Annual Statements Open main menu

Riley Exploration Permian, Inc. - Quarter Report: 2011 March (Form 10-Q)

tenq_march31.htm
 
 

 

­
 
U.S. Securities and Exchange Commission
Washington, D.C. 20549
Form 10-Q
 
QUARTERLY REPORT UNDER SECTION 13 OR 15(d) OF
 
THE SECURITIES EXCHANGE ACT OF 1934
 
For the quarterly period ended March 31, 2011
 
Commission File No. 1-15555
 
 
Tengasco, Inc.
    (Exact name of issuer as specified in its charter)
 
Tennessee
87-0267438
State or other jurisdiction
of Incorporation or organization
(IRS Employer Identification No.)
 
11121 Kingston Pike, Suite E, Knoxville, TN 37934
(Address of principal executive offices)
 
(865-675-1554)
 
(Issuer’s telephone number, including area code)
 

Indicate by check mark whether the issuer (1) has  filed all reports required to be filed by Section 13 or 15(d) of the Exchange Act during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes X   No__

Indicate by checkmark whether the registrant has submitted electronically and posted on its corporate website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§231.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). [ X ] Yes [  ] No
 
Indicate by check mark whether the registrant is a large accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of "large accelerated filer," "accelerated filer" and "smaller reporting company" in Rule 12b-2 of the Exchange Act.
 
Large accelerated filer___
Non-accelerated filer ___
(Do not check if a smaller reporting company)
Accelerated filer ___
Smaller reporting company   x
 
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes____ No X
 
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date: 60,687,413 common shares at May 3, 2011.
 

 
 

 


 
TABLE OF CONTENTS

 
PART I.
FINANCIAL INFORMATION
PAGE
 
 
ITEM 1. FINANCIAL STATEMENTS
 
 
*    Condensed Consolidated Balance Sheets as of March 31, 2011 and December 31, 2010
3
     
 
*    Condensed Consolidated Statements of Operations for the three and nine months ended March 31, 2011 and 2010
5
     
 
*    Condensed  Consolidated Statement of Stockholders’ Equity for the three months ended March 31, 2011
6
     
 
*    Condensed Consolidated Statements of Cash Flows for the three months ended  March 31, 2011 and 2010
7
     
 
*    Notes to Condensed  Consolidated Financial Statements
8
 
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
24
     
 
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURE ABOUT MARKET RISK
29
     
 
 
ITEM 4. CONTROLS AND PROCEDURES
 
31
     
PART II.
OTHER INFORMATION
32
 
ITEM 1. LEGAL PROCEEDINGS
32
 
ITEM 1A. RISK FACTORS
32
 
ITEM 2. UNREGISTERD SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
32
 
ITEM 3. DEFAULTS UPON SENIOR SECURITIES
32
 
ITEM 4. (REMOVED AND RESERVED) 
32
     
 
ITEM 5. OTHER INFORMATION
32
 
ITEM 6. EXHIBITS
33
 
*    SIGNATURES
34
 
*    CERTIFICATIONS
  35

 
 

 
Tengasco, Inc. and Subsidiaries
 
Consolidated Balance Sheets
 
(in thousands, except share data)
 


 
March 31, 2011
 
December 31, 2010
 
(unaudited)
   
       
Assets
     
       
Current
     
  Cash and cash equivalents
$        183
 
$         141
  Accounts receivable
1,515
 
1,517
  Accounts receivable – related party
885
 
993
  Inventory
645
 
577
  Deferred tax asset-current
297
 
264
  Other current assets
42
 
42
  Total current assets
3,567
 
3,534
       
  Restricted cash
121
 
121
  Loan fees, net
140
 
99
  Oil and gas properties, net (full cost accounting method)
16,092
 
14,157
  Pipeline facilities, net
6,997
 
7,041
  Methane project, net
4,375
 
4,394
  Other property and equipment, net
274
 
308
  Deferred tax asset-noncurrent
9,880
 
10,095
       
Total assets
$   41,446
 
$    39,749

 
See accompanying notes to condensed consolidated financial statements.
 

 

 

 

3

 
 

 
Tengasco, Inc. and Subsidiaries
 
Consolidated Balance Sheets
 
(in thousands, except share data)
 


 
March 31, 2011
 
December 31, 2010
 
(unaudited)
   
       
Liabilities and Stockholders’ Equity
 
Current liabilities
     
  Accounts payable – trade
$   1,043
 
$    550
  Accounts payable – other
885
 
993
  Accrued liabilities
623
 
571
  Prepaid revenues – current
395
 
594
  Current maturities of long-term debt
128
 
129
  Unrealized derivative liability – current
774
 
687
  Total current liabilities
3,848
 
3,524
       
  Asset retirement obligation
1,458
 
1,437
  Long term debt, less current maturities
10,522
 
9,564
  Total liabilities
15,828
 
14,525
       
Stockholders’ equity
     
  Common stock, $.001 par value; authorized     100,000,000  shares; 60,687,413 shares issued and outstanding
 
 
61
 
 
 
61
  Additional paid –in capital
55,442
 
55,402
  Accumulated deficit
(29,885)
 
(30,239)
  Total stockholders’ equity
25,618
 
25,224
       
Total liabilities and stockholders’ equity
$   41,446
 
$   39,749

 
See accompanying notes to condensed consolidated financial statements.
 

 

 

 

 

4

 
 

 
Tengasco, Inc. and Subsidiaries
Consolidated Statements of Operations
(unaudited)
(In thousands, except share and per share data)




   
For the Three Months
Ended March 31,
   
2011
 
2010
         
Revenues
 
$ 3,662 
 
$  2,851
   
       
Cost and expenses
       
   Production costs and taxes
 
1,524
 
1,316
   Depreciation, depletion, and amortization
 
572
 
523
   General and administrative
 
522
 
592
   Total cost and expenses
 
2,618
 
2,431
         
Net income from operations
 
1,044
 
420
   
       
Other income (expense)
       
    Interest expense
 
(145)
 
(177)
    Gain (loss) on derivatives
 
(366)
 
162
    Gain on sale of assets
 
3
 
-
    Total other income (expenses)
 
(508)
 
(15)
         
Income before income tax
 
536
 
405
         
Income tax expense
 
(182)
 
(137)
         
Net income
 
$   354
 
$   268
  
       
Net income per share
       
   Basic fully diluted
 
$  0.01
 
$ 0.00
   Diluted
 
$  0.01
 
$ 0.00
Shares used in computing earnings per share
       
   Basic
 
60,687,413
 
59,760,661
   Diluted
 
60,762,622
 
61,691,661

 
See accompanying notes to condensed consolidated financial statements.
 

 

 

5

 
 

 
Tengasco, Inc. and Subsidiaries
Consolidated Statements of Stockholders’ Equity
(unaudited)
(In thousands, except share data)




 
   
    Common Stock
           
 
 
Shares
 
 
Amount
 
Additional Paid in Capital
 
Accumulated
Deficit
 
 
Total
Balance, December 31, 2010
60,687,413
 
$   61
 
$  55,402
 
 $  (30,239)
 
$  25,224
                   
Net Income
-
 
-
 
-
 
354
 
354
                   
Option & Compensation Expense
-
 
-
 
40
 
-
 
40
                   
Balance,  March 31, 2011 (Unaudited)
60,687,413
 
$   61
 
$  55,442
 
$  (29,885)
 
$  25,618

 
See accompanying notes to condensed consolidated financial statements.
 

 

 

6

 
 

 
Tengasco, Inc. and Subsidiaries
Consolidated Statements of Cash Flows
(unaudited)
(In thousands)


 
For the three months ended March 31,
 
2011
 
2010
       
Operating activities
     
   Net income
$   354 
 
$    268
   Adjustments to reconcile net income to net cash
   provided by operating activities:
     
   Depreciation, depletion, and amortization
572
 
523
     Amortization of loan fees-interest expense
19
 
28
     Accretion on asset retirement obligation
26
 
13
     Gain on sale of assets
(3)
 
-
     Compensation and services paid in stock options and stock
40
 
20
     Deferred tax expense
182
 
137
     Unrealized loss (gain) on derivatives
87
 
(162)
     Changes in assets and liabilities:
     
       Accounts receivable
2
 
7
       Accounts receivable – related party
108
 
(1,708)
       Inventory
(68)
 
(121)
       Other current assets
-
 
(46)
       Accounts payable-trade
493
 
(229)
       Accounts payable-other
(108)
 
1,708
       Accrued liabilities
52
 
146
       Settlement on asset retirement obligation
(33)
 
(20)
       Net cash provided by operating activities
1,723
 
564
Investing activities
     
   Net additions to oil and gas properties
(2,568)
 
(496)
   Additions to other property & equipment
(13)
 
-
  Proceeds from sale of other property and equipment
3
 
-
   Net cash used in investing activities
(2,578)
 
(496)
Financing activities
     
   Repayments of borrowings
(33)
 
(27)
   Proceeds from borrowings
990
 
-
   Loan fees
(60)
 
-
   Net cash used in financing activities
897
 
(27)
       
Net change in cash and cash equivalents
42
 
41
Cash and cash equivalents, beginning of period
141
 
422
Cash and cash equivalents, end of period
$     183
 
$    463
       
       
Supplemental cash flow information:
     
   Cash interest payments
$    126
 
$      149

 
See accompanying notes to condensed consolidated financial statements.
 

