SOUTHERN CALIFORNIA EDISON Co - Quarter Report: 2007 March (Form 10-Q)

Form 10-Q
Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


FORM 10-Q

 


(Mark One)

x QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

  For the quarterly period ended March 31, 2007

 

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

  For the transition period from                          to                         

Commission File Number 1-2313

 


SOUTHERN CALIFORNIA EDISON COMPANY

(Exact name of registrant as specified in its charter)

 


 

California

  95-1240335

(State or other jurisdiction of
incorporation or organization)

  (I.R.S. Employer
Identification No.)

2244 Walnut Grove Avenue

(P. O. Box 800)

Rosemead, California

  91770

(Address of principal executive offices)

  (Zip Code)

(626) 302-1212

(Registrant’s telephone number, including area code)

 


Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.  Yes    x    No  ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or non-accelerated filer. See definition of “accelerated filer and large accelerated filer” in Rule 12b-2 of the Exchange Act.

 

Large Accelerated Filer  ¨

  Accelerated Filer  ¨   Non-Accelerated Filer  x

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).  Yes  ¨    No  x

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:

 

Class

 

Outstanding at April 30, 2007

Common Stock, no par value

  434,888,104

 



Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

INDEX

 

            

Page

No.

Part  I. Financial Information   
  Item 1.  

Financial Statements

   1
   

Consolidated Statements of Income – Three Months Ended March 31, 2007 and 2006

   1
   

Consolidated Statements of Comprehensive Income – Three Months Ended March 31, 2007 and 2006

   1
   

Consolidated Balance Sheets – March 31, 2007 and December 31, 2006

   2
   

Consolidated Statements of Cash Flows – Three Months Ended March 31, 2007 and 2006

   4
   

Notes to Consolidated Financial Statements

   5
  Item 2.  

Management’s Discussion and Analysis of Financial Condition and Results of Operations

   22
  Item 3.  

Quantitative and Qualitative Disclosures About Market Risk

   35
  Item 4.  

Controls and Procedures

   35
Part II. Other Information   
  Item 6.  

Exhibits

   36
  Signature    37

 

i


Table of Contents

GLOSSARY

When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below.

 

CDWR    California Department of Water Resources
CPSD    Consumer Protection and Safety Division
CPUC    California Public Utilities Commission
District Court    U.S. District Court for the District of Columbia
DOE    United States Department of Energy
DWP    Los Angeles Department of Water & Power
EME    Edison Mission Energy
ERRA    energy resource recovery account
FASB    Financial Accounting Standards Board
FERC    Federal Energy Regulatory Commission
FIN 48    Financial Accounting Standards Interpretation No. 48, Accounting for Uncertainty in Income Taxes – an interpretation of FAS 109

FTR

  

firm transmission rights

GRC    General Rate Case
IRS    Internal Revenue Service
ISO    California Independent System Operator
kWh(s)    kilowatt-hour(s)
MD&A    Management’s Discussion and Analysis of Financial Condition and Results of Operations
Midway-Sunset    Midway-Sunset Cogeneration Company
Mohave    Mohave Generating Station
MW    megawatts
Ninth Circuit    United States Court of Appeals for the Ninth Circuit
NRC    Nuclear Regulatory Commission
Palo Verde    Palo Verde Nuclear Generating Station
PBR    performance-based ratemaking
PG&E    Pacific Gas & Electric Company
PX    California Power Exchange
QF(s)    qualifying facility(ies)
San Onofre    San Onofre Nuclear Generating Station
SCE    Southern California Edison Company
SDG&E    San Diego Gas & Electric
SFAS No. 157    Statement of Financial Accounting Standards No. 157, “Fair Value Measurements”
SFAS No. 158    Statement of Financial Accounting Standards No. 158, “Employers’ Accounting for Defined Benefit Pension and Other Post-Retirement Plans”

SFAS No. 159

  

Statement of Financial Accounting Standards No. 159, “The Fair Value Option for Financial Assets and Liabilities, including an Amendment of FASB Statement No. 115”

VIE(s)    variable interest entity(ies)


Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

PART I. FINANCIAL INFORMATION

 

Item 1. Financial Statements

CONSOLIDATED STATEMENTS OF INCOME

 

     

Three Months Ended

March 31,

 
In millions        2007              2006      
     (Unaudited)  

Operating revenue

   $   2,222      $   2,217  

Fuel

     310        311  

Purchased power

     317        1,013  

Provisions for regulatory adjustment clauses – net

     289        (363 )

Other operation and maintenance

     601        617  

Depreciation, decommissioning and amortization

     276        253  

Property and other taxes

     55        54  

Total operating expenses

     1,848        1,885  

Operating income

     374        332  

Interest income

     11        15  

Other nonoperating income

     17        27  

Interest expense – net of amounts capitalized

     (107 )      (97 )

Other nonoperating deductions

     (11 )      (11 )

Income before income tax and minority interest

     284        266  

Income tax

     53        83  

Minority interest

     38        50  

Net income

     193        133  

Dividends on preferred and preference stock not subject to mandatory redemption

     13        12  

Net income available for common stock

   $ 180      $ 121  

CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

 

     

Three Months Ended

March 31,

In millions        2007            2006    
     (Unaudited)

Net income

   $      193    $      133

Other comprehensive income, net of tax:

     

Pension and postretirement benefits other than pensions:

     

Amortization of actuarial loss – net

     1     

Comprehensive income

   $ 194    $ 133

The accompanying notes are an integral part of these consolidated financial statements.

 

1


Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

CONSOLIDATED BALANCE SHEETS

 

In millions   

March 31,

2007

    

December 31,

2006

 
     (Unaudited)         

ASSETS

     

Cash and equivalents

   $ 85      $ 83  

Restricted cash

     53        56  

Margin and collateral deposits

     36        55  

Receivables, less allowances of $26 and $29 for uncollectible accounts at respective dates

     878        939  

Accrued unbilled revenue

     296        303  

Inventory

     234        232  

Accumulated deferred income taxes – net

     294        250  

Derivative assets

     172        56  

Regulatory assets

     443        554  

Other current assets

     195        54  

Total current assets

     2,686        2,582  

Nonutility property – less accumulated provision for depreciation of $650 and $633 at respective dates

     1,033        1,046  

Nuclear decommissioning trusts

     3,220        3,184  

Other investments

     80        62  

Total investments and other assets

     4,333        4,292  

Utility plant, at original cost:

     

Transmission and distribution

     17,905        17,606  

Generation

     1,480        1,465  

Accumulated provision for depreciation

     (4,937 )      (4,821 )

Construction work in progress

     1,578        1,486  

Nuclear fuel, at amortized cost

     176        177  

Total utility plant

     16,202        15,913  

Regulatory assets

     2,874        2,818  

Derivative assets

     12        17  

Other long-term assets

     484        488  

Total long-term assets

     3,370        3,323  

Total assets

   $   26,591      $   26,110  

The accompanying notes are an integral part of these consolidated financial statements.

 

2


Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

CONSOLIDATED BALANCE SHEETS

 

In millions, except share amounts   

    March 31,    

2007

    

    December 31,    

2006

 
     (Unaudited)         

LIABILITIES AND SHAREHOLDERS’ EQUITY

     

Short-term debt

   $ 120      $  

Long-term debt due within one year

     334        396  

Accounts payable

     635        856  

Accrued taxes

     182        193  

Accrued interest

     113        114  

Counterparty collateral

     50        36  

Customer deposits

     207        198  

Book overdrafts

     164        140  

Derivative liabilities

     32        99  

Regulatory liabilities

     1,163        1,000  

Other current liabilities

     575        624  

Total current liabilities

     3,575        3,656  

Long-term debt

     5,162        5,171  

Accumulated deferred income taxes – net

     2,672        2,675  

Accumulated deferred investment tax credits

     110        112  

Customer advances

     162        160  

Derivative liabilities

     30        77  

Power-purchase contracts

     29        32  

Accumulated provision for pensions and benefits

     825        809  

Asset retirement obligations

     2,778        2,749  

Regulatory liabilities

     3,157        3,140  

Other deferred credits and other long-term liabilities

     1,025        802  

Total deferred credits and other liabilities

     10,788        10,556  

Total liabilities

     19,525        19,383  

Commitments and contingencies (Note 6)

     

Minority interest

     342        351  

Common stock, no par value (434,888,104 shares outstanding at each date)

     2,168        2,168  

Additional paid-in capital

     385        383  

Accumulated other comprehensive loss

     (13 )      (14 )

Retained earnings

     3,255        2,910  

Total common shareholder’s equity

     5,795        5,447  

Preferred and preference stock
not subject to mandatory redemption

     929        929  

Total shareholders’ equity

     6,724        6,376  

Total liabilities and shareholders’ equity

   $   26,591      $   26,110  

The accompanying notes are an integral part of these consolidated financial statements.

 

3


Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

CONSOLIDATED STATEMENTS OF CASH FLOWS

 

     

Three Months Ended

March 31,

 
In millions        2007              2006      
     (Unaudited)  

Cash flows from operating activities:

     

Net income

   $ 193      $ 133  

Adjustments to reconcile to net cash provided by operating activities:

     

Depreciation, decommissioning and amortization

     276        253  

Realized loss on nuclear decommissioning trusts

     8         

Other amortization

     26        17  

Minority interest

     38        50  

Deferred income taxes and investment tax credits

     (184 )      67  

Regulatory assets – long-term

     62        38  

Regulatory liabilities – long-term

     (11 )      (8 )

Derivative assets – long-term

     6        18  

Derivative liabilities – long-term

     (46 )      18  

Other assets

     (14 )      4  

Other liabilities

     221        (4 )

Margin and collateral deposits – net of collateral received

     34        (82 )

Receivables and accrued unbilled revenue

     67        192  

Derivative assets – short-term

     (115 )      208  

Derivative liabilities – short-term

     (67 )      68  

Inventory and other current assets

     (142 )      16  

Regulatory assets – short-term

     111        (293 )

Regulatory liabilities – short-term

     163        (177 )

Accrued interest and taxes

     200        2  

Accounts payable and other current liabilities

     (162 )      (200 )

Net cash provided by operating activities

     664        320  

Cash flows from financing activities:

     

Long-term debt issued

            500  

Long-term debt issuance costs

     (1 )      (5 )

Long-term debt repaid

     (9 )      (350 )

Issuance of preference stock

            196  

Rate reduction notes repaid

     (62 )      (62 )

Short-term debt financing – net

     120        188  

Change in book overdrafts

     24        (76 )

Shares purchased for stock-based compensation

     (57 )      (44 )

Proceeds from stock option exercises

     23        14  

Excess tax benefits related to stock option exercises

     10        6  

Minority interest

     (47 )      (81 )

Dividends paid

     (73 )      (81 )

Net cash provided (used) by financing activities

     (72 )      205  

Cash flows from investing activities:

     

Capital expenditures

     (560 )      (494 )

Proceeds from nuclear decommissioning trust sales

     1,029        470  

Purchases of nuclear decommissioning trust investments

     (1,062 )      (506 )

Customer advances for construction and other investments

     3        4  

Net cash used by investing activities

     (590 )      (526 )

Net increase (decrease) in cash and equivalents

     2        (1 )

Cash and equivalents, beginning of period

     83        143  

Cash and equivalents, end of period

   $         85      $    142  

The accompanying notes are an integral part of these consolidated financial statements.

 

4


Table of Contents

SOUTHERN CALIFORNIA EDISON COMPANY

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

Management’s Statement

In the opinion of management, all adjustments, including recurring accruals, have been made that are necessary for a fair statement of the financial position, results of operations and cash flows in accordance with accounting principles generally accepted in the United States of America for the periods covered by this quarterly report on Form 10-Q. The results of operations for the three months ended March 31, 2007 are not necessarily indicative of the operating results for the full year.

The quarterly report should be read in conjunction with SCE’s Annual Report to Shareholders incorporated by reference into SCE’s Annual Report on Form 10-K for the year ended December 31, 2006 filed with the Securities and Exchange Commission.

