Annual Statements Open main menu

URANIUM ENERGY CORP - Quarter Report: 2012 January (Form 10-Q)

Uranium Energy Corp.: Form 10-Q - Filed by newsfilecorp.com

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q

[X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended January 31, 2012

or

[   ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from _____ to _____

Commission File Number: 001-33706

URANIUM ENERGY CORP.
(Exact name of registrant as specified in its charter)

NEVADA 98-0399476
(State or other jurisdiction of incorporation of organization) (I.R.S. Employer Identification No.)
   
1111 West Hastings Street, Suite 320, Vancouver, B.C. V6E 2J3
(Address of principal executive offices) (Zip Code)

(604) 682-9775
(Registrant’s telephone number, including area code)

N/A
(Former name, former address and former fiscal
year, if changed since last report)

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes [X]    No [   ]

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or such shorter period that the registrant was required to submit and post such files). Yes [X]     No [   ]

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or a smaller reporting company. See definitions of “large accelerated filer”, “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

[   ] Large accelerated filer [X] Accelerated filer
   
[   ] Non-accelerated filer (Do not check if a smaller reporting company) [   ] Smaller reporting company


Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes [   ]      No [X]

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:
75,945,996 shares of common stock outstanding as of March 7, 2012.

2


URANIUM ENERGY CORP.

TABLE OF CONTENTS

PART I – FINANCIAL INFORMATION 4
     
   Item 1. Financial Statements 4
     
   Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations 29
     
   Item 3. Quantitative and Qualitative Disclosures about Market Risk 35
     
   Item 4. Controls and Procedures 36
     
PART II – OTHER INFORMATION 37
     
   Item 1. Legal Proceedings 37
     
   Item 1A. Risk Factors 38
     
   Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 44
     
   Item 3. Defaults Upon Senior Securities 44
     
   Item 4. (Removed and Reserved) 44
     
   Item 5. Other Information 44
     
   Item 6. Exhibits 44
     
SIGNATURES 45

3


PART I – FINANCIAL INFORMATION

Item 1.        Financial Statements

4


 

 

 

 

 

URANIUM ENERGY CORP.

CONSOLIDATED FINANCIAL STATEMENTS

FOR THE THREE AND SIX MONTHS ENDED JANUARY 31, 2012

(Unaudited)

 

 

5


URANIUM ENERGY CORP.
CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE LOSS
(Unaudited)

    Notes     January 31, 2012     July 31, 2011  
                   
CURRENT ASSETS                  
   Cash and cash equivalents   13   $  16,852,335   $  30,724,051  
   Available-for-sale securities   3     64,941     79,126  
   Accounts and interest receivable         82,336     90,907  
   Inventories   4     3,044,257     2,775,947  
   Prepaid expenses and deposits         591,119     267,158  
          20,634,988     33,937,189  
                   
MINERAL RIGHTS AND PROPERTIES   5     28,352,803     17,841,083  
PROPERTY, PLANT AND EQUIPMENT   6     8,799,398     8,702,413  
RECLAMATION DEPOSITS   7     4,845,495     4,610,300  
LOAN RECEIVABLE   8     334,394     300,000  
        $  62,967,078   $  65,390,985  
                   
                   
CURRENT LIABILITIES                  
   Accounts payable and accrued liabilities       $  3,816,467   $  3,232,104  
   Due to related parties   9     3,247     8,287  
   Convertible debentures   14     178,066     -  
   Current portion of asset retirement obligations   10     909,356     675,872  
          4,907,136     3,916,263  
                   
ASSET RETIREMENT OBLIGATIONS   10     1,722,333     2,351,931  
          6,629,469     6,268,194  
                   
STOCKHOLDERS' EQUITY                  
   Capital stock                  
       Common stock $0.001 par value: 750,000,000 shares
       authorized, 75,675,151 shares issued and outstanding
       (July 31, 2011 - 73,487,337)
  11     75,675     73,487  
   Additional paid-in-capital         163,896,577     154,564,206  
   Share issuance obligation         194,700     194,700  
   Accumulated deficit         (107,845,784 )   (95,740,228 )
   Accumulated other comprehensive income         16,441     30,626  
          56,337,609     59,122,791  
        $  62,967,078   $  65,390,985  
                   
COMMITMENTS AND CONTINGENCIES   5, 12              
SUBSEQUENT EVENTS   14,16              

The accompanying notes are an integral part of these consolidated financial statements.

6


URANIUM ENERGY CORP.
CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE LOSS
(Unaudited)

      Three Months Ended January 31,       Six Months Ended January 31,  
  Notes   2012     2011     2012     2011  
                           
SALES   $ 3,120,000   $  -   $  6,240,000   $  -  
COST OF SALES     1,740,768     -     3,160,854     -  
      1,379,232     -     3,079,146     -  
                           
EXPENSES                          
   Mineral property expenditures 5   4,162,690     2,098,052     6,895,291     5,536,991  
   General and administrative 9,11   3,715,568     4,294,662     7,605,249     9,510,594  
   Depreciation, depletion and accretion 6,10   321,897     260,878     620,476     516,169  
      8,200,155     6,653,592     15,121,016     15,563,754  
LOSS BEFORE OTHER ITEMS     (6,820,923 )   (6,653,592 )   (12,041,870 )   (15,563,754 )
                           
OTHER ITEMS                          
   Interest income     15,645     11,902     34,443     20,403  
   Loss on sale of assets     (501 )   (5,267 )   (501 )   (5,267 )
   Unrealized loss in fair value of convertible debentures 14   (22,484 )   -     (48,439 )   -  
   Gain (loss) on settlement of convertible debentures 14   152,806     -     (177,402 )   -  
   Gain on settlement of accounts payable 5   128,213     -     128,213     -  
      273,679     6,635     (63,686 )   15,136  
NET LOSS FOR THE PERIOD     (6,547,244 )   (6,646,957 )   (12,105,556 )   (15,548,618 )
                           
OTHER COMPREHENSIVE INCOME (LOSS), NET OF INCOME TAXES 3   268     38,960     (14,185 )   61,327  
TOTAL COMPREHENSIVE LOSS FOR THE PERIOD   $ (6,546,976 ) $  (6,607,997 ) $  (12,119,741 ) $  (15,487,291 )
                           
NET LOSS PER SHARE, BASIC AND DILUTED   $ (0.09 ) $  (0.10 ) $  (0.16 ) $  (0.24 )
                           
WEIGHTED AVERAGE NUMBER OF SHARES OUTSTANDING, BASIC AND DILUTED     75,515,864     69,808,230     75,006,312     65,541,373  

The accompanying notes are an integral part of these consolidated financial statements.

7



URANIUM ENERGY CORP.
CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY
FOR THE SIX MONTHS ENDED JANUARY 31, 2012
(Unaudited)

                                  Accumulated        
    Common Stock     Additional     Share           Other        
                Paid-in     Issuance     Accumulated     Comprehensive     Stockholders'  
    Shares     Amount     Capital     Obligation     Deficit     Income     Equity  
Balance, July 31, 2011   73,487,337   $  73,487   $  154,564,206   $  194,700   $  (95,740,228 ) $  30,626   $  59,122,791  
Common stock                                          
 Issued on the exercise of options and warrants   32,435     33     15,031     -     -     -     15,064  
 Issued pursuant to consulting services agreement   20,000     20     62,580     -     -     -     62,600  
 Issued pursuant on settlement of convertible debentures   72,703     72     385,155     -     -     -     385,227  
 Issued pursuant on acquisition of mineral properties   1,903,440     1,904     6,108,893     -     -     -     6,110,797  
 Issued pursuant to database acquisition   159,236     159     510,988     -     -     -     511,147  
Stock-based compensation                                          
 Options issued for consulting services   -     -     576,215     -     -     -     576,215  
 Options issued for management fees   -     -     834,219     -     -     -     834,219  
 Options issued for wages and benefits   -     -     839,290     -     -     -     839,290  
Net loss for the period   -     -     -           (12,105,556 )   -     (12,105,556 )
Unrealized loss on available-for-sale securities   -     -     -     -     -     (14,185 )   (14,185 )
Balance, January 31, 2012   75,675,151   $  75,675   $  163,896,577   $  194,700   $  (107,845,784 ) $  16,441   $  56,337,609  

The accompanying notes are an integral part of these consolidated financial statements.

8


URANIUM ENERGY CORP.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)

      Six Months Ended     Six Months Ended  
  Notes   January 31, 2012     January 31, 2011  
CASH (USED IN) PROVIDED BY:              
               
OPERATING ACTIVITIES              
Net loss for the period   $ (12,105,556 ) $  (15,548,618 )
Adjustments to reconcile net loss to net cash from operating activities              
   Stock based compensation 11   2,181,312     4,941,099  
   Depreciation, depletion and accretion     620,476     516,169  
   Loss on sale of assets     501     5,267  
   Unrealized loss in fair value of convertible debentures 14   48,439     -  
   Loss on settlement of convertible debentures 14   177,402     -  
   Gain on settlement of accounts payables 5   (128,213 )   -  
Changes in operating assets and liabilities              
   Accounts and interest receivable     8,242     (20,821 )
   Inventories 4   253,062     (400,973 )
   Prepaid expenses and deposits     (323,961 )   (290,767 )
   Accounts payable and accrued liabilities     (618,340 )   (2,046,480 )
Settlement of asset retirement obligations 10   (458,920 )   (862,092 )
NET CASH FLOWS USED IN OPERATING ACTIVITIES     (10,345,556 )   (13,707,216 )
               
FINANCING ACTIVITIES              
   Issuance of shares for cash, net of issuance costs     15,064     28,731,994  
   Settlement of convertible debentures 14   (1,370,486 )   -  
   Payments to related parties 9   (5,040 )   (46,829 )
NET CASH FLOWS (USED IN) PROVIDED BY FINANCING ACTIVITIES     (1,360,462 )   28,685,165  
               
INVESTING ACTIVITIES              
   Investment in mineral rights and properties 13   (1,044,442 )   (243,391 )
   Purchase of property, plant and equipment     (551,996 )   (246,817 )
   Loan associated with acquisition of Cue Resources Ltd. 8   (334,065 )   -  
   Proceeds from sale of assets     -     700  
   Reclamation deposit     (235,195 )   (1,876,298 )
NET CASH FLOWS USED IN INVESTING ACTIVITIES     (2,165,698 )   (2,365,806 )
               
NET CASH FLOWS     (13,871,716 )   12,612,143  
CASH AND CASH EQUIVALENTS, BEGINNING OF PERIOD     30,724,051     21,067,662  
CASH AND CASH EQUIVALENTS, END OF PERIOD   $ 16,852,335   $  33,679,805  
               
SUPPLEMENTAL CASH FLOW INFORMATION 13            

The accompanying notes are an integral part of these consolidated financial statements.

9



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

NOTE 1:              NATURE OF OPERATIONS

Uranium Energy Corp. was incorporated in the State of Nevada on May 16, 2003. Uranium Energy Corp. and its subsidiary companies and a partnership (collectively, the “Company”) are engaged in uranium exploration and development programs and mining operations on properties located in the United States and most recently, Paraguay.

The Company realized revenue from uranium sales during the six months ended January 31, 2012, however, it has a history of operating losses and significant negative cash flow since inception. Although planned principal operations have commenced and existing cash resources are expected to provide sufficient funds for the next twelve months, future capital expenditures of the Company may be substantial and its continuation as a going concern for a period longer than twelve months will be dependent upon the Company’s ability to obtain adequate financing. Historically, the Company has been reliant primarily on equity financing from the sale of its common shares and this reliance is expected to continue for the foreseeable future. Furthermore, the continued operations of the Company including the recoverability of the carrying values of its assets are dependent ultimately on the Company’s ability to achieve and maintain profitability and positive cash flow from its operations. At January 31, 2012, the Company had working capital of $15.7 million and an accumulated deficit of $107.8 million.

Unaudited Interim Consolidated Financial Statements

The accompanying unaudited interim consolidated financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America (“U.S. GAAP”) for interim financial information. They may not include all information and footnotes required by U.S. GAAP for complete financial statements, however, except as disclosed herein, there have been no material changes in the information disclosed in the notes to the consolidated financial statements for the fiscal year ended July 31, 2011 included in the Company’s Annual Report on Form 10-K. These unaudited interim consolidated financial statements should be read in conjunction with those consolidated financial statements included in the Form 10-K. In the opinion of management, all adjustments considered necessary for a fair presentation, consisting solely of normal recurring adjustments, have been made. Operating results for the six months ended January 31, 2012 are not necessarily indicative of the results that may be expected for the upcoming fiscal year ending July 31, 2012.

