Annual Statements Open main menu

SOUTHERN CALIFORNIA EDISON Co - Quarter Report: 2022 September (Form 10-Q)

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

(Mark One)

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended   September 30, 2022

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                        to

Commission
File Number

   

Exact Name of Registrant
as specified in its charter

State or Other Jurisdiction of
Incorporation or Organization

   

IRS Employer
Identification Number

1-9936

EDISON INTERNATIONAL

California

95-4137452

1-2313

SOUTHERN CALIFORNIA EDISON COMPANY

California

95-1240335

EDISON INTERNATIONAL

SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue

2244 Walnut Grove Avenue

(P.O. Box 976)

(P.O. Box 800)

Rosemead, California 91770

Rosemead, California 91770

(Address of principal executive offices)

(Address of principal executive offices)

(626) 302-2222

(626) 302-1212

(Registrant's telephone number, including area code)

(Registrant's telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Act:

Edison International:

Title of each class

Trading Symbol(s)

Name of each exchange on which registered

Common Stock, no par value

EIX

NYSE LLC

Southern California Edison Company: None.

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Edison International

Yes  No 

Southern California Edison Company

Yes  No 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Edison International

Yes  No 

Southern California Edison Company

Yes  No 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of "large accelerated filer," accelerated filer," "smaller reporting company," and "emerging growth company" in Rule 12b-12 of the Exchange Act.

Edison International

   

Large Accelerated Filer

   

Accelerated Filer

   

Non-accelerated Filer

   

Smaller Reporting Company

   

Emerging growth company

Southern California Edison Company

Large Accelerated Filer

Accelerated Filer

Non-accelerated Filer

Smaller Reporting Company

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.

Edison International

Southern California Edison Company

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Edison International

Yes  No 

Southern California Edison Company

Yes No 

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:

Common Stock outstanding as of October 25, 2022:

Edison International

381,874,674 Shares

Southern California Edison Company

434,888,104 Shares

Table of Contents

TABLE OF CONTENTS

SEC Form 10-Q

Reference Number

GLOSSARY

iv

FORWARD-LOOKING STATEMENTS

1

MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

4

Part I, Item 2

MANAGEMENT OVERVIEW

4

Highlights of Operating Results

4

Cost of Capital Applications

6

Capital Program

6

Southern California Wildfires and Mudslides

8

Upstream Lighting Program

10

RESULTS OF OPERATIONS

11

Southern California Edison Company

11

Three months ended September 30, 2022 versus September 30, 2021

12

Earning Activities

12

Cost-Recovery Activities

14

Nine months ended September 30, 2022 versus September 30, 2021

14

Earning Activities

15

Cost-Recovery Activities

16

Supplemental Operating Revenue Information

17

Income Taxes

17

Edison International Parent and Other

17

Loss from Operations

17

LIQUIDITY AND CAPITAL RESOURCES

18

Southern California Edison Company

18

Available Liquidity

19

Regulatory Proceedings

19

Capital Investment Plan

21

SCE Dividends

22

Margin and Collateral Deposits

22

Edison International Parent and Other

23

Edison International Income taxes

24

Historical Cash Flows

25

Southern California Edison Company

25

Edison International Parent and Other

28

Contingencies

29

MARKET RISK EXPOSURES

29

i

Table of Contents

Commodity Price Risk

29

Credit Risk

29

CRITICAL ACCOUNTING ESTIMATES AND POLICIES

30

NEW ACCOUNTING GUIDANCE

31

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

31

Part I, Item 3

FINANCIAL STATEMENTS

32

Part I, Item 1

Edison International Consolidated Statements of Income

32

Edison International Consolidated Statements of Comprehensive Income

33

Edison International Consolidated Balance Sheets

34

Edison International Consolidated Statements of Cash Flows

36

SCE Consolidated Statements of Income

37

SCE Consolidated Statements of Comprehensive Income

37

SCE Consolidated Balance Sheets

38

SCE Consolidated Statements of Cash Flows

40

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

41

Note 1. Summary of Significant Accounting Policies

41

Note 2. Consolidated Statements of Changes in Equity

45

Note 3. Variable Interest Entities

48

Note 4. Fair Value Measurements

51

Note 5. Debt and Credit Agreements

54

Note 6. Derivative Instruments

55

Note 7. Revenue

58

Note 8. Income Taxes

59

Note 9. Compensation and Benefit Plans

61

Note 10. Investments

62

Note 11. Regulatory Assets and Liabilities

64

Note 12. Commitments and Contingencies

66

Note 13. Equity

78

Note 14. Accumulated Other Comprehensive Loss

79

Note 15. Other Income

80

Note 16. Supplemental Cash Flows Information

80

Note 17. Related-Party Transactions

80

CONTROLS AND PROCEDURES

82

Part I, Item 4

Disclosure Controls and Procedures

82

Changes in Internal Control Over Financial Reporting

82

Jointly Owned Utility Plant

82

LEGAL PROCEEDINGS

82

Part II, Item 1

2017/2018 Wildfire/Mudslide Events

82

ii

Table of Contents

Environmental Proceedings

83

EXHIBITS

84

Part II, Item 6

SIGNATURES

85

This is a combined Form 10-Q separately filed by Edison International and Southern California Edison Company. Information contained herein relating to an individual company is filed by such company on its own behalf.

iii

Table of Contents

GLOSSARY

The following terms and abbreviations appearing in the text of this report have the meanings indicated below.

2017/2018 Wildfire/Mudslide Events

    

the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire, collectively

2021 Form 10-K

Edison International's and SCE's combined Annual Report on Form 10-K for the year ended December 31, 2021

AB 1054

California Assembly Bill 1054, executed by the governor of California on July 12, 2019

AB 1054 Excluded Capital Expenditures

 

approximately $1.6 billion in wildfire risk mitigation capital expenditures that SCE has excluded from the equity portion of SCE's rate base as required under AB 1054

AB 1054 Liability Cap

a cap on the aggregate requirement to reimburse the Wildfire Insurance Fund over a trailing three calendar year period which applies if certain conditions are met and is equal to 20% of the equity portion of the utility's transmission and distribution rate base, excluding general plant and intangibles, in the year of the applicable prudency determination

ARO(s)

asset retirement obligation(s)

BRRBA

 

Base Revenue Requirement Balancing Account

CAISO

 

California Independent System Operator

Capital Structure Compliance Period

January 1, 2020 to December 31, 2022, the current compliance period for SCE's CPUC authorized capital structure

CAPP

California Arrearage Payment Program

CCAs

 

community choice aggregators which are cities, counties, and certain other public agencies with the authority to generate and/or purchase electricity for their local residents and businesses

CCC

California Coastal Commission

CDP

Coastal Development Permit

CEMA

Catastrophic Event Memorandum Accounts

COVID-19

Coronavirus disease 2019

CPUC

California Public Utilities Commission

CSRP

Customer Service Re-platform, a SCE project to implement a new customer service system

Edison Energy

 

Edison Energy, LLC, an indirect wholly-owned subsidiary of Edison International, is engaged in the competitive business of providing integrated decarbonization and energy solutions to commercial, institutional and industrial customers

EIS

Edison Insurance Services, Inc., a wholly-owned subsidiary of Edison International, is licensed to provide insurance to Edison International and its subsidiaries.

Electric Service Provider

 

an entity that offers electric power and ancillary services to retail customers, other than electrical corporations (like SCE) and CCAs

ERRA

 

Energy Resource Recovery Account

FERC

 

Federal Energy Regulatory Commission

FHPMA

 

Fire Hazard Prevention Memorandum Account

Fitch

Fitch Ratings, Inc.

GAAP

generally accepted accounting principles

GHG

greenhouse gas

GRC

general rate case

GS&RP

    

Grid Safety and Resiliency Program

Koenigstein Fire

a wind-driven fire that originated near Koenigstein Road in the City of Santa Paula in Ventura County, California, on December 4, 2017

Local Public Entity Settlements

settlements entered into in the fourth quarter of 2019 under which SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Wildfire/Mudslide Events

iv

Table of Contents

MD&A

Management's Discussion and Analysis of Financial Condition and Results of Operations

Montecito Mudslides

the debris flows and flooding in Montecito, Santa Barbara County, California, that occurred in January 2018

Moody's

Moody's Investors Service, Inc.

NERC

North American Electric Reliability Corporation

NRC

Nuclear Regulatory Commission

OEIS

Office of Energy Infrastructure Safety of the California Natural Resources Agency

PABA

Portfolio Allocation Balancing Account

Palo Verde

nuclear electric generating facility located near Phoenix, Arizona in which SCE holds a 15.8% ownership interest

PBOP(s)

postretirement benefits other than pension(s)

PG&E

Pacific Gas & Electric Company

Post-2018 Wildfires

collectively, all the wildfires that originated in Southern California after 2018 where SCE's equipment may be alleged to be associated with the fire's ignition

PSPS

Public Safety Power Shutoff(s)

ROE

return on common equity

RPS

California's Renewables Portfolio Standard

S&P

Standard & Poor's Financial Services LLC

San Onofre

retired nuclear generating facility located in south San Clemente, California in which SCE holds a 78.21% ownership interest

SCE

Southern California Edison Company, a wholly-owned subsidiary of Edison International

SCE Recovery Funding LLC

a bankruptcy remote, wholly owned special purpose subsidiary, consolidated by SCE

SDG&E

San Diego Gas & Electric

SEC

U.S. Securities and Exchange Commission

SED

Safety and Enforcement Division of the CPUC

SED Agreement

An agreement dated October 21, 2021 between SCE and the SED

Thomas Fire

a wind-driven fire that originated in the Anlauf Canyon area of Ventura County, California, on December 4, 2017

TKM

collectively, the Thomas Fire, the Koenigstein Fire and the Montecito Mudslides

TKM Subrogation Plaintiffs

the plaintiffs party to the TKM Subrogation Settlement, representing all the insurance subrogation plaintiffs in the TKM litigation at the time of the settlement

TKM Subrogation Settlement

a settlement entered into by Edison International and SCE in September 2020 in the TKM litigation to which the TKM Subrogation Plaintiffs are party

WCCP

Wildfire Covered Conductor Program

WEMA

Wildfire Expense Memorandum Account

WMP

a wildfire mitigation plan required to be filed under AB 1054 to describe a utility's plans to construct, operate, and maintain electrical lines and equipment that will help minimize the risk of catastrophic wildfires caused by such electrical lines and equipment

Wildfire Insurance Fund

the insurance fund established under AB 1054

Woolsey Fire

a wind-driven fire that originated in Ventura County in November 2018

Woolsey Subrogation Plaintiffs

the plaintiffs party to the Woolsey Subrogation Settlement, representing all the insurance subrogation plaintiffs in the Woolsey Fire litigation at the time of the settlement

Woolsey Subrogation Settlement

a settlement entered into by Edison International and SCE in January 2021 in the Woolsey litigation to which the Woolsey Subrogation Plaintiffs are party

v

Table of Contents

FORWARD-LOOKING STATEMENTS

This quarterly report on Form 10-Q contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect Edison International's and SCE's current expectations and projections about future events based on Edison International's and SCE's knowledge of present facts and circumstances and assumptions about future events and include any statements that do not directly relate to a historical or current fact. Other information distributed by Edison International and SCE that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "projects," "intends," "plans," "probable," "may," "will," "could," "would," "should," and variations of such words and similar expressions, or discussions of strategy or plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ from those currently expected, or that otherwise could impact Edison International and SCE, include, but are not limited to the:

ability of SCE to recover its costs through regulated rates, including uninsured wildfire-related and debris flow-related costs, costs incurred to mitigate the risk of utility equipment causing future wildfires, costs incurred as a result of the COVID-19 pandemic, and increased labor and materials costs due to supply chain constraints and inflation;
ability of SCE to implement its WMP and capital program;
risks of regulatory or legislative restrictions that would limit SCE's ability to implement operational measures to mitigate wildfire risk, including PSPS and fast curve settings, when conditions warrant or would otherwise limit SCE's operational practices relative to wildfire risk mitigation;
risks associated with implementing PSPS, including regulatory fines and penalties, claims for damages and reputational harm;
ability of SCE to maintain a valid safety certification;
ability to obtain sufficient insurance at a reasonable cost, including insurance relating to wildfire-related claims, and to recover the costs of such insurance or, in the event liabilities exceed insured amounts, the ability to recover uninsured losses from customers or other parties;
extreme weather-related incidents (including events caused, or exacerbated, by climate change, such as wildfires, debris flows, droughts, high wind events and extreme heat events) and other natural disasters (such as earthquakes), which could cause, among other things, public safety issues, property damage, rotating outages and other operational issues (such as issues due to damaged infrastructure), PSPS activations and unanticipated costs;
risk that AB 1054 does not effectively mitigate the significant exposure faced by California investor-owned utilities related to liability for damages arising from catastrophic wildfires where utility facilities are alleged to be a substantial cause, including the longevity of the Wildfire Insurance Fund and the CPUC's interpretation of and actions under AB 1054, including its interpretation of the prudency standard established under AB 1054;
ability of Edison International and SCE to effectively attract, manage, develop and retain a skilled workforce, including its contract workers;
decisions and other actions by the CPUC, the FERC, the NRC and other governmental authorities, including decisions and actions related to nationwide or statewide crisis, determinations of authorized rates of return or return on equity, the recoverability of wildfire-related and debris flow-related costs, issuance of SCE's wildfire safety certification, wildfire mitigation efforts, approval and implementation of electrification programs, and delays in executive, regulatory and legislative actions;

1

Table of Contents

cost and availability of labor, equipment and materials, including as a result of supply chain constraints;
ability of Edison International or SCE to borrow funds and access bank and capital markets on reasonable terms;
risks associated with the decommissioning of San Onofre, including those related to worker and public safety, public opposition, permitting, governmental approvals, on-site storage of spent nuclear fuel and other radioactive material, delays, contractual disputes, and cost overruns;
pandemics, such as COVID-19, and other events that cause regional, statewide, national or global disruption, which could impact, among other things, Edison International's and SCE's business, operations, cash flows, liquidity and/or financial results and cause Edison International and SCE to incur unanticipated costs;
physical security of Edison International's and SCE's critical assets and personnel and the cybersecurity of Edison International's and SCE's critical information technology systems for grid control, and business, employee and customer data;
risks associated with cost allocation resulting in higher rates for utility bundled service customers because of possible customer bypass or departure for other electricity providers such as CCAs and Electric Service Providers;
risks inherent in SCE's capital investment program, including those related to project site identification, public opposition, environmental mitigation, construction, permitting, changes in the CAISO's transmission plans, and governmental approvals;
risks associated with the operation of electrical facilities, including worker and public safety issues, the risk of utility assets causing or contributing to wildfires, failure, availability, efficiency, and output of equipment and facilities, and availability and cost of spare parts;
actions by credit rating agencies to downgrade Edison International or SCE's credit ratings or to place those ratings on negative watch or negative outlook;
changes in tax laws and regulations, at both the state and federal levels, or changes in the application of those laws, that could affect recorded deferred tax assets and liabilities and effective tax rate;
changes in future taxable income, or changes in tax law, that would limit Edison International's and SCE's realization of expected net operating loss and tax credit carryover benefits prior to expiration;
changes in the fair value of investments and other assets;
changes in interest rates and rates of inflation, including escalation rates (which may be adjusted by public utility regulators);
governmental, statutory, regulatory, or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market adopted by the NERC, CAISO, Western Electricity Council, and similar regulatory bodies in adjoining regions, and changes in the United States' and California's environmental priorities that lessen the importance the state places on GHG reduction;
availability and creditworthiness of counterparties and the resulting effects on liquidity in the power and fuel markets and/or the ability of counterparties to pay amounts owed in excess of collateral provided in support of their obligations;
potential for penalties or disallowance for non-compliance with applicable laws and regulations, including fines, penalties and disallowances related to wildfires where SCE's equipment is alleged to be associated with ignition; and

2

Table of Contents

cost of fuel for generating facilities and related transportation, which could be impacted by, among other things, disruption of natural gas storage facilities, to the extent not recovered through regulated rate cost escalation provisions or balancing accounts.

Additional information about risks and uncertainties, including more detail about the factors described in this report, is contained throughout this report and in the 2021 Form 10-K, including the "Risk Factors" section. Readers are urged to read this entire report, including information incorporated by reference, as well as the 2021 Form 10-K, and carefully consider the risks, uncertainties, and other factors that affect Edison International's and SCE's businesses. Forward-looking statements speak only as of the date they are made and neither Edison International nor SCE are obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Edison International and SCE with the SEC. Edison International and SCE post or provide direct links to (i) certain SCE and other parties' regulatory filings and documents with the CPUC and the FERC and certain agency rulings and notices in open proceedings in a section titled "SCE Regulatory Highlights," (ii) certain documents and information related to Southern California wildfires which may be of interest to investors in a section titled "Southern California Wildfires," and (iii) presentations, documents and information that may be of interest to investors in a section titled "Presentations and Updates" at www.edisoninvestor.com in order to publicly disseminate such information. The reports, presentations, documents and information contained on, or connected to, the Edison investor website are not deemed part of, and are not incorporated by reference into, this report.

The MD&A for the nine months ended September 30, 2022 discusses material changes in the consolidated financial condition, results of operations and other developments of Edison International and SCE since December 31, 2021 and as compared to the nine months ended September 30, 2021. This discussion presumes that the reader has read or has access to Edison International's and SCE's MD&A for the calendar year 2021 (the "2021 MD&A"), which was included in the 2021 Form 10-K.

Except when otherwise stated, references to each of Edison International or SCE mean each such company with its subsidiaries on a consolidated basis. References to "Edison International Parent and Other" mean Edison International Parent and its subsidiaries other than SCE and its subsidiaries and "Edison International Parent" mean Edison International on a stand-alone basis, not consolidated with its subsidiaries. Unless otherwise described, all the information contained in this report relates to both filers.

3

Table of Contents

MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

MANAGEMENT OVERVIEW

Highlights of Operating Results

Edison International is the ultimate parent holding company of SCE and Edison Energy. SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of southern California. Edison Energy is engaged in the competitive business of providing integrated decarbonization and energy solutions to commercial, institutional and industrial customers. Edison Energy's business activities are currently not material to report as a separate business segment.

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions)

    

2022

    

2021

    

 Change

    

2022

    

2021

    

 Change

Net (loss) income attributable to Edison International

 

  

 

  

 

  

 

  

 

  

 

  

SCE

$

(80)

$

(284)

$

204

$

369

$

371

$

(2)

Edison International Parent and Other

 

(48)

 

(57)

 

9

 

(172)

 

(135)

 

(37)

Edison International

 

(128)

 

(341)

 

213

 

197

 

236

 

(39)

Less: Non-core items

 

  

 

  

 

  

 

  

 

  

 

  

SCE

 

  

 

  

 

  

 

 

 

  

2017/2018 Wildfire/Mudslide Events claims and expenses, net of recoveries

(600)

(899)

299

(891)

(909)

18

Wildfire Insurance Fund expense

 

(39)

 

(39)

 

 

(115)

 

(116)

 

1

Upstream Lighting Program decision

(64)

(64)

(64)

(64)

CSRP impairment

(34)

(34)

Employment litigation matter, net of recoveries

(16)

(16)

GRC track 3 impairment

(12)

(12)

Organizational realignment charge

(10)

(10)

Disallowed historical capital expenditures in SCE's 2021 GRC decision

(47)

47

(47)

47

Sale of San Onofre nuclear fuel

7

(7)

Edison International Parent and Other

 

 

 

 

 

 

Customer revenues for EIS insurance contract, net of claims

11

11

11

11

Total non-core items

 

(692)

 

(985)

 

293

 

(1,131)

 

(1,065)

 

(66)

Core earnings (losses)

 

  

 

  

 

  

 

  

 

  

 

  

SCE

 

623

 

701

 

(78)

 

1,511

 

1,436

 

75

Edison International Parent and Other

 

(59)

 

(57)

 

(2)

 

(183)

 

(135)

 

(48)

Edison International

$

564

$

644

$

(80)

$

1,328

$

1,301

$

27

Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (losses) internally for financial planning and for analysis of performance. Core earnings (losses) are also used when communicating with investors and analysts regarding Edison International's earnings results to facilitate comparisons of the company's performance from period to period. Core earnings (losses) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (losses) are defined as earnings attributable to Edison International shareholders less non-core items. Non-core items include income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs, asset impairments and other income and expense related to changes in law, outcomes in tax, regulatory or legal proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing.

4

Table of Contents

Edison International's third quarter 2022 losses decreased $213 million from the third quarter of 2021, resulting from a decrease in SCE's losses of $204 million and a decrease in Edison International Parent and Other's losses of $9 million. SCE's lower net loss consisted of $282 million of lower non-core losses and $78 million of lower core earnings. Edison International's decreased loss was due to $11 million of higher non-core earnings and $2 million of higher core losses. Edison International's earnings for the nine months ended September 30, 2022 decreased $39 million from the nine months ended September 30, 2021, resulting from a decrease in SCE's earnings of $2 million and an increase in Edison International Parent and Other's losses of $37 million. SCE's lower earnings consisted of $77 million of higher non-core losses and $75 million of higher core earnings. Edison International Parent and Other's higher losses consisted of $11 million of higher non-core earnings and $48 million of higher core losses.

The decrease in SCE's core earnings for the three months ended September 30, 2022 from the same period in 2021 was primarily due to an increase in earnings recorded in the third quarter of 2021 on implementation of the 2021 GRC final decision that was retroactive to January 1, 2021, and higher operations and maintenance expenses, partially offset by recognition of return on rate base related to the CSRP decision and an increase of CPUC-related revenue due to the escalation mechanism set forth in the 2021 GRC final decision. The increase in SCE's core earnings for the nine months ended September 30, 2022 from the same periods in 2021 was primarily due to higher CPUC-related revenue due to the escalation mechanism as set forth in the 2021 GRC final decision and recognition of return on rate base related to the CSRP decision, partially offset by higher operation and maintenance expenses and higher interest expense.

The increase in Edison International Parent and Other's core losses for the three months and the nine months ended September 30, 2022 was primarily due to higher preferred dividends.

Consolidated non-core items for the nine months ended September 30, 2022 and 2021 primarily included:

Charges of $1.2 billion ($891 million after-tax) recorded in 2022 and $1.2 billion ($909 million after-tax) recorded in 2021 for 2017/2018 Wildfire/Mudslide Events claims and expenses, net of expected recoveries from FERC customers. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
Charges of $160 million ($115 million after-tax) recorded in 2022 and $161 million ($116 million after-tax) recorded in 2021 from the amortization of SCE's contributions to the Wildfire Insurance Fund. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" in the 2021 Form 10-K for further information.
A charge of $81 million ($64 million after-tax) recorded in 2022 related to the Presiding Officer's Decision ("POD") in September 2022 on SCE's Upstream Lighting Program. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
An impairment charge of $47 million ($34 million after-tax) recorded in 2022 related to SCE's CSRP settlement agreement filed with the CPUC in June 2022. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information.
A charge of $23 million ($16 million after-tax) recorded in 2022 related to settlement of an employment litigation matter, net of estimated insurance recoveries. SCE and Edison International settled the matter following an atypical jury award. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Employment Litigation Matter" for further information.
An impairment charge of $17 million ($12 million after-tax) recorded in 2022 related to historical capital expenditures disallowed in SCE's GRC track 3 final decision. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information.
A charge of $14 million ($10 million after-tax) recorded in 2022 related to organizational realignment services.

5

Table of Contents

An impairment charge of $79 million ($47 million after-tax) recorded in 2021 related to disallowed historical capital expenditures in SCE's 2021 GRC final decision.
Gains of $10 million ($7 million after-tax) recorded in 2021 for SCE's sale of San Onofre nuclear fuel.
Net earnings of $14 million ($11 million after-tax) for Edison International Parent and Other recorded in 2022, which includes earnings of $23 million ($18 million after-tax) related to customer revenues for EIS insurance contract offset by a charge of $9 million ($7 million after-tax) related to expected wildfire claims insured by EIS. See "Notes to Consolidated Financial Statements—Note 17. Related-Party Transactions" and "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.

See "Results of Operations" for discussion of SCE's and Edison International Parent and Other's results of operations.

Cost of Capital Applications

As discussed in the 2021 Form 10-K, in August 2021, SCE filed an application with the CPUC for authority to establish its authorized cost of capital for utility operations for 2022 and to reset the related annual cost of capital mechanism that can adjust the authorized cost of capital between SCE's cost of capital proceedings based on changes in Moody's utility bond rate index (see "Business—SCE—Overview of Ratemaking Process" in the 2021 Form 10-K for further information on the adjustment mechanism). In December 2021, the CPUC set an initial phase for the proceeding to determine whether extraordinary circumstances warrant a departure from the cost of capital mechanism for 2022 and, if so, whether the CPUC should leave the cost of capital components at pre-2022 levels for the year 2022 or open a second phase to consider alternative proposals. In September 2022, SCE received a proposed decision and an alternate proposed decision, both finding that the extraordinary circumstances do warrant a departure from the cost of capital mechanism for 2022. The proposed decision, if approved, would initiate a second phase to determine the SCE’s cost of capital for 2022. The alternate proposed decision, if approved, would leave SCE's cost of capital at pre-2022 levels and close the proceedings. The outcome of the proceeding is uncertain. In the absence of a decision, SCE is currently recording revenue using the pre-2022 cost of capital, subject to refund.

On April 20, 2022, SCE filed its application with the CPUC for authority to establish its authorized cost of capital for utility operations for a three-year term beginning in 2023 and to reset the related annual cost of capital adjustment mechanism. In September 2022, SCE was permitted to update its costs of long-term debt and preferred equity. Based on the updated projections, SCE is seeking a return on common equity (ROE) of 10.53% (compared to its last authorized ROE of 10.30%), a cost of long-term debt of 4.39%, and a cost of preferred equity of 6.50%. SCE also seeks to maintain its current authorized capital structure, after CPUC-allowed exclusions, of 52% common equity, 43% long-term debt, and 5% preferred equity. Based on the capital structure and cost factors discussed above, SCE's weighted average return on rate base would be 7.69% for 2023. Additionally, SCE has proposed that memorandum and balancing accounts required to be amortized over periods of greater than twelve months should accrue carrying charges at SCE's weighted average cost of capital rather than commercial paper interest rates, which are only applicable to short-term borrowing. If approved, based on SCE's 2021 GRC, including the post-test year ratemaking mechanism, this application would increase SCE's revenue requirements for 2023 by approximately $41 million compared to the cost of capital currently in rates. The CPUC set a schedule for the 2023 cost of capital proceeding that would result in a proposed decision in the fourth quarter of 2022.

Capital Program

Total capital expenditures (including accruals) were $4.1 billion and $3.7 billion for the first nine months ended September 30, 2022 and 2021, respectively.

SCE's capital expenditure forecast reflects planned CPUC-jurisdictional spending including amounts requested in SCE's GRC track 4 filing, WCCP and other programs outlined in SCE's WMP that are above amounts authorized in the 2021 GRC,

6

Table of Contents

CPUC-approved utility owned storage expenditures, and planned FERC capital expenditures. See "Liquidity and Capital Resources—SCE—Regulatory Proceedings" for more information on the GRC track 4 filing.

Potential capital spending variability associated with future regulatory requests based on management judgment, potential for permitting delays and other operational considerations is reflected in the range case below. The completion of projects, the timing of expenditures, and the associated cost recovery may be affected by permitting requirements and delays, construction schedules, availability of labor, equipment and materials, financing, legal and regulatory approvals and developments, community requests or protests, weather and other unforeseen conditions.