Note 1. Summary of Significant Accounting Policies

Basis of Presentation

SCE’s significant accounting policies were described in Note 1 of “Notes to Consolidated Financial Statements” included in its 2006 Annual Report on Form 10-K. SCE follows the same accounting policies for interim reporting purposes, with the exception of the change in accounting for uncertain tax positions (discussed below in “New Accounting Pronouncements”).

Certain prior-period amounts were reclassified to conform to the March 31, 2007 financial statement presentation.

Income Taxes

SCE and its eligible subsidiaries are included in Edison International’s consolidated federal income tax and combined state tax returns. Under an income tax-allocation agreement approved by the CPUC, SCE’s tax liability is computed as if it filed a separate return.

As part of the process of preparing its consolidated financial statements, SCE is required to estimate its income taxes in each jurisdiction in which it operates. This process involves estimating actual current tax expense together with assessing temporary differences resulting from differing treatment of items for tax and accounting purposes, such as depreciable property. These differences result in deferred tax assets and liabilities, which are included within SCE’s consolidated balance sheets.

Income tax expense includes the current tax liability from operations and the change in deferred income taxes during the year. Investment tax credits are deferred and amortized over the lives of the related properties. Interest expense and penalties associated with income taxes are reflected in the caption “Income tax expense” on the consolidated statements of income.

For a further discussion of income taxes, see Note 4.

New Accounting Pronouncements

Accounting Pronouncement Adopted

In July 2006, the FASB issued FIN 48 which clarifies the accounting for uncertain tax positions. FIN 48 requires an enterprise to recognize, in its financial statements, the best estimate of the impact of a tax position by determining if the weight of the available evidence indicates it is more likely than not, based solely on the

 

5


Table of Contents

technical merits, that the position will be sustained on audit. SCE adopted FIN 48 effective January 1, 2007. Based on the current status of discussions with tax authorities related to open tax years under audit and other information currently available, implementation of FIN 48 resulted in a cumulative-effect adjustment that increased retained earnings by $213 million. SCE will continue to monitor and assess new income tax developments.

Accounting Pronouncements Not Yet Adopted

In February 2007, the FASB issued SFAS No. 159, which provides an option to report eligible financial assets and liabilities at fair value, with changes in fair value recognized in earnings. Upon adoption, the first remeasurement to fair value would be reported as a cumulative-effect adjustment to the opening balance of retained earnings. SCE will adopt SFAS No. 159 on January 1, 2008. SCE is currently evaluating the impact of adopting SFAS No. 159 on its consolidated financial statements.

In September 2006, the FASB issued SFAS No. 157, which clarifies the definition of fair value, establishes a framework for measuring fair value and expands the disclosures on fair value measurements. SCE will adopt SFAS No. 157 on January 1, 2008. SCE is currently evaluating the impact of adopting SFAS No. 157 on its financial statements.

Sales and Use Taxes

SCE bills certain sales and use taxes levied by state or local governments to its customers. Included in these sales and use taxes are franchise fees, which SCE pays to various municipalities (based on contracts with these municipalities) in order to operate within the limits of the municipality. SCE bills these franchise fees to its customers based on a CPUC-authorized rate. These franchise fees, which are required to be paid regardless of SCE’s ability to collect from the customer, are accounted for on a gross basis. SCE’s franchise fees billed to customers and recorded as operating revenue were $23 million and $20 million for the three months ended March 31, 2007 and 2006, respectively. When SCE acts as an agent, and the tax is not required to be remitted if it is not collected from the customer, the taxes are accounted for on a net basis.

Stock-Based Compensation

Stock, stock options, performance shares, deferred stock units and, beginning in 2007, restricted stock units have been granted under Edison International’s long-term incentive compensation programs. Edison International usually does not issue new common stock for equity awards settled. Rather, a third party is used to facilitate the exercise of stock options and the purchase and delivery of outstanding common stock for settlement of option exercises, performance shares and restricted stock units. Deferred stock units granted to management are settled in cash, not stock and represent a liability.

On April 26, 2007, Edison International’s shareholders approved a new incentive plan (the 2007 Performance Incentive Plan) that includes stock-based compensation. No additional awards will be granted under Edison International’s prior stock-based compensation plans on or after April 26, 2007, and all future issuances will be made under the new plan. The maximum number of shares of Edison International’s common stock that may be issued or transferred pursuant to awards under the new incentive plan is 8.5 million shares, plus the number of any shares subject to awards issued under Edison International’s prior plans and outstanding as of April 26, 2007, which expire, cancel or terminate without being exercised or shares being issued. For further discussion see “Stock-Based Compensation” in Note 5.

Note 2. Derivative Instruments and Hedging Activities

SCE is exposed to commodity price risk associated with its purchases for additional capacity and ancillary services to meet its peak energy requirements as well as exposure to natural gas prices associated with power purchased from QFs, fuel tolling arrangements, and its own gas-fired generation, including the Mountainview

 

6


Table of Contents

plant. SCE realized and unrealized gains and losses arising from derivative instruments are reflected in purchased-power expense and offset through the provision for regulatory adjustment clauses – net on the consolidated statements of income.

The following is a summary of purchased-power expense:

 

In millions     Three-Month Period Ended March 31,    2007      2006

Purchased-power expense

   $ 480      $ 688

Unrealized (gains) / losses on economic hedging activities

     (134 )      334
Energy settlements and refunds    (29)      (9)

Total purchased-power expense

   $     317      $     1,013

The 2007 net unrealized gains were primarily due to higher forward natural gas prices in the first quarter of 2007, compared to the same period in 2006.

Note 3. Liabilities and Lines of Credit

Short-term Debt

Short-term debt is generally used to finance fuel inventories, balancing account undercollections and general, temporary cash requirements. At March 31, 2007, the outstanding short-term debt and weighted-average interest rate was $120 million at 5.37%. This short-term debt is supported by a $2.5 billion credit line of which $2.1 billion was available as of March 31, 2007.

Note 4. Income Taxes

The composite federal and state statutory income tax rate was approximately 40% (net of the federal benefit for state income taxes) for all periods presented. SCE’s effective tax rate from net income was 22% for the three-month period ended March 31, 2007, as compared to 38% for the three-month period ended March 31, 2006. The decreased effective tax rate was primarily caused by reductions made to the income tax reserve in 2007 to reflect progress in an administrative appeal process with the IRS related to the income tax treatment of costs associated with environmental remediation.

The total amount of unrecognized tax benefits as of the date of adoption of FIN 48 was $98 million. The total amount of unrecognized tax benefits as of the date of adoption that, if recognized, would affect the effective tax rate was $28 million. The total amount of accrued interest and penalties was $65 million as of the date of adoption. SCE reduced its accrued liability for interest and penalties during the first quarter of 2007 to reflect progress in settlement negotiations with the IRS. The total benefit recognized in income tax expense for the three months ended March 31, 2007 was $39 million. The total amount of interest expense and penalties recognized in income tax expense was $12 million for the three months ended March 31, 2006.

Edison International and its subsidiaries remain subject to examination by the IRS from 1994 – present. In addition, the federal statute of limitations remains open from 1986 – 1993 on selected affirmative issues. Edison International and its subsidiaries remain subject to examination by the California Franchise Tax Board from 2003 – present. In addition, Edison International and its subsidiaries are also subject to examination by select state tax authorities, with varying statute of limitations. Some state jurisdictions follow the federal statute for comparable issues. Edison International and SCE continue their efforts to resolve open tax issues with the IRS and State authorities. The timing for resolving these open tax positions is subject to uncertainty, but it is reasonably possible that some portion of these open tax positions could be resolved in the next twelve months.

As a matter of course, Edison International and its subsidiaries are regularly audited by federal, state and foreign taxing authorities. For further discussion of this matter, see “Federal and State Income Taxes” in Note 6.

 

7


Table of Contents

Note 5. Compensation and Benefits Plans

Pension Plans

SCE previously disclosed in Note 5 of “Notes to Consolidated Financial Statements” included in its 2006 Annual Report on Form 10-K that it expects to contribute approximately $50 million to its pension plan in 2007. As of March 31, 2007, $47 million in contributions have been made relating to fiscal year 2006. Expected contribution funding could vary from anticipated amounts depending on the funded status at year-end and tax-deductible funding limitations.

Net pension cost recognized is calculated under the actuarial method used for ratemaking. The difference between pension costs calculated for accounting and ratemaking is deferred.

 

Expense components are:

 

      Three Months Ended
March 31,
 
In millions    2007      2006  
     (Unaudited)  

Service cost

   $ 26      $ 25  

Interest cost

        44           42  

Expected return on plan assets

     (61 )      (56 )

Amortization of prior service cost

     4        4  

Amortization of net actuarial loss

     1        1  

Expense under accounting standards

     14        16  

Regulatory adjustment – deferred

     1        (2 )

Total expense recognized

   $ 15      $ 14  

Postretirement Benefits Other Than Pensions

SCE previously disclosed in Note 6 of “Notes to Consolidated Financial Statements” included in its 2006 Annual Report on Form 10-K that it expects to contribute approximately $41 million to its postretirement benefits other than pension plans in 2007. As of March 31, 2007, $5 million in contributions have been made relating to fiscal year 2006. Expected contribution funding could vary from anticipated amounts depending on the funded status at year-end and tax-deductible funding limitations.

Expense components are:

 

      Three Months Ended
March 31,
 
In millions    2007      2006  
     (Unaudited)  

Service cost

   $ 10      $ 12  

Interest cost

        31           31  

Expected return on plan assets

     (30 )      (27 )

Amortization of prior service cost (credit)

     (7 )      (7 )

Amortization of net actuarial loss

     6        11  

Total expense recognized

   $ 10      $ 20  

 

8


Table of Contents

Stock-Based Compensation

Total stock-based compensation expense (reflected in the caption “Other operation and maintenance” on the consolidated statements of income) was $4 million and $6 million for the three months ended March 31, 2007 and 2006, respectively. The income tax benefit recognized in the consolidated statements of income was $1 million and $3 million for the three months ended March 31, 2007 and 2006, respectively. Total stock-based compensation cost capitalized was $1 million for each of the three months ended March 31, 2007 and 2006.

Stock Options

A summary of the status of Edison International stock options is as follows:

 

    Weighted - Average
     Stock
Options
    Exercise
Price
  Remaining
Contractual
Term (Years)
  Aggregate
Intrinsic Value

Outstanding at December 31, 2006

  7,761,336     $   26.78    

Granted

  895,348     $ 47.43    

Expired

           

Forfeited

  (16,426 )   $ 35.75    

Exercised

  (1,041,607 )   $ 22.57    

Outstanding at March 31, 2007

  7,598,651     $ 29.79   6.82  

Vested and expected to vest at March 31, 2007

  7,305,965     $ 29.44   6.76   $   125,717,393

Exercisable at March 31, 2007

  4,327,534     $ 23.66   5.62   $ 99,479,188

Stock options granted in 2007 do not accrue dividend equivalents.

The amount of cash used to settle stock options exercised was $49 million and $29 million for the three months ended March 31, 2007 and 2006, respectively. Cash received from options exercised was $23 million and $14 million for the three months ended March 31, 2007 and 2006, respectively. The estimated tax benefit from options exercised was $10 million and $6 million for the three months ended March 31, 2007 and 2006, respectively.

Note 6. Commitments and Contingencies

Lease Commitments

SCE entered into a new operating lease for power contracts during the first three months of 2007. SCE’s additional operating lease commitments for this new power contract are currently estimated to be $68 million for 2008, $114 million for 2009, $114 million for 2010, and $114 million for 2011.

Other Commitments

SCE entered into service contracts associated with uranium enrichment and fuel fabrication during the first three months of 2007. SCE’s additional nuclear fuel commitments for the remainder of 2007 are estimated to be $70 million.

Indemnities

In connection with the acquisition of Mountainview, SCE agreed to indemnify the seller with respect to specific environmental claims related to SCE’s previously owned San Bernardino Generating Station, divested by SCE in

 

9


Table of Contents

1998 and reacquired as part of the Mountainview acquisition. SCE retained certain responsibilities with respect to environmental claims as part of the original divestiture of the station. The aggregate liability for either party to the purchase agreement for damages and other amounts is a maximum of $60 million. This indemnification for environmental liabilities expires on or before March 12, 2033. SCE has not recorded a liability related to this indemnity.