7

 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


(1)    Description of Business and Significant Accounting Policies

Tengasco, Inc. is a Tennessee corporation (“Tengasco” or the “Company”).  The Company is in the business of exploration and production of oil and natural gas.  The Company’s primary area of oil exploration and production is in Kansas.  The Company’s primary area of natural gas production is the Swan Creek Field in Tennessee.

The Company’s wholly-owned subsidiary, Tengasco Pipeline Corporation (“TPC”), owns and operates a 65-mile intrastate pipeline which it constructed to transport natural gas from the Company’s Swan Creek Field to customers in Kingsport, Tennessee.

The Company’s wholly-owned subsidiary, Manufactured Methane Corporation (“MMC”) owns and operates treatment and delivery facilities using the latest developments in available treatment technologies for the extraction of methane gas from nonconventional sources for delivery through the nation’s existing natural gas pipeline system, including the Company’s TPC pipeline system in Tennessee for eventual sale to natural gas customers.

Basis of Presentation

The accompanying unaudited condensed consolidated financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“U.S. GAAP”) for interim financial information and with the instructions to Form 10-Q and Item 210 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by U.S. GAAP for complete financial statements. In the opinion of management, all adjustments (consisting of only normal recurring accruals) considered necessary for a fair presentation have been included. Operating results for the three months ended March 31, 2011 are not necessarily indicative of the results that may be expected for the year ended December 31, 2011. For further information, refer to the Company’s consolidated financial statements and footnotes thereto included in the Company’s Annual Report on Form 10-K for the year ended December 31, 2010.

Principles of Consolidation

The accompanying consolidated financial statements are presented in accordance with U.S. GAAP.  The consolidated financial statements include the accounts of the Company and its wholly-owned subsidiaries after elimination of all significant intercompany transactions and balances.

Use of Estimates

The accompanying consolidated financial statements are prepared in conformity with U.S. GAAP which require management to make estimates and assumptions that affect

8
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period.  The actual results could differ from those estimates.

Revenue Recognition

Revenues are recognized based on actual volumes of oil and gas sold to purchasers at a fixed or determinable price, when delivery has occurred and title has transferred and collectability is reasonably assured.  Natural gas meters are placed at the customer’s location and usage is billed each month.  Crude oil is stored and at the time of delivery to the purchasers, revenues are recognized.

Cash and Cash Equivalents

Cash and cash equivalents include temporary cash investments with a maturity of ninety days or less at date of purchase.  The Company has elected to enter into a sweep account arrangement allowing excess cash balances, if any, to be used to temporarily pay down the credit facility, thereby reducing overall interest cost.

Reclassifications

Certain prior year amounts have been reclassified to conform to current year presentation with no effect on net income.

 (2)    Income Taxes

Income taxes are reported in accordance with U.S. GAAP, which requires the establishment of deferred tax accounts for all temporary differences between the financial reporting and tax bases of assets and liabilities, using currently enacted federal and state income tax rates.  In addition, deferred tax accounts must be adjusted to reflect new rates if enacted into law.  Temporary differences result principally from federal and state net operating loss carry-forwards, differences in oil and gas property values resulting from a 2008 ceiling test write down, differences in pipeline values resulting from a 2010 impairment, and differences in methods of reporting depreciation and amortization.

Realization of deferred tax assets is contingent on the generation of future taxable income.  As a result, management considers whether it is more likely than not that all or a portion of such assets will be realized during periods when they are available, and if not, management provides a valuation allowance for amounts not likely to be recovered.

Management periodically evaluates tax reporting methods to determine if any uncertain tax positions exist that would require the establishment of a loss contingency.  A loss contingency would be recognized if it were probable that a liability has been incurred as of the date of the financial statements and the amount of the loss can be reasonably estimated.
 
 

9
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


The amount recognized is subject to estimates and management’s judgment with respect to the likely outcome of each uncertain tax position.  The amount that is ultimately incurred for an individual uncertain tax position or for all uncertain tax positions in the aggregate could differ from the amount recognized.  Management has determined that no significant uncertain tax positions existed as of March 31, 2011, and December 31, 2010.

At December 31, 2010, federal net operating loss carry forwards amounted to approximately $18.3 million which expire between 2013 and 2024. The total deferred tax asset at March 31, 2011 and December 31, 2010 was $10.2 million and $10.4 million, respectively

(3)    Income per Common Share

In accordance with Financial Accounting Standards Board (“FASB”) Accounting Standards Codification (“ASC”) 260, Earnings per Share, basic income (loss) per share is based on 60,687,413 and 59,760,661 weighted average shares outstanding for the quarters ended March 31, 2011, and March 31, 2010 respectively.  Diluted earnings per common share are computed by dividing income available to common shareholders by the weighted average number of shares of common stock outstanding during the period increased to include the number of additional shares of common stock that would have been outstanding if the dilutive potential shares of common stock had been issued. The dilutive effect of outstanding options is reflected in diluted earnings per share for the quarters ended March 31, 2011 and March 31, 2010.

(4)   Recent Accounting Pronouncements

In July 2010, the “Dodd-Frank Wall Street Reform and Consumer Protection Act” (“Wall Street Reform Act”) was signed into law.  The Wall Street Reform Act permanently exempts small public companies with less than $75 million in market capitalization (nonaccelerated filers) from the requirement to obtain an external audit on the effectiveness of internal financial reporting controls provided in Section 404(b) of the Sarbanes-Oxley Act of 2002.  Section 404(b) requires a registrant to provide an attestation report on management’s assessment of internal controls over financial reporting by the registrant’s external auditor.  Disclosure of management’s assessment of internal controls over financial reporting under existing Section 404(a) is still required for nonaccelerated filers.

In February, 2010, the FASB issued Accounting Standards Update (“ASU”) 2010-09, effective immediately, which amended ASC Topic 855, Subsequent Events.  The amendment was made to address concerns about conflicts with SEC guidance and other practice issues.  Among the provisions of the amendment, the FASB defined a new type of entity, termed an “SEC filer,” which is an entity required to file with or furnish its financial statements to the SEC.  Entities other than registrants whose financial statements are included in SEC filings (e.g., businesses or real estate operations acquired or to be acquired, equity method investees, and entities whose securities collateralize registered securities) are not SEC filers.

10
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


While an SEC filer is still required by U.S. GAAP to evaluate subsequent events through the date its financial statements are issued, it is no longer required to disclose in the financial statements that it has done so or the date through which subsequent events have been evaluated. The Company does not believe the changes have a material impact on its results of operations or financial position.

In January 2010, the FASB issued ASU 2010-06, “Fair Value Measurements and Disclosures (Topic 820): Improving Disclosures about Fair Value Measurements”.  This update requires more robust disclosures about valuation techniques and inputs to fair value measurements.  The update is effective for interim and annual reporting periods beginning after December 15, 2009.  This update had no material effect on the Company’s consolidated financial statements.

On December 31, 2008, the SEC published the final rules and interpretations updating its oil and gas reporting requirements (“Modernization of Oil and Gas Reporting”).  In January 2010, the FASB released ASU 2010-03, Extractive Activities - Oil and Gas (“Topic 932”); Oil and Gas Reserve Estimation and Disclosures, aligning U.S. GAAP standards with the SEC’s new rules.  Many of the revisions were updates to definitions in the existing oil and gas rules to make them consistent with the petroleum resource management system, which is a widely accepted standard for the management of petroleum resources that was developed by several industry organizations.  Key revisions include: (a) changes to the pricing used to estimate reserves utilizing a 12-month average price rather than a single day spot price which eliminates the ability to utilize subsequent prices to the end of a reporting period when the full cost ceiling was exceeded and subsequent pricing exceeds pricing at the end of a reporting period; (b) the ability to include nontraditional resources in reserves; (c) the use of new technology for determining reserves; and (d) permitting disclosure of probable and possible reserves.  The SEC requires companies to comply with the amended disclosure requirements for registration statements filed after January 1, 2010, and for annual reports on Form 10-K for fiscal years ending on or after December 15, 2009.  ASU 2010-03 is effective for annual periods ending on or after December 31, 2009.  Adoption of Topic 932 did not have a material impact on the Company’s results of operations or financial position. In April 2010, the FASB issued ASU 2010-14, Accounting for Extractive Activities-Oil & Gas: Amendments to Paragraph 932-10-S99-1.  This ASU amends terminology as defined in Topic 932-10-S99-1.

(5)     Related Party Transactions

On September 17, 2007, the Company entered into a drilling program with Hoactzin Partners, L.P. (“Hoactzin”) for ten wells consisting of approximately three wildcat wells and seven developmental wells to be drilled on the Company’s Kansas Properties (the “Ten Well Program”). Peter E. Salas, the Chairman of the Board of Directors of the Company, is the controlling person of Hoactzin. He is also the sole shareholder and controlling person of Dolphin Management, Inc. and the general partner of Dolphin Offshore Partners, L.P., which is the Company’s largest shareholder. Carlos P. Salas, a director of the Company, has an interest in Hoactzin but is not a controlling person of Hoactzin.

