non-strategic Business segment generated no revenues and a gross loss of $2 million for the six months ended June 30, 2018 compared to revenues of $33 million and gross losses of $3 million for the six months ended June 30, 2017. All Non-Strategic Business projects are substantially complete as of June 30, 2018. We continue to finalize project close-out activities and negotiate the settlement of claims and various other matters associated with these projects.

The information below is an analysis of our consolidated results for the six months ended June 30, 2018 compared to the six months ended June 30, 2017. See Results of Operations by Business Segment below for additional information describing the performance of each of our reportable segments.
Revenues
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Revenues
$
2,305

 
$
2,200

 
$
105

 
5
%

The increase in consolidated revenues was primarily driven by the consolidation of the Aspire Defence project entities as discussed in Note 5 to our condensed consolidated financial statements, acquisition of SGT, and organic growth on LogCAP IV and other contracts within our GS business segment. The increase was partially offset by decreased revenue in our HS segment caused by reduced activity and the completion or near completion of several projects in the U.S. and Canada, the non-recurrence of $35 million in revenue from the PEMEX settlement that occurred in 2017, and decreased revenues in our non-strategic segment as we exit that business.


53



Gross Profit
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Gross profit
$
211

 
$
190

 
$
21

 
11
%

The increase in gross profit was primarily caused by the consolidation of the Aspire Defence project entities as discussed in Note 5 to our condensed consolidated financial statements, acquisition of SGT, and organic growth on LogCAP IV and other contracts within our GS business segment and increased profit in our Technology segment. These increases were partially offset by decreased profit in our HS segment due to reduced activity and the non-recurrence of the PEMEX settlement.

Equity in Earnings of Unconsolidated Affiliates
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Equity in earnings of unconsolidated affiliates
$
33

 
$
41

 
$
(8
)
 
(20
)%

The decrease in equity in earnings of unconsolidated affiliates was primarily due to the consolidation of the Aspire Defence project entities and losses from a joint venture in Mexico, partially offset by increased earnings on our Ichthys LNG project joint venture and a European JV. See Notes 9, 12, and 18 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

General and Administrative Expenses
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
General and administrative expenses
$
(76
)
 
$
(70
)
 
$
(6
)
 
9
%

The increase in general and administrative expenses was primarily due to $4 million of G&A expenses related to SGT which was acquired on April 25, 2018 and increased expense due to the organic growth in our GS business segment. General and administrative expenses in the six months ended June 30, 2018 and 2017 included $42 million and $43 million, respectively, related to corporate activities and $34 million and $27 million, respectively, related to the business segments.

Acquisition and Integration Related Costs
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Acquisition and integration related costs
$
(4
)
 
$

 
$
(4
)
 
N/A

The increase in acquisition and integration related costs was primarily due to $3 million of direct, incremental costs related to the acquisition of SGT and approximately $1 million related to the consolidation of the Aspire Defence project entities.

Gain on Consolidation of Aspire Entities
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Gain on consolidation of Aspire entities
$
115

 
$

 
$
115

 
N/A

The gain on consolidation of Aspire entities was due to the $115 million gain recognized upon the consolidation of the Aspire Defence project entities. See Note 5 to our condensed consolidated financial statements for additional information.


54



Interest Expense
Six Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Interest expense
$
(23
)
 
$
(10
)
 
$
(13
)
 
130
%

The increase in interest expense was primarily due to increased borrowings and an increase in the weighted-average interest rate on our borrowings as a result of the refinancing transaction as discussed in Note 14 to our condensed consolidated financial statements.
Other Non-operating Income (Expense)
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Other non-operating income (expense)
$
(3
)
 
$
(5
)
 
$
2

 
(40
)%

Other non-operating income (expense) includes interest income, foreign exchange gains and losses and other non-operating income or expense items. The decrease in other non-operating expense was primarily due to an increase in interest income associated with the cash balances held by the Aspire Defence project entities. See Note 5 to our condensed consolidated financial statements for discussion of the Aspire entities.
Provision for Income Taxes
Six Months Ended June 30,
 
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Income before provision for income taxes and noncontrolling interests
$
253

 
$
151

 
$
102

 
68
%
Provision for income taxes
$
(52
)
 
$
(34
)
 
$
(18
)
 
53
%

Our provision for income taxes for the six months ended June 30, 2018 reflects a 20% tax rate as compared to a 23% tax rate for the six months ended June 30, 2017. The 2018 period provision for income taxes is higher than the 2017 period primarily due to higher income before provision for income taxes related to the gain of approximately $115 million recognized in the first quarter of 2018 as a result of obtaining control of the Aspire Defence project subcontracting joint ventures. See Note 15 to our condensed consolidated financial statements for further discussion on income taxes.