SCE provides other indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, and specified environmental indemnities and income taxes with respect to assets sold. SCE’s obligations under these agreements may be limited in terms of time and/or amount, and in some instances SCE may have recourse against third parties for certain indemnities. The obligated amounts of these indemnifications often are not explicitly stated, and the overall maximum amount of the obligation under these indemnifications cannot be reasonably estimated. SCE has not recorded a liability related to these indemnities.

Contingencies

In addition to the matters disclosed in these Notes, SCE is involved in other legal, tax and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. SCE believes the outcome of these other proceedings will not materially affect its results of operations or liquidity.

Environmental Remediation

SCE is subject to numerous environmental laws and regulations, which require it to incur substantial costs to operate existing facilities, construct and operate new facilities, and mitigate or remove the effect of past operations on the environment.

SCE believes that it is in substantial compliance with environmental regulatory requirements; however, possible future developments, such as the enactment of more stringent environmental laws and regulations, could affect the costs and the manner in which business is conducted and could cause substantial additional capital expenditures. There is no assurance that additional costs would be recovered from customers or that SCE’s financial position and results of operations would not be materially affected.

SCE records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operations and maintenance, monitoring and site closure. Unless there is a probable amount, SCE records the lower end of this reasonably likely range of costs (classified as other long-term liabilities) at undiscounted amounts.

As of March 31, 2007, SCE’s recorded estimated minimum liability to remediate its 23 identified sites is $76 million. The ultimate costs to clean up SCE’s identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs could exceed its recorded liability by up to $125 million. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes. In addition to its identified sites (sites in which the upper end of the range of costs is at least $1 million), SCE also has 32 immaterial sites whose total liability ranges from $3 million (the recorded minimum liability) to $8 million.

 

10


Table of Contents

The CPUC allows SCE to recover environmental remediation costs at certain sites, representing $29 million of its recorded liability, through an incentive mechanism (SCE may request to include additional sites). Under this mechanism, SCE will recover 90% of cleanup costs through customer rates; shareholders fund the remaining 10%, with the opportunity to recover these costs from insurance carriers and other third parties. SCE has successfully settled insurance claims with all responsible carriers. SCE expects to recover costs incurred at its remaining sites through customer rates. SCE has recorded a regulatory asset of $75 million for its estimated minimum environmental-cleanup costs expected to be recovered through customer rates.

SCE’s identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.

SCE expects to clean up its identified sites over a period of up to 30 years. Remediation costs in each of the next several years are expected to range from $11 million to $31 million. Recorded costs for the twelve months ended March 31, 2007 were $16 million.

Based on currently available information, SCE believes it is unlikely that it will incur amounts in excess of the upper limit of the estimated range for its identified sites and, based upon the CPUC’s regulatory treatment of environmental remediation costs, SCE believes that costs ultimately recorded will not materially affect its results of operations or financial position. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to such estimates.

Federal and State Income Taxes

Edison International received Revenue Agent Reports from the IRS in August 2002 and in January 2005 asserting deficiencies in federal corporate income taxes with respect to audits of its 1994 – 1996 and 1997 – 1999 tax years, respectively. Edison International expects to conclude the administrative phase of the 1994 – 1996 tax years during the first half of 2007. Many of the asserted tax deficiencies are timing differences and, therefore, amounts ultimately paid (exclusive of penalties), if any, would be deductible on future tax returns of Edison International and would benefit SCE. Edison International has also submitted affirmative claims to the IRS and state tax agencies which are being addressed in administrative proceedings. Any benefits would be recorded at the earlier of when Edison International believes that the affirmative claim position has a more likely than not probability of being sustained or when a settlement is reached. Certain affirmative claims have been recorded as part of the implementation of FIN 48.

The IRS Revenue Agent Report for the 1997 – 1999 audit also asserted deficiencies with respect to a transaction entered into by an SCE subsidiary which may be considered substantially similar to a listed transaction described by the IRS as a contingent liability company. While Edison International and SCE intend to defend its tax return position with respect to this transaction, the tax benefits relating to this transaction have been valued at an amount equal to the settlement offer made by the Internal Revenue Service pursuant to FIN 48.

In April 2004, Edison International filed California Franchise Tax amended returns for tax years 1997 – 2002 to mitigate the possible imposition of new California penalty provisions on transactions that may be considered as listed or substantially similar to listed transactions described in an IRS notice that was published in 2001. These transactions include the SCE subsidiary contingent liability company transaction described above. Edison International filed these amended returns under protest retaining its appeal rights.

In December 2006, Edison International reached a settlement with the California Franchise Tax Board regarding the sourcing of gross receipts from the sale of electric services for California state tax apportionment purposes for tax years 1981 to 2004. In the fourth quarter of 2006, SCE recorded a $49 million benefit related to a tax

 

11


Table of Contents

reserve adjustment as a result of this settlement. In addition to this tax reserve adjustment, SCE received a net cash refund of $52 million in April 2007 as a result of this same settlement.

FERC Refund Proceedings

SCE is participating in several related proceedings seeking recovery of refunds from sellers of electricity and natural gas who manipulated the electric and natural gas markets during the 2000 – 2001 California energy crisis or who benefited from the manipulation by receiving inflated market prices. SCE is required to refund to customers 90% of any refunds actually realized by SCE, net of litigation costs, and 10% will be retained by SCE as a shareholder incentive.

During the course of the refund proceedings, the FERC ruled that governmental power sellers, like private generators and marketers that sold into the California market, should refund the excessive prices they received during the crisis period. However, on September 21, 2005, the Ninth Circuit ruled that the FERC does not have

authority directly to enforce its refund orders against governmental power sellers. The Court, however, clarified that its decision does not preclude SCE or other parties from pursuing civil claims against the governmental power sellers. On March 16, 2006, SCE, PG&E and the California Electricity Oversight Board jointly filed suit in federal court against several governmental power sellers, seeking damages based on the reduced prices set by the FERC for transactions during the crisis period. In March 2007, the federal court dismissed this suit concluding that the claims should have been filed in state court. SCE, along with PG&E, the Oversight Board and SDG&E, refilled on April 29, 2007 in the Los Angeles Superior Court. In addition, on March 12, 2007, SCE, PG&E and the Oversight Board filed a similar group of claims in the U.S. Court of Federal Claims against two federal agencies that sold power into California during the energy crisis. SCE cannot predict whether it may be able to recover any additional refunds from governmental power sellers as a result of these suits.

In November 2005, SCE and other parties entered into a settlement agreement with Enron Corporation and a number of its affiliates, most of which are debtors in Chapter 11 bankruptcy proceedings pending in New York. In 2006, SCE received distributions of approximately $55 million on its allowed bankruptcy claim. In April 2007, SCE received and recorded an additional distribution on its allowed bankruptcy claim of approximately $12 million and 55,465 shares of Portland General Electric Company stock, with an aggregate value of less than $2 million. Additional distributions are expected but SCE cannot currently predict the amount or timing of such distributions.

On August 2, 2006, the Ninth Circuit issued an opinion regarding the scope of refunds issued by the FERC. The Ninth Circuit broadened the time period during which refunds could be ordered to include the summer of 2000 based on evidence of pervasive tariff violations and broadened the categories of transactions that could be subject to refund. As a result of this decision, SCE may be able to recover additional refunds from sellers of electricity during the crisis with whom settlements have not been reached.

Investigations Regarding Performance Incentives Rewards

SCE was eligible under its CPUC-approved PBR mechanism to earn rewards or penalties based on its performance in comparison to CPUC-approved standards of customer satisfaction, employee injury and illness reporting, and system reliability.

SCE conducted investigations into its performance under these PBR mechanisms and has reported to the CPUC certain findings of misconduct and misreporting as further discussed below.

Customer Satisfaction

SCE received two letters in 2003 from one or more anonymous employees alleging that personnel in the service planning group of SCE’s transmission and distribution business unit altered or omitted data in attempts to

 

12


Table of Contents

influence the outcome of customer satisfaction surveys conducted by an independent survey organization. The results of these surveys are used, along with other factors, to determine the amounts of any incentive rewards or penalties for customer satisfaction. SCE recorded aggregate customer satisfaction rewards of $28 million over the period 1997 – 2000. Potential customer satisfaction rewards aggregating $10 million for the years 2001 and 2002 are pending before the CPUC and have not been recognized in income by SCE. SCE also anticipated that it could be eligible for customer satisfaction rewards of approximately $10 million for 2003.

Following its internal investigation, SCE proposed to refund to ratepayers $7 million of the PBR rewards previously received and forgo an additional $5 million of the PBR rewards pending that are both attributable to the design organization’s portion of the customer satisfaction rewards for the entire PBR period (1997 – 2003). In addition, SCE also proposed to refund all of the approximately $2 million of customer satisfaction rewards associated with meter reading.

SCE has taken remedial action as to the customer satisfaction survey misconduct by disciplining employees and/or terminating certain employees, including several supervisory personnel, updating system process and related documentation for survey reporting, and implementing additional supervisory controls over data collection and processing. Performance incentive rewards for customer satisfaction expired in 2003 pursuant to the 2003 GRC.

Employee Injury and Illness Reporting

In light of the problems uncovered with the customer satisfaction surveys, SCE conducted an investigation into the accuracy of SCE’s employee injury and illness reporting. The yearly results of employee injury and illness reporting to the CPUC are used to determine the amount of the incentive reward or penalty to SCE under the PBR mechanism. Since the inception of PBR in 1997, SCE has recognized $20 million in employee safety incentives for 1997 through 2000 and, based on SCE’s records, may be entitled to an additional $15 million for 2001 through 2003.

On October 21, 2004, SCE reported to the CPUC and other appropriate regulatory agencies certain findings concerning SCE’s performance under the PBR incentive mechanism for injury and illness reporting. SCE disclosed in the investigative findings to the CPUC that SCE failed to implement an effective recordkeeping system sufficient to capture all required data for first aid incidents.

As a result of these findings, SCE proposed to the CPUC that it not collect any reward under the mechanism and return to ratepayers the $20 million it had already received. SCE has also proposed to withdraw the pending rewards for the 2001 – 2003 time frames.

SCE has taken remedial action to address the issues identified, including revising its organizational structure and overall program for environmental, health and safety compliance, disciplining employees who committed wrongdoing and terminating one employee. SCE submitted a report on the results of its investigation to the CPUC on December 3, 2004.

System Reliability

In light of the problems uncovered with the PBR mechanisms discussed above, SCE conducted an investigation into the third PBR metric, system reliability. On February 28, 2005, SCE provided its final investigatory report to the CPUC concluding that the reliability reporting system is working as intended.

CPUC Investigation

On June 15, 2006, the CPUC instituted a formal investigation to determine whether and in what amounts to order refunds or disallowances of past and potential PBR rewards for customer satisfaction, employee safety and system reliability portions of PBR. The CPUC also may consider whether to impose additional penalties on SCE.

 

13


Table of Contents

In June 2006, the CPSD of the CPUC issued its report regarding SCE’s PBR program, recommending that the CPUC impose various refunds and penalties on SCE. Subsequently, in September 2006, the CPSD and other intervenors, such as the CPUC’s Division of Ratepayer Advocates and The Utility Reform Network, filed testimony on these matters recommending various refunds and penalties to be imposed upon SCE. On October 16, 2006, SCE filed testimony opposing the various refund and penalty recommendations of the CPSD and other intervenors. Based on SCE’s proposal for refunds and the combined recommendations of the CPSD and other intervenors, the potential refunds and penalties could range from $52 million up to $388 million. SCE has recorded an accrual at the lower end of this range of potential loss and is accruing interest on collected amounts that SCE has proposed to refund to customers. Evidentiary hearings which addressed the planning and meter reading components of customer satisfaction, safety, issues related to SCE’s administration of the survey, and statutory fines associated with those matters took place in the fourth quarter of 2006. A schedule has not been set to address the other components of customer satisfaction, system reliability, and other issues in a second phase of the proceeding, although the CPSD has indicated its intent to complete a report by August 2007. A Presiding Officer’s Decision is expected during the second quarter of 2007 on the issues addressed during phase one. At this time, SCE cannot predict the outcome of these matters or reasonably estimate the potential amount of any additional refunds, disallowances, or penalties that may be required above the lower end of the range.