11
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


Under the terms of the Ten Well Program, Hoactzin paid the Company $0.4 million for each well drilled in the Ten Well Program completed as a producing well and $0.25 million for each well that was non-productive. The terms of the Ten Well Program also provide that Hoactzin will receive all the working interest in the ten wells in the Program, but will pay an initial fee to the Company of 25% of its working interest revenues net of operating expenses.  This is referred to as a management fee but, as defined, is in the nature of a net profits interest.  The fee paid to the Company by Hoactzin will increase to 85% of working interest revenues when and if net revenues received by Hoactzin reach an agreed payout point of approximately 1.35 times Hoactzin’s purchase price (the “Payout Point”) for its interest in the Ten Well Program.

In March 2008, the Company drilled and completed the tenth and final well in the Ten Well Program. Of the ten wells drilled, nine were completed as oil producers and are currently producing approximately 46 barrels per day in total. Hoactzin paid a total of $3.85 million (the “Purchase Price”) for its interest in the Ten Well Program resulting in the Payout Point being determined as $5.2 million.  The amount paid by Hoactzin for its interest in the Program wells exceeded the Company’s actual drilling costs of approximately $2.8 million for the ten wells by more than $1 million.

Although production level of the Program wells will decline with time in accordance with expected decline curves for these types of wells, based on the drilling results of the wells in the Ten Well Program and the current price of oil, the Program wells would be expected to reach the Payout Point by December 31, 2013 solely from the oil revenues from the wells. However, under the terms of the Company’s agreement with Hoactzin, reaching the Payout Point may be accelerated by operation of a second agreement by which Hoactzin will apply 75% of the net profits it may receive from a methane extraction project discussed below developed by the Company’s wholly-owned subsidiary, Manufactured Methane Corporation (“MMC”), to the Payout Point. Those methane project net profits if applied may result in the Payout Point being achieved sooner than relying solely upon revenues from the Program wells.  However, as discussed below, although the Methane Project has been place into operation, no Methane Project net profits have been generated or paid to Hoactzin through March 31, 2011.

On September 17, 2007, Hoactzin, simultaneously with subscribing to participate in the Ten Well Program, pursuant to the second agreement referred to above with the Company was conveyed a 75% net profits interest in the methane extraction project developed by MMC at the Carter Valley landfill owned and operated by Republic Services in Church Hill, Tennessee (the "Methane Project"). Net profits, if any from the Project received by Hoactzin will be applied towards the determination of the Payout Point (as defined above) for the Ten Well Program.  Through March 31, 2011, no payments have been made to Hoactzin for its 75% net profits interest in the Methane Project, because no net profits have been generated.  The method of calculation of the net profits interest takes into account specific costs and expenses as well as gross revenues for the project.  As a result of the startup costs and ongoing operating expenses, no net profits as defined in the agreement have been generated from project startup in April, 2009
 
 

12
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


through March 31, 2011 for payment to Hoactzin under the net profits interest conveyed. When the Payout Point is reached from either the revenues from the wells drilled in the Ten Well Program or Hoactzin’s share of the net profits from the Methane Project or a combination thereof, Hoactzin’s net profits interest in the Methane Project will decrease to a 7.5% net profits interest.

On September 17, 2007, the Company also entered into a third simultaneous agreement with Hoactzin providing that if the Program and the Methane Project interest in combination failed to return net revenues to Hoactzin equal to 25% of the Purchase Price it paid for its interest in the Ten Well Program by December 31, 2009, then Hoactzin would have an option to exchange up to 20% of its net profits interest in the Methane Project for convertible preferred stock to be issued by the Company with a liquidation value equal to 20% of the Purchase Price less the net proceeds received at the time of any exchange. At the time the agreement was negotiated, the Company's forecast of the probable results of the projects indicated that there was little risk that the option to acquire preferred stock would ever arise, so the Company placed no significant value to the preferred stock option. By March 31, 2011, the amount of net revenues received by Hoactzin from the Ten Well Program has reduced the Company’s obligation to Hoactzin for the amount of the funds it had advanced for the Purchase Price from $3.85 million to $0.4 million. The conversion option would be set at issuance of the preferred stock at the then twenty business day trailing average closing price of Company stock on the NYSE Amex. Hoactzin has a similar option each year after 2009 in which Hoactzin’s then-unrecovered Purchase Price at the beginning of the year is not reduced 20% further by the end of that year, using the same conversion option calculation at date of the subsequent year’s issuance, if any.  The Company, however, may in any year make a cash payment from any source in the amount required to prevent such an exchange option for preferred stock from arising.  In addition, the conversion right is limited to no more than 19% of the outstanding common shares of the Company.

In the event Hoactzin’s 75% net profits interest in the Methane Project were fully exchanged for preferred stock, by definition the reduction of that 75% interest to a 7.5% net profits interest that was agreed to occur upon the receipt of 1.35 of the Purchase Price by Hoactzin could not happen because the larger percentage interest then exchanged, no longer exists to be reduced.  Accordingly, Hoactzin would retain no net profits interest in the Methane Project after a full exchange of Hoactzin’s 75% net profits interest for preferred stock.

Under this exchange agreement, if no proceeds at all were received by Hoactzin through 2009 or in any year thereafter (i.e. a worst-case scenario already highly unlikely in view of the success of the Program), then Hoactzin would have an option to exchange 20% of its interest in the Methane Project in 2010 and each year thereafter for preferred stock with liquidation value of 100% of the Purchase Price (not 135%) convertible at the trailing average price before each year’s issuance of the preferred stock.  The maximum number of common shares into which all such preferred stock could be converted cannot be calculated given the formulaic determination of conversion price based on future stock price.
 
 

13
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


However, as of March 31, 2011 revenues from the Ten Well Program have resulted in 90% of the Purchase Price having already been reached. As noted above, no Methane Project net profits interest payments have been made to Hoactzin and the 90% of Purchase Price already reached has been accomplished solely from the Ten Well Program.  Further, it is highly unlikely that any requirement to issue preferred stock will arise in 2011 or any succeeding years.

On December 18, 2007, the Company entered into a Management Agreement with Hoactzin.  On that same date, the Company also entered into an agreement with Charles Patrick McInturff employing him as a Vice-President of the Company.  Pursuant to the Management Agreement with Hoactzin, Mr. McInturff’s duties while he is employed as Vice President of the Company will include the management on behalf of Hoactzin of its working interest in certain oil and gas properties owned by Hoactzin and located in the onshore Texas Gulf Coast, and offshore Texas and offshore Louisiana.

As consideration for the Company entering into the Management Agreement, Hoactzin agreed that it will be responsible to reimburse the Company for the payment of one-half of Mr. McInturff’s salary, as well as certain other benefits he receives during his employment by the Company.  In further consideration for the Company’s agreement to enter into the Management Agreement, Hoactzin has granted to the Company an option to participate in up to a 15% working interest on a dollar for dollar cost basis in any new drilling or workover activities undertaken on Hoactzin’s managed properties during the term of the Management Agreement.  The term of the Management Agreement ends on the earlier of the date Hoactzin sells its interest in its managed properties or five years (December 2012).

The Company became the operator of certain properties owned by Hoactzin in connection with the Management Agreement.  The Company obtained from IndemCo, over time, bonds in the face amount of approximately $10.7 million for the purpose of covering plugging and abandonment obligations for operated properties located in federal offshore waters in favor of both the Minerals Management Service and certain private parties.  In connection with the issuance of these bonds, the Company entered into a Payment and Indemnity Agreement with IndemCo that guarantees payment of any bonding liabilities incurred by IndemCo.  Dolphin Direct Equity Partners, LP co-signed the Payment and Indemnity Agreement, thereby becoming jointly and severally liable with the Company for the obligations to IndemCo.  Hoactzin has provided $6.6 million in cash to IndemCo as collateral for the obligations.  Dolphin Direct Equity Partners is a private equity fund controlled by Peter E. Salas that has a significant economic interest in Hoactzin.

As operator, the Company has routinely contracted in its name for goods and services with vendors in connection with its operation of the Hoactzin properties.  In practice, Hoactzin pays directly these invoices for goods and services that are contracted in the Company’s name.  During late 2009 and early 2010, Hoactzin undertook several significant operations, for which the Company contracted in the ordinary course.  Payables related to these and ongoing operations remained outstanding at the end of the first quarter 2011 and 2010 in the amount of $0.9 million

14
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


and $1.7 million respectively.   Because this amount is material, the Company has recorded the Hoactzin-related payables and the corresponding receivable from Hoactzin as of March 31, 2011 in its Consolidated Balance Sheets under “Accounts payable – other” and “Accounts receivable – related party”.