Net Income Attributable to Noncontrolling Interests
Six Months Ended June 30,
  
 
 
 
 
2018 vs. 2017
Dollars in millions
2018
 
2017
 
$
 
%
Net income attributable to noncontrolling interests
$
(21
)
 
$
(3
)
 
$
(18
)
 
600
%

The increase in net income attributable to noncontrolling interests was primarily caused by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.


55



Results of Operations by Business Segment

We analyze the financial results for each of our five business segments. The business segments presented are consistent with our reportable segments discussed in Note 3 to our condensed consolidated financial statements.

 
Six Months Ended June 30,
Dollars in millions
2018
 
2017
Revenues
 
 
 
Government Services
$
1,545

 
$
1,058

Technology
134

 
136

Hydrocarbons Services
626

 
973

Subtotal
2,305

 
2,167

Non-strategic Business

 
33

Total
$
2,305

 
$
2,200

 
 
 
 
Gross profit (loss)
 
 
 
Government Services
$
123

 
$
74

Technology
38

 
31

Hydrocarbons Services
52

 
88

Subtotal
213

 
193

Non-strategic Business
(2
)
 
(3
)
Total
$
211

 
$
190

 
 
 
 
Equity in earnings of unconsolidated affiliates
 
 
 
Government Services
$
14

 
$
27

Hydrocarbons Services
19

 
14

Subtotal
33

 
41

Non-strategic Business

 

Total
$
33

 
$
41

 
 
 
 
Total general and administrative expenses
$
(76
)
 
$
(70
)
 
 
 
 
Acquisition and integration related costs
$
(4
)
 
$

 
 
 
 
Gain on disposition of assets
$

 
$
5

 
 
 
 
Gain on consolidation of Aspire entities
$
115

 
$

 
 
 
 
Total operating income
$
279

 
$
166


56



Government Services

GS revenues increased by $487 million, or 46%, to $1.5 billion in the six months ended June 30, 2018, compared to $1.1 billion in the six months ended June 30, 2017. This increase was primarily due to an additional $246 million of revenues from the consolidation of the Aspire Defence project entities, an additional $90 million of revenues from the acquisition of SGT, and strong organic growth in LogCAP IV, progress on Diego Garcia which was awarded in May 2017, and growth on various other contracts. See Note 5 to our condensed consolidated financial statements for more information on the consolidation of the Aspire entities and the acquisition of SGT.
 
GS gross profit increased by $49 million, or 66%, to $123 million in the six months ended June 30, 2018, compared to $74 million in the six months ended June 30, 2017. This increase was primarily due to $28 million of gross profit from the consolidation of the Aspire Defence project entities, $7 million of gross profit from the acquisition of SGT, and the increased revenue from growth on LogCAP IV.

GS equity in earnings of unconsolidated affiliates decreased by $13 million, or 48%, to $14 million in the six months ended June 30, 2018 compared to $27 million in the six months ended June 30, 2017. This decrease was primarily due to the consolidation of the Aspire Defence project entities.

Technology

Technology revenues decreased by $2 million, or 1%, to $134 million in the six months ended June 30, 2018, compared to $136 million in the six months ended June 30, 2017 primarily due to a decrease in proprietary equipment sales, partially offset by increases in our olefins, chemicals, and syngas technology applications.

Technology gross profit increased by $7 million, or 23%, to $38 million in the six months ended June 30, 2018, compared to $31 million in the six months ended June 30, 2017, primarily driven by mix of work and improved chargeability of our operating centers.

Hydrocarbons Services

HS revenues decreased by $347 million, or 36%, to $626 million in the six months ended June 30, 2018, compared to $973 million in the six months ended June 30, 2017. This decrease was primarily due to reduced activity and the completion or near completion of several projects in the U.S. and Canada, and the non-recurrence of $35 million in revenue from the PEMEX settlement that occurred in 2017. These decreases were partially offset by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.

HS gross profit decreased by $36 million, or 41%, to $52 million in the six months ended June 30, 2018, compared to $88 million in the six months ended June 30, 2017. This decrease was primarily due to the non-recurrence of $35 million in revenue from the PEMEX settlement that occurred in 2017 and projects completing or nearing completion and the under recovery of resources. These decreases were partially offset by the recognition of variable consideration associated with the successful completion and performance testing of a major Hydrocarbons Services project.

