NEXTERA ENERGY PARTNERS, LP - Quarter Report: 2015 September (Form 10-Q)
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended September 30, 2015
Commission File Number | Exact name of registrant as specified in its charter, address of principal executive office and registrant's telephone number | IRS Employer Identification Number | ||
001-36518 | NEXTERA ENERGY PARTNERS, LP | 30-0818558 | ||
700 Universe Boulevard Juno Beach, Florida 33408 (561) 694-4000 |
State or other jurisdiction of incorporation or organization: Delaware
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months, and (2) has been subject to such filing requirements for the past 90 days. Yes þ No ¨
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months. Yes þ No ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of "large accelerated filer," "accelerated filer" and "smaller reporting company" in Rule 12b-2 of the Securities Exchange Act of 1934.
Large Accelerated Filer ¨ | Accelerated Filer ¨ | Non-Accelerated Filer þ | Smaller Reporting Company ¨ |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Securities Exchange Act of 1934). Yes ¨ No þ
Number of NextEra Energy Partners, LP common units outstanding as of September 30, 2015: 29,668,745
DEFINITIONS
Acronyms and defined terms used in the text include the following:
Term | Meaning |
2014 Form 10-K | NEP's Annual Report on Form 10-K for the year ended December 31, 2014, as amended |
2014 Consolidated Financial Statements | Management's Discussion and Analysis of Financial Condition and Results of Operations - Overview, Results of Operations, Liquidity and Capital Resources and Quantitative and Qualitative Disclosures about Market Risk and Financial Statement and Supplementary Data which were retrospectively adjusted in NEP's Current Report on Form 8-K filed on September 21, 2015 |
ASA | administrative services agreements |
BLM | U.S. Bureau of Land Management |
Bluewater | wind project located in Huron County, Ontario, Canada |
CITC | Convertible Investment Tax Credit |
COD | commercial operation date |
Conestogo | wind project located in Wellington County, Ontario, Canada |
CSCS agreement | cash sweep and credit support agreement |
FIT | Feed-in-Tariff |
Genesis | solar project that is composed of Genesis Unit 1 and Genesis Unit 2 |
Genesis Unit 1 | Genesis Unit 1 utility-scale solar generating facility located in Riverside County, California |
Genesis Unit 2 | Genesis Unit 2 utility-scale solar generating facility located in Riverside County, California |
GWh | gigawatt-hour(s) |
IPO | initial public offering |
IPP | independent power producer |
Mammoth Plains | wind project located in Dewey and Blaine Counties, Oklahoma |
Management's Discussion | Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations |
MSA | Management Services Agreement among NEP, NEE Management, NEP OpCo and NEP GP |
MW | megawatt(s) |
NEE | NextEra Energy, Inc. |
NEECH | NextEra Energy Capital Holdings, Inc. |
NEE Equity | NextEra Energy Equity Partners, LP |
NEE Management | NextEra Energy Management Partners, LP |
NEE Operating GP | NextEra Energy Operating Partners GP, LLC |
NEER | NextEra Energy Resources, LLC |
NEP | NextEra Energy Partners, LP |
NEP GP | NextEra Energy Partners GP, Inc. |
NEP OpCo | NextEra Energy Operating Partners, LP |
NET Midstream | NET Holdings Management, LLC, a Delaware limited liability company |
NOLs | net operating losses |
Northern Colorado | wind project located in Logan County, Colorado |
Note __ | Note __ to condensed consolidated financial statements |
O&M | operations and maintenance |
Palo Duro | wind project located in Hansford and Ochiltree Counties, Texas |
PEMEX | Petróleos Mexicanos |
PPA | power purchase agreement, which could include contracts under a FIT or RESOP |
Prospectus | NEP’s prospectus filed with the SEC on June 26, 2014 |
RESOP | Renewable Energy Standard Offer Program |
RPS | renewable portfolio standards |
SEC | U.S. Securities and Exchange Commission |
Shafter | solar project located in Shafter, California |
Summerhaven | wind project located in Haldimand County, Ontario, Canada |
U.S. | United States of America |
U.S. Project Entities | project entities located within the U.S. |
Each of NEP and NEP OpCo has subsidiaries and affiliates with names that may include NextEra Energy, NextEra Energy Partners and similar references. For convenience and simplicity, in this report, the terms NEP and NEP OpCo are sometimes used as abbreviated references to specific subsidiaries, affiliates or groups of subsidiaries or affiliates. The precise meaning depends on the context. Discussions of NEP's ownership of subsidiaries and projects refers to its controlling interest in the general partner of NEP OpCo and NEP's indirect interest in and control over the subsidiaries of NEP OpCo. See Note 1 for a description of the noncontrolling interest in NEP OpCo.
2
TABLE OF CONTENTS
Page No. | ||
PART I - FINANCIAL INFORMATION | ||
PART II - OTHER INFORMATION | ||
3
FORWARD-LOOKING STATEMENTS
This report includes forward-looking statements within the meaning of the federal securities laws. Any statements that express, or involve discussions as to, expectations, beliefs, plans, objectives, assumptions, strategies, future events or performance (often, but not always, through the use of words or phrases such as result, are expected to, will continue, is anticipated, aim, believe, will, could, should, would, estimated, may, plan, potential, future, projection, goals, target, outlook, predict and intend or words of similar meaning) are not statements of historical facts and may be forward looking. Forward-looking statements involve estimates, assumptions and uncertainties. Accordingly, any such statements are qualified in their entirety by reference to, and are accompanied by, the following important factors (in addition to any assumptions and other factors referred to specifically in connection with such forward-looking statements) that could have a significant impact on NEP's operations and financial results, and could cause NEP's actual results to differ materially from those contained or implied in forward-looking statements made by or on behalf of NEP in this Form 10-Q, in presentations, on its website, in response to questions or otherwise.
Operational Risks
• | NEP has a limited operating history and its projects may not perform as expected. |
• | NEP's ability to make cash distributions to its unitholders is affected by wind and solar conditions at its projects. |
• | Operation and maintenance of energy projects involve significant risks that could result in unplanned power outages or reduced output. |
• | The wind turbines at some of NEP's projects and at some of NEER's right of first offer projects (ROFO Projects) are not generating the amount of energy estimated by their manufacturers' original power curves, and the manufacturers may not be able to restore energy capacity at the affected turbines. |
• | NEP depends on certain of the projects in its portfolio for a substantial portion of its anticipated cash flows. |
• | Terrorist or similar attacks could impact NEP's projects or surrounding areas and adversely affect its business. |
• | NEP's energy production may be substantially below its expectations if a natural disaster or meteorological conditions damage its turbines, solar panels, other equipment or facilities. |
• | NEP is not able to insure against all potential risks and it may become subject to higher insurance premiums. |
• | Warranties provided by the suppliers of equipment for NEP's projects may be limited by the ability of a supplier to satisfy its warranty obligations or if the term of the warranty has expired or liability limits, which could reduce or void the warranty protections, or the warranties may be insufficient to compensate NEP's losses. |
• | Supplier concentration at certain of NEP's projects may expose it to significant credit or performance risks. |
• | NEP relies on interconnection and transmission facilities of third parties to deliver energy from its projects, and if these facilities become unavailable, NEP's projects may not be able to operate or deliver energy. |
• | NEP's business is subject to liabilities and operating restrictions arising from environmental, health and safety laws and regulations. |
• | NEP's projects may be adversely affected by legislative changes or a failure to comply with applicable energy regulations. |
• | NEP's partnership agreement restricts the voting rights of unitholders owning 20% or more of its common units, and under certain circumstances this could be reduced to 10%. |
• | NEP does not own all of the land on which the projects in its portfolio are located and its use and enjoyment of the property may be adversely affected to the extent that there are any lienholders or leaseholders that have rights that are superior to NEP's rights or the BLM suspends its federal rights-of-way grants. |
• | NEP is subject to risks associated with litigation or administrative proceedings that could materially impact its operations, including future proceedings related to projects it subsequently acquires. |
• | NEP's wind projects located in Canada are subject to Canadian domestic content requirements under their FIT contracts. |
• | NEP's cross-border operations require NEP to comply with anti-corruption laws and regulations of the U.S. government and non-U.S. jurisdictions. |
• | NEP is subject to risks associated with its ownership or acquisition of projects that remain under construction, which could result in its inability to complete construction projects on time or at all, and make projects too expensive to complete or cause the return on an investment to be less than expected. |
Contract Risks
• | NEP relies on a limited number of energy sale counterparties and NEP is exposed to the risk that they are unwilling or unable to fulfill their contractual obligations to NEP or that they otherwise terminate their agreements with NEP. |
• | NEP may not be able to extend, renew or replace expiring or terminated PPAs at favorable rates or on a long-term basis. |
• | If the energy production by or availability of NEP's U.S. projects is less than expected, they may not be able to satisfy minimum production or availability obligations under NEP's U.S. Project Entities’ PPAs. |
Risks Related to NEP's Acquisition Strategy and Future Growth
• | NEP's growth strategy depends on locating and acquiring interests in additional projects consistent with its business strategy at favorable prices. |
• | NEP OpCo's partnership agreement requires that it distribute its available cash, which could limit its ability to grow and make acquisitions. |
• | Lower prices for other fuel sources reduce the demand for wind and solar energy. |
• | Government regulations providing incentives and subsidies for clean energy could change at any time and such changes may negatively impact NEP's growth strategy. |
4
• | NEP's growth strategy depends on the acquisition of projects developed by NEE and third parties, which face risks related to project siting, financing, construction, permitting, the environment, governmental approvals and the negotiation of project development agreements. |
• | NEP's ability to consummate future acquisitions will depend on NEP's ability to finance those acquisitions. |
• | Acquisitions of existing clean energy projects involve numerous risks. |
• | Renewable energy procurement is subject to U.S. state and Canadian provincial regulations, with relatively irregular, infrequent and often competitive procurement windows. |
• | NEP may acquire other sources of clean energy, including natural gas and nuclear projects, and may expand to include other types of assets including transmission projects, and any future acquisition of non-renewable energy projects, including transmission projects, may present unforeseen challenges and result in a competitive disadvantage relative to NEP's more-established competitors. A failure to successfully integrate such acquisitions with NEP's then-existing projects as a result of unforeseen operational difficulties or otherwise, could have a material adverse effect on NEP's business, financial condition, results of operations and ability to grow its business and make cash distributions to its unitholders. |
• | NEP faces substantial competition primarily from regulated utilities, developers, IPPs, pension funds and private equity funds for opportunities in North America. |
Risks Related to NEP's Financial Activities
• | Restrictions in NEP OpCo's subsidiaries' revolving credit facility could adversely affect NEP's business, financial condition, results of operations and ability to make cash distributions to its unitholders. |
• | NEP's cash distributions to its unitholders may be reduced as a result of restrictions on NEP's subsidiaries’ cash distributions to NEP under the terms of their indebtedness. |
• | NEP's subsidiaries’ substantial amount of indebtedness may adversely affect NEP's ability to operate its business and its failure to comply with the terms of its subsidiaries' indebtedness could have a material adverse effect on NEP's financial condition. |
• | Currency exchange rate fluctuations may affect NEP's operations. |
• | NEP is exposed to risks inherent in its use of interest rate swaps. |
• | NEP’s failure to remediate a material weakness in internal controls, and to maintain effective internal controls in the future, could have a material adverse effect on its business. |
Risks Related to NEP's Relationship with NEE
• | NEE exercises substantial influence over NEP and NEP is highly dependent on NEE and its affiliates. |
• | NEP is highly dependent on credit support from NEE and its affiliates. |
• | NEP's subsidiaries may default under contracts or become subject to cash sweeps if credit support is terminated, if NEE or its affiliates fail to honor their obligations under credit support arrangements, or if NEE or another credit support provider ceases to satisfy creditworthiness requirements, and NEP will be required in certain circumstances to reimburse NEE for draws that are made on credit support. |
• | NEER or one of its affiliates is permitted to borrow funds received by NEP's subsidiaries, including NEP OpCo, as partial consideration for its obligation to provide credit support to NEP, and NEER will use these funds for its own account without paying additional consideration to NEP and is obligated to return these funds only as needed to cover project costs and distributions or as demanded by NEP OpCo. |
• | NEP's financial condition and ability to make distributions to its unitholders, as well as its ability to grow distributions in the future, is highly dependent on NEER’s performance of its obligations to return a portion of these funds. |
• | NEP may not be able to consummate future acquisitions from NEER. |
• | NEP GP, NEP's general partner, and its affiliates, including NEE, have conflicts of interest with NEP and limited duties to NEP and its unitholders and they may favor their own interests to the detriment of NEP and holders of NEP's common units. |