SCE's 2022 – 2024 forecast for major capital expenditures is set forth in the table below:

Total

(in billions)

    

2022

    

2023

    

2024

    

2022 – 2024

Traditional capital expenditures

 

  

 

  

 

  

 

  

Distribution1

$

4.0

$

4.2

$

3.9

$

12.1

Transmission

 

0.4

0.5

0.6

 

1.5

Generation

 

0.1

0.2

0.2

 

0.5

Subtotal

 

4.5

 

4.9

 

4.7

 

14.1

Wildfire mitigation-related capital expenditures

 

1.2

 

1.1

 

1.1

 

3.4

Total capital expenditures

$

5.7

$

6.0

$

5.8

$

17.5

Total capital expenditures using range case discussed above

$

5.5

$

5.5

$

5.2

$

16.2

1Includes forecast expenditures for the utility owned storage projects described below and reflects delays to the original project timelines.

SCE expects to make additional CPUC capital expenditures, the recovery of which will be subject to future regulatory approval. This includes expenditures from the 2025 GRC and non-GRC programs including the Building Electrification Program. These capital expenditures and expected FERC capital expenditures, excluded from the table above, are expected to be in a range of approximately $5.3 billion to $6.8 billion between 2024 and 2025.

Reflected below is SCE's weighted average annual rate base for 2022 – 2024 incorporating authorized CPUC-jurisdictional expenditures including utility owned storage, planned FERC capital expenditures, and planned non-GRC projects or programs.

(in billions)

    

2022

    

2023

    

2024

Rate base for expected capital expenditures

$

38.6

$

41.9

$

44.8

Rate base for expected capital expenditures using range case discussed above

$

38.4

$

41.2

$

43.6

Including programs outlined in SCE's WMP subject to future cost recovery proceedings, rate base associated with wildfire restoration capital expenditures subject to future CEMA applications, and planned expenditures from the 2025 GRC, SCE's weighted average annual rate base could be up to $45.0 billion in 2024 and is expected to be between $46.7 billion and $49.5 billion in 2025.

Utility Owned Storage Projects

In October 2021, SCE contracted with Ameresco, Inc. ("Ameresco") for the construction of utility owned energy storage projects at three sites in SCE's service territory with an aggregate capacity of 537.5 MW and an in-service date of August 1, 2022.

7

Table of Contents

In April 2022, SCE received a force majeure event notice from Ameresco in which Ameresco asserted that both manufacturing delays related to COVID-19 shut-downs in China and new shipping restrictions imposed by Chinese governmental authorities were then impacting the supply of batteries from China necessary for timely completion of the projects. Ameresco subsequently supplemented its force majeure notice noting additional supply chain issues related to COVID-19. SCE is continuing to evaluate the force majeure event notices. If there is a valid force majeure event under the contracts with Ameresco, subject to certain conditions, the project schedules and any related triggers of liquidated damages may be extended, and the contract prices may be increased to account for the impact of the force majeure event.

Permitting delays and engineering issues also impacted the projects. Because Ameresco did not achieve an in-service date of August 1, 2022, SCE is entitled to liquidated damages under the terms of the contracts subject to any relief Ameresco may be entitled to under the contracts, including any relief for a valid force majeure event. Once triggered, liquidated damages accrue daily for up to 60 days up to a maximum of $89 million in aggregate for all three projects.

Because of the delays described above and certain changes requested by SCE, SCE expects all three projects to be in-service prior to the summer of 2023. SCE expects to receive in aggregate approximately $270 million of tax credits available under the Inflation Reduction Act of 2022 for all three projects, which will accrue to the benefit of its customers.

Subject to reductions for any liquidated damages SCE is paid, SCE currently expects these storage projects to result in $1.0 billion of capital expenditures. In December 2021, the CPUC approved recovery of these expenditures and establishment of a balancing account for the associated revenue requirement, which have been reflected in rates beginning in the first quarter of 2022. Authorized revenue requirements will be included in the annual ERRA review proceeding and can only be disallowed upon a finding that SCE failed to prudently administer the contracts.

Southern California Wildfires and Mudslides

2017/2018 Wildfire/Mudslide Events

As discussed in the 2021 Form 10-K, multiple lawsuits and investigations related to the 2017/2018 Wildfire/Mudslide Events have been initiated against SCE and Edison International. As of September 30, 2022, in addition to the Local Public Entity Settlement, the TKM Subrogation Settlement and the Woolsey Subrogation Settlement, SCE had entered into settlements with approximately 8,500 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In addition, SCE and the SED executed the SED Agreement in October 2021, and SCE's obligations under the SED Agreement commenced on August 15, 2022, when CPUC approval of the SED Agreement became final and non-appealable.

Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Management’s third quarter 2022 review included a review of information obtained after the statute of limitations for individual plaintiffs for the Woolsey Fire expired, including information regarding the nature of claims remaining in the Woolsey Fire litigation. Management also reviewed information obtained from settling a substantial portion of the claims in the 2017/2018 Wildfire/Mudslide Events litigations, including higher than expected costs to settle claims. As a result of management’s third quarter 2022 review, SCE recorded an $880 million increase in estimated losses for the 2017/2018 Wildfire/Mudslide Events as of September 30, 2022, which increase is related to the Woolsey Fire. As a result, SCE also recorded expected recoveries through FERC electric rates of $50 million against the charge, and the resulting net charge to earnings was $830 million ($598 million after-tax).

Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged. For instance, SCE will receive additional information with respect to damages claimed as the mediation process progresses. Other factors that can cause actual losses incurred to be higher or lower than estimated include the ability to reach settlements and the outcomes of settlements reached through the ongoing claims mediation processes, uncertainties related to the sufficiency of insurance held by plaintiffs, uncertainties related to the litigation processes, uncertainty as to the legal and factual determinations to be made

8

Table of Contents

during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements.

Through September 30, 2022, SCE has recorded total estimated losses of $8.8 billion, expected recoveries from insurance of $2.0 billion and expected recoveries through FERC electric rates of $376 million related to the 2017/2018 Wildfire/Mudslide Events. The after-tax net charges to earnings recorded through September 30, 2022 have been $4.6 billion.

As of September 30, 2022, SCE had paid $7.3 billion under executed settlements and had $237 million to be paid under executed settlements, including $175 million to be paid under the SED Agreement, related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, SCE had recovered $2.0 billion through insurance and approximately $213 million through FERC-jurisdictional electric rates.

After giving effect to all payment obligations under settlements entered into through September 30, 2022, including under the SED Agreement, Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events was $1.2 billion. As of the same date, Edison International and SCE had assets for expected recoveries through FERC electric rates of $163 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events. Edison International and SCE may incur a material loss in excess of amounts accrued in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events.

SCE will seek rate recovery of prudently-incurred losses and related costs realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance, other than for any obligations under the SED Agreement. Based on Edison International's and SCE's current best estimate of expected losses for the 2017/2018 Wildfire/Mudslide Events, SCE currently expects to seek CPUC-jurisdictional rate recovery of approximately $6 billion by filing multiple future applications with the CPUC, the first of which SCE anticipates filing in 2023. These filings may be delayed if proceedings related to the 2017/2018 Wildfire/Mudslide Events do not progress as anticipated. SCE believes that, in light of the CPUC's decision in a cost recovery proceeding involving SDG&E arising from several 2007 wildfires in SDG&E's service area, there is substantial uncertainty regarding how the CPUC will interpret and apply its prudency standard to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. Accordingly, while the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs related to the 2017/2018 Wildfire/Mudslide Events are probable of recovery through electric rates.

Post-2018 Wildfires

Several wildfires, including the 2019 Saddle Ridge Fire, the 2020 Bobcat Fire, the 2022 Coastal Fire and the 2022 Fairview Fire, have significantly impacted portions of SCE's service territory after 2018.

At September 30, 2022, SCE recorded a $415 million increase in estimated losses for the Post-2018 Wildfires and recorded $253 million in expected insurance recoveries against the charge. In light of the prudency standard the CPUC is required to apply under AB 1054 to utilities holding a safety certificate at the time a wildfire ignited after July 12, 2019, SCE has concluded, at this time, that both uninsured CPUC-jurisdictional and uninsured FERC-jurisdictional wildfire-related costs related to the Post-2018 Wildfires, other than for those already authorized for inclusion in electric rates, are probable of recovery through electric rates. As a result, SCE also recorded total expected recoveries through electric rates of $162 million against the charge accrued at September 30, 2022 related to the Post-2018 Wildfires, resulting in no net charge to earnings.

Through September 30, 2022, SCE has recorded total estimated losses (established at the lower end of the estimated range of reasonably possible losses) of $689 million, expected recoveries from insurance of $467 million and expected recoveries through electric rates of $166 million related to the Post-2018 Wildfires. The after-tax net charges to earnings recorded for the Post-2018 Wildfires through September 30, 2022 have been $40 million. Expected recoveries from insurance recorded for

9

Table of Contents

the Post-2018 Wildfires are supported by SCE's insurance coverage for multiple policy years. While Edison International and SCE may incur material losses in excess of the amounts accrued for each of the Post-2018 Wildfires, Edison International and SCE expect that any losses incurred in connection with any such fire will be covered by insurance, subject to self-insured retentions and co-insurance, and expect that any such losses after expected recoveries from insurance will not be material.

PSPS

As discussed in the 2021 Form 10-K, SCE uses PSPS to proactively de-energize power lines as a last resort to mitigate the risk of catastrophic wildfires during extreme weather events. The CPUC may assess penalties on SCE if it finds that SCE has not executed PSPS in compliance with applicable rules and regulations. In June 2022, the SED issued an Administrative Enforcement Order ("AEO") against SCE proposing penalties of $10 million for alleged noncompliance with customer notification requirements related to PSPS events in 2020. In July 2022, SCE filed a request for a hearing to challenge the allegations of noncompliance and penalty, at which time the requirement to pay the penalty was stayed pending the hearing process. In October 2022, the SED and SCE reached a settlement agreement to resolve the AEO under which SCE agreed to pay $7 million to resolve the AEO. SCE did not admit wrongdoing or liability as part of the settlement. SCE's obligations under the settlement agreement will commence after CPUC approval of the agreement is final and non-appealable. SCE has made and continues to make significant investments and progress in improving its PSPS protocols, including through increased automation of customer notifications.

Safety Certification and Wildfire Mitigation Plan

As discussed in the 2021 Form 10-K, SCE most recently submitted updates to its 2020 – 2022 WMP in February 2022 to, among other things, report on implementation of its plan, describe new and ongoing wildfire mitigation activities and report on its progress on remedying issues identified in an action statement issued by the OEIS in August 2021. In July 2022, the OEIS approved SCE's 2022 updates to its 2020 – 2022 WMP and the CPUC ratified the OEIS approval in August 2022. Consequently, SCE requested a new safety certification in September 2022 and expects a decision on its request in December 2022. SCE's current safety certification will remain valid until OEIS acts on SCE's request for a new safety certification.

For further information, see "Business— Southern California Wildfires," "Risk Factors," "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054" in the 2021 Form 10-K and "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" in this report.

Upstream Lighting Program

From 2017 – 2019, SCE administered the Upstream Lighting Program, part of a statewide program administered by investor-owned utilities that offered discounted energy efficient light bulbs to customers through incentives to lighting manufacturers. The CPUC began investigating the programs administered by the investor-owned utilities based on reports that investor-owned utilities, including SCE, shipped a significant number of bulbs under the program that could not be tracked to customers.

In May 2022, the CPUC issued an order directing SCE to show cause as to why SCE should not be required to: (i) refund ratepayer funding for the portion of the program budget associated with light bulbs that were unaccounted for, (ii) refund energy efficiency incentive mechanism ("ESPI") awards associated with unaccounted-for light bulbs, and (iii) pay penalties for misrepresenting program progress and results to the CPUC. In September 2022, a Presiding Officer’s Decision ("POD") was issued in the proceeding finding that SCE mismanaged its Upstream Lighting Program from 2017 through 2019 and failed to ensure that efficient light bulbs were tracked and sold as intended by the program design. The POD requires SCE to (i) refund to ratepayers $76.1 million, representing the portion of the program budget associated with light bulbs that could not be accounted for, (ii) refund to ratepayers $6.8 million, representing ESPI awards associated with light bulbs that could

10

Table of Contents

not be accounted for, (iii) pay $19.06 million in fines; and (iv) bear the cost of SCE's investigation, approximately $900,000. SCE filed an appeal of the POD in October 2022. The POD will become the final decision of the CPUC when the CPUC makes a decision on the appeal. As of September 30, 2022, SCE has accrued liabilities of $102 million for losses relating to the Upstream Lighting Program.

RESULTS OF OPERATIONS

SCE

SCE's results of operations are derived mainly through two sources:

Earning activities – representing revenue authorized by the CPUC and the FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances.
Cost-recovery activities – representing CPUC- and FERC- authorized balancing accounts, which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards, as well as non-bypassable rates collected for SCE Recovery Funding LLC. Cost-recovery activities include rates which provide recovery, subject to reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), certain operation and maintenance expenses (including vegetation management and wildfire insurance), and repayment of bonds and financing costs of SCE Recovery Funding LLC. SCE earns no return on these activities.

The following table is a summary of SCE's results of operations for the periods indicated.

11

Table of Contents

Three months ended September 30, 2022 versus September 30, 2021

    

Three months ended September 30, 2022

Three months ended September 30, 2021

Cost-

Cost-

Earning

Recovery

Total

Earning

 Recovery

Total

(in millions)

    

 Activities

    

  Activities

    

 Consolidated

  

  

 Activities

    

 Activities

    

 Consolidated

Operating revenue

$

2,450

$

2,767

$

5,217

$

2,395

$

2,898

$

5,293

Purchased power and fuel

2,485

 

2,485

2,088

 

2,088

Operation and maintenance

673

304

 

977

363

837

 

1,200

Wildfire-related claims, net of insurance recoveries

880

 

880

1,273

 

1,273

Wildfire Insurance Fund expense

54

 

54

54

 

54

Depreciation and amortization

732

5

 

737

595

3

 

598

Property and other taxes

126

2

 

128

110

1

 

111

Impairment, net of other operating income

(1)

 

(1)

79

 

79

Total operating expenses

 

2,464

 

2,796

5,260

 

2,474

 

2,929

5,403

Operating loss

 

(14)

 

(29)

(43)

 

(79)

 

(31)

(110)

Interest expense

 

(253)

(5)

(258)

 

(208)

 

(3)

(211)

Other income

 

37

34

71

 

19

 

34

53

Loss before taxes

 

(230)

 

(230)

 

(268)

 

(268)

Income tax benefit

 

(177)

(177)

 

(11)

 

(11)

Net loss

 

(53)

 

(53)

 

(257)

 

(257)

Less: Preference stock dividend requirements

 

27

27

 

27

 

27

Net income available for common stock

$

(80)

$

$

(80)

$

(284)

$

$

(284)

Net income available for common stock

$

(80)

$

(284)

Less: Non-core expense

 

  

 

  

 

(703)

 

  

 

  

 

(985)

Core earnings1

  

 

  

$

623

 

  

 

  

$

701

1See use of non-GAAP financial measures in "Management Overview—Highlights of Operating Results."

Earning Activities

Earning activities were primarily affected by the following:

Higher operating revenue of $55 million primarily due to the following:
SCE recognized $156 million of revenue on CPUC approval of recovery for CSRP-related costs in September 2022 ("the CSRP Decision"). The revenue comprised recovery of $174 million of previously deferred expenses and $48 million of previously unrecognized return on rate base and taxes, offset by $66 million of income tax benefits returned to customers through a balancing account. See "Liquidity and Capital Resources—Regulatory Proceedings" for more information.
A decrease of CPUC-related revenue of approximately $6 million from the implementation of the 2021 GRC final decision in the third quarter of 2021, offset by an increase in revenue from the escalation mechanism set forth in the 2021 GRC decision. Upon receipt of the 2021 GRC final decision in August 2021, SCE recorded the retroactive increase to revenues from the first and second quarter, which increased CPUC-related revenue by $102 million in the third quarter of 2021. SCE's authorized revenue attributable to the third quarter increased $96 million in 2022 compared to 2021.
A decrease of CPUC-related revenue of $168 million related to higher income tax benefits returned to customers through a balancing account.

12

Table of Contents

An increase of other CPUC-related revenue of $78 million related to higher return on rate base included in balancing accounts, franchise fees and uncollectibles due to higher billed revenue and operating expenses recovered through balancing accounts.
A decrease in FERC-related revenue and other operating revenue of $5 million primarily due to a lower wildfire-related claims and expenses to be recovered in FERC revenues compared to 2021.
Higher operation and maintenance costs of $310 million is primarily due to:
Higher expenses of $122 million primarily due to wildfire insurance and vegetation management expenses being presented in cost recovery activities as a result of balancing accounts authorized in the 2021 GRC final decision. In the third quarter of 2021 this included reclassification of expenses from the first and second quarter of 2021.
Higher expenses of $95 million related to the POD in September 2022 on SCE's Upstream Lighting Program. This consisted of $76 million of disallowed costs reclassified from cost recovery activities and $19 million of fines. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
Higher expenses of $27 million previously deferred and expensed on approval for recovery in the CSRP Decision.
Higher uncollectibles expenses of $20 million primarily related to prior period expenses not subject to cost recovery, following a CPUC decision requiring SCE to change its methodology for calculating the portion of uncollectibles expenses incremental to GRC authorized revenues.
Higher inspection and maintenance expenses of $13 million.
Increased other expenses of $33 million primarily due to franchise fees related to higher billed revenue, higher IT costs and power plant maintenance costs.
Lower wildfire-related claims and expenses of $393 million primarily due to a $385 million change in estimated losses related to wildfire claims from the 2017/2018 Wildfire/Mudslide Events in 2021. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
Higher depreciation and amortization expense of $137 million primarily due to $134 million of previously deferred expenses expensed on approval for recovery in the CSRP Decision.
Lower impairment and other operating income of $80 million primarily due to an impairment charge of $79 million recorded in 2021 related to disallowed historical capital expenditures in SCE's 2021 GRC final decision.
Higher interest expense of $45 million primarily due to:
Higher expense of $19 million primarily due to increased long-term borrowing, including $13 million subject to regulatory cost recovery.
Higher expense of $12 million previously deferred and expensed on the CSRP Decision.
Higher other interest expense of $14 million primarily due to higher interest rates on short-term debt.
Higher other income of $18 million primarily due to a higher interest rate on balancing account undercollections.
See "Income Taxes" below for the explanation of $166 million increase in income tax benefits.

13

Table of Contents

Cost-Recovery Activities

Operating revenue and the corresponding operating expenses in cost-recovery activities were primarily affected by the following:

Higher purchased power and fuel costs of $397 million primarily due to higher power and gas price, higher CAISO settlement costs and higher capacity costs, partially offset by lower purchased power volume.
Lower operation and maintenance costs of $533 million primarily due to:
Lower expenses of $200 million related to vegetation management and $170 million related to wildfire insurance as a result of implementation of the 2021 GRC. See "Earnings Activities" above.
Lower expenses due to $76 million of disallowed costs reclassified to earnings activities related to Upstream Lighting Program. See "Earnings Activities" above.

Nine months ended September 30, 2022 versus September 30, 2021

    

Nine months ended September 30, 2022

Nine months ended September 30, 2021

Cost-

Cost-

Earning

Recovery

Total

Earning

Recovery

Total

(in millions)

    

 Activities

    

  Activities

    

 Consolidated

  

  

 Activities

    

  Activities

    

 Consolidated

Operating revenue

$

6,881

$

6,293

$

13,174

$

5,992

$

5,560

$

11,552

Purchased power and fuel

 

4,826

 

4,826

4,384

 

4,384

Operation and maintenance

 

2,252

1,529

 

3,781

1,493

1,266

 

2,759

Wildfire-related claims, net of insurance recoveries

 

1,307

 

1,307

1,276

 

1,276

Wildfire Insurance Fund expense

 

160

 

160

161

 

161

Depreciation and amortization

 

1,907

13

 

1,920

1,651

4

 

1,655

Property and other taxes

 

359

12

 

371

351

2

 

353

Impairment, net of other operating income

 

61

 

61

68

 

68

Total operating expenses

 

6,046

 

6,380

12,426

 

5,000

 

5,656

10,656

Operating income (loss)

 

835

 

(87)

748

 

992

 

(96)

896

Interest expense

 

(691)

(15)

(706)

 

(588)

(5)

(593)

Other income

 

108

102

210

 

88

101

189

Income before taxes

 

252

 

252

 

492

 

492

Income tax (benefit) expense

 

(195)

(195)

 

41

41

Net income

 

447

 

447

 

451

 

451

Less: Preference stock dividend requirements

 

78

78

 

80

80

Net income available for common stock

$

369

$

$

369

$

371

$

$

371

Net income available for common stock

$

369

$

371

Less: Non-core expense

 

  

 

  

 

(1,142)

 

  

 

  

 

(1,065)

Core earnings1

  

 

  

$

1,511

 

  

 

  

$

1,436

1See use of non-GAAP financial measures in "Management Overview—Highlights of Operating Results."

14

Table of Contents

Earnings Activities

Earning activities were primarily affected by the following:

Higher operating revenue of $889 million primarily due to the following:
SCE recognized $701 million of revenue for wildfire-related expenses that had been deferred prior to 2021 and were authorized for recovery in the GRC track 2 in January 2022 and GRC track 3 in June 2022 ($416 million included in earnings activities, $285 million included in cost-recovery activities). See "Liquidity and Capital ResourceRegulatory Proceedings2021 General Rate Case" in the 2021 MD&A for more information.
An increase of CPUC-related revenue of $281 million primarily due to the escalation mechanism set forth in the 2021 GRC decision.
SCE recognized $156 million of revenue on CPUC approval of recovery for CSRP-related costs in September 2022. The revenue comprised recovery of $174 million of previously deferred expenses and $48 million of previously unrecognized return on rate base and taxes, offset by $66 million of income tax benefits returned to customers through a balancing account. See "Liquidity and Capital Resources—Regulatory Proceedings" for more information.
A decrease of other CPUC-related revenue of $27 million related to $141 million of higher income tax benefits returned to customers through a balancing account, partially offset by return on rate base and operating expenses subject to balancing accounts and franchise fees.
An increase in FERC-related revenue of $24 million primarily due to higher wildfire-related claims and expenses to be recovered in FERC revenues and higher revenue due to rate base growth.
An increase in other operating revenue of $39 million primarily due to higher revenue from the Morongo line transfer capability agreement (offset in depreciation and other operating expenses) and higher late payment charges. See "Notes to Consolidated Financial Statements—Note 7. Revenue."
Higher operation and maintenance costs of $759 million primarily due to the following:
Higher expenses of $404 million subject to balancing account treatment including the approval in the GRC track 2 and GRC track 3 to recover wildfire-related expenses that had been deferred as regulatory assets prior to 2021 (offset in revenue above).
Higher expenses of $95 million related to the POD in September 2022 on SCE's Upstream Lighting Program. This consisted of $76 million of disallowed costs reclassified from cost recovery activities and $19 million of fines. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
Higher expenses of $45 million related to inspections and maintenance.
Higher expenses of $27 million previously deferred and expensed on approval for recovery in the CSRP Decision.
Higher uncollectibles expenses of $26 million including prior period expenses not subject to cost recovery, following a CPUC decision requiring SCE to change its methodology for calculating the portion of uncollectibles expenses incremental to GRC authorized revenues.
A charge of $23 million related to settlement of an employment litigation matter, net of estimated insurance recoveries. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Employment Litigation Matter " for further information.
Higher franchise fee expenses of $20 million.

15

Table of Contents

Higher expenses of $18 million of wildfire mitigation expenses that were disallowed in the GRC track 3 decision.
A charge of $14 million related to organizational realignment services.
A $7 million proposed penalty from the CPUC for SCE's operation of PSPS in 2020. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" for further information.
Higher other expenses of $80 million including safety programs related to COVID-19, IT costs and power plant maintenance costs.
Higher wildfire-related claims and expenses of $31 million primarily due to higher charges in estimated losses related to wildfire claims from the 2017/2018 Wildfire/Mudslide Events in 2022 compared to 2021.
Higher depreciation and amortization expense of $256 million primarily due to $134 million of previously deferred CSRP depreciation and expensed on approval for recovery in the CSRP Decision.
Lower impairment and other operating income of $7 million primarily due to an impairment charge of $79 million recorded in 2021 related to disallowed historical capital expenditures in SCE's 2021 GRC final decision. Impairments were recorded in 2022 of $17 million related to the CPUC decision in the GRC track 3 proceeding and $47 million related to a settlement agreement between SCE and TURN in the CSRP proceeding. See "Liquidity and Capital Resources—Regulatory Proceedings" for more information.
Higher interest expense of $103 million primarily due to:
Higher expense of $61 million primarily due to increased long-term borrowing, including $29 million subject to regulatory cost recovery.
Higher expense of $30 million due to higher interest rates on short-term debt and balancing account overcollections.
Higher expense of $12 million previously deferred and expensed on approval for recovery in the CSRP Decision.
Higher other income of $20 million primarily due to a higher interest rate on balancing account undercollections.
See "Income Taxes" below for the explanation of $236 million increase in income tax benefits.

Cost-Recovery Activities

Operating revenue and the corresponding operating expenses in cost-recovery activities were primarily affected by the following:

Higher purchased power and fuel costs of $442 million primarily due to higher power and gas price, higher CAISO settlement costs and higher capacity and GHG cost, partially offset by lower purchased power volume.
Higher operation and maintenance costs of $263 million primarily due to:
Higher expenses of $286 million of GRC track 2 and GRC track 3 wildfire mitigation expenses that had been deferred prior to 2021 and were authorized for recovery in January 2022 and June 2022 respectively. See "Earnings Activities" above.
Higher uncollectible expenses of $109 million primarily due to authorization to recover 2020 and 2021 costs that had been deferred as regulatory assets through the residential uncollectibles balancing account.
Lower cost recovery activity expenses due to $76 million of disallowed costs reclassified to earnings activities related to Upstream Lighting Program. See "Earnings Activities" above.

16

Table of Contents

Higher property and other taxes of $10 million due to recovery of property taxes associated with AB 1054 Excluded Capital Expenditures financed through securitization.
Higher interest expense of $10 million due to recovery of expenses associated with AB 1054 Excluded Capital Expenditures financed through securitization.

Supplemental Operating Revenue Information

As a result of the CPUC-authorized decoupling mechanism, SCE revenues are not affected by changes in retail electricity sales.

Income Taxes

SCE's income tax benefit increased by $166 million and $236 million for the three and nine months ended September 30, 2022 compared to the same periods in 2021. The increase for the three months and nine months ended September 30, 2022 was primarily driven by a decrease in pre-tax income, an increase in flow through tax benefits and the absence of a one-time charge recorded in the third quarter of 2021. In July of 2021, SCE received the IRS' response to its private letter ruling request, regarding the scope of the deferred tax normalization requirements and the computations required to comply with the average rate assumption method. As a result, SCE's estimate changed and a cumulative reduction in tax benefits was recorded in 2021.

SCE's effective tax rates were (77.0)% and (4.1)% for the three months ended September 30, 2022 and 2021, respectively. SCE's effective tax rates were (77.4)% and 8.3% for the nine months ended September 30, 2022 and 2021, respectively. SCE's effective tax rate is below the federal statutory rate of 21% primarily due to the CPUC's ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences, which reverse over time. The accounting treatment for these temporary differences results in recording regulatory assets and liabilities for amounts that would otherwise be recorded to deferred income tax expense.