HS equity in earnings of unconsolidated affiliates increased by $5 million, or 36%, to $19 million in the six months ended June 30, 2018, compared to $14 million in the six months ended June 30, 2017. This increase was primarily due to an increase in earnings provided by the Ichthys LNG project, partially resulting from increased cost estimates in the first quarter of 2017 that did not recur in 2018, and increased earnings on a JV in Europe. These increases were partially offset by decreased earnings on a joint venture in Mexico. See Notes 9, 12, and 18 to our condensed consolidated financial statements for more information on the Ichthys LNG project.

Non-strategic Business

Non-strategic Business revenues decreased by $33 million, or 100%, to $0 million in the six months ended June 30, 2018, compared to $33 million in the six months ended June 30, 2017. This decrease was due to completion or near completion of two power projects as we exit that business.

Non-strategic Business incurred a gross loss of $2 million in the six months ended June 30, 2018, compared to a loss of $3 million in the six months ended June 30, 2017. The current year gross loss was associated with close-out activities on completed projects as we exit the business.


57



Changes in Estimates

Information relating to our changes in estimates is discussed in Note 3 to our condensed consolidated financial statements. See Notes 9, 12, and 18 to our condensed consolidated financial statements for more information on the Ichthys JV.

Backlog of Unfilled Orders

Backlog generally represents the dollar amount of revenues we expect to realize in the future as a result of performing work on contracts and our pro-rata share of work to be performed by unconsolidated joint ventures. We generally include total expected revenues in backlog when a contract is awarded under a legally binding agreement. In many instances, arrangements included in backlog are complex, nonrepetitive and may fluctuate over the contract period dependent upon critical project decisions to be made by the customer. Additionally, nearly all contracts allow customers to terminate the agreement at any time for convenience. Where contract duration is indefinite and clients can terminate for convenience without compensating us for periods beyond the date of termination, backlog is limited to the estimated amount of expected revenues within the following twelve months. Certain contracts provide maximum dollar limits, with actual authorization to perform work under the contract agreed upon on a periodic basis with the customer. In these arrangements, only the amounts authorized are included in backlog. For projects where we act solely in a project management capacity, we only include the expected value of our services in backlog.

We define backlog, as it relates to U.S. government contracts, as our estimate of the remaining future revenue from existing signed contracts over the remaining base contract performance period (including customer approved option periods) for which work scope and price have been agreed with the customer. We define funded backlog as the portion of backlog for which funding currently is appropriated, less the amount of revenue we have previously recognized. We define unfunded backlog as the total backlog less the funded backlog. Our GS backlog does not include any estimate of future potential delivery orders that might be awarded under our government-wide acquisition contracts, agency-specific indefinite delivery/indefinite quantity contracts, or other multiple-award contract vehicles nor does it include option periods that have not been exercised by the customer.

Within our GS business segment, we calculate estimated backlog for long-term contracts associated with the U.K. government's PFIs based on the aggregate amount that our client would contractually be obligated to pay us over the life of the project. We update our estimates of the future work to be executed under these contracts on a quarterly basis and adjust backlog if necessary.

We have included in the table below our proportionate share of unconsolidated joint ventures' estimated revenues. Since these projects are accounted for under the equity method, only our share of future earnings from these projects will be recorded in our results of operations. Our proportionate share of backlog for projects related to unconsolidated joint ventures totaled $2.6 billion at June 30, 2018 and $7.2 billion at December 31, 2017. Our backlog included in the table below for projects related to consolidated joint ventures with noncontrolling interests includes 100% of the backlog associated with those joint ventures and totaled $6.4 billion at June 30, 2018 and $125 million at December 31, 2017.


58



The following table summarizes our backlog by business segment for the periods ended June 30, 2018 and December 31, 2017, respectively:
 
June 30,
 
December 31,
Dollars in millions
2018
 
2017
Government Services
$
10,842

 
$
8,355

Technology
509

 
387

Hydrocarbons Services
2,140

 
1,822

Subtotal
13,491

 
10,564

Non-strategic Business
4

 
6

Total backlog
$
13,495

 
$
10,570


Backlog in our Government Services business segment at June 30, 2018 was $10.8 billion, an increase of $2.5 billion when compared to backlog of $8.4 billion at December 31, 2017. The increase was primarily due to including 100% of backlog associated with the consolidation of the Aspire Defence subcontracting joint ventures as of June 30, 2018, as compared to our 50% proportionate share of backlog for these entities as of December 31, 2017 and new awards, partially offset by workoff.