NOTE 2:              SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

Basis of Presentation and Principles of Consolidation

These consolidated financial statements are presented in United States dollars and have been prepared in accordance with U.S. GAAP.

The accompanying consolidated financial statements include the accounts of Uranium Energy Corp. and its wholly-owned subsidiaries, UEC Resources Ltd., UEC Paraguay Corp., and its subsidiary, Piedra Rica Mining S.A., UEC Concentric Merge Corp., URN Texas GP, LLC and URN South Texas Project, Ltd. and a partnership, South Texas Mining Venture, L.L.P. (“STMV”). All significant inter-company transactions and balances have been eliminated upon consolidation.

Certain line items of the comparative figures have been reclassified to conform to the current period’s presentation format.

Cash and Cash Equivalents

The Company considers all highly-liquid instruments with an original maturity of three months or less at the time of issuance to be cash equivalents.

10



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Use of Estimates

The preparation of financial statements in conformity with U.S. GAAP requires management to make estimates and assumptions that affect the reported amount of assets and liabilities at the date of the financial statements and revenues and expenses during the period reported. By their nature, these estimates are subject to measurement uncertainty and the effect on the financial statements of changes in such estimates in future periods could be significant. Significant areas requiring management's estimates and assumptions are determining the fair value of transactions involving common stock, valuation and impairment losses on mineral property interests, valuation of stock-based compensation, valuation of available-for-sale securities, net realizable valuation of inventory and valuation of convertible debentures and asset retirement obligations. Other areas requiring estimates include allocations of expenditures to mineral property interests, depreciation of property and equipment, and amortization of mineral properties, databases and land use agreements. Actual results could differ from those estimates.

Fair Value Measurements

The Company measures its available-for-sale securities at fair value in accordance with ASC 820 Fair Value Measurements. ASC 820 specifies a valuation hierarchy based on whether the inputs to those valuation techniques are observable or unobservable. Observable inputs reflect market data obtained from independent sources, while unobservable inputs reflect the Company’s own assumptions. These two types of inputs have created the following fair value hierarchy:

  • Level 1 – Quoted prices for identical instruments in active markets;
  • Level 2 – Quoted prices for similar instruments in active markets, quoted prices for identical or similar instruments in markets that are not active, and model-derived valuations in which all significant inputs and significant value drivers are observable in active markets; and
  • Level 3 – Valuations derived from valuation techniques in which one or more significant inputs or significant value drivers are unobservable.

Inventories

Inventories are comprised of supplies, uranium concentrates and work-in-progress. Expenditures include mining and processing activities that result in future production of uranium concentrates and depreciation and depletion charges. Mining and processing activities include labor, chemicals and other directly attributable production expenditures. Inventories are valued and charged to cost of sales using the weighted average costing method and are carried at the lower of cost or net realizable value.

Mineral Rights

Expenditures relating to the acquisition of mineral rights are capitalized as incurred. Expenditures relating to exploration activities are expensed as incurred, while those relating to development activities are expensed when incurred prior to the completion of a bankable feasibility study establishing proven and probable reserves. Once proven and probable reserves are established, subsequent development expenditures relating to that project are capitalized.

Upon commencement of production, the project’s capitalized expenditures are depleted over proven and probable reserves using the units-of-production method. Where proven and probable reserves have not been established, such capitalized expenditures are depleted over the estimated production life using the straight-line method. The Company has not established proven or probable reserves on any of its projects.

The carrying values of the mineral rights are assessed for impairment by management on a quarterly basis. Should management determine that these carrying values cannot be recovered, the unrecoverable amounts are written off against earnings.

11



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Databases

Expenditures relating to mineral property databases are capitalized upon acquisition while those developed internally are expensed as incurred. Mineral property databases are tested for impairment whenever events or changes indicate that the carrying values may not be recoverable. An impairment loss is recognized if it is determined that the carrying value is not recoverable and exceeds fair value. Mineral property databases are amortized using the straight-line method over a five-year period over which management believes the asset will contribute to the Company’s cash flows. Databases are included in Mineral Rights and Properties on the balance sheet.

Land Use Agreements

Expenditures relating to mineral property land use agreements are capitalized upon acquisition. Mineral property land use agreements are tested for impairment whenever events or changes indicate that the carrying values may not be recoverable. An impairment loss is recognized if it is determined that the carrying value is not recoverable and exceeds fair value. Mineral property land use agreements are amortized using the straight-line method over a ten-year period over which management believes the asset will contribute to the Company’s cash flows. Land use agreements are included in Mineral Rights and Properties on the balance sheet.

Convertible Debentures

Pursuant to ASC 815, the convertible debentures were initially measured at fair value in its entirety, without separating associated elements such as the convertible feature. Subsequent to the initial recognition, the fair value of the convertible debentures is revalued and recognized in the applicable period as an unrealized change in fair value of convertible debentures in the consolidated statements of operations and comprehensive loss.

The Company’s fair value measurement for the convertible debentures is calculated using a probability-weighted discounted cash flow model (level 3 fair value measurement) which includes the Company’s assessment of the outstanding principle, the accrued interest and the applicable discount rate. Convertible debentures are classified as a liability on the consolidated balance sheets.

Upon exercise under the convertible provision, the financial liability is derecognized and common shares of the Company would be issued at the exercise price, with any differences recorded as a gain or loss in the consolidated statement of operations and comprehensive loss.

Upon settlement of the convertible debentures, the financial liability is derecognized and any difference between the carrying value of the financial liability and the settlement amount is recorded as a gain or loss of convertible debenture settlement in the consolidated statement of operations and comprehensive loss.

Restoration and Remediation Costs (Asset Retirement Obligations)

Various federal and state mining laws and regulations require the Company to reclaim the surface areas and restore underground water quality for its mine projects to the pre-existing mine area average quality after the completion of mining.

Future reclamation and remediation costs, which include production equipment removal and environmental remediation, are accrued based on management's best estimate at the end of each period of the costs expected to be incurred at each project. Such estimates are determined by the Company's engineering studies calculating the cost of future surface and groundwater activities, current regulations, actual expenses incurred, and technology and industry standards.

In accordance with ASC 410, Asset Retirement and Environmental Obligations, the Company capitalizes the measured fair value of asset retirement obligations to mineral rights and properties. The asset retirement obligations are accreted to an undiscounted value until the time at which they are expected to be settled. The accretion expense is charged to the statement of operations and comprehensive loss and actual retirement costs are recorded against the asset retirement obligations when incurred. Any difference between the recorded asset retirement obligations and the actual retirement costs incurred will be recorded as a gain or loss in the period of settlement.

12



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

On a quarterly basis, the Company updates cost estimates, and other assumptions used in the valuation of asset retirement obligations at each of its mineral properties to reflect new events, changes in circumstances and any new information that is available. Changes in these costs have a corresponding impact on the asset retirement obligations.

Revenue Recognition

The recognition of revenue from the sale of uranium concentrates is in accordance with the guidelines outlined in ASC Section 605-10-25 Revenue Recognition. The Company delivers its uranium concentrates to a uranium storage facility and once the product is confirmed to meet the required specifications, the Company receives credit for a specified quantity measured in pounds. Future sales of uranium concentrates are expected to generally occur under uranium supply agreements or on the uranium spot market. Once a sale of uranium concentrates is negotiated, the Company will notify the uranium storage facility with instructions for a title transfer to the customer. Revenue is recognized once a title transfer of the uranium concentrates is confirmed by the uranium storage facility at which point the customer is invoiced by the Company.

Impairment of Long-Lived Assets

Long-lived assets are reviewed for impairment whenever events or changes in circumstances indicate the carrying amount of an asset may not be recoverable. Circumstances which could trigger a review include, but are not limited to: significant decreases in the market price of the asset; significant adverse changes in the business climate or legal factors; accumulation of costs significantly in excess of the amount originally expected for the acquisition or construction of the asset; current period cash flow or operating losses combined with a history of losses or a forecast of continuing losses associated with the use of the asset; and current expectation that the asset will more likely than not be sold or disposed significantly before the end of its estimated useful life. Recoverability of these assets is measured by comparison of its carrying amount to future undiscounted cash flows the assets are expected to generate. An impairment loss is recognized when the carrying amount is not recoverable and exceeds fair value.

Financial Instruments

The fair values of cash and cash equivalents, reclamation deposits, other current monetary assets, accounts payable, accrued liabilities, royalty obligations and related party transactions were estimated to approximate their carrying values due to the immediate or short-term maturity of these financial instruments. The Company's operations and financing activities are conducted primarily in United States dollars, and as a result the Company is not subject to significant exposure to market risks from changes in foreign currency rates. The Company is exposed to credit risk through its cash and cash equivalents, but mitigates that risk by keeping deposits at major financial institutions.

Earnings (Loss) per Common Share

Basic earnings (loss) per share includes no potential dilution and is computed by dividing the earnings (loss) attributable to common stockholders by the weighted average number of common shares outstanding for the period. Diluted earnings (loss) per share reflect the potential dilution of securities that could share in the earnings (loss) of the Company. The common shares potentially issuable on the exercise of share purchase warrants and stock options were not included in the calculation of weighted average number of shares outstanding because the effect is anti-dilutive.

13



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Foreign Currency Translation

The functional currency of the Company, including its subsidiaries, is the United States dollar. UEC Resources Ltd. maintains its accounting records in its local currency (Canadian dollar). Piedra Rica Mining S.A. maintains its accounting records in its local currency (Guarani). In accordance with ASC 830, Foreign Currency Matters, the financial statements of the Company's subsidiary is translated into United States dollars using period end exchange rates as to monetary assets and liabilities and average exchange rates as to revenues and expenses. Non-monetary assets are translated at their historical exchange rates. Net gains and losses resulting from foreign exchange translations and foreign currency exchange gains and losses on transactions occurring in a currency other than the Company's functional currency are included in the determination of net income (loss) in the period.

Income Taxes

The Company follows the liability method of accounting for income taxes. Under this method, deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax balances. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to the taxable income in the years in which those differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the date of enactment. The Company recognizes deferred taxes on unrealized gains directly within other comprehensive income, and concurrently releases part of the valuation allowance resulting in nil impact within other comprehensive income or on the balance sheet. The Company’s policy is to accrue any interest and penalties related to unrecognized tax benefits in its provision for income taxes. Additionally, ASC 740, Income Taxes, requires that a company recognize in its financial statements the impact of a tax position that is more likely than not to be sustained upon examination based on the technical merits of the position.

Stock-Based Compensation

The Company follows ASC 718, Compensation - Stock Compensation, which addresses the accounting for stock-based payment transactions, requiring such transactions to be accounted for using the fair value method. Awards of shares for property or services are recorded at the more readily measurable of the fair value of the stock and the fair value of the service. The Company uses the Black-Scholes option-pricing model to determine the grant date fair-value of stock-based awards under ASC 718. The fair value is recorded in income depending on the terms and conditions of the award, and the nature of the relationship of the recipient of the award to the Company. The Company records the grant date fair value in income in line with the period over which it was earned. For employees and management, this is typically considered to be the vesting period of the award. For consultants, the fair value of the award is recorded in income over the term of the service period, and unvested amounts are revalued at each reporting period over the service period. The Company estimates the expected forfeitures and updates the valuation accordingly.

Property, Plant and Equipment

Property, plant and equipment are recorded at cost and are depreciated to their estimated residual values using the straight-line method over their estimated useful lives as follows:

  • Hobson Processing Facility - 10 years
  • Computer Equipment - 3 years
  • Other Equipment, Vehicles and Furniture and Fixtures - 5 years
  • Leasehold Improvements - Term of lease

14



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Recent Accounting Pronouncements

On May 12, 2011, the FASB issued ASU 2011-04 to converge U.S. GAAP and IFRS requirements for measuring amounts at fair value as well as disclosures about these measurements. The ASU is effective for the first reporting period (including interim periods) beginning after December 15, 2011. The ASU is not expected to have a material impact on the consolidated financial statements for the Company.