See "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rates.

Edison International Parent and Other

Results of operations for Edison International Parent and Other include amounts from other subsidiaries that are not reportable as segments, as well as intercompany eliminations.

Loss from Operations

The following table summarizes the results of Edison International Parent and Other:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Edison Energy Group and subsidiaries

$

(4)

$

(6)

$

(10)

$

(11)

Corporate expenses and other subsidiaries

 

(17)

 

(34)

 

(83)

 

(86)

Edison International Parent and Other net loss

$

(21)

$

(40)

$

(93)

$

(97)

Preferred stock dividend requirement

27

17

79

38

Edison International Parent and Other net loss attributable to common stock

$

(48)

$

(57)

$

(172)

$

(135)

The net loss attributable to common stock from operations of Edison International Parent and Other decreased $9 million for the three months ended September 30, 2022 compared to the same periods in 2021, primarily due to higher unrealized gain on investments and net earnings from revenue and wildfire-related claims expense related to an EIS insurance contract, partially offset by higher preferred dividends. The net loss attributable to common stock from operations of Edison

17

Table of Contents

International Parent and Other increased $37 million for the nine months ended September 30, 2022 compared to the same periods in 2021, primarily due to higher preferred dividends, partially offset by net earnings from revenue and wildfire-related claims expense related to an EIS insurance contract. See "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies" and "Notes to Consolidated Financial Statements—Note 17. Related Party Transactions" for further information.

LIQUIDITY AND CAPITAL RESOURCES

SCE

SCE's ability to operate its business, fund capital expenditures, and implement its business strategy is dependent upon its cash flow and access to the bank and capital markets. SCE's overall cash flows fluctuate based on, among other things, its ability to recover its costs in a timely manner from its customers through regulated rates, changes in commodity prices and volumes, collateral requirements, interest obligations, dividend payments to and equity contributions from Edison International, obligations to preference shareholders, and the outcome of tax, regulatory and legal matters.

In the next 12 months, SCE expects to fund its cash requirements through operating cash flows, capital market and bank financings, refinancing of existing debt, and equity contributions from Edison International Parent, as needed. SCE also has availability under its credit facility to fund cash requirements. SCE expects to issue bonds to finance or refinance eligible sustainable projects. For further information about eligible sustainable projects, see "Liquidity and Capital Resources—SCE" in the 2021 MD&A. SCE also expects to issue additional debt for general corporate purposes and to finance payments for future resolutions of claims related to the 2017/2018 Wildfire/Mudslide Events.

SCE has invested all $1.6 billion of the required AB 1054 Excluded Capital Expenditures. SCE issued securitized bonds in the amounts of $338 million in February 2021 and $533 million in February 2022 to finance a portion of these expenditures. SCE used the proceeds of the February 2022 securitized bonds to partially repay a $1.2 billion term loan and extended the due date of the remaining balance on the term loan to May 2023. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." SCE expects to repay the remaining balance of $730 million prior to the term loan maturing with the proceeds of future securitized bonds. In September 2022, SCE filed an application with the CPUC requesting to securitize the remaining AB 1054 Excluded Capital Expenditures and related financing costs from amounts approved as reasonable in track 1 and track 3 of the 2021 GRC proceeding. For further information, see "—Regulatory Proceedings—Financing Order."

In August 2022, the Inflation Reduction Act 2022 was signed into law. See "—Edison International Parent and Other— Edison International Income Taxes" for a description of the impacts of the legislation on the Edison International consolidated tax group including SCE.

SCE's credit ratings may be affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by claims from catastrophic wildfires. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, bond financings or other borrowings. In addition, some of SCE's power procurement contracts would require SCE to pay related liabilities or post additional collateral if SCE's credit rating were to fall below investment grade. Incremental collateral requirements for power procurement contracts and environmental remediation obligations would result from a potential downgrade of SCE's credit rating to below investment grade. For further details, see "—Margin and Collateral Deposits."

18

Table of Contents

Available Liquidity

At September 30, 2022, SCE had cash on hand of $90 million.

At September 30, 2022, SCE had approximately $1.8 billion available under its $3.4 billion revolving credit facility. In May 2022, SCE extended its credit facility through May 2026, pursuant to an option to extend, and may extend its credit facility for one additional year with the lenders' approval. The aggregate maximum principal amount under the SCE revolving credit facility may be increased up to $4.0 billion, provided that additional lender commitments are obtained. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." At September 30, 2022, SCE had $1.1 billion outstanding commercial paper, net of discount, at a weighted-average interest rate of 3.82%.

SCE may finance balancing account undercollections and working capital requirements to support operations and capital expenditures with commercial paper, its credit facilities or other borrowings, subject to availability in the bank and capital markets. As necessary, SCE will utilize its available liquidity, capital market financings, other borrowings or parent company contributions to SCE equity in order to meet its obligations as they become due, including costs related to the 2017/2018 Wildfire/Mudslide Events. For further information, see "Management Overview—Southern California Wildfires and Mudslides."

Debt Covenant

SCE's credit facilities and term loan require a debt to total capitalization ratio as defined in the applicable agreements of less than or equal to 0.65 to 1. At September 30, 2022, SCE's debt to total capitalization ratio was 0.56 to 1.

At September 30, 2022, SCE was in compliance with all financial covenants that affect access to capital.

Regulatory Proceedings

Wildfire Related Regulatory Proceedings

2021 General Rate Case Wildfire Mitigation Memorandum Account Balances

In March 2021, SCE made its 2021 GRC track 3 filing with the CPUC. In its filing, SCE requested reasonableness review of approximately $1.2 billion of wildfire mitigation costs incurred prior to 2021, consisting of $476 million of incremental operation and maintenance expenses, and $679 million of incremental capital expenditures.

In June 2022, the CPUC issued a decision that authorized SCE to recover $385 million of incremental operation and maintenance expense and approved $465 million of incremental capital expenditures as reasonable. SCE did not obtain a determination of reasonableness for an additional $197 million of capital expenditures, associated with construction in progress, plant assets and installation of current limiting fuses, portions of which were defective. SCE has the opportunity to support its request for these costs with additional information in future applications.

SCE is seeking recovery of $35 million, after accounting for a $10 million deductible, for vegetation management-related operations and maintenance expenses not approved in this proceeding. These increased costs are tracked in a "Z-Factor" memorandum account for vegetation management line clearance costs related to Senate Bill 247, which went into effect January 1, 2020, and requires that SCE to pay line clearance tree trimmers the prevailing wage of qualified electrical workers.

The decision did not find reasonable certain capital expenditures related to vegetation management software purchased by SCE. As a result of the decision, in June 2022, SCE recorded a $17 million impairment of utility property, plant and equipment.

The decision resulted in a revenue requirement of approximately $400 million including a $15 million 2020 revenue requirement for capital expenditures previously found reasonable by the CPUC. The approved revenue requirements are required to be amortized over a 36-month period. SCE expects to seek recovery of the approved capital expenditures in a

19

Table of Contents

separate financing order application, along with additional wildfire mitigation capital expenditures approved as reasonable in the 2021 GRC.

2020 Emergency Wildfire Restoration

Multiple wildfires occurred during 2020 which caused damage within SCE's service territory and to SCE's Big Creek hydroelectric facility.

In March 2022, SCE filed a CEMA application requesting recovery of $207 million of operation and maintenance expenses incremental to authorized revenue requirements and $312 million of capital expenditures incremental to amounts authorized in the 2021 GRC primarily related to these restoration efforts. SCE has not yet filed for recovery of generation restoration costs, as repairs to hydroelectric generation facilities are not complete.

2021 Incremental Wildfire Mitigation and Vegetation Management Cost Application

As discussed in the 2021 Form 10-K, the 2021 GRC decision authorized cost recovery of up to 115% of authorized vegetation management expenses and allowed SCE to record non-covered conductor wildfire mitigation costs that exceeded authorized amounts in two memorandum accounts. Such expenses that exceed the authorized level for 2021 and subsequent years are subject to reasonableness review. In June 2022, SCE filed an application with the CPUC requesting reasonableness review of these incremental costs incurred in 2021 related to non-covered conductor wildfire mitigation and vegetation management activities, requesting a total revenue requirement of approximately $327 million. In October 2022, the CPUC temporarily suspended the procedural schedule for the proceeding to consider whether there is sufficient record in the proceeding to address the issue of whether recorded costs are incremental, reasonable, and properly recoverable.

2021 General Rate Case Track 4

In May 2022, SCE made its 2021 GRC track 4 filing with the CPUC, requesting a revenue requirement of $8.6 billion for 2024. This represents an increase of $972 million compared to SCE's estimated revenue requirement of $7.7 billion for the 2023 attrition year. A significant component of the track 4 revenue requirement request relates to projects previously authorized by the CPUC, including those which were completed and put into service since the 2021 GRC final decision. The other primary drivers of the increase are inflation and SCE's 2024 vegetation management and wildfire mitigation spending forecasts, partially due to a legislatively required wage rate increase. The schedule adopted by the CPUC for the 2021 GRC track 4 filing calls for a proposed decision in the fourth quarter of 2023.

Financing Order

In September 2022, SCE filed its third and final application for an irrevocable order from the CPUC to finance $772 million, comprised of AB1054 Excluded Capital Expenditures, allowed overhead costs and associated financing expenses, through the issuance of securitized bonds. The expenditures consist of $204 million approved in the 2021 GRC track 1 and $465 million approved in the 2021 GRC track 3.

CSRP

In September 2022, the CPUC approved the settlement agreement between SCE and TURN for SCE's CSRP proceeding filed in July 2021 for expenditures incurred through April 2021. The approved settlement agreement allowed SCE to recover $436 million in capital expenditures and $33 million in operation and maintenance expenses, and resulted in a revenue requirement of $388 million through December 2024. Upon approval of the settlement, SCE recognized revenue of $156 million, including recovery of $174 million of previously deferred expenses and $48 million of previously unrecognized return on rate base, offset by $66 million of income tax benefits returned to customers through a balancing account. CPUC approval of the settlement agreement resulted in SCE permanently foregoing cost recovery for $47 million of

20

Table of Contents

capital expenditures, which SCE recorded as an impairment of property, plant and equipment in June 2022.

In May 2022, SCE filed a second CSRP application with the CPUC requesting recovery of $59 million of capital expenditures and $28 million of operation and maintenance expenses incurred from May 2021 to December 2021. SCE also proposed review and cost recovery for additional post-implementation CSRP costs incurred from January 2022 through December 2024 in the 2025 GRC filing.

ERRA Trigger Application

SCE's cost-recovery mechanism for its fuel and purchased power-related costs is primarily facilitated in two main balancing accounts, the ERRA and the PABA. SCE sets rates based on an annual forecast of the costs that it expects to incur during the subsequent year. At September 30, 2022, the ERRA and PABA were undercollected by approximately $950 million due to higher gas and power prices. The undercollection in ERRA and PABA at August 31, 2022 resulted in SCE triggering an established mechanism requiring SCE to file an application to advise the CPUC that SCE's undercollections had exceeded the trigger amount (See "Business—Overview of Ratemaking Process" in 2021 Form 10-K, for further information). In light of the concurrent pending 2023 ERRA forecast application, SCE requested to maintain ERRA-related rates at current levels and address the trigger balance in SCE's 2023 ERRA forecast proceeding or consolidate this proceeding with the 2023 ERRA forecast proceeding, in which SCE anticipates to implement new rates in January 2023. SCE expects to finance power procurement-related costs using commercial paper, its credit facilities and other borrowings until rates are adjusted.

2023 FERC Formula Rate Annual Update

In June 2022, SCE provided its preliminary 2023 annual transmission revenue requirement update to interested parties. The update reflects a $96 million decrease in SCE's transmission revenue requirement of $1.3 billion or 6.8% lower than amounts included in the 2022 annual rates. The decrease is primarily due to lower undercollections based on actual 2021 costs, lower administrative and general expenses related to the timing of inclusion of wildfire-related claims recovery in transmission revenue requirements and lower transmission operation and maintenance expenses related to vegetation management and inspections and maintenance included in transmission revenue requirements. SCE expects to file its 2023 annual update with the FERC by December 1, 2022 with the proposed rates effective January 1, 2023.

2022 California Arrearage Payment Program ("CAPP 2022")

In June 2022, California's state assembly passed legislation to authorize, fund and implement the CAPP 2022, which is expected to reduce customer arrearages for certain residential customers of California's investor-owned utilities ("IOUs") by up to $1.0 billion. While the CAPP 2022 funds have not yet been allocated between the IOUs, SCE received approximately 30% of funding allocated to the IOUs under the initial California Arrearage Payment Program, approved in 2021. To the extent SCE's uncollectibles expenses are offset by the CAPP 2022, recovery will not be sought through other mechanisms.

Incremental Uncollectibles Methodology

In October 2022, as part of the 2020 ERRA review proceeding, the CPUC rejected the methodology SCE used to calculate the portion of uncollectibles expense incremental to amounts authorized in SCE's GRC. This led to a disallowance of
$16 million of uncollectibles expense recorded to the residential uncollectible balancing account ("RUBA") in 2020. This decision modifies SCE's methodology for calculating incremental uncollectibles expense to be included in RUBA beginning in the fourth quarter of 2022.

Capital Investment Plan

Riverside Transmission Reliability Project

The Riverside Transmission Reliability Project is a joint project between SCE and Riverside Public Utilities ("RPU"), the municipal utility department of the City of Riverside. While RPU will be responsible for constructing some of the project's

21

Table of Contents

facilities within Riverside, SCE's portion of the project consists of constructing upgrades to its system, including a new 230 kV substation; certain interconnection and telecommunication facilities and transmission lines in the cities of Riverside, Jurupa Valley and Norco and in portions of unincorporated Riverside County.

In May 2022, the Riverside City Council voted to review and advise on alternatives to the CPUC approved project, which could include other technologies or additional undergrounding that was not included in the CPUC approved project. SCE has suspended all major activities on the project until SCE obtains more clarity on whether Riverside intends to proceed with the project as licensed or pursue an alternative approach. SCE is currently assessing the impacts any potential revisions may have on the total direct expenditures and the scheduled in-service date for the project. The capital expenditures forecast above includes capital expenditures for the Riverside Transmission Reliability Project of $126 million in 2023, $190 million in 2024, and $40 million in 2025.

Mesa Substation Project

The Mesa Substation Project consists of replacing the existing 220 kV Mesa Substation with a new 500/220 kV substation. The Mesa Substation Project will address reliability concerns by providing additional transmission import capability, allowing greater flexibility in the siting of new generation, and reducing the total amount of new generation required to meet local reliability needs in the Western Los Angeles Basin area. The 500 kV substation went into service in the second quarter of 2022.

SCE Dividends

As discussed in the 2021 Form 10-K, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders. The CPUC issued a decision on SCE's application to the CPUC for waiver of compliance with its equity ratio requirement, that allows SCE to exclude, until May 7, 2022, from its equity ratio calculations (i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. In April 2022, SCE filed an application to extend the waiver of compliance with its equity ratio requirement and the permitted exclusion. Under the CPUC's rules, SCE is not deemed to be in violation of the equity ratio requirement while the waiver application is pending resolution.

Margin and Collateral Deposits

Certain derivative instruments, power and energy procurement contracts and other contractual arrangements contain collateral requirements. In addition, certain environmental remediation obligations require financial assurance that may be in the form of collateral postings. Future collateral requirements may differ from the requirements at September 30, 2022 due to the addition of incremental power and energy procurement contracts with collateral requirements, if any, the impact of changes in wholesale power and natural gas prices on SCE's contractual obligations, and the impact of SCE's credit ratings falling below investment grade.

The table below provides the amount of collateral posted by SCE to its counterparties as well as the potential collateral that would have been required as of September 30, 2022, if SCE's credit rating had been downgraded to below investment grade as of that date. The table below also provides the potential collateral that could be required due to adverse changes in wholesale power and natural gas prices over the remaining lives of existing power and energy procurement contracts.

In addition to amounts shown in the table, power and fuel contract counterparties may also institute new collateral requirements, applicable to future transactions to allow SCE to continue trading in power and fuel contracts at the time of a downgrade or upon significant increases in market prices. Furthermore, SCE may also be required to post up to $50 million in collateral in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which the downgrade occurs.

22

Table of Contents

(in millions)

    

Collateral posted as of September 30, 20221

$

549

Incremental collateral requirements for purchased power and fuel contracts resulting from a potential downgrade of SCE's credit rating to below investment grade2

 

197

Incremental collateral requirements for purchased power and fuel contracts resulting from adverse market price movement3

 

58

Posted and potential collateral requirements

$

804

1

Net collateral provided to counterparties and other brokers consisted of $487 million in letters of credit and surety bonds and $62 million of cash collateral, of which $61 million was offset against derivative liabilities. In addition, SCE was required to post an additional $8 million cash collateral due to margin requirements on gas and power positions, which was accrued as of September 30, 2022 and posted on October 3, 2022.

2

Represents potential collateral requirements for accounts payable and mark-to-market valuation at September 30, 2022. Requirement varies throughout the period and is generally lower at the end of the month.

3

Incremental collateral requirements were based on potential changes in SCE's forward positions as of September 30, 2022 due to adverse market price movements over the remaining lives of the existing power contracts using a 95% confidence level.

Edison International Parent and Other

In the next 12 months, Edison International expects to fund its net cash requirements through cash on hand, dividends from SCE, and capital market and bank financings. Edison International may finance its ongoing cash requirements, including dividends, working capital requirements, payment of obligations, and capital investments, including capital contributions to subsidiaries, with short-term or other financings, subject to availability in the bank and capital markets.

At September 30, 2022, Edison International Parent and Other had cash on hand of $142 million.

At September 30, 2022 Edison International Parent had $22 million outstanding commercial paper, net of discount, at a weighted-average interest rate of 3.83% supported by the $1.5 billion revolving credit facility. In May 2022, Edison International Parent extended its credit facility through May 2026, pursuant to an option to extend, and may extend its credit facility for one additional year with the lenders' approval. The aggregate maximum principal amount under the Edison International Parent revolving credit facility may be increased up to $2.0 billion, provided that additional lender commitments are obtained.

Edison International plans to issue securities containing $300 million to $400 million of equity content as viewed by rating agencies in 2022, to support SCE's capital investment needs and SCE maintaining the common equity component of its capital structure, after CPUC allowed exclusions, at 52% on a weighted average basis over the Capital Structure Compliance Period. In April 2022, Edison International Parent borrowed $600 million under a term loan agreement due in April 2023. The term loan provides Edison International with the flexibility to defer its planned issuance to 2023, depending on market conditions. For further information, see "Liquidity and Capital Resources—SCE—SCE Dividends" in the 2021 MD&A and "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." In August 2022, Edison International Parent issued $400 million of senior notes due 2025. The proceeds were used for general corporate purposes. For further information, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." In August 2022, Edison International Parent established a program to sell shares of its common stock with aggregate sales price up to
$500 million, including through designated broker-dealers at prevailing market prices (an at-the-market offering). For further information, see "Notes to Consolidated Financial Statements—Note 13. Equity."

Edison International Parent and Other's liquidity and its ability to pay operating expenses and pay dividends to common shareholders are dependent on access to the bank and capital markets, dividends from SCE, realization of tax benefits and its ability to meet California law requirements for the declaration of dividends. Prior to declaring dividends, Edison International's Board of Directors evaluates available information to ensure that the California law requirements for the

23

Table of Contents

declarations are met. For information on the California law requirements on the declaration of dividends, see "Liquidity and Capital Resources—SCE—SCE Dividends" in the 2021 MD&A. Edison International intends to maintain its target payout ratio of 45% – 55% of SCE's core earnings, subject to the factors identified above.

Edison International's ability to declare and pay common dividends may be restricted under the terms of the Series A and Series B Preferred Stock. For further information see "Notes to Consolidated Financial Statements—Note 14. Equity" in the 2021 Form 10-K.

Edison International Parent's credit facility requires a consolidated debt to total capitalization ratio as defined in the applicable agreements of less than or equal to 0.70 to 1. At September 30, 2022, Edison International's consolidated debt to total capitalization ratio was 0.63 to 1.

At September 30, 2022, Edison International Parent was in compliance with all financial covenants that affect access to capital.

Edison International Parent's credit ratings may be affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by claims from catastrophic wildfires. Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, note financings or other borrowings.

Edison International Income Taxes

Net Operating Loss and Tax Credit Carryforwards

Edison International consolidates for federal income tax purposes, but not for financial accounting purposes, a group of wind projects referred to as Capistrano Wind. A sale of the wind projects was consummated in the third quarter of 2022. The sale and cancellation of debt utilized approximately $125 million of tax attributes previously generated by the Capistrano entities. Remaining tax attributes not utilized in 2022 will be available for the Edison International consolidated group to utilize in the future. When the remaining Capistrano tax attributes are used in the future by Edison International, payments will be made to those entities under a tax allocation agreement.

Inflation Reduction Act 2022

In August 2022, the Inflation Reduction Act 2022 was signed into law. The law imposes an alternative minimum tax ("AMT") of 15% if the average annual adjusted financial statement income exceeds $1 billion over a specified 3-year period. Based on current interpretation of the law and Edison International's and SCE’s historical net incomes, Edison International and SCE do not expect to meet this threshold and therefore do not expect to be subject to this AMT in 2023.

The law also includes significant extensions, expansions, and enhancements of numerous energy-related investment tax credits, as well as creating new credits applicable to electricity production which may apply to SCE's capital expenditures. SCE expects to generate investment tax credits related to its utility owned storage projects under the Inflation Reduction Act.

24

Table of Contents

Historical Cash Flows

SCE

Nine months ended September 30, 

(in millions)

    

2022

    

2021

Net cash provided by (used in) operating activities

$

2,158

$

(294)

Net cash provided by financing activities

 

1,757

 

4,377

Net cash used in investing activities

 

(4,104)

 

(3,654)

Net (decrease) increase in cash, cash equivalents and restricted cash

$

(189)

$

429

Net Cash Provided by (Used in) Operating Activities

The following table summarizes major categories of net cash provided by operating activities as provided in more detail in SCE's consolidated statements of cash flows for the nine months ended September 30, 2022 and 2021.

Nine months ended September 30, 

Change in cash flows

(in millions)

    

2022

    

2021

    

2022/2021

    

Net income

    

$

447

    

$

451

    

  

Non-cash items1

 

1,942

 

1,904

 

  

Subtotal

 

2,389

2,355

 

$

34

Changes in cash flow resulting from working capital2

 

(1,064)

 

(953)

 

(111)

Regulatory assets and liabilities

 

1,032

 

(484)

 

1,516

Wildfire related claims3

271

(2,120)

2,391

Proceeds from Morongo Transmission LLC4

400

(400)

Other noncurrent assets and liabilities5

 

(470)

 

508

 

(978)

Net cash provided by (used in) operating activities

$

2,158

$

(294)

$

2,452

1Non-cash items include depreciation and amortization, allowance for equity during construction, impairment and other income, deferred income taxes, Wildfire Insurance Fund amortization expenses and other.
2Changes in working capital items include receivables, accrued unbilled revenue, prepaid expenses, inventory, accounts payable, tax receivables and payables, and other current assets and liabilities.
3Represents an increase in wildfire estimated losses of $1.9 billion, partially offset by payments of $1.6 billion for 2017/2018 Wildfire/Mudslide Events. 2021 amount represents payment of $3.4 billion for 2017/2018 Wildfire/Mudslide Events, partially offset by an increase in wildfire estimated losses of $1.3 billion.
4Represents $400 million in proceeds from Morongo Transmission LLC for use of a portion of the West of Devers transmission line in the third quarter of 2021.
5Includes changes in wildfire-related insurance receivables. Also includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information.

Net cash provided by (used in) operating activities was impacted by the following:

Net income and non-cash items increased in 2022 by $34 million primarily due to higher CPUC-related revenue due to the escalation mechanism as set forth in the 2021 GRC final decision and recognition of return on rate base related to the CSRP decision, partially offset by higher operation and maintenance expenses and higher interest expense.

Net cash outflow for working capital was $1,064 million and $953 million during the nine months ended September 30, 2022 and 2021, respectively. Net cash outflows for 2022 and 2021 were primarily due to net increases in customer receivables and unbilled revenue of $1.3 billion and $1.2 billion, respectively.

25

Table of Contents

Net cash provided by (used in) regulatory assets and liabilities, including changes in net undercollections recorded in balancing accounts, was $1,032 million and $(484) million during the nine months ended September 30, 2022 and 2021, respectively. SCE has a number of balancing and memorandum accounts, which impact cash flows based on differences between timing of collection of amounts through rates and accrual expenditures. Cash flows were primarily impacted by the following:

2022

Net undercollections of BRRBA decreased by $159 million primarily due to current year overcollections due to higher sales volume and average rates due to extreme heat in California and recovery of prior year undercollections, including 2021 GRC authorized additional revenue requirement for the first nine months of 2021 to be collected over a 27-month period starting October 2021. These higher collections were partially offset by inclusion in BRRBA of $401 million of expense authorized under GRC track 2 for collection in customer rates starting March 2022 over a 36-month period and a revenue requirement of approximately $400 million authorized under GRC track 3 for collection in customer rates starting October 2022 over a 36-month period.
Undercollections decreased by $394 million related to wildfire risk mitigation and restoration memorandum and balancing accounts as a result of approval to recover costs in GRC track 2 and track 3, which were transferred to BRRBA for recovery as mentioned above, partially offset by additional WEMA and wildfire risk mitigation and restoration costs incurred.
Net undercollections for ERRA, PABA and the New System Generation Balancing Account ("NSGBA") increased by $298 million primarily due to current year undercollections due to higher energy prices and power purchase load, partially offset by current year overcollections due to higher volume and average rates driven by extreme heat in California and recovery of prior PABA and NSGBA undercollections.
Increased overcollections of $537 million for the public purpose and energy efficiency programs primarily due to lower program spending due to timing and increased sales volume.
Net overcollection increased by $188 million for the FERC balancing accounts primarily due to current year overcollections due to higher sales volume, recovery of prior year undercollections and lower operating expenses than amounts included in revenue requirements, partially offset by undercollection due to higher wildfire expense.
Increase in overcollections of $93 million for excess California Department of Water Resources ("DWR") bond and power charges to be refunded to customers over a 12-month period beginning in June 2022.
Increased overcollections of $123 million for GHG revenue related to GHG auction revenue received, partially offset by climate credits provided to customers and various transfers.
Undercollections of $112 million related to uncollectible expenses from residential customers.
Undercollections of $83 million in the CSRP memorandum account related to deferred CSRP post implementation costs.

2021

Net undercollections increased by $162 million primarily driven by adoption of 2021 GRC final decision, including authorized additional revenue requirement for the first nine months of 2021 to be collected over a 27-month period starting October 2021. The undercollections are partially offset by current year overcollection due to higher sales volume and rates, and recovery of prior year undercollections, including WEMA and GS&RP to be collected over a two-year and one-year period, respectively, starting October 2020.