Backlog in our Technology business segment at June 30, 2018 was $509 million, an increase of $122 million when compared to backlog of $387 million at December 31, 2017. The increase was primarily the result of new awards, partially offset by workoff.

Backlog in our Hydrocarbons Services business segment at June 30, 2018 was $2.1 billion, an increase of $318 million when compared to backlog of $1.8 billion at December 31, 2017. The increase was primarily the result of new awards, partially offset by backlog workoff.

The difference between backlog of $13.5 billion and the remaining performance obligation as defined by ASC 606 of $10.1 billion is primarily due to our proportionate share of backlog related to unconsolidated joint ventures which is not included in our remaining performance obligation. See Note 4 to our condensed consolidated financial statements for discussion of the remaining performance obligation.

We estimate that as of June 30, 2018, 31% of our backlog will be executed within one year. Of this amount, 82% will be recognized in revenues on our condensed consolidated statement of operations and 18% will be recorded by our unconsolidated joint ventures. As of June 30, 2018, $87 million of our backlog relates to active contracts that are in a loss position.

As of June 30, 2018, 7% of our backlog was attributable to fixed-price contracts, 62% was attributable to PFIs and 31% of our backlog was attributable to cost-reimbursable contracts. For contracts that contain both fixed-price and cost-reimbursable components, we classify the individual components as either fixed-price or cost-reimbursable according to the composition of the contract; however, for smaller contracts, we characterize the entire contract based on the predominant component. As of June 30, 2018, $9.9 billion of our GS backlog was currently funded by our customers.

As of June 30, 2018, we had approximately $4.3 billion of priced option periods for U.S. government contracts that are not included in the backlog amounts presented above.

Transactions with Joint Ventures

We perform many of our projects through incorporated and unincorporated joint ventures. In addition to participating as a joint venture partner, we often provide engineering, procurement, construction, operations or maintenance services to the joint venture as a subcontractor. Where we provide services to a joint venture that we control and therefore consolidate for financial reporting purposes, we eliminate intercompany revenues and expenses on such transactions. In situations where we account for our interest in the joint venture under the equity method of accounting, we do not eliminate any portion of our revenues or expenses. We recognize the profit on our services provided to joint ventures that we consolidate and joint ventures that we record under the equity method of accounting primarily using the percentage-of-completion method. See Note 12 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q for more information. The information discussed therein is incorporated by reference into this Part I, Item 2.

Legal Proceedings


59



Information relating to various commitments and contingencies is described in Notes 16 and 17 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

Liquidity and Capital Resources

Hydrocarbons services projects generally require us to provide credit support for our performance obligations to our customers in the form of letters of credit, surety bonds or guarantees. Our ability to obtain new project awards in the future may be dependent on our ability to maintain or increase our letter of credit and surety bonding capacity, which may be further dependent on the timely release of existing letters of credit and surety bonds. As the need for credit support arises, letters of credit will be issued under our $500 million PLOC or our $500 million Revolver under our Senior Credit Facility. Letters of credit may also be arranged with our banks on a bilateral, syndicated or other basis. We believe we have adequate letter of credit capacity under our Senior Credit Facilities and bilateral lines, as well as adequate surety bond capacity under our existing lines to support our operations and current backlog for the next 12 months.
Cash generated from operations and the new Senior Credit Facility are our primary sources of liquidity.  Our operating cash flow can vary significantly from year to year and is affected by the mix, terms, timing and percentage of completion of our hydrocarbons services projects.  We sometimes receive cash in the early phases of our larger hydrocarbons services fixed-price projects, technology projects, and those of our consolidated joint ventures in advance of incurring related costs.  On reimbursable contracts, we may utilize cash on hand or availability under our Senior Credit Facility to satisfy any periodic operating cash requirements for working capital, as we frequently incur costs and subsequently invoice our customers. We believe that existing cash balances, internally generated cash flows and availability under our Senior Credit Facility are sufficient to support our day-to-day domestic and foreign business operations for the next 12 months.
Cash and equivalents totaled $519 million at June 30, 2018 and $439 million at December 31, 2017 and consisted of the following:
 
June 30,
 
December 31,
Dollars in millions
2018
 
2017
Domestic U.S. cash
$
96

 
$
184

International cash
121

 
194

Joint venture and Aspire Defence project cash
302

 
61

Total
$
519

 
$
439

  
Our cash balances are held in numerous accounts throughout the world to fund our global activities. Domestic cash relates to cash balances held by U.S. entities and is largely used to support project activities of those businesses as well as general corporate needs such as the payment of dividends to shareholders, repayment of debt and potential repurchases of our outstanding common stock.