On June 16, 2011, the FASB issued ASU 2011-05 to provide two options of how to present items of net income, items of other comprehensive income and total comprehensive income. Companies can create one continuous statement of comprehensive income or two separate consecutive statements. Companies will no longer be allowed to present other comprehensive income in the statement of stockholders’ equity. The ASU is effective for the first reporting period (including interim periods) beginning after December 15, 2011. On December 23, 2011, FASB issued ASU 2011-12 to defer the ASU 2011-05 requirement with the same effective date as ASU 2011-12. Both of ASU 2011-05 and ASU 2011-12 are not expected to have a material impact on the consolidated financial statements for the Company.

NOTE 3:              AVAILABLE-FOR-SALE SECURITIES

Available-for-sale securities consist of shares in publicly traded uranium exploration companies listed on the TSX Venture and Australian Stock Exchanges. For the three and six months ended January 31, 2012 and 2011, the Company recorded an unrealized gain (loss) of $268 and ($14,185) (2011: $38,960 and $61,327), respectively, on available-for-sale securities recognized in accumulated other comprehensive gain (loss).

The fair value of the Company’s available-for-sale securities at January 31, 2012 is as follows:

    Quoted Prices in     Significant     Significant  
    Active Markets for     Other Observable     Unobservable  
    Identical Assets     Inputs     Inputs  
    (Level 1 )   (Level 2 )   (Level 3 )
Available-for-Sale Securities                  
 Strategic Resources Inc. $  11,667   $  -   $  -  
 Uran Limited   53,274     -     -  
  $  64,941   $  -   $  -  

The fair value of the Company’s available-for-sale securities at July 31, 2011 is as follows:

    Quoted Prices in     Significant     Significant  
    Active Markets for     Other Observable     Unobservable  
    Identical Assets     Inputs     Inputs  
    (Level 1 )   (Level 2 )   (Level 3 )
Available-for-Sale Securities                  
 Strategic Resources Inc. $  24,490   $  -   $  -  
 Uran Limited   54,636     -     -  
  $  79,126   $  -   $  -  

15



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

NOTE 4:              INVENTORIES

In November 2010, the Company commenced uranium production at its Palangana Mine and processing of uranium concentrates at its Hobson Processing Facility. The Company’s inventory consists of the following:

    January 31, 2012     July 31, 2011  
Supplies $  20,584   $  39,263  
Work-in-progress   313,246     505,446  
Finished goods - uranium concentrates   2,710,427     2,231,238  
  $  3,044,257   $  2,775,947  

At January 31, 2012, the total non-cash component of inventory was $652,040 (July 31, 2011: $712,317). During the three and six months ended January 31, 2012, the Company did not incur a net realizable value write-down of inventory.

NOTE 5:              MINERAL RIGHTS AND PROPERTIES

Mineral Rights

At January 31, 2012, the Company had mineral rights covering 44,283 acres located in the States of Arizona, Colorado, New Mexico, Texas and Wyoming and an additional 247,000 acres located in Paraguay. These mineral rights were acquired for the purposes of uranium exploration, development and mining at a cost of $27,536,802, net of $1,713,504 in impairment charges. The acquisition costs of $27,536,802 include $23,747,973 representing the fair value of non-cash consideration and $3,788,829 representing the cash consideration provided. Included in the non-cash consideration is $1,798,387 representing the present value of the retirement obligation associated with the Palangana Mine. These mineral rights were acquired through staking and lease or option agreements and are subject to varying royalty interests, some of which are indexed to the sale price of uranium. At January 31, 2012, annual maintenance payments of $489,995 were required to maintain these mineral rights.

16



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Mineral rights and property acquisition costs consist of the following:

    January 31, 2012     July 31, 2011  
Mineral Rights and Properties, Unproven            
 Palangana Mine $  5,710,187   $  5,710,187  
 Goliad Project   8,689,127     8,689,127  
 Salvo Project   363,645     303,645  
 Nichols Project   154,774     154,774  
 Los Cuatros (formerly New River) Project   257,250     257,250  
 Anderson Project   9,154,268     427,616  
 Todilto Project   182,320     182,320  
 Workman Creek Project   1,031,578     -  
 Coronel Oviedo Project   880,579     880,579  
 Other property acquisitions   1,113,074     837,215  
    27,536,802     17,442,713  
Accumulated depreciation and depletion   (635,047 )   (360,418 )
    26,901,755     17,082,295  
             
Databases   2,345,038     1,433,890  
Accumulated depreciation   (1,168,911 )   (968,782 )
    1,176,127     465,108  
             
Land Use Agreements   375,155     375,155  
Accumulated depreciation   (100,234 )   (81,475 )
    274,921     293,680  
  $  28,352,803   $  17,841,083  

During the three and six months ended January 31, 2012, the Company did not incur an impairment charge (three and six months ended January 31, 2011: $Nil).

Pursuant to a Data Purchase and Sale Agreement dated August 19, 2011, the Company purchased certain database covering the Goliad formation from Uranium One Inc. for total consideration of $911,148, comprised of a cash payment of $400,000 and the issuance of 159,326 restricted common shares of the Company with a fair value estimated to be $511,148.

Mineral property expenditures on a regional basis are as follows:

    Three Months Ended January 31,     Six Months Ended January 31,  
    2012     2011     2012     2011  
Mineral Property Expenditures                        
 Arizona $ 46,026   $  4,106   $ 186,702   $  15,951  
 Colorado   4,278     19,088     50,319     41,742  
 New Mexico   5,452     5,637     15,600     28,771  
 Texas   3,463,163     2,068,923     5,722,182     5,433,600  
 Utah   -     298     -     3,172  
 Wyoming   1,275     -     14,625     13,755  
 Paraguay   642,496     -     905,863     -  
  $  4,162,690   $  2,098,052   $  6,895,291   $  5,536,991  

17



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Palangana Mine, Texas

On December 18, 2009, the Company acquired the Palangana Mine as part of the acquisition of STMV with an estimated fair value of $3,911,800 at acquisition. The Palangana Mine is an 8,178 acre property located approximately 100 miles south of the Hobson Processing Facility and is subject to 6% to 12% sliding scale production royalties.

Upon commencement of production in November 2010, the Company began depreciating and depleting the capitalized costs, which includes a reclamation liability of $1,798,387, of the Palangana Mine over forty-two months. At January 31, 2012, capitalized costs totaled $5,710,187, less accumulated depreciation and depletion of $635,047, for a net book value of $5,075,140.

Goliad Project, Texas

On October 11, 2005, the Company entered into a mineral asset option agreement granting the Company the right to acquire title to the leases totaling 2,342 acres, encompassing the Goliad Project. The Goliad Project is located in south Texas near the northeast end of the extensive South Texas Uranium trend. At January 31, 2012, capitalized costs totaled $8,689,127.

Salvo Project, Texas

On November 29, 2010, the Company entered into various lease agreements granting the Company the exclusive right to conduct mining exploration and related operations over an area covering 4,965 acres. The leases have a minimum term of five years with provisions for extensions. At January 31, 2012, capitalized costs totaled $363,645.

Nichols Project, Texas

On January 13, 2007, the Company entered into various lease agreements granting the Company the exclusive right to conduct mining exploration and related operations over an area covering 1,348 acres. The leases have a minimum term of five years with provisions for extensions. At January 31, 2012, capitalized costs totaled $154,774.

Los Cuatros Project, Arizona

On January 25, 2010, the Company executed an amendment to the underlying purchase agreement to acquire 640 acres of mineral exploration claims located in Maricopa County, Arizona, together with database records containing material information regarding the mineral claims. At January 31, 2012, capitalized costs totaled $257,250.

Anderson Project, Arizona

Pursuant to a Merger Agreement and Plan of Merger dated May 5, 2011 and effective September 9, 2011 (the “Merger Agreement”), the Company merged with Concentric Energy Corp. (“Concentric”) resulting in the acquisition of an undivided 100% interest in the 7,581-acre Anderson Property located in Yavapai County, Arizona. In accordance with the Merger Agreement, Concentric’s shareholders received 0.1075 of one share of the Company’s common stock for every one share of Concentric common stock, resulting in the issuance of 1,253,440 shares of the Company to the former Concentric shareholders. In addition, holders of Concentric share purchase warrants received 0.1075 of one share purchase warrant of the Company for every one Concentric share purchase warrant, resulting in the issuance of share purchase warrants representing 375,834 shares of the Company exercisable at prices ranging from $9.30 to $65.12 per share to the former holders of Concentric share purchase warrants.

Pursuant to an Acquisition Agreement dated April 11, 2011, as amended on June 24, 2011, and effective September 9, 2011 (the “Acquisition Agreement”) concurrently with the Merger Agreement, the Company was assigned all of Global Uranium Corp.’s (“Global”) rights and interests under the terms and conditions of an Option and Joint Venture Agreement dated April 13, 2010 between Concentric and Global with respect to the Anderson Project. In accordance with the Acquisition Agreement, the Company provided the following consideration to Global:

18



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)
  • an initial cash payment of $150,000;
  • a further cash payment of $200,000 representing repayment in full of a secured loan between Global and Concentric thereby releasing and assigning to the Company the security previously granted by Concentric to Global; and
  • a final cash payment of $150,000 and the issuance of 350,000 restricted shares of the Company.

The acquisition of the Anderson Project was accounted for in accordance with ASC 360, Property, Plant and Equipment, as an asset acquisition and the respective fair values of the material line items are summarized as follows:

  • Cash payment of $500,000;
  • Issuance of 1,603,440 shares of the Company and warrants to purchase 375,834 shares valued at $5,195,797;
  • Transaction costs incurred valued at $509,273;
  • Assumption of Concentric’s accounts payable liabilities and accrued liabilities valued at $1,241,260; and
  • Assumption of Concentric’s convertible debenture liabilities valued at $1,707,938 (Note 14).

During the three months ended January 31, 2012, the Company paid a total of $152,045 to various vendors to settle a total of $280,258 in accounts payables assumed from the acquisition of the Anderson Project. As a result, a gain of $128,213 on settlement of accounts payables was recorded on the statements of operations and comprehensive loss.

At January 31, 2012, capitalized costs of Anderson Project totaled $9,154,268.

Workman Creek Project, Arizona

Pursuant to a Property Acquisition Agreement dated November 7, 2011, as amended on November 25, 2011, and effective November 30, 2011, the Company acquired from Cooper Minerals, Inc. (“Cooper”) an undivided 100% interest in the 3,520-acre Workman Creek Project located in Gila County, Arizona. The Workman Creek Project is subject to a 3.0% net smelter revenue royalty requiring an annual advance royalty payment of $100,000. The Company has the exclusive right and option to acquire one-half (1.5%) of the net smelter revenue royalty for $1,000,000 at any time until January 21, 2024. Additionally, certain individuals hold an option to acquire a 0.5% net smelter revenue royalty exercisable by paying the Company the sum of $333,340 at any time until January 21, 2024.

As consideration for this acquisition, the Company made cash payments totaling $84,640 and issued 300,000 restricted shares. The acquisition of the Workman Creek Project was accounted for in accordance with ASC 360, Property, Plant and Equipment, as an asset acquisition and the respective fair values of the material line items are summarized as follows:

  • Cash payment of $84,640;
  • Issuance of 300,000 shares valued at $915,000; and
  • Transaction costs incurred valued at $31,938.

At January 31, 2012, capitalized costs totaled $1,031,578.

19



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Todilto Project, New Mexico

Effective January, 14, 2009, the Company entered into an Option and Joint Venture Agreement with Uran Limited of Perth, Australia over a certain area of the Company’s Todilto Project located in New Mexico. Uran Limited may earn a 65% interest in the area by:

  • making an initial cash payment of $75,000 to the Company (received);
  • incurring project exploration expenditures of $100,000 in year one (completed), $200,000 in year two (completed), $300,000 in year three, $400,000 in year four and $500,000 in year five, for total aggregate exploration expenditures of $1,500,000;
  • completion of a feasibility study; and
  • issuing and delivering to the Company an initial 1,000,000 common shares of Uran Limited (received) and a further 750,000 shares each in year two (received), year three (received) and year four, for total aggregate issuance of 3,250,000 common shares of Uran Limited.

Uran Limited can withdraw from the project after expenditures of $250,000. At January 31, 2012, capitalized costs totaled $182,320.