• | NEE and other affiliates of NEP GP are not restricted in their ability to compete with NEP. |
• | NEP may be unable to terminate the MSA. |
• | If NEE Management terminates the MSA, NEER terminates the management services subcontract between NEE Management and NEER or either of them defaults in the performance of its obligations thereunder, NEP may be unable to contract with a substitute service provider on similar terms, or at all. |
• | NEP's arrangements with NEE limit NEE's liability, and NEP has agreed to indemnify NEE against claims that it may face in connection with such arrangements, which may lead NEE to assume greater risks when making decisions relating to NEP than it otherwise would if acting solely for its own account. |
• | The credit and risk profile of NEP GP and its owner, NEE, could adversely affect any NEP credit ratings and risk profile, which could increase NEP's borrowing costs or hinder NEP's ability to raise capital. |
Risks Relating to the NET Midstream Acquisition
• | NEP may fail to realize the growth prospects anticipated as a result of the NET Midstream acquisition. |
• | Uncertainties associated with the NET Midstream acquisition may cause a loss of management personnel and other key employees that could adversely affect NEP's future business, operations and financial results following the NET Midstream acquisition. |
• | As a result of the NET Midstream acquisition, the scope and size of NEP's operations and business will substantially change. NEP's expansion into the midstream natural gas industry may not be successful. |
5
Risks Relating to Ownership and Operation of Natural Gas Pipelines
• | NET Midstream depends on a key customer for a significant portion of its revenues. The loss of this customer could result in a decline in NEP's revenues and cash available to make distributions to its unitholders. |
• | NEP may be unable to secure renewals of long-term natural gas transportation agreements, which could expose its revenues to increased volatility. |
• | NEP may not succeed in realizing the anticipated benefits of the NET Mexico pipeline joint venture with a subsidiary of PEMEX. |
• | With the NET Midstream acquisition, for the first time NEP is pursuing the development of pipeline expansion projects that will require up-front capital expenditures and expose NEP to project development risks. |
• | NEP's ability to maximize the productivity of the NET Midstream business and to complete potential pipeline expansion projects will be dependent on the continued availability of natural gas production in NET Midstream’s areas of operation. |
• | NET Midstream does not own all of the land on which the NET Midstream pipelines are located, which could disrupt its operations. |
• | The natural gas pipeline industry is highly competitive, and increased competitive pressure could adversely affect NEP's business. |
• | If third-party pipelines and other facilities interconnected to the NET Midstream pipelines become partially or fully unavailable to transport natural gas, NEP's revenues and cash available for distribution to unitholders could be adversely affected. |
• | A change in the jurisdictional characterization of some of the NET Midstream assets, or a change in law or regulatory policy, could result in increased regulation of these assets, which could have material adverse effect on NEP's business, financial condition and results of operations, including its cash available for distribution to unitholders. |
• | NEP may incur significant costs and liabilities as a result of pipeline integrity management program testing and any necessary pipeline repair or preventative or remedial measures. |
• | NET Midstream's pipeline operations could incur significant costs if the Pipeline and Hazardous Materials Safety Administration or the Railroad Commission of Texas adopts more stringent regulations governing NEP's business. |
• | NEP could be exposed to liabilities under the U.S. Foreign Corrupt Practices Act (FCPA) and other anti-corruption laws (including non-U.S. laws), any of which could have a material adverse effect on its financial condition and results of operations, including its cash available for distribution to unitholders. |
• | PEMEX may claim certain immunities under the Foreign Sovereign Immunities Act and Mexican law, and NET Midstream’s ability to sue or recover from PEMEX for breach of contract may be limited. |
• | The Federal Energy Regulatory Commission is investigating certain commodities trading activities at a subsidiary of NET Midstream. |
• | Natural gas operations are subject to numerous environmental laws and regulations, compliance with which may require significant capital expenditures, increase NEP's cost of operations and affect or limit its business plans, or expose NEP to liabilities. |
• | Reductions in demand for natural gas in the United States or Mexico and low market prices of commodities could adversely affect NET Midstream's operations and cash flows. |
• | Natural gas gathering and transmission activities involve numerous risks that may result in accidents or otherwise affect NET Midstream's operations. |
• | The assumptions underlying NEP's projections of future revenues from the NET Midstream acquisition are inherently uncertain and are subject to significant business, economic, financial, regulatory and competitive risks and uncertainties that could cause actual results to differ materially from those forecasted. |
Risks Related to Ownership of NEP's Common Units
• | NEP's ability to make distributions to its unitholders depends on the ability of NEP OpCo to make cash distributions to its limited partners. |
• | If NEP incurs material tax liabilities, NEP's distributions to its unitholders may be reduced, without any corresponding reduction in the amount of the IDR Fee (as defined in the MSA) payable to NEE Management under the MSA. |
• | Holders of NEP's common units have limited voting rights and are not entitled to elect NEP's general partner or NEP GP's directors. |
• | NEP's partnership agreement restricts the remedies available to holders of NEP's common units for actions taken by NEP GP that might otherwise constitute breaches of fiduciary duties. |
• | NEP's partnership agreement replaces NEP GP's fiduciary duties to holders of NEP's common units with contractual standards governing its duties. |
• | Even if holders of NEP's common units are dissatisfied, they cannot initially remove NEP GP, as NEP's general partner, without NEE's consent. |
• | NEP GP's interest in NEP and the control of NEP GP may be transferred to a third party without unitholder consent. |
• | The IDR Fee may be transferred to a third party without unitholder consent. |
• | NEP may issue additional units without unitholder approval, which would dilute unitholder interests. |
• | Reimbursements and fees owed to NEP GP and its affiliates for services provided to NEP or on NEP's behalf will reduce cash distributions to or from NEP OpCo and from NEP to NEP's unitholders, and the amount and timing of such reimbursements and fees will be determined by NEP GP and there are no limits on the amount that NEP OpCo may be required to pay. |
• | Discretion in establishing cash reserves by NEE Operating GP, the general partner of NEP OpCo, may reduce the amount of cash distributions to NEP's unitholders. |
6
• | While NEP's partnership agreement requires NEP to distribute its available cash, NEP's partnership agreement, including provisions requiring NEP to make cash distributions, may be amended. |
• | NEP OpCo can borrow money to pay distributions, which would reduce the amount of credit available to operate NEP's business. |
• | Increases in interest rates could adversely impact the price of NEP's common units, NEP's ability to issue equity or incur debt for acquisitions or other purposes and NEP's ability to make cash distributions to its unitholders. |
• | The price of NEP's common units may fluctuate significantly and unitholders could lose all or part of their investment and a market that will provide unitholders with adequate liquidity may not develop. |
• | The liability of holders of NEP's common units, which represent limited partner interests in NEP, may not be limited if a court finds that unitholder action constitutes control of NEP's business. |
• | Unitholders may have liability to repay distributions that were wrongfully distributed to them. |
• | Except in limited circumstances, NEP GP has the power and authority to conduct NEP's business without unitholder approval. |
• | Contracts between NEP, on the one hand, and NEP GP and its affiliates, on the other hand, will not be the result of arm's-length negotiations. |
• | Unitholders have no right to enforce the obligations of NEP GP and its affiliates under agreements with NEP. |
• | NEP GP decides whether to retain separate counsel, accountants or others to perform services for NEP. |
• | The New York Stock Exchange does not require a publicly traded limited partnership like NEP to comply with certain of its corporate governance requirements. |
Taxation Risks
• | NEP's future tax liability may be greater than expected if NEP does not generate NOLs sufficient to offset taxable income or if tax authorities challenge certain of NEP's tax positions. |
• | NEP's ability to utilize NOLs to offset future income may be limited. |
• | NEP will not have complete control over NEP's tax decisions. |
• | A valuation allowance may be required for NEP's deferred tax assets. |
• | Distributions to unitholders may be taxable as dividends. |
These factors should be read together with the risk factors included in Part I, Item 1A. Risk Factors in the 2014 Form 10-K, in Part II, Item 1A. Risk Factors in NEP's Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2015 (June 2015 Form 10-Q) and Part II, Item 1A. Risk Factors in this Form 10-Q, and investors should refer to those sections of the 2014 Form 10-K, the June 2015 Form 10-Q and this Form 10-Q. Any forward-looking statement speaks only as of the date on which such statement is made, and NEP undertakes no obligation to update any forward-looking statement to reflect events or circumstances, including, but not limited to, unanticipated events, after the date on which such statement is made, unless otherwise required by law. New factors emerge from time to time and it is not possible for management to predict all of such factors, nor can it assess the impact of each such factor on the business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained or implied in any forward-looking statement.
Website Access to U.S. Securities and Exchange Commission (SEC) Filings. NEP makes its SEC filings, including the annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and any amendments to those reports, available free of charge on NEP's internet website, www.nexteraenergypartners.com, as soon as reasonably practicable after those documents are electronically filed with or furnished to the SEC. The information and materials available on NEP's website are not incorporated by reference into this Form 10-Q. The SEC maintains an internet website that contains reports and other information regarding registrants that file electronically with the SEC at www.sec.gov.
7
PART I - FINANCIAL INFORMATION
Item 1. Financial Statements
NEXTERA ENERGY PARTNERS, LP
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
(millions, except per unit amounts)
(unaudited)
Three Months Ended September 30, | Nine Months Ended September 30, | ||||||||||||||
2015 | 2014(a) | 2015 | 2014(a) | ||||||||||||
OPERATING REVENUES | $ | 103 | $ | 97 | $ | 297 | $ | 267 | |||||||
OPERATING EXPENSES | |||||||||||||||
Operations and maintenance | 22 | 18 | 64 | 53 | |||||||||||
Depreciation and amortization | 31 | 24 | 90 | 67 | |||||||||||
Transmission | 1 | 1 | 2 | 2 | |||||||||||
Taxes other than income taxes and other | 3 | 2 | 10 | 5 | |||||||||||
Total operating expenses | 57 | 45 | 166 | 127 | |||||||||||
OPERATING INCOME | 46 | 52 | 131 | 140 | |||||||||||
OTHER INCOME (DEDUCTIONS) | |||||||||||||||
Interest expense | (28 | ) | (28 | ) | (79 | ) | (73 | ) | |||||||
Benefits associated with differential membership interests - net | 3 | — | 10 | — | |||||||||||
Equity in earnings of equity method investees | — | — | (1 | ) | (1 | ) | |||||||||
Other - net | (4 | ) | — | (4 | ) | — | |||||||||
Total other deductions - net | (29 | ) | (28 | ) | (74 | ) | (74 | ) | |||||||
INCOME BEFORE INCOME TAXES | 17 | 24 | 57 | 66 | |||||||||||
INCOME TAXES | 3 | 1 | 11 | 14 | |||||||||||
NET INCOME | 14 | 23 | 46 | 52 | |||||||||||
Less net income prior to initial public offering for NEP's initial portfolio | — | — | — | 28 | |||||||||||
Less net income attributable to noncontrolling interest(b) | 13 | 20 | 40 | 21 | |||||||||||
NET INCOME ATTRIBUTABLE TO NEXTERA ENERGY PARTNERS, LP | $ | 1 | $ | 3 | $ | 6 | $ | 3 | |||||||
Weighted average number of common units outstanding - basic and assuming dilution | 22.6 | 18.7 | 20.5 | 18.7 | |||||||||||
Earnings per common unit attributable to NextEra Energy Partners, LP - basic and assuming dilution | $ | 0.05 | $ | 0.17 | $ | 0.28 | $ | 0.17 |
____________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
(b) | The calculation of net income attributable to noncontrolling interest includes the pre-acquisition net income of the 2015 acquisitions. See Note 2. |
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2014 Consolidated Financial Statements.
8
NEXTERA ENERGY PARTNERS, LP
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)
(millions)
(unaudited)
Three Months Ended September 30, | Nine Months Ended September 30, | ||||||||||||||
2015 | 2014(a) | 2015 | 2014(a) | ||||||||||||
NET INCOME | $ | 14 | $ | 23 | $ | 46 | $ | 52 | |||||||
Net unrealized gains (losses) on cash flow hedges: | |||||||||||||||
Effective portion of net unrealized losses (net of income tax benefit of $1 for each of the periods presented) | (11 | ) | (2 | ) | (9 | ) | (15 | ) | |||||||
Reclassification from accumulated other comprehensive loss to net income (net of income tax expense of less than $1, less than $1, $1 and less than $1, respectively) | 1 | 1 | 4 | 3 | |||||||||||
Net unrealized losses on foreign currency translation (net of income tax benefit of less than $1, $1, $2 and $1, respectively) | (8 | ) | (7 | ) | (18 | ) | (10 | ) | |||||||
Total other comprehensive loss, net of tax | (18 | ) | (8 | ) | (23 | ) | (22 | ) | |||||||
COMPREHENSIVE INCOME (LOSS) | (4 | ) | 15 | 23 | 30 | ||||||||||
Less comprehensive income prior to initial public offering for NEP's initial portfolio | — | — | — | 14 | |||||||||||
Less comprehensive income (loss) attributable to noncontrolling interest(b) | (1 | ) | 13 | 21 | 14 | ||||||||||
COMPREHENSIVE INCOME (LOSS) ATTRIBUTABLE TO NEXTERA ENERGY PARTNERS, LP | $ | (3 | ) | $ | 2 | $ | 2 | $ | 2 |
____________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
(b) | The calculation of comprehensive income (loss) attributable to noncontrolling interest includes the pre-acquisition comprehensive income of the 2015 acquisitions. See Note 2. |
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2014 Consolidated Financial Statements.