Our international cash balances may be available for general corporate purposes but are subject to local restrictions, such as capital adequacy requirements and local obligations, including maintaining sufficient cash balances to support our underfunded U.K. pension plan and other obligations incurred in the normal course of business by those foreign entities. Repatriations of our undistributed foreign earnings are now generally free of U.S. tax but may incur withholding and/or state taxes. We still must assess our future U.S. and non-U.S. cash needs such as 1) our anticipated foreign working capital requirements, including funding of our U.K. pension plan, 2) the expected growth opportunities across all geographical markets and 3) our plans to invest in strategic growth opportunities that may include acquisitions around the world. As of June 30, 2018, we have not changed our indefinite reinvestment decision on our undistributed earnings of our foreign subsidiaries.

Joint venture cash and Aspire Defence Project cash balances reflect the amounts held by those entities that we consolidate for financial reporting purposes. These amounts are limited to those entities' activities and are not readily available for general corporate purposes; however, portions of such amounts may become available to us in the future should there be a distribution of dividends to the joint venture partners. We expect that the majority of the joint venture cash balances will be utilized for the corresponding joint venture projects.

As of June 30, 2018, substantially all of our excess cash was held in commercial bank time deposits or interest bearing short-term investment accounts with the primary objectives of preserving capital and maintaining liquidity.
Cash Flows

60



Cash flows activities summary
 
 
 
 
Six Months Ended June 30,
Dollars in millions
2018
 
2017
Cash flows (used in) provided by operating activities
$
(36
)
 
$
210

Cash flows used in investing activities
(332
)
 
(3
)
Cash flows provided by (used in) financing activities
472

 
(261
)
Effect of exchange rate changes on cash
(24
)
 
9

Increase (decrease) in cash and equivalents
$
80

 
$
(45
)

Operating activities. Cash flows from operating activities result primarily from earnings and are affected by changes in operating assets and liabilities which consist primarily of working capital balances for projects. Working capital levels vary from year to year and are primarily affected by the Company's volume of work. These levels are also impacted by the mix, stage of completion and commercial terms of hydrocarbons services projects. Working capital requirements also vary by project depending on the type of client and location throughout the world. Most contracts require payments as the projects progress. Additionally, certain projects receive advance payments from clients. A normal trend for these projects is to have higher cash balances during the initial phases of execution which then decline to equal project earnings at the end of the construction phase. As a result, our cash position is reduced as customer advances are worked off, unless they are replaced by advances on other projects.

The primary components of our working capital accounts are accounts receivable, contract assets, accounts payable and contract liabilities. These components are impacted by the size and changes in the mix of our cost reimbursable versus fixed price projects, and as a result, fluctuations in these components are not uncommon in our business.

Cash used in operations totaled $36 million in the first six months in 2018, primarily resulting from net unfavorable changes of $130 million in working capital balances for projects as discussed below:

Accounts receivable is impacted by the timing and collections on billings to our customers. The $70 million unfavorable cash flow impact related to accounts receivable was primarily related to increases in accounts receivable in our GS U.S. operations and increases in accounts receivable in the consolidated Aspire entities, since the date we obtained control, partially offset by strong collections in our Technology segment.
Contract assets are associated with the timing of billings to our customers and are generally related to our cost reimbursable projects where we bill as we incur project costs. The $38 million unfavorable cash flow impact related to contract assets was primarily related to increases in contract assets related to a downstream EPC project in the U.S. and in various other U.S. government projects.
Accounts payable is impacted by the timing of receipts of invoices from our vendors and subcontractors and payments on these invoices. The $36 million favorable cash flow impact related to accounts payable was primarily related to an increase in accounts payable related to the consolidated Aspire entities subsequent to the date we obtained control and various other U.S. government projects. This increase was partially offset by decreases in accounts payable related to our HS and Technology business segments.
Contract liabilities are associated with our fixed price projects, which we generally structure to be cash positive, and are impacted by the timing of billing for achievement of milestones and payments received from our customers in advance of incurring project costs. The $58 million unfavorable cash flow impact related to contract liabilities was primarily related to funding of projects in Australia within our HS business segment. This unfavorable impact was partially offset by advanced billings in our GS business segment.
In addition, we received distributions of earnings from our unconsolidated affiliates of $9 million and contributed $19 million to our pension funds in the first six months of 2018.
Cash provided by operations totaled $210 million in the first six months in 2017 primarily resulting from net favorable changes of $218 million in working capital balances for projects as discussed below:

Accounts receivable decreased primarily due to collections from customers within our HS business segment associated with several ammonia projects in the U.S. and a road construction project in the Middle East within our GS business segment.