26

Table of Contents

Undercollections of $218 million related to wildfire-related expenses that are probable of future recovery from customers, including wildfire risk mitigation costs, insurance premiums, service restoration and damage repair costs, partially offset by authorized revenue to recover certain wildfire insurance expenses and vegetation management expenses as a result of the 2021 GRC final decision.
Undercollections of CEMA accounts decreased by $74 million as a result of approval to recover drought restoration costs, which was transferred to BRRBA for recovery, partially offset by additional restoration costs due to wildfire events in 2020.
Net overcollections of GHG and low carbon fuel standard revenue increased by $129 million primarily due to receipt of GHG auction revenue, partially offset by climate credits paid to the customer.
Net undercollections for ERRA, PABA and NSGBA increased by $105 million primarily due to current year undercollections as a result of higher gas and power prices, partially offset by higher sales load and rates than forecast, and recovery of prior PABA and NSGBA undercollections.
Net undercollections of $119 million related to customer uncollectible expenses from COVID-19-related memorandum and balancing accounts.
Undercollection of $71 million in the CSRP memorandum account related to CSRP implementation costs.

Cash flows (used in) provided by other noncurrent assets and liabilities were primarily related to an increase in wildfire insurance receivables of $392 million in 2022 and recoveries of $708 million in 2021. Cash flow for other noncurrent assets and liabilities in 2022 includes payments of decommissioning costs of $161 million, partially offset by SCE's net earnings from nuclear decommissioning trust investments of $59 million. The 2021 amount includes payments of decommissioning costs of $191 million and SCE's net losses from nuclear decommissioning trust investments of $20 million. See "Nuclear Decommissioning Activities" below for further discussion.

Net Cash Provided by Financing Activities

The following table summarizes cash provided by financing activities for the nine months ended September 30, 2022 and 2021. Issuances of debt are discussed in "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."

Nine months ended September 30, 

(in millions)

2022

    

2021

Issuances of long-term debt, including premium/discount and net of issuance costs

$

2,949

$

4,798

Long-term debt repaid or repurchased

 

(373)

 

(1,031)

Short-term debt (repaid) borrowed, net

 

(993)

 

750

Commercial paper borrowing, net of (repaid)

508

(725)

Capital contributions from Edison International Parent

 

700

 

1,308

Payment of common stock dividends to Edison International

 

(975)

 

(650)

Payment of preference stock dividends

 

(83)

 

(85)

Other

 

24

 

12

Net cash provided by financing activities

$

1,757

$

4,377

Net Cash Used in Investing Activities

Cash flows used in investing activities are primarily due to total capital expenditures ($4.2 billion and $3.9 billion for the nine months ended September 30, 2022 and 2021, respectively). In addition, SCE had a net redemption of nuclear decommissioning trust investments of $81 million and $204 million during the nine months ended September 30, 2022 and 2021, respectively. See "Nuclear Decommissioning Activities" below for further discussion.

27

Table of Contents

Nuclear Decommissioning Activities

SCE's consolidated statements of cash flows include nuclear decommissioning activities, which are reflected in the following line items:

    

Nine months ended September 30, 

(in millions)

    

2022

    

2021

Net cash used in operating activities:

Net earnings (losses) from nuclear decommissioning trust investments

$

59

$

(20)

SCE's decommissioning costs

 

(161)

 

(191)

Net cash provided by investing activities:

 

 

Proceeds from sale of investments

3,120

3,218

Purchases of investments

 

(3,039)

 

(3,014)

Net cash impact

$

(21)

$

(7)

Net cash used in operating activities relates to interest and dividends less administrative expenses, taxes and SCE's decommissioning costs. Investing activities represent the purchase and sale of investments within the nuclear decommissioning trusts, including the reinvestment of earnings from nuclear decommissioning trust investments. The net cash impact reflects timing of decommissioning payments ($161 million and $191 million in 2022 and 2021, respectively) and reimbursements to SCE from the nuclear decommissioning trust ($140 million and $184 million in 2022 and 2021, respectively).

Edison International Parent and Other

The table below sets forth condensed historical cash flow from operations for Edison International Parent and Other, including intercompany eliminations.

Nine months ended September 30, 

(in millions)

    

2022

    

2021

Net cash used in operating activities

$

(46)

$

(122)

Net cash provided by financing activities

 

75

 

129

Net cash used in investing activities

 

(1)

 

Net increase in cash, cash equivalents and restricted cash

$

28

$

7

Net Cash Used in Operating Activities

Net cash used in operating activities was impacted by the following:

$136 million and $122 million cash outflow from operating activities in 2022 and 2021, respectively, primarily due to payments relating to interest and operating costs.
$90 million cash inflow from a wildfire insurance premium received by EIS in 2022.

Net Cash Provided by Financing Activities

Net cash provided by financing activities was as follows:

28

Table of Contents

Nine months ended September 30, 

(in millions)

    

2022

    

2021

Dividends paid to Edison International common shareholders

$

(787)

$

(741)

Dividends paid to Edison International preferred shareholders

(99)

(35)

Dividends received from SCE

 

975

 

650

Capital contributions to SCE

 

(700)

 

(1,308)

Issuance of preferred stock, net of issuance costs

1,235

Long-term debt issuance, net of discount and issuance costs

 

398

 

Long-term debt repayments

 

(400)

 

Issuance of term loan

 

600

 

Commercial paper financing, net

 

21

 

290

Other

 

67

 

38

Net cash provided by financing activities

$

75

$

129

Contingencies

Edison International's and SCE's contingencies are discussed in "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies."

MARKET RISK EXPOSURES

Edison International's and SCE's primary market risks are described in the 2021 Form 10-K. For further discussion of market risk exposures, including commodity price risk, credit risk, and interest rate risk, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "—Note 6. Derivative Instruments."

Commodity Price Risk

SCE records derivative instruments on its consolidated balance sheets as either assets or liabilities measured at fair value unless otherwise exempted from derivative treatment as normal purchases or sales. The fair value of outstanding derivative instruments used to mitigate exposure to commodity price risk was reflected as a net asset of $54 million and $44 million on SCE's consolidated balance sheets at September 30, 2022 and December 31, 2021, respectively. For further discussion of fair value measurements and the fair value hierarchy, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "— Note 6. Derivative Instruments."

Credit Risk

Credit risk exposure from counterparties for power and gas trading activities is measured as the sum of net accounts receivable (accounts receivable less accounts payable) and the current fair value of net derivative assets (derivative assets less derivative liabilities) reflected on the consolidated balance sheets. SCE enters into master agreements which typically provide for a right of set-off. Accordingly, SCE's credit risk exposure from counterparties is based on a net exposure under these arrangements. SCE manages the credit risk on the portfolio of counterparties based on credit ratings and other publicly disclosed information, such as financial statements, regulatory filings and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements. Based on SCE's policies and risk exposures related to credit, SCE does not anticipate a material adverse effect on their financial statements as a result of counterparty nonperformance. At September 30, 2022, SCE's power and gas trading counterparty credit risk exposure was $53 million, all of which is associated with entities that have an investment grade rating of A or higher. SCE assigns a credit rating to counterparties based on the lowest of a counterparty's S&P, Moody's, and Fitch's rating.

For more information related to credit risks, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments."

29

Table of Contents

CRITICAL ACCOUNTING ESTIMATES AND POLICIES

Rate Regulated Enterprises

Nature of Estimate Required. SCE follows the accounting principles for rate-regulated enterprises which are required for entities whose rates are set by regulators at levels intended to recover the estimated costs of providing service, plus a return on net investment, or rate base. Regulators may also impose penalties or grant incentives. Due to timing and other differences in the collection of revenue, these principles allow a cost that would otherwise be charged as an expense by an unregulated entity to be capitalized as a regulatory asset if it is probable that such cost is recoverable through future rates; conversely the principles allow creation of a regulatory liability for amounts collected in rates to recover costs expected to be incurred in the future or amounts collected in excess of costs incurred and refundable to customers. In addition, SCE recognizes revenue and regulatory assets from alternative revenue programs, which enables the utility to adjust future rates in response to past activities or completed events, if certain criteria are met, even for programs that do not qualify for recognition of "traditional" regulatory assets and liabilities.

Accounting principles for rate-regulated enterprises also require recognition of an impairment loss if it becomes probable that the regulated utility will abandon a plant investment, or if it becomes probable that the cost of a recently completed plant will be disallowed, either directly or indirectly, for ratemaking purposes and a reasonable estimate of the amount of the disallowance can be made.

Key Assumptions and Approach Used. SCE's management assesses at the end of each reporting period whether regulatory assets are probable of future recovery by considering factors such as the current regulatory environment, the issuance of rate orders on recovery of the specific or a similar incurred cost to SCE or other rate-regulated entities, and other factors that would indicate that the regulator will treat an incurred cost as allowable for ratemaking purposes. Using these factors, management has determined that existing regulatory assets and liabilities are probable of future recovery or settlement. This determination reflects the current regulatory climate and is subject to change in the future. SCE also considers whether any plant investments are probable of abandonment or disallowance.

Effect if Different Assumptions Used. Significant management judgment is required to evaluate the anticipated recovery of regulatory assets and plant investments, the recognition of incentives and revenue subject to refund, as well as the anticipated cost of regulatory liabilities or penalties. If future recovery of costs ceases to be probable, all or part of the regulatory assets, plant investments and/or liabilities would have to be written off against current period earnings. At September 30, 2022, the consolidated balance sheets included regulatory assets of $9.5 billion and regulatory liabilities of $9.1 billion. If different judgments were reached on recovery of costs and timing of income recognition, SCE's earnings may vary from the amounts reported.

Application to Post-2018 Wildfires

Management judgment was required to assess the probability of recovery of SCE's losses realized in connection with the Post-2018 Wildfires in excess of available insurance.

The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. On July 12, 2019, AB 1054 clarified that the CPUC must allow recovery of costs and expenses arising from a covered wildfire if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time, and based on the information available at that time. Further, utilities with a valid safety certification at the time of the relevant wildfire will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates “serious doubt” as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to dispel that doubt and prove its conduct was prudent. The serious doubt standard in AB 1054 is modeled after the Federal Energy Regulatory Commission’s cost recovery standard. SCE evaluates the probability of recovery for Post-2018 Wildfires

30

Table of Contents

in the context of the prudency standard laid out by AB 1054 above. This assessment is made based on SCE’s status as a holder of a valid safety certificate, facts known to date related to the ignition, and any regulatory decisions illustrating the interpretation and/or application of the prudency standard under AB 1054, which as of September 30, 2022 has not been applied by the CPUC to an actual cost recovery application filed by any California IOU. Management’s assessment of the probability of recovery may change, related to changes in any of these factors in the future.

For further discussion of Edison International's and SCE's critical accounting policies, see "Critical Accounting Estimates and Policies" in the 2021 MD&A.

NEW ACCOUNTING GUIDANCE

New accounting guidance is discussed in "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—New Accounting Guidance."

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Information responding to this section is included in the MD&A under the heading "Market Risk Exposures" and is incorporated herein by reference.

31

Table of Contents

FINANCIAL STATEMENTS

Consolidated Statements of Income

Edison International

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions, except per-share amounts, unaudited)

    

2022

    

2021

    

2022

    

2021

Total operating revenue

$

5,228

$

5,299

$

13,204

$

11,574

Purchased power and fuel

 

2,485

 

2,088

 

4,826

 

4,384

Operation and maintenance

 

979

 

1,222

 

3,827

 

2,817

Wildfire-related claims, net of insurance recoveries

 

889

 

1,273

 

1,316

 

1,276

Wildfire Insurance Fund expense

 

54

 

54

 

160

 

161

Depreciation and amortization

 

738

 

599

 

1,922

 

1,657

Property and other taxes

 

128

 

113

 

374

 

356

Impairment, net of other operating income

 

(1)

 

78

 

60

 

67

Total operating expenses

 

5,272

 

5,427

 

12,485

 

10,718

Operating (loss) income

 

(44)

 

(128)

 

719

 

856

Interest expense

 

(302)

 

(245)

 

(819)

 

(694)

Other income

 

85

 

47

 

219

 

195

(Loss) income before income taxes

 

(261)

 

(326)

 

119

 

357

Income tax (benefit) expense

 

(187)

 

(29)

 

(235)

 

3

Net (loss) income

 

(74)

 

(297)

 

354

 

354

Preference stock dividend requirements of SCE

 

27

 

27

 

78

 

80

Preferred stock dividend requirement of Edison International

27

17

79

38

Net (loss) income attributable to Edison International common shareholders

$

(128)

$

(341)

$

197

$

236

Basic (losses) earnings per share:

 

  

 

  

 

  

 

  

Weighted average shares of common stock outstanding

 

382

 

380

 

381

 

380

Basic (losses) earnings per common share attributable to Edison International common shareholders

$

(0.33)

$

(0.90)

$

0.52

$

0.62

Diluted (losses) earnings per share:

 

  

 

  

 

  

 

  

Weighted average shares of common stock outstanding, including effect of dilutive securities

 

383

 

380

 

382

 

380

Diluted (losses) earnings per common share attributable to Edison International common shareholders

$

(0.33)

$

(0.90)

$

0.52

$

0.62

The accompanying notes are an integral part of these consolidated financial statements.

32

Table of Contents

Consolidated Statements of Comprehensive Income

Edison International

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions, unaudited)

    

2022

    

2021

    

2022

    

2021

Net (loss) income

$

(74)

$

(297)

$

354

$

354

Other comprehensive income, net of tax:

 

  

 

  

 

  

 

  

Pension and postretirement benefits other than pensions

 

1

 

2

 

7

 

6

Other comprehensive income, net of tax

 

1

 

2

 

7

 

6

Comprehensive (loss) income

 

(73)

 

(295)

 

361

 

360

Less: Comprehensive income attributable to noncontrolling interests

 

27

 

27

 

78

 

80

Comprehensive (loss) income attributable to Edison International

$

(100)

$

(322)

$

283

$

280

The accompanying notes are an integral part of these consolidated financial statements.

33

Table of Contents

Consolidated Balance Sheets

Edison International

September 30, 

December 31, 

(in millions, unaudited)

    

2022

    

2021

ASSETS

 

  

 

  

Cash and cash equivalents

$

232

$

390

Receivables, less allowances of $391 and $193 for uncollectible accounts at respective dates

 

2,259

 

1,398

Accrued unbilled revenue

 

1,298

 

794

Inventory

 

439

 

420

Prepaid expenses

 

278

 

258

Regulatory assets

 

1,497

 

1,778

Wildfire Insurance Fund contributions

 

204

 

204

Other current assets

 

234

 

249

Total current assets

 

6,441

 

5,491

Nuclear decommissioning trusts

 

3,823

 

4,870

Marketable securities

7

12

Other investments

 

70

 

39

Total investments

 

3,900

 

4,921

Utility property, plant and equipment, less accumulated depreciation and amortization of $12,152 and $11,407 at respective dates

 

52,386

 

50,497

Nonutility property, plant and equipment, less accumulated depreciation of $109 and $98 at respective dates

 

213

 

203

Total property, plant and equipment

 

52,599

 

50,700

Receivables, less allowances of $35 and $116 for uncollectible accounts at respective dates

20

122

Regulatory assets (include $840 and $325 related to Variable Interest Entities "VIEs" at respective dates)

 

8,033

 

7,660

Wildfire Insurance Fund contributions

 

2,206

 

2,359

Operating lease right-of-use assets

 

1,530

 

1,932

Long-term insurance receivables

458

75

Other long-term assets

 

1,522

 

1,485

Total long-term assets

 

13,769

 

13,633

Total assets

$

76,709

$

74,745

The accompanying notes are an integral part of these consolidated financial statements.

34

Table of Contents

Consolidated Balance Sheets

Edison International

September 30, 

December 31, 

(in millions, except share amounts, unaudited)

    

2022

    

2021

LIABILITIES AND EQUITY

 

  

 

  

Short-term debt

$

3,011

$

2,354

Current portion of long-term debt

 

2,175

 

1,077

Accounts payable

 

2,348

 

2,002

Wildfire-related claims

173

131

Customer deposits

 

163

 

193

Regulatory liabilities

 

702

 

603

Current portion of operating lease liabilities

 

541

 

582

Other current liabilities

 

1,707

 

1,667

Total current liabilities

 

10,820

 

8,609

Long-term debt (include $823 and $314 related to VIEs at respective dates)

 

25,145

 

24,170

Deferred income taxes and credits

 

5,976

 

5,740

Pensions and benefits

 

460

 

496

Asset retirement obligations

 

2,785

 

2,772

Regulatory liabilities

 

8,348

 

8,981

Operating lease liabilities

 

989

 

1,350

Wildfire-related claims

 

1,962

 

1,733

Other deferred credits and other long-term liabilities

 

2,931

 

3,105

Total deferred credits and other liabilities

 

23,451

 

24,177

Total liabilities

 

59,416

 

56,956

Commitments and contingencies (Note 12)

 

  

 

  

Preferred stock (50,000,000 shares authorized; 1,250,000 shares of Series A and 750,000 shares of Series B issued and outstanding at respective dates)

1,977

1,977

Common stock, no par value (800,000,000 shares authorized; 381,873,341 and 380,378,145 shares issued and outstanding at respective dates)

 

6,167

 

6,071

Accumulated other comprehensive loss

 

(47)

 

(54)

Retained earnings

 

7,295

 

7,894

Total Edison International's shareholders' equity

 

15,392

 

15,888

Noncontrolling interests – preference stock of SCE

 

1,901

 

1,901

Total equity

 

17,293

 

17,789

Total liabilities and equity

$

76,709

$

74,745

The accompanying notes are an integral part of these consolidated financial statements.

35

Table of Contents

Consolidated Statements of Cash Flows

Edison International

Nine months ended September 30, 

(in millions, unaudited)

    

2022

    

2021

Cash flows from operating activities:

 

  

 

  

Net income

$

354

$

354

Adjustments to reconcile to net cash provided by operating activities:

 

 

Depreciation and amortization

 

1,977

 

1,709

Allowance for equity during construction

 

(91)

 

(92)

Impairment and other expense

 

60

 

67

Deferred income taxes

 

(237)

 

(1)

Wildfire Insurance Fund amortization expense

 

160

 

161

Other

 

50

 

34

Nuclear decommissioning trusts

 

(81)

 

(204)

Proceeds from Morongo Transmission LLC

400

Changes in operating assets and liabilities:

 

 

  

Receivables

 

(807)

 

(706)

Inventory

 

(20)

 

(10)

Accounts payable

 

363

 

282

Tax receivables and payables

 

171

 

204

Other current assets and liabilities

 

(681)

 

(716)

Regulatory assets and liabilities, net

 

1,032

 

(484)

Wildfire-related insurance receivable

 

(383)

 

707

Wildfire-related claims

 

271

 

(2,120)

Other noncurrent assets and liabilities

 

(26)

 

(1)

Net cash provided by (used in) operating activities

 

2,112

 

(416)

Cash flows from financing activities:

 

  

 

  

Long-term debt issued, plus premium and net of discount and issuance costs of $36 and $40 for the respective periods

 

3,347

 

4,798

Long-term debt repaid

 

(773)

 

(1,031)

Short-term debt issued

 

600

 

2,105

Short-term debt repaid

 

(993)

 

(1,355)

Common stock issued

 

10

 

28

Preferred stock issued, net

 

 

1,235

Commercial paper borrowing (repayments), net

 

529

 

(435)

Dividends and distribution to noncontrolling interests

 

(83)

 

(85)

Common stock dividends paid

 

(787)

 

(741)

Preferred stock dividends paid

(99)

(35)

Other

 

81

 

22

Net cash provided by financing activities

 

1,832

 

4,506

Cash flows from investing activities:

 

  

 

  

Capital expenditures

 

(4,206)

 

(3,948)

Proceeds from sale of nuclear decommissioning trust investments

 

3,120

 

3,218

Purchases of nuclear decommissioning trust investments

 

(3,039)

 

(3,014)

Other

 

20

 

90

Net cash used in investing activities

 

(4,105)

 

(3,654)

Net (decrease) increase in cash, cash equivalents and restricted cash

 

(161)

 

436

Cash, cash equivalents and restricted cash at beginning of period

 

394

 

89

Cash, cash equivalents and restricted cash at end of period

$

233

$

525

The accompanying notes are an integral part of these consolidated financial statements.

36

Table of Contents

Consolidated Statements of Income

Southern California Edison Company

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions, unaudited)

    

2022

    

2021

    

2022

    

2021

Operating revenue

$

5,217

$

5,293

$

13,174

$

11,552

Purchased power and fuel

 

2,485

 

2,088

 

4,826

 

4,384

Operation and maintenance

 

977

 

1,200

 

3,781

 

2,759

Wildfire-related claims, net of insurance recoveries

 

880

 

1,273

 

1,307

 

1,276

Wildfire Insurance Fund expense

 

54

 

54

 

160

 

161

Depreciation and amortization

 

737

 

598

 

1,920

 

1,655

Property and other taxes

 

128

 

111

 

371

 

353

Impairment, net of other operating income

 

(1)

 

79

 

61

 

68

Total operating expenses

 

5,260

 

5,403

 

12,426

 

10,656

Operating (loss) income

 

(43)

 

(110)

 

748

 

896

Interest expense

 

(258)

 

(211)

 

(706)

 

(593)

Other income

 

71

 

53

 

210

 

189

(Loss) income before taxes

 

(230)

 

(268)

 

252

 

492

Income tax (benefit) expense

 

(177)

 

(11)

 

(195)

 

41

Net (loss) income

 

(53)

 

(257)

 

447

 

451

Less: Preference stock dividend requirements

 

27

 

27

 

78

 

80

Net (loss) income available for common stock

$

(80)

$

(284)

$

369

$

371

Consolidated Statements of Comprehensive Income

Southern California Edison Company

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions, unaudited)

    

2022

    

2021

    

2022

    

2021

Net (loss) income

$

(53)

$

(257)

$

447

$

451

Other comprehensive income, net of tax:

 

  

 

  

 

  

 

  

Pension and postretirement benefits other than pensions

 

1

 

2

 

5

 

5

Other comprehensive income, net of tax

 

1

 

2

 

5

 

5

Comprehensive (loss) income

$

(52)

$

(255)

$

452

$

456

The accompanying notes are an integral part of these consolidated financial statements.

37

Table of Contents

Consolidated Balance Sheets

Southern California Edison Company

September 30, 

December 31, 

(in millions, unaudited)

    

2022

    

2021

ASSETS

 

  

 

  

Cash and cash equivalents

$

90

$

279

Receivables, less allowances of $391 and $193 for uncollectible accounts at respective dates

 

2,246

 

1,393

Accrued unbilled revenue

 

1,298

 

794

Inventory

 

439

 

420

Prepaid expenses

 

345

 

257

Regulatory assets

 

1,497

 

1,778

Wildfire Insurance Fund contributions

 

204

 

204

Other current assets

 

228

 

222

Total current assets

 

6,347

 

5,347

Nuclear decommissioning trusts

 

3,823

 

4,870

Other investments

 

56

 

34

Total investments

 

3,879

 

4,904

Utility property, plant and equipment, less accumulated depreciation and amortization of $12,152 and $11,407 at respective dates

 

52,386

 

50,497

Nonutility property, plant and equipment, less accumulated depreciation of $97 and $88 at respective dates

 

208

 

196

Total property, plant and equipment

 

52,594

 

50,693

Receivables, less allowances of $35 and $116 for uncollectible accounts at respective dates

20

122

Regulatory assets (include $840 and $325 related to VIEs at respective dates)

 

8,033

 

7,660

Wildfire Insurance Fund contributions

 

2,206

 

2,359

Operating lease right-of-use assets

 

1,524

 

1,925

Long-term insurance receivables

133

75

Long-term insurance receivables due from affiliate

 

334

 

Other long-term assets

 

1,490

 

1,453

Total long-term assets

 

13,740

 

13,594

Total assets

$

76,560

$

74,538

The accompanying notes are an integral part of these consolidated financial statements.

38

Table of Contents

Consolidated Balance Sheets

Southern California Edison Company

September 30, 

December 31, 

(in millions, except share amounts, unaudited)

    

2022

    

2021

LIABILITIES AND EQUITY

 

  

 

  

Short-term debt

$

2,389

$

2,354

Current portion of long-term debt

 

1,475

 

377

Accounts payable

 

2,349

 

1,999

Wildfire-related claims

173

131

Customer deposits

 

163

 

193

Regulatory liabilities

 

702

 

603

Current portion of operating lease liabilities

 

540

 

582

Other current liabilities

 

1,681

 

1,631

Total current liabilities

 

9,472

 

7,870

Long-term debt (include $823 and $314 related to VIEs at respective dates)

 

22,707

 

21,733

Deferred income taxes and credits

 

7,351

 

7,181

Pensions and benefits

 

105

 

111

Asset retirement obligations

 

2,785

 

2,772

Regulatory liabilities

 

8,348

 

8,981

Operating lease liabilities

 

984

 

1,343

Wildfire-related claims

 

1,962

 

1,733

Other deferred credits and other long-term liabilities

 

2,910

 

2,979

Total deferred credits and other liabilities

 

24,445

 

25,100

Total liabilities

 

56,624

 

54,703

Commitments and contingencies (Note 12)

 

  

 

  

Preference stock

 

1,945

 

1,945

Common stock, no par value (560,000,000 shares authorized; 434,888,104 shares issued and outstanding at respective dates)

 

2,168

 

2,168

Additional paid-in capital

 

7,735

 

7,033

Accumulated other comprehensive loss

 

(27)

 

(32)

Retained earnings

 

8,115

 

8,721

Total equity

 

19,936

 

19,835

Total liabilities and equity

$

76,560

$

74,538

The accompanying notes are an integral part of these consolidated financial statements.

39

Table of Contents

Consolidated Statements of Cash Flows

Southern California Edison Company

Nine months ended September 30, 

(in millions, unaudited)

    

2022

    

2021

Cash flows from operating activities:

 

  

 

  

Net income

$

447

$

451

Adjustments to reconcile to net cash provided by operating activities:

 

 

Depreciation and amortization

 

1,971

 

1,703

Allowance for equity during construction

 

(91)

 

(92)

Impairment and other expense

 

61

 

68

Deferred income taxes

 

(197)

 

39

Wildfire Insurance Fund amortization expense

 

160

 

161

Other

 

38

 

25

Nuclear decommissioning trusts

 

(81)

 

(204)

Proceeds from Morongo Transmission LLC

400

Changes in operating assets and liabilities:

 

 

Receivables

 

(801)

 

(704)

Inventory

 

(20)

 

(10)

Accounts payable

 

367

 

286

Tax receivables and payables

 

152

 

202

Other current assets and liabilities

 

(762)

 

(727)

Regulatory assets and liabilities, net

 

1,032

 

(484)

Wildfire-related insurance receivable

 

(392)

 

707

Wildfire-related claims

 

271

 

(2,120)

Other noncurrent assets and liabilities

 

3

 

5

Net cash provided by (used in) operating activities

 

2,158

 

(294)

Cash flows from financing activities:

 

  

 

  

Long-term debt issued, plus premium and net of discount and issuance costs of $34 and $40 for the respective periods

 

2,949

 

4,798

Long-term debt repaid

(373)

(1,031)

Short-term debt borrowed

 

 

2,105

Short-term debt repaid

 

(993)

 

(1,355)

Capital contributions from Edison International Parent

 

700

 

1,308

Commercial paper borrowing (repayments), net

 

508

 

(725)

Common stock dividends paid

(975)

(650)

Preference stock dividends paid

 

(83)

 

(85)

Other

 

24

 

12

Net cash provided by financing activities

 

1,757

 

4,377

Cash flows from investing activities:

 

  

 

  

Capital expenditures

 

(4,205)

 

(3,946)

Proceeds from sale of nuclear decommissioning trust investments

 

3,120

 

3,218

Purchases of nuclear decommissioning trust investments

 

(3,039)

 

(3,014)

Other

 

20

 

88

Net cash used in investing activities

 

(4,104)

 

(3,654)

Net (decrease) increase in cash, cash equivalents and restricted cash

 

(189)

 

429

Cash, cash equivalents and restricted cash at beginning of period

 

280

 

56

Cash, cash equivalents and restricted cash at end of period

$

91

$

485

The accompanying notes are an integral part of these consolidated financial statements.