9
NEXTERA ENERGY PARTNERS, LP
CONDENSED CONSOLIDATED BALANCE SHEETS
(millions)
(unaudited)
September 30, 2015 | December 31, 2014(a) | ||||||
ASSETS | |||||||
Current assets: | |||||||
Cash and cash equivalents | $ | 696 | $ | 103 | |||
Accounts receivable | 48 | 32 | |||||
Due from related parties | 34 | 219 | |||||
Restricted cash ($13 and $55 related to VIEs, respectively) | 16 | 82 | |||||
Prepaid expenses | 4 | 4 | |||||
Other current assets | 13 | 10 | |||||
Total current assets | 811 | 450 | |||||
Non-current assets: | |||||||
Property, plant and equipment - net ($707 and $722 related to VIEs, respectively) | 3,145 | 3,276 | |||||
Construction work in progress | 2 | 9 | |||||
Deferred income taxes | 151 | 144 | |||||
Investments in equity method investees - VIEs | 18 | 19 | |||||
Other non-current assets | 90 | 90 | |||||
Total non-current assets | 3,406 | 3,538 | |||||
TOTAL ASSETS | $ | 4,217 | $ | 3,988 | |||
LIABILITIES AND EQUITY | |||||||
Current liabilities: | |||||||
Accounts payable and accrued expenses | $ | 17 | $ | 119 | |||
Short-term debt | 12 | — | |||||
Due to related parties | 14 | 37 | |||||
Current maturities of long-term debt | 86 | 86 | |||||
Accrued interest | 13 | 23 | |||||
Other current liabilities | 27 | 21 | |||||
Total current liabilities | 169 | 286 | |||||
Non-current liabilities: | |||||||
Long-term debt | 1,824 | 1,847 | |||||
Deferral related to differential membership interests - VIEs | 419 | 428 | |||||
Accumulated deferred income taxes | 52 | 75 | |||||
Asset retirement obligation | 29 | 28 | |||||
Non-current due to related party | 18 | 19 | |||||
Other non-current liabilities | 25 | 25 | |||||
Total non-current liabilities | 2,367 | 2,422 | |||||
TOTAL LIABILITIES | 2,536 | 2,708 | |||||
COMMITMENTS AND CONTINGENCIES | |||||||
EQUITY | |||||||
Limited partners (common units issued and outstanding - 29.7 and 18.7, respectively) | 897 | 551 | |||||
Accumulated other comprehensive loss | (7 | ) | (3 | ) | |||
Noncontrolling interest | 791 | 732 | |||||
TOTAL EQUITY | 1,681 | 1,280 | |||||
TOTAL LIABILITIES AND EQUITY | $ | 4,217 | $ | 3,988 |
____________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2014 Consolidated Financial Statements.
10
NEXTERA ENERGY PARTNERS, LP
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
(millions)
(unaudited)
Nine Months Ended September 30, | |||||||
2015 | 2014(a) | ||||||
CASH FLOWS FROM OPERATING ACTIVITIES | |||||||
Net income | $ | 46 | $ | 52 | |||
Adjustments to reconcile net income to net cash provided by operating activities: | |||||||
Depreciation and amortization | 90 | 67 | |||||
Amortization of deferred financing costs | 4 | 5 | |||||
Deferred income taxes | 9 | 13 | |||||
Benefits associated with differential membership interests - net | (10 | ) | — | ||||
Other - net | — | 4 | |||||
Changes in operating assets and liabilities: | |||||||
Accounts receivable | (6 | ) | (17 | ) | |||
Prepaid expenses and other current assets | (4 | ) | — | ||||
Other non-current assets | (2 | ) | (1 | ) | |||
Accounts payable and accrued expenses | (2 | ) | (1 | ) | |||
Due to related parties | (3 | ) | 2 | ||||
Other current liabilities | (2 | ) | 9 | ||||
Other non-current liabilities | (3 | ) | 1 | ||||
Net cash provided by operating activities | 117 | 134 | |||||
CASH FLOWS FROM INVESTING ACTIVITIES | |||||||
Capital expenditures | (85 | ) | (183 | ) | |||
Proceeds from convertible investment tax credits | — | 306 | |||||
Acquisitions of projects | (716 | ) | (288 | ) | |||
Changes in restricted cash | 66 | (4 | ) | ||||
Payments from (to) related parties under CSCS agreement - net | 182 | (146 | ) | ||||
Net cash used in investing activities | (553 | ) | (315 | ) | |||
CASH FLOWS FROM FINANCING ACTIVITIES | |||||||
Partners/Members' contributions | 40 | 448 | |||||
Partners/Members' distributions | (65 | ) | (253 | ) | |||
Payments to differential membership investors | (2 | ) | — | ||||
Proceeds from short-term debt | 325 | — | |||||
Repayments of short-term debt | (313 | ) | — | ||||
Change in amounts due to related party | (20 | ) | — | ||||
Proceeds from issuance of NEP OpCo common units to noncontrolling interest | 702 | — | |||||
Issuances of long-term debt | 234 | 15 | |||||
Deferred financing costs | (4 | ) | (1 | ) | |||
Retirements of long-term debt | (190 | ) | (375 | ) | |||
Proceeds from differential membership interest | 5 | — | |||||
Proceeds from issuance of common units - net | 319 | 438 | |||||
Net cash provided by financing activities | 1,031 | 272 | |||||
Effect of exchange rate changes on cash | (2 | ) | (2 | ) | |||
NET INCREASE IN CASH AND CASH EQUIVALENTS | 593 | 89 | |||||
CASH AND CASH EQUIVALENTS - BEGINNING OF PERIOD | 103 | 32 | |||||
CASH AND CASH EQUIVALENTS - END OF PERIOD | $ | 696 | $ | 121 | |||
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION: | |||||||
Cash paid for interest, net of amounts capitalized | $ | 85 | $ | 59 | |||
Cash paid for income taxes | $ | — | $ | 1 | |||
Partners/Members' noncash distributions | $ | 5 | $ | 479 | |||
Members’ noncash contributions for construction costs and other expenditures | $ | 67 | $ | 559 | |||
Members’ net distributions for CITC payments | $ | — | $ | 150 | |||
Change in investments in equity method investees - net | $ | 1 | $ | 20 | |||
Change in accrued CITC that results in a reduction to property, plant and equipment - net | $ | 13 | $ | — | |||
New asset retirement obligation additions | $ | — | $ | 1 | |||
Change in accrued but not paid for capital expenditures | $ | 1 | $ | 110 | |||
Noncash reclassification of distributions to due from related parties | $ | — | $ | 38 | |||
Noncash member contribution upon transition from predecessor method | $ | 3 | $ | 60 |
____________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
This report should be read in conjunction with the Notes herein and the Notes to Consolidated Financial Statements appearing in the 2014 Consolidated Financial Statements.
11
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
(unaudited)
The accompanying condensed consolidated financial statements should be read in conjunction with the 2014 Consolidated Financial Statements. In the opinion of NEP management, all adjustments (consisting of normal recurring accruals) considered necessary for fair financial statement presentation have been made. The results of operations for an interim period generally will not give a true indication of results for the year, and the results of operations for the accounting predecessor are not indicative of the actual level of expense that would have been incurred had NEP operated as a publicly-traded company during the period prior to the completion of its IPO on July 1, 2014.
1. SUMMARY OF SIGNIFICANT ACCOUNTING AND REPORTING POLICIES
Restricted Cash - At September 30, 2015 and December 31, 2014, approximately $13 million and $55 million, respectively, of current restricted cash on NEP's condensed consolidated balance sheets represents cash to fund certain construction costs. In addition, at December 31, 2014 approximately $22 million of current restricted cash, also included in due to related parties on NEP's condensed consolidated balance sheets, represents CITC proceeds due to NEECH. The remaining current restricted cash and approximately $3 million of other non-current assets on NEP’s condensed consolidated balance sheets as of both September 30, 2015 and December 31, 2014, are held by subsidiaries to pay for certain capital or operating expenditures as well as to fund required equity contributions pursuant to restrictions contained in the debt agreements. Restricted cash reported as current assets are recorded as such based on the anticipated use of these funds.
Revenue Recognition - In July 2015, the Financial Accounting Standards Board (FASB) approved the deferral of the effective date of the new accounting standard related to the recognition of revenue from contracts with customers and required disclosures. The standard is now effective for NEP beginning January 1, 2018. NEP is currently evaluating the effect the adoption of this standard will have, if any, on its financial statements.
Noncontrolling Interests - After the completion of NEP's IPO, NEP owned a controlling, non-economic general partnership interest and a 20.1% limited partnership interest in NEP OpCo and NEE Equity owned a noncontrolling 79.9% limited partnership interest in NEP OpCo. NEP's limited partnership interest in NEP OpCo increased to 22.6% as of September 30, 2015. See Equity below. The following table reflects the changes in NEP's noncontrolling interest balance:
Nine Months Ended September 30, | |||||||
2015 | 2014(a) | ||||||
(millions) | |||||||
Noncontrolling interest at December 31, 2014(b) and December 31, 2013 | $ | 732 | $ | — | |||
Payments to NEE for acquisitions of projects | (716 | ) | (288 | ) | |||
NEE purchase of NEP OpCo's common units | 702 | — | |||||
Cash distributions | (47 | ) | — | ||||
Noncash distributions | (7 | ) | — | ||||
Member contributions, net(c) | 103 | 1,372 | |||||
Comprehensive income attributable to noncontrolling interest, including pre-acquisition net income of the 2015 acquisitions | 21 | 14 | |||||
Noncash member contribution upon transition from predecessor method | 3 | (60 | ) | ||||
Noncontrolling interest at September 30 | $ | 791 | $ | 1,038 |
____________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
(b) | As reported in the 2014 Consolidated Financial Statements. |
(c) | For 2015, primarily construction-related contributions between January 1, 2015 and the respective acquisition dates. |
Equity - In May 2015, NEP completed the sale of 2,594,948 common units representing limited partnership interests in NEP in a private placement for an aggregate purchase price of approximately $109 million, or $41.87 per common unit. NEP used the proceeds, net of approximately $3 million in fees and expenses relating to the offering, from this private placement to fund a portion of the purchase price payable in the May 2015 project acquisitions discussed in Note 2. The issuance of these additional common units resulted in an increase of NEP's limited partnership interest in NEP OpCo to 22.2%.
In September 2015, NEP completed the sale of 8,375,907 common units representing limited partnership interests in NEP in a public offering for an aggregate purchase price of approximately $218 million, or $26.00 per common unit. NEP used the proceeds, net of approximately $5 million in fees and expenses relating to the offering, to repay amounts owed under the $313 million term loan.
12
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
Also in September 2015, a subsidiary of NEE purchased 27,000,000 of NEP OpCo's common units for $702 million. Approximately $110 million of the proceeds were used to repay amounts owed under the $313 million term loan and the balance of the proceeds was used to finance a portion of the acquisition of NET Midstream discussed in Note 2 and for general partnership purposes. After giving effect to the issuance of the NEP common units and the sale of NEP OpCo common units to NEE, NEP's limited partnership interest in NEP OpCo is 22.6% as of September 30, 2015.
On October 28, 2015, NEP announced a distribution of $0.27 per common unit payable on November 13, 2015 to its unitholders of record on November 5, 2015.
Variable Interest Entities (VIEs) - At September 30, 2015, NEP has two VIEs which it consolidates. Certain investors that hold no equity interest in these VIEs hold differential membership interests, which give them the right to receive a portion of the economic attributes of these wind electric generating facilities, including certain tax attributes. The assets and liabilities of the VIEs, consisting primarily of property, plant and equipment and deferral related to differential membership interests, totaled approximately $758 million and $464 million at September 30, 2015, respectively, and approximately $812 million and $555 million at December 31, 2014, respectively.
At September 30, 2015 and December 31, 2014, the equity investment described in Note 2 totaled approximately $18 million and $19 million, respectively, and is reflected as investments in equity method investees - VIEs on the condensed consolidated balance sheets and is attributable to the noncontrolling interest. All equity in earnings of the equity method investees is allocated to net income attributable to noncontrolling interest. NEP is not the primary beneficiary and therefore does not consolidate these entities because it does not control any of the ongoing activities of these entities, was not involved in the initial design of these entities and does not have a controlling interest in these entities.
Amendments to the Consolidation Analysis - In February 2015, the FASB issued a new accounting standard that will modify current consolidation guidance. The standard makes changes to both the variable interest entity model and the voting interest entity model, including modifying the evaluation of whether limited partnerships or similar legal entities are VIEs or voting interest entities and amending the guidance for assessing how relationships of related parties affect the consolidation analysis of VIEs. The standard is effective for NEP beginning January 1, 2016. NEP is currently evaluating the effect the adoption of this standard will have, if any, on its consolidated financial statements.
Presentation of Debt Issuance Costs - In April 2015, the FASB issued a new accounting standard which changes the presentation of debt issuance costs in financial statements. The amendments in this standard require that debt issuance costs related to a recognized debt liability be presented in the balance sheet as a direct deduction from the carrying amount of that debt liability, consistent with debt discounts. The recognition and measurement guidance for debt issuance costs are not affected by this standard. The standard is effective for NEP beginning January 1, 2016. NEP is currently evaluating the effect the adoption of this standard will have on its consolidated financial statements.
2. ACQUISITIONS
On April 28, 2015, a subsidiary of NEP made an equity investment in three NEER solar projects under construction in California (the equity investment). Once completed, the solar projects are expected to have a total generating capacity of 277 MW, of which approximately 95 MW have been placed in service as of September 30, 2015. Through a series of transactions, a subsidiary of NEP issued 1,000,000 NEP OpCo Class B Units, Series 1 and 1,000,000 NEP OpCo Class B Units, Series 2, to NEER for approximately 50% of the ownership interests in the three solar projects. NEER, as holder of the Class B Units, will retain 100% of the economic rights in the projects to which the respective Class B Units relate, including the right to all distributions paid by the project subsidiaries that own the projects to NEP OpCo. NEER has agreed to indemnify NEP against all risks relating to NEP’s ownership of the projects and construction of the projects until NEER offers to sell economic interests to NEP and NEP accepts such offer, if NEP chooses to do so. NEER has also agreed to continue to manage the construction and operation of the projects at its own cost, and to contribute to the projects any capital necessary for the construction and operation of the projects, until NEER offers to sell economic interests to NEP and NEP accepts such offer.