Coronel Oviedo Project, Paraguay

Pursuant to a Share Exchange Agreement dated May 11, 2011 (the “Agreement”) and effective May 24, 2011, the Company acquired a 100% interest in Piedra Rica Mining S.A., a private Paraguayan company, which holds an undivided 100% interest in the Coronel Oviedo Project located in Paraguay. The Coronel Oviedo Project is comprised of two prospecting permits covering a total 247,000 acres and is subject to a 1.5% gross overriding royalty. The Company has the exclusive right and option at any time to acquire one-half percent (0.5%) of the gross overriding royalty for $500,000, including a right of first refusal to acquire all or any portion of the remaining one percent (1.0%) .

As consideration for this acquisition, the Company issued 225,000 restricted shares. The acquisition of the Coronel Oviedo Project was accounted for in accordance with ASC 360, Property, Plant and Equipment, as an asset acquisition and the respective fair values of the material line items are summarized as follows:

  • Issuance of 225,000 shares valued at $722,250; and
  • Transaction costs incurred valued at $158,329

At January 31, 2012, capitalized costs totaled $880,579.

NOTE 6:              PROPERTY, PLANT AND EQUIPMENT

Property, plant and equipment consist of the following:

    January 31, 2012     July 31, 2011  
Cost Accumulated
Amortization
Net Book Value Cost Accumulated
Amortization
Net Book Value
Hobson Processing Facility $  6,529,928   $  (178,898 ) $  6,351,030   $  6,529,928   $  (106,832 ) $  6,423,096  
Vehicles   1,683,437     (905,843 )   777,594     1,615,480     (746,268 )   869,212  
Mining equipment   1,816,268     (669,971 )   1,146,297     1,527,101     (506,424 )   1,020,677  
Computer equipment   563,304     (313,192 )   250,112     376,275     (272,706 )   103,569  
Furniture and fixtures   188,939     (90,856 )   98,083     183,338     (72,623 )   110,715  
Land   175,144     -     175,144     175,144     -     175,144  
Leasehold improvements   9,970     (8,832 )   1,138     8,728     (8,728 )   -  
  $  10,966,990   $  (2,167,592 ) $  8,799,398   $  10,415,994   $  (1,713,581 ) $  8,702,413  

20



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Hobson Processing Facility

Effective December 18, 2009, the Company acquired the Hobson Processing Facility (“Hobson”) as part of the acquisition of STMV with a fair value of $6,529,928 at acquisition. Hobson is located in Karnes County, Texas about 100 miles northwest of Corpus Christi and was originally licensed and constructed in 1978. Hobson is designed to process uranium-loaded resins from satellite facilities, such as the Palangana Mine, to the final U3O8 product.

Upon commencement of processing the uranium-loaded resins from the Palangana Mine in November 2010, the Company began depreciating the capitalized costs of Hobson, which includes a reclamation liability of $329,928, on a straight-line basis over a ten-year period.

NOTE 7:              RECLAMATION DEPOSITS

Reclamation deposits includes interest and non-interest bearing deposits issued in the States of Arizona, Texas and Wyoming pursuant to exploration, production and reclamation activities in the respective states. Reclamation deposits consist of the following:

    January 31, 2012     July 31, 2011  
Palangana Mine $  2,363,624   $  2,117,011  
Hobson Processing Facility   1,824,350     1,824,350  
Mount Lucas   672,650     672,650  
Arizona   15,000     15,000  
Wyoming   812     811  
    4,876,436     4,629,822  
Service Charges   (30,941 )   (19,522 )
  $  4,845,495   $  4,610,300  

NOTE 8:              LOAN RECEIVABLE

Pursuant to a Secured Loan Agreement dated January 20, 2012, the Company provided a senior secured loan to Cue in the principal amount of $334,065 (CAD$335,000), subject to interest calculated at 3% per annum, for Cue’s general corporate expenses incurred prior to the completion of the Arrangement Agreement relating to the Yuty Project (Note 5). At January 31, 2012, interest receivable of $329 (CAD$330) was accrued by the Company relating to this secured loan.

Pursuant to a Secured Loan Agreement dated April 20, 2011, the Company provided a senior secured loan to Concentric in the principal amount of $300,000, subject to interest calculated at 6% per annum, of which $200,000 was utilized to repay a secured loan owed to Global by Concentric, with the remainder for Concentric’s general corporate expenses incurred prior to the completion of the Merger Agreement relating to the Anderson Project (Note 5). Effective September 9, 2011, the Company merged with Concentric which resulted in the reclassification of the loan receivable as partial consideration towards the purchase price related to the Anderson Project.

NOTE 9:              DUE TO RELATED PARTIES AND RELATED PARTY TRANSACTIONS

During the three and six months ended January 31, 2012, the Company had transactions with certain officers and directors of the Company as follows:

  • incurred $16,167 and $50,860 (three and six months ended January 31, 2011: $39,050 and $80,125) in general and administrative costs paid to a company controlled by a direct family member of a current officer; and

21



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)
  • incurred $18,347 and $131,176 in administrative services and associated expense reimbursements paid to a company controlled by a current director. In addition, an amount of $179,904 was incurred during the three and six months ended January 31, 2011 for finder’s fees related to private placements.

At January 31, 2012, amounts owed to related parties totaled $3,247 (July 31, 2011: $8,287).

NOTE 10:            ASSET RETIREMENT OBLIGATIONS

The Company's asset retirement obligations relates to site restoration for the Hobson Processing Facility, Palangana Mine and Mt. Lucas and Tex-1 projects from the acquisition of STMV.

    January 31, 2012     July 31, 2011  
Opening balance $  3,027,803   $  2,243,840  
Liabilities assumed   -     1,798,387  
Liabilities settled with cash   (458,920 )   (1,212,942 )
Liabilities settled with common shares   -     (54,000 )
Accretion   62,806     126,518  
Revision in estimate of asset retirement obligations   -     126,000  
    2,631,689     3,027,803  
Less: current portion of asset retirement obligations   (909,356 )   (675,872 )
Long-term asset retirement obligations $  1,722,333   $  2,351,931  

    January 31, 2012     July 31, 2011  
Undiscounted amount of estimated cash flows $  2,954,455   $  3,677,822  
Assumptions            
Payable in years   3.5 to 8.5     3.5 to 8.5  
Inflation Rate   2.25%     2.25%  
Discount Rate   5.00%     5.00%  

22



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

NOTE 11:            CAPITAL STOCK

Capital Stock

The Company’s capital stock at January 31, 2012 was 750,000,000 authorized common shares with a par value of $0.001 per share.

Share Transactions

Period / Description Common Shares Issued   Value per Share   Issuance Value
  Low     High  
Balance, July 31, 2011   73,487,337                    
     Service Agreements   10,000   $  2.99   $  3.49   $  32,400  
     Mineral Property Acquisition   1,603,440     3.20     3.20     5,195,797  
     Database Acquisition   159,236     3.21     3.21     511,147  
Balance, October 31, 2011   75,260,013                    
     Mineral Property Acquisition   300,000     3.05     3.05     915,000  
     Service Agreements   10,000     3.00     3.04     30,200  
     Settlement of Convertible Debenture   72,703     3.18     3.18     231,195  
     Options Exercised (1)   29,027     0.45     2.78     4,500  
     Warrants Exercised   3,408     3.10     3.10     10,564  
Balance, January 31, 2012   75,675,151                    

  (1)

55,000 options were exercised on a cashless basis resulting in 19,027 net shares issued

Share Purchase Warrants

A continuity schedule of exercisable and outstanding share purchase warrants for the underlying common shares of the Company at January 31, 2012, and the changes during the period, is presented below:

  Number of Weighted average Weighted average remaining
  Warrants exercise price          contractual term (years)
Balance, July 31, 2011 4,348,983 $ 3.57 0.79
     Issued 375,834 16.30 1.16
     Expired (3,596,797) (3.95) n/a
Balance, October 31, 2011 1,128,020 6.59 2.49
     Exercised (3,408) 3.10 0.17
Balance, January 31, 2012 1,124,612 $ 6.60 2.24

The aggregate intrinsic value (“AIV”) under the provisions of ASC 718 of the outstanding warrants at January 31, 2012 was estimated to be $1,025,000.

Stock Options

At January 31, 2012, the Company has two Stock Option Plans as follows:

  • 2006 Stock Option Plan, with 10,000,000 common shares available for issuance; and
  • 2009 Stock Option Plan, with 7,000,000 common shares available for issuance.

23



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

A summary of the Company’s stock option grants for the three and six months ended January 31, 2012, using the Black Scholes pricing model, is presented below:

Date / Period   Options
Issued
    Exercise
Price
  Term
(Years)
  Fair Value   Expected Life
(Years)
Risk-Free
Interest Rate
  Dividend
Yield
    Expected
Volatility
 
     August 18, 2011   15,000   $  3.15   10 $  32,998   4 0.61%   0.00%     102.50%  
     September 26, 2011   1,005,000     2.78   10   2,070,098   4 0.65%   0.00%     112.05%  
Three months ended October 31, 2011   1,020,000             2,103,096                  
     November 2, 2011   10,000     3.15   10   20,823   4 0.63%   0.00%     94.77%  
     November 3, 2011   15,000     3.34   10   34,991   4 0.65%   0.00%     102.47%  
     November 7, 2011   20,000     3.21   10   47,606   4 0.63%   0.00%     112.23%  
     January 10, 2012   10,000     3.05   10   20,605   4 0.53%   0.00%     97.83%  
     January 16, 2012   50,000     3.43   10   126,743   4 0.57%   0.00%     111.71%  
Three months ended January 31, 2012   105,000             250,768                  
Balance, January 31, 2012   1,125,000           $  2,353,864                  

The weighted average fair value per option granted during the six months ended January 31, 2012 was $2.09.

A continuity schedule of outstanding stock options for the underlying common shares of the Company during the six months ended January 31, 2012 is presented below:

    Number of Stock     Weighted Average     Weighted Average  
    Options     Exercise Price     Remaining Contractual  
                Term (Years)  
Balance, July 31, 2011   8,579,750   $  1.79     7.40  
     Issued   1,020,000     2.79     9.92  
     Forfeited   (4,500 )   (2.43 )   (9.00 )
Balance, October 31, 2011   9,595,250     1.91     7.44  
     Issued   105,000     3.31     10.00  
     Exercised   (65,000 )   (2.23 )   (8.26 )
     Forfeited   (83,250 )   (3.04 )   (9.26 )
Balance, January 31, 2012   9,552,000   $  1.91     6.99  

The AIV under the provisions of ASC 718 of all outstanding options at January 31, 2012 was estimated to be $11,717,623.

A summary of options outstanding and exercisable at January 31, 2012 is presented below:

    Options Outstanding     Options Exercisable  
Range of Exercise Prices   Outstanding at     Weighted Average     Exercisable at     Weighted Average  
    January 31, 2012     Exercise Price     January 31, 2012     Exercise Price  
$0.33 to $0.95   3,380,000   $  0.41     3,380,000   $  0.41  
$1.50 to $2.49   3,747,000     2.40     3,517,500     2.39  
$2.52 to $6.05   2,425,000     3.25     1,572,500     3.35  
    9,552,000   $  1.91     8,470,000   $  1.78  

24



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

Stock Based Compensation

A summary of stock based compensation expense, which is included in general and administrative expenses, for the three and six months ended January 31, 2012 and 2011 is presented below:

    Three Months Ended January 31,     Six Months Ended January 31,  
    2012     2011     2012     2011  
                         
Stock Based Consulting                        
     Common stock issued for consulting services $  30,200   $  298,746   $  62,600   $  487,970  
     Options issued to consultants   334,581     595,143     576,215     1,134,465  
    364,781     893,889     638,815     1,622,435  
                         
Stock Based Management Fees                        
     Options issued to management   -     289,681     834,219     2,079,707  
    -     289,681     834,219     2,079,707  
                         
Stock Based Wages and Benefits                        
     Options issued to employees   310,818     419,973     839,290     1,238,957  
    310,818     419,973     839,290     1,238,957  
                         
Stock based compensation charged to inventory   (607 )   -     (131,012 )   -  
  $  674,992   $  1,603,543   $  2,181,312   $  4,941,099  

For the three and six months ended January 31, 2012, stock-based compensation of $607 and $131,012 was charged to inventory (three and six months ended January 31, 2011: $nil) respectively.