40

Table of Contents

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(Unaudited)

Note 1.Summary of Significant Accounting Policies

Organization and Basis of Presentation

Edison International is the ultimate parent holding company of Southern California Edison Company ("SCE") and Edison Energy, LLC ("Edison Energy Group"). SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of Southern California. Edison Energy Group is an indirect wholly-owned subsidiary of Edison International and a holding company for Edison Energy, LLC ("Edison Energy") which is engaged in the competitive business of providing integrated decarbonization and energy solutions to commercial, institutional and industrial customers. Edison Energy's business activities are currently not material to report as a separate business segment. These combined notes to the consolidated financial statements apply to both Edison International and SCE unless otherwise described. Edison International's consolidated financial statements include the accounts of Edison International, SCE, and other wholly owned and controlled subsidiaries. References to Edison International refer to the consolidated group of Edison International and its subsidiaries. References to "Edison International Parent and Other" refer to Edison International Parent and its competitive subsidiaries and "Edison International Parent" refer to Edison International on a stand-alone basis, not consolidated with its subsidiaries. SCE's consolidated financial statements include the accounts of SCE, its wholly owned and controlled subsidiaries and a variable interest entity of which SCE is the primary beneficiary, SCE Recovery Funding LLC. All intercompany transactions have been eliminated from the consolidated financial statements.

Edison International's and SCE's significant accounting policies were described in the "Notes to Consolidated Financial Statements" included in Edison International's and SCE's combined Annual Report on Form 10-K for the year ended December 31, 2021 (the "2021 Form 10-K"). This quarterly report should be read in conjunction with the financial statements and notes included in the 2021 Form 10-K.

In the opinion of management, all adjustments, consisting only of adjustments of a normal recurring nature, have been made that are necessary to fairly state the consolidated financial position, results of operations, and cash flows in accordance with accounting principles generally accepted in the United States ("GAAP") for the periods covered by this quarterly report on Form 10-Q. The results of operations for the interim periods presented are not necessarily indicative of the operating results for the full year.

The December 31, 2021 financial statement data was derived from audited financial statements but does not include all disclosures required by GAAP.

41

Table of Contents

Cash, Cash Equivalents and Restricted Cash

Cash equivalents consist of investments in money market funds. Generally, the carrying value of cash equivalents equals the fair value, as these investments have original maturities of three months or less. The cash equivalents were as follows:

    

Edison International

SCE

September 30, 

December 31, 

September 30, 

December 31, 

(in millions)

    

2022

    

2021

2022

    

2021

Money market funds

$

139

$

329

$

4

$

230

Cash is temporarily invested until required for check clearing. Checks issued, but not yet paid by the financial institution, are reclassified from cash to accounts payable at the end of each reporting period.

The following table sets forth the cash, cash equivalents and restricted cash included in the consolidated statements of cash flows:

September 30, 

    

December 31, 

(in millions)

    

2022

    

2021

Edison International:

  

  

Cash and cash equivalents

$

232

$

390

Short-term restricted cash1

 

1

 

4

Total cash, cash equivalents and restricted cash

$

233

$

394

SCE:

 

 

  

Cash and cash equivalents

$

90

$

279

Short-term restricted cash1

 

1

 

1

Total cash, cash equivalents and restricted cash

$

91

$

280

1Reflected in "Other current assets" on Edison International's and SCE's consolidated balance sheets.

Allowance for Uncollectible Accounts

The allowance for uncollectible accounts is recorded based on SCE's estimate of expected credit losses and adjusted over the life of the receivables as needed. Since the customer base of SCE is concentrated in Southern California and exposes SCE to a homogeneous set of economic conditions, the allowance is measured on a collective basis on the historical amounts written-off, assessment of customer collectibility and current economic trends, including unemployment rates and any likelihood of recession for the region. At September 30, 2022, this included the estimated impacts of the COVID-19 pandemic.

The following table sets forth the changes in allowance for uncollectible accounts for SCE:

Three months ended

Three months ended

September 30, 2022

September 30, 2021

(in millions)

Customers

All others

Total

Customers

All others

Total

Beginning balance

 

$

364

 

$

17

$

381

$

254

 

$

16

$

270

Plus: current period provision for uncollectible accounts

Included in operation and maintenance expenses in earning activities1

 

12

 

2

 

14

 

9

 

4

 

13

Included in operation and maintenance expenses in cost-recovery activities2

57

57

52

52

Deferred to regulatory memorandum accounts

 

 

 

 

7

 

 

7

Less: write-offs, net of recoveries

 

24

2

 

26

 

1

 

3

 

4

Ending balance

 

$

409

 

$

17

$

426

³

$

321

 

$

17

$

338

42

Table of Contents

Nine months ended

Nine months ended

September 30, 2022

September 30, 2021

(in millions)

Customers

All others

Total

Customers

All others

Total

Beginning balance

 

$

293

 

$

16

$

309

³

$

175

 

$

13

$

188

Plus: current period provision for uncollectible accounts

Included in operation and maintenance expenses in earning activities1

 

45

 

11

 

56

 

27

 

11

 

38

Included in operation and maintenance expenses in cost-recovery activities2

112

112

112

112

Deferred to regulatory memorandum accounts

 

3

 

 

3

 

13

 

 

13

Less: write-offs, net of recoveries

 

44

 

10

 

54

 

6

 

7

 

13

Ending balance

 

$

409

 

$

17

$

426

³

$

321

 

$

17

$

338

1Earning activities is one of SCE's disaggregated revenue sources. See Note 7 for further details.
2Cost-recovery activities is one of SCE's disaggregated revenue sources. See Note 7 for further details. This portion of costs from the allowance for uncollectible expenses is recovered through the residential uncollectibles balancing account.
3Approximately $35 million and $116 million of allowance for uncollectible accounts are included in long-term "Receivables" on Edison International's and SCE's consolidated balance sheets as of September 30, 2022 and December 31, 2021, respectively.

Earnings Per Share

Edison International computes earnings per common share ("EPS") using the two-class method, which is an earnings allocation formula that determines EPS for each class of common stock and participating security. Edison International's participating securities are stock-based compensation awards, payable in common shares, which earn dividend equivalents on an equal basis with common shares once the awards are vested. See Note 13 for further information.

EPS attributable to Edison International common shareholders was computed as follows:

    

Three months ended September 30, 

    

Nine months ended September 30, 

(in millions, except per-share amounts)

    

2022

    

2021

    

2022

    

2021

Basic earnings per share:

Net (loss) income attributable to common shareholders

$

(128)

$

(341)

$

197

$

236

Net (loss) income available to common shareholders

$

(128)

$

(341)

$

197

$

236

Weighted average common shares outstanding

 

382

 

380

 

381

380

Basic (loss) earnings per share

$

(0.33)

$

(0.90)

$

0.52

$

0.62

Diluted (loss) earnings per share:

 

 

Net (loss) income attributable to common shareholders

$

(128)

$

(341)

$

197

$

236

Net (loss) income available to common shareholders

$

(128)

$

(341)

$

197

$

236

Net (loss) income available to common shareholders and assumed conversions

$

(128)

$

(341)

$

197

$

236

Weighted average common shares outstanding

 

382

 

380

 

381

380

Incremental shares from assumed conversions

 

1

 

 

1

Adjusted weighted average shares – diluted

 

383

 

380

 

382

380

Diluted (loss) earnings per share

$

(0.33)

$

(0.90)

$

0.52

$

0.62

In addition to the participating securities discussed above, Edison International also may award stock options, which are payable in common shares and are included in the diluted earnings per share calculation. Stock option awards to purchase 5,089,280 and 11,315,504 shares of common stock for the three months ended September 30, 2022 and 2021, respectively, and 5,204,369 and 11,351,651 shares of common stock for the nine months ended September 30, 2022 and 2021, respectively were outstanding, but were not included in the computation of diluted earnings per share because the effect would have been antidilutive.

43

Table of Contents

Revenue Recognition

Regulatory Proceedings

Cost of Capital

In August 2021, SCE filed an application with the CPUC for authority to establish its authorized cost of capital for utility operations for 2022 and to reset the related annual cost of capital mechanism that can adjust the authorized cost of capital between SCE's cost of capital proceedings based on changes in Moody's utility bond rate index. In September 2022, SCE received a proposed decision and an alternate proposed decision, both finding that the extraordinary circumstances warrant a departure from the cost of capital mechanism for 2022. The proposed decision, if approved, would initiate a second phase to determine SCE's cost of capital for 2022. The alternate proposed decision, if approved, would leave SCE's cost of capital at pre-2022 levels and close the proceedings. The outcome of the proceeding is uncertain. In the absence of a decision, SCE is currently recording revenue using the pre-2022 cost of capital, subject to refund.

FERC 2022 Formula Rate Update

In November 2021, SCE filed its 2022 annual update with the FERC with the proposed rates effective January 1, 2022, subject to settlement procedures and refund. SCE requested an increase in SCE's transmission revenue requirement of $326 million or 30% higher than amounts included in the 2021 annual rates. Pending resolution of the FERC formula rate proceedings, SCE recognized revenue in the first nine months of 2022 based on the FERC 2022 annual update rate. On August 2, 2022 SCE made a compliance filing required by FERC indicating that no changes are necessary to 2022 rates. No comments were filed by interested parties.

Impairment of Long-Lived Assets

In June 2022, the CPUC issued a decision in track 3 of SCE's 2021 GRC proceeding. As a result of the decision, SCE recorded a $17 million impairment of utility property, plant and equipment which was disallowed by the CPUC, primarily related to the costs associated with vegetation management software purchased by SCE.

In June 2022, SCE and The Utility Reform Network filed a joint motion for CPUC approval of a settlement agreement for SCE's Customer Service Re-platform ("CSRP") proceeding filed in July 2021 for expenditures incurred through April 2021. As a result of the settlement agreement, SCE recorded a $47 million impairment of property, plant and equipment.

New Accounting Guidance

Accounting Guidance Adopted

In November 2021, the Financial Accounting Standards Board (“FASB”) issued an accounting standards update to require business entities that account for transactions with a government by analogizing to a grant or contribution accounting model to make certain annual disclosures. Edison International and SCE have adopted this standard on January 1, 2022 using the prospective adoption approach. The adoption of this standard did not have a material impact on Edison International's and SCE's annual disclosure.

Subsequent Event

In October 2022, Edison Energy acquired an international energy and sustainability consultancy based in the United Kingdom for an initial cash payment of $18 million. Under the terms of the acquisition agreement, the sellers will be entitled to up to 14 million British pounds ($15 million U.S. dollars at September 30, 2022) in additional consideration if certain financial thresholds are achieved after 3 years.

44

Table of Contents

Note 2.Consolidated Statements of Changes in Equity

The following table provides Edison International's changes in equity for the nine months ended September 30, 2022:

Noncontrolling

Equity Attributable to Edison International Shareholders

Interests

Accumulated

Other

Preferred

Common

Comprehensive

Retained

Preference

Total

(in millions, except per share amounts)

    

Stock

Stock

    

Loss

    

Earnings

    

Subtotal

    

Stock

    

Equity

Balance at December 31, 2021

$

1,977

$

6,071

$

(54)

$

7,894

$

15,888

$

1,901

$

17,789

Net income

 

 

 

110

 

110

 

26

 

136

Other comprehensive income

 

 

2

 

 

2

 

 

2

Common stock issued, net of issuance cost

 

12

 

 

 

12

 

 

12

Common stock dividends declared ($0.7000 per share)

 

 

 

(267)

 

(267)

 

 

(267)

Preferred stock dividend declared ($26.875 per share for Series A and $17.08333 per share for Series B)

(21)

(21)

(21)

Dividends to noncontrolling interests ($11.160 - $35.937 per share for preference stock)

 

 

 

 

 

(26)

 

(26)

Noncash stock-based compensation

 

7

 

 

 

7

 

 

7

Balance at March 31, 2022

$

1,977

$

6,090

$

(52)

$

7,716

$

15,731

$

1,901

$

17,632

Net income

 

 

 

267

 

267

 

25

 

292

Other comprehensive income

 

 

4

 

 

4

 

 

4

Common stock issued, net of issuance cost

 

27

 

 

 

27

 

 

27

Common stock dividends declared ($0.7000 per share)

 

 

 

(267)

 

(267)

 

 

(267)

Dividends to noncontrolling interests ($14.017 - $35.937 per share for preference stock)

 

 

 

 

 

(25)

 

(25)

Noncash stock-based compensation

 

12

 

 

 

12

 

 

12

Balance at June 30, 2022

$

1,977

$

6,129

$

(48)

$

7,716

$

15,774

$

1,901

$

17,675

Net (loss) income

 

 

 

(101)

 

(101)

 

27

 

(74)

Other comprehensive income

 

 

1

 

 

1

 

 

1

Common stock issued, net of issuance cost

 

28

 

 

 

28

 

 

28

Common stock dividends declared ($0.7000 per share)

 

 

 

(267)

 

(267)

 

 

(267)

Preferred stock dividend declared ($26.875 per share for Series A and $25.000 per share for Series B)

(53)

(53)

(53)

Dividends to noncontrolling interests ($17.8564 - $35.937 per share for preference stock)

 

 

 

 

 

(27)

 

(27)

Noncash stock-based compensation

 

10

 

 

 

10

 

 

10

Balance at September 30, 2022

$

1,977

$

6,167

$

(47)

$

7,295

$

15,392

$

1,901

$

17,293

45

Table of Contents

The following table provides Edison International's changes in equity for the nine months ended September 30, 2021:

Noncontrolling

Equity Attributable to Edison International Shareholders

Interests

Accumulated

Other

Preferred

Common

Comprehensive

Retained

Preference

Total

(in millions, except per share amounts)

    

Stock

Stock

    

Loss

    

Earnings

    

Subtotal

    

Stock

    

Equity

Balance at December 31, 2020

$

$

5,962

$

(69)

$

8,155

$

14,048

$

1,901

$

15,949

Net income

 

 

 

 

263

 

263

 

27

 

290

Other comprehensive income

 

 

 

2

 

 

2

 

 

2

Common stock issued, net of issuance cost

21

21

21

Preferred stock issued, net of issuance cost

1,237

1,237

1,237

Common stock dividends declared ($0.6625 per share)

 

 

 

 

(251)

 

(251)

 

 

(251)

Preferred stock dividend accrued ($3.434 per share)

(4)

(4)

(4)

Dividends to noncontrolling interests ($15.625 - $35.936 per share for preference stock)

 

 

 

 

 

 

(27)

 

(27)

Noncash stock-based compensation

 

 

6

 

 

 

6

 

 

6

Balance at March 31, 2021

$

1,237

$

5,989

$

(67)

$

8,163

$

15,322

$

1,901

$

17,223

Net income

 

 

 

 

335

 

335

 

26

 

361

Other comprehensive income

 

 

 

2

 

 

2

 

 

2

Common stock issued, net of issuance cost

14

14

14

Preferred stock issuance cost

(2)

(2)

(2)

Common stock dividends declared ($0.6625 per share)

 

 

 

 

(252)

 

(252)

 

 

(252)

Preferred stock dividend accrued ($13.2882 per share)

(17)

(17)

(17)

Dividends to noncontrolling interests ($15.625 - $35.936 per share for preference stock)

 

 

 

 

 

 

(26)

 

(26)

Noncash stock-based compensation

 

 

10

 

 

 

10

 

 

10

Balance at June 30, 2021

$

1,235

$

6,013

$

(65)

$

8,229

$

15,412

$

1,901

$

17,313

Net (loss) income

 

 

 

 

(324)

 

(324)

 

27

 

(297)

Other comprehensive income

 

 

 

2

 

 

2

 

 

2

Common stock issued, net of issuance cost

 

10

 

 

 

10

 

 

10

Common stock dividends declared ($0.6625 per share)

 

 

 

 

(252)

 

(252)

 

 

(252)

Preferred stock dividend accrued ($3.4375 per share)

(17)

(17)

(17)

Dividends to noncontrolling interests ($15.625 - $35.936 per share for preference stock)

 

 

 

 

 

 

(27)

 

(27)

Noncash stock-based compensation and other

 

 

10

 

 

 

10

 

 

10

Balance at September 30, 2021

$

1,235

$

6,033

$

(63)

$

7,636

$

14,841

$

1,901

$

16,742

46

Table of Contents

The following table provides SCE's changes in equity for the nine months ended September 30, 2022:

Accumulated

Additional

Other

Preference

Common

Paid-in

Comprehensive

Retained

Total

(in millions, except per share amounts)

    

Stock

    

Stock

    

Capital

    

Loss

    

Earnings

    

Equity

Balance at December 31, 2021

$

1,945

$

2,168

$

7,033

$

(32)

$

8,721

$

19,835

Net income

 

 

 

 

 

173

 

173

Other comprehensive income

 

 

 

 

1

 

 

1

Dividends declared on common stock ($0.7473 per share)

 

 

 

 

 

(325)

 

(325)

Dividends on preference stock ($11.160 - $35.937 per share)

 

 

 

 

 

(26)

 

(26)

Stock-based compensation

 

 

 

(9)

 

 

 

(9)

Noncash stock-based compensation

 

 

 

4

 

 

(1)

 

3

Balance at March 31, 2022

$

1,945

$

2,168

$

7,028

$

(31)

$

8,542

$

19,652

Net income

 

 

 

 

 

327

 

327

Other comprehensive income

 

 

 

 

3

 

 

3

Capital contribution from Edison International Parent

 

 

 

700

 

 

 

700

Dividends declared on common stock ($0.7473 per share)

 

 

 

 

 

(325)

 

(325)

Dividends declared on preference stock ($14.017 - $35.937 per share)

 

 

 

 

 

(25)

 

(25)

Stock-based compensation

(1)

(1)

Noncash stock-based compensation

 

 

 

5

 

 

1

 

6

Balance at June 30, 2022

$

1,945

$

2,168

$

7,732

$

(28)

$

8,520

$

20,337

Net loss

 

 

 

 

 

(53)

 

(53)

Other comprehensive income

 

 

 

 

1

 

 

1

Dividends declared on common stock ($0.7473 per share)

 

 

 

 

 

(325)

 

(325)

Dividends declared on preference stock ($17.8564 - $35.937 per share)

 

 

 

 

 

(27)

 

(27)

Stock-based compensation

 

 

 

(2)

 

 

 

(2)

Noncash stock-based compensation and other

 

 

 

5

 

 

 

5

Balance at September 30, 2022

$

1,945

$

2,168

$

7,735

$

(27)

$

8,115

$

19,936

47

Table of Contents

The following table provides SCE's changes in equity for the nine months ended September 30, 2021:

Accumulated

Additional

Other

Preference

Common

Paid-in

Comprehensive

Retained

Total

(in millions, except per share amounts)

    

Stock

    

Stock

    

Capital

    

Loss

    

Earnings

    

Equity

Balance at December 31, 2020

$

1,945

$

2,168

$

5,387

$

(41)

$

9,191

$

18,650

Net income

 

 

 

 

 

323

 

323

Other comprehensive income

 

 

 

 

2

 

 

2

Capital contribution from Edison International Parent

900

900

Dividends declared on common stock ($0.7473 per share)

 

 

 

 

 

(325)

 

(325)

Dividends declared on preference stock (15.625 - $35.936 per share)

 

 

 

 

 

(27)

 

(27)

Stock-based compensation

 

 

 

(4)

 

 

 

(4)

Noncash stock-based compensation

 

 

 

3

 

 

 

3

Balance at March 31, 2021

$

1,945

$

2,168

$

6,286

$

(39)

$

9,162

$

19,522

Net income

 

 

 

 

 

385

 

385

Other comprehensive income

 

 

 

 

1

 

 

1

Capital contribution from Edison International Parent

 

 

 

325

 

 

 

325

Dividends declared on common stock ($0.7473 per share)

(325)

(325)

Dividends declared on preferred and preference stock ($15.625 - $35.936 per share for preference stock)

 

 

 

 

 

(26)

 

(26)

Noncash stock-based compensation

 

 

 

5

 

 

 

5

Balance at June 30, 2021

$

1,945

$

2,168

$

6,616

$

(38)

$

9,196

$

19,887

Net loss

 

 

 

 

 

(257)

 

(257)

Other comprehensive income

 

 

 

 

2

 

 

2

Capital contribution from Edison International Parent

 

 

 

83

 

 

 

83

Dividends declared on common stock ($0.7473 per share)

 

 

 

 

 

(325)

 

(325)

Dividends declared on preferred and preference stock ($15.625 - $35.936 per share for preference stock)

 

 

 

 

 

(27)

 

(27)

Noncash stock-based compensation and other

 

 

 

5

 

 

 

5

Balance at September 30, 2021

$

1,945

$

2,168

$

6,704

$

(36)

$

8,587

$

19,368

Note 3.Variable Interest Entities

A VIE is defined as a legal entity that meets one of two conditions: (1) the equity owners do not have sufficient equity at risk, or (2) the holders of the equity investment at risk, as a group, lack any of the following three characteristics: decision-making rights, the obligation to absorb losses or the right to receive the expected residual returns of the entity. The primary beneficiary is identified as the variable interest holder that has both the power to direct the activities of the VIE that most significantly impact the entity's economic performance and the obligation to absorb losses or the right to receive benefits from the entity that could potentially be significant to the VIE. The primary beneficiary is required to consolidate the VIE. Commercial and operating activities are generally the factors that most significantly impact the economic performance of such VIEs. Commercial and operating activities include construction, operation and maintenance, fuel procurement, dispatch and compliance with regulatory and contractual requirements.

48

Table of Contents

Variable Interest in VIEs that are Consolidated

California Assembly Bill 1054 ("AB 1054"), executed on July 12, 2019, requires SCE to exclude from the equity portion of SCE's rate base approximately $1.6 billion in wildfire risk mitigation capital expenditures ("AB 1054 Excluded Capital Expenditures"). SCE Recovery Funding LLC is a bankruptcy remote, wholly owned special purpose subsidiary, consolidated by SCE. SCE Recovery Funding LLC is a VIE and SCE is the primary beneficiary. SCE Recovery Funding LLC was formed in 2021 for the purpose of issuing and servicing securitized bonds related to SCE's AB 1054 Excluded Capital Expenditures.

In February 2022 and 2021, SCE Recovery Funding LLC issued $533 million and $338 million of securitized bonds, respectively, and used the proceeds to acquire SCE's right, title and interest in and to non-bypassable rates and other charges to be collected from certain existing and future customers in SCE's service territory, associated with the AB 1054 Excluded Capital Expenditures ("Recovery Property"), until the bonds are paid in full and all financing costs have been recovered. The securitized bonds are secured by the Recovery Property and cash collections from the non-bypassable rates and other charges are the sole source of funds to satisfy the debt obligation. The bondholders have no recourse to SCE. For further details, see Note 5.

The following table summarizes the impact of SCE Recovery Funding LLC on SCE's and Edison International's consolidated balance sheets.

September 30, 

December 31, 

(in millions)

2022

2021

Other current assets

$

49

$

19

Regulatory assets: non-current

840

325

Regulatory liabilities: current

24

14

Current portion of long-term debt

25

14

Other current liabilities

13

1

Long-term debt1

 

823

314

1The bondholders have no recourse to SCE.

Variable Interest in VIEs that are not Consolidated

Power Purchase Agreements

SCE has PPAs that are classified as variable interests in VIEs, including agreements through which SCE provides the natural gas to fuel the plants, fixed price contracts for renewable energy, and resource adequacy agreements that, upon the seller's election, include the purchase of energy at fixed prices. SCE has concluded that it is not the primary beneficiary of these VIEs since it does not control the commercial and operating activities of these entities. Since payments for capacity are the primary source of income, the most significant economic activity for these VIEs is the operation and maintenance of the power plants.

As of the balance sheet date, the carrying amount of assets and liabilities in SCE's consolidated balance sheet that relate to involvement with VIEs that are not consolidated result from amounts due under the PPAs. Under these contracts, SCE recovers the costs incurred through demonstration of compliance with its CPUC-approved long-term power procurement plans. SCE has no residual interest in the entities and has not provided or guaranteed any debt or equity support, liquidity arrangements, performance guarantees, or other commitments associated with these contracts other than the purchase commitments described in Note 12 of the 2021 Form 10-K. As a result, there is no significant potential exposure to loss to SCE from its variable interest in these VIEs. The aggregate contracted capacity dedicated to SCE from these VIE projects was 3,901 MW and 3,455 MW at September 30, 2022 and 2021, respectively, and the amounts that SCE paid to these projects were $252 million and $248 million for the three months ended September 30, 2022 and 2021, respectively, and

49

Table of Contents

$460 million and $519 million for the nine months ended September 30, 2022 and 2021, respectively. These amounts are recoverable in customer rates, subject to reasonableness review.

Unconsolidated Trusts of SCE

SCE Trust II, Trust III, Trust IV, Trust V, and Trust VI were formed in 2013, 2014, 2015, 2016, and 2017, respectively, for the exclusive purpose of issuing the 5.10%, 5.75%, 5.375%, 5.45%, and 5.00% trust preference securities, respectively ("trust securities"). The trusts are VIEs. SCE has concluded that it is not the primary beneficiary of these VIEs as it does not have the obligation to absorb the expected losses or the right to receive the expected residual returns of the trusts. SCE Trust II, Trust III, Trust IV, Trust V and Trust VI issued to the public trust securities in the face amounts of $400 million, $275 million, $325 million, $300 million, and $475 million (cumulative, liquidation amounts of $25 per share), respectively, and $10,000 of common stock each to SCE. The trusts invested the proceeds of these trust securities in Series G, Series H, Series J, Series K, and Series L Preference Stock issued by SCE in the principal amounts of $400 million, $275 million, $325 million, $300 million, and $475 million (cumulative, $2,500 per share liquidation values), respectively, which have substantially the same payment terms as the respective trust securities.

The Series G, Series H, Series J, Series K, and Series L Preference Stock and the corresponding trust securities do not have a maturity date. Upon any redemption of any shares of the Series G, Series H, Series J, Series K, or Series L Preference Stock, a corresponding dollar amount of trust securities will be redeemed by the applicable trust. The applicable trust will make distributions at the same rate and on the same dates on the applicable series of trust securities if and when the SCE board of directors declares and makes dividend payments on the related Preference Stock. The applicable trust will use any dividends it receives on the related Preference Stock to make its corresponding distributions on the applicable series of trust securities. If SCE does not make a dividend payment to any of these trusts, SCE would be prohibited from paying dividends on its common stock. SCE has fully and unconditionally guaranteed the payment of the trust securities and trust distributions, if and when SCE pays dividends on the related Preference Stock.

The Trust II, Trust III, Trust IV, Trust V and Trust VI balance sheets as of September 30, 2022 and December 31, 2021 consisted of investments of $220 million, $275 million, $325 million, $300 million, and $475 million in the Series G, Series H, Series J, Series K and Series L Preference Stock, respectively, $220 million, $275 million, $325 million, $300 million, and $475 million of trust securities, respectively, and $10,000 each of common stock.