On May 12, 2015, a subsidiary of NEP completed the acquisition from NEER of four entities with direct or indirect ownership interests in wind energy generating facilities with total generating capacity of approximately 664 MW for total consideration of approximately $424 million in cash consideration, excluding certain adjustments, and the assumption of approximately $269 million in existing debt and tax equity financing. The equity investment on April 28, 2015 and the acquisition of wind projects on May 12, 2015 are collectively referred to as the second quarter 2015 acquisitions.
The second quarter 2015 acquisitions and the acquisitions of Palo Duro and Shafter in the first quarter of 2015 are collectively referred to as the 2015 acquisitions. The 2015 acquisitions were transfers of assets between entities under common control, which required them to be accounted for as if the transfers occurred since the inception of common control, with prior periods retrospectively adjusted to furnish comparative information. Accordingly, the accompanying condensed consolidated financial statements have
13
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
been retrospectively adjusted to include the historical results and financial position of the 2015 acquisitions prior to their respective acquisition dates.
As part of its growth strategy, NEP entered into an agreement, effective July 31, 2015, to acquire 100% of the membership interests in NET Midstream, a developer, owner and operator of a portfolio of seven long-term contracted natural gas pipeline assets located in Texas. On October 1, 2015, a subsidiary of NEP completed the NET Midstream acquisition. The aggregate purchase price of approximately $2 billion included approximately $934 million in cash consideration and the assumption of approximately $654 million in existing debt of NET Midstream and its subsidiaries at closing and excluded post-closing working capital adjustments. The purchase price is subject to (i) a $200 million holdback payable, in whole or in part, upon satisfaction of financial performance and capital expenditure thresholds relating to planned expansion projects and (ii) a $200 million holdback retained for an 18-month period to satisfy any indemnification obligations of the sellers. The $200 million indemnity holdback may be reduced by up to $10 million depending on certain post-closing employee retention thresholds. If successful, NEP may spend up to an additional $100 million of capital expenditures for the planned expansion projects, bringing the total transaction size for the NET Midstream acquisition to approximately $2.1 billion. NEP is still in the process of evaluating the business combination accounting considerations, including the initial purchase price allocation. Acquisition-related costs incurred during the three and nine months ended September 30, 2015 totaled approximately $5 million.
Also on October 1, 2015, a subsidiary of NEP acquired a 149 MW wind generating facility located in Ontario, Canada from NEER. In exchange for the shares in the company that indirectly owns the facility, the purchaser paid a total purchase price of approximately $210 million in cash consideration, plus $19 million in working capital (subject to post-closing working capital and other adjustments), and assumed approximately $294 million in existing debt. As part of this acquisition and included in the cash consideration, a subsidiary of NEP acquired an approximately CAD 43 million receivable from a subsidiary of NEER relating to operational performance issues at this facility. The receivable is intended to compensate NEP for the operational performance issues and is supported in full by corrective actions or compensation expected from an equipment vendor under an undertaking the vendor has with NEER. The receivable can be settled, in part or in whole, to the extent the operational performance issues are improved or resolved by the vendor by the end of 2016. This receivable bears interest at 7.1% per annum, is payable by NEER in equal quarterly installments and matures in September 2035.
3. INCOME TAXES
For periods ending prior to July 1, 2014, income taxes are calculated using the separate return method for each of the project entities acquired in connection with the IPO that are structured as corporations or as limited liability companies. For the 2015 acquisitions, income taxes are calculated using the separate return method for periods prior to their respective acquisition dates. Income taxes are not included for entities that are structured as flow through entities (partnerships) electing to be taxed as partnerships.
For periods after the date a project is acquired by NEP (NEP acquisition date), taxes are calculated for NEP as a single taxpaying entity for U.S. federal and state income tax purposes (based on its election to be taxed as a corporation). Because NEP OpCo is a limited partnership electing to be taxed as a partnership for U.S. federal and state income tax purposes, NEP has only included its proportionate share of U.S. income taxes. The U.S. income taxes on the remaining noncontrolling interest in NEP OpCo earnings were allocated to NEE Equity and are not included in NEP's condensed consolidated financial statements. The Canadian subsidiaries are all Canadian taxpayers subject to Canadian income tax, and therefore all Canadian taxes are included in NEP's condensed consolidated financial statements. NEE Equity's share of Canadian taxes is included in net income attributable to noncontrolling interest in NEP's condensed consolidated financial statements.
The effective tax rate for the three months ended September 30, 2015 and 2014 was approximately 18% and 4%, respectively. The effective tax rate for the nine months ended September 30, 2015 and 2014 was approximately 19% and 21%, respectively. For periods ending prior to July 1, 2014, the effective tax rate is affected by recurring items, such as the relative amount of income earned in jurisdictions, the 50% tax basis reduction due to CITCs that are recognized when assets are placed into service, and valuation allowances on deferred tax assets. Additionally, in periods ending after July 1, 2014, the effective tax rate is affected by taxes attributable to the noncontrolling interest, and the taxation of Canadian income in both Canada and the U.S.
4. FAIR VALUE MEASUREMENTS
The fair value of assets and liabilities are determined using either unadjusted quoted prices in active markets (Level 1) or pricing inputs that are observable (Level 2) whenever that information is available and using unobservable inputs (Level 3) to estimate fair value only when relevant observable inputs are not available. NEP uses several different valuation techniques to measure the fair value of assets and liabilities relying primarily on observable market information for identical or comparable assets and liabilities for those assets and liabilities that are measured at fair value on a recurring basis. Certain financial instruments may be valued using multiple inputs including discount rates, counterparty credit ratings and credit enhancements. NEP’s assessment of the significance of any particular input to the fair value measurement requires judgment and may affect the fair value measurement of
14
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
its assets and liabilities and the placement of those assets and liabilities within the fair value hierarchy levels. Non-performance risk, including the consideration of a credit valuation adjustment, is also considered in the determination of fair value for all assets and liabilities measured at fair value. All transfers between fair value hierarchy levels occur at the beginning of the period in which the transfer occurred.
Cash Equivalents - Cash equivalents, which are included in cash and cash equivalents, restricted cash and other non-current assets on the condensed consolidated balance sheets, consist of short-term, highly liquid investments with original maturities of three months or less. NEP primarily holds these investments in money market funds. NEP estimates the fair value of these funds using a market approach based on current observable market prices.
Interest Rate Swaps and Foreign Currency Contracts - NEP estimates the fair value of its derivatives using an income approach, or a discounted cash flows valuation technique, based on the net amount of estimated future cash inflows and outflows related to the agreements. The primary inputs used in these fair value measurements include the contractual terms of the derivative agreements, foreign currency exchange rates, current interest rates and credit spreads. The significant inputs for the resulting fair value measurement are market-observable inputs and the measurements are reported as Level 2 in the fair value hierarchy. At September 30, 2015, the fair value of NEP's foreign currency contracts is less than $1 million.
NEP’s financial assets and liabilities and other fair value measurements made on a recurring basis by fair value hierarchy level are as follows:
September 30, 2015 | December 31, 2014 | ||||||||||||||||||||||
Level 1 | Level 2 | Total | Level 1 | Level 2 | Total | ||||||||||||||||||
(millions) | |||||||||||||||||||||||
Assets: | |||||||||||||||||||||||
Cash equivalents | $ | 56 | $ | — | $ | 56 | $ | 104 | $ | — | $ | 104 | |||||||||||
Interest rate swaps | — | — | — | — | 2 | 2 | |||||||||||||||||
Total assets | $ | 56 | $ | — | $ | 56 | $ | 104 | $ | 2 | $ | 106 | |||||||||||
Liabilities: | |||||||||||||||||||||||
Interest rate swaps | $ | — | $ | 16 | $ | 16 | $ | — | $ | 11 | $ | 11 | |||||||||||
Total liabilities | $ | — | $ | 16 | $ | 16 | $ | — | $ | 11 | $ | 11 |
Fair Value of Financial Instruments Recorded at the Carrying Amount - The carrying amounts of accounts receivable approximate their fair values. The carrying amounts and estimated fair values of other financial instruments, excluding assets and liabilities which are recorded at fair value and disclosed above, are as follows:
September 30, 2015 | December 31, 2014 | ||||||||||||||
Carrying Value | Fair Value | Carrying Value | Fair Value | ||||||||||||
(millions) | |||||||||||||||
Notes receivable(a) | $ | 20 | $ | 20 | $ | 20 | $ | 20 | |||||||
Long-term debt, including current maturities(b) | $ | 1,910 | $ | 2,001 | $ | 1,933 | $ | 2,008 |
____________________
(a) | Fair value approximates carrying amount as they bear interest primarily at variable rates and have long-term maturities (Level 2) and are included in other non-current assets on the condensed consolidated balance sheets. |
(b) | Fair value is estimated based on the borrowing rates as of each date for similar issues of debt with similar remaining maturities (Level 2). |
5. DERIVATIVE INSTRUMENTS AND HEDGING ACTIVITY
NEP recognizes all derivative instruments, when required to be marked to market, on the balance sheet as either assets or liabilities and measures them at fair value each reporting period. In connection with certain debt financings, NEP entered into interest rate swap agreements to manage interest rate cash flow risk. Under the interest rate swap agreements, NEP pays a fixed rate of interest and receives a floating rate of interest over the term of the agreements without the exchange of the underlying notional amounts. These agreements allow NEP to offset the variability of its floating-rate loan interest cash flows with the variable interest cash flows received from the interest rate swap agreements. The commencement and termination dates of the interest rate swap agreements and the related hedging relationship coincide with the corresponding dates of the underlying variable-rate debt instruments, with maturity dates through 2032. As of September 30, 2015 and December 31, 2014, the combined notional amounts of the swap agreements were approximately $374 million and $361 million, respectively. In order to apply hedge accounting, the transactions must be designated as hedges and must be highly effective in offsetting the hedged risk. For interest rate swaps, generally NEP assesses a hedging instrument’s effectiveness by using non-statistical methods including dollar value comparisons of the change
15
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
in the fair value of the derivative to the change in the fair value or cash flows of the hedged item. Hedge effectiveness is tested at the inception of the hedge and on at least a quarterly basis throughout the hedge’s life. The effective portion of changes in the fair value of derivatives accounted for as cash flow hedges are deferred and recorded as a component of accumulated other comprehensive income (loss) (AOCI). The amounts deferred in AOCI are recognized in earnings in the period(s) during which the transaction being hedged affects earnings. Any amounts excluded from the assessment of hedge effectiveness, as well as the ineffective portion of the gain or loss, is reported in current earnings.
Approximately $6 million of net losses included in AOCI at September 30, 2015, is expected to be reclassified into interest expense within the next 12 months as interest payments are made. Such amount assumes no change in interest rates. Cash flows from these interest rate swap contracts are reported in cash flows from operating activities in NEP's condensed consolidated statements of cash flows.
The fair values of NEP's derivative instruments designated as cash flow hedging instruments are included on NEP's condensed consolidated balance sheets as follows:
September 30, 2015 | December 31, 2014 | ||||||||||||||
Assets | Liabilities | Assets | Liabilities | ||||||||||||
(millions) | |||||||||||||||
Interest rate swaps: | |||||||||||||||
Other non-current assets | $ | — | $ | 1 | $ | 5 | $ | — | |||||||
Other current liabilities | $ | — | $ | 6 | $ | 3 | $ | 3 | |||||||
Other non-current liabilities | $ | — | $ | 11 | $ | — | $ | 8 |
Gains (losses) related to NEP's cash flow hedges are recorded in NEP's condensed consolidated financial statements as follows:
Three Months Ended September 30, | Nine Months Ended September 30, | ||||||||||||||
2015 | 2014 | 2015 | 2014 | ||||||||||||
(millions) | |||||||||||||||
Interest rate swaps: | |||||||||||||||
Losses recognized in other comprehensive income | $ | (12 | ) | $ | (3 | ) | $ | (10 | ) | $ | (16 | ) | |||
Losses reclassified from AOCI to net income(a) | $ | 1 | $ | 1 | $ | 5 | $ | 3 |
____________________
(a) Included in interest expense.
During the nine months ended September 30, 2015, NEP entered into certain foreign currency exchange contracts to economically hedge its cash flows from foreign currency rate fluctuations. As of September 30, 2015, the notional amount of the foreign currency contracts was approximately $41 million. During each of the three and nine months ended September 30, 2015, NEP recorded approximately $1 million of gains related to the foreign currency contracts in other - net in the condensed consolidated statements of income.