ISO Disputed Charges

On April 20, 2004, the FERC issued an order concerning a dispute between the ISO and the Cities of Anaheim, Azusa, Banning, Colton and Riverside, California over the proper allocation and characterization of certain transmission service related charges. The order directed the ISO to shift the charges from scheduling coordinators in the affected zone to the responsible participating transmission owner, SCE. The potential cost to SCE, net of amounts SCE expects to receive through the PX, SCE’s scheduling coordinator at the time, is estimated to be approximately $20 million to $25 million, including interest. On March 29, 2007, the FERC issued an order agreeing with SCE’s position that the charges incurred by the ISO were related to voltage support and should be allocated to the scheduling coordinators rather than to SCE as a transmission owner. The Cities filed a request for rehearing of the FERC’s order on April 27, 2007. SCE believes that the most recent FERC order correctly allocates responsibility for these ISO charges. However, SCE cannot provide assurance as to the final outcome of the Cities request for rehearing. If a subsequent regulatory decision changes the allocation of responsibility for these charges and SCE is required to pay these charges as a transmission owner, SCE may seek recovery in its reliability service rates. SCE cannot provide any assurance that recovery of these charges in its reliability service rates would be permitted.

Midway-Sunset Cogeneration Company

San Joaquin Energy Company, a wholly owned subsidiary of EME, owns a 50% general partnership interest in Midway-Sunset, which owns a 225-MW cogeneration facility near Fellows, California. Midway-Sunset is a party to several proceedings pending at the FERC because Midway-Sunset was a seller in the PX and ISO markets during 2000 and 2001, both for its own account and on behalf of SCE and PG&E, the utilities to which the majority of Midway-Sunset’s power was contracted for sale. As a seller into the PX and ISO markets, Midway-Sunset is potentially liable for refunds to purchasers in these markets. See discussion above in “FERC Refund Proceedings”.

The claims asserted against Midway-Sunset for refunds related to power sold into the PX and ISO markets, including power sold on behalf of SCE and PG&E, are estimated to be less than $70 million for all periods under consideration. Midway-Sunset did not retain any proceeds from power sold into the PX and ISO markets on behalf of SCE and PG&E in excess of the amounts to which it was entitled under the pre-existing power sales contracts, but instead passed through those proceeds to the utilities. Since the proceeds were passed through to the utilities, EME believes that PG&E and SCE are obligated to reimburse Midway-Sunset for any refund liability that it incurs as a result of sales made into the PX and ISO markets on their behalves.

 

14


Table of Contents

During this period, amounts SCE received from Midway-Sunset were credited to SCE’s customers against power purchase expenses through the ratemaking mechanism in place at that time. SCE believes that any net amounts reimbursed to Midway-Sunset would be substantially recoverable from its customers through current regulatory mechanisms. SCE does not expect any reimbursement to Midway-Sunset to have a material impact on earnings.

Navajo Nation Litigation

The Navajo Nation filed a complaint in June 1999 in the District Court against SCE, among other defendants, arising out of the coal supply agreement for Mohave. The complaint asserts claims for, among other things, violations of the federal RICO statute, interference with fiduciary duties and contractual relations, fraudulent misrepresentations by nondisclosure, and various contract-related claims. The complaint claims that the defendants’ actions prevented the Navajo Nation from obtaining the full value in royalty rates for the coal supplied to Mohave. The complaint seeks damages of not less than $600 million, trebling of that amount, and punitive damages of not less than $1 billion.

In April 2004, the District Court dismissed SCE’s motion for summary judgment and concluded that a 2003 U.S. Supreme Court decision in an on-going related lawsuit by the Navajo Nation against the U.S. Government did not preclude the Navajo Nation from pursuing its RICO and intentional tort claims.

Pursuant to a joint request of the parties, the District Court granted a stay of the action on October 5, 2004 to allow the parties to attempt to negotiate a resolution of the issues associated with Mohave with the assistance of a facilitator. An initial organizational session was held with the facilitator on October 14, 2004 and negotiations are on-going. On July 28, 2005, the District Court issued an order removing the case from its active calendar, subject to reinstatement at the request of any party. On April 30, 2007, the District Court issued a minute order directing that the parties file a joint status report and recommendation for future proceedings no later than June 1, 2007 in light of the duration of the stay.

SCE cannot predict the outcome of the 1999 Navajo Nation’s complaint against SCE, the ultimate impact on the complaint of the Supreme Court’s 2003 decision and the on-going litigation by the Navajo Nation against the Government in the related case, or the impact on the facilitated negotiations of the Mohave co-owners’ announced decisions to discontinue efforts to return Mohave to service.

Nuclear Insurance

Federal law limits public liability claims from a nuclear incident to $10.8 billion. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available ($300 million). The balance is covered by the industry’s retrospective rating plan that uses deferred premium charges to every reactor licensee if a nuclear incident at any licensed reactor in the United States results in claims and/or costs which exceed the primary insurance at that plant site. Federal regulations require this secondary level of financial protection. The NRC exempted San Onofre Unit 1 from this secondary level, effective June 1994. The current maximum deferred premium for each nuclear incident is $101 million per reactor, but not more than $15 million per reactor may be charged in any one year for each incident. The maximum deferred premium per reactor and the yearly assessment per reactor for each nuclear incident will be adjusted for inflation on a 5-year schedule. The next inflation adjustment will occur no later than August 20, 2008. Based on its ownership interests, SCE could be required to pay a maximum of $201 million per nuclear incident. However, it would have to pay no more than $30 million per incident in any one year. Such amounts include a 5% surcharge if additional funds are needed to satisfy public liability claims and are subject to adjustment for inflation. If the public liability limit above is insufficient, federal regulations may impose further revenue-raising measures to pay claims, including a possible additional assessment on all licensed reactor operators.

Property damage insurance covers losses up to $500 million, including decontamination costs, at San Onofre and Palo Verde. Decontamination liability and property damage coverage exceeding the primary $500 million also

 

15


Table of Contents

has been purchased in amounts greater than federal requirements. Additional insurance covers part of replacement power expenses during an accident-related nuclear unit outage. A mutual insurance company owned by utilities with nuclear facilities issues these policies. If losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to $44 million per year. Insurance premiums are charged to operating expense.

Procurement of Renewable Resources

California law requires SCE to increase its procurement of renewable resources by at least 1% of its annual retail electricity sales per year so that 20% of its annual electricity sales are procured from renewable resources by no later than December 31, 2010.

On October 19, 2006, the CPUC issued a decision that, among other things, implemented a “cumulative deficit banking” feature which would carry forward and accumulate annual deficits until the deficit has been satisfied at a later time through actual deliveries of eligible renewable energy and made an accounting determination that defines the annual targets for each year of the renewable portfolio standards program. Based on terms of the controlling California statute, in March 2007, SCE successfully challenged the CPUC’s accounting determination of SCE’s annual targets. This change is expected to enable SCE to meet its target for 2007 and possibly later years.

On April 3, 2007, SCE filed its renewable portfolio standard compliance report for 2004 through 2006. The compliance report confirms that SCE met its renewable goals for each of these years. In light of the annual target revisions that resulted from the March 2007 successful challenge to the CPUC’s accounting determination, the report also projects that SCE will meet its renewable goals for 2007 and 2008 but could have a potential deficit in 2009. The potential deficit in 2009, however, does not take into account future procurement opportunities or the full utilization by SCE of the CPUC’s rules for flexible compliance with annual targets. SCE continues to engage in several initiatives to procure additional renewable resources, including formal solicitations approved by the CPUC, bilateral negotiations with individual projects and other initiatives.

Under current CPUC decisions, potential penalties for SCE’s failure to achieve its renewable procurement objectives for any year will be considered by the CPUC in the context of the CPUC’s review of SCE’s annual compliance filing. Under the CPUC’s current rules, the maximum penalty for failing to achieve renewable procurement targets is $25 million per year. SCE cannot predict whether it will be assessed penalties.

Scheduling Coordinator Tariff Dispute

Pursuant to the Amended and Restated Exchange Agreement, SCE serves as a scheduling coordinator for the DWP over the ISO-controlled grid. In late 2003, SCE began charging the DWP under a tariff subject to refund for FERC-authorized scheduling coordinator charges incurred by SCE on the DWP’s behalf. The scheduling coordinator charges are billed to the DWP under a FERC tariff that remains subject to dispute. The DWP has paid the amounts billed under protest but requested that the FERC declare that SCE was obligated to serve as the DWP’s scheduling coordinator without charge. The FERC accepted SCE’s tariff for filing, but held that the rates charged to the DWP have not been shown to be just and reasonable and thus made them subject to refund and further review by the FERC. As a result, SCE could be required to refund all or part of the amounts collected from the DWP under the tariff. As of March 31, 2007, SCE has an accrued liability of $42 million for the potential refunds. In September 2006, SCE and DWP entered into a term sheet that would settle this dispute, among others surrounding the Exchange Agreement. If the settlement is effectuated, SCE would refund to DWP the scheduling coordinator charges collected, with an offset for losses, subject to being able to recover the scheduling coordinator charges from all transmission grid customers through another regulatory mechanism. The parties are currently negotiating the exact terms of the settlement which would be subject to FERC and ISO approval.

 

16


Table of Contents

Spent Nuclear Fuel

Under federal law, the DOE is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE did not meet its obligation to begin acceptance of spent nuclear fuel not later than January 31, 1998. It is not certain when the DOE will begin accepting spent nuclear fuel from San Onofre or other nuclear power plants. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. SCE has paid the DOE the required one-time fee applicable to nuclear generation at San Onofre through April 6, 1983 (approximately $24 million, plus interest). SCE is also paying the required quarterly fee equal to 0.1¢-per-kWh of nuclear-generated electricity sold after April 6, 1983. On January 29, 2004, SCE, as operating agent, filed a complaint against the DOE in the United States Court of Federal Claims seeking damages for the DOE’s failure to meet its obligation to begin accepting spent nuclear fuel from San Onofre. The case was stayed through April 7, 2006, when SCE and the DOE filed a Joint Status Report in which SCE sought to lift the stay and the government opposed lifting the stay. On June 5, 2006, the Court of Federal Claims lifted the stay on SCE’s case and established a discovery schedule. A Joint Status Report is due on September 7, 2007, regarding further proceedings in this case and presumably including establishing a trial date.

SCE has primary responsibility for the interim storage of spent nuclear fuel generated at San Onofre. Spent nuclear fuel is stored in the San Onofre Units 2 and 3 spent fuel pools and the San Onofre independent spent fuel storage installation where all of Unit 1’s spent fuel located at San Onofre is stored. There is now sufficient space in the Unit 2 and 3 spent fuel pools to meet plant requirements through mid-2007 and mid-2008, respectively. In order to maintain a full core off-load capability, SCE began moving Unit 2 spent fuel into the independent spent fuel storage installation in late February 2007.

There are now sufficient dry casks and modules available at the independent spent fuel storage installation to meet plant requirements through 2008. SCE, as operating agent, plans to continually load casks on a schedule to maintain full core off-load capability for both units in order to meet the plant requirements after 2008 until 2022 (the end of the current NRC operating license).

In order to increase on-site storage capacity and maintain core off-load capability, Palo Verde has constructed an independent spent fuel storage facility. Arizona Public Service, as operating agent, plans to continually load dry casks on a schedule to maintain full core off-load capability for all three units.