61



Contract assets decreased in the first six months in 2017, due primarily to billings to a customer within our HS business segment associated with progress on a project in the U.S. These decreases were partially offset by the timing of billings to various customers within our Technology business segment.
Claims receivable decreased in the first half of 2017 due to the billing and collection of the outstanding claims receivable associated with the PEMEX litigation settlement.
Accounts payable decreased in the first six months in 2017, primarily due to the power project within our Non-strategic Business segment as the project neared completion as well as the timing of invoicing and payments within the normal course of business.
Contract liabilities decreased in the first six months in 2017, primarily due to the funding of two EPC ammonia projects in the U.S. within our HS business segment as well as a power project within our Non-strategic Business segment as they neared completion.
We received distributions of earnings from our unconsolidated affiliates of $30 million and contributed approximately $18 million to our pension funds in the first six months in 2017.
Investing activities. Cash used in investing activities totaled $332 million in the first six months in 2018 and was primarily due to the acquisition of SGT and investment in JKC, partially offset by the incremental cash resulting from the consolidation of the Aspire entities.

Cash used in investing activities totaled $3 million in the first six months in 2017 and was primarily used in the purchase of equipment.

Financing activities. Cash provided by financing activities totaled $472 million in the first six months of 2018 and includes $120 million in borrowings on our terminated Credit Agreement, $130 million on our new Revolver, $959 million in borrowings on Term Loans A and B, offset by the $590 million payoff of our terminated Credit Agreement, $15 million in payments on our new Revolver, $46 million debt issuance costs, $23 million for dividend payments to common shareholders and $56 million to acquire the noncontrolling interest in the Aspire project entities and the remaining 25% noncontrolling interest in one of our other joint ventures.

Cash used in financing activities totaled $261 million in the first six months of 2017 and included $180 million of payments on our Credit Agreement, $52 million of common stock repurchases and $23 million for dividend payments to common shareholders.

Future sources of cash. We believe that future sources of cash include cash flows from operations, cash derived from working capital management, and cash borrowings under our Senior Credit Facility.

Future uses of cash. We believe that future uses of cash include working capital requirements, funding of recognized project losses, joint venture capital calls, capital expenditures, dividends, pension funding obligations, repayments of borrowings under our Senior Credit Facility, share repurchases and strategic investments including acquisitions. Our capital expenditures will be focused primarily on facilities and equipment to support our businesses. In addition, we will use cash to make payments under operating leases and various other obligations, including potential litigation payments, as they arise.

Other factors potentially affecting liquidity

Ichthys LNG Project. As discussed in Note 18 to our condensed consolidated financial statements, JKC has included in its project estimates-at-completion significant revenues associated with unapproved change orders and customer claims plus estimated recoveries of claims against suppliers and subcontractors. If JKC does not resolve these matters for the amounts recorded, we would be responsible for funding our pro-rata portion of costs ultimately necessary to complete the project.  Also, to the extent the client does not continue to provide adequate funding for project activities prior to resolution of these matters, the joint venture partners will be required to fund working capital requirements of JKC.

In addition, JKC has estimated it will incur substantial costs to complete the power plant under the fixed price portion of the Ichthys LNG contract. While JKC believes these costs are recoverable from the Consortium who abandoned the project as the original subcontractor, we expect it will take a legal process to complete such recovery. This legal process may take several years. As a result, we expect to fund JKC for our portion of the working capital requirements to complete the power plant as these legal proceedings are underway. JKC's obligations to the client are guaranteed on a joint and several basis by the joint venture partners.

62



To the extent our joint venture partners are unable to complete their obligations, we may be required to fund incremental amounts above our 30% ownership interest.
  
During the six months ended June 30, 2018, we made additional investments in JKC of approximately $162 million to fund our proportionate share of the ongoing project execution activities. We are projecting our funding requirements to JKC to be in the range of $140-$240 million over the next 12 months.

Negotiations and legal proceedings with the client and the subcontractors are ongoing, the goal of which is to minimize these expected outflows.