16
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
6. DEBT
Significant short-term and long-term debt issuances and borrowings by subsidiaries of NEP during the nine months ended September 30, 2015 were as follows:
Date Issued | Debt Issuances/Borrowings | Interest Rate | Principal Amount | Maturity Date | ||||||
(millions) | ||||||||||
January - February 2015 | Senior secured revolving credit facility | Variable(a) | $ | 122 | (b) | 2019 | ||||
May 2015 | Short-term term loan | Variable(a) | $ | 313 | (c) | 2016 | ||||
June 2015 | Short-term cash grant bridge loan | Variable(a) | $ | 12 | 2016 | |||||
June 2015 | Limited-recourse senior secured term loan | 4.52% | $ | 31 | 2033 | |||||
July 2015 | Limited-recourse term loan | Variable(d) | $ | 81 | 2026 |
————————————
(a) | Variable rate is based on an underlying index plus a margin. |
(b) | At September 30, 2015, $29 million is outstanding under the revolving credit facility. |
(c) | In connection with the sale of NEP common units and the sale of NEP OpCo common units in September 2015, this loan was repaid. See Note 1 - Equity. |
(d) | Approximately $54 million of the term loan bears interest based on an underlying index plus a margin. The remaining amount of the term loan bears interest at a fixed rate of 4.38%. |
The long-term debt agreements listed above are secured by liens on certain assets and contain provisions which, under certain conditions, could restrict the payment of distributions or related party fee payments.
On October 1, 2015, a subsidiary of NEP (the borrower) borrowed $600 million under several variable rate senior secured term loan agreements (term loans) that mature in October 2018. Interest is based on the London Interbank Offered Rate plus a margin, with payment being due at the end of interest rate periods which can range from one to six months, as selected by the borrower. The term loans are secured by liens on certain of the assets of NEP OpCo and certain other assets of, and the direct ownership interest in, one of NEP OpCo's direct subsidiaries. All borrowings under the term loans are guaranteed by NEP and NEP OpCo.
7. ACCUMULATED OTHER COMPREHENSIVE LOSS
Accumulated Other Comprehensive Loss | |||||||||||
Net Unrealized Losses on Cash Flow Hedges | Net Unrealized Losses on Foreign Currency Translation | Total | |||||||||
(millions) | |||||||||||
Three months ended September 30, 2015 | |||||||||||
Balances, June 30, 2015 | $ | — | $ | (49 | ) | $ | (49 | ) | |||
Other comprehensive loss before reclassification | (11 | ) | (8 | ) | (19 | ) | |||||
Amounts reclassified from AOCI to interest expense | 1 | — | 1 | ||||||||
Net other comprehensive loss | (10 | ) | (8 | ) | (18 | ) | |||||
Balances, September 30, 2015 | (10 | ) | (57 | ) | (67 | ) | |||||
AOCI attributable to noncontrolling interest | (9 | ) | (51 | ) | (60 | ) | |||||
AOCI attributable to NEP, September 30, 2015 | $ | (1 | ) | $ | (6 | ) | $ | (7 | ) |
17
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
Accumulated Other Comprehensive Loss | |||||||||||
Net Unrealized Losses on Cash Flow Hedges | Net Unrealized Losses on Foreign Currency Translation | Total | |||||||||
(millions) | |||||||||||
Nine months ended September 30, 2015 | |||||||||||
Balances, December 31, 2014 | $ | (5 | ) | $ | (39 | ) | $ | (44 | ) | ||
Other comprehensive loss before reclassification | (9 | ) | (18 | ) | (27 | ) | |||||
Amounts reclassified from AOCI to interest expense | 4 | — | 4 | ||||||||
Net other comprehensive loss | (5 | ) | (18 | ) | (23 | ) | |||||
Balances, September 30, 2015 | (10 | ) | (57 | ) | (67 | ) | |||||
AOCI attributable to noncontrolling interest | (9 | ) | (51 | ) | (60 | ) | |||||
AOCI attributable to NEP, September 30, 2015 | $ | (1 | ) | $ | (6 | ) | $ | (7 | ) |
Accumulated Other Comprehensive Loss | |||||||||||
Net Unrealized Losses on Cash Flow Hedges | Net Unrealized Losses on Foreign Currency Translation | Total | |||||||||
(millions) | |||||||||||
Three months ended September 30, 2014 | |||||||||||
Balances, June 30, 2014 | $ | (2 | ) | $ | (28 | ) | $ | (30 | ) | ||
Other comprehensive loss before reclassification | (2 | ) | (7 | ) | (9 | ) | |||||
Amounts reclassified from AOCI to interest expense | 1 | — | 1 | ||||||||
Net other comprehensive loss | (1 | ) | (7 | ) | (8 | ) | |||||
Balance sheet adjustment related to transitioning from separate return method (see Note 3) | 6 | — | 6 | ||||||||
Balances, September 30, 2014 | 3 | (35 | ) | (32 | ) | ||||||
AOCI attributable to noncontrolling interest | 3 | (34 | ) | (31 | ) | ||||||
AOCI attributable to NEP, September 30, 2014 | $ | — | $ | (1 | ) | $ | (1 | ) |
Accumulated Other Comprehensive Loss | |||||||||||
Net Unrealized Losses on Cash Flow Hedges | Net Unrealized Losses on Foreign Currency Translation | Total | |||||||||
(millions) | |||||||||||
Nine months ended September 30, 2014 | |||||||||||
Balances, December 31, 2013 | $ | 9 | $ | (25 | ) | $ | (16 | ) | |||
Other comprehensive loss before reclassification | (15 | ) | (10 | ) | (25 | ) | |||||
Amounts reclassified from AOCI to interest expense | 3 | — | 3 | ||||||||
Net other comprehensive loss | (12 | ) | (10 | ) | (22 | ) | |||||
Balance sheet adjustment related to transitioning from separate return method (see Note 3) | 6 | — | 6 | ||||||||
Balances, September 30, 2014 | 3 | (35 | ) | (32 | ) | ||||||
AOCI attributable to noncontrolling interest | 3 | (34 | ) | (31 | ) | ||||||
AOCI attributable to NEP, September 30, 2014 | $ | — | $ | (1 | ) | $ | (1 | ) |
18
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
8. RELATED PARTY TRANSACTIONS
At September 30, 2015, each project has entered into O&M agreements and ASAs with subsidiaries of NEER whereby the projects pay a certain annual fee plus actual costs incurred in connection with certain O&M and administrative services performed under these agreements. NEP’s O&M expenses for each of the three months ended September 30, 2015 and 2014 include approximately $1 million, and for the nine months ended September 30, 2015 and 2014, $4 million and $3 million, respectively, related to such services. Additionally, Northern Colorado pays an affiliate for transmission services. NEP’s transmission expense for the three and nine months ended September 30, 2015 and 2014 represents the fees paid for these services. At September 30, 2015 and December 31, 2014, the net payables for these services, as well as for payroll and other payments made on behalf of these projects, were approximately $7 million and $13 million, respectively, and are included in due to related parties on NEP's condensed consolidated balance sheets.
Management Services Agreement - Effective July 1, 2014, subsidiaries of NEP entered into a MSA with indirect wholly owned subsidiaries of NEE, under which operational, management and administrative services are provided to NEP, including managing NEP’s day to day affairs and providing individuals to act as NEP GP’s executive officers and directors, in addition to those services that are provided under the existing O&M agreements and ASAs described above between NEER subsidiaries and NEP subsidiaries. NEP OpCo will pay NEE an annual management fee equal to the greater of 1% of the sum of NEP OpCo’s net income plus interest expense, income tax expense and depreciation and amortization expense less certain non-cash, non-recurring items for the most recently ended fiscal year and $4 million (as adjusted for inflation beginning in 2016), which will be paid in quarterly installments of $1 million with an additional payment each January to the extent 1% of the sum of NEP OpCo’s net income plus interest expense, income tax expense and depreciation and amortization expense less certain non-cash, non-recurring items for the preceding fiscal year exceeds $4 million (as adjusted for inflation beginning in 2016). NEP OpCo will also make certain payments to NEE based on the achievement by NEP OpCo of certain target quarterly distribution levels to its unitholders (IDR Fees). NEP’s O&M expenses for the three and nine months ended September 30, 2015 include approximately $1 million and $3 million, respectively, and $1 million for each of the three and nine months ended September 30, 2014, related to payments made under the MSA.
Cash Sweep and Credit Support Agreement - Effective July 1, 2014, NEP OpCo entered into a CSCS agreement with NEER, under which NEER and certain of its subsidiaries may provide credit support in the form of letters of credit and guarantees to satisfy NEP’s subsidiaries’ contractual obligations. NEP OpCo will pay NEER an annual credit support fee based on the level and cost of the credit support provided, payable in quarterly installments. NEP’s expense for the three and nine months ended September 30, 2015 includes approximately $1 million and $2 million, respectively, and for each of the three and nine months ended September 30, 2014 less than $1 million, related to payments made under the CSCS agreement.
NEER and certain of its subsidiaries may withdraw funds received by NEP OpCo under the CSCS agreement, or its subsidiaries in connection with certain of the long-term debt agreements (Project Sweeps), and hold those funds in accounts belonging to NEER or its subsidiaries to the extent the funds are not required to pay project costs or otherwise required to be maintained by NEP's subsidiaries. NEER and its subsidiaries may keep the funds until the financing agreements permit distributions to be made, or, in the case of NEP OpCo, until such funds are required to make distributions or to pay expenses or other operating costs or NEP OpCo otherwise demands the return of such funds. If NEER fails to return withdrawn funds when required by NEP's subsidiaries’ financing agreements, the lenders will be entitled to draw on credit support provided by NEER in the amount of such withdrawn funds. If NEER or one of its affiliates realizes any earnings on the withdrawn funds prior to the return of such funds, it will be permitted to retain those earnings. The cash sweep amount held in accounts belonging to NEER or its subsidiaries as of September 30, 2015 and December 31, 2014 were approximately $34 million and $218 million, respectively, and are included in due from related parties on NEP’s condensed consolidated balance sheets.
Guarantees and Letters of Credit Entered into by Related Parties - Certain PPAs include requirements of the project entities to meet certain performance obligations. NEECH has provided letters of credit or guarantees for certain of these performance obligations and payment of any obligations from the transactions contemplated by the PPAs. In addition, certain of the financing agreements require cash and cash equivalents to be reserved for various purposes. In accordance with the terms of these financing agreements, guarantees from NEECH have been substituted in place of these cash and cash equivalents reserve requirements. In addition, certain interconnection agreements and site certificates require letters of credit or a bond to secure certain payment or restoration obligations related to those agreements. NEECH also guarantees the Project Sweep amounts held in accounts belonging to NEER as described above. As of September 30, 2015, NEECH guaranteed or provided letters of credit or bonds totaling approximately $532 million related to these obligations. Agreements related to the sale of differential membership interests require NEER to guarantee payment of construction-related expenses that were not yet paid before the sale of the differential membership interests in VIEs as well as payments due by the VIEs and indemnifications to the VIEs' respective investors. As of September 30, 2015, NEER guaranteed a total of approximately $53 million related to these obligations.
Due to Related Party - As of September 30, 2015 and December 31, 2014, approximately $16 million reported in non-current due to related party on NEP's condensed consolidated balance sheets represents an amount due from Palo Duro to NEER to refund NEER for certain transmission costs paid on behalf of Palo Duro. Amounts will be paid to NEER as Palo Duro receives payments
19
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Continued)
(unaudited)
from a third party for a related note receivable in the amount of approximately $16 million recorded in other non-current assets on NEP’s condensed consolidated balance sheets. At September 30, 2015 and December 31, 2014, the remaining balances reported in non-current due to related party on the accompanying condensed consolidated balance sheets represent amounts owed to NEER or NEER subsidiaries for reimbursement of certain costs as well as, at December 31, 2014, for fees related to O&M agreements and ASAs discussed above.
Development, Engineering and Construction Commitments - During the nine months ended September 30, 2015, NEER purchased and contributed approximately $24 million under several engineering, procurement and construction contracts related to the procurement of materials and services for certain NEP assets and for which costs were capitalized in construction work in progress. There were no such purchases and contributions in the three months ended September 30, 2015 or the three and nine months ended September 30, 2014.
9. COMMITMENTS AND CONTINGENCIES
Land Use Commitments - The project owners are parties to various agreements that provide for payments to landowners for the right to use the land upon which the projects are located. These leases and easements can typically be renewed by the project owners for various periods. The annual fees range from minimum rent payments varying by lease to maximum rent payments of a certain percentage of gross revenues, varying by lease. Total lease expense was approximately $4 million for each of the three month periods ended September 30, 2015 and 2014, and $12 million and $10 million for the nine months ended September 30, 2015 and 2014, respectively, and is included in operations and maintenance expenses in NEP's condensed consolidated statements of income.
Genesis' land lease includes a right-of-way lease/grant that provides for payments to the BLM for the right to use the public lands upon which the project is located. The lease may be renewed at expiration at Genesis' option and will be subject to the regulations existing at the time of renewal. In connection with the terms of this lease, Genesis obtained a surety bond from a non-affiliated party in favor of the BLM for approximately $23 million. The surety bond remains in effect until the BLM is satisfied that there is no outstanding liability on the bond or satisfactory replacement bond coverage is furnished.
The related minimum and varying lease payments are based on fair value. Certain of these payments are considered contingent rent and, therefore, expense is recognized as incurred.