Note 7. Supplemental Cash Flows Information 

 

      Three Months Ended
March 31,
In millions    2007    2006
     (Unaudited)

Cash payments for interest and taxes:

     

Interest – net of amounts capitalized

   $   86    $   90

Tax payments

          29

Noncash investing and financing activities:

     

Dividends declared but not paid:

     

Common Stock

   $ 25    $ 60

Preferred and Preference stock not subject to mandatory redemption

     9      10

 

17


Table of Contents

Note 8. Regulatory Assets and Liabilities

Regulatory assets included in the consolidated balance sheets are:

 

In millions    March 31,
2007
   December 31,
2006
     (Unaudited)     

Current:

     

Regulatory balancing accounts

   $ 103    $ 128

Rate reduction notes – transition cost deferral

     165      219

Direct access procurement charges

     42      63

Energy derivatives

     16      88

Purchased-power settlements

     25      31

Deferred FTR proceeds

     68      14

Other

     24      11
       443      554

Long-term:

     

Flow-through taxes – net

     1,158      1,023

Unamortized nuclear investment – net

     428      435

Nuclear-related asset retirement obligation investment – net

     312      317

Unamortized coal plant investment – net

     100      102

Unamortized loss on reacquired debt

     313      318

SFAS No. 158 pensions and postretirement benefits

     304      303

Energy derivatives

     88      145

Environmental remediation

     75      77

Other

     96      98
       2,874      2,818

Total Regulatory Assets

   $   3,317    $   3,372

Deferred FTR proceeds represent the deferral of congestion revenue SCE received as a transmission owner from the annual ISO FTR auction. The deferred FTR proceeds will be recognized over the period April 2007 through January 2008.

 

18


Table of Contents

Regulatory liabilities included in the consolidated balance sheets are:

 

In millions    March 31,
2007
   December 31,
2006
     (Unaudited)     

Current:

     

Regulatory balancing accounts

   $ 998    $ 912

Direct access procurement charges

     42      63

Energy derivatives

     28      7

Deferred FTR costs

     92      11

Other

     3      7
       1,163      1,000

Long-term:

     

Asset retirement obligations

     744      732

Costs of removal

     2,174      2,158

SFAS No. 158 pensions and other postretirement benefits

     149      145

Energy derivatives

     12      27

Employee benefit plans

     78      78
       3,157      3,140

Total Regulatory Liabilities

   $   4,320    $   4,140

Deferred FTR costs represent the deferral of the costs associated with FTRs that SCE purchased during the annual ISO auction process. The FTRs provide SCE with scheduling priority in certain transmission grid congestion areas in the day-ahead market. The deferred FTR costs are recognized as FTRs are used or expire during the period April 2007 through March 2008.

 

19


Table of Contents

Note 9. Business Segments

SCE’s reportable business segments include the rate-regulated electric utility segment and the variable interest entities (VIEs) segment. The VIEs were consolidated as of March 31, 2004. Additional details on the VIE segment are in Note 14 of “Notes to Consolidated Financial Statements” included in SCE’s 2006 Annual Report on Form 10-K. The VIEs are gas-fired power plants that sell both electricity and steam. The VIE segment consists of non-rate-regulated entities (all in California). SCE’s management has no control over the resources allocated to the VIE segment and does not make decisions about its performance.

SCE’s business segment information including all line items with VIE activities, is:

 

In millions    Electric
Utility
   VIEs    Eliminations     SCE
     (Unaudited)

Balance Sheet Items as of March 31, 2007:

          

Cash and equivalents

   $ 5    $ 80    $     $ 85

Accounts receivable – net

     837      135      (94 )     878

Inventory

     221      13            234

Other current assets

     192      3            195

Nonutility property – net of depreciation

     721      312            1,033

Other long-term assets

     478      6            484

Total assets

     26,136      549      (94 )     26,591

Accounts payable

     583      146      (94 )     635

Other current liabilities

     573      2            575

Long-term debt

     5,117      45            5,162

Asset retirement obligations

     2,764      14            2,778

Minority interest

          342            342

Total liabilities and shareholder’s equity

   $ 26,136    $ 549    $ (94 )   $ 26,591

Balance Sheet Items as of December 31, 2006:

          

Cash and equivalents

   $ 5    $ 78    $     $ 83

Accounts receivable – net

     893      141      (95 )     939

Inventory

     218      14            232

Other current assets

     50      4            54

Nonutility property – net of depreciation

     727      319            1,046

Other long-term assets

     481      7            488

Total assets

     25,642      563      (95 )     26,110

Accounts payable

     809      142      (95 )     856

Other current liabilities

     622      2            624

Long-term debt

     5,117      54            5,171

Asset retirement obligations

     2,735      14            2,749

Minority interest

          351            351

Total liabilities and shareholder’s equity

   $   25,642    $   563    $   (95 )   $   26,110

 

20


Table of Contents

 

In millions    Electric
Utility
   VIEs    Eliminations*     SCE
     (Unaudited)

Income Statement Items for the
Three Months Ended March 31, 2007:

          

Operating revenue

   $   2,128    $   260    $   (166 )   $   2,222

Fuel

     123      187            310

Purchased power

     483           (166 )     317

Other operation and maintenance

     575      26            601

Depreciation, decommissioning and amortization

     267      9            276

Total operating expenses

     1,792      222      (166 )     1,848

Operating income

     336      38            374

Interest income

     11                 11

Interest expense – net of amounts capitalized

     107                 107

Income tax expense

     53                 53

Minority interest

          38            38
Net income    $ 193    $    $     $ 193
      

Income Statement Items for the
Three Months Ended March 31, 2006:

     (Unaudited)

Operating revenue

   $ 2,100    $ 309    $ (192 )   $ 2,217

Fuel

     86      225            311

Purchased power

     1,205           (192 )     1,013

Other operation and maintenance

     592      25            617

Depreciation, decommissioning and amortization

     244      9            253
Total operating expenses      1,818      259      (192 )     1,885

Operating income

     282      50            332

Interest income

     15                 15

Interest expense – net of amounts capitalized

     97                 97

Income tax expense

     83                 83

Minority interest

          50            50
Net income    $ 133    $    $     $ 133
* VIE segment revenue includes sales to the electric utility segment, which is eliminated in revenue and purchased power in the consolidated statements of income.

 

21


Table of Contents
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

INTRODUCTION

This Management’s Discussion and Analysis of Financial Condition and Results of Operation for the three-month period ended March 31, 2007 discusses material changes in the financial condition, results of operations and other developments of SCE since December 31, 2006, and as compared to the three-month period ended March 31, 2006. This discussion presumes that the reader has read or has access to SCE’s MD&A for the calendar year 2006 (the year-ended 2006 MD&A), which was included in SCE’s 2006 annual report to shareholders and incorporated by reference into SCE’s Annual Report on Form 10-K for the year ended December 31, 2006, filed with the Securities and Exchange Commission.

This MD&A contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect SCE’s current expectations and projections about future events based on SCE’s knowledge of present facts and circumstances and assumptions about future events and include any statement that does not directly relate to a historical or current fact. Other information distributed by SCE that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words “expects,” “believes,” “anticipates,” “estimates,” “projects,” “intends,” “plans,” “probable,” “may,” “will,” “could,” “would,” “should,” and variations of such words and similar expressions, or discussions of strategy or of plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ, or that otherwise could impact SCE or its subsidiaries, include, but are not limited to:

 

 

the ability of SCE to recover its costs in a timely manner from its customers through regulated rates;

 

 

decisions and other actions by the CPUC, the FERC and other regulatory authorities and delays in regulatory actions;

 

 

market risks affecting SCE’s energy procurement activities;

 

 

access to capital markets and the cost of capital;

 

 

changes in interest rates and rates of inflation;

 

 

governmental, statutory, regulatory or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market;

 

 

environmental regulations that could require additional expenditures or otherwise affect the cost and manner of doing business;

 

 

risks associated with operating nuclear and other power generating facilities, including operating risks, nuclear fuel storage, equipment failure, availability, heat rate, output, and availability and cost of spare parts and repairs;

 

 

the availability of labor, equipment and materials;

 

 

the ability to obtain sufficient insurance, including insurance relating to SCE’s nuclear facilities;

 

 

effects of legal proceedings, changes in or interpretations of tax laws, rates or policies, and changes in accounting standards;

 

 

the cost and availability of coal, natural gas, fuel oil, nuclear fuel, and associated transportation;

 

 

the ability to provide sufficient collateral in support of hedging activities and purchased power and fuel;

 

 

the risk of counter-party default in hedging transactions or power-purchase and fuel contracts;

 

22


Table of Contents
 

general political, economic and business conditions;

 

 

weather conditions, natural disasters and other unforeseen events; and

 

 

changes in the fair value of investments and other assets.

Additional information about risks and uncertainties, including more detail about the factors described above, are discussed throughout this MD&A and in the “Risk Factors” section included in Part I, Item 1A of SCE’s 2006 Annual Report on Form 10-K. Readers are urged to read this entire report, including the information incorporated by reference, and carefully consider the risks, uncertainties and other factors that affect SCE’s business. Forward-looking statements speak only as of the date they are made and SCE is not obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by SCE with the Securities & Exchange Commission.

This MD&A includes information about SCE, an investor-owned utility company providing electricity to retail customers in central, coastal and southern California. SCE is regulated by the CPUC and FERC.

This MD&A is presented in 8 major sections: (1) current developments; (2) liquidity; (3) regulatory matters; (4) other developments; (5) market risk exposures; (6) results of operations and historical cash flow analysis; (7) new accounting pronouncements; and (8) commitments and indemnities.

CURRENT DEVELOPMENTS

This section is intended to be a summary of those current developments that management believes are of most importance since year-end December 31, 2006. This section is not intended to be an all-inclusive list of all current developments and should be read together with all sections of this MD&A.

2008 Cost of Capital Proceeding

On May 8, 2007, SCE filed its 2008 cost of capital application requesting a rate-making capital structure of 43% long-term debt, 9% preferred equity and 48% common equity. In addition, SCE is seeking a cost of long-term debt of 6.20%, cost of preferred equity of 5.98% and a return on common equity of 11.80%.

LIQUIDITY

Overview

As of March 31, 2007, SCE had cash and equivalents of $85 million ($80 million of which was held by SCE’s consolidated VIEs). As of March 31, 2007, long-term debt, including current maturities of long-term debt, was $5.5 billion. On February 23, 2007, SCE amended its credit facility, increasing the amount of borrowing capacity to $2.5 billion, extending the maturity to February 2012 and removing the first mortgage bond security pledge. As a result of removing the first mortgage bond security, the credit facility’s pricing changed to an unsecured basis per the terms of the credit facility agreement. At March 31, 2007, the credit facility supported $304 million in letters of credit and $120 million in commercial paper leaving $2.1 billion available for liquidity purposes.

SCE’s estimated cash outflows during the twelve-month period following March 31, 2007 consist of:

 

 

Debt maturities of approximately $334 million, including $184 million of rate reduction notes that have a separate nonbypassable recovery mechanism approved by state legislation and CPUC decisions. The rate reduction notes are scheduled to be paid off in December 2007 and the nonbypassable rates being charged to customers are expected to cease as of January 1, 2008;

 

 

Projected capital expenditures of $1.9 billion remaining for 2007 primarily to replace and expand distribution and transmission infrastructure and construct and replace major components of generation assets (see “—Capital Expenditures” below);

 

23


Table of Contents
 

Dividend payments to SCE’s parent company. On February 22, 2007, the Board of Directors of SCE declared a $25 million dividend to Edison International which was paid in April 2007. On April 26, 2007 the Board of Directors of SCE declared a $25 million dividend to be paid to Edison International;

 

 

Fuel and procurement-related costs (see “Regulatory Matters—Current Regulatory Developments—Energy Resource Recovery Account Proceedings”); and

 

 

General operating expenses.

SCE expects to meet its continuing obligations, including cash outflows for operating expenses, including power-procurement, through cash and equivalents on hand, operating cash flows and short-term borrowings, when necessary. Projected capital expenditures are expected to be financed through operating cash flows and the issuance of short-term and long-term debt and preferred equity.

SCE’s liquidity may be affected by, among other things, matters described in “Regulatory Matters” and “Commitments and Indemnities.”