U.K. pension obligation. We recognized on our balance sheet a funding deficit of $349 million (measured as the difference between the fair value of plan assets and the projected benefit obligation) for our frozen defined benefit pension plans. The total amounts of employer pension contributions paid for the six months ended June 30, 2018 were $19 million and primarily related to our defined benefit plan in the U.K. The funding requirements for our U.K. pension plan are determined based on the U.K. Pensions Act 1995. Annual minimum funding requirements are based on a binding agreement with the trustees of the U.K. pension plan that is negotiated on a triennial basis with the next valuation period beginning in April 2018. The binding agreement also includes other assurances and commitments regarding the business and assets that support the U.K. pension plan. In the future, such pension funding may increase or decrease depending on changes in the levels of interest rates, pension plan performance and other factors. A significant increase in our funding requirements for the U.K. pension plan could result in a material adverse impact on our financial position.

Credit Agreement and Senior Credit Facility

Information relating to our Credit Agreement and Senior Credit Facility is described in Note 14 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

Nonrecourse Project Debt

Information relating to our nonrecourse project debt is described in Note 14 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part I, Item 2.

Off-Balance Sheet Arrangements

Letters of credit, surety bonds and guarantees. In connection with certain projects, we are required to provide letters of credit, surety bonds or guarantees to our customers. Letters of credit are provided to certain customers and counterparties in the ordinary course of business as credit support for contractual performance guarantees, advanced payments received from customers and future funding commitments. We have $1 billion in a committed line of credit under our Senior Credit Facility, comprised of the $500 million Revolver and $500 million PLOC. Additionally, we have approximately $324 million of uncommitted lines of credit to support the issuance of letters of credit. Surety bonds are also posted under the terms of certain contracts to guarantee our performance. As of June 30, 2018, with respect to our $500 million Revolver, we have $115 million of outstanding revolver borrowings and have issued $31 million of letters of credit, with $354 million of remaining capacity. With respect to our PLOC, we have $82 million of outstanding letters of credit and $418 million of remaining capacity. With respect to our $324 million of uncommitted lines of credit, we have utilized $235 million for letters of credit as of June 30, 2018, with $89 million of remaining capacity. The total remaining capacity of these committed and uncommitted lines of credit is approximately $861 million. Of the letters of credit outstanding under our Senior Credit Facility, none have expiry dates beyond the maturity date of the Senior Credit Facility. Of the total letters of credit outstanding, $158 million relate to our joint venture operations where the letters of credit are posted using our capacity to support our pro-rata share of obligations under various contracts executed by joint ventures of which we are a member. As the need arises, future projects will be supported by letters of credit issued under our PLOC, revolving credit facility or other lines of credit arranged on a bilateral, syndicated or other basis. We believe we have adequate letter of credit capacity under our PLOC, revolving credit facility and bilateral lines of credit to support our operations for the next 12 months.


63



Critical Accounting Policies and Estimates

For a discussion of the impact of critical accounting policies and estimates on our consolidated financial statements, refer to Item 7 "Management's Discussion and Analysis of Financial Condition and Results of Operations" included in the 2017 Form 10-K.

See Note 1, Description of Company and Significant Accounting Policies, to our condensed consolidated financial statements for a discussion of the potential impact of new accounting standards on our unaudited condensed consolidated financial statements.


Item 3. Quantitative and Qualitative Disclosures about Market Risk

We invest excess cash and equivalents in short-term securities, primarily time deposits, which carry a fixed rate of return for a given duration of time. Additionally, a substantial portion of our cash balances are maintained in foreign countries.

We are exposed to market risk associated with changes in foreign currency exchange rates, which may adversely affect our results of operations and financial condition.

We are exposed to and use derivative instruments, such as foreign exchange forward contracts and options to hedge foreign currency risk related to non-functional currency assets and liabilities on our balance sheet. Each period, these balance sheet hedges are marked to market through earnings and the change in their fair value is offset by remeasurement of the underlying assets and liabilities. See Note 22 to our condensed consolidated financial statements and the information discussed therein is incorporated by reference into this Item 3.

We are exposed to market risk for changes in interest rates for borrowings under our Senior Credit Facility, of which there were $1.1 billion as of June 30, 2018.   Borrowings under our Credit Agreement bear interest at variable rates. Our weighted average interest rate for the six months ended June 30, 2018 was 4.63%.  Our weighted average interest rate was 5.56% for the period subsequent to our refinancing transaction discussed in Note 14 to our condensed consolidated financial statements. We had no derivative financial instruments to manage interest rate risk related to outstanding borrowings. If interest rates were to increase by 50 basis points, pre-tax interest expense would increase by approximately $5 million in the next 12 months, based on outstanding borrowings as of June 30, 2018.