The total minimum rental commitments at September 30, 2015 under these land use agreements are as follows:
Land Use Commitments | ||||
(millions) | ||||
Remainder of 2015 | $ | 2 | ||
2016 | 6 | |||
2017 | 6 | |||
2018 | 6 | |||
2019 | 6 | |||
2020 | 7 | |||
Thereafter | 176 | |||
Total minimum land use payments | $ | 209 |
Letter of Credit Facility - Genesis entered into a letter of credit (LOC) facility, under which the LOC lender may issue standby letters of credit not to exceed approximately $83 million, with a maturity date of August 15, 2017. The purpose and amounts of letters of credit outstanding as of September 30, 2015 are as follows:
LOC Facility Purpose | Amount | Outstanding Dates | ||||
(millions) | ||||||
PPA security | $ | 25 | September 2011 - Maturity | |||
Large generator interconnection agreement obligations | 8 | September 2011 - Maturity | ||||
O&M reserve | 10 | December 2013 - Maturity | ||||
Debt service reserve | 35 | August 2014 - Maturity | ||||
Total | $ | 78 |
Canadian FIT Contracts - At September 30, 2015, the FIT contracts relating to Summerhaven, Conestogo and Bluewater require suppliers to source a minimum percentage of their equipment and services from Ontario resident suppliers to meet the minimum
20
NEXTERA ENERGY PARTNERS, LP
NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Concluded)
(unaudited)
required domestic content level (MRDCL). The MRDCL for Summerhaven and Conestogo is 25% and the MRDCL for Bluewater is 50%. Following their respective CODs, Summerhaven, Conestogo and Bluewater submitted reports to the Independent Electricity System Operator (IESO) summarizing how they achieved the MRDCL for their respective projects (domestic content reports) and the IESO issued letters to Summerhaven, Conestogo and Bluewater acknowledging the completeness of their domestic content reports. The IESO has the right to audit the Summerhaven, Conestogo and Bluewater projects for a period of up to 7 years post-COD to confirm that they complied with the domestic content requirements under their respective FIT contracts and achieved their respective MRDCLs. The failure by any of these projects to achieve its MRDCL could result in a default by such project under its FIT contract, which default may not be possible to cure and could result in a termination of its FIT contract, without compensation, by the IESO. A termination of the FIT contract for Summerhaven, Conestogo or Bluewater could negatively affect revenues generated by such project and have a material adverse effect on NEP's business, financial condition, results of operations and ability to make cash distributions to its unitholders.
21
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations
Overview
NEP is a growth-oriented limited partnership formed by NEE to acquire, manage and own contracted clean energy projects with stable long-term cash flows. NEP owns a controlling, non-economic general partnership interest and a 22.6% limited partnership interest in NEP OpCo. Through NEP OpCo, NEP owns a portfolio of contracted renewable generation assets consisting of wind and solar projects and, after October 1, 2015, a portfolio of seven long-term contracted natural gas pipeline assets.
This discussion should be read in conjunction with the Notes contained herein and Management's Discussion and Analysis of Financial Condition and Results of Operations appearing in the 2014 Form 10-K and the 2014 Consolidated Financial Statements. In the opinion of NEP management, all adjustments (consisting of normal recurring accruals) considered necessary for fair financial statement presentation have been made. The results of operations for an interim period generally will not give a true indication of results for the year, and the results of operations for the accounting predecessor are not indicative of the actual level of expense that would have been incurred had NEP operated as a publicly-traded company during the period prior to the completion of the IPO.
Following NEP’s IPO, NEP has consolidated the results of NEP OpCo and its subsidiaries through its controlling interest in the general partner of NEP OpCo. NEP owns a 22.6% limited partnership interest in NEP OpCo and NEE Equity owns a noncontrolling 77.4% limited partnership interest in NEP OpCo. NEP's financial results are shown on a consolidated basis with financial results attributable to NEE Equity reflected in noncontrolling interest.
NEP acquired projects during the nine months ended September 30, 2015 as further described in Note 2. The acquisitions were a transfer of assets between entities under common control, which required them to be accounted for as if the transfers occurred since the inception of common control, with prior periods retrospectively adjusted to furnish comparative information. Accordingly, the accompanying condensed consolidated financial statements have been retrospectively adjusted to include the historical results and financial position of the 2015 acquisitions prior to their respective acquisition dates.
For all periods prior to the IPO on July 1, 2014, the accompanying condensed consolidated financial statements represent the combination of the assets that NEP acquired and were prepared using NEE’s historical basis in the assets and liabilities. For all periods subsequent to the IPO, the accompanying condensed consolidated financial statements represent the consolidated results of NEP.
NEP expects to take advantage of trends in the North American energy industry, including the addition of clean energy projects as aging or uneconomic generation facilities are phased out, increased demand from utilities for renewable energy to meet state RPS and improving competitiveness of clean energy generated from wind and solar projects relative to other fuels. NEP plans to focus on high-quality, long-lived projects operating under long-term contracts with creditworthy counterparties that are expected to produce stable long-term cash flows. NEP believes its cash flow profile, geographic and technological diversity, cost-efficient business model and relationship with NEE will provide NEP with a significant competitive advantage and enable NEP to execute its business strategy.
NEP entered into an agreement, effective July 31, 2015, to acquire the membership interests in NET Midstream, a developer, owner and operator of a portfolio of seven long-term contracted natural gas pipeline assets located in Texas. The NET Midstream pipeline portfolio has total existing capacity of approximately 4 billion cubic feet (Bcf) per day, of which 3 Bcf per day is currently contracted with firm ship-or-pay contracts. There are planned expansion projects for the three largest pipelines in the portfolio that, if completed, are expected to provide an additional 0.9 Bcf per day of contracted volumes. On October 1, 2015, a subsidiary of NEP completed the NET Midstream acquisition. The aggregate purchase price of approximately $2 billion included approximately $934 million in cash consideration and the assumption of approximately $654 million in existing debt of NET Midstream and its subsidiaries at closing and excluded post-closing working capital adjustments. The purchase price is subject to (i) a $200 million holdback payable, in whole or in part, upon satisfaction of financial performance and capital expenditure thresholds relating to planned expansion projects and (ii) a $200 million holdback retained for an 18-month period to satisfy any indemnification obligations of the sellers. The $200 million indemnity holdback may be reduced by up to $10 million depending on certain post-closing employee retention thresholds. If successful, NEP may spend up to an additional $100 million of capital expenditures for the planned expansion projects, bringing the total transaction size for the NET Midstream acquisition to approximately $2.1 billion.
Also, on October 1, 2015, a subsidiary of NEP completed the acquisition of a 149 MW wind generating facility located in Ontario, Canada from a subsidiary of NEER for a total purchase price of approximately $210 million in cash consideration, plus $19 million in working capital (subject to post-closing working capital and other adjustments), and assumed approximately $294 million in existing debt. See Note 2.
22
Results of Operations
Three Months Ended September 30, | Nine Months Ended September 30, | ||||||||||||||
2015 | 2014(a) | 2015 | 2014(a) | ||||||||||||
(millions) | |||||||||||||||
Statement of Operations Data: | |||||||||||||||
OPERATING REVENUES | $ | 103 | $ | 97 | $ | 297 | $ | 267 | |||||||
OPERATING EXPENSES | |||||||||||||||
Operations and maintenance | 22 | 18 | 64 | 53 | |||||||||||
Depreciation and amortization | 31 | 24 | 90 | 67 | |||||||||||
Transmission | 1 | 1 | 2 | 2 | |||||||||||
Taxes other than income taxes and other | 3 | 2 | 10 | 5 | |||||||||||
Total operating expenses | 57 | 45 | 166 | 127 | |||||||||||
OPERATING INCOME | 46 | 52 | 131 | 140 | |||||||||||
OTHER INCOME (DEDUCTIONS) | |||||||||||||||
Interest expense | (28 | ) | (28 | ) | (79 | ) | (73 | ) | |||||||
Benefits associated with differential membership interests - net | 3 | — | 10 | — | |||||||||||
Equity in earnings of equity method investees | — | — | (1 | ) | (1 | ) | |||||||||
Other - net | (4 | ) | — | (4 | ) | — | |||||||||
Total other deductions - net | (29 | ) | (28 | ) | (74 | ) | (74 | ) | |||||||
INCOME BEFORE INCOME TAXES | 17 | 24 | 57 | 66 | |||||||||||
INCOME TAXES | 3 | 1 | 11 | 14 | |||||||||||
NET INCOME | $ | 14 | $ | 23 | $ | 46 | $ | 52 |
_________________________
(a) | Prior-period financial information has been retrospectively adjusted as discussed in Note 2. |
Three Months Ended September 30, 2015 Compared to Three Months Ended September 30, 2014
Operating Revenues
Operating revenues primarily consist of income from the sale of energy under PPAs. Operating revenues increased $6 million during the three months ended September 30, 2015, as compared to the three months ended September 30, 2014, primarily due to revenues of approximately $10 million related to the commencement of commercial operations at Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015, partially offset by lower generation in 2015 due primarily to lower wind resource.
Three Months Ended September 30, | |||||||
2015 | 2014 | ||||||
(dollars in millions) | |||||||
Operating revenues | $ | 103 | $ | 97 | |||
Generation | 1,239 GWh | 785 GWh |
Operating Expenses
Operations and Maintenance
O&M expenses include interconnection costs, labor expenses, turbine servicing costs, lease royalty payments, insurance, materials, supplies, shared services and administrative expenses attributable to NEP's projects, and costs and expenses under ASAs and O&M agreements. O&M expenses also include the cost of maintaining and replacing certain parts for the projects in the portfolio to maintain, over the long-term, operating income or operating capacity. O&M expense increased $4 million for the three months ended September 30, 2015, as compared to the three months ended September 30, 2014, primarily due to the commencement of commercial operations at Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015.
Depreciation and Amortization
Depreciation and amortization expense reflects costs associated with depreciation and amortization of NEP's assets, based on consistent depreciable asset lives and depreciation methodologies. For all of the U.S. projects except Mammoth Plains and Palo Duro, CITCs have been elected, or are expected to be elected, and are recorded as a reduction in property, plant and equipment
23
- net on the condensed consolidated balance sheets and amortized as a reduction to depreciation and amortization expense over the estimated life of the related property. Depreciation and amortization expense also includes a provision for wind and solar facility dismantlement, asset removal costs and accretion related to asset retirement obligations.
Depreciation and amortization expense increased $7 million during the three months ended September 30, 2015, as compared to the three months ended September 30, 2014, primarily due to the commencement of commercial operations at Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015.
Other Income (Deductions)
Interest Expense
Interest expense primarily consists of interest under project financings, partially offset by interest capitalization on qualified expenditures. Interest expense was flat during the three months ended September 30, 2015, as compared to the three months ended September 30, 2014, primarily due to new financings, including project financings in June 2015 and July 2015, and draws on the existing revolving credit facility in 2015 (see Note 6), offset by repayment of debt with CITC proceeds at Genesis and normal debt amortization.
Benefits Associated with Differential Membership Interests - net
Benefits associated with differential membership interests - net reflect benefits recognized by NEP as third-party investors received their portion of the economic attributes of the underlying wind projects, including income tax attributes, net of associated costs. The tax equity arrangements were entered into in December 2014.
Other - net
The increase in other - net primarily relates to transaction costs associated with the October 2015 acquisition of NET Midstream.
Income Taxes
For periods prior to the NEP acquisition date, income taxes are calculated on the predecessor method using the separate return method for each of the project entities structured as limited liability companies or corporations. Income taxes are not included for entities that are structured as flow through entities (partnerships).
For periods after the NEP acquisition date, income taxes are calculated on the successor method where taxes are calculated for NEP as a single taxpaying corporation for U.S. federal and state income tax purposes. Because NEP OpCo is a limited partnership electing to be taxed as a partnership, NEP only recognizes in income its proportionate share of U.S. income taxes related to both the U.S. and Canadian projects, allocated by NEP OpCo. The Canadian subsidiaries are all Canadian taxpayers, and therefore, NEP recognizes in income all of the Canadian taxes.
For the three months ended September 30, 2015, NEP recorded income tax expense of approximately $3 million, resulting in an effective tax rate of 18%. The tax expense is comprised primarily of income tax of approximately $6 million at the statutory rate of 35% and foreign taxes of $1 million offset by $4 million of taxes attributable to noncontrolling interest.
For the three months ended September 30, 2014, NEP recorded income tax expense of approximately $1 million resulting in an effective tax rate of 4%. The tax expense is comprised primarily of income tax of approximately $8 million at the statutory rate of 35% offset by $7 million of taxes attributable to noncontrolling interest.
Due to the transition from predecessor to successor method of accounting for income taxes, comparing current period results to the same period in the prior year does not provide meaningful information. See Note 3.
Nine Months Ended September 30, 2015 Compared to Nine Months Ended September 30, 2014
Operating Revenues
Operating revenues primarily consist of income from the sale of energy under PPAs. Operating revenues increased $30 million during the nine months ended September 30, 2015, as compared to the nine months ended September 30, 2014, primarily due to revenues of approximately $51 million related to the commencement of commercial operations at Genesis Unit 2 in March 2014, Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015, partially offset by lower generation in 2015 due primarily to lower wind resource.
24
Nine Months Ended September 30, | |||||||
2015 | 2014 | ||||||
(dollars in millions) | |||||||
Operating revenues | $ | 297 | $ | 267 | |||
Generation | 4,077 GWh | 2,842 GWh |
Operating Expenses
Operations and Maintenance
O&M expenses include interconnection costs, labor expenses, turbine servicing costs, lease royalty payments, insurance, materials, supplies, shared services and administrative expenses attributable to NEP's projects, and costs and expenses under ASAs and O&M agreements. O&M expenses also include the cost of maintaining and replacing certain parts for the projects in the portfolio to maintain, over the long-term, operating income or operating capacity. O&M expense increased $11 million for the nine months ended September 30, 2015, as compared to the nine months ended September 30, 2014, primarily due to the commencement of commercial operations at Genesis Unit 2 in March 2014, Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015.