As a result of the operations performed in late 2009 and early 2010, Hoactzin currently has significant past due balances to several vendors, a portion of which are included on the Company’s balance sheet.  No Tengasco funds have been advanced by Tengasco to pay any obligations of Hoactzin.  No borrowing capability of Tengasco has been or is expected to be used, by the Company in connection with its obligations under the Management Agreement.  The Company expects that Hoactzin will fully satisfy these obligations with its own resources.  The Management Agreement terminates at the earlier of the date of sale, if any, by Hoactzin of its managed properties, or December 2012.

(6)  Deferred Conveyance/Prepaid Revenues

The Company has adopted a deferred conveyance/prepaid revenues presentation of the transactions between the Company and Hoactzin Partners, L.P. on September 17, 2007 to more clearly present the effects of the three-part transaction consisting of the Ten Well Program, the Methane Project and a contingent exchange option agreement.  To reflect the deferred conveyance, the Company allocated $0.85 million of the $3.85 million Purchase Price paid by Hoactzin for its interest in the Ten Well Program to the Methane Project, based on a relative fair value calculation of the Methane Project’s portion of the projected payout stream of the combined two projects as seen at the inception of the agreement, utilizing then current prices and anticipated time periods when the Methane Project would come on stream.  The Ten Well Program at inception was $3.0 million and the prepaid revenues were $0.85 million.

The Company has established separate deferred conveyance and prepaid revenue accounts for the Ten Well Program and the Methane Project.  Release of the deferred amounts to the Ten Well Program will be made as proceeds are actually distributed to Hoactzin.  Release will be made on the respective proceeds only as to each project until either one or both satisfy the threshold amount that removes the contingent equity exchange option.

The reserve information for the parties’ respective Ten Well Program interests as of December 31, 2010 is indicated in the table below. Reserve reports are obtained annually and estimates related to those reports are updated upon receipt of the report.  These calculations were made using commodity prices based on the twelve month arithmetic average of the price on the first day of each month for the period January through December 2010 as required by SEC regulations. The table below reflects eventual pay as occurring through the realization of proceeds at a price of approximately $72.30 per barrel used in the reserve report dated December 31, 2010.


15
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


Reserve Information for Ten Well Program Interests for Year Ended December 31, 2010

 
Barrels Attributable to Party’s Interest
MBbl
Future Cash Flows Attributable to Party’s Interest
(in thousands)
Present Value of Future Cash Flows Attributable to Party’s Interest
(in thousands)
Tengasco
69.4
$    2,779
$    1,022
Hoactzin Partners, L.P.
50.3
$    2,367
$    1,647

As of March 31, 2011 the original invested amount of $3.85 million has been reduced to $0.4 million which is reflected in “Prepaid revenues – current”. Hoactzin’s first right to convert its invested amount of $3.85 million into preferred stock was only exercisable to the extent Hoactzin’s investment had not been reduced by 25% by the end of 2009. For each year after 2009 in which Hoactzin’s then-unrecovered invested amount at the beginning of the year is not reduced 20% further by the end of that year, Hoactzin has a similar option. Since the beginning of the year, the unrecovered invested amount has already been reduced by more than 20%, and therefore, Hoactzin is already precluded by these results from any possibility of exercising its contingent option under the exchange agreement to convert into preferred in 2011.  In addition, the Company anticipates the remaining investment will be recovered by December 31, 2011, and therefore preclude Hoactzin from exercising its contingent option.  All of the $3.45 million paid has been from the Ten Well Program with no payments made from the Methane Project, reducing the deferred conveyance account from $3.0 million to zero. The remaining payments will be applied against the prepaid revenue account.

As noted, in future periods, the Company anticipates that this Hoactzin investment will continue to be further reduced by sales of oil produced from the Ten Well Program, or methane produced from the Methane Project, or both.  By December 31, 2011, the Company projects that the original $3.85 million Purchase Price will be reduced to zero.  As a result, Hoactzin’s contingent option to exchange for preferred stock would fully terminate without any further annual reduction tests.  These projections are based upon expected production levels from the oil wells in the Ten Well Program using an $80 oil price, without any contribution from the Methane Project.  The projection will vary with the actual oil prices, production volumes, and expenses experienced in 2011.  Based on these projections the Company considers that it is unlikely that any right of Hoactzin to elect to exchange its Methane Project interest for Company preferred stock will ever arise. However, in the event of a conversion of Hoactzin’s Methane Project interest for Company preferred stock as set out in limited circumstances in the applicable agreement, and which the Company anticipates is highly unlikely, there would be a debit to the prepaid revenue account for both the Ten Well Program and Methane Project because no contingent option would remain on such a conversion and the Company would simultaneously credit preferred stock in the converted amount. In the event of the termination of the option to convert into preferred stock because the $3.85 million has been repaid from the Ten Well Program or Methane Project or both, the applicable oil and gas properties will be deemed to have been fully conveyed to Hoactzin and the Ten Well Program account, will be credited
 

16
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


and the liability will be removed, as at this time the price received for the Program will be fixed and determinable.
 
(7)     Oil and Gas Properties
 

The following table sets forth information concerning the Company’s oil and gas properties (in thousands):

 
March 31, 2011
December 31, 2010
Oil and gas properties, at cost
$     30,050
$    27,837
Unevaluated properties
372
189
Accumulated depletion
(14,330)
(13,869)
Oil and gas properties, net
$    16,092
$    14,157

The Company recorded $0.46 million in depletion expense for the first three months of 2011 and $0.36 million for the first three months of 2010.

(8)     Asset Retirement Obligation
 
The Company follows the requirements of FASB ASC 410, “Asset Retirement Obligations and Environmental Obligations”.  Among other things, FASB ASC 410 requires entities to record a liability and corresponding increase in long-lived assets for the present value of material obligations associated with the retirement of tangible long-lived assets. Over the passage of time, accretion of the liability is recognized as an operating expense and the capitalized cost is depleted over the estimated useful life of the related asset.  The Company’s asset retirement obligations relate primarily to the plugging, dismantling and removal of wells drilled to date. The Company’s calculation of Asset Retirement Obligation used a credit-adjusted risk free rate of 12%, when the original liability for wells drilled prior to 2009 was recognized.  In 2009, the retirement obligations for new wells were recognized using a credit adjusted risk free rate of 8%. The retirement obligations for new wells drilled in January through July 2010 were recognized using a credit adjusted risk free rate of 6%. The retirement obligations for new wells drilled after July 2010 were recognized using a credit adjusted risk free rate of 5.25%. The Company used an estimated useful life of wells ranging from 10-40 years and an estimated plugging and abandonment cost of $11,000 per well in Kansas and $7,500 per well in Tennessee. Management continues to periodically evaluate the appropriateness of these assumptions.

(9)     Restricted Cash

As security required by Tennessee oil and gas regulations, the Company placed $120,500 in a Certificate of Deposit to cover future asset retirement obligations for the Company’s Tennessee wells.

17
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements



(10)     Bank Debt

At March 31, 2011, the Company had a revolving credit facility with F&M Bank & Trust Company (“F&M Bank”).

Under the credit facility, loans and letters of credit are available to the Company on a revolving basis in an amount outstanding not to exceed the lesser of $40 million or the Company’s borrowing base in effect from time to time. The credit facility is secured by substantially all of the Company’s producing and non-producing oil and gas properties and pipeline and the Company’s Methane Project assets.  The credit facility includes certain covenants in which the Company is required to comply.  These covenants include leverage, interest coverage, minimum liquidity, and general and administrative coverage ratios.

As of September 30, 2009, the Company was out of compliance on the Leverage Ratio and Interest Coverage Ratio covenants under the credit facility prior to the assignment to F&M Bank.  The Company was in compliance with the remaining financial covenants under the credit facility.  The noncompliance occurred primarily as a result of the low commodity prices in the last quarter of 2008 and first and second quarters of 2009 that are included in the covenant compliance calculations.  The Company received a waiver for noncompliance of these covenants for the quarter ended September 30, 2009.  As of March 31, 2011, the Company was in compliance with all covenants.  There can be no assurances that the lender will waive noncompliance of covenants should future instances occur.

On July 30, 2010, the Company and F&M Bank entered into an amendment to the credit facility as assigned to F&M Bank which increased the borrowing base from $11 million to $14 million, set the interest rate to the greater of prime plus 0.25% or 5.25% per annum, eliminated the monthly commitment reduction, and changed the maturity date to January 27, 2012.

On February 22, 2011, the Company and F&M Bank entered into an amendment to the credit facility which increased the borrowing base from $14 million to $20 million, increased the maximum line of the Company’s credit amount from $20 million to $40 million, and extended the term of the facility to January 27, 2013.

The next borrowing base review will take place in June 2011.  The total borrowing by the Company under the facility at March 31, 2011 and December 31, 2010 was $10.5 million and $9.5 million respectively.

(11)     Methane Project

On October 24, 2006, the Company signed a twenty-year Landfill Gas Sale and Purchase Agreement (the “Agreement”) with BFI Waste Systems of Tennessee, LLC (“BFI”), an affiliate of Allied Waste Industries (“Allied”).
 