The following table provides a summary of the trusts' income statements:

Three months ended September 30, 

(in millions)

    

Trust II

    

Trust III

    

Trust IV

    

Trust V

    

Trust VI

2022

 

Dividend income

$

2

$

4

$

4

$

4

$

6

Dividend distributions

 

2

 

4

 

4

 

4

 

6

2021

 

  

 

  

 

 

  

 

  

Dividend income

$

5

$

4

$

4

$

4

$

6

Dividend distributions

 

5

4

4

4

6

Nine months ended September 30, 

(in millions)

    

Trust II

    

Trust III

    

Trust IV

    

Trust V

    

Trust VI

2022

 

Dividend income

$

8

$

12

$

13

$

12

$

18

Dividend distributions

 

8

 

12

 

13

 

12

 

18

2021

 

  

 

  

 

  

 

  

 

  

Dividend income

$

15

$

12

$

13

$

12

$

18

Dividend distributions

 

15

12

13

12

18

50

Table of Contents

Note 4.Fair Value Measurements

Recurring Fair Value Measurements

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (referred to as an "exit price"). Fair value of an asset or liability considers assumptions that market participants would use in pricing the asset or liability, including assumptions about nonperformance risk. As of September 30, 2022 and December 31, 2021, nonperformance risk was not material for Edison International and SCE.

Assets and liabilities are categorized into a three-level fair value hierarchy based on valuation inputs used to determine fair value.

Level 1 – The fair value of Edison International's and SCE's Level 1 assets and liabilities is determined using unadjusted quoted prices in active markets that are available at the measurement date for identical assets and liabilities. This level includes exchange-traded equity securities, U.S. treasury securities, mutual funds, and money market funds.

Level 2 – Edison International's and SCE's Level 2 assets and liabilities include fixed income securities, primarily consisting of U.S. government and agency bonds, municipal bonds and corporate bonds, and over-the-counter derivatives. The fair value of fixed income securities is determined using a market approach by obtaining quoted prices for similar assets and liabilities in active markets and inputs that are observable, either directly or indirectly, for substantially the full term of the instrument.

The fair value of SCE's over-the-counter derivative contracts is determined using an income approach. SCE uses standard pricing models to determine the net present value of estimated future cash flows. Inputs to the pricing models include forward published or posted clearing prices from an exchange (Intercontinental Exchange) for similar instruments and discount rates. A primary price source that best represents trade activity for each market is used to develop observable forward market prices in determining the fair value of these positions. Broker quotes, prices from exchanges, or comparison to executed trades are used to validate and corroborate the primary price source. These price quotations reflect mid-market prices (average of bid and ask) and are obtained from sources believed to provide the most liquid market for the commodity.

Level 3 – The fair value of SCE's Level 3 assets and liabilities is determined using the income approach through various models and techniques that require significant unobservable inputs. This level includes derivative contracts that trade infrequently such as congestion revenue rights ("CRRs"). Edison International Parent and Other does not have any Level 3 assets and liabilities.

Assumptions are made in order to value derivative contracts in which observable inputs are not available. In circumstances where fair value cannot be verified with observable market transactions, it is possible that a different valuation model could produce a materially different estimate of fair value. Modeling methodologies, inputs, and techniques are reviewed and assessed as markets continue to develop and more pricing information becomes available, and the fair value is adjusted when it is concluded that a change in inputs or techniques would result in a new valuation that better reflects the fair value of those derivative contracts. See Note 6 for a discussion of derivative instruments.

51

Table of Contents

SCE

The following table sets forth assets and liabilities of SCE that were accounted for at fair value by level within the fair value hierarchy:

    

September 30, 2022

Netting

 and 

 

(in millions)

    

Level 1

    

Level 2

    

Level 3

    

Collateral1

    

Total

Assets at fair value

Derivative contracts

$

$

15

$

55

$

(16)

$

54

Money market funds and other

 

4

22

 

 

 

26

Nuclear decommissioning trusts:

 

 

 

  

 

  

 

Stocks2

 

1,465

 

 

 

 

1,465

Fixed Income3

 

839

 

1,255

 

 

 

2,094

Short-term investments, primarily cash equivalents

 

203

 

112

 

 

 

315

Subtotal of nuclear decommissioning trusts4

 

2,507

 

1,367

 

 

 

3,874

Total assets

 

2,511

 

1,404

 

55

 

(16)

 

3,954

Liabilities at fair value

 

  

 

  

 

  

 

  

 

  

Derivative contracts

 

 

38

 

2

 

(40)

 

Total liabilities

 

 

38

 

2

 

(40)

 

Net assets

$

2,511

$

1,366

$

53

$

24

$

3,954

    

December 31, 2021

Netting

 and 

 

(in millions)

    

Level 1

    

Level 2

    

Level 3

    

Collateral1

    

Total

Assets at fair value

Derivative contracts

$

$

26

$

49

$

(31)

$

44

Money market funds and other

 

230

 

23

 

 

 

253

Nuclear decommissioning trusts:

 

  

 

  

 

  

 

  

 

  

Stocks2

 

1,972

 

 

 

 

1,972

Fixed Income3

 

1,083

 

1,607

 

 

 

2,690

Short-term investments, primarily cash equivalents

 

102

 

125

 

 

 

227

Subtotal of nuclear decommissioning trusts4

 

3,157

 

1,732

 

 

 

4,889

Total assets

 

3,387

 

1,781

 

49

 

(31)

 

5,186

Liabilities at fair value

 

  

 

  

 

  

 

  

 

  

Derivative contracts

 

 

42

 

5

 

(47)

 

Total liabilities

 

 

42

 

5

 

(47)

 

Net assets

$

3,387

$

1,739

$

44

$

16

$

5,186

1Represents the netting of assets and liabilities under master netting agreements and cash collateral.
2Approximately 75% SCE's equity investments were in companies located in the United States at both September 30, 2022 and December 31, 2021.
3Includes corporate bonds, which were diversified by the inclusion of collateralized mortgage obligations and other asset backed securities, of $46 million and $30 million at September 30, 2022 and December 31, 2021, respectively.
4Excludes net payables of $51 million and $19 million at September 30, 2022 and December 31, 2021, respectively, which consist of interest and dividend receivables as well as receivables and payables related to SCE's pending securities sales and purchases.

52

Table of Contents

SCE Fair Value of Level 3

The following table sets forth a summary of changes in SCE's fair value of Level 3 net derivative assets and liabilities:

    

Three months ended

    

Nine months ended

September 30, 

September 30, 

(in millions)

2022

2021

2022

2021

Fair value of net assets at beginning of period

$

32

$

67

$

44

$

108

Sales

(1)

(1)

(7)

(2)

Settlements

 

(25)

 

(30)

 

(54)

 

(46)

Total realized/unrealized gains1,2

 

47

 

69

 

70

 

45

Fair value of net assets at end of period

$

53

$

105

$

53

$

105

1Due to regulatory mechanisms, SCE's realized and unrealized gains and losses are recorded as regulatory assets and liabilities.
2There were no material transfers into or out of Level 3 during 2022 and 2021.

The following table sets forth SCE's valuation techniques and significant unobservable inputs used to determine fair value for significant Level 3 assets and liabilities:

    

Fair Value

Significant

Weighted

(in millions)

Valuation

Unobservable

Range

Average

    

Assets

    

Liabilities

    

Technique

    

 Input

    

(per MWh)

    

(per MWh)

Congestion revenue rights

  

  

  

  

  

  

September 30, 2022

$

55

$

2

 

Auction prices

 

CAISO CRR auction prices

 

$(6.28) - $43.32

$

0.72

December 31, 2021

 

49

 

5

 

Auction prices

 

CAISO CRR auction prices

 

$(18.87) - $43.03

1.46

Level 3 Fair Value Uncertainty

For CRRs, increases or decreases in CAISO auction prices would result in higher or lower fair value, respectively.

Nuclear Decommissioning Trusts

SCE's nuclear decommissioning trust investments include equity securities, U.S. treasury securities, and other fixed income securities. Equity and treasury securities are classified as Level 1 as fair value is determined by observable market prices in active or highly liquid and transparent markets. The remaining fixed income securities are classified as Level 2. There are no securities classified as Level 3 in the nuclear decommissioning trusts.

Edison International Parent and Other

Edison International Parent and Other assets measured at fair value and classified as Level 1 consisted of $7 million and $12 million in equity investments as of September 30, 2022 and December 31, 2021, respectively and money market funds of $135 million and $99 million at September 30, 2022 and December 31, 2021, respectively, and classified as Level 2 consisted of short-term investments of $3 million and $6 million at September 30, 2022 and December 31, 2021, respectively. There are no securities classified as Level 3 for Edison International Parent and Other.

53

Table of Contents

Fair Value of Debt Recorded at Carrying Value

The carrying value and fair value of Edison International's and SCE's long-term debt (including current portion of long-term debt) are as follows:

    

September 30, 2022

    

December 31, 2021

Carrying 

Fair 

Carrying 

Fair 

(in millions)

    

Value1

    

Value2

    

Value1

    

Value2

Edison International

$

27,320

$

23,434

$

25,247

$

27,718

SCE

 

24,182

 

20,399

 

22,110

 

24,375

1Carrying value is net of debt issuance costs.
2The fair value of Edison International's and SCE's short-term and long-term debt is classified as Level 2.

Note 5.Debt and Credit Agreements

Long-Term Debt

In January 2022, SCE issued $500 million of 2.75% first and refunding mortgage bonds due in 2032 and $700 million of 3.45% first and refunding mortgage bonds due in 2052. The proceeds were used to finance or refinance eligible sustainable projects.

In May 2022, SCE issued $300 million of 4.20% first and refunding mortgage bonds due in 2025, $600 million of 4.70% first and refunding mortgage bonds due in 2027 and $350 million of 5.45% first and refunding mortgage bonds due in 2052. The proceeds were used to fund the payment of wildfire claims above the amount of insurance proceeds and to repay commercial paper borrowings.

In August 2022, Edison International Parent issued $400 million of 4.70% senior notes due in 2025. The proceeds were used for general corporate purposes.

Senior Secured Recovery Bonds

In the first quarter of 2022, SCE Recovery Funding LLC issued $533 million of Senior Secured Recovery Bonds, Series 2022-A, in three tranches ("Recovery Bonds") and used the proceeds to acquire Recovery Property. The three tranches of Recovery Bonds consisted of $100 million, 1.98% with final maturity in 2030; $305 million, 2.94% with final maturity in 2044; and $128 million, 3.24% with final maturity in 2048. The Recovery Bonds are payable only from and secured by the Recovery Property. SCE Recovery Funding LLC is consolidated by SCE for financial reporting purposes; however, the Recovery Bonds do not constitute a debt or other legal obligation of, or interest in, SCE or any of its affiliates, except for SCE Recovery Funding LLC. SCE used the proceeds it received from the sale of Recovery Property to reimburse itself for previously incurred AB 1054 Excluded Capital Expenditures, including the retirement of related debt and financing costs. For further details, see Note 3.

54

Table of Contents

Credit Agreements and Short-Term Debt

The following table summarizes the status of the credit facilities at September 30, 2022:

(in millions, except for rates)

Execution

Termination

Secured Overnight Financing Rate ("SOFR")

Outstanding

Outstanding

Amount

date

date

plus (bps) 

Use of proceeds

    

Commitment

    

borrowings

    

letters of credit

    

available

Edison International Parent

May 2022

May 2026

128

Support commercial paper borrowings and general corporate purposes1, 3

$

1,500

$

22

$

$

1,478

Total Edison International Parent:

$

1,500

$

22

$

$

1,478

SCE

May 2022

May 2026

108

Support commercial paper borrowings and general corporate purposes2, 3

$

3,350

$

1,109

$

430

$

1,811

Total SCE:

$

3,350

$

1,109

$

430

$

1,811

Total Edison International:

$

4,850

$

1,131

$

430

$

3,289

1At September 30, 2022, Edison International Parent had $22 million outstanding commercial paper, net of discount, at a weighted-average interest rate of 3.83%.
2At September 30, 2022, SCE had $1.1 billion outstanding commercial paper, net of discount, at a weighted-average interest rate of 3.82%.
3In May 2022, Edison International Parent and SCE amended their credit facilities to extend the maturity dates to May 2026, with one additional one year extension option. The aggregate maximum principal amount under the SCE and Edison International Parent revolving credit facilities may be increased up to $4.0 billion and $2.0 billion, respectively, provided that additional lender commitments are obtained.

Term loan and other short-term debt

In April 2022, Edison International Parent borrowed $600 million under a term loan agreement due in April 2023 that bears interest at either an adjusted term SOFR plus 0.70% or a base rate with no applicable margin. Edison International used the proceeds for general corporate purposes.

In May 2022, SCE amended its green term loan agreement to extend the maturity date from May 2022 to May 2023 and updated the interest rate from LIBOR plus 0.60% to SOFR plus 0.55%. As of September 30, 2022, the outstanding balance on the term loan is $730 million.

Note 6.Derivative Instruments

Derivative financial instruments are used to manage exposure to commodity price risk. These risks are managed in part by entering into forward commodity transactions, including options, swaps and futures. To mitigate credit risk from counterparties in the event of nonperformance, master netting agreements are used whenever possible and counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.

55

Table of Contents

Commodity Price Risk

Commodity price risk represents the potential impact that can be caused by a change in the market value of a particular commodity. SCE's electricity price exposure arises from energy purchased from and sold to wholesale markets as a result of differences between SCE's load requirements and the amount of energy delivered from its generating facilities and PPAs. SCE's natural gas price exposure arises from natural gas purchased for the Mountainview power plants and Peaker plants, Qualifying Facilities contracts where pricing is based on a monthly natural gas index and PPAs in which SCE has agreed to provide the natural gas needed for generation, referred to as tolling arrangements.

Credit and Default Risk

Credit and default risk represent the potential impact that can be caused if a counterparty were to default on its contractual obligations and SCE would be exposed to spot markets for buying replacement power or selling excess power. In addition, SCE would be exposed to the risk of non-payment of accounts receivable, primarily related to the sales of excess power and realized gains on derivative instruments.

Certain power and gas contracts contain master netting agreements or similar agreements, which generally allow counterparties subject to the agreement to offset amounts when certain criteria are met, such as in the event of default. The objective of netting is to reduce credit exposure. Additionally, to reduce SCE's risk exposures counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.

Certain power and gas contracts contain a provision that requires SCE to maintain an investment grade rating from the major credit rating agencies that have credit ratings for SCE, referred to as a credit-risk-related contingent feature. If SCE's credit rating were to fall below investment grade, SCE may be required to post additional collateral to cover derivative liabilities and the related outstanding payables. The net fair value of all derivative liabilities with these credit-risk-related contingent features were less than $1 million as of September 30, 2022 and December 31, 2021, for which SCE posted no collateral to its counterparties for its derivative liabilities and related outstanding payables for both periods. If the credit-risk-related contingent features underlying these agreements were triggered on September 30, 2022, SCE would be required to post $7 million of collateral, most of which is related to outstanding payables.

Fair Value of Derivative Instruments

SCE presents its derivative assets and liabilities on a net basis on its consolidated balance sheets when subject to master netting agreements or similar agreements. Derivative positions are also offset against margin and cash collateral deposits. In addition, SCE has provided collateral in the form of letters of credit. Collateral requirements can vary depending upon the level of unsecured credit extended by counterparties, changes in market prices relative to contractual commitments and other factors. See Note 4 for a discussion of fair value of derivative instruments. The following table summarizes the gross and net fair values of SCE's commodity derivative instruments:

September 30, 2022

Derivative Assets

Derivative Liabilities

(in millions)

    

Short-Term1

    

Long-Term2

    

Subtotal

    

Short-Term

    

Long-Term

    

Subtotal

    

Net Assets

Commodity derivative contracts

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Gross amounts recognized

$

62

$

8

$

70

$

40

$

$

40

$

30

Gross amounts offset in the consolidated balance sheets

 

(16)

 

 

(16)

 

(16)

 

 

(16)

 

Cash collateral posted and accrued3

 

 

 

 

(24)

 

 

(24)

 

24

Net amounts presented in the consolidated balance sheets

$

46

$

8

$

54

$

$

$

$

54

56

Table of Contents

December 31, 2021

Derivative Assets

Derivative Liabilities

(in millions)

    

Short-Term1

    

Long-Term2

    

Subtotal

    

Short-Term

    

Long-Term

    

Subtotal

    

Net Assets

Commodity derivative contracts

 

  

 

  

 

  

 

  

 

  

 

  

 

  

Gross amounts recognized

$

70

$

6

$

76

$

46

$

2

$

48

$

28

Gross amounts offset in the consolidated balance sheets

 

(30)

 

(2)

 

(32)

 

(30)

 

(2)

 

(32)

 

Cash collateral posted3

 

 

 

 

(16)

 

 

(16)

 

16

Net amounts presented in the consolidated balance sheets

$

40

$

4

$

44

$

$

$

$

44

1Included in "Other current assets" on Edison International's and SCE's consolidated balance sheets.
2Included in "Other long-term assets" on Edison International's and SCE's consolidated balance sheets.
3At September 30, 2022, SCE posted and accrued $69 million of cash collateral, of which $24 million was offset against derivative liabilities and $45 million was reflected in "Other current asset" on the consolidated balance sheets. At December 31, 2021, SCE posted $65 million of cash, of which $16 million was offset against derivative liabilities and $49 million was reflected in "Other current assets" on the consolidated balance sheets.

Financial Statement Impact of Derivative Instruments

SCE recognizes realized gains and losses on derivative instruments as purchased power expense and expects that such gains or losses will be part of the purchased power costs recovered from customers. As a result, realized gains and losses do not affect earnings, but may temporarily affect cash flows. Due to expected future recovery from customers, unrealized gains and losses are recorded as regulatory assets and liabilities and therefore also do not affect earnings. The remaining effects of derivative activities and related regulatory offsets are reported in cash flows from operating activities in the consolidated statements of cash flows.

The following table summarizes the components of SCE's economic hedging activity:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

2021

    

2022

2021

Realized gains

$

69

$

66

$

179

$

193

Unrealized gains

 

36

 

116

 

1

 

126

Notional Volumes of Derivative Instruments

The following table summarizes the notional volumes of derivatives used for SCE's economic hedging activities:

Unit of

Economic Hedges

Commodity

    

Measure

    

September 30, 2022

    

December 31, 2021

Electricity options, swaps and forwards

 

GWh

 

1,038

 

1,869

Natural gas options, swaps and forwards

 

Bcf

 

47

 

58

Congestion revenue rights

 

GWh

 

39,800

 

33,216

57

Table of Contents

Note 7.Revenue

SCE's revenue is disaggregated by two revenue sources:

Earning activities – representing revenue authorized by the CPUC and FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances.
Cost-recovery activities – representing CPUC- and FERC- authorized balancing accounts, which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards, as well as non-bypassable rates collected for SCE Recovery Funding LLC. Cost-recovery activities include rates which provide recovery, subject to reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), certain operation and maintenance expenses and repayment of bonds and financing costs of SCE Recovery Funding LLC. SCE earns no return on these activities.

The following table is a summary of SCE's revenue:

Three months ended September 30, 2022

Three months ended September 30, 2021

Cost-

Cost- 

Earning

 Recovery

Total

Earning 

Recovery 

Total 

(in millions)

    

 Activities

    

 Activities

Consolidated

    

Activities

    

Activities

    

Consolidated

Revenue from contracts with customers1,2

$

2,350

$

3,603

$

5,953

$

2,260

 

$

2,804

 

$

5,064

Alternative revenue programs and other operating revenue3

 

100

 

(836)

 

(736)

 

135

 

94

 

229

Total operating revenue

$

2,450

$

2,767

$

5,217

$

2,395

$

2,898

$

5,293

Nine months ended September 30, 2022

Nine months ended September 30, 2021

Cost-

Cost- 

Earning

 Recovery

Total

Earning 

Recovery 

Total 

(in millions)

    

 Activities

    

 Activities

Consolidated

    

Activities

    

Activities

    

Consolidated

   

Revenues from contracts with customers1,2

$

6,313

$

7,000

$

13,313

$

5,667

 

$

5,422

 

$

11,089

Alternative revenue programs and other operating revenue3

 

568

 

(707)

 

(139)

 

325

 

138

 

463

Total operating revenue

$

6,881

$

6,293

$

13,174

$

5,992

$

5,560

$

11,552

1The revenue requirements in the 2021 GRC final decision are retroactive to January 1, 2021. SCE recorded the impact of the 2021 GRC decision in the third quarter of 2021, including $404 million related to the six-month period ended June 30, 2021.
2At September 30, 2022 and December 31, 2021, SCE's receivables related to contracts from customers were $3.5 billion and $2.3 billion, respectively, which include accrued unbilled revenue of $1.3 billion and $794 million, respectively.
3Includes differences between amounts billed and authorized levels for both the CPUC and FERC.

58

Table of Contents

Deferred Revenue

In July 2021, Morongo Transmission LLC ("Morongo") paid SCE $400 million for the use of a portion of the West of Devers transmission line transfer capability for a period of 30 years. SCE recognized the entire proceeds as deferred revenue and is amortizing deferred revenue from the use of the transfer capability over the 30-year term on a straight-line basis resulting in revenue of $13 million per year. As of September 30, 2022, the deferred revenue is $384 million, of which $13 million and $371 million are included in "Other current liabilities" and "Other deferred credits and other long-term liabilities," respectively, on SCE's consolidated balance sheets. For the three months ended September 30, 2022 and September 30, 2021, SCE has recognized revenue of $3 million and $2 million, respectively. For the nine months ended September 30, 2022 and September 30, 2021, SCE has recognized revenue of $10 million and $2 million, respectively.

Note 8.Income Taxes

Effective Tax Rate

The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Edison International:

(Loss) income from operations before income taxes

$

(261)

$

(326)

$

119

$

357

Provision for income tax at federal statutory rate of 21%

 

(55)

 

(68)

 

25

 

75

Increase (decrease) in income tax from:

 

  

 

  

 

  

 

  

State tax, net of federal benefit

 

(58)

 

(39)

 

(79)

 

(28)

Property-related

 

(79)

 

(33)

 

(172)

 

(159)

Average rate assumption method ("ARAM") adjustment 1

87

87

Insurance benefits

(2)

(2)

(6)

(7)

Wildfire related charges2

31

31

Other

 

7

 

(5)

 

(3)

 

4

Total income tax expense (benefit)

$

(187)

$

(29)

$

(235)

$

3

Effective tax rate

 

(71.6)

%  

 

(8.9)

%

 

(197.5)

%  

 

0.8

%

SCE:

Income from operations before income taxes

$

(230)

$

(268)

$

252

$

492

Provision for income tax at federal statutory rate of 21%

 

(48)

 

(56)

 

53

 

103

Increase (decrease) in income tax from:

 

  

 

  

 

  

 

  

State tax, net of federal benefit

 

(53)

 

(32)

 

(66)

 

(17)

Property-related

 

(79)

 

(33)

 

(172)

 

(159)

ARAM adjustment 1

87

87

Insurance benefits

(2)

(2)

(6)

(7)

Wildfire related charges2

31

31

Other

 

5

 

(6)

 

(4)

 

3

Total income tax expense (benefit)

$

(177)

$

(11)

$

(195)

$

41

Effective tax rate

 

(77.0)

%  

 

(4.1)

%

 

(77.4)

%  

 

8.3

%

1In July 2021, SCE received the IRS's response to its private letter ruling request, regarding the scope of the deferred tax normalization requirements and the computations required to comply with the average rate assumption method. As a result, SCE recorded a cumulative true up of $87 million reduction in tax benefits in the third quarter of 2021, for the period of January 2018 to June 2021. The above true up has an offsetting revenue adjustment resulting in no impact on earnings.
2Relates to portions of the estimated charge for the 2017/2018 Wildfire/Mudslide Events recorded in the third quarter of 2021, deemed to be non-deductible for tax purposes.

59

Table of Contents

The CPUC requires flow-through ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences which reverse over time. Flow-through items reduce current authorized revenue requirements in SCE's rate cases and result in a regulatory asset for recovery of deferred income taxes in future periods. The difference between the authorized amounts as determined in SCE's rate cases, adjusted for balancing and memorandum account activities, and the recorded flow-through items also result in increases or decreases in regulatory assets with a corresponding impact on the effective tax rate to the extent that recorded deferred amounts are expected to be recovered in future rates. For further information, see Note 11.

Net Operating Loss and Tax Credit Carryforwards

Edison International consolidates for federal income tax purposes, but not for financial accounting purposes, a group of wind projects referred to as Capistrano Wind. A sale of the wind projects was consummated in the third quarter of 2022. The sale and cancellation of debt utilized approximately $125 million of tax attributes previously generated by the Capistrano entities. Remaining tax attributes not utilized in 2022 will be available for the Edison International consolidated group to utilize in the future. When the remaining Capistrano tax attributes are used in the future by Edison International, payments will be made to those entities under a tax allocation agreement.

Tax Disputes

Tax years that remain open for examination by the IRS and the California Franchise Tax Board ("FTB") are 2017 – 2021 and 2013 – 2021, respectively.

60

Table of Contents

Note 9.Compensation and Benefit Plans

Pension Plans

Net periodic pension expense components are:

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Edison International:

Service cost

$

30

$

34

$

90

$

102

Non-service cost (benefit)

 

 

 

  

 

  

Interest cost

 

27

 

26

 

81

 

78

Expected return on plan assets

 

(57)

 

(56)

 

(171)

 

(168)

Settlement costs1

 

 

 

3

 

Amortization of net loss2

 

1

 

3

 

3

 

9

Regulatory adjustment

 

2

 

4

 

6

 

12

Total non-service benefit3

$

(27)

$

(23)

$

(78)

$

(69)

Total expense recognized

$

3

$

11

$

12

$

33

SCE:

Service cost

$

29

$

33

$

87

$

99

Non-service cost (benefit)

 

 

 

 

Interest cost

 

25

 

24

 

75

 

72

Expected return on plan assets

 

(54)

 

(53)

 

(162)

 

(159)

Settlement costs1

 

 

 

3

 

Amortization of net loss2

 

1

 

2

 

3

 

6

Regulatory adjustment

 

2

 

4

 

6

 

12

Total non-service benefit3

$

(26)

$

(23)

$

(75)

$

(69)

Total expense recognized

$

3

$

10

$

12

$

30

1Under GAAP, a settlement is recorded when lump-sum payments exceed estimated annual service and interest costs. Lump sum payments made in 2022 to SCE executives retiring in 2021 from the Executive Retirement Plan exceeded the estimated service and interest costs, resulting in a partial settlement of that plan. A settlement loss of approximately $3 million ($2 million after-tax) was recorded at SCE in the second quarter of 2022.
2Includes the amount of net loss reclassified from other comprehensive loss. The amount reclassified for Edison International and SCE was $2 million and $1 million, respectively, for the three months ended September 30, 2022 and $6 million and $3 million, respectively, for the nine months ended September 30, 2022. The amount reclassified for Edison International and SCE was $3 million and $2 million, respectively, for the three months ended September 30, 2021 and $9 million and $6 million, respectively, for the nine months ended September 30, 2021.
3Included in "Other income" on Edison International's and SCE's consolidated statements of income.