Depreciation and Amortization
Depreciation and amortization expense reflects costs associated with depreciation and amortization of NEP's assets, based on consistent depreciable asset lives and depreciation methodologies. For all of the U.S. projects except Mammoth Plains and Palo Duro, CITCs have been elected, or are expected to be elected, and are recorded as a reduction in property, plant and equipment - net on the condensed consolidated balance sheets and amortized as a reduction to depreciation and amortization expense over the estimated life of the related property. Depreciation and amortization expense also includes a provision for wind and solar facility dismantlement, asset removal costs and accretion related to asset retirement obligations.
Depreciation and amortization expense increased $23 million during the nine months ended September 30, 2015, as compared to the nine months ended September 30, 2014, primarily due to the commencement of commercial operations at Genesis Unit 2 in March 2014, Bluewater in July 2014, Mammoth Plains in December 2014, Palo Duro in December 2014 and Shafter in May 2015.
Taxes Other Than Income Taxes and Other
Taxes other than income taxes and other increased $5 million during the nine months ended September 30, 2015, as compared to the nine months ended September 30, 2014, primarily due to higher property taxes related to assets placed in service in 2014 and 2015.
Other Income (Deductions)
Interest Expense
Interest expense primarily consists of interest under project financings, partially offset by interest capitalization on qualified expenditures. Interest expense increased $6 million during the nine months ended September 30, 2015, as compared to the nine months ended September 30, 2014, primarily due to new financings, including project financings in June 2014, June 2015 and July 2015, and draws on the existing revolving credit facility in 2015 (see Note 6), partially offset by repayment of debt with CITC proceeds at Genesis and normal debt amortization.
Benefits Associated with Differential Membership Interests - net
Benefits associated with differential membership interests - net reflect benefits recognized by NEP as third-party investors received their portion of the economic attributes of the underlying wind projects, including income tax attributes, net of associated costs. The tax equity arrangements were entered into in December 2014.
Other - net
The increase in other - net primarily relates to transaction costs associated with the October 2015 acquisition of NET Midstream.
Income Taxes
For periods prior to the NEP acquisition date, income taxes are calculated on the predecessor method using the separate return method for each of the project entities structured as limited liability companies or corporations. Income taxes are not included for entities that are structured as flow through entities (partnerships).
25
For periods after the NEP acquisition date, income taxes are calculated on the successor method where taxes are calculated for NEP as a single taxpaying corporation for U.S. federal and state income tax purposes. Because NEP OpCo is a limited partnership electing to be taxed as a partnership, NEP only recognizes in income its proportionate share of U.S. income taxes related to both the U.S. and Canadian projects, allocated by NEP OpCo. The Canadian subsidiaries are all Canadian taxpayers, and therefore, NEP recognizes in income all of the Canadian taxes.
For the nine months ended September 30, 2015, NEP recorded income tax expense of approximately $11 million, resulting in an effective tax rate of 19%. The tax expense is comprised primarily of income tax of approximately $20 million at the statutory rate of 35% and foreign taxes of $5 million offset by $14 million of taxes attributable to noncontrolling interest.
For the nine months ended September 30, 2014, NEP recorded income tax expense of approximately $14 million resulting in an effective tax rate of 21%. The tax expense is comprised primarily of income tax of approximately $23 million at the statutory rate of 35% offset by $7 million of taxes attributable to noncontrolling interest.
Due to the transition from predecessor to successor method of accounting for income taxes, comparing current period results to the same period in the prior year does not provide meaningful information. See Note 3.
Liquidity and Capital Resources
NEP’s ongoing operations use cash to fund O&M expenses, maintenance capital expenditures, debt service payments and distributions to common unit holders. NEP expects to satisfy these requirements primarily with internally generated cash flow. In addition, as a growth-oriented limited partnership, NEP expects from time to time to make acquisitions and other investments. These acquisitions and investments are expected to be funded with cash on hand, cash generated from operations, borrowings under NEP's credit facility, issuances of additional indebtedness and issuances of additional NEP common units.
These sources of funds are expected to be adequate to provide for NEP's short-term and long-term liquidity and capital needs, although its ability to make future acquisitions and increase its distributions to common unitholders will depend on its ability to access the capital markets on acceptable terms.
As a normal part of its business, depending on market conditions, NEP expects from time to time to consider opportunities to repay, redeem, repurchase or refinance its indebtedness. In addition, NEP expects from time to time to consider potential investments in new acquisitions. These events may cause NEP to seek additional debt or equity financing, which may not be available on acceptable terms or at all. Debt financing, if available, could impose operating restrictions, additional cash payment obligations and additional covenants.
NEP OpCo has agreed to allow NEER or one of its affiliates to withdraw funds received by its subsidiaries, including NEP OpCo, and to hold those funds in accounts of NEER or one of its affiliates to the extent the funds are not required to pay project costs or otherwise required to be maintained by NEP's subsidiaries, until the financing agreements permit distributions to be made, or, in the case of NEP OpCo, until such funds are required to make distributions or to pay expenses or other operating costs. If NEER fails to return withdrawn funds when required by NEP's subsidiaries’ financings, the lenders will be entitled to draw on credit support provided by NEER in the amount of such withdrawn funds. In addition, NEP OpCo will have a claim for any funds that NEER fails to return:
• | when required by its subsidiaries’ financings; |
• | when its subsidiaries’ financings otherwise permit distributions to be made to NEP OpCo; |
• | when funds are required to be returned to NEP OpCo; or |
• | when otherwise demanded by NEP OpCo. |
If NEER or one of its affiliates realizes any earnings on the withdrawn funds prior to the return of such funds, it will be permitted to retain those earnings.
In October 2015, NEP announced that it plans to put in place an at-the-market equity issuance program pursuant to which NEP may issue, from time to time, up to $150 million of its common units, which gives NEP the flexibility to issue new units when the price is acceptable.
26
Liquidity Position
At September 30, 2015 and December 31, 2014, NEP's liquidity position was approximately $956 million and $572 million, respectively. The table below provides the components of NEP’s liquidity position as of September 30, 2015 and December 31, 2014:
September 30, 2015 | December 31, 2014 | ||||||
(millions) | |||||||
Cash and cash equivalents | $ | 696 | $ | 103 | |||
Amounts due under the CSCS agreement | 34 | 218 | |||||
Revolving credit facility | 250 | 250 | |||||
Less borrowings | (29 | ) | — | ||||
Letter of credit facilities - Genesis | 83 | 83 | |||||
Less letters of credit | (78 | ) | (82 | ) | |||
Total(a) | $ | 956 | $ | 572 |
____________________
(a) | Excludes current restricted cash of approximately $16 million and $82 million at September 30, 2015 and December 31, 2014, respectively. See Note 1 - Restricted Cash. |
Management believes that NEP's liquidity position and cash flows from operations will be adequate to finance O&M, capital expenditures, distributions to its unitholders and liquidity commitments. Management continues to regularly monitor NEP's financing needs consistent with prudent balance sheet management.
Financing Arrangements
Revolving Credit Facility
During the nine months ended September 30, 2015, a subsidiary of NEP borrowed $122 million under the existing revolving credit facility and subsequently repaid $93 million of such borrowings, bringing the outstanding balance to $29 million as of September 30, 2015.
Project Financings and Term Loans
Projects in the portfolio are subject to project financings that contain certain financial covenants and distribution tests, including debt service coverage ratios. In general, these project financings contain covenants customary for these types of financings, including limitations on investments and restricted payments. Generally, NEP's project financings provide for interest payable at a fixed interest rate. However, certain of NEP's project financings accrue interest at variable rates based on the London InterBank Offered Rate and one project accrues interest at a variable rate based upon the three-month Canadian Dealer Offered Rate. Interest rate swaps were entered into for certain of these financings to hedge against interest rate movements with respect to interest payments on the financing. Under the project financings, each project will be permitted to pay distributions out of available cash on a semi-annual basis so long as certain conditions are satisfied, including that reserves are funded with cash or credit support, no default or event of default under the applicable financings has occurred and is continuing at the time of such distribution or would result therefrom, and each project is otherwise in compliance with the project financing’s covenants and the applicable minimum debt service coverage ratio is satisfied. The minimum debt service coverage ratio that must be satisfied under all of NEP's project financings is 1.20:1.00. At September 30, 2015, each of the applicable NEP subsidiaries was in compliance with all covenants under its project financings.
During the nine months ended September 30, 2015, subsidiaries of NEP entered into various project financings and term loans. See Note 6.
On October 1, 2015, a subsidiary of NEP borrowed $600 million under several variable rate senior secured term loan agreements that mature in October 2018. See Note 6.
27
Contractual Obligations
NEP's contractual obligations as of September 30, 2015 were as follows:
Remainder of 2015 | 2016 | 2017 | 2018 | 2019 | Thereafter | Total | |||||||||||||||||||||
(millions) | |||||||||||||||||||||||||||
Contractual obligations(a) | $ | 1 | $ | 4 | $ | 5 | $ | 7 | $ | 7 | $ | 23 | $ | 47 | |||||||||||||
Debt, including interest(b) | 20 | 192 | 180 | 167 | 195 | 2,163 | 2,917 | ||||||||||||||||||||
Revolving credit facility fee | — | 1 | 1 | 1 | 1 | — | 4 | ||||||||||||||||||||
Asset retirement activities(c) | — | — | — | — | — | 173 | 173 | ||||||||||||||||||||
MSA and credit support | 2 | 8 | 8 | 8 | 8 | 116 | 150 | ||||||||||||||||||||
Land lease payments(d) | 2 | 6 | 6 | 6 | 6 | 183 | 209 | ||||||||||||||||||||
Total | $ | 25 | $ | 211 | $ | 200 | $ | 189 | $ | 217 | $ | 2,658 | $ | 3,500 |
____________________
(a) | Primarily represents obligations related to estimated cash payments related to the acquisition of certain development rights and differential membership interests. |
(b) | Includes principal, interest and interest rate swaps. Variable rate interest was computed using September 30, 2015 rates. |
(c) | Represents expected cash payments adjusted for inflation for estimated costs to perform asset retirement activities. |
(d) | Represents various agreements that provide for payments to landowners for the right to use the land upon which the projects are located. |
Capital Expenditures
Annual capital spending plans are developed based on projected requirements by the projects. Capital expenditures primarily represent the estimated cost of acquisitions or capital improvements, including construction expenditures that are expected to increase NEP OpCo’s operating income or operating capacity over the long-term. Capital expenditures for projects that have already commenced commercial operations are generally not significant because most expenditures relate to repairs and maintenance and are expensed when incurred. For the three months ended September 30, 2015 and 2014, NEP had capital expenditures of approximately $6 million and $533 million, respectively. For the nine months ended September 30, 2015 and 2014, NEP had capital expenditures of approximately $139 million and $717 million, respectively. At September 30, 2015, estimated capital expenditures for the remainder of 2015 are approximately $14 million. There are no significant additional planned capital expenditures for the remainder of 2015 through 2019, other than with respect to NET Midstream and the wind generating facility acquired in October 2015 discussed in Overview above. These estimates are subject to continuing review and adjustment and actual capital expenditures may vary significantly from these estimates.
Cash Distributions to Unitholders
NEP's partnership agreement requires it to distribute available cash quarterly. Generally, available cash is all cash on hand at the date of determination in respect of such quarter (including any expected distributions from NEP OpCo), less the amount of cash reserves established by NEP GP. NEP currently expects that cash reserves would be established solely to provide for the payment of income taxes by NEP, if any. Cash flow is generated from distributions NEP receives from NEP OpCo each quarter and, during the purchase price adjustment period, from NEE Equity, which payments will be funded solely by any distributions NEE Equity receives from NEP OpCo with respect to such quarter. Although, as described above, NEP currently expects that cash reserves would be established by NEP GP solely to provide for the payment of any NEP income taxes, NEP expects NEP OpCo to establish cash reserves prior to making distributions to NEP to pay costs and expenses of NEP's subsidiaries, in addition to NEP's expenses, as well as any debt service requirements and future capital expenditures. During the purchase price adjustment period, should NEP OpCo not make a quarterly distribution in an amount at least equal to the minimum quarterly distribution of $0.1875 per common unit, the purchase price paid for NEP OpCo under the purchase agreement will be reduced by the difference for such quarter and NEE Equity will pay NEP a purchase price adjustment equal to such shortfall, provided that NEE Equity will not be required to pay a purchase price adjustment in any quarter in excess of the distribution actually received by NEP OpCo.
NEP OpCo's partnership agreement requires it to distribute all of its available cash to its unitholders, including NEP, each quarter. It is expected that the majority of such available cash will be derived from the operations of the projects. The cash available for distribution is likely to fluctuate from quarter to quarter, and in some cases significantly, as a result of the performance of the projects, seasonality, fluctuating wind resource, maintenance and outage schedules, timing of debt service and other factors.
During the nine months ended September 30, 2015, NEP distributed approximately $12 million to its unitholders. On October 28, 2015, NEP announced a distribution of $0.27 per common unit payable on November 13, 2015 to its unitholders of record on November 5, 2015.