Capital Expenditures

As discussed under the heading “Liquidity—Capital Expenditures” in the year-ended 2006 MD&A, SCE is experiencing significant growth in actual and planned capital expenditures to replace and expand its distribution and transmission infrastructure, and to construct and replace major components of generation assets. On February 22, 2007, the Finance Committee of the Board of Directors approved SCE’s 2007 through 2011 capital investment plan which includes total capital spending of up to $17.3 billion. During the first quarter of 2007, SCE spent $495 million for capital expenditures related to its 2007 capital plan.

Credit Ratings

At March 31, 2007, SCE’s credit ratings were as follows:

 

      Moody’s Rating    S&P Rating    Fitch Rating

Long-term senior secured debt

   A2    BBB+    A+

Short-term (commercial paper)

   P-2    A-2    F-1

SCE cannot provide assurance that its current credit ratings will remain in effect for any given period of time or that one or more of these ratings will not be changed. These credit ratings are not recommendations to buy, sell or hold its securities and may be revised at any time by a rating agency.

Dividend Restrictions and Debt Covenants

The CPUC regulates SCE’s capital structure and limits the dividends it may pay Edison International. In SCE’s most recent cost of capital proceeding, the CPUC set an authorized capital structure for SCE which included a common equity component of 48%. SCE determines compliance with this capital structure based on a 13-month weighted-average calculation. At March 31, 2007, SCE’s 13-month weighted-average common equity component of total capitalization was 49.48%. At March 31, 2007, SCE had the capacity to pay $171 million in additional dividends based on the 13-month weighted-average method. However, based on recorded March 31, 2007 balances, SCE’s common equity to total capitalization ratio (as adjusted for rate-making purposes) was 50.18%. SCE had the capacity to pay $252 million of additional dividends to Edison International based on March 31, 2007 recorded balances.

SCE has a debt covenant in its credit facility that requires a debt to total capitalization ratio of less than or equal to 0.65 to 1 to be met. At March 31, 2007, SCE’s debt to total capitalization ratio was 0.45 to 1.

 

24


Table of Contents

Margin and Collateral Deposits

SCE has entered into certain margining agreements for power and gas trading activities in support of its procurement plan as approved by the CPUC. SCE’s margin deposit requirements under these agreements can vary depending upon the level of unsecured credit extended by counterparties and brokers, changes in market prices relative to contractual commitments, and other factors. At March 31, 2007, SCE had a net deposit of $300 million (consisting of $36 million in cash and reflected in “Margin and collateral deposits” on the consolidated balance sheet and $264 million in letters of credit) with counterparties. In addition, SCE has deposited $40 million in letters of credit with other brokers. Cash deposits with brokers and counterparties earn interest at various rates.

REGULATORY MATTERS

Current Regulatory Developments

This section of the MD&A describes significant regulatory issues that may impact SCE’s financial condition or results of operations.

Impact of Regulatory Matters on Customer Rates

SCE is concerned about high customer rates, which were a contributing factor that led to the deregulation of the electric services industry during the mid-1990s. On January 1, 2007 SCE’s system average rate was 14.5¢ per-kWh (including 3.1¢ per-kWh related to CDWR which is not recognized as revenue by SCE). On February 14, 2007, SCE’s system average rate decreased to 13.9¢-per-kWh (including 3.0¢ per-kWh related to CDWR) mainly as the result of estimated lower natural gas prices in 2007, as well as the refund of overcollections in the ERRA balancing account that occurred in 2006 from lower than expected natural gas prices and higher than expected summer 2006 kWh sales (see “—Energy Resource Recovery Account Proceedings” below). In addition, the rate change incorporates the collection of the residential rate increase deferral discussed in the year-ended 2006 MD&A under the heading “Regulatory Matters—Current Regulatory Developments—Impact of Regulatory Matters on Customer Rates.”

Energy Resource Recovery Account Proceedings

As discussed under the heading “Regulatory Matters—Current Regulatory Developments—Energy Resource Recovery Account Proceedings” in the year-ended 2006 MD&A, the ERRA is the balancing account mechanism to track and recover SCE’s fuel and procurement-related costs. At December 31, 2006, the ERRA was overcollected by $526 million, which was 13.2% of SCE’s prior year’s generation revenue. On January 25, 2007, the CPUC approved SCE’s request to reduce the 2007 ERRA revenue requirement by $630 million. The CPUC also authorized SCE to consolidate the decreased ERRA revenue requirement with the authorized revenue requirement changes in other SCE proceedings resulting in lower rate levels implemented in February 2007. See “—Impact of Regulatory Matters on Customer Rates” above for further discussion. At March 31, 2007 the ERRA was overcollected by $605 million. The ERRA overcollection increased since December 31, 2006 mainly as a result of lower procurement costs recorded during the first quarter of 2007 compared to forecast costs incorporated into rates; however SCE still anticipates this overcollection will decrease during 2007, based on the reduced ERRA revenue requirement approved by the CPUC on January 25, 2007.

ISO Disputed Charges

As discussed under the heading “Regulatory Matters—Current Regulatory Developments—ISO Disputed Charges” in the year-ended 2006 MD&A, on April 20, 2004, the FERC issued an order concerning a dispute between the ISO and the Cities of Anaheim, Azusa, Banning, Colton and Riverside, California over the proper allocation and characterization of certain transmission service related charges. On March 29, 2007, the FERC

 

25


Table of Contents

issued an order agreeing with SCE’s position that the charges incurred by the ISO were related to voltage support and should be allocated to the scheduling coordinators, rather than to SCE as a transmission owner. The Cities filed a request for rehearing of the FERC’s order on April 27, 2007. SCE believes that the most recent FERC order correctly allocates responsibility for these ISO charges. However, SCE cannot provide assurance as to the final outcome of the Cities request for rehearing. If a subsequent regulatory decision changes the allocation of responsibility for these charges, and SCE is required to pay these charges as a transmission owner, SCE may seek recovery in its reliability service rates. SCE cannot provide any assurance that recovery of these charges in its reliability service rates would be permitted.

Peaker Plant Generation Projects

As discussed under the heading “Regulatory Matters—Current Regulatory Developments—Peaker Plant Generation Projects” in the year-ended 2006 MD&A, on August 15, 2006, the CPUC issued a ruling addressing electric reliability needs in Southern California for the summer of 2007 and directing, among other things, that SCE pursue new utility-owned peaker generation (which would be available on notice during peak demand periods) that would be online by August 2007. SCE continues to pursue the construction of five combustion turbine peaker plants, each with a capacity of approximately 45 MW. As of April 4, 2007, SCE had received construction permits for four of the five projects. SCE cannot predict when it will receive the permit for the fifth project and cannot estimate the impact that this delay will have on the project’s construction schedule. SCE believes that construction of all five peakers will help meet electric reliability needs, notwithstanding the delay encountered by one of the projects. SCE has revised its initial budget from $250 million to approximately $275 million for these projects. SCE expects to fully recover its costs from these projects, but cannot predict the outcome of regulatory proceedings. As of March 31, 2007 SCE had spent or firmly committed approximately $133 million.

Procurement of Renewable Resources

California law requires SCE to increase its procurement of renewable resources by at least 1% of its annual retail electricity sales per year so that 20% of its annual electricity sales are procured from renewable resources by no later than December 31, 2010.

On October 19, 2006, the CPUC issued a decision that, among other things, implemented a “cumulative deficit banking” feature which would carry forward and accumulate annual deficits until the deficit has been satisfied at a later time through actual deliveries of eligible renewable energy and made an accounting determination that defines the annual targets for each year of the renewable portfolio standards program. Based on terms of the controlling California statute, in March 2007, SCE successfully challenged the CPUC’s accounting determination of SCE’s annual targets. This change is expected to enable SCE to meet its target for 2007 and possibly later years.

On April 3, 2007, SCE filed its renewable portfolio standard compliance report for 2004 through 2006. The compliance report confirms that SCE met its renewable goals for each of these years. In light of the annual target revisions that resulted from the March 2007 successful challenge to the CPUC’s accounting determination, the report also projects that SCE will meet its renewable goals for 2007 and 2008 but could have a potential deficit in 2009. The potential deficit in 2009, however, does not take into account future procurement opportunities or the full utilization by SCE of the CPUC’s rules for flexible compliance with annual targets. SCE continues to engage in several initiatives to procure additional renewable resources, including formal solicitations approved by the CPUC, bilateral negotiations with individual projects and other initiatives.

Under current CPUC decisions, potential penalties for SCE’s failure to achieve its renewable procurement objectives for any year will be considered by the CPUC in the context of the CPUC’s review of SCE’s annual compliance filing. Under the CPUC’s current rules, the maximum penalty for failing to achieve renewable procurement targets is $25 million per year. SCE cannot predict whether it will be assessed penalties.

 

26


Table of Contents

FERC Refund Proceedings

SCE is participating in several related proceedings seeking recovery of refunds from sellers of electricity and natural gas who manipulated the electric and natural gas markets during the 2000 – 2001 California energy crisis or who benefited from the manipulation by receiving inflated market prices. SCE is required to refund to customers 90% of any refunds actually realized by SCE, net of litigation costs, and 10% will be retained by SCE as a shareholder incentive.

During the course of the refund proceedings, the FERC ruled that governmental power sellers, like private generators and marketers that sold into the California market, should refund the excessive prices they received during the crisis period. However, on September 21, 2005, the Ninth Circuit ruled that the FERC does not have authority directly to enforce its refund orders against governmental power sellers. The Court, however, clarified that its decision does not preclude SCE or other parties from pursuing civil claims against the governmental power sellers. On March 16, 2006, SCE, PG&E and the California Electricity Oversight Board jointly filed suit in federal court against several governmental power sellers, seeking damages based on the reduced prices set by the FERC for transactions during the crisis period. In March 2007, the federal court dismissed this suit concluding that the claims should have been filed in state court. SCE, along with PG&E, the Oversight Board and SDG&E, re-filed on April 9, 2007 in the Los Angeles Superior Court. In addition, on March 12, 2007, SCE, PG&E and the Oversight Board filed a similar group of claims in the U.S. Court of Federal Claims against two federal agencies that sold power into California during the energy crisis. SCE cannot predict whether it may be able to recover any damages from governmental power sellers as a result of these suits.

In November 2005, SCE and other parties entered into a settlement agreement with Enron Corporation and a number of its affiliates, most of which are debtors in Chapter 11 bankruptcy proceedings pending in New York. In 2006, SCE received distributions of approximately $55 million on its allowed bankruptcy claim . In April 2007, SCE received and recorded an additional distribution on its allowed bankruptcy claim of approximately $12 million and 55,465 shares of Portland General Electric Company stock, with an aggregate value of less than $2 million. Additional distributions are expected but SCE cannot currently predict the amount or timing of such distributions.

On August 2, 2006, the Ninth Circuit issued an opinion regarding the scope of refunds issued by the FERC. The Ninth Circuit broadened the time period during which refunds could be ordered to include the summer of 2000 based on evidence of pervasive tariff violations and broadened the categories of transactions that could be subject to refund. As a result of this decision, SCE may be able to recover additional refunds from sellers of electricity during the crisis with whom settlements have not been reached.

OTHER DEVELOPMENTS

Environmental Matters

SCE is subject to numerous federal and state environmental laws and regulations, which require them to incur substantial costs to operate existing facilities, construct and operate new facilities, and mitigate or remove the effect of past operations on the environment. SCE believes that its operating affiliates are in substantial compliance with existing environmental regulatory requirements.

SCE’s power plants, in particular their coal-fired plants, may be affected by recent developments in federal and state environmental laws and regulations. These laws and regulations, including those relating to SO2 and NOx emissions, mercury emissions, ozone and fine particulate matter emissions, regional haze, water quality, and climate change, may require significant capital expenditures at these facilities. These laws and regulations will continue to be monitored to assess what implications, if any, they will have on the operation of domestic power plants owned or operated by SCE, or the impact on SCE’s results of operations or financial position.