NOTE 12:            COMMITMENTS AND CONTINGENCIES

The Company is currently renting or leasing office premises in Arizona, New Mexico, Texas and Vancouver, B.C., Canada with total monthly payments of $20,950. The office lease agreements in Arizona, New Mexico and Texas are leased and will expire in October 2012, October 2012 and August 2012, respectively. The office lease agreement in Vancouver is on a month-to-month basis. The Company also has consulting agreements which will expire in less than one year.

The aggregate minimum payments over the next five years are as follows:

July 31, 2012 $  331,938  
July 31, 2013   71,661  
July 31, 2014   10,121  
  $  413,720  

The Company is committed to pay its key executives a total of $766,191 per year for management services.

The Company entered into a multi-year uranium sales contract in June 2011, as amended in January 2012, requiring the delivery of a total 320,000 pounds of U3O8 by the Company over a three-year period starting in August 2011. The sales price will be based on published market price indicators at the time of delivery. During the six months ended January 31, 2012, the Company fulfilled its first-year delivery obligation under this contract.

On February 23, 2011, the Company received notification of a lawsuit filed against the Company related to the acquisition of STMV for an unspecified amount. Pursuant to the acquisition terms, the claimant is entitled to the difference between the estimated $2.2 million in reclamation costs associated with Mt. Lucas and the actual reclamation costs associated with Mt. Lucas, provided the actual costs are less than the $2.2 million, subject to the receipt of a clearance certificate from the Texas Commission on Environmental Quality which has yet to be issued. The Company believes it has complied with all of the terms related to the acquisition of STMV as current reclamation costs associated with Mt. Lucas are greater than $2.2 million. The Company intends on disputing any and all claims under this lawsuit. Any potential judgment received against the Company and awarded to the claimant is expected to be immaterial. At January 31, 2012, the claimant has engaged a firm to perform an audit on the expenses associated with Mt. Lucas.

25



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

NOTE 13:            SUPPLEMENTAL CASH FLOW INFORMATION

    January 31, 2012     January 31, 2011  
Cash and Cash Equivalents Consist of:            
 Cash in bank $  6,525,677   $  4,946,147  
 Term deposits   10,326,658     28,733,658  
  $  16,852,335   $  33,679,805  

During the six months ended January 31, 2012, as a result of the merger with Concentric, the Company issued 1,603,440 common shares and 375,834 warrants with a combined fair value of $5,195,797 and made cash payments totaling $500,000. Additionally, the Company settled with certain Series “A” and “B” convertible debenture holders through a shares-for-debt arrangement whereby a total 72,703 common shares of the Company with a fair value of $231,195 were issued.

During the three months ended January 31, 2012, the Company issued 300,000 common shares with fair value of $915,000 and made cash payment of $84,640 for acquisition of the Workman Creek Project.

NOTE 14:            CONVERTIBLE DEBENTURES

On September 9, 2011, as a result of the merger with Concentric, the Company assumed liability for certain Series “A” and “B” convertible debentures that were previously issued by Concentric in the aggregate principal amount of $1,127,020.

The Series “A” convertible debentures, comprised of $628,376 in aggregate principal accruing interest at 15% annually, are convertible into shares of Concentric at $0.90 per share and mature on December 31, 2012. The Series “B” convertible debentures, comprised of $498,644 in aggregate principal accruing interest at 15% annually, are convertible into shares of Concentric at $1.22 per share and mature on April 22, 2013 and May 21, 2013. At September 9, 2011, the combined fair value of the Series “A” and “B” convertible debentures was estimated to be $1,707,938.

On September 26, 2011, the Company settled with certain Series “A” convertible debenture holders for cash payments totaling $1,051,854, resulting in a reduction of the Series “A” convertible debentures of $721,646 and the recognition of a loss on settlement of convertible debentures of $330,208.

On November 28, 2011, the Company settled partial Series “B” convertible debentures with a cash payment of $318,632, resulting the reduction of the convertible debentures of $626,919 and recognition of a gain on settlement of convertible debentures of $308,287 on the statement of operations and comprehensive loss.

On December 21, 2011, the Company settled certain Series “A” and the remaining “B” convertible debentures with an aggregate value of $75,714 through the issuance of 72,703 common shares of the Company at $3.18 per share. As a result, a loss on settlement of convertible debentures of $155,481 was recorded on the statements of operations and comprehensive loss, and the amount of the convertible debentures was reduced by $229,747 which represents the fair value on the settlement date.

26



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)

During the three and six months ended January 31, 2012, the Company recognized an unrealized loss in fair value of convertible debentures of $22,484 and $48,439 respectively.

At January 31, 2012, the fair value of the remaining Series “A” convertible debentures is presented below:

    Quoted Prices in     Significant     Significant  
    Active Markets for     Other Observable     Unobservable  
    Identical Assets     Inputs     Inputs  
    (Level 1 )   (Level 2 )   (Level 3 )
Convertible Debentures $  -   $  -   $  178,066  

Subsequent to January 31, 2012, the Company settled the remaining Series “A” convertible debentures through the issuance of 55,805 common shares of the Company with a fair value of $219,892, resulting in the reduction of the convertible debentures of $179,308, revalued at the settlement dates. The loss resulted will be recorded on the consolidated statements of operations and comprehensive loss for the period ended April 30, 2012.

NOTE 15:            SEGMENT INFORMATION

The Company currently operates in a single reportable segment and is focused on uranium mining and related activities, including exploration, development, extraction and processing of uranium concentrates, with the majority of the Company’s assets located in the United States. During the six months ended January 31, 2012, the Company completed two sales of uranium concentrates to one customer comprising all of the Company’s external revenue source.

NOTE 16:            SUBSEQUENT EVENTS

Other than disclosed elsewhere in this consolidated financial statement, the Company had the following material subsequent events:

  • Pursuant to an Arrangement Agreement dated January 20, 2012 (the “Arrangement Agreement”), the Company plans to acquire all of the outstanding shares of Cue Resources Ltd. (“Cue”) which would result in the acquisition of an undivided 100% interest in the 230,650-hectare Yuty Project located in southeastern Paraguay. In accordance with the Arrangement Agreement, Cue’s shareholders will receive 0.0195 of one share of the Company’s common stock for every one share of Cue common stock, resulting in the issuance of 2,375,035 shares of the Company to the former Cue shareholders. Holders of Cue share purchase warrants with exercise prices ranging from $0.12 to $0.15 per share will receive 0.0195 of one share purchase warrant of the Company for every one Cue share purchase warrant, resulting in the issuance of share purchase warrants of the Company exercisable at prices ranging from $6.15 to $7.69 per share. Holders of Cue stock options with exercise prices ranging from $0.10 to $0.45 per share will receive 0.0195 of one stock option of the Company for every one Cue stock option, resulting in the issuance of stock options of the Company exercisable at prices ranging from $5.13 to $23.08 per share. Holders of Cue broker options issued as part of a November 2010 private placement with an exercise price of $0.07 per share will receive 0.0195 of one broker option of the Company for every one Cue broker option, resulting in the issuance of broker options of the Company exercisable at a price of $3.59 per share.

    The Arrangement Agreement is subject to regulatory and court approvals and the satisfaction of certain closing conditions, including the approval of at least two-thirds of the votes cast at a special meeting of the Cue shareholders scheduled to take place on or about March 26, 2012.

27



URANIUM ENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
JANUARY 31, 2012
(Unaudited)
  • The Company entered into a Property Acquisition Agreement dated October 14, 2011, as amended on February 28, 2012, with three Paraguayan companies to acquire an undivided 100% interest in two prospecting permits covering approximately 247,000 acres, with an option to acquire interests in an additional four prospecting licenses covering approximately 493,000 acres, for a total of 740,000 acres located in the area of the Coronel Oviedo Project, subject to a 1.5% gross overriding royalty. The Company has the exclusive right and option at any time to acquire one-half percent (0.5%) of the gross overriding royalty for $166,667, including a right of first refusal to acquire all or any portion of the remaining one percent (1.0%). Prior to closing, satisfactory due diligence must be completed by the Company including receipt of approval at the ministerial level by the Paraguayan Government. Upon closing, the Company will be required to make a cash payment of $7,500 and issue 100,000 restricted shares.

  • In February 2012, the Company acquired certain mineral and surface rights located in Texas by paying $1.3 million.

28


Item 2.        Management's Discussion and Analysis of Financial Condition and Results of Operations

The following management’s discussion and analysis of the Company’s financial condition and results of operations contain forward-looking statements that involve risks, uncertainties and assumptions including, among others, statements regarding our capital needs, business plans and expectations. In evaluating these statements, you should consider various factors including the risks, uncertainties and assumptions set forth in reports and other documents of the Company filed with or furnished to the SEC, including, without limitation, this Form 10-Q filing for the six months ended January 31, 2012 and the Form 10-K filing for the fiscal year ended July 31, 2011 including the consolidated financial statements and related notes contained therein. These factors, or any one of them, may cause the actual results to differ materially from any forward-looking statement made in this document. Refer to “Item 1A. Risk Factors under Part II - Other Information”.

Results of Operations for the Three and Six Months Ended January 31, 2012 and 2011

General

For the three and six months ended January 31, 2012, the Company recorded a net loss of $6,547,244 ($0.09 per share) and $12,105,556 ($0.16 per share), respectively. The Company currently operates in a single reportable segment and is focused on uranium mining and related activities, including exploration, development, extraction and processing of uranium concentrates. Over 90% of the assets of the Company are located in the United States.

During the six months ended January 31, 2012, the Company completed two sales of uranium concentrates which accounted for all the Company’s external revenue.

Revenues and Cost of Sales

The Company commenced uranium production at its Palangana Mine in November 2010. In October 2011 and January 2012, the Company completed two sales of uranium concentrates under the terms of its existing offtake agreement, fulfilling its delivery commitments for the first year. For the three and six months ended January 31, 2012, sales of uranium concentrates totaled 60,000 pounds and 120,000 pounds at $52 per pound, generating revenues of $3,120,000 and $6,240,000, respectively.

For the three and six months ended January 31, 2012, cost of sales was $1,740,768 and $3,160,854, respectively. Cost of sales for uranium concentrates is determined using the weighted average cost per pound at the end of the month prior to the month in which the sale occurs, plus royalty obligations and other direct selling costs.

For the three and six months ended January 31, 2012, the Company generated a gross profit of $1,379,232 and $3,079,146, respectively.

Expenses

For the three and six months ended January 31, 2012 and 2011, total expenses incurred by the Company were $8,200,155 and $15,121,016 (2011: $6,653,592 and $15,563,754), respectively. In general, both mineral property expenditures and general and administrative expenses, excluding stock based compensation, have increased.

Mineral property expenditures during the three and six months ended January 31, 2012 and 2011 were $4,162,690 and $6,895,291 (2011: $2,098,052 and $5,536,991), respectively. These amounts include expenditures relating to property maintenance, exploration, development including permitting and all other non-production related activities on the Company’s uranium projects. As disclosed under Risk Factors, the Company has not established proven and probable reserves through the completion of feasibility studies for any of its mineral properties in accordance with SEC Industry Guide 7. Accordingly, all expenditures relating to exploration and development activities are expensed as incurred.

29


The following table set forth the mineral property expenditures for the Company’s major projects incurred during the three and six months ended January 31, 2012 and 2011:

    Three Months Ended January 31,     Six Months Ended January 31,  
    2012     2011     2012     2011  
                         
Mineral Property Expenditures                        
 Palangana Mine $  2,531,871   $  1,306,179   $  4,367,433   $  4,431,557  
 Goliad Project   210,040     186,419     306,978     258,506  
 Salvo Project   448,922     307,407     553,499     379,021  
 Nichols Project   -     6,406     150,000     15,496  
 Anderson Project   34,435     -     153,893     -  
 Coronel Oviedo Project   642,496     -     905,863     -  
 Other Mineral Property Expenditures   294,926     291,641     457,625     452,411  
  $  4,162,690   $  2,098,052   $  6,895,291   $  5,536,991  

General and administrative expenses during the three and six months ended January 31, 2012 and 2011 were $3,715,568 and $7,605,249 (2011: $4,294,662 and $9,510,594), respectively. General and administrative expenses decreased overall as a result of a significant decrease in stock based compensation expense.