28
Cash Flows
Nine Months Ended September 30, 2015 Compared to Nine Months Ended September 30, 2014
The following table reflects the changes in cash flows for the comparative periods:
2015 | 2014 | Change | |||||||||
(millions) | |||||||||||
Nine Months Ended September 30, | |||||||||||
Net cash provided by operating activities | $ | 117 | $ | 134 | $ | (17 | ) | ||||
Net cash used in investing activities | $ | (553 | ) | $ | (315 | ) | $ | (238 | ) | ||
Net cash provided by financing activities | $ | 1,031 | $ | 272 | $ | 759 |
Net Cash Provided by Operating Activities
Changes in net cash provided by operating activities were driven primarily by cash flows related to projects that commenced commercial operations after January 2014. These projects included Genesis Unit 2, Bluewater, Mammoth Plains, Palo Duro and Shafter.
Net Cash Used in Investing Activities
Changes in net cash used in investing activities were driven by project acquisitions, proceeds from CITCs, payments from related parties under the CSCS agreement, decreased capital expenditures related to construction activities and changes in restricted cash balances related to the timing of construction payments.
2015 | 2014 | ||||||
(millions) | |||||||
Nine Months Ended September 30, | |||||||
Capital expenditures | $ | (85 | ) | $ | (183 | ) | |
Acquisitions of projects | (716 | ) | (288 | ) | |||
Changes in restricted cash | 66 | (4 | ) | ||||
Payments from (to) related parties under CSCS agreement - net | 182 | (146 | ) | ||||
Proceeds from convertible investment tax credits | — | 306 | |||||
Net cash used in investing activities | $ | (553 | ) | $ | (315 | ) |
Net Cash Provided by Financing Activities
Changes in net cash provided by financing activities were primarily driven by member contributions/distributions, issuances of debt and issuances of additional NEP common units and NEP OpCo common units to acquire additional projects and repay debt.
2015 | 2014 | ||||||
(millions) | |||||||
Nine Months Ended September 30, | |||||||
Member contributions (distributions) - net | $ | (25 | ) | $ | 195 | ||
Proceeds from short-term debt - net | 12 | — | |||||
Issuances of long-term debt - net | 44 | (360 | ) | ||||
Repayment of amount due to related party | (20 | ) | — | ||||
Proceeds from issuance of common units, net | 319 | 438 | |||||
Proceeds from issuance of NEP OpCo common units to noncontrolling interest | 702 | — | |||||
Other | (1 | ) | (1 | ) | |||
Net cash provided by financing activities | $ | 1,031 | $ | 272 |
29
Quantitative and Qualitative Disclosures about Market Risk
NEP is exposed to several market risks in its normal business activities. Market risk is the potential loss that may result from market changes associated with its business. The types of market risks include interest rate, counterparty credit and foreign currency risks.
Interest Rate Risk
NEP is exposed to risk resulting from changes in interest rates associated with current and future issuances of debt. The debt of some of its subsidiaries accrues interest at fixed rates and the debt of some of its other subsidiaries accrues interest at variable rates. NEP manages interest rate exposure by monitoring current interest rates, entering into interest rate swap contracts and using a combination of fixed rate and variable rate debt. Interest rate swaps are used to mitigate or adjust interest rate exposure when deemed appropriate based upon market conditions or when required by financing agreements.
NEP has long-term debt instruments that subject it to the risk of loss associated with movements in market interest rates. As of September 30, 2015, less than 10% of the long-term debt, including current maturities, was exposed to such risk as the remaining balance was either financially hedged or comprised of fixed rate debt. As of September 30, 2015, the estimated fair value and the carrying value of NEP's long-term debt was approximately $2.0 billion and $1.9 billion, respectively. Based upon a hypothetical 10% decrease in interest rates, which is a reasonable near-term market change, the fair value of NEP's long-term debt would increase by approximately $72 million.
Counterparty Credit Risk
Risks surrounding counterparty performance and credit risk could ultimately impact the amount and timing of expected cash flows. Credit risk relates to the risk of loss resulting from non-performance or non-payment by counterparties under the terms of their contractual obligations. NEP monitors and manages credit risk through credit policies that include a credit approval process and the use of credit mitigation measures such as prepayment arrangements in certain circumstances. NEP also seeks to mitigate counterparty risk by having a diversified portfolio of counterparties. In addition, the projects in NEP's portfolio are fully contracted under long-term contracts that have a capacity-weighted average remaining contract term of approximately 19 years as of September 30, 2015.
Foreign Currency Risk
Because NEP has Canadian operations, it is exposed to foreign currency exchange gains and losses. Since the functional currency of NEP's Canadian operations is in their local currency, the currency effects of translating the financial statements of those Canadian subsidiaries, which operate in local currency environments, are included in the accumulated other comprehensive income (loss) component of consolidated equity and do not impact earnings. However, gains and losses related to foreign currency transactions not in NEP's subsidiaries’ functional currency do impact earnings and resulted in approximately $1 million of gains in the three and nine months ended September 30, 2015. Additionally, during the nine months ended September 30, 2015, NEP entered into certain foreign currency exchange contracts to economically hedge its cash flows from foreign currency rate fluctuations. See Note 5.
30
Item 3. Quantitative and Qualitative Disclosures About Market Risk
See Management's Discussion - Quantitative and Qualitative Disclosures About Market Risk.
Item 4. Controls and Procedures
(a) | Evaluation of Disclosure Controls and Procedures |
As of September 30, 2015, NEP had performed an evaluation, under the supervision and with the participation of its management, including the chief executive officer and chief financial officer of NEP GP, the general partner of NEP, of the effectiveness of the design and operation of NEP's disclosure controls and procedures (as defined in the Securities Exchange Act of 1934 Rules 13a-15 (e) and 15d-15(e)). Based upon that evaluation, the chief executive officer and the chief financial officer of NEP GP concluded that NEP's disclosure controls and procedures are not effective at a reasonable assurance level to ensure that information required to be disclosed in reports that are filed or submitted under the Securities Exchange Act of 1934 are recorded, processed, summarized and reported within time periods specified in SEC rules and forms, as of September 30, 2015. Management recognizes that any controls and procedures, no matter how well designed and operated, can provide only a reasonable assurance of achieving their objectives and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures.
A material weakness is a deficiency, or combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of a company’s annual or interim financial statements will not be prevented or detected on a timely basis.
During the third quarter of 2014, management determined that NEP did not maintain effective internal controls over the accounting for income taxes. NEP identified deficiencies with the valuation of deferred income tax accounts, which resulted in a material weakness in internal control over financial reporting. Specifically, NEP did not effectively determine and monitor its valuation allowances on deferred income tax assets and the accuracy of its deferred income taxes, all non-cash activities. This deficiency resulted in an immaterial misstatement of income tax expense and deferred income taxes in the December 31, 2013 financial statements included in the Prospectus. Additionally, this deficiency could have resulted in a material misstatement of income tax expense within the annual and interim consolidated financial statements that would not have been prevented or detected, and accordingly, this internal control deficiency constitutes a material weakness as of September 30, 2015. NEP continues to take steps to remediate the material weakness, including the development of enhanced oversight and review procedures, organizational changes and adding additional personnel with income tax accounting experience. Management believes the additional control procedures and organizational changes, when implemented and validated, will be sufficient to remediate this material weakness.
(b) | Changes in Internal Control Over Financial Reporting |
This report does not include management's assessment regarding changes in internal control over financial reporting due to a transition period established by rules of the SEC for newly public companies.
31
PART II - OTHER INFORMATION
Item 1A. Risk Factors
There have been no material changes from the risk factors disclosed in the 2014 Form 10-K and the June 2015 Form 10-Q except as follows:
Risks Related to NEP's Acquisition Strategy and Future Growth
NEP’s ability to consummate future acquisitions will depend on NEP’s ability to finance those acquisitions.
Since NEP expects to finance acquisitions of clean energy projects partially or wholly through the issuance of additional common units, NEP needs to be able to access the capital markets on commercially reasonable terms when acquisition opportunities arise. NEP’s ability to access the equity capital markets is dependent on, among other factors, the overall state of the capital markets and investor appetite for investment in clean energy projects in general and NEP’s common units in particular. An inability to obtain equity financing on commercially reasonable terms could significantly limit NEP’s ability to consummate future acquisitions and to effectuate its growth strategy. In addition, the issuance of additional common units in connection with acquisitions could cause significant unitholder dilution and reduce the cash distribution per common unit if the acquisitions are not sufficiently accretive.
Furthermore there may not be sufficient availability under NEP’s revolving credit facility or other financing arrangements on commercially reasonable terms when acquisition opportunities arise. An inability to obtain the required or desired financing could significantly limit NEP's ability to consummate acquisitions and effectuate its growth strategy. If financing is available, it may be available only on terms that could significantly increase NEP's interest expense, impose additional or more restrictive covenants and reduce cash distributions to its unitholders. NEP's inability to effectively consummate future acquisitions could have a material adverse effect on NEP's ability to grow its business and make cash distributions to its unitholders.
Risks Related to NEP's Financial Activities
NEP’s failure to remediate a material weakness in internal controls, and to maintain effective internal controls in the future, could have a material adverse effect on its business.
Pursuant to Section 404 of the Sarbanes-Oxley Act, NEP’s management determined that NEP did not maintain effective internal controls over the accounting for income taxes and that this internal control deficiency constitutes a material weakness as of September 30, 2015. NEP is taking steps to remediate the material weakness. If NEP fails to remediate this material weakness or any failure to maintain adequate internal controls over financial reporting occurs in the future, NEP’s failure to achieve and maintain effective internal controls could have a material adverse effect on its business.
Risks Relating to Ownership and Operation of Natural Gas Pipelines
NET Midstream depends on a key customer for a significant portion of its revenues. The loss of this customer could result in a decline in NEP's revenues and cash available to make distributions to its unitholders.
A subsidiary of PEMEX is expected to account for approximately 14% of the firm contracted revenues of NEP in 2016, based on NEP's forecasted portfolio as of December 31, 2015. The loss of all or even a portion of the contracted volumes of PEMEX, as a result of competition, creditworthiness, inability to negotiate extensions or replacements of contracts or otherwise, or disputes with PEMEX, could have a material adverse effect on NEP's business, financial condition and results of operations, including its cash available for distribution to unitholders.
The factors discussed above, in Part II, Item 1A. Risk Factors in NEP's June 2015 Form 10-Q and in Part I, Item 1A. Risk Factors in NEP's 2014 Form 10-K, as well as other information set forth in this report, which could materially adversely affect NEP's business, financial condition, results of operations, cash available for distribution and prospects should be carefully considered. The risks described above, in NEP's June 2015 Form 10-Q and in NEP's 2014 Form 10-K are not the only risks facing NEP. Additional risks and uncertainties not currently known to NEP, or that are currently deemed to be immaterial, also may materially adversely affect NEP's business, financial condition, results of operations, cash available for distribution and prospects.
32
Item 5. Other Information
NEP has been advised that NEE authorized a program to purchase, from time to time, up to $150 million of NEP's outstanding common units. Under the program, any purchases may be made in amounts, at prices and at such times as NEE or its subsidiaries deem appropriate, all subject to market conditions and other considerations. The common unit purchase program does not require NEE to acquire any specific number of common units and may be modified or terminated by NEE at any time. The purpose of the program is not to cause NEP’s common units to be delisted from the New York Stock Exchange or to cause the common units to be deregistered with the SEC.
Item 6. Exhibits
Exhibit Number | Description | |
2* | Membership Interest Purchase Agreement by and among Dearing Holdings, LP, Gutierrez Holdings, LP, Mission Pipeline Midstream, Inc., and NET Investment Company LLC, Midstream Partners Sellers’ Representative LLC, Jerry Dearing and Joe Gutierrez, NextEra Energy Partners, LP, ArcLight Capital Partners, LLC, National Energy & Trade, LP and NET Holdings Management, LLC, dated as of July 31, 2015 (filed as Exhibit 2 to Form 8-K dated July 31, 2015, File No. 1-36518) | |
10* | Equity Purchase Agreement, dated September 10, 2015 between NextEra Energy Operating Partners, LP and NextEra Energy Equity Partners, LP (filed as Exhibit 10 to Form 8-K dated September 10, 2015, File No. 1-36518) | |
12 | Computation of Ratios | |
31(a) | Rule 13a-14(a)/15d-14(a) Certification of Chief Executive Officer of NextEra Energy Partners GP, Inc. | |
31(b) | Rule 13a-14(a)/15d-14(a) Certification of Chief Financial Officer of NextEra Energy Partners GP, Inc. | |
32 | Section 1350 Certification of NextEra Energy Partners, LP | |
101.INS | XBRL Instance Document | |
101.SCH | XBRL Schema Document | |
101.PRE | XBRL Presentation Linkbase Document | |
101.CAL | XBRL Calculation Linkbase Document | |
101.LAB | XBRL Label Linkbase Document | |
101.DEF | XBRL Definition Linkbase Document |
____________________
* | Incorporated herein by reference. |
33
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
Date: November 6, 2015
NEXTERA ENERGY PARTNERS, LP | |
(Registrant) | |
By: | NextEra Energy Partners GP, Inc., its general partner |
CHRIS N. FROGGATT | |
Chris N. Froggatt Controller and Chief Accounting Officer (Principal Accounting Officer) |
34