18
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


In 2008, Allied merged into Republic Services, Inc. (“Republic”). The Company assigned its interest in the Agreement to MMC and the Agreement provides that MMC will purchase the entire naturally produced gas stream being collected at the Carter Valley municipal solid waste landfill owned and operated by Republic in Church Hill, Tennessee serving the metropolitan area of Kingsport, Tennessee.  Republic’s facility is located about two miles from the Company’s pipeline.  The Company installed a proprietary combination of advanced gas treatment technology to extract the methane component of the purchased gas stream.  Methane is the principal component of natural gas and makes up about half of the purchased raw gas stream by volume.  The Company has constructed a pipeline to deliver the extracted methane gas to the Company’s existing pipeline (the “Methane Project”).
 
The total cost for the Methane Project, including pipeline construction, was approximately $4.5 million. The costs of the Methane Project were funded primarily by (a) the money received by the Company from Hoactzin to purchase its interest in the Ten Well Program which exceeded the Company’s actual costs of drilling the wells in that Program by more than $1 million; (b) cash flow from the Company’s operations; and (c) $0.8 million of the funds the Company borrowed under its then credit facility with Sovereign Bank of Dallas, Texas (“Sovereign Bank”). Methane gas produced by the project facilities was initially mixed in the Company’s pipeline and delivered and sold to Eastman under the terms of the Company’s natural gas purchase and sale agreement with Eastman. At current gas production rates in the landfill itself and expected extraction efficiencies, the Company estimates it has the capability to be able to produce and deliver about 500 Mcfd of methane sales gas.  The gas supply from this landfill is projected to grow over the years as the underlying operating landfill continues to expand and generate additional naturally produced gas, and for several years following the closing of the landfill, estimated by Republic to occur in 2041.  At December 31, 2009, Republic had estimated the landfill closure would occur in 2021.  Gas production will continue in commercial quantities up to 10 years after closure of the landfill.
 
As part of the Methane Project agreement, the Company agreed to install a new force-main water drainage line for Republic, the landfill owner, in the same two-mile pipeline trench as the gas pipeline needed for the Project, reducing overall costs and avoiding environmental effects to private landowners resulting from multiple installations of pipeline.  Republic paid the additional material costs for including the water line of approximately $0.7 million.   As a certificated utility, the Company’s pipeline subsidiary, TPC, required no additional permits for the gas pipeline construction.  Initial test volumes of methane were produced in late December 2008.  During the first two months of 2009, Eastman was reviewing its current air quality permits with regard to MMC’s methane production and deliveries did not occur during that review. 
 
MMC declared startup of commercial operations on April 1, 2009.   During the month of April, the facility produced and sold 14 MMcf of methane gas to Eastman and was online about 91% of the calendar month. System maintenance and landfill supply adjustments accounted for the remainder of the time.  On May 1, 2009, Eastman advised MMC that it was suspending deliveries of the methane gas stream pending approval by the federal Environmental Protection
 

19
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


Agency (“EPA”) of Eastman’s petition for inclusion of treated methane gas as natural gas within the meaning of the EPA’s continuous emission monitoring rules applicable to Eastman’s large boilers during the annual “smog season” beginning May 1 of each year.  Although Eastman had begun seeking this approval in February, 2009, with the assistance of the Air Quality Department of the Tennessee Department of Environment and Conservation, the EPA had not acted by May 1.  Eastman furnished to the EPA information provided by MMC that establishes that the methane gas stream is better fuel under the rule standards than even “natural” gas, which is technically defined in the smog season rules to include gas being “found in geologic formations beneath the earth’s surface”.  Methane sales to Eastman were intended to resume upon EPA’s formal approval of Eastman’s petition or expansion of the regulatory definition, or both.  However, as of July 31, 2009 neither of these actions has been taken by EPA, despite the existence of EPA’s own established agency initiative, the Landfill Methane Outreach Program, which is intended to encourage beneficial use of the methane component of raw landfill gas.  Because approval was not received, MMC was forced to seek alternative markets for the methane gas stream.
 
The Company concluded an agreement for sale of the methane gas to Hawkins County Gas Utility, a local utility commencing August 1, 2009 on a month to month basis until either sales to Eastman may resume or other customers were located by the Company.
 
Effective September 1, 2009 the Company began sales of its Swan Creek gas production to Hawkins County Gas Utility District, because the physical mixing of Swan Creek natural gas with MMC’s methane gas caused Eastman to suspend deliveries of both categories of gas as mixed.
 
On August 27, 2009, the Company entered into a five-year fixed price gas sales contract with Atmos Energy Marketing, LLC, (“AEM”) in Houston, Texas, a nonregulated unit of Atmos Energy Corporation (NYSE: ATO) for the sale of the methane component of landfill gas produced by MMC at the Carter Valley Landfill.  The agreement provides for the sale of up to 600 MMBtu per day.  The contract was effective beginning with September 2009 gas production and ends July 31, 2014.  The agreed contract price of over $6 per MMBtu was a premium to the then current five-year strip price for natural gas on the NYMEX futures market. 
 
As of March 31, 2011, MMC’s plant is capable of producing a daily average of about 500 MMBtu/day of methane from the Carter Valley landfill at the current raw gas volumes being generated underground and collected in Republic’s piping and collection system.   However, in order to produce 500 MMBtu, the plant needs to remain in operation for a full 24 hours per day. Daily production is less than 500 MMBtu on such days when the plant operates less than a full 24 hours, whether due to any equipment or collection system supply issue.  The primary reason experienced for less-than-full-24-hour operation since April 2009 has been frequent spiking in the oxygen content in the raw gas collected by Republic and delivered to the plant, and not to equipment malfunctions in MMC’s plant.  Oxygen spikes shut down MMC’s equipment for safety reasons as high oxygen gas is explosive in our treatment process.  In mid-2010, the oxygen
 
 
 
 

20
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


spikes increased from occasional spikes to an almost constant level of oxygen that caused longer downtime to our equipment.  During the first quarter of 2011, the oxygen spikes continued throughout the quarter, with the plant only being able to produce during a two week period in March 2011.
 
Low production in the first quarter of 2011 was primarily due to the effects of ongoing repairs being made by Republic to its gas collection system to prevent the oxygen intrusion which, as noted above, shuts down MMC’s treatment facility to assure safety and reduce risk of explosion.  As of the date of this report, Republic has completed the majority of currently needed collection system repairs and daily production for the Methane Project has occurred since April 28, 2011, and reached 542 MMBtu on May 1, 2011 which is the highest daily production volume since project startup in April 2009.  The Company anticipates that Republic’s collection system may continue to require repairs from time to time and no assurances can be made concerning when Republics system repairs may again be needed and if so, when such repairs may be concluded.  If such additional repairs become necessary, until such time that the repairs are completed, the Company anticipates that only intermittent and minimal volumes would be produced.
 
On September 17, 2007, Hoactzin, simultaneously with subscribing to participate in the Ten Well Program (the “Program”), pursuant to a separate agreement with the Company was conveyed a 75% net profits interest in the Methane Project. Any net profits from the Methane Project, if received by Hoactzin, would be applied towards the determination of the Payout Point (as defined above) for the Ten Well Program.  When the Payout Point is reached from either the revenues from the wells drilled in the Program or the Methane Project or a combination thereof, Hoactzin’s net profits interest in the Methane Project will decrease to 7.5%.  The agreed method of calculation of net profits takes into account specific costs and expenses as well as gross revenues for the project.  As a result of the production levels discussed above, no net profits as defined have been generated from project startup in April, 2009 through March 31, 2011 for payment to Hoactzin under the net profits interest conveyed.
 
As stated above, the Purchase Price paid by Hoactzin for its interest in the Program exceeded the Company’s anticipated and actual costs of drilling the ten wells in the Program. Those excess funds provided by Hoactzin were used to pay for approximately $1 million of equipment required for the Methane Project, or about 22% of the Project’s capital costs.  The availability of the funds provided by Hoactzin eliminated the need for the Company to borrow those funds, to have to pay interest to any lending institution making such loans or to dedicate Company revenues or revenues from the Methane Project to pay such debt service.  Accordingly, the grant of a 7.5% interest in the Methane Project to Hoactzin was negotiated by the Company as a favorable element to the Company of the overall transaction.
 

(12)   Fair Value Measurements

FASB ASC 820, “Fair Value Measurements and Disclosures” establishes a

21
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


framework for measuring fair value. That framework provides a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets and liabilities (Level 1 measurements) and the lowest priority to unobservable inputs (Level 3 measurements). The three levels of the fair value hierarchy under FASB ASC 820 are described as follows:

Level 1 inputs to the valuation methodology are unadjusted quoted prices for identical assets or liabilities in active markets.

Level 2 inputs to the valuation methodology include:
·  Quoted prices for similar assets or liabilities in active markets; Quoted prices for identical or similar assets or liabilities in inactive markets;
·  Inputs other than quoted prices that are observable for the asset or liability;
·  Inputs that are derived principally from or corroborated by observable market data by correlation or other means. If the asset or liability has a specified (contractual) term, the Level 2 input must be observable for substantially the full term of the asset or liability.
 
Level 3 inputs to the valuation methodology are unobservable for the asset or liability and generally require fair value assumptions by management.