61

Table of Contents

Postretirement Benefits Other Than Pensions ("PBOP")

Net periodic PBOP expense components for Edison International and SCE are:

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Service cost

$

8

$

10

$

24

$

30

Non-service cost (benefit)

 

  

 

  

 

  

 

  

Interest cost

 

14

 

14

 

42

 

42

Expected return on plan assets

 

(24)

 

(27)

 

(72)

 

(81)

Amortization of net gain

 

(12)

 

(8)

 

(36)

 

(24)

Regulatory adjustment

 

14

 

11

 

42

 

33

Total non-service benefit1

$

(8)

$

(10)

$

(24)

$

(30)

Total expense

$

$

$

$

1Included in "Other income" on Edison International's and SCE's consolidated statements of income.

Note 10. Investments

Nuclear Decommissioning Trusts

Future decommissioning costs related to SCE's nuclear assets are expected to be funded from independent decommissioning trusts.

The following table sets forth amortized cost and fair value of the trust investments (see Note 4 for a discussion of fair value of the trust investments):

Amortized Cost

Fair Value

Longest

September 30, 

December 31, 

September 30, 

December 31, 

(in millions)

    

Maturity Dates

    

2022

    

2021

    

2022

    

2021

Equity securities

 

 

*

 

*

$

1,465

$

1,972

Municipal bonds

 

2058

 

$

767

 

$

875

 

806

 

1,033

Government and agency securities

 

2067

 

846

 

1,095

 

899

 

1,212

 

Corporate bonds

 

2070

 

376

 

386

 

398

 

446

 

Short-term investments and receivables/payables1

 

One-year

 

236

 

199

 

255

 

207

 

Total

 

  

$

2,225

$

2,555

$

3,823

$

4,870

 

*Not applicable
1Short-term investments include $69 million and $37 million of repurchase agreements payable by financial institutions which earn interest, are fully secured by U.S. Treasury securities and mature by October 3, 2022 and January 3, 2022 as of September 30, 2022 and December 31, 2021, respectively.

Trust fund earnings (based on specific identification) increase the trust fund balance and the asset retirement obligation ("ARO") regulatory liability. Unrealized holding gains, net of losses, were $1.4 billion and $2.1 billion at September 30, 2022 and December 31, 2021, respectively.

Trust assets are used to pay income taxes arising from trust investing activity. Deferred tax liabilities related to net unrealized gains were $272 million and $517 million at September 30, 2022 and December 31, 2021, respectively. Accordingly, the fair value of trust assets available to pay future decommissioning costs, net of deferred income taxes, totaled $3.6 billion and $4.4 billion at September 30, 2022 and December 31, 2021, respectively.

62

Table of Contents

The following table summarizes the gains and losses for the trust investments:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Gross realized gains

$

22

$

77

$

111

$

328

Gross realized losses

 

(35)

 

(5)

 

(96)

 

(21)

Net unrealized losses for equity securities

 

(83)

 

(74)

 

(515)

 

(41)

Due to regulatory mechanisms, changes in assets of the trusts from income or loss items have no impact on operating revenue or earnings.

Edison International Parent and Other's Investments

Edison International Parent and Other hold strategic investments in companies focused on developing electric technologies and services. As of September 30, 2022 and December 31, 2021, these investments consist of $7 million and $12 million of marketable securities, respectively, and $11 million and $3 million of equity investments without readily determinable fair values, respectively (included as "Other investments" on Edison International's consolidated balance sheets). The equity investments without readily determinable fair values balances included cumulative upward adjustments of $9 million and $1 million as of September 30, 2022 and December 31, 2021, respectively. The cumulative upward adjustments resulted primarily from values determined by additional capital infusions.

The following table summarizes unrealized gains/(losses) for equity securities held at the reporting date, recorded as "Other income" on Edison International's consolidated statement of income:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Marketable securities

$

$

(8)

$

(5)

$

4

Equity investments without readily determinable fair values - upward adjustments

 

8

 

 

8

 

1

Total unrealized gains/(losses)

$

8

$

(8)

$

3

$

5

For further information, see Note 4 and Note 15.

63

Table of Contents

Note 11. Regulatory Assets and Liabilities

Regulatory Assets

SCE's regulatory assets included on the consolidated balance sheets are:

September 30, 

December 31, 

(in millions)

    

2022

    

2021

Current:

 

  

 

  

Regulatory balancing and memorandum accounts

$

1,368

$

1,591

Power contracts

 

103

 

168

Other

 

26

 

19

Total current

 

1,497

 

1,778

Long-term:

 

  

 

  

Deferred income taxes, net of liabilities

 

5,089

 

4,770

Power contracts

 

 

71

Unamortized investments, net of accumulated amortization

 

113

 

114

Unamortized loss on reacquired debt

 

112

 

121

Regulatory balancing and memorandum accounts

 

1,516

 

1,897

Environmental remediation

 

242

 

242

Recovery assets1

840

325

Other

 

121

 

120

Total long-term

 

8,033

 

7,660

Total regulatory assets

$

9,530

$

9,438

1Represents the balance associated with the AB 1054 Excluded Capital Expenditures related Recovery Properties and prudently incurred financing costs securitized with issuance of the associated bond. For further details, see Note 3.

Regulatory Liabilities

SCE's regulatory liabilities included on the consolidated balance sheets are:

September 30, 

December 31, 

(in millions)

    

2022

    

2021

Current:

 

  

 

  

Regulatory balancing and memorandum accounts

$

648

$

553

Energy derivatives

 

22

 

25

Other

 

32

 

25

Total current

 

702

 

603

Long-term:

 

  

 

  

Costs of removal

 

2,648

 

2,552

Re-measurement of deferred taxes

 

2,267

 

2,315

Recoveries in excess of ARO liabilities1

 

1,071

 

2,155

Regulatory balancing and memorandum accounts

 

1,043

 

648

Pension and other postretirement benefits

 

1,293

 

1,281

Other

 

26

 

30

Total long-term

 

8,348

 

8,981

Total regulatory liabilities

$

9,050

$

9,584

1Represents the cumulative differences between ARO expenses and amounts collected in rates primarily for the decommissioning of SCE's nuclear generation facilities. Decommissioning costs recovered through rates are primarily placed in nuclear decommissioning trusts. This regulatory liability also represents the deferral of realized and unrealized gains and losses on the nuclear decommissioning trust investments. See Note 10 for further discussion.

64

Table of Contents

Net Regulatory Balancing and Memorandum Accounts

The following table summarizes the significant components of regulatory balancing and memorandum accounts included in the above tables of regulatory assets and liabilities:

September 30, 

December 31, 

(in millions)

    

2022

    

2021

Asset (liability)

 

  

 

  

Energy resource recovery account

$

619

$

759

Portfolio allocation balancing account

 

327

 

(183)

New system generation balancing account

 

1

 

73

Public purpose programs and energy efficiency programs

 

(1,603)

 

(1,066)

Base revenue requirement balancing account

 

690

 

849

GRC wildfire mitigation balancing accounts1

88

12

Residential uncollectibles balancing account

112

Greenhouse gas auction revenue and low carbon fuel standard revenue

 

(421)

 

(298)

FERC balancing accounts

 

(133)

 

55

Wildfire and drought restoration accounts2

 

315

 

299

Wildfire-related memorandum accounts3

970

1,456

COVID-19-related memorandum accounts

72

94

Customer service re-platform memorandum account4

211

128

Tax accounting memorandum account and pole loading balancing account

55

171

Excess bond and power charge balancing account5

(93)

Other

 

(17)

 

(62)

Asset

$

1,193

$

2,287

1The 2021 GRC decision approved the establishment of the vegetation management balancing account ("VMBA") to track vegetation management expenses up to 115% of amounts authorized, the Wildfire Risk Mitigation balancing account ("WRMBA") to track the costs of SCE's Wildfire Covered Conductor Program up to 110% of amounts authorized and the risk management balancing account to track the authorized costs of wildfire insurance. The amount recorded to these balancing accounts represents the difference between costs tracked in the balancing accounts and authorized revenue for those costs recorded to the base revenue requirement balancing account. If spending is less than authorized, SCE will refund those amounts to customers. If spending is within the specified threshold, if any, for each balancing account, SCE will recover those costs from customers. Amounts above the specified threshold, or above amounts authorized if a higher threshold was not established, for each balancing account may be eligible for deferral to wildfire-related memorandum accounts.
2The wildfire and drought restoration accounts regulatory assets represent restoration costs that are recorded in a Catastrophic Event Memorandum Account ("CEMA").
3The wildfire-related memorandum accounts regulatory assets represent wildfire-related costs that are probable of future recovery from customers, subject to a reasonableness review. The Fire Hazard Prevention Memorandum Account ("FHPMA") is used to track costs related to fire safety and to implement fire prevention corrective action measures in extreme and very high fire threat areas. The Wildfire Expense Memorandum Account ("WEMA") is used to track incremental wildfire insurance costs and uninsured wildfire-related financing, legal and claims costs. The Wildfire Mitigation Plan Memorandum Account ("WMPMA") is used to track costs incurred to implement SCE's wildfire mitigation plan that are not currently reflected in SCE's revenue requirements. The Fire Risk Mitigation Memorandum Account ("FRMMA") is used to track costs related to the reduction of fire risk that are incremental to costs approved for recovery in SCE's GRCs that are not tracked in any other wildfire-related memorandum account. The balance also includes vegetation management spending in excess of the 115% threshold for the VMBA described above.
4CSRP memorandum account was established in the 2018 GRC to track costs for implementation of a new customer service system not currently reflected in SCE's revenue requirements. Expenditures for the CSRP project are subject to reasonableness review by the CPUC. Expenditures for the project were significantly higher than originally projected.
5This balancing account was established in January 2022 to refund customers for excess California Department of Water Resources ("DWR") bond and power charges. The refund began in June 2022 for a 12-month period.

65

Table of Contents

Note 12. Commitments and Contingencies

Indemnities

Edison International and SCE have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business.

Edison International and SCE have agreed to provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, indemnities for specified environmental liabilities and income taxes with respect to assets sold or other contractual arrangements. Edison International's and SCE's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International and SCE may have recourse against third parties. Edison International and SCE have not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.

Contingencies

In addition to the matters disclosed in these Notes, Edison International and SCE are involved in other legal, tax, and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International and SCE believe the outcome of each of these other proceedings will not materially affect its financial position, results of operations and cash flows.

Southern California Wildfires and Mudslides

California has experienced unprecedented weather conditions in recent years due to climate change and wildfires in SCE's territory, including those where SCE's equipment may be alleged to be associated with the fire's ignition, have caused loss of life and substantial damage in recent years. SCE's service territory remains susceptible to additional wildfire activity.

Numerous claims related to wildfire events have been initiated against SCE and Edison International. Edison International and SCE have incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events (defined below), which are described below. In addition, SCE's equipment has been, and may further be, alleged to be associated with wildfires that have originated in Southern California subsequent to 2018.

Liability Overview

The extent of liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether the utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be required to show negligence in addition to causation. California courts have previously found utilities to be strictly liable for property damage along with associated interest and attorneys' fees, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. If inverse condemnation is held to be inapplicable to SCE in connection with a wildfire, SCE still could be held liable for property damages and associated interest if the property damages were found to have been proximately caused by SCE's negligence. If SCE were to be found negligent, SCE could also be held liable for, among other things, fire suppression costs, business interruption losses, evacuation costs, clean-up costs, medical expenses, and personal injury/wrongful death claims. Additionally, SCE could potentially be subject to fines and penalties for alleged violations of CPUC rules and state laws investigated in connection with the ignition of a wildfire.

Final determinations of liability for wildfire events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes. Even when investigations are still pending or liability is disputed, an assessment of likely outcomes, including through future settlement of disputed claims, may require estimated losses to be accrued under accounting standards. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire

66

Table of Contents

related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged.

2017/2018 Wildfire/Mudslide Events

Wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The investigating government agencies, the Ventura County Fire Department ("VCFD") and California Department of Forestry and Fire Protection ("CAL FIRE"), have determined that the largest of the 2017 fires in SCE's territory originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by a second fire that originated near Koenigstein Road in the City of Santa Paula (the "Koenigstein Fire"). The December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. According to CAL FIRE, the Thomas and Koenigstein Fires, collectively, burned over 280,000 acres, destroyed or damaged an estimated 1,343 structures and resulted in two confirmed fatalities. The largest of the November 2018 fires in SCE's territory, known as the "Woolsey Fire," originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties. According to CAL FIRE, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three confirmed fatalities. Four additional fatalities are alleged to have been associated with the Woolsey Fire.

As described below, multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by debris flows and flooding in Montecito and surrounding areas in January 2018 (the "Montecito Mudslides") based on a theory alleging that SCE has responsibility for the Thomas and/or Koenigstein Fires and further alleging that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in 21 confirmed fatalities, with two additional fatalities presumed. One of the presumed fatalities has been confirmed.

The Thomas Fire, the Koenigstein Fire, the Montecito Mudslides (defined below) and the Woolsey Fire are each referred to as a "2017/2018 Wildfire/Mudslide Event," and, collectively, referred to as the "2017/2018 Wildfire/Mudslide Events."

Recent developments

Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Management’s third quarter 2022 review included a review of information obtained after the statute of limitations for individual plaintiffs for the Woolsey Fire expired, including information regarding the nature of claims remaining in the Woolsey Fire litigation. Management also reviewed information obtained from settling a substantial portion of the claims in the 2017/2018 Wildfire/Mudslide Events litigations, including higher than expected costs to settle claims. As a result of management’s third quarter 2022 review, SCE recorded an $880 million increase in estimated losses for the 2017/2018 Wildfire/Mudslide Events as of September 30, 2022, which increase is related to the Woolsey Fire. As a result, expected recoveries through FERC electric rates of $50 million against the charge were also recorded, and the resulting net charge to earnings was $830 million ($598 million after-tax).

As of September 30, 2022, Edison International and SCE had paid $7.3 billion under executed settlements, had $237 million to be paid under executed settlements, including $175 million to be paid under the SED Agreement (as defined below), and had $1.2 billion of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets

67

Table of Contents

related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, Edison International and SCE had assets for expected recoveries through FERC electric rates of $163 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events.

The estimated losses for the 2017/2018 Wildfire/Mudslide Events do not include an estimate of potential losses related to certain alleged and potential claims made by the California Governor's Office of Emergency Service ("Cal OES") seeking recovery on behalf of itself and 30 state and local government entities that did not pursue their own suits against SCE, but sustained damage in the 2017/2018 Wildfire/Mudslide Events and received funding through the Federal Emergency Management Agency ("FEMA") that was dispersed by the Cal OES. As of the filing of this report SCE has not concluded that losses related to FEMA funds disbursed by Cal OES are probable.

Edison International and SCE may incur a material loss in excess of amounts accrued in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. Due to the number of uncertainties and possible outcomes related to the 2017/2018 Wildfire/Mudslide Events litigation, Edison International and SCE cannot estimate the upper end of the range of reasonably possible losses that may be incurred.

Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including the uncertainty in estimating damages that have been or may be alleged. For instance, SCE will receive additional information with respect to damages claimed as the mediation process progresses. Other factors that can cause actual losses incurred to be higher or lower than estimated include the ability to reach settlements and the outcomes of settlements reached through the ongoing claims mediation processes, uncertainties related to the sufficiency of insurance held by plaintiffs, uncertainties related to the litigation processes, uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements.

The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. SCE will seek rate recovery of prudently incurred losses and related costs realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance, other than for any obligations under the SED Agreement (as defined below). See "Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates" below for additional information.

External Investigations and Internal Review

The VCFD and CAL FIRE have jointly issued reports concerning their findings regarding the causes of the Thomas Fire and the Koenigstein Fire. The reports did not address the causes of the Montecito Mudslides. SCE has also received a non-final redacted draft of a report from the VCFD regarding Woolsey Fire (the "Redacted Woolsey Report"). SCE cannot predict if or when the VCFD will release its final report regarding the Woolsey Fire. The VCFD and CAL FIRE findings do not determine legal causation of or assign legal liability for the Thomas, Koenigstein or Woolsey Fires; final determinations of legal causation and liability would only be made during lengthy and complex litigation.

The CPUC's Safety and Enforcement Division ("SED") conducted investigations to assess SCE's compliance with applicable rules and regulations in areas impacted by the Thomas, Koenigstein and Woolsey Fires. As discussed below, in October 2021, SCE and the SED executed the SED Agreement (as defined below) to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events.

The California Attorney General's Office has completed its separate investigations of the Thomas Fire and the Woolsey Fire without pursuing criminal charges.

68

Table of Contents

SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is complex and time consuming. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation processes.

Thomas Fire

On March 13, 2019, the VCFD and CAL FIRE jointly issued a report concluding, after ruling out other possible causes, that the Thomas Fire was started by SCE power lines coming into contact during high winds, resulting in molten metal falling to the ground. However, the report does not state that their investigation found molten metal on the ground. At this time, based on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the report's indicated start time, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's system and at least 15 minutes prior to the start time indicated in the report. SCE is continuing to assess the extent of damages that may be attributable to the Thomas Fire.

Koenigstein Fire

On March 20, 2019, the VCFD and CAL FIRE jointly issued a report finding that the Koenigstein Fire was caused when an energized SCE electrical wire separated and fell to the ground along with molten metal particles and ignited the dry vegetation below. As previously disclosed, SCE believes that its equipment was associated with the ignition of the Koenigstein Fire. SCE is continuing to assess the extent of damages that may be attributable to the Koenigstein Fire.

Montecito Mudslides

SCE's internal review includes inquiry into whether the Thomas and/or Koenigstein Fires proximately caused or contributed to the Montecito Mudslides, whether, and to what extent, the Thomas and/or Koenigstein Fires were responsible for the damages in the Montecito area and other factors that potentially contributed to the losses that resulted from the Montecito Mudslides. Many other factors, including, but not limited to, weather conditions and insufficiently or improperly designed and maintained debris basins, roads, bridges and other channel crossings, could have proximately caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides.

At this time, based on available information, SCE has not been able to determine whether the Thomas Fire or the Koenigstein Fire, or both, were responsible for the damages in the Montecito area. In the event that SCE is determined to have caused the fire that spread to the Montecito area, SCE cannot predict whether, if fully litigated, the courts would conclude that the Montecito Mudslides were caused or contributed to by the Thomas and/or Koenigstein Fires or that SCE would be liable for some or all of the damages caused by the Montecito Mudslides.

Woolsey Fire

SCE's internal review into the facts and circumstances of the Woolsey Fire is ongoing. SCE has reported to the CPUC that there was an outage on SCE's electric system in the vicinity of where the Woolsey Fire reportedly began on November 8, 2018. SCE is aware of witnesses who saw fire in the vicinity of SCE's equipment at the time the fire was first reported. While SCE did not find evidence of downed electrical wires on the ground in the suspected area of origin, it observed a pole support wire in proximity to an electrical wire that was energized prior to the outage.

The Redacted Woolsey Report states that the VCFD investigation team determined that electrical equipment owned and operated by SCE was the cause of the Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment was associated with the ignition of the Woolsey Fire. SCE expects to obtain and review additional information and materials in the possession of CAL FIRE and others during the course of its internal review and the Woolsey Fire litigation process, including SCE equipment that has been retained by CAL FIRE.

69

Table of Contents

Litigation

Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.

On October 4, 2018, the Los Angeles Superior Court denied Edison International's and SCE's challenge to the application of inverse condemnation to SCE with respect to the Thomas and Koenigstein Fires and, on February 26, 2019, the California Supreme Court denied SCE's petition to review the Superior Court's decision. In April 2022, following a stipulated judgment entered against SCE in the TKM litigation, SCE filed an appeal related to inverse condemnation in the California Court of Appeal.

In January 2019, SCE filed a cross-complaint against certain local public entities alleging that failures by these entities, such as failure to adequately plan for flood hazards and build and maintain adequate debris basins, roads, bridges and other channel crossings, among other things, caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. These cross-claims in the Montecito Mudslides litigation were not released as part of the Local Public Entity Settlements (as defined below).

Settlements

In the fourth quarter of 2019, SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Wildfire/Mudslide Events (the "Local Public Entity Settlements").

In the third quarter of 2020, Edison International and SCE entered into an agreement (the "TKM Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation (the "TKM Subrogation Plaintiffs") collective claims arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides have been resolved. Under the TKM Subrogation Settlement, SCE paid the TKM Subrogation Plaintiffs an aggregate of $1.2 billion in October 2020 and also agreed to pay $0.555 for each dollar in claims to be paid by the TKM Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.

In January 2021, Edison International and SCE entered into an agreement (the "Woolsey Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Woolsey Fire litigation (the "Woolsey Subrogation Plaintiffs") collective claims arising from the Woolsey Fire have been resolved. Under the Woolsey Subrogation Settlement, SCE paid the Woolsey Subrogation Plaintiffs an aggregate of $2.2 billion in March and April 2021. SCE has also agreed to pay $0.67 for each dollar in claims to be paid by the Woolsey Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap.

As of September 30, 2022, SCE has also entered into settlements with approximately 8,500 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In 2020 and 2021, SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $300 million and $1.7 billion, respectively, to those individual plaintiffs. In the first, second and third quarters of 2022 SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $700 million, $400 million and $350 million, respectively, to those individual plaintiffs. The statutes of limitations for individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation have expired.

Edison International and SCE did not admit wrongdoing or liability as part of any of the settlements described above. Other claims and potential claims related to the 2017/2018 Wildfire/Mudslide Events remain. SCE continues to explore reasonable settlement opportunities with other plaintiffs in the outstanding 2017/2018 Wildfire/Mudslide Events litigation.

70

Table of Contents

SED Agreement

In October 2021, SCE and the SED executed an agreement (the "SED Agreement") to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events and three other 2017 wildfires for, among other things, aggregate costs of $550 million. The $550 million in costs is comprised of a $110 million fine to be paid to the State of California General Fund, $65 million of shareholder-funded safety measures, and an agreement by SCE to waive its right to seek cost recovery in CPUC-jurisdictional rates for $375 million of third-party uninsured claims payments. The SED Agreement provides that SCE may, on a permanent basis, exclude from its ratemaking capital structure any after-tax charges to equity or debt borrowed to finance costs incurred under the SED Agreement. The SED Agreement also imposes other obligations on SCE, including reporting requirements and safety-focused studies. SCE's obligations under the SED Agreement commenced on August 15, 2022, when CPUC approval of the SED Agreement became final and non-appealable. SCE did not admit imprudence, negligence or liability with respect to the 2017/2018 Wildfire/Mudslide Events in the SED Agreement.

Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates

At September 30, 2022 and December 31, 2021, Edison International's and SCE's consolidated balance sheets include fixed payments to be made under executed settlement agreements and accrued estimated losses of $1.4 billion and $1.7 billion, respectively, for the 2017/2018 Wildfire/Mudslide Events. The following table presents changes in estimated losses since December 31, 2021:

(in millions)

    

Balance at December 31, 20211

$

1,734

Increase in accrued estimated losses

 

1,296

Amounts paid

 

(1,583)

Balance at September 30, 20222

$

1,447

1At December 31, 2021, $131 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At December 31, 2021, the $1,733 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International's and SCE's best estimate of expected losses for the 2017/2018 Wildfire/Mudslide Events of $1,603 million and other wildfire-related claims estimates of $130 million.
2At September 30, 2022, $173 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of $62 million of settlements executed and $111 million of a short term payables under the SED Agreement in connection with the 2017/2018 Wildfire/Mudslide Events. At September 30, 2022, the $1,962 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International's and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events of $1,210 million, $64 million of a long term payables under the SED Agreement and other wildfire-related claims estimates of $688 million.

For the three and nine months ended September 30, 2022 and 2021, Edison International's and SCE's income statements include charges for the estimated losses, net of expected recoveries from insurance and FERC customers, related to the 2017/2018 Wildfire/Mudslide Events as follows:

71

Table of Contents

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Charge for wildfire-related claims

$

880

$

1,265

$

1,296

$

1,265

Expected revenue from FERC customers

 

(50)

(67)

 

(76)

 

(67)

Total pre-tax charge

 

830

 

1,198

 

1,220

 

1,198

Income tax benefit

 

(232)

(304)

 

(341)

(304)

Total after-tax charge

$

598

$

894

$

879

$

894

For events that occurred in 2017 and early 2018, principally the Thomas and Koenigstein Fires and Montecito Mudslides, SCE had $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. For the Woolsey Fire, SCE had an additional $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence.

In total, through September 30, 2022, SCE has accrued estimated losses of $8.8 billion, has paid or agreed to pay approximately $7.6 billion in settlements, including $175 million to be paid under the SED Agreement, and has recovered $2.0 billion from its insurance carriers in relation to the 2017/2018 Wildfire/Mudslide Events.

Recovery of SCE's losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent in which a California investor-owned utility has sought recovery for uninsured wildfire-related costs is San Diego Gas & Electric's ("SDG&E") requests for cost recovery related to 2007 wildfire activity, where the FERC allowed recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that SDG&E did not meet the CPUC's prudency standard. As a result, while SCE does not agree with the CPUC's decision, it believes that the CPUC's interpretation and application of the prudency standard to SDG&E creates substantial uncertainty regarding how that standard will be applied to an investor-owned utility in wildfire cost-recovery proceedings for fires ignited prior to July 12, 2019. SCE will continue to evaluate the probability of recovery based on available evidence, including judicial, legislative and regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard when making determinations regarding recovery of uninsured wildfire-related costs. While the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates. SCE would record a regulatory asset at the time it obtains sufficient information to support a conclusion that recovery is probable.

Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded total expected recoveries of $376 million within the FERC balancing account. This was the FERC portion of the total estimated losses accrued. As of September 30, 2022, collections have reduced the regulatory assets remaining in the FERC balancing account to $163 million.

In July 2019, SCE filed a CEMA application with the CPUC to seek recovery of, among other things, approximately $60 million of capital expenditures and capital related expenses incurred to restore service to customers and to repair, replace and restore buildings and SCE's facilities damaged or destroyed as a result of six 2017 fires, primarily the Thomas and Koenigstein Fires. In August 2021, the CPUC issued a final decision which denied without prejudice SCE's application to recover a revenue requirement of $8 million for all six 2017 wildfires on the basis that SCE did not demonstrate that it was prudent in relation to the Thomas and Rye fires and had failed to segregate the costs attributable to the other four fires. Of the $8 million revenue requirement that was denied, $6 million was for the Thomas and Rye fires. CAL FIRE has determined that the Thomas and Rye fires were caused by SCE equipment. The decision allows SCE to submit additional applications

72

Table of Contents

with the CPUC to recover the costs associated with the Thomas and Rye fires, does not specify a deadline for any such applications, and directs that SCE must prove it was prudent in relation to the Thomas and/or Rye fires, as applicable, in any such future applications. As required by the final decision with respect to the other four fires, SCE filed supplemental testimony in November 2021 segregating the restoration costs attributable to each such fire. In June 2022, the CPUC approved SCE's entire request with respect to the other four fires. As of September 30, 2022, SCE has $180 million in assets recorded in property, plant and equipment in relation to restoration costs related to the 2017/2018 Wildfire/Mudslide Events which may not be recoverable. These assets would be impaired if the restoration costs are permanently disallowed by the CPUC in future cost recovery proceedings. SCE continues to incur costs for reconstructing its system and restoring service to structures that were damaged or destroyed by the Thomas, Koenigstein and Woolsey Fires and plans to seek to recover these costs in future applications with the CPUC.

Post-2018 Wildfires

Several wildfires have significantly impacted portions of SCE's service territory after 2018 (the wildfires that originated in Southern California after 2018 where SCE's equipment may be alleged to be associated with the fire's ignition are referred to collectively as the "Post-2018 Wildfires").