 

27


Table of Contents

For a discussion of SCE’s environmental matters, refer to “Other Developments—Environmental Matters” in the year-ended 2006 MD&A. There have been no significant developments with respect to environmental matters affecting SCE since the filing of SCE’s Annual Report on Form 10-K, except as follows:

Climate Change

On April 2, 2007, the United States Supreme Court issued an opinion in Massachusetts et. al. v. Environmental Protection Agency, et. al., ruling that US EPA has the authority to regulate greenhouse gas emissions of new motor vehicles under the Clean Air Act and that it has a duty to (i) determine whether greenhouse gas emissions of new motor vehicles contribute to climate change or (ii) offer a reasoned explanation for its failure to make such a determination when presented with a request for a rulemaking on the issue by the state claimants. The Court ruled that US EPA’s failure to make the necessary determination or offer a reasonable explanation for its refusal to do so was impermissible. While this case hinged on a provision of the Clean Air Act related to emissions of motor vehicles, a parallel provision of the Clean Air Act applies to stationary sources such as electric generators. SCE believes that the Court’s Massachusetts decision may spur additional congressional action to require reductions of greenhouse gas emissions by all material sources, including electric generators.

Environmental Remediation

SCE records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operations and maintenance, monitoring and site closure. Unless there is a probable amount, SCE records the lower end of this reasonably likely range of costs (classified as other long-term liabilities) at undiscounted amounts.

As of March 31, 2007, SCE’s recorded estimated minimum liability to remediate its 23 identified sites is $76 million. The ultimate costs to clean up SCE’s identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs could exceed its recorded liability by up to $125 million. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes. In addition to its identified sites (sites in which the upper end of the range of costs is at least $1 million), SCE also has 32 immaterial sites whose total liability ranges from $3 million (the recorded minimum liability) to $8 million.

The CPUC allows SCE to recover environmental remediation costs at certain sites, representing $29 million of its recorded liability, through an incentive mechanism (SCE may request to include additional sites). Under this mechanism, SCE will recover 90% of cleanup costs through customer rates; shareholders fund the remaining 10%, with the opportunity to recover these costs from insurance carriers and other third parties. SCE has successfully settled insurance claims with all responsible carriers. SCE expects to recover costs incurred at its remaining sites through customer rates. SCE has recorded a regulatory asset of $75 million for its estimated minimum environmental-cleanup costs expected to be recovered through customer rates.

SCE’s identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.

 

28


Table of Contents

SCE expects to clean up its identified sites over a period of up to 30 years. Remediation costs in each of the next several years are expected to range from $11 million to $31 million. Recorded costs for the twelve months ended March 31, 2007 were $16 million.

Based on currently available information, SCE believes it is unlikely that it will incur amounts in excess of the upper limit of the estimated range for its identified sites and, based upon the CPUC’s regulatory treatment of environmental remediation costs, SCE believes that costs ultimately recorded will not materially affect its results of operations or financial position. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to such estimates.

Federal and State Income Taxes

Edison International received Revenue Agent Reports from the IRS in August 2002 and in January 2005 asserting deficiencies in federal corporate income taxes with respect to audits of its 1994 – 1996 and 1997 – 1999 tax years, respectively. Edison International expects to conclude the administrative phase of the 1994 – 1996 tax years during the first half of 2007. Many of the asserted tax deficiencies are timing differences and, therefore, amounts ultimately paid (exclusive of penalties), if any, would be deductible on future tax returns of Edison International and would benefit SCE. Edison International has also submitted affirmative claims to the IRS and state tax agencies which are being addressed in administrative proceedings. Any benefits would be recorded at the earlier of when Edison International believes that the affirmative claim position has a more likely than not probability of being sustained or when a settlement is reached. Certain affirmative claims have been recorded as part of the implementation of FIN 48.

The IRS Revenue Agent Report for the 1997 – 1999 audit also asserted deficiencies with respect to a transaction entered into by an SCE subsidiary which may be considered substantially similar to a listed transaction described by the IRS as a contingent liability company. While Edison International and SCE intend to defend its tax return position with respect to this transaction, the tax benefits relating to this transaction have been valued at an amount equal to the settlement offer made by the Internal Revenue Service pursuant to FIN 48.

In April 2004, Edison International filed California Franchise Tax amended returns for tax years 1997 – 2002 to mitigate the possible imposition of new California penalty provisions on transactions that may be considered as listed or substantially similar to listed transactions described in an IRS notice that was published in 2001. These transactions include the SCE subsidiary contingent liability company transaction described above. Edison International filed these amended returns under protest retaining its appeal rights.

In December 2006, Edison International reached a settlement with the California Franchise Tax Board regarding the sourcing of gross receipts from the sale of electric services for California state tax apportionment purposes for tax years 1981 to 2004. In the fourth quarter of 2006, SCE recorded a $49 million benefit related to a tax reserve adjustment as a result of this settlement. In addition to this tax reserve adjustment, SCE received a net cash refund of $52 million in April 2007 as a result of this same settlement.

MARKET RISK EXPOSURES

SCE’s primary market risks include fluctuations in interest rates, commodity prices and volumes, and counterparty credit. Fluctuations in interest rates can affect earnings and cash flows. Fluctuations in commodity prices and volumes and counterparty credit losses may temporarily affect cash flows, but are not expected to affect earnings due to expected recovery through regulatory mechanisms. SCE uses derivative financial instruments, as appropriate, to manage its market risks.

Commodity Price Risk

As discussed under the heading “Market Risk Exposures—Commodity Price Risk” in the year-ended 2006 MD&A, SCE is exposed to commodity price risk associated with its purchases for additional capacity and

 

29


Table of Contents

ancillary services to meet its peak energy requirements as well as exposure to natural gas prices associated with power purchased from QFs, fuel tolling arrangements, and its own gas-fired generation, including the Mountainview plant.

SCE has an active hedging program in place to minimize ratepayer exposure to spot-market price spikes; however, to the extent that SCE does not mitigate the exposure to commodity price risk, the unhedged portion is subject to the risks and benefits of spot-market price movements, which are ultimately passed-through to ratepayers.

To mitigate SCE’s exposure to spot-market prices, SCE entered into energy options, tolling arrangements, and forward physical contracts. In the first quarter of 2007 SCE secured FTRs through the annual ISO auction. These FTRs provide SCE with scheduling priority in certain transmission grid congestion areas in the day-ahead market and qualify as derivative instruments. SCE records its derivative instruments on its consolidated balance sheets at fair value unless they meet the definition of a normal purchase or sale. The normal purchases and sales exception requires, among other things, physical delivery in quantities expected to be used or sold over a reasonable period in the normal course of business. SCE enters into contracts for power and gas options, as well as swaps and futures, in order to mitigate its exposure to increases in natural gas and electricity pricing. These transactions are pre-approved by the CPUC or executed in compliance with CPUC-approved procurement plans. The derivative instrument fair values are marked to market at each reporting period. Any fair value changes for recorded derivatives are recorded in purchased-power expense and offset through the provision for regulatory adjustment clauses – net; therefore, fair value changes do not affect earnings. Hedge accounting is not used for these transactions due to this regulatory accounting treatment. The following table summarizes the fair values of outstanding derivative financial instruments used at SCE to mitigate its exposure to spot market prices:

 

     March 31, 2007    December 31, 2006
In millions    Assets    Liabilities    Assets    Liabilities

Energy options

   $    $ 27    $    $ 10

FTRs

     102               

Forward physicals (power) and tolling arrangements

     10                1

Gas options, swaps and forward arrangements

     27                101

Total

   $     139    $     27    $     —    $     112

Quoted market prices, if available, are used for determining the fair value of contracts, as discussed above. If quoted market prices are not available, internally maintained standardized or industry accepted models are used to determine the fair value. The models are updated with spot prices, forward prices, volatilities and interest rates from regularly published and widely distributed independent sources.

SCE recorded net unrealized gains of $134 million for the first quarter of 2007, compared to net unrealized losses of $334 million for the first quarter of 2006. The 2007 net unrealized gains were primarily due to higher forward natural gas prices in the first quarter of 2007 compared to the same period in 2006.

 

30


Table of Contents

RESULTS OF OPERATIONS AND HISTORICAL CASH FLOW ANALYSIS

The following subsections of “Results of Operations and Historical Cash Flow Analysis” provide a discussion on the changes in various line items presented on the Consolidated Statements of Income, as well as a discussion of the changes on the Consolidated Statements of Cash Flows.

Results of Operations

Net Income Available for Common Stock

SCE’s net income available for common stock in the first quarter of 2007 was $180 million, compared with $121 million in the first quarter of 2006. The increase was mainly due to earnings of $31 million reflecting progress in an administrative appeal process with the IRS related to the income tax treatment of costs associated with environmental remediation. In addition, earnings increased due to the delay in receiving the 2006 GRC decision. When the decision was received in May 2006, SCE was authorized to recover its revenue requirement effective back to January 12, 2006.

Operating Revenue

The following table sets forth the major changes in operating revenue:

 

In millions    2007 vs. 2006  

Operating revenue

  

Rate changes (including unbilled)

   $ 127  

Sales volume changes (including unbilled)

          66  

Balancing account over/under collections

     (128 )

Sales for resale

     (31 )

SCE’s VIEs

     (23 )

Other (including inter company transactions)

     (6 )

Total

   $ 5  

SCE’s retail sales represented approximately 88% and 85% of operating revenue for the quarters ended March 31, 2007 and 2006, respectively. Due to warmer weather during the summer months, operating revenue during the third quarter of each year is generally significantly higher than other quarters.

Total operating revenue increased by $5 million for the three-month period ended 2007 (as shown in the table above). The increase resulting from rate changes was primarily due to the delay in implementing the decreased ERRA revenue requirement resulting in increased rates in the first quarter of 2007 (see “Regulatory Matters—Current Regulatory Developments—Impact of Regulatory Matters on Customer Rates,” and “—Energy Resource Recovery Account Proceedings” for further discussion of these rate changes). The increase in operating revenue resulting from sales volume changes was mainly due to an increase in customer growth. Balancing account over/undercollections represent the difference between recorded retail revenue and authorized retail revenue that is subject to regulatory balancing account mechanisms. Recorded retail revenue exceeded authorized revenue resulting in a revenue deferral of approximately $21 million for the three-month period ended March 31, 2007. For the same period in 2006, authorized revenue exceeded recorded revenue resulting in a revenue recognition of approximately $107 million. Operating revenue from sales for resale represents the sale of excess energy. Excess energy from SCE sources which may exist at certain times is resold in the energy markets. Sales for resale revenue decreased due to lower excess energy resulting from higher demand from customer growth in the first quarter of 2007, as compared to the same period in 2006. Revenue from sales for resale is refunded to customers through the ERRA balancing account and does not impact earnings. SCE’s VIE revenue represents the recognition of revenue resulting from the consolidation of four gas-fired power plants where SCE is considered the primary beneficiary. These VIEs affect SCE’s revenue, but do not affect earnings; the decrease in revenue from SCE’s VIEs is primarily due to lower steam and energy prices and for, one of the projects, lower volumes sold in 2007.

 

31


Table of Contents

Amounts SCE bills and collects from its customers for electric power purchased and sold by the CDWR to SCE’s customers, CDWR bond-related costs and a portion of direct access exit fees are remitted to the CDWR and none of these collections are recognized as revenue by SCE. These amounts were $587 million and $568 million for the three-month periods ended March 31, 2007 and 2006, respectively.

Operating Expenses

Fuel Expense

SCE’s fuel expense decreased slightly for the three-month period ended March 31, 2007. The decrease was mainly due to lower fuel expense of approximately $40 million related to SCE’s VIEs driven by lower natural gas prices and lower fuel expense of approximately $5 million at SCE’s Mohave Generating Station resulting from the plant shutdown on December 31, 2005. These decreases were almost entirely offset by an increase of $20 million primarily resulting from newly constructed Mountainview Unit 4 beginning operations mid-January 2006, higher nuclear fuel expense of $15 million resulting primarily from a planned refueling and maintenance outages at SCE’s San Onofre Unit 2 in 2006, and a Department of Energy settlement refund of approximately $10 million related to crude oil overcharges in 2006. The settlement refund was returned to ratepayers through the ERRA mechanism.