The assets or liabilities fair value measurement level within the fair value hierarchy is based on the lowest level of any input that is significant to the fair value measurement. Valuation techniques used need to maximize the use of observable inputs and minimize the use of unobservable inputs.

The methods described above may produce a fair value calculation that may not be indicative of net realizable value or reflective of future fair values. Furthermore, although the Company believes its valuation methods are appropriate and consistent with other market participants, the use of different methodologies or assumptions to determine the fair value of certain financial instruments could result in a different fair value measurement at the reporting date.

The following table sets forth by level, within the fair value hierarchy, the Company’s liabilities at fair value as of March 31, 2011 (in thousands):

 
Level 1
Level 2
Level 3
       
Derivative liabilities
$ -
$ (774)
$ -
Total liabilities at fair value
$ -
$ (774)
$ -

(13)   Derivatives

On July 28, 2009, the Company entered into a two-year agreement on crude oil pricing
 
 

22
 
 

 
Tengasco, Inc. and Subsidiaries
Notes to Consolidated Statements


applicable to a specified number of barrels of oil that then constituted approximately two-thirds of the Company’s daily production.  Due to increased production levels, as well as a drop in the specified monthly barrels from 9,500 to 7,375 in 2011, this number of barrels now constitutes less than half of the Company’s daily production.

This “costless collar” agreement was effective beginning August 1, 2009 and has a $60.00 per barrel floor and $81.50 per barrel cap on a volume of 9,500 barrels per month during the period from August 1, 2009 through December 31, 2010, and 7,375 barrels per month from January 1 through July 31, 2011. The prices referenced in this agreement are WTI NYMEX. While the agreement is based on WTI NYMEX prices, the Company receives a price based on Kansas Common plus bonus, which results in a price approximately $7 per barrel less than current WTI NYMEX prices.

Under the “costless collar” agreement, no payment would be made or received by the Company, as long as the settlement price is between the floor price and cap price (“within the collar”).  However, if the settlement price is above the cap, the Company would be required to pay the counterparty an amount equal to the excess of the settlement price over the cap times the monthly volumes hedged. If the settlement price is below the floor, the counterparty would be required to pay the Company the deficit of the settlement price below the floor times the monthly volumes hedged.

This agreement is primarily intended to help maintain and stabilize cash flow from operations if lower oil prices return, while providing at least some upside if prices increase above the cap.  If lower oil prices return, this agreement may allow the Company to maintain production levels of crude oil by enabling the Company to perform some ongoing polymer or other workover treatments on then existing producing wells in Kansas.

As of March 31, 2011, the Company’s open forward positions on our outstanding “costless collar” agreement, all of which are with Macquarie Bank Limited (“Macquarie”), were as follows (fair value is based on methodology described in footnote 12 Fair Value Measurement):

 
Period
 
Monthly Volume
 
Total Volume
 
Floor/Cap NYMEX
Fair Value at
 March 31, 2011
 
Oil (Bbls)
Oil (Bbls)
$ per Bbl
(in thousands)
         
2nd Qtr 2011
7,375
22,125
$60.00-$81.50
$     (574)
3rd Qtr 2011
7,375
7,375
$60.00-$81.50
$       (200)
     
Total liability
$     (774)
         
     
Current liability
$     (774)

23
 
 

 
Tengasco, Inc. and Subsidiaries




Management has engaged Risked Revenue Energy Associates to perform an independent valuation of the Fair Value of the Company’s open forward positions.  The Company records changes in the unrealized derivative asset or liability as a “Gain (loss) on derivatives” in the Consolidated Statements of Operations.

The following settlement payments were made by the Company related to production months in the first quarter of 2011 (in thousands):

 Payments
Production Month
Payment Month
     
$     59.6
January 2011
February 2011
60.8
February 2011
March 2011
158.4
March 2011
April 2011
  Total                    $   278.8
   

These realized losses were recorded as a “Gain (loss) on derivatives” in the Consolidated Statements of Operation

ITEM 2.     MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Results of Operations and Financial Condition      

During the first three months of 2011, the Company sold 52 MBbl of oil from its Kansas wells. Of the 52 MBbl, 40 MBbl were net to the Company after required payments to all of the royalty interests and drilling program participants.  The Company’s net sales for the first three months of 2011 of 40 MBbl of oil compares to 35 MBbl net to the Company’s interest in the first three months of 2010.  This 5 MBbl increase was due primarily to increased sales volumes on the Albers lease. The Company’s net revenue from the Kansas properties was $3.5 million in the first three months of 2011 compared to $2.7 million in 2010. This increase was due to an increase in oil prices from an average of $71.24 per barrel in 2010 to an average of $86.93 per barrel in 2011, as well as the 5 MBbl increase in sales volumes.  For the first three months of 2011 and 2010, the Company’s sales included $0.1 million from Swan Creek.

Comparison of the Quarters Ended March 31, 2011 and 2010

The Company recognized $3.7 million in revenues during the first quarter of 2011 compared to $2.9 million in the first quarter of 2010. The increase in 2011 revenues was due to a 5 MBbl increase in sales volumes as well as a $15.69 increase in Kansas oil price.   Kansas oil prices in the first quarter of 2011 averaged $86.93 per barrel compared to $71.24 per barrel in the first quarter of 2010.  The Company realized net income attributable to common shareholders of $0.354 million or $0.01 per share of common stock during the first quarter of 2011, compared to
 
 

24
 
 

 
Tengasco, Inc. and Subsidiaries



a net income in the first quarter of 2010 to common shareholders of $0.268 million or $0.00 per share of common stock. In the first quarter of 2011, the Company had income from operations of $1.0 million compared to income from operations of $0.4 million in the first quarter of 2010.  This increase was primarily due to the increase in Kansas sales volumes and oil prices.  Production costs and taxes in the first quarter of 2011 increased to $1.5 million from $1.3 million in the first quarter of 2010.

Depreciation, depletion, and amortization expense was $0.57 million and $0.52 million for the first quarters of 2011 and 2010, respectively.

General and administrative costs were $0.52 million for the first quarter of 2011 and $0.59 million for the first quarter of 2010.

The Company recorded a $(0.09) million non-cash unrealized loss on derivatives for the first quarter of 2011 and a $0.16 million non-cash unrealized gain on derivatives for the first quarter 2010. Interest expense was $0.15 million and $0.18 million for the first quarters of 2011 and 2010, respectively.

Liquidity and Capital Resources

At March 31, 2011, the Company had a revolving credit facility with F&M Bank & Trust Company (“F&M Bank”).

Under the credit facility, loans and letters of credit are available to the Company on a revolving basis in an amount outstanding not to exceed the lesser of $40 million or the Company’s borrowing base in effect from time to time. The credit facility is secured by substantially all of the Company’s producing and non-producing oil and gas properties and pipeline and the Company’s Methane Project assets.  The credit facility includes certain covenants in which the Company is required to comply.  These covenants include leverage, interest coverage, minimum liquidity, and general and administrative coverage ratios.

As of September 30, 2009, the Company was out of compliance on the Leverage Ratio and Interest Coverage Ratio covenants under the credit facility prior to the assignment to F&M Bank.  The Company was in compliance with the remaining financial covenants under the credit facility.  The noncompliance occurred primarily as a result of the low commodity prices in the last quarter of 2008 and first and second quarters of 2009 that are included in the covenant compliance calculations.  The Company received a waiver for noncompliance of these covenants for the quarter ended September 30, 2009.  As of March 31, 2011, the Company was in compliance with all covenants.  There can be no assurances that the lender will waive noncompliance of covenants should future instances occur.

On July 30, 2010, the Company and F&M Bank entered into an amendment to the credit facility as assigned to F&M Bank which increased the borrowing base from $11

25
 
 

 
Tengasco, Inc. and Subsidiaries



million to $14 million, set the interest rate to the greater of prime plus 0.25% or 5.25% per annum, eliminated the monthly commitment reduction, and changed the maturity date to January 27, 2012.

On February 22, 2011, the Company and F&M Bank entered into an amendment to the credit facility which increased the borrowing base from $14 million to $20 million, increased the maximum line of the Company’s credit amount from $20 million to $40 million, and extended the term of the facility to January 27, 2013.

The next borrowing base review will take place in June 2011.  The total borrowing by the Company under the facility at March 31, 2011 and December 31, 2010 was $ 10.5 million and $9.5 million respectively.

Although the Company has not been required as of the date of this Report to make any payment of principal on the credit facility, the Company can make no assurance that in view of the conditions in the national and world economies, including the realistic possibility of low commodity prices being received for the Company’s oil and gas production for extended periods, that F&M Bank may in the future make a redetermination of the Company’s borrowing base to a point below the level of current borrowings.  In such event, F&M Bank may require installment or other payments in such amount in order to reduce the principal of the Company’s outstanding borrowing to a level not in excess of the borrowing base as it may be redetermined.

During 2010 and 2011, the Company remained focused on increasing production. However, the Company can make no assurance that it can continue normal operations indefinitely or for any specific period of time in the event of extended periods of low commodity prices, such as occurred in late 2008 and early 2009, or upon the occurrence of any significant downturn or losses in operations.  In such event, the Company may be required to reduce costs of operations by various means, including not undertaking certain maintenance or reworking operations that may be necessary to keep some of the Company’s properties in production or to seek additional working capital by additional means such as issuance of equity including preferred stock or such other means as may be considered and authorized by the Company’s Board of Directors from time to time.