Through September 30, 2022, SCE has recorded total estimated losses (established at the lower end of the estimated range of reasonably possible losses) of $689 million, and expected recoveries from insurance of $467 million and expected recoveries through electric rates of $166 million related to the Post-2018 Wildfires. The after-tax net charges to earnings recorded through September 30, 2022 have been $40 million. Expected recoveries from insurance recorded for the Post-2018 Wildfires are supported by SCE’s insurance coverage for multiple policy years.

While Edison International and SCE may incur material losses in excess of the amounts accrued for certain of the Post-2018 Wildfires, Edison International and SCE expect that any losses incurred in connection with any such fire will be covered by insurance, subject to self-insured retentions and co-insurance, and expect that any such losses after expected recoveries from insurance will not be material.

2019 Saddle Ridge Fire

The "Saddle Ridge Fire," originated in Los Angeles county in October 2019 and burned approximately 9,000 acres, destroyed an estimated 19 structures, damaged an estimated 88 structures, and resulted in one fatality and injuries to 8 fire fighters. An investigation into the cause of the Saddle Ridge Fire is being led by the Los Angeles Fire Department. Based on pending litigation and without considering insurance recoveries, it is reasonably possible that SCE will incur a material loss in connection with the Saddle Ridge Fire, but the range of reasonably possible losses that could be incurred cannot be estimated at this time. SCE has not accrued a charge for potential losses relating to the Saddle Ridge Fire.

2020 Bobcat Fire

The "Bobcat Fire" was reported in the vicinity of Cogswell Dam in Los Angeles County, California in September 2020. The United States Forest Service ("USFS") has reported that the Bobcat Fire burned approximately 116,000 acres in Los Angeles County, destroyed an estimated 87 homes, 1 commercial property and 83 minor structures, damaged an estimated 28 homes and 19 minor structures, and resulted in injuries to 6 firefighters. In addition, fire authorities have estimated suppression costs at $80 million. While SCE’s investigation remains ongoing, SCE’s information reflects that a camera in the vicinity of Cogswell Dam captured the initial stages of a fire with the first observed smoke approximately six minutes before a SCE circuit in the area experienced an anomaly (a relay). An investigation into the cause of the Bobcat Fire is being led by the USFS, and the USFS has taken a specific section of an SCE overhead conductor in the vicinity of Cogswell Dam into possession as part of its investigation. SCE understands that the USFS has also taken three tree branches in the area into possession. The SED is also conducting an investigation of the Bobcat Fire. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation process.

73

Table of Contents

SCE has accrued material charges for potential losses relating to the Bobcat Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Bobcat Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.

2022 Coastal Fire

The "Coastal Fire" originated in Orange County in May 2022 and burned approximately 200 acres. The Orange County Fire Authority ("OCFA") has reported that the Coastal Fire destroyed 20 residential structures and damaged 11 residential structures. Two firefighters also reportedly sustained minor injuries. In addition, fire authorities have estimated suppression costs at approximately $3 million. While SCE's investigation remains ongoing, SCE's information reflects that a SCE circuit in the area experienced an anomaly (a relay) approximately 2 minutes prior to the reported time of the fire. An investigation into the cause of the Coastal Fire is being led by the OCFA. The OCFA has retained SCE equipment in connection with its investigation. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation process. SCE has accrued material charges for potential losses relating to the Coastal Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Coastal Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.

2022 Fairview Fire

The "Fairview Fire" originated in Riverside County in September 2022 and burned approximately 28,000 acres. CAL FIRE has reported that the Fairview Fire destroyed 22 residential structures, damaged 5 residential structures, and destroyed or damaged 17 minor structures. CAL FIRE also reported 2 civilian fatalities, 1 civilian injury and 2 injuries to responding fire personnel. In addition, fire authorities have estimated suppression costs at $39 million. While SCE's investigation remains ongoing, SCE's information reflects that a SCE circuit in the area experienced an anomaly (relay) approximately 8 minutes prior to the reported start time of the fire. An investigation into the cause of the Fairview Fire is being led by the CAL FIRE. CAL FIRE has retained SCE equipment in connection with its investigation. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation process. SCE has accrued material charges for potential losses relating to the Fairview Fire. The accrued charges correspond to the lower end of the estimated range of reasonably possible losses that may be incurred in connection with the Fairview Fire and is subject to change as additional information becomes available. While Edison International and SCE may incur a material loss in excess of the amount accrued, they cannot estimate the upper end of the range of reasonably possible losses that may be incurred.

Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates

At September 30, 2022 and December 31, 2021, Edison International's and SCE's consolidated balance sheets include accrued estimated losses of $683 million and $123 million, respectively, for the Post-2018 Wildfires.

The following table presents changes in estimated losses since December 31, 2021:

(in millions)

    

Balance at December 31, 2021

$

123

Increase in accrued estimated losses

 

565

Amounts paid

 

(5)

Balance at September 30, 2022

$

683

74

Table of Contents

For the three and nine months ended September 30, 2022 and 2021, Edison International's and SCE's income statements include charges for the estimated losses, net of expected recoveries from insurance and customers, related to the Post-2018 Wildfires as follows, respectively:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Edison International:

Charge for wildfire-related claims1

$

415

$

5

$

565

$

7

Expected insurance recoveries2

 

(244)

 

(383)

 

Expected revenue from CPUC and FERC customers

 

(162)

 

(162)

 

Total pre-tax charge

 

9

 

5

 

20

 

7

Income tax benefit

 

(3)

(1)

(6)

(2)

Total after-tax charge

$

6

$

4

$

14

$

5

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

SCE:

Charge for wildfire-related claims1

$

415

$

5

$

565

$

7

Expected insurance recoveries

 

(253)

 

(392)

 

Expected revenue from CPUC and FERC customers

 

(162)

 

(162)

 

Total pre-tax charge

 

 

5

 

11

 

7

Income tax benefit

 

(1)

(3)

(2)

Total after-tax charge

$

$

4

$

8

$

5

1Includes estimated co-insurance payments recorded as operations and maintenance expense.
2For the three and nine months ended September 30, 2022, Edison Insurance Services, Inc. ("EIS"), a wholly-owned subsidiary of Edison International, paid $9 million insurance, which was included in the insurance recovery of SCE but was excluded in Edison International.

Recovery of SCE's losses realized in connection with the Post-2018 Wildfires in excess of available insurance is subject to approval by regulators. The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. As discussed above, there is evidence of a California investor-owned utility seeking recovery for uninsured wildfire-related costs and FERC allowing recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that the utility did not meet the CPUC's prudency standard. This evidence was prior to the adoption of AB 1054 on July 12, 2019, after which date AB 1054 clarified that the CPUC must find a utility to be prudent if the utility's conduct related to the ignition was consistent with actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time, and based on the information available at that time. Further, utilities with a valid safety certification at the time of the relevant wildfire will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was prudent. Each of the Post-2018 Wildfires was ignited after July 12, 2019, and SCE has held a valid safety certificate since July 15, 2019. While a California investor-owned utility has not yet sought recovery for uninsured claims and other costs related to wildfires ignited after the adoption of AB 1054, SCE believes that for fires ignited after July 12, 2019, and investor-owned utilities holding a safety certificate at the time of the fire, the CPUC will apply a standard of review similar to that applied by the FERC which presumes all costs requested by an investor-owned utility are reasonable and prudent unless

75

Table of Contents

serious doubt as to the reasonableness of the utility’s conduct is raised. As such, SCE has concluded, at this time, that both uninsured CPUC-jurisdictional and uninsured FERC-jurisdictional wildfire-related costs related to the Post-2018 Wildfires, other than for those already authorized for inclusion in electric rates, are probable of recovery through electric rates. As of September 30, 2022, SCE has recorded total expected recoveries related to the Post-2018 Wildfires of $152 million within the WEMA and risk management balancing account and $10 million within the FERC balancing account. SCE will continue to evaluate the probability of recovery based on available evidence, including regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard under AB 1054, and, for each applicable fire, evidence that could cast serious doubt as to the reasonableness of SCE's conduct relative to that fire.

Wildfire Insurance Coverage

SCE has approximately $1.0 billion of wildfire-specific insurance coverage for events that may occur during the period July 1, 2022 through June 30, 2023, subject to up to $100 million of self-insured retention and co-insurance per fire, which results in aggregate net coverage of approximately $937 million. Of this coverage, approximately $102 million is provided by EIS) and approximately $835 million is provided by other commercial insurance carriers (commercial insurance carriers other than EIS are referred to herein as "Third-Party Commercial Insurers"). SCE has approximately $1.0 billion of wildfire-specific insurance coverage for events that occurred during the period July 1, 2021 through June 30, 2022, subject to up to $100 million of self-insured retention and co-insurance per fire, as well as additional co-insurance of up to $63 million for the policy year, which resulted in net coverage of approximately $875 million provided by Third-Party Commercial Insurers and $28 million provided by EIS for part of the policy year.

SCE believes that its insurance coverage for the July 1, 2022 through June 30, 2023 period meets its obligation to maintain reasonable insurance coverage under AB 1054. Edison International and SCE record a receivable for insurance recoveries when recovery of a recorded loss is determined to be probable.

SCE's wildfire insurance expense for the July 1, 2022 through June 30, 2023 policy period, prior to any regulatory deferrals, will be approximately $450 million, of which $357 million is paid to Third-Party Commercial Insurers. SCE's wildfire insurance expense for the July 1, 2021 through June 30, 2022 policy period, prior to any regulatory deferrals, was approximately $437 million, of which $413 million was paid to Third-Party Commercial Insurers. The difference between the Third-Party Commercial Insurer cost and total cost in both policy years was paid in premiums to EIS. Wildfire insurance premiums paid for the July 1, 2021 through June 30, 2022 and July 1, 2022 through June 30, 2023 policy periods are being recovered through customer rates. See Note 17 for further information.

While SCE's cost of obtaining wildfire insurance coverage from Third-Party Commercial Insurers was lower in 2022 compared to 2021, SCE's cost of obtaining wildfire insurance coverage in recent years is significantly higher than costs incurred prior to the 2017/2018 Wildfire/Mudslide Events due to, among other things, the number of significant wildfire events throughout California and the application of inverse condemnation to investor-owned utilities. While SCE is required to maintain reasonable insurance coverage under AB 1054, SCE may not be able to obtain a reasonable amount of wildfire insurance, at a reasonable cost, from Third-Party Commercial Insurers for future policy periods.

Employment Litigation Matter

In August 2017, Justin Page and Alfredo Martinez, brought a lawsuit against SCE and Edison International in Los Angeles Superior Court ("Page/Martinez Matter"). Both Mr. Page and Mr. Martinez brought claims of retaliation and failure to prevent retaliation based on allegations that while they were employees of SCE they were retaliated against for reporting harassment of various female employees of SCE. Mr. Page additionally claimed that he was subjected to sexual harassment during the course of his employment. In June 2022, a jury found in favor of Mr. Page and Mr. Martinez and awarded them aggregate compensatory damages of $24.6 million and aggregate punitive damages of $440 million. In July 2022, the parties entered into agreements to resolve Mr. Page's and Mr. Martinez's collective claims in the Page/Martinez Matter. Edison International and SCE did not admit wrongdoing or liability as part of the settlement. SCE has paid the amounts due under

76

Table of Contents

the agreements and recorded an expense, net of expected recoveries from insurance, of $23 million, related to the Page/Martinez Matter.

Environmental Remediation

SCE records its environmental remediation and restoration liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operation and maintenance, monitoring, and site closure. Unless there is a single probable amount, SCE records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.

At September 30, 2022, SCE's recorded estimated minimum liability to remediate its 26 identified material sites (sites with a liability balance at September 30, 2022, in which the upper end of the range of expected costs is at least $1 million) was $259 million, including $166 million related to San Onofre. In addition to these sites, SCE also has 14 immaterial sites with a liability balance as of September 30, 2022, for which the total minimum recorded liability was $3 million. Of the $262 million total environmental remediation liability for SCE, $242 million has been recorded as a regulatory asset. SCE expects to recover $37 million through an incentive mechanism that allows SCE to recover 90% of its environmental remediation costs at certain sites (SCE may request to include additional sites in this mechanism) and $205 million through proceedings that allow SCE to recover up to 100% of the costs incurred at certain sites through customer rates. SCE's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.

The ultimate costs to clean up SCE's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs at the identified material sites and immaterial sites could exceed its recorded liability by up to $120 million and $8 million, respectively. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes.

SCE expects to clean up and mitigate its identified sites over a period of up to 40 years. Remediation costs for each of the next five years are expected to range from $8 million to $30 million. Costs incurred for the nine months ended September 30, 2022 and 2021 were $5 million and $6 million, respectively.

Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, SCE believes that costs ultimately recorded will not materially affect its results of operations, financial position, or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.

Nuclear Insurance

SCE is a member of Nuclear Electric Insurance Limited ("NEIL"), a mutual insurance company owned by entities with nuclear facilities. NEIL provides insurance for nuclear property damage, including damages caused by acts of terrorism up to specified limits, and for accidental outages for active facilities. The amount of nuclear property damage insurance purchased for San Onofre and Palo Verde exceeds the minimum federal requirement of $50 million and $1.1 billion, respectively. If

77

Table of Contents

NEIL losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $30 million per year.

Federal law limits public offsite liability claims for bodily injury and property damage from a nuclear incident to the amount of available financial protection, which is currently approximately $13.7 billion for Palo Verde and $560 million for San Onofre. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available through a Facility Form issued by American Nuclear Insurers. SCE withdrew from participation in the secondary insurance pool for San Onofre for offsite liability insurance effective January 5, 2018. Based on its ownership interests in Palo Verde, SCE could be required to pay a maximum of approximately $65 million per nuclear incident for future incidents. However, it would have to pay no more than approximately $10 million per future incident in any one year. Based on its ownership interests in San Onofre and Palo Verde prior to January 5, 2018, SCE could be required to pay a maximum of approximately $255 million per nuclear incident and a maximum of $38 million per year per incident for liabilities arising from events prior to January 5, 2018, although SCE is not aware of any such events.

Upstream Lighting Program

From 2017 – 2019, SCE administered the Upstream Lighting Program, part of a statewide program administered by investor-owned utilities that offered discounted energy efficient light bulbs to customers through incentives to lighting manufacturers. The CPUC began investigating the programs administered by the investor-owned utilities based on reports that investor-owned utilities, including SCE, shipped a significant number of bulbs under the program that could not be tracked to customers. Beginning in January 2020, the CPUC has sought comments on remedies related to SCE's implementation of the Upstream Lighting Program from 2017 through 2019 program years.

In May 2022, the CPUC issued an order directing SCE to show cause as to why SCE should not be required to: (i) refund ratepayer funding for the portion of the program budget associated with light bulbs that were unaccounted for, (ii) refund energy efficiency incentive mechanism ("ESPI") awards associated with unaccounted-for light bulbs, and (iii) pay penalties for misrepresenting program progress and results to the CPUC. In September 2022, a Presiding Officer’s Decision ("POD") was issued in the proceeding finding that SCE mismanaged its Upstream Lighting Program from 2017 through 2019 and failed to ensure that efficient light bulbs were tracked and sold as intended by the program design. The POD requires SCE to (i) refund to ratepayers $76.1 million, representing the portion of the program budget associated with light bulbs that could not be accounted for, (ii) refund to ratepayers $6.8 million, representing ESPI awards associated with light bulbs that could not be accounted for, (iii) pay $19.06 million in fines; and (iv) bear the cost of SCE's investigation, approximately $900,000. SCE filed an appeal of the POD in October 2022. The POD will become the final decision of the CPUC when the CPUC makes a decision on the appeal. As of September 30, 2022, SCE has accrued liabilities of $102 million for losses relating to the Upstream Lighting Program.

Note 13. Equity

Common Stock Issuances

Edison International continued to settle its ongoing common stock requirements of various internal programs through issuance of new common stock. During the three months ended September 30, 2022, 349,748 shares of common stock were issued as stock compensation awards for net cash receipts of $20 million, 64,917 shares of new common stock were issued in lieu of distributing $4 million to shareholders opting to receive dividend payments in the form of additional common stock, 35,000 shares of common stock were issued to employees through the 401(k) defined contribution savings plan for net cash receipts of $2 million as dividend payments and 22,643 shares of common stock were issued to employees through the Employee Stock Purchase Plan for net cash receipts of $1 million.

During the nine months ended September 30, 2022, 1,134,580 shares of common stock were issued as stock compensation awards for net cash receipts of $51 million, 201,263 shares of new common stock were issued in lieu of distributing

78

Table of Contents

$13 million to shareholders opting to receive dividend payments in the form of additional common stock, 106,000 shares of common stock were issued to employees through the 401(k) defined contribution savings plan for net cash receipts of $7 million as dividend payments, 36,912 shares of common stock were issued to employees through the Employee Stock Purchase Plan for net cash receipts of $2 million and 16,441 shares of common stock were issued to employees through voluntary cash purchases for net cash receipts of $1 million.

At-the-Market Program

In August 2022, Edison International filed a prospectus supplement and executed several distribution agreements with certain sales agents to establish an "at-the-market"("ATM") program under which it may sell shares of its common stock having an aggregate sales price of up to $500 million. As of September 30, 2022, no sales had occurred and Edison International has no obligation to sell the remaining shares available under the ATM program.

Equity Contributions

In the three months and nine months ended September 30, 2022, SCE received zero and $700 million in capital contributions from Edison International Parent, respectively, to support SCE's capital program, maintain the equity portion of SCE's capital structure at authorized levels and for general corporate purposes.

Note 14. Accumulated Other Comprehensive Loss

Edison International's accumulated other comprehensive loss, net of tax, consist of:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Beginning balance

$

(48)

$

(65)

$

(54)

$

(69)

Pension and PBOP – net loss:

 

 

  

 

  

 

  

Reclassified from accumulated other comprehensive loss1

 

1

 

2

 

7

 

6

Change

 

1

 

2

 

7

 

6

Ending Balance

$

(47)

$

(63)

$

(47)

$

(63)

1These items are included in the computation of net periodic pension and PBOP Plan expense, including amortization of net loss and settlement costs. See Note 9 for additional information.

SCE's accumulated other comprehensive loss, net of tax, consists of:

Three months ended September 30, 

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Beginning balance

$

(28)

$

(38)

$

(32)

$

(41)

Pension and PBOP – net loss:

 

  

 

  

 

  

 

  

Reclassified from accumulated other comprehensive loss1

 

1

 

2

 

5

 

5

Change

 

1

 

2

 

5

 

5

Ending Balance

$

(27)

$

(36)

$

(27)

$

(36)

1These items are included in the computation of net periodic pension and PBOP Plan expense, including amortization of net loss and settlement costs. See Note 9 for additional information.

79

Table of Contents

Note 15. Other Income

Other income net of expenses is as follows:

Three months ended

Nine months ended

September 30, 

September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

SCE other income (expense):

 

  

 

  

 

  

 

  

Equity allowance for funds used during construction

$

30

$

32

$

91

$

92

Increase in cash surrender value of life insurance policies and life insurance benefits

 

9

 

8

 

30

 

33

Interest income

 

19

 

1

 

36

 

2

Net periodic benefit income – non-service components

 

34

 

33

 

99

 

99

Civic, political and related activities and donations

 

(11)

 

(16)

 

(29)

 

(28)

Other

 

(10)

 

(5)

 

(17)

 

(9)

Total SCE other income

 

71

 

53

 

210

 

189

Other income (expense) of Edison International Parent and Other:

 

  

 

  

 

  

 

  

Net gains (losses) on equity securities

 

8

 

(8)

 

2

 

4

Other

 

6

 

2

 

7

 

2

Total Edison International other income

$

85

$

47

$

219

$

195

Note 16. Supplemental Cash Flows Information

Supplemental cash flows information is:

Edison International

SCE

Nine months ended September 30, 

(in millions)

    

2022

    

2021

    

2022

    

2021

Cash payments (receipts):

 

  

 

  

 

  

 

  

Interest, net of amounts capitalized

$

788

$

728

$

701

$

642

Income taxes, net

 

(49)

 

(87)

 

(49)

 

(87)

Non-cash financing and investing activities:

 

 

 

 

Dividends declared but not paid:

 

 

 

 

Common stock

 

267

 

252

 

325

 

325

Preference stock of SCE

 

6

 

 

6

 

SCE's accrued capital expenditures at September 30, 2022 and 2021 were $649 million and $567 million, respectively. Accrued capital expenditures will be included as an investing activity in the consolidated statements of cash flow in the period paid.

Note 17. Related-Party Transactions

SCE has previously purchased wildfire liability insurance from EIS, a wholly-owned subsidiary of Edison International. In July 2022, SCE purchased wildfire liability insurance for premiums of $273 million, from EIS. EIS fully reinsured the exposure for these policies through the commercial reinsurance market, with reinsurance limits and premiums equal to those of the insurance purchased by SCE, except for a contract for a premium of $93 million under which EIS provided insurance protection to SCE. SCE recorded the premium as insurance expense and recorded equal revenue due to customer funding through regulatory cost recovery mechanisms, therefore there was no earnings impact on SCE's consolidated statement of income. EIS recorded the premium as insurance revenue. On the Edison International consolidated statement of income, the EIS insurance revenue eliminated with SCE's insurance expense, therefore the SCE customer revenues impacted the earnings of Edison International.

80

Table of Contents

The related-party transactions included in SCE's consolidated balance sheets for wildfire-related insurance purchased from EIS and related expected insurance recoveries were as follows:

September 30, 

December 31, 

(in millions)

    

2022

    

2021

Prepaid insurance1

$

160

$

52

Long-term insurance receivable due from affiliate

334

1

Reflected in "Prepaid expenses" on SCE's consolidated balance sheets.

The expense for wildfire-related insurance premiums paid to EIS was $67 million and $41 million for the three months ended September 30, 2022 and 2021, and $146 million and $128 million for the nine months ended September 30, 2022 and 2021, respectively.

81

Table of Contents

CONTROLS AND PROCEDURES

Disclosure Controls and Procedures

The management of Edison International and SCE, under the supervision and with the participation of Edison International's and SCE's respective Chief Executive Officers and Chief Financial Officers, have evaluated the effectiveness of Edison International's and SCE's disclosure controls and procedures (as that term is defined in Rules 13a-15(e) or 15d-15(e) under the Securities Exchange Act of 1934, as amended), respectively, as of the end of the third quarter of 2022. Based on that evaluation, Edison International's and SCE's respective Chief Executive Officers and Chief Financial Officers have each concluded that, as of the end of the period, Edison International's and SCE's disclosure controls and procedures, respectively, were effective.

Changes in Internal Control Over Financial Reporting

There were no changes in Edison International's or SCE's internal control over financial reporting, respectively, during the third quarter of 2022 that have materially affected, or are reasonably likely to materially affect, Edison International's or SCE's internal control over financial reporting.

Jointly Owned Utility Plant

Edison International's and SCE's respective scope of evaluation of internal control over financial reporting includes their Jointly Owned Utility Projects as discussed in "Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment" in the 2021 Form 10-K.

LEGAL PROCEEDINGS

2017/2018 Wildfire/Mudslide Events

Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.

As of October 25, 2022, SCE was aware of approximately 120 currently pending lawsuits, representing approximately 1,000 plaintiffs, related to the Thomas and Koenigstein Fires naming SCE as a defendant. Approximately 95 of the approximately 120 pending lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. One of the lawsuits was filed as a purported class action. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties allege, among other things, negligence, inverse condemnation, trespass, private nuisance, and violations of the public utilities and health and safety codes. SCE and certain of the individual plaintiffs in the Thomas and Koenigstein Fire litigation have been pursuing settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs have opted to pursue trial outside of the settlement program.

Approximately 30 of the approximately 120 pending lawsuits mentioned in the paragraph above allege that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides, resulting in the plaintiffs' claimed damages. Many of the Montecito Mudslides lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. In addition to other causes of action, some of the Montecito Mudslides lawsuits also allege personal injury and wrongful death. A bellwether jury trial previously scheduled for October 12, 2020 was vacated due to the wide-spread disruption caused by the COVID-19 pandemic.

As of October 25, 2022, SCE was aware of approximately 370 currently pending lawsuits, representing approximately 4,000 plaintiffs, related to the Woolsey Fire naming SCE as a defendant. Approximately 110 of the 370 lawsuits also name Edison

82

Table of Contents

International as a defendant based on its ownership and alleged control of SCE. At least one of the lawsuits was filed as a purported class action. The lawsuits, which have been filed in the superior courts of Ventura and Los Angeles Counties allege, among other things, negligence, inverse condemnation, personal injury, wrongful death, trespass, private nuisance, and violations of the public utilities and health and safety codes. SCE and certain of the individual plaintiffs in the Woolsey Fire litigation have been pursuing settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs may opt to pursue trial outside of the settlement program.

The Thomas and Koenigstein Fires and Montecito Mudslides lawsuits are being coordinated in the Los Angeles Superior Court. The Woolsey Fire lawsuits have also been coordinated in the Los Angeles Superior Court.

For further information, including regarding settlement activity related to the 2017/2018 Wildfire/Mudslide Events, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."

Environmental Proceedings

Each of Edison International and SCE have elected to disclose environmental proceedings described in Item 103(c)(3)(iii) of Regulation S-K unless it reasonably believes that such proceeding will result in no monetary sanctions, or in monetary sanctions, exclusive of interest and costs, of less than $1,000,000.

83

Table of Contents

EXHIBITS

Exhibit Number

   

Description

10.1**

Edison International and Southern California Edison Company Director Compensation Schedule, as adopted August 25, 2022

31.1

Certifications of the Chief Executive Officer and Chief Financial Officer of Edison International pursuant to Section 302 of the Sarbanes-Oxley Act

31.2

Certifications of the Chief Executive Officer and Chief Financial Officer of Southern California Edison Company pursuant to Section 302 of the Sarbanes-Oxley Act

32.1

Certifications of the Chief Executive Officer and the Chief Financial Officer of Edison International required by Section 906 of the Sarbanes-Oxley Act

32.2

Certifications of the Chief Executive Officer and the Chief Financial Officer of Southern California Edison Company required by Section 906 of the Sarbanes-Oxley Act

101.1

Financial statements from the quarterly report on Form 10-Q of Edison International for the quarter ended September 30, 2022, filed on November 1, 2022, formatted in Inline XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; and (v) the Notes to Consolidated Financial Statements

101.2

Financial statements from the quarterly report on Form 10-Q of Southern California Edison Company for the quarter ended September 30, 2022, filed on November 1, 2022, formatted in Inline XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; and (v) the Notes to Consolidated Financial Statements

104

The cover page of this report formatted in Inline XBRL (included as Exhibit 101)

** Indicates a management contract or compensatory plan or arrangement, as required by Item 15(a)(3).

Edison International and SCE will furnish a copy of any exhibit listed in the accompanying Exhibit Index upon written request and upon payment to Edison International or SCE of their reasonable expenses of furnishing such exhibit, which shall be limited to photocopying charges and, if mailed to the requesting party, the cost of first-class postage.

84

Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorized.

EDISON INTERNATIONAL

   

SOUTHERN CALIFORNIA EDISON COMPANY

By:

/s/ Kate Sturgess

By:

/s/ Kate Sturgess

Kate Sturgess

Vice President and Controller

(Duly Authorized Officer and Principal Accounting Officer)

Kate Sturgess

Vice President and Controller

(Duly Authorized Officer and Principal Accounting Officer)

Date:

November 1, 2022

Date:

November 1, 2022

85