Purchased-Power Expense

The following is a summary of purchased-power expense:

 

In millions     Three-Month Period Ended March 31,    2007      2006

Purchased-power expense

   $ 480      $ 688

Unrealized (gains) / losses on economic hedging activities

     (134 )      334
Energy settlements and refunds    (29)      (9)

Total purchased-power expense

   $     317      $     1,013

Purchased-power expense decreased $696 million for the three-month period ended March 31, 2007. The 2007 decrease was mainly due to net unrealized gains on economic hedging activities of $134 million, compared to net unrealized losses on economic hedging activities of $334 million for the same period in 2006 (see “Market Risk Exposures—Commodity Price Risk” for further discussion). The 2007 net unrealized gains were primarily due to higher forward natural gas prices in the first quarter of 2007, compared to the same period in 2006. In addition, the purchased-power decrease was also due to lower QF purchased power expense of approximately $60 million resulting from lower average spot natural gas prices and lower kWh purchases (as further discussed below), and lower ISO-related purchases of approximately $110 million resulting from lower kWh purchases.

Federal law and CPUC orders required SCE to enter into contracts to purchase power from QFs at CPUC-mandated prices. Energy payments to gas-fired QFs are generally tied to spot natural gas prices. Energy payments for most renewable QFs are at a fixed price of 5.37¢-per-kWh. In late 2006, certain renewable QF contracts were amended and energy payments for these contracts will be at a fixed price of 6.15¢-per-kWh, effective May 2007.

Provisions for Regulatory Adjustment Clauses – Net

Provisions for regulatory adjustment clauses – net increased $652 million for the three-month period ended March 31, 2007. The 2007 increase was mainly due to net unrealized gains on economic hedging activities (mentioned above in purchased-power expense) of approximately $134 million for the three-month period ended March 31, 2007, that, if realized, would be refunded to ratepayers, compared to net unrealized losses on economic hedging activities of $334 million for the three-month period ended March 31, 2006, which, if realized,

 

32


Table of Contents

would be recovered from the ratepayers (see “Market Risk Exposures—Commodity Price Risk” for further discussion). The increase also reflects higher net overcollections of purchased-power, fuel, and operation and maintenance expense of approximately $185 million resulting from higher rates and lower procurement costs for the three-month period ended March 31, 2007, compared to the same period in 2006.

Other Operation and Maintenance Expense

SCE’s other operation and maintenance expense decreased $16 million for the three-month period ended March 31, 2007. The 2007 decrease was mainly due to higher generation-related costs of approximately $25 million resulting from the planned refueling and maintenance outages at SCE’s San Onofre Units 2 and 3 for the first quarter 2006, and a decrease in must-run and must offer obligation costs of approximately $10 million related to the reliability of the California ISO systems. This decrease was partially offset by higher demand-side management and energy efficiency costs of approximately $25 million (which are recovered through regulatory mechanisms approved by the CPUC).

Depreciation, Decommissioning and Amortization Expense

SCE’s depreciation, decommissioning and amortization expense increased $23 million for the three-month period ended March 31, 2007. The increase in 2007 was mainly due to an increase in depreciation expense resulting from additions to transmission and distribution assets, as well as an increase from the implementation of the depreciation rates authorized in the 2006 GRC decision, and higher net investment earnings from SCE’s nuclear decommissioning trusts, which, due to its regulatory treatment, are recorded in operating revenue and are offset in decomissioning expense. As a result, these investment earnings have no impact on net income.

Other Income and Deductions

Other Nonoperating Income

SCE’s other nonoperating income decreased $10 million for the three-month period ended March 31, 2007 mainly due to an higher incentive rewards in 2006 related to the efficient operation of Palo Verde. The incentive reward approved by the CPUC for the efficient operation of Palo Verde was $13 million in the first quarter of 2006. This decrease was partially offset by an increase in allowance for funds used during construction – equity of approximately $5 million resulting from an increase in construction work in progress due to planned capital expenditures (see “Liquidity—Capital Expenditures” for further discussion).

Interest Expense – Net of Amounts Capitalized

SCE’s interest expense – net of amounts capitalized increased $10 million for the three-month period ended March 31, 2007 mainly due to higher interest expense on balancing account overcollections in 2007, as compared to 2006. The increase was also due to higher interest expense on long-term debt resulting from higher balances outstanding as of March 31, 2007, compared to the same period in 2006.

Income Tax Expense

The composite federal and state statutory income tax rate was approximately 40% (net of the federal benefit for state income taxes) for all periods presented. SCE’s effective tax rate from net income was 22% for the three-month period ended March 31, 2007 as compared to 38% for the three-month period ended March 31, 2006. The decreased effective tax rate was primarily caused by reductions made to the income tax reserve in 2007 to reflect progress in an administrative appeal process with the IRS related to the income tax treatment of costs associated with environmental remediation.

Historical Cash Flow Analysis

The “Historical Cash Flow Analysis” section of this MD&A discusses consolidated cash flows from operating, financing and investing activities.

 

33


Table of Contents

Cash Flows from Operating Activities

Cash provided by operating activities from continuing operations was $664 million for the three months ended 2007, compared to $320 million for the comparable period in 2006, mainly due to an increase in cash collected from SCE’s customers due to increased rates (see “Regulatory Matters—Current Regulatory Developments—Impact of Regulatory Matters on Customer Rates”) which contributed to higher balancing account overcollections in 2007, as compared to the same period in 2006. In addition, the 2007 change was also due to the timing of cash receipts and disbursements related to working capital items.

Cash Flows from Financing Activities

Cash used by financing activities from continuing operations mainly consisted of long-term and short-term debt payments.

Financing activities in the first quarter of 2007 were as follows:

 

 

During the first quarter of 2007, SCE issued $120 million in commercial paper classified as short-term debt.

 

 

Financing activities in the first quarter of 2007 also included dividend payments of $60 million made to Edison International.

Financing activities in the first quarter of 2006 included activities related to the rebalancing of SCE’s capital structure.

 

 

In January 2006, SCE issued $500 million of first and refunding mortgage bonds which consisted of $350 million of 5.625% bonds due in 2036 and $150 million of floating rate bonds due in 2009. The proceeds from this issuance were used in part to redeem $150 million of variable rate first and refunding mortgage bonds due in January 2006 and $200 million of its 6.375% first and refunding mortgage bonds due in January 2006.

 

 

In January 2006, SCE issued two million shares of 6% Series C preference stock (noncumulative, $100 liquidation value) and received net proceeds of $197 million.

 

 

Financing activities in the first quarter of 2006 also included dividend payments of $71 million made to Edison International.

Cash Flows from Investing Activities

Cash flows from investing activities are affected by capital expenditures and SCE’s funding of nuclear decommissioning trusts.

Investing activities include capital expenditures of $560 million and $494 million for the three months ended March 31, 2007 and 2006, respectively, primarily for transmission and distribution assets. Capital expenditures include $20 million and $17 million for the three months ended March 31, 2007 and 2006, respectively, for nuclear fuel acquisitions.

NEW ACCOUNTING PRONOUNCEMENTS

Accounting Pronouncement Adopted

In July 2006, the FASB issued FIN 48 which clarifies the accounting for uncertain tax positions. FIN 48 requires an enterprise to recognize, in its financial statements, the best estimate of the impact of a tax position by determining if the weight of the available evidence indicates it is more likely than not, based solely on the technical merits, that the position will be sustained on audit. SCE adopted FIN 48 effective January 1, 2007. Based on the current status of discussions with tax authorities related to open tax years under audit and other information currently available, implementation of FIN 48 resulted in a cumulative-effect adjustment that increased retained earnings by $213 million. SCE will continue to monitor and assess new income tax developments.

 

34


Table of Contents

Accounting Pronouncements Not Yet Adopted

In February 2007, the FASB issued SFAS No. 159, which provides an option to report eligible financial assets and liabilities at fair value, with changes in fair value recognized in earnings. Upon adoption, the first remeasurement to fair value would be reported as a cumulative-effect adjustment to the opening balance of retained earnings. SCE will adopt SFAS No. 159 on January 1, 2008. SCE is currently evaluating the impact of adopting SFAS No. 159 on its consolidated financial statements.

In September 2006, the FASB issued. SFAS No. 157, which clarifies the definition of fair value, establishes a framework for measuring fair value and expands the disclosures on fair value measurements. SCE will adopt SFAS No. 157 on January 1, 2008. SCE is currently evaluating the impact of adopting SFAS No. 157 on its financial statements.

COMMITMENTS AND INDEMNITIES

Fuel Supply Contracts

SCE entered into service contracts associated with uranium enrichment and fuel fabrication during the first three months of 2007. SCE’s additional nuclear fuel commitments for the remainder of 2007 are estimated to be $70 million.

Operating and Capital Leases

SCE entered into a new operating lease for power contracts during the first three months of 2007. SCE’s additional operating lease commitments for this new power contract are currently estimated to be $68 million for 2008, $114 million for 2009, $114 million for 2010, and $114 million for 2011.

 

Item  3. Quantitative and Qualitative Disclosures About Market Risk

Information responding to Part I, Item 3 is included in Part I, Item 2, “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” under the heading “Market Risk Exposures” is incorporated herein by this reference.

 

Item  4. Controls and Procedures

Disclosure Controls and Procedures

SCE’s management, under the supervision and with the participation of the company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of SCE’s disclosure controls and procedures (as that term is defined in Rules 13a-15(e) or 15d-15(e) under the Securities Exchange Act of 1934, as amended (the Exchange Act)) as of the end of the period covered by this report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period, SCE’s disclosure controls and procedures are effective.

Internal Control Over Financial Reporting

There were no changes in SCE’s internal control over financial reporting (as that term is defined in Rules 13a-15(f) or 15d-15(f) under the Exchange Act) during the quarter to which this report relates that have materially affected, or are reasonably likely to materially affect, SCE’s internal control over financial reporting.

 

35


Table of Contents

PART II. OTHER INFORMATION

 

Item  6. Exhibits

Southern California Edison Company

 

10.1    Edison International 2007 Long-Term Incentives Terms and Conditions (File No. 1-9936, filed as Exhibit 10.1 to Edison International’s Form 10-Q for the quarter ended March 31, 2007)*
10.2    Edison International Director Non-Qualified Stock Option Terms and Conditions (File No. 1-9936, filed as Exhibit 10.2 to Edison International’s Form 10-Q for the quarter ended March 31, 2007)*
10.3    Edison International 2007 Performance Incentive Plan (File No. 1-9936, filed as Exhibit A to the Edison International and Southern California Edison Company Joint Proxy Statement filed on March 16, 2007)*
10.4    Edison International 2007 Executive Bonus Program (File No. 1-2313, filed as Exhibit 10.2 to Southern California Edison’s Form 8-K dated April 26, 2007 and filed on May 2, 2007)*
10.5    Amended and Restated Credit Agreement, dated as of February 23, 2007, among Southern California Edison Company and JPMorgan Chase Bank, N.A., as Administrative Agent, Citicorp North America, Inc., as Syndication Agent, and Credit Suisse, Lehman Commercial Paper Inc., and Wells Fargo Bank, N.A., as documentation Agents and the lenders thereto.
31.1    Certification of the Chief Executive Officer pursuant to Section 302 of the Sarbanes-Oxley Act
31.2    Certification of the Chief Financial Officer pursuant to Section 302 of the Sarbanes-Oxley Act
32    Statement Pursuant to 18 U.S.C. Section 1350

* Incorporated herein by reference pursuant to Rule 12b-32.

 

36


Table of Contents

SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 

SOUTHERN CALIFORNIA EDISON COMPANY

(Registrant)

By

  /s/    LINDA G. SULLIVAN        
 

Linda G. Sullivan

Vice President and Controller

(Duly Authorized Officer and

Principal Accounting Officer)

Dated: May 9, 2007

 

37