For the three and six months ended January 31, 2012 and 2011, general and administrative expenses were comprised, respectively, of salaries, management and consulting fees of $1,217,832 and $1,649,262 (2011: $1,054,049 and $1,400,502), office, communications and travel of $1,744,231 and $3,157,005 (2011: $1,422,013 and $2,643,759), and professional fees of $78,513 and $617,670 (2011: $215,057 and $525,234). These expenses have generally increased reflecting an increased level of general and administrative support, which includes the recent addition of a Paraguayan office, required to advance projects such as the recently acquired Anderson and Workman Creek Projects and the Coronel Oviedo Project in Paraguay.

For the three and six months ended January 31, 2012 and 2011, stock-based compensation of $674,992 and $2,181,312 (2011: $1,603,543 and $4,941,099) is also included in general and administrative expenses. This decrease is primarily the result of fewer stock options in general granted to employees, officers and consultants.

Depreciation, depletion and accretion during the three and six months ended January 31, 2012 and 2011 were $321,897 and $620,476 (2011: $260,878 and $516,169), respectively. The increase was primarily due to general exploration and development assets acquired through the normal course of business as well as the accretion of asset retirement obligations.

Production and Inventories

During the three and six months ended January 31, 2012, the Palangana Mine produced 38,000 and 105,000 pounds of uranium concentrates (three and six months ended January 31, 2011: Nil). During the three and six months ended January 31, 2012, the Hobson Facility processed 42,000 and 111,000 pounds of uranium concentrates. As at January 31, 2012, the Hobson Facility has processed a total of 236,000 pounds of uranium concentrates since the commencement of production at the Palangana Mine.

As at January 31, 2012, the total value of inventories were $3,044,257, of which $2,710,427 (89%) represents the value of finished goods-uranium concentrates, $313,246 (10%) represents the value of work-in-progress and $20,584 (1%) represents the value of supplies. The cash component(1) of the total value of inventories was $2,392,217, and the non-cash component(1) of the total value of inventory was $652,040. As at January 31, 2012, the Company had available for sale a total of 116,000 pounds of uranium concentrates.

  (1)

Cash component and non-cash component are key indicators not defined under US GAAP and are non-GAAP measures. Cash component is calculated as the total inventory value less the non-cash component of the inventory value. The non-cash component is comprised of depreciation, depletion and stock-based compensation.

30


Transactions with Officers and Directors

During the three and six months ended January 31, 2012, the Company had transactions with certain officers and directors of the Company as follows:

  • incurred $16,167 and $50,860 (three and six months ended January 31, 2011: $39,050 and $80,125) in general and administrative costs paid to a company controlled by a direct family member of a current officer; and

  • incurred $18,347 and $131,176 in administrative services and associated expense reimbursements paid to a company controlled by a current director. In addition, an amount of $179,904 was incurred during the three and six months ended January 31, 2011 for finder’s fees related to private placements.

At January 31, 2012, amounts owed to related parties totaled $3,247 (July 31, 2011: $8,287).

Liquidity and Capital Resources

    January 31, 2012     July 31, 2011  
Cash and cash equivalents $  16,852,335   $  30,724,051  
Working capital   15,727,852     30,020,926  
Total assets   62,967,078     65,390,985  
Total liabilities   6,629,469     6,268,194  
Shareholders' equity   56,337,609     59,122,791  

As at January 31, 2012, the Company had $16,852,335 in cash and cash equivalents and working capital of $15,727,852. Net cash decreased by $13,871,716 during the six months ended January 31, 2012 compared to an increase of $12,612,143 during the six months ended January 31, 2011.

Operating Activities

Net cash used in operating activities during the six months ended January 31, 2012 was $10,345,556 (six months ended January 31, 2011: $13,707,216). Significant operating expenditures during the current period included mineral property expenditures, production costs and general and administrative expenses. During the six months ended January 31, 2012, the Company incurred production costs of $2,124,069 (six months ended January 31, 2011: $Nil). In addition, during the six months ended January 31, 2012, the Company settled asset retirement obligations in cash for a total of $458,920 (six months ended January 31, 2011: $862,092) and settled accounts payables assumed from the acquisition of Concentric Energy Corp. with cash payment of $152,045 (six months ended January 31, 2011: $Nil).

Financing Activities

Net cash used in financing activities during the six months ended January 31, 2012 was $1,360,462 (net cash provided by financing activities during the six months ended January 31, 2011: $28,685,165) resulting from shares issued for cash of $15,064 (six months ended January 31, 2011: $28,731,994 from private placement), cash paid for settlement of convertible debentures of $1,370,486 (six months ended January 31, 2011: $Nil) and payment to related parties of $5,040 (six months ended January 31, 2011:$46,829).

Investing Activities

Net cash used in investing activities during the six months ended January 31, 2012 was $2,165,698 (six months ended January 31, 2011: $2,365,806) resulting from acquisition of mineral rights and properties of $1,044,442 (six months ended January 31, 2011: $243,391), purchase of property, plant and equipment of $551,996 (six months ended January 31, 2011: $246,817), loan to Cue Resources Ltd. of $334,065 associated with the acquisition of mineral properties (six months ended January 31, 2011: $Nil) and reclamation deposit paid of $235,195 (six months ended January 31, 2011: $1,876,298).

31


Stock Options and Warrants

As at January 31, 2012, we had 9,552,000 stock options and 1,124,612 share purchase warrants outstanding. The outstanding stock options have a weighted average exercise price of $1.91 per share and the outstanding warrants have a weighted average exercise price of $6.60 per share. As at January 31, 2012, outstanding stock options and warrants totaled 10,676,612 shares issuable for gross proceeds of approximately $25,665,876 should these options and warrants be exercised in full. At January 31, 2012, outstanding, in-the-money stock options and warrants totaled 8,470,000 shares issuable for gross proceeds of approximately $15,076,115 should these options and warrants be exercised in full. The exercise of these stock options and warrants is at the discretion of the respective holders and, accordingly, there is no assurance that any of these stock options or warrants will be exercised in the future.

Plan of Operations

Our primary plan of operations for the next twelve months is to expand production at the Palangana Mine, continue development of the Goliad Project towards production and continue with the exploration of Salvo, Anderson, Paraguay and other mineral projects.

At January 31, 2012, the Company had $16.9 million in cash and cash equivalents and working capital of $15.7 million. It is anticipated that existing cash resources will be sufficient to carry out the Company’s plan of operations including exploration and development activities for the next twelve months. Beyond the next twelve months, the Company may be required to obtain additional financing in order to continue our plan of operations. It is anticipated that additional financing will be in the form of equity financing from the sale of the Company’s common stock, for example, through the S-3 “Shelf” Registration Statement that became effective on September 2, 2011 or other appropriate methods. We cannot provide any assurance that we will be able to generate sufficient financing from the sale of our common stock to fund our plan of operations and intended growth. In the absence of such financing, we may not be able to continue exploration or development of our mineral rights and, conceptually, may be forced to abandon our projects.

Other options include entering into a joint venture arrangement to provide the required funding to advance our uranium projects, provided a third party would enter into a joint venture agreement with us in order to fund development or exploration of our projects. If we entered into a joint venture arrangement, we would likely have to assign a percentage of our interest in our projects to the joint venture partner.

Material Commitments

Material commitments of the Company since the filing of the Form 10-K for the year ended July 31, 2011 increased by the following:

  • Office space leases have increased the commitments by $32,000 resulting from the Anderson Acquisition and the addition of the Company’s Paraguayan office.
  • Consulting agreements have decreased the commitments by $54,000 as a result of entering and renewing various consulting agreements.

Off-Balance Sheet Arrangements

The Company does not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to investors.

Critical Accounting Policies

Below outlines describes the Company’s critical accounting policies in managements opinion, however refer to Note 2 of Item 1: Financial Statements which discloses all of the Company’s accounting policies.

32


Inventories

Inventories are comprised of supplies, uranium concentrates and work-in-progress. Expenditures include mining and processing activities that will result in future production of uranium concentrates and depreciation and depletion charges. Mining and processing activities include labor, chemicals and other directly attributable production expenditures. Inventories are valued and charged to cost of sales using the weighted average costing method and are carried at the lower of cost or net realizable value.

Mineral Rights

Expenditures relating to the acquisition of mineral rights are capitalized as incurred. Expenditures relating to exploration activities are expensed as incurred, while those relating to development activities are expensed when incurred prior to the completion of a bankable feasibility study establishing proven and probable reserves. Once proven and probable reserves are established, subsequent development expenditures relating to that project are capitalized.

Upon commencement of production, the project’s capitalized expenditures are depleted over proven and probable reserves using the units-of-production method. Where proven and probable reserves have not been established, such capitalized expenditures are depleted over the estimated production life using the straight-line method. The Company has not established proven or probable reserves on any of its projects.

The carrying values of the mineral rights are assessed for impairment by management on a quarterly basis. Should management determine that these carrying values cannot be recovered, the unrecoverable amounts are written off against earnings.

Restoration and Remediation Costs (Asset Retirement Obligations)

Various federal and state mining laws and regulations require the Company to reclaim the surface areas and restore underground water quality for its mine projects to the pre-existing mine area average quality after the completion of mining.

Future reclamation and remediation costs, which include production equipment removal and environmental remediation, are accrued based on management's best estimate at the end of each period of the costs expected to be incurred at each project. Such estimates are determined by the Company's engineering studies calculating the cost of future surface and groundwater activities, current regulations, actual expenses incurred, and technology and industry standards.

In accordance with ASC 410, Asset Retirement and Environmental Obligations, the Company capitalizes the measured fair value of asset retirement obligations to mineral rights and properties. The asset retirement obligations are accreted to an undiscounted value until the time at which they are expected to be settled. The accretion expense is charged to the statement of operations and comprehensive loss and actual retirement costs are recorded against the asset retirement obligations when incurred. Any difference between the recorded asset retirement obligations and the actual retirement costs incurred will be recorded as a gain or loss in the period of settlement.

On a quarterly basis, the Company updates cost estimates, and other assumptions used in the valuation of asset retirement obligations at each of its mineral properties to reflect new events, changes in circumstances and any new information that is available. Changes in these costs have a corresponding impact on the asset retirement obligations.

Revenue Recognition

The recognition of revenue from the sale of uranium concentrates is in accordance with the guidelines outlined in ASC Section 605-10-25 Revenue Recognition. The Company delivers its uranium concentrates to a uranium storage facility and once the product is confirmed to meet the required specifications, the Company receives credit for a specified quantity measured in pounds. Future sales of uranium concentrates are expected to generally occur under uranium supply agreements or on the uranium spot market. Once a sale of uranium concentrates is negotiated, the Company will notify the uranium storage facility with instructions for a title transfer to the customer. Revenue is recognized once a title transfer of the uranium concentrates is confirmed by the uranium storage facility at which point the customer is invoiced by the Company.

33


Subsequent Events

The Company had the following material subsequent events to report:

  • Pursuant to an Arrangement Agreement dated January 20, 2012 (the “Arrangement Agreement”), the Company plans to acquire all of the outstanding shares of Cue Resources Ltd. (“Cue”) which would result in the acquisition of an undivided 100% interest in the 230,650-hectare Yuty Project located in southeastern Paraguay. In accordance with the Arrangement Agreement, Cue’s shareholders will receive 0.0195 of one share of the Company’s common stock for every one share of Cue common stock, resulting in the issuance of 2,375,035 shares of the Company to the former Cue shareholders. Holders of Cue share purchase warrants with exercise prices ranging from $0.12 to $0.15 per share will receive 0.0195 of one share purchase warrant of the Company for every one Cue share purchase warrant, resulting in the issuance of share purchase warrants of the Company exercisable at prices ranging from $6.15 to $7.69 per share. Holders of Cue stock options with exercise prices ranging from $0.10 to $0.45 per share will receive 0.0195 of one stock option of the Company for every one Cue stock option, resulting in the issuance of stock options of the Company exercisable at prices ranging from $5.13 to $23.08 per share. Holders of Cue broker options issued as part of a November 2010 private placement with an exercise price of $0.07 per share will receive 0.0195 of one broker option of the Company for every one Cue broker option, resulting in the issuance of broker options of the Company exercisable at a price of $3.59 per share.