Item 4. Controls and Procedures

In accordance with Exchange Act Rules 13a-15 and 15d-15, we carried out an evaluation, under the supervision and with the participation of management, including our Chief Executive Officer and Chief Financial Officer, of the effectiveness of our disclosure controls and procedures as of the end of the period covered by this report. Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of June 30, 2018 to provide reasonable assurance that information required to be disclosed in our reports filed or submitted under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms. Our disclosure controls and procedures include controls and procedures designed to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Beginning January 1, 2018, we adopted ASC 606, Revenue from Contracts with Customers and we implemented changes to our processes and controls related to revenue recognition.  These included the development of new policies based on the five-step model provided in the new revenue standard, new training, ongoing contract review requirements, and gathering of information provided for disclosures.   

We consolidated certain Aspire Defence project entities as of January 15, 2018 and we completed the acquisition of SGT on April 25, 2018. We are in the process of integrating these businesses which may result in additions or changes to our internal controls over financial reporting.





64



PART II. OTHER INFORMATION

Item 1. Legal Proceedings

Information relating to various commitments and contingencies is described in Notes 16 and 17 to our condensed consolidated financial statements in Part I, Item 1 of this Quarterly Report on Form 10-Q, and the information discussed therein is incorporated by reference into this Part II, Item 1.

Item 1A. Risk Factors

There are no material changes from the risk factors previously disclosed in Part I, Item 1A in our Annual Report on Form 10-K, which is incorporated herein by reference, for the year ended December 31, 2017.

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

(a)    None.

(b)    None.

(c)    On February 25, 2014, our Board of Directors authorized a $350 million share repurchase program, which replaced and terminated the August 26, 2011 share repurchase program. The authorization does not specify an expiration date for the share repurchase program. The following is a summary of share repurchases of our common stock settled during the three months ended June 30, 2018.
Purchase Period
Total Number
of Shares
Purchased (1)
 
Average
Price Paid
per Share
 
Total Number  of
Shares  Purchased
as Part of  Publicly
Announced Plan
 
Dollar Value of Maximum Number of Shares that May Yet Be
Purchased Under the Plan
April 1 - 30, 2018
291

 
$
16.50

 

 
$
160,236,157

May 1 - 31, 2018
4,746

 
$
17.24

 

 
$
160,236,157

June 1 - 30, 2018
11,284

 
$
18.57

 

 
$
160,236,157

  

(1)
Shares repurchased include shares acquired from employees in connection with the settlement of income tax and related benefit withholding obligations arising from issuance of share-based equity awards under the KBR, Inc. 2006 Stock and Incentive Plan. Total shares acquired from employees during the three months ended as of June 30, 2018 was 16,321 shares at an average price of $18.14 per share.

65



Item 6. Exhibits
Exhibit
Number
 
Description
 
 
 
 
KBR Amended and Restated Certificate of Incorporation (incorporated by reference to Exhibit 3.1 to KBR’s current report on Form 8-K filed June 7, 2012; File No. 1-33146)
 
 
 
 
Amended and Restated Bylaws of KBR, Inc. (incorporated by reference to Exhibit 3.2 to KBR’s annual report on Form 10-K for the year ended December 31, 2013 filed on February 27, 2014; File No. 1-33146)
 
 
 
 
Credit Agreement, dated as of April 25, 2018, by and among KBR, Inc., Bank of America, N.A., as Administrative Agent, Swing Line Lender and a Letter of Credit Issuer, and the other lenders party thereto (incorporated by reference to Exhibit 10.1 to KBR's current report on Form 8-K filed April 27, 2018)

 
 
 
 
Certification of the Chief Executive Officer Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
 
Certification of the Chief Financial Officer Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002
 
 
 
 
Certification Furnished Pursuant to 18 U.S.C. Section 1350 as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
 
 
 
 
Certification Furnished Pursuant to 18 U.S.C. Section 1350 as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
 
 
 
***101.Def
 
Definition Linkbase Document
 
 
 
***101.Pre
 
Presentation Linkbase Document
 
 
 
***101.Lab
 
Labels Linkbase Document
 
 
 
***101.Cal
 
Calculation Linkbase Document
 
 
 
***101.Sch
 
Schema Linkbase Document
 
 
 
***101.Ins
 
Instance Document - the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document

*
Filed with this Form 10-Q
 
 
 
 
**
Furnished with this Form 10-Q
 
 
 
 
***
Interactive data files
 


66



SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized:
 
KBR, INC.
 
 
 
 
 
 
 
 
/s/ Mark Sopp
 
/s/ Raymond L. Carney
Mark Sopp
 
Raymond L. Carney
Executive Vice President and Chief Financial Officer
 
Vice President and Chief Accounting Officer

Dated: July 30, 2018                      Dated: July 30, 2018


67