During the first three months of each year, net cash provided by operating activities was $1.7 million in 2011 and $0.6 million in 2010.  The increase of cash provided by operating activities from 2010 to 2011 was primarily due to higher product prices received during 2011 compared to 2010 and increased cash flow provided by working capital.  Cash flow provided by working capital was $0.4 million in 2011 and $(0.3) million was used in working capital in 2010 due primarily to an increase in accounts payable related to increased activity levels in the first three months of 2011.  Net cash used in investing activities was $(2.6) million in 2011 and $(0.5) million in 2010.  The increase in investing activities was primarily due to an increase in drilling and polymer work performed in 2011.

26
 
 

 
Tengasco, Inc. and Subsidiaries



In the first three months of 2011, $0.9 million was provided by financing activities and zero was used in or provided by financing activities during the first three months of 2010.  Funds provided by financing activities were used to supplement cash flow funding for new drilling and polymer treatments.

Critical Accounting Policies

The Company prepares its Consolidated Financial Statements in conformity with accounting principles generally accepted in the United States of America, which require the Company to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosures of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the year.  Actual results could differ from those estimates.  The Company considers the following policies to be the most critical in understanding the judgments that are involved in preparing the Company’s financial statements and the uncertainties that could impact the Company’s results of operations, financial condition and cash flows.

Revenue Recognition

Revenues are recognized based on actual volumes of oil and gas sold to purchasers at a fixed or determinable price when delivery has occurred and title has transferred, and collectability is reasonably assured.  Natural gas meters are placed at the customer’s location and usage is billed each month.  Crude oil is stored and at the time of delivery to the purchasers, revenues are recognized.

Inventory

Inventory consists of crude oil in tanks and is carried at lower of cost or market value. In addition, the Company may also carry tubing, casing, and other equipment to be used in Kansas operations and is carried at lower of cost or market value.

Full Cost Method of Accounting

The Company follows the full cost method of accounting for oil and gas property acquisition, exploration, and development activities.  Under this method, all productive and non-productive costs incurred in connection with the acquisition of, exploration for, and development of oil and gas reserves for each cost center are capitalized. Capitalized costs include lease acquisitions, geological and geophysical work, day rate rentals and costs of drilling, completing and equipping oil and gas wells.  However, costs associated with production and general corporate activities are expensed in the period incurred.  Interest costs related to unproved properties and properties under development are also capitalized to oil and gas properties.

Gains or losses are recognized only upon sales or dispositions of significant amounts of oil and gas reserves representing an entire cost center.  Proceeds from all other sales or dispositions are treated as reductions to capitalized costs.  The capitalized oil and

27
 
 

 
Tengasco, Inc. and Subsidiaries



gas property, less accumulated depreciation, depletion and amortization and related deferred income taxes, if any, are generally limited to an amount (the ceiling limitation) equal to the sum of: (a) the present value of estimated future net revenues computed by applying an average price (arithmetic average of the beginning of the month prices for the prior 12 months) to estimated future production of proved oil and gas reserves, less estimated future expenditures (based on current costs) to be incurred in developing and producing the reserves using a discount factor of 10% and assuming continuation of existing economic conditions; and (b) cost of properties not being amortized; and (c) the lower of cost or estimated fair value of unproven properties included in the cost being amortized.

Oil and Gas Reserves / Depletion of Oil and Gas Properties

The Company’s proved oil and gas reserves as of December 31, 2010 were determined by LaRoche Petroleum Consultants, Ltd.  Projecting the effects of commodity prices on production, and timing of development expenditures includes many factors beyond the Company’s control.  The future estimates of net cash flows from the Company’s proved reserves and their present value are based upon various assumptions about future production levels, prices, and costs that may prove to be incorrect over time.  Any significant variance from assumptions could result in the actual future net cash flows being materially different from the estimates.

The capitalized costs of oil and gas properties, plus estimated future development costs relating to proved reserves and estimated costs of plugging and abandonment, net of costs relating to proved reserves and estimated costs of plugging and abandonment, and net of estimated salvage value, are amortized on the unit-of-production method based on total proved reserves.  The costs of unproved properties are excluded from amortization until the properties are evaluated, subject to an annual assessment of whether impairment has occurred.

Asset Retirement Obligations

The Company follows the requirements of FASB ASC 410, “Asset Retirement Obligations and Environmental Obligations”.  Among other things, FASB ASC 410 requires entities to record a liability and corresponding increase in long-lived assets for the present value of material obligations associated with the retirement of tangible long-lived assets. Over the passage of time, accretion of the liability is recognized as an operating expense and the capitalized cost is depleted over the estimated useful life of the related asset.  The Company’s asset retirement obligations relate primarily to the plugging, dismantling and removal of wells drilled to date. The Company’s calculation of Asset Retirement Obligation used a credit-adjusted risk free rate of 12%, when the original liability for wells drilled prior to 2009 was recognized. In 2009, the retirement obligation for new wells were was recognized using a credit adjusted risk free rate of 8%. The retirement obligations for new wells drilled in January through July 2010 were recognized using a credit adjusted risk free rate of 6%.  The retirement obligations for new wells drilled after July 2010 were recognized using a credit adjusted risk free rate of 5.25%.

28
 
 

 
Tengasco, Inc. and Subsidiaries



The Company used an estimated useful life of wells ranging from 10-40 years and an estimated plugging and abandonment cost of $11,000 per well in Kansas and $7,500 per well in Tennessee. Management continues to periodically evaluate the appropriateness of these assumptions.

ITEM 3.    QUANTITATIVE AND QUALITATIVE DISCLOSURE ABOUT MARKET RISKS

The Company’s Borrowing Base under its Credit Facility may be reduced by the lender.

The borrowing base under the Company’s revolving credit facility will be determined from time to time by the lender, consistent with its customary natural gas and crude oil lending practices.   Reductions in estimates of the Company’s natural gas and crude oil reserves could result in a reduction in the Company’s borrowing base, which would reduce the amount of financial resources available under the Company’s revolving credit facility to meet its capital requirements. Such a reduction could be the result of lower commodity prices or production, inability to drill or unfavorable drilling results, changes in natural gas and crude oil reserve engineering, the lender’s inability to agree to an adequate borrowing base or adverse changes in the lenders’ practices regarding estimation of reserves.   If cash flow from operations or the
 
 
Company’s borrowing base decreases for any reason, the Company’s ability to undertake exploration and development activities could be adversely affected.

As a result, the Company’s ability to replace production may be limited. In addition, if the borrowing base is reduced, the Company may be required to pay down its borrowings under the revolving credit facility so that outstanding borrowings do not exceed the reduced borrowing base. This requirement could further reduce the cash available to the Company for capital spending and, if the Company did not have sufficient capital to reduce its borrowing level, could
cause the Company to default under its revolving credit facility.  As of March 31, 2011, the Company’s borrowing base was set at $20 million of which $10.5 million had been drawn down by the Company.  The Company’s next periodic borrowing base review is scheduled to occur in June 2011.

Commodity Risk

The Company's major market risk exposure is in the pricing applicable to its oil and gas production.  Realized pricing is primarily driven by the prevailing worldwide price for crude oil and spot prices applicable to natural gas production.  Historically, prices received for oil and gas production have been volatile and unpredictable and price volatility is expected to continue.  Monthly Kansas oil prices during the first three months of 2011 ranged from a low of $82.35 per barrel to a high of $95.81 per barrel.   Swan Creek gas prices ranged from a monthly low of $4.03 per Mcf to a monthly high of $4.51 per Mcf during the same period.

29
 
 

 
Tengasco, Inc. and Subsidiaries



In order to mitigate commodity price risk, the Company has entered into a long term fixed price contract for MMC gas sales.  On August 27, 2009, the Company entered into a five-year fixed price gas sales contract with Atmos Energy Marketing, LLC, (“AEM”) in Houston, Texas, a nonregulated unit of Atmos Energy Corporation (NYSE: ATO) for the sale of the methane gas produced by MMC at the Carter Valley Landfill. The agreement provides for the sale of up to 600 MMBtu per day.  The contract is effective beginning with September 2009 gas production and ends July 31, 2014.  The agreed contract price of over $6 per MMBtu was a premium to the then current five-year strip price for natural gas on the NYMEX futures market. 

In addition, the Company has a derivative agreement on a specified number of barrels of oil that currently constitutes less than half of the Company’s daily production that ends on July 31, 2011.  On July 28, 2009, the Company entered into a two-year agreement on crude oil pricing applicable to a specified number of barrels of oil that then constituted about two-thirds of the Company’s daily production.  This “costless collar” agreement was effective beginning August 1, 2009 and has a $60.00 per barrel floor and $81.50 per barrel cap on a volume of 9,500 barrels per month during the period from August 1, 2009 through December 31, 2010, and 7,375 barrels per month from January 1 through July 31, 2011.  The prices referenced in this agreement are WTI NYMEX.  While the agreement is based on WTI NYMEX prices, the Company receives a price based on Kansas Common plus bonus, which results in a price approximately $7 per barrel less than current WTI NYMEX prices.