    The Arrangement Agreement is subject to regulatory and court approvals and the satisfaction of certain closing conditions, including the approval of at least two-thirds of the votes cast at a special meeting of the Cue shareholders scheduled to take place on or about March 26, 2012.

  • The Company entered into a Property Acquisition Agreement dated October 14, 2011, as amended on February 28, 2012, with three Paraguayan companies to acquire an undivided 100% interest in two prospecting permits covering approximately 247,000 acres, with an option to acquire interests in an additional four prospecting licenses covering approximately 493,000 acres, for a total of 740,000 acres located in the area of the Coronel Oviedo Project, subject to a 1.5% gross overriding royalty. The Company has the exclusive right and option at any time to acquire one-half percent (0.5%) of the gross overriding royalty for $166,667, including a right of first refusal to acquire all or any portion of the remaining one percent (1.0%). Prior to closing, satisfactory due diligence must be completed by the Company including receipt of approval at the ministerial level by the Paraguayan Government. Upon closing, the Company will be required to make a cash payment of $7,500 and issue 100,000 restricted shares.

  • In February 2012, the Company acquired certain mineral and surface rights located in Texas by paying $1.3 million.

34


Item 3.        Quantitative and Qualitative Disclosures about Market Risk

We are subject to market risk related to the market price of uranium. We have one uranium sales agreement based upon the market price of uranium at the time of delivery, and since future sales of uranium concentrates are expected to generally occur under this uranium supply agreement or through the uranium spot market, fluctuations in the market price of uranium would have a direct impact on our revenues and cash flows.

We are subject to market risk related to foreign currency exchange rate fluctuations. Our functional currency is the United States dollar, however, a portion of our business is transacted in other currencies including the Canadian dollar and Paraguayan Guarani. To date, these fluctuations have not had a material impact on our results of operations. We do not use derivative financial instruments for speculative trading purposes, nor do we hedge our foreign currency exposure to manage our foreign currency fluctuation risk.

35


Item 4.        Controls and Procedures

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Principal Executive Officer and Principal Financial Officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of the end of the period covered by this report. Based on such evaluation, our Principal Executive Officer and Principal Financial Officer have concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective.

It should be noted that any system of controls is based in part upon certain assumptions designed to obtain reasonable (and not absolute) assurance as to its effectiveness, and there can be no assurance that any design will succeed in achieving its stated goals.

Changes in Internal Controls

There have been no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the six months ended January 31, 2012, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

36


PART II – OTHER INFORMATION

Item 1.        Legal Proceedings

As of the date of this Quarterly Report, there are no material pending legal proceedings, other than ordinary routine litigation incidental to our business, to which the Company or any of its subsidiaries is a party or of which any of their property is subject, and no director, officer, affiliate or beneficial owner of more than 5% of our common stock, or any associate or any such director, officer, affiliate or beneficial owner, is (i) a party adverse to us in any legal proceeding, or (ii) has an adverse interest to us in any legal proceeding. Other than as disclosed below, management is not aware of any other material legal proceedings pending or that have been threatened against us or our properties.

On February 23, 2011, the Company received notification of a lawsuit filed against the Company related to the acquisition of South Texas Mining Venture, L.L.P. (“STMV”) for an unspecified amount. Pursuant to the acquisition terms, the claimant is entitled to the difference between the estimated $2.2 million in reclamation costs associated with Mt. Lucas and the actual reclamation costs associated with Mt. Lucas, provided the actual costs are less than the $2.2 million, subject to the receipt of a clearance certificate from the Texas Commission on Environmental Quality which has yet to be issued. The Company believes it has complied with all of the terms related to the acquisition of STMV as current reclamation costs associated with Mt. Lucas are greater than $2.2 million. The Company intends on disputing any and all claims under this lawsuit. Any potential judgment received against the Company and awarded to the claimant is expected to be immaterial. At January 31, 2012, the claimant has engaged a firm to perform an audit on the expenses associated with Mt. Lucas.

Effective September 9, 2011, as the result of the merger with Concentric, the Company assumed all of Concentric’s rights and obligations. On June 16, 2010 (the “Petition Date”), an involuntary bankruptcy petition (the “Petition”) was filed by certain holders of Series “A” convertible debenture (the “Debentures”) against Concentric in the United States Bankruptcy Court 2 in and for the District of Arizona. Prior to and after the Petition Date, the Petitioners sent Concentric letters alleging defaults under the Debentures and requesting acceleration of amounts due under the Debentures. The Company and the Petitioners agreed to settle all claims and potential claims raised in the Bankruptcy case and the Debentures, and have entered into a Settlement Agreement and Mutual Release dated October 4, 2011 (the “Settlement Agreement”). Pursuant to the Settlement Agreement, the Company delivered a cash settlement payment of $1,051,854 (the “Settlement Payment”) to the Petitioners' counsel as payment in full of the Debentures. In addition, pursuant to the Settlement Agreement, the parties thereunder caused their respective attorneys to sign and file a stipulation to dismiss the Petition and the Bankruptcy case. Upon entry by the Bankruptcy Court of a dismissal order, Petitioners’ counsel will be authorized to disperse the Settlement Payment to the Petitioners. On October 12, 2011, the United States Bankruptcy Court for the District of Arizona approved the dismissal of the involuntary petition filed on June 16, 2010.

37


Item 1A.    Risk Factors

In addition to the information contained in our Form 10-K Annual Report for the fiscal year ended July 31, 2011 and this Form 10-Q Quarterly Report, the following list of material risks and uncertainties should be carefully reviewed by our stockholders and any potential investors in evaluating our Company, our business and the market value of our common stock. Any one of these risks and uncertainties has the potential to cause material adverse effects on our business, prospects, financial condition and operating results which could cause actual results to differ materially from any forward-looking statements expressed by us and a significant decrease in the market price of our common stock.

There is no assurance that we will be successful in preventing the material adverse effects that any of the following risks and uncertainties may cause, or that these potential risks and uncertainties are a complete list of the risks and uncertainties facing us. Furthermore, there may be additional risks and uncertainties that we are presently unaware of, or presently consider immaterial, that may become material in the future and have a material adverse effect on us. You could lose all or a significant portion of your investment due to any of these risks and uncertainties.

Risks Related to Our Company and Business

Evaluating our future performance may be difficult since we have a limited financial and operating history, with significant negative cash flow and net losses to date. Furthermore, the success of the Company will depend ultimately on our ability to achieve and maintain profitability from our mining operations.

Uranium Energy Corp. was incorporated on May 16, 2003 as a precious metals explorer and subsequently changed our business operations to focus on uranium properties in the United States. Since then, we have been engaged in uranium exploration and development programs and mining operations on properties located in the United States and, most recently, Paraguay. We commenced uranium production for the first time at our Palangana Mine in November 2010 and generated uranium concentrates sales during the six months ended January 31, 2012. We also hold certain mineral property interests in various stages of exploration and development in the States of Arizona, Colorado, New Mexico, Texas and Wyoming and in the area of Coronel Oviedo, Paraguay. The Company has not established proven or probable reserves on any of its mineral properties.

The Company has a history of significant negative cash flow and net losses since its inception to January 31, 2012 totaling $107.8 million. Although we generated revenue from sales of uranium concentrates in Fiscal 2012, we do not expect to achieve profitability or develop positive cash flow from operations in the near term. Historically, we have been reliant primarily on equity financings to fund our ongoing operations and we expect this reliance to continue for the foreseeable future.

As a result of our limited financial and operating history, including significant negative cash flow and net losses to date, it may be difficult to evaluate the future performance of the Company. Furthermore, the long-term success of the Company’s business including its ability to acquire additional uranium projects and continue with its exploration, development and production activities on existing uranium projects will depend ultimately on our ability to achieve and maintain profitability and to develop positive cash flow from operations.

The uranium industry is capital intensive, and we will require significant additional financing to acquire additional uranium projects and continue with our exploration and development programs and mining operations on our existing uranium projects.

The uranium industry is capital intensive, and we will require significant additional financing to acquire additional uranium projects and continue with our exploration and development programs and mining operations on our existing uranium projects. Without such additional financing, we will be required to curtail or abandon any one or all of these activities.

Historically, we have relied on equity financing as our primary source of financing. Our ongoing reliance on equity financing and its availability whenever such additional financing is required will be dependent on many factors, including but not limited to general market conditions and the market value of our common stock. We may also be required to seek other forms of financing such as joint ventures, debt financing or other arrangements. We also filed a Form S-3 “Shelf” Registration Statement that became effective September 2, 2011 which provides for the offer and sale of certain securities of the Company from time to time, at its discretion, up to an aggregate public offering of $50 million. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us.

38


Uranium exploration and development programs and mining operations are inherently subject to many significant risks and uncertainties and actual results may differ significantly from estimated amounts.

Uranium exploration and development programs and mining operations are inherently subject to many significant risks and uncertainties.

Uranium exploration is frequently non-productive, in which case the uranium project may be abandoned and written-off. Furthermore, we will not be able to recover the funds that we incur on our exploration programs if we do not establish ore bodies that contain commercially recoverable uranium on our mineral projects and develop these into profitable mining operations. There is no assurance that we will be successful in establishing ore bodies that contain commercially recoverable uranium.

Whether an ore body contains commercially recoverable uranium depends on many factors including, without limitation: (i) the particular attributes of the deposit such as size, grade and proximity to infrastructure; (ii) the market price of uranium, which may be volatile; and (iii) government regulations and regulatory requirements including, without limitation, those relating to environmental protection, permitting and land use, taxes, land tenure and transportation. We have neither established nor have plans on establishing proven and probable reserves through the completion of feasibility studies in accordance with SEC Industry Guide 7 on our mineral projects on which we are currently utilizing or planning on utilizing in-situ recovery mining.

Our long-term success will depend on our ability to establish ore bodies that contain commercially recoverable uranium and to develop these into profitable mining operations. Mining operations have many risks and uncertainties including, but not limited to: (i) significantly higher than expected capital costs to construct the mine; (ii) significantly higher than expected actual production costs; and (iii) mine production being below expectations. There is no assurance that any ore body that we may develop into a mine will become profitable.

Uranium exploration and development programs and mining operations are subject to many risks beyond our control including, but not limited to: (i) unanticipated ground and water conditions and adverse claims to water rights; (ii) unusual or unexpected geological formations; (iii) metallurgical and other processing problems; (iv) the occurrence of unusual weather or operating conditions and other force majeure events; (v) lower than expected ore grades; (vi) industrial accidents; (vii) delays in the receipt of or failure to receive necessary government permits; (viii) delays in transportation; (ix) availability of contractors and labor; (x) government permit restrictions and regulation restrictions; (xi) unavailability of materials and equipment; and (xii) the failure of equipment or processes to operate in accordance with specifications or expectations. These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties; personal injury; environmental damage; delays in mining; increased production costs; monetary losses; and legal claims.

If we become subject to liability, we may not be able or may elect not to insure against such risk due to high insurance premiums or other reasons. Where coverage is available and not prohibitively expensive relative to the perceived risk, we will maintain insurance against such risk, subject to exclusions and limitations. However, we cannot provide any assurance that such insurance will continue to be available at reasonable premiums or that such insurance will be adequate to cover any resulting liability.

The uranium industry is subject to numerous stringent laws, regulations and standards, including environment protection laws and regulations. If any changes occur that would make these laws, regulations and standards more stringent, it may require capital outlays in excess of those anticipated or cause substantial delays, which would have a material adverse effect on our operations.

Uranium exploration and development programs and mining operations are subject to numerous stringent laws, regulations and standards at the federal, state, and local levels governing permitting, development, production, exports, taxes, labor standards, occupational health, waste disposal, protection and reclamation of the environment, protection of endangered and protected species, mine safety, hazardous substances and other matters. Our compliance with these requirements requires significant financial and personnel resources.

39


The laws, regulations, policies or current administrative practices of any government body, organization or regulatory agency in the United States or any other applicable jurisdiction, may change or be applied or interpreted in a manner which may also have a material adverse effect on our operations. The actions, policies or regulations, or changes thereto, of any government body or regulatory agency or special interest group, may also have a material adverse effect on our operations.