Under a “costless collar” agreement, no payment would be made or received by the Company, as long as the settlement price is between the floor price and cap price (“within the collar”).  However, if the settlement price is above the cap, the Company would be required to pay the counterparty an amount equal to the excess of the settlement price over the cap times the monthly volumes hedged.  If the settlement price is below the floor, the counterparty would be required to pay the Company the deficit of the settlement price below the floor times the monthly volumes hedged.

This agreement is primarily intended to help maintain and stabilize cash flow from operations if lower oil prices return, while providing some upside if prices increase above the cap.  If lower oil prices return, this agreement may help to maintain the Company’s production levels of crude oil by enabling the company to perform some ongoing polymer or other workover treatments on then-existing producing wells in Kansas.

Interest Rate Risk

At March 31, 2011, the Company had debt outstanding of $10.7 million including, as of that date, $10.5 million owed on its credit facility with F&M Bank. The interest rate on the credit facility was variable at a rate equal to the greater of prime plus 0.25% or 5.25% per annum.

30
 
 

 
Tengasco, Inc. and Subsidiaries



The Company’s debt owed to other parties of $0.2 million has fixed interest rates ranging from 5.5% to 8.25%.

The annual impact on interest expense and the Company’s cash flows of a 10 percent increase in the interest rate on the credit facility would be approximately $0.05 million assuming borrowed amounts under the credit facility remained at the same amount owed as of March 31, 2011.  The Company did not have any open derivative contracts relating to interest rates at March 31, 2011 or 2010.

Forward-Looking Statements and Risk

Certain statements in this report, including statements of the future plans, objectives, and expected performance of the Company, are forward-looking statements that are dependent upon certain events, risks and uncertainties that may be outside the Company's control, and which could cause actual results to differ materially from those anticipated. Some of these include, but are not limited to, the market prices of oil and gas, economic and competitive conditions, inflation rates, legislative and regulatory changes, financial market conditions, political and economic uncertainties of foreign governments, future business decisions, and other uncertainties, all of which are difficult to predict.

There are numerous uncertainties inherent in projecting future rates of production and the timing of development expenditures. The total amount or timing of actual future production may vary significantly from estimates. The drilling of exploratory wells can involve significant risks, including those related to timing, success rates and cost overruns. Lease and rig availability, complex geology and other factors can also affect these risks.  Additionally, fluctuations in oil and gas prices, or a prolonged period of low prices, may substantially adversely affect the Company's financial position, results of operations, and cash flows.

ITEM 4.     CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company’s Chief Executive Officer and Chief Financial Officer, and other members of management team have evaluated the effectiveness of the Company’s disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)). Based on such evaluation, the Company’s Chief Executive Officer and Chief Financial Officer have concluded that the Company’s disclosure controls and procedures, as of the end of the period covered by this Report, were adequate and effective to provide reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act, is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. The effectiveness of a system of disclosure controls and procedures is subject to various inherent limitations, including cost limitations, judgments used in decision making, assumptions about the likelihood of future events, the soundness of internal controls, and fraud. Due to such inherent limitations, there can be no assurance that any system of disclosure controls

31
 
 

 
Tengasco, Inc. and Subsidiaries



and procedures will be successful in preventing all errors or fraud, or in making all material information known in a timely manner to the appropriate levels of management.

Changes in Internal Controls

During the period covered by this report, there have been no changes to the Company’s system of internal controls over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s system of controls over financial reporting.

As part of a continuing effort to improve the Company’s business processes, management is evaluating its internal controls and may update certain controls to accommodate any modifications to its business processes or accounting procedures.

 
PART II OTHER INFORMATION
 
ITEM 1.     LEGAL PROCEEDINGS
 

 
None.
 
ITEM 1A.    RISK FACTORS
 

 
Refer to Item 1A Risk Factors in the Company’s Report on Form 10-K for the year ended December 31, 2010 filed on March 31, 2011 which is incorporated by this reference.
 
ITEM 2.     UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

None.
 
ITEM 3.    DEFAULT UPON SENIOR SECURITIES
 

None.
 
ITEM 4.    (REMOVED AND RESERVED)
 

 
ITEM 5.     OTHER INFORMATION
 

 
The 2011 annual meeting of stockholders of Tengasco, Inc., will be held at the Homewood Suites by Hilton, 10935 Turkey Drive, Knoxville, Tennessee 37922 at 9:00 A.M., local time, on Monday, June 20, 2011.
 

 

32
 
 

 
Tengasco, Inc. and Subsidiaries



ITEM 6.   EXHIBITS
 
The following exhibits are filed with this report:

31.1 Certification of the Chief Executive Officer, pursuant to Exchange Act Rule, Rule 13a-14a/15d-14a.

31.2 Certification of the Chief Financial Officer, pursuant Exchange Act Rule, Rule 13a-14a/15d-14a.

32.1 Certification of the Chief Executive Officer, pursuant to 18 U.S.C Section 1350 as adopted pursuant to section 906 of the Sarbanes-Oxley Act of 2002.

32.2 Certification of the Chief Financial Officer, pursuant to 18 U.S.C Section 1350 as adopted pursuant to section 906 of the Sarbanes-Oxley Act of 2002.


33
 
 

 
Tengasco, Inc. and Subsidiaries



SIGNATURES
 

 
Pursuant to the requirements of the Securities and Exchange Act of 1934, the Registrant duly caused this report to be signed on its behalf by the undersigned hereto duly authorized.

Dated: May 16, 2011

TENGASCO, INC.


By: s/Jeffrey R. Bailey
Jeffrey R. Bailey
Chief Executive Officer



By:  s/Michael J. Rugen
Michael J. Rugen
Chief Financial Officer

34
 
 

 
Tengasco, Inc. and Subsidiaries



Exhibit 31.1   CERTIFICATION

 
I, Jeffrey R. Bailey, certify that:
 
1. I have reviewed this Quarterly Report on Form 10-Q of Tengasco, Inc. for the quarter ended March 31, 2011.
 
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3. Based on my knowledge, the financial statements, and other information included in this annual report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 
4. The registrant’s other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-(f) for the registrant and we have:
 
 
(a)
designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
 
(b)
designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
 
(c)
evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
 
(d)
disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The Registrant’s other certifying officers and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions):
 
(a)      All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and
 
(b)      Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting.
 
 
Dated: May 16, 2011
 
By: _ s/Jeffrey R. Bailey
 
Jeffrey R. Bailey Chief Executive Officer
 

 

35
 
 

 
Tengasco, Inc. and Subsidiaries



I, Michael Rugen, certify that:
 
1. I have reviewed this Quarterly Report on Form 10-Q of Tengasco, Inc. for the quarter March 31, 2011.
 

 
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
 
3. Based on my knowledge, the financial statements, and other information included in this annual report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
 
4. The registrant’s other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-(f) for the registrant and we have:
 
(a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
 
(b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
 
(c) evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
 
(d) disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
 
5. The Registrant’s other certifying officers and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of the registrant's board of directors (or persons performing the equivalent functions):
 
(a)           All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and
 
(b)           Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting.
 

 
Dated: May 16, 2011
 
By:  s/ Michael J. Rugen
 
       Michael J. Rugen Chief Financial Officer
 

 

36
 
 

 
Tengasco, Inc. and Subsidiaries




 
Exhibit 32.1
CERTIFICATION
 
Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 I hereby certify that:
 
 
        I have reviewed the Quarterly Report on Form 10-Q for the quarter ended March 31, 2011.
 
 
        To the best of my knowledge this Quarterly Report on Form 10-Q (i) fully complies with the requirements of section 13(a) or 15(d) of the Securities and Exchange Act of 1934 (15 U.S.C. 78m (a) or 78o (d)); and, (ii) the information contained in this Report fairly present, in all material respects, the financial condition and results of operations of Tengasco, Inc. and its subsidiaries during the period covered by this report.
 
 
      Dated: May 16, 2011
 
 

 
   
By: s/Jeffrey R. Bailey
Jeffrey R. Bailey
Chief Executive Officer


37
 
 

 
Tengasco, Inc. and Subsidiaries




 
Exhibit 32.2
CERTIFICATION
 
Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 I hereby certify that:
 
 
        I have reviewed the Quarterly Report on Form 10-Q for the quarter ended March 31, 2011.
 
 
        To the best of my knowledge this Quarterly Report on Form 10-Q (i) fully complies with the requirements of section 13(a) or 15(d) of the Securities and Exchange Act of 1934 (15 U.S.C. 78m (a) or 78o (d)); and, (ii) the information contained in this Report fairly present, in all material respects, the financial condition and results of operations of Tengasco, Inc. and its subsidiaries during the period covered by this report.
 
      Dated:  May 16, 2011
 

 
   
By:  s/ Michael J. Rugen
 Michael J. Rugen
 Chief Financial Officer
 
 
     

 

 

 

 

 

 



 

38