Uranium exploration and development programs and mining operations are subject to stringent environmental protection laws and regulations at the federal, state, and local levels. These laws and regulations, which include permitting and reclamation requirements, regulate emissions, water storage and discharges and disposal of hazardous wastes. Uranium mining operations are also subject to laws and regulations which seek to maintain health and safety standards by regulating the design and use of mining methods. Various permits from governmental and regulatory bodies are required for mining to commence or continue, and no assurance can be provided that required permits will be received in a timely manner.

Our compliance costs including the posting of surety bonds associated with environmental protection laws and regulations and health and safety standards have been significant to date, and are expected to increase in scale and scope as we expand our operations in the future. Furthermore, environmental protection laws and regulations may become more stringent in the future, and compliance with such changes may require capital outlays in excess of those anticipated or cause substantial delays, which would have a material adverse effect on our operations.

To the best of our knowledge, our operations are in compliance, in all material respects, with all applicable laws, regulations and standards. If we become subject to liability for any violations, we may not be able or may elect not to insure against such risk due to high insurance premiums or other reasons. Where coverage is available and not prohibitively expensive relative to the perceived risk, we will maintain insurance against such risk, subject to exclusions and limitations. However, we cannot provide any assurance that such insurance will continue to be available at reasonable premiums or that such insurance will be adequate to cover any resulting liability.

Major nuclear incidents may have adverse effects on the nuclear and uranium industries.

The nuclear incident that occurred in Japan in March 2011 had significant and adverse effects on both the nuclear and uranium industries. If another nuclear incident were to occur, it may have further adverse effects for both industries. Public opinion of nuclear power as a source of electricity generation may be adversely affected, which may cause governments of certain countries to further increase regulation for the nuclear industry, reduce or abandon current reliance on nuclear power or reduce or abandon existing plans for nuclear power expansion. Any one of these occurrences has the potential to reduce current and/or future demand for nuclear power, resulting in lower demand for uranium and lower market prices for uranium, adversely affecting the Company’s operations and prospects. Furthermore, the growth of the nuclear and uranium industries is dependent on continuing and growing public support of nuclear power a source of electricity generation.

The marketability of uranium concentrates will be affected by numerous factors beyond our control which may result in our inability to receive an adequate return on our invested capital.

The marketability of uranium concentrates produced by us will be affected by numerous factors beyond our control. These factors include macroeconomic factors, fluctuations in the market price of uranium, governmental regulations, land tenure and use, regulations concerning the importing and exporting of uranium and environmental protection regulations. The future effects of these factors cannot be accurately predicted, but any one or a combination of these factors may result in our inability to receive an adequate return on our invested capital.

The uranium industry is highly competitive and we may not be successful in acquiring additional projects.

The uranium industry is highly competitive, and our competition includes larger, more established companies with longer operating histories that not only explore for and produce uranium, but also market uranium and other products on a regional, national or worldwide basis. Due to their greater financial and technical resources, we may not be able to acquire additional uranium projects in a competitive bidding process involving such companies. Additionally, these larger companies have greater resources to continue with their operations during periods of depressed market conditions.

40


We hold mineral rights in foreign jurisdictions which could be subject to additional risks due to political, taxation, economic and cultural factors.

We hold certain mineral rights located in Paraguay through the acquisition of a 100% interest in Piedra Rica Mining S.A., a company incorporated in Paraguay. Operations in foreign jurisdictions outside of the U.S. and Canada, especially in developing countries, may be subject to additional risks as they may have different political, regulatory, taxation, economic and cultural environments that may adversely affect the value or continued viability of our rights. These additional risks include, but are not limited to: (i) changes in governments or senior government officials; (ii) changes to existing laws or policies on foreign investments, environmental protection, mining and ownership of mineral interests; (iii) renegotiation, cancellation, expropriation and nationalization of existing permits or contracts; (iv) foreign currency controls and fluctuations; and (v) civil disturbances, terrorism and war.

We depend on certain key personnel, and our success will depend on our continued ability to retain and attract such qualified personnel.

Our success is dependent on the efforts, abilities and continued service of certain senior officers and key employees and consultants, especially Amir Adnani, President and Chief Executive Officer, and Harry Anthony, Chief Operating Officer. A number of our key employees and consultants have significant experience in the uranium industry. A loss of service from any one of these individuals may adversely affect our operations, and we may have difficulty or may not be able to locate and hire a suitable replacement.

Certain directors and officers may be subject to conflicts of interest.

The majority of our directors and officers are involved in other business ventures including similar capacities with other private or publicly-traded companies. Such individuals may have significant responsibilities to these other business ventures, including consulting relationships, which may require significant amounts of their available time. Conflicts of interest may include decisions on how much time to devote to our business affairs and what business opportunities should be presented to us. Our Code of Business Conduct for Directors, Officers and Employees provides for guidance on conflicts of interest.

Nevada law and our Articles of Incorporation may protect our directors and officers from certain types of lawsuits.

Nevada law provides that our directors and officers will not be liable to the Company or its stockholders for monetary damages for all but certain types of conduct as directors and officers. Our Bylaws provide for broad indemnification powers to all persons against all damages incurred in connection with our business to the fullest extent provided or allowed by law. These indemnification provisions may require us to use our limited assets to defend our directors and officers against claims, and may have the effect of preventing stockholders from recovering damages against our directors and officers caused by their negligence, poor judgment or other circumstances.

A majority of our directors and officers are residents outside of the U.S., and it may be difficult for stockholders to enforce within the U.S. any judgments obtained against us or any of our directors or officers.

A majority of our directors and officers are nationals and/or residents of countries other than the U.S., and all or a substantial portion of such persons' assets are located outside of the U.S. As a result, it may be difficult for investors to effect service of process on our directors and officers, or enforce within the U.S. any judgments obtained against us or our directors and officers, including judgments predicated upon the civil liability provisions of the securities laws of the U.S. or any state thereof. Consequently, stockholders may be effectively prevented from pursuing remedies against us or our directors and officers under U.S. federal securities laws. In addition, stockholders may not be able to commence an action in a Canadian court predicated upon the civil liability provisions under U.S. federal securities laws. The foregoing risks also apply to those experts identified in this document that are not residents of the U.S.

41


Disclosure controls and procedures and internal control over financial reporting, no matter how well designed and operated, are designed to obtain reasonable, and not absolute, assurance as to its reliability and effectiveness.

Management’s evaluation on the effectiveness of disclosure controls and procedures is designed to ensure that information required for disclosure in our public filings is recorded, processed, summarized and reported on a timely basis to our senior management, as appropriate, to allow timely decisions regarding required disclosure. Management’s report on internal control over financial reporting is designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use and transactions are properly recorded and reported. Any system of controls, no matter how well designed and operated, is based in part upon certain assumptions designed to obtain reasonable, and not absolute, assurance as to its reliability and effectiveness.

Risks Related to the Company’s Common Stock

Historically, the market price of our common stock has been and may continue to fluctuate significantly.

On September 28, 2007, our common stock commenced trading on the NYSE Amex Equities Exchange (formerly known as the American Stock Exchange) and prior to that, traded on the OTC Bulletin Board. The global stock markets have experienced significant and increased volatility, especially over the last few years. Although this volatility is often unrelated to specific company performance, it can have an adverse effect on the market price of our common stock. Historically, the market price of our common stock has fluctuated significantly, and may continue to do so in the future.

In addition to the volatility associated with general economic trends and market conditions, the market price of our common stock could decline significantly due to the impact of any one or more events, including, but not limited to, the following: (i) volatility in the uranium market; (ii) occurrence of a major nuclear incident; (iii) changes in the outlook for the nuclear power and uranium industries; (iv) failure to meet market expectations on our exploration, development or production activities, including abandonment of key uranium projects; (v) sales of a large number of our common stock held by certain stockholders including institutions and insiders; (vi) downward revisions to estimates on us by securities analysts; (vii) removal from market indices; (viii) legal claims brought forth against us; or (ix) introduction of technological innovations by competitors or in competing technologies.

A prolonged decline in the market price of our common stock could affect our ability to obtain additional financing which would adversely affect our operations.

During the recent past, the global markets have been impacted by the effects of mass sub-prime mortgage defaults and liquidity problems of the asset-backed commercial paper market, which have resulted in a number of large financial institutions requiring government bailouts or filing for bankruptcy. The effects of these past events and any similar events in the future may continue to or further affect the global markets, which may directly affect the market price of our common stock and our accessibility for additional financing.

Historically, we have relied on equity financing as our primary source of financing. A prolonged decline in the market price of our common stock or a reduction in our accessibility to the global markets may result in our inability to secure additional financing which would have an adverse effect on our operations.

Additional issuances of our common stock may result in significant dilution to our existing stockholders and reduce the market value of their investment.

Issuances of our common stock for additional financing, mergers and acquisitions and for other reasons may result in significant dilution to our existing stockholders, including a reduction in the proportionate ownership and voting power and a decrease in the market price of our common stock. We also filed a Form S-3 “Shelf” Registration Statement that became effective September 2, 2011 which provides for the offer and sale of certain securities of the Company from time to time, at its discretion, up to an aggregate public offering of $50 million.

42


Our common stock is currently classified as a "penny stock" under SEC rules which may limit the market for our common stock.

Under SEC rules, a "penny stock" generally refers to securities of companies that trade below $5.00 per share. Historically, the trading price of our common stock has fluctuated significantly and has traded above and below $5.00 per share. At January 31, 2012, the trading price of our common stock closed at $3.60 per share and was therefore classified as a penny stock. SEC Rule 15g-9 of the Exchange Act imposes additional sales practice requirements on broker-dealers that recommend the purchase or sale of penny stocks to persons other than those who qualify as an "established customer" or an "accredited investor." This includes the requirement that a broker-dealer must make a determination that investments in penny stocks are suitable for the customer and must make special disclosures to the customers concerning the risk of penny stocks. Many broker-dealers decline to participate in penny stock transactions because of the extra requirements imposed on penny stock transactions. Application of the penny stock rules to our common stock from time to time may limit our market liquidity, which in turn affects the ability of our stockholders to resell their shares at prices at or above their cost.

43


Item 2.        Unregistered Sales of Equity Securities and Use of Proceeds

The Company made the following issuance of common stock that were not registered under the Securities Act of 1933, as amended (the “Securities Act”) during the Company’s fiscal quarter ended January 31, 2012:

On each of November 15, 2011 and December 16, 2011, the Company issued 5,000 shares of restricted common stock at a deemed issuance price of $3.37 per share to one shareholder pursuant to the terms of a consulting agreement. With respect to such issuances, the Company relied on an exemption from the registration requirements under the Securities Act pursuant to Regulation S and /or Section 4(2).

On November 29, 211, the Company issued 300,000 shares of restricted common stock at a deemed issuance price of $3.15 per share to one shareholder as partial consideration for the purchase of an interest in certain mining claims in Arizona. With respect to such issuance, the Company relied on an exemption from the registration requirement under the Securities Act pursuant to Section 4(2).

On December 19, 2011, the Company issued an aggregate of 72,703 shares of restricted commons stock at a deemed issuance price of $3.20 per share to four shareholders in settlement of certain convertible debentures. With respect to such issuances, the Company relied on an exemption from the registration requirements under the Securities Act Pursuant to Rule 506 and/or Section 4(2), based on representations by such shareholders in subscription agreements with the Company.

Item 3.        Defaults Upon Senior Securities

None.

Item 4.        (Removed and Reserved)

Not applicable.

Item 5.        Other Information

None.

Item 6.        Exhibits

The following exhibits are included with this Quarterly Report on Form 10-Q:

Exhibit Description of Exhibit
   
31.1

Certification of Chief Executive Officer pursuant to Securities Exchange Act of 1934 Rule 13a-14(a) or 15d-14(a).

 

31.2

Certification of Chief Financial Officer pursuant to Securities Exchange Act of 1934 Rule 13a-14(a) or 15d-14(a).

 

32.1

Certifications pursuant to Securities Exchange Act of 1934 Rule 13a-14(b) or 15d-14(b) and 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

44


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

URANIUM ENERGY CORP.

/s/ “Amir Adnani”  
Amir Adnani  
President, Chief Executive Officer and Principal Executive Officer  
Date: March 9, 2012  
   
   
   
   
/s/ “Mark Katsumata”  
Mark Katsumata  
Secretary, Treasurer and Chief Financial Officer  
Date: March 9, 